US3922859A - Control system for a power producing unit - Google Patents

Control system for a power producing unit Download PDF

Info

Publication number
US3922859A
US3922859A US465705A US46570574A US3922859A US 3922859 A US3922859 A US 3922859A US 465705 A US465705 A US 465705A US 46570574 A US46570574 A US 46570574A US 3922859 A US3922859 A US 3922859A
Authority
US
United States
Prior art keywords
vapor
set point
point value
temperature
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US465705A
Inventor
Oliver W Durrant
Robert R Walker
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Babcock and Wilcox Co
Original Assignee
Babcock and Wilcox Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Babcock and Wilcox Co filed Critical Babcock and Wilcox Co
Priority to US465705A priority Critical patent/US3922859A/en
Priority to DE19752518353 priority patent/DE2518353A1/en
Priority to ES437201A priority patent/ES437201A1/en
Priority to CA225,992A priority patent/CA1011198A/en
Priority to IT09419/75A priority patent/IT1028815B/en
Priority to AU80626/75A priority patent/AU484728B2/en
Priority to GB17970/75A priority patent/GB1509743A/en
Priority to ZA00752786A priority patent/ZA752786B/en
Priority to BE156002A priority patent/BE828640A/en
Priority to SE7505065A priority patent/SE407258B/en
Priority to FR7513505A priority patent/FR2269633B1/fr
Priority to JP50051606A priority patent/JPS6224608B2/ja
Application granted granted Critical
Publication of US3922859A publication Critical patent/US3922859A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/02Controlling, e.g. stopping or starting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D17/00Regulating or controlling by varying flow
    • F01D17/20Devices dealing with sensing elements or final actuators or transmitting means between them, e.g. power-assisted
    • F01D17/22Devices dealing with sensing elements or final actuators or transmitting means between them, e.g. power-assisted the operation or power assistance being predominantly non-mechanical

Definitions

  • ABSTRACT [52] US. Cl. 60/665 [51 lnt. C1. F01K 13/02 A control system for a power producing unit arranged [58] Field of Search 60/660-667, f li g o eration including means for the rapid 6 652; 290/2; 4 loading and unloading of the unit and on-line variable pressure operation throughout a selected load range. [56] References Cited UNITED STATES PATENTS 14 Claims, 3 Drawing Figures 3,338,053 8/1967 Gorzegno ct a1.
  • This invention relates to a control system for power producing units and more particularly to a control system for fossil fuel fired electric power producing units such as found in modern central stations.
  • nuclear units come into operation, there are strong incentives for them to be base loaded because of their low incremental fuel cost and because of operating restrictions.
  • other units in the system must be capable of changing load frequently and rapidly, including complete shutdown during periods of low system demand.
  • Typical cycling units may, for example, be rated at between 400-600 MW with initial steam conditions of 2400 psig and 1000F.
  • the steam usually passes first through a high pressure turbine, thence through a reheater pass in the steam generator wherein the steam is raised to a hot reheat temperature of 1000F, thence through an intermediate pressure turbine and thence through a low pressure to a condenser.
  • the turbine valves are utilized to obtain short-term transient changes in steam flow to the turbine to thereby satisfy, temporarily, load changes, while firing is adjusted to maintain balance between energy input and output to and from the unit on a relatively long term steady state basis.
  • firing rate may be controlled to maintain a programmed gas temperature at a selected point in the boiler during start-up and low loads and by MW demand during on-line operation.
  • the demand for energy input to the unit is established to meet the requirements of various conditions such as, but not necessarily limited to load, steam pressure and temperature, by firing the boiler to meet the highest of these requirements, while the lower ranking demands are accommodated by control instrumentalities such as super heater division and super heater by-pass valves, and by steam and water attemerators.
  • the steam generating section and primary super heater of the boiler are maintained at set point pressure, thereby maintaining a relatively large amount of energy storage which may be borrowed from or added to to meet rapid load changes and reducing the amount of over firing or under firing required to satisfy load changes and to minimize start-up times.
  • FIG. 1 is a block diagram of the basic steam-water cycle of a power producing unit.
  • FIG. 2 is a block diagram of the air-gas cycle of the boiler shown in FIG. 1.
  • FIG. 3 is a block diagram of our invention as applied to the power producing unit illustrated in FIGS. 1 and 2.
  • FIG. 1 there is shown the elementary steamwater cycle for a more or less conventional generator-turbine generator power producing unit comprising a steam generator, or boiler, generally indicated at I and a turbine-generator unit generally indciated at 2, having a high pressure (HP) turbine 3, an
  • IP turbine 4 intermediate pressure (IP) turbine 4 and a low pressure (LP) turbine 5.
  • LP turbine 5 low pressure turbine 5.
  • IP intermediate pressure
  • LP low pressure
  • the HP turbine 3, IPturbine 5 drive a single generator 6, producing electric power transmitted therefrom by conductors 7, 8 and 9.
  • each turbine unit may be arranged to drive a separate generator all feeding into a common buss.
  • the particular arrangement of turbine-generator which may be used forms no part of the present invention.
  • FIG. 2 there is shown in elementary form the air-gas cycle for thesteam generator 1.
  • Air for combustion supplied by forced draft fan 21, passes through an air heater 22 and is discharged into furnace 19.
  • Fuel which may be oil, gas, coal, or a combination thereof, is discharged into furnace 19 from any conventional means (not shown, but schematically represented by line 23).
  • Flue gas leaving the economizer 18 may also be recirculated into the furnace 19 by gas recirculating fan 25 as one of controlling the temperature of the hot reheat steam discharged from reheater 11 within part or all of the nor mal operating range of the unit.
  • the rate of flow of recirculated gas is maintained in inverse proportion to the heat or energy input to the steam generator l.
  • the order shown in which the products of combustion pass over the several heating sections is not the exclusive order. The order may be, for example, primary superheater, secondary superheater, and reheater: or secondary superheater, primary superheater,
  • a by-pass system is provided around the primary and secondary superheaters comprising a conduit 26 having its inlet connected to the inlet of the primary superheater and its discharge opening into the condenser 12 which is arranged to receive and condense the steam transmitted through conduit 26 for return to the feedwater system. Further, as shown, provisions are made for diverting steam from the conduit 26, through a conduit 27, to the outlet of the secondary superheater 10 and from the conduit 26, through a conduit 28 to the outlet of the reheater. The diversion of substantially saturated steam into the superheated and hot reheat steam to the turbine provides a means for moderating the temperatures thereof as may be required during start-up and low load operations.
  • FIG. 3 the control system as applied to the power generating unit illustrated in FIGS. 1 and 2 is shown in block diagram form.
  • the control components so represented or hardware, as it is sometimes called, are commercially available and their operation well understood by those familiar with the art.
  • the primary controllers shown in FIG. 3 have been referred into FIGS. 1 and 2 as have the final control elements.
  • start-up In the operation of cycling units there are two types of start-up which may be defined as, cold start and hot start. Regardless of the boiler-turbine condition i.e. whether hot or cold or at an intermediate temperature, on-line operation can be reached most quickly by firing the boiler to satisfy the most citical requirement and satisfying the other requirements by auxiliary control instrumentalities.
  • start-up it may be assumed that the steam generating section and primary superheater of the boiler are at relatively high pressure and at saturation temperature whereas the secondary superheater and reheater are at relatively low temperature, under such conditions the most critical requirement is uperheated steam temperature, accordingly the boiler is fired to raise this temperature at the maximum allowable rate, and if necessary steam may be dumped to the condenser to maintain boiler pressure at the desired value.
  • the unit load demand signal may be established by an automatic load dispatch system as shown as 29, or by other automatic or manual means, inputing to a primary control signal generator 30, the purpose of which is to generate a feed forward control signal corresponding to the desired energy output of the power producing unit.
  • Also inputing into unit 32 is a signal corresponding to megawatts output generated in transmitter 34 which signal may be considered a feedback signal and the unit 32 generating an output demand signal as required to maintain equality between the two signals inputing thereto.
  • the primary control signal is also transmitted over line 31 to a Throttle Pressure Ramp Development Unit 35 provided with manually adjustable selectors 36, 38, and 37 whereby the minimum, maximum and rarnp throttle pressures respectively may be established.
  • max. throttle pressure may be set at 2400 psi
  • min. throttle pressure at 600 psi and the ramp set to vary the throttle pressure from 600 psi to 2400 psi from 20% full load to full load. That is to say, unit 35 develops a turbine throttle pressure demand signal transmitted over line 39, demanding, until the 20% load point is reached a constant pressure of 600 psi, and thence a throttle pressure increasing as load demand increases until the 70% load point is reached and thereafter to full load a constant pressure of 2400 psi.
  • Adjusters 36, 37 and 38 enable an operator to set, as desired, the minimum, and maximum throttle pressures and the load span covered by the ramp.
  • the steam flow demand signal transmitted over line 33 adjusts in parallel fuel flow control valve 40 and air flow control damper unit 41 to thereby maintain energy input to the unit in accordance with energy demand.
  • the steam flow demand signal is also transmitted over line 33 to turbine steam flow control valves 42 to maintain a rate of flow of steam to high pressure turbine 3 in accordance with steam flow demand.
  • the turbine valves will, for the min., and max. and ramp pressures heretofore described remain approximately 70% open from min. pressure to max. pressure as established at the 70% load point and thereafter proportionality as load demand increases. However, throughout the min.
  • control valves will modulate from the 70% open position to immediately satisfy demands for increasing or decreasing steam flow, but will be restored to the 70% open position as such changes in demand are satisfied by changes in firing rate. That is to say, transient changes in load demand are satisfied by borrowing from or giving to the energy storage in the boiler and the energy storage is then brought to its desired level by appropriate changes in the firing rate.
  • the throttle pressure demand signal is transmitted through line 39 to a Throttle Pressure and Sequence Unit 43, also receiving a signal proportional to actual throttle pressure generated in pressure controller 44 and generating an output signal transmitted along line 45 to position valve 46, located between primary superheater 20 and secondary superheater 10 as required to maintain throttle pressure at the desired value.
  • valve 46 acts as a down stream pressure regulator to maintain throttle pressure at the programmed value as established in unit 35.
  • the throttle pressure program control signal is also transmitted along line 39 to a Boiler Pressure Program Control Unit 47, also receiving a signal proportional to actual primary superheater outlet pressure generated in pressure controller 48, and generating an output signal, varying in functional relationship to turbine pressure, transmitted along line 49, which after various modifying devices is effective, through summing unit 50, to modulate the firing rate as required to maintain steam pressure at the primary superheater outlet at the desired value.
  • firing rate must be modified to maintain the most critical condition at desired value and maintain other conditions at desired value by various auxiliary control instrumentalities.
  • hot-start wherein boiler pressure through the primary superheater is at approximately the desired value
  • cold-start wherein boiler and turbine are at low temperatures.
  • the primary consideration is that mismatch between steam temperatures and turbine metal temperatures must be maintained within acceptable limits, while raising steam and metal temperatures as rapidly as possible to bring the unit on line in minimum time.
  • the unit is fired as required to maintain the condition, among the conditions such as, but not necessarily limited to throttle pressure, gas temperature at the steam outlets of the secondary superheater and reheater and superheated steam pressure, having the greatest demand at the programmed value.
  • a control signal upon valve 46 being unable to satisfy the demand for throttle pressure is transmitted through line 51 to a high signal selector 52 into which is also introduced a control signal, through line 53, proportional to the deviation in gas temperature from the programmed value and a control signal through line 54 proportional to the deviation in throttle pressure from the programmed value.
  • the highest of these signals is then transmitted through line 55 to summing unit 50 and effective to modify the firing rate as required to maintain the selected condition at the programmed value.
  • the gas temperature control signal, transmitted through line 33, is generated in a programming unit 56 which is responsive to the steam flow demand signal transmitted through line 33 and signal corresponding to actual gas temperature generated in temperature controller 57.
  • a programming unit 56 which is responsive to the steam flow demand signal transmitted through line 33 and signal corresponding to actual gas temperature generated in temperature controller 57.
  • the temperature controller 57 responds to the gas temperature at this point.
  • gas temperature can be used as an index of steam temperature only under startup and low flow conditions, conveniently the gas temperature controller 57 may be of the retractable type and withdrawn from the gas duct during operation of the unit in the normal operating range, when gas temperatures may be far in excess of the superheat and reheat steam temperatures.
  • Temperature Rate of Change Development Unit 59 responsive to manually set signals generated in stations 60, 61 and 62 establish a signal corresponding to initial desired steam temperature and increasing at an adjustable rate until corresponding in value to the desired on-line operation temperature.
  • the initial temperature is ordinarily set to give a desired temperature differential between steam and turbine metal temperatures and the rate of change set to increase steam temperature from initial to final value as required to maintain the difference between steam temperature and turbine metal temperature within prescribed limits.
  • the initial temperature may be 6001 the rate of change F per hour and the final temperature 10001
  • Control unit 64 generated an output signal corresponding to the difference between the signals generated in unit 59 and superheated steam temperature controller 63 which may further be modified by a feed forward signal generated in flow controller 65 responsive to the rate of air flow to the furnace 19.
  • the output signal from unit 64 controls saturated steam attemporator valve 66 introducing relatively cool steam into the superheated steam to thereby restore the steam temperature to the desired value.
  • the control signal generated in unit 64 is effective through control unit 67 to adjust the firing rate in an increasing sense.
  • the control arrangement is such that the signal values corresponding to the decrease in actual steam temperature below the programmed value is effective for modulating the firing rate, whereas only signal values corresponding to the increase in actual steam temperature above the programmed value is effective for modulating, by means of valve 66, the flow of saturated steam into the superheat steam.
  • superheated steam temperature may be controlled throughout the normal operating range by introducing water as required through water attemporator valve 68 responsive to a signal generated in unit 64 corresponding to deviation in actual superheated steam temperature from the programmed value (normally the final steam temperature as set in manual station 62).
  • Reheat steam temperature control is generally similar to that described for superheat steam temperature control.
  • a signal output from temperature ramp unit 59 through line 68 is transmitted to control unit 69 wherein it is compared with a signal corresponding to actual steam reheat temperature generated in temperature controller 70.
  • Also introduced into control unit 69 is the feed forward signal, transmitted along line 71, from air flow controller 65.
  • the output signal generated in control unit 69 is transmitted to a sequence controller 72, operating in sequence steam attemporator valve 73, gas recirculating control damper unit 74 and reheat water attemporator control valve 75. Similar to the operation of the superheat steam control instrumentalities, the steam attemporator is effective during certain start-up conditions when firing to maintain the most critical condition produces a high reheat temperature.
  • gas recirculation is effective to control reheat temperature, in general a rate of recirculation varying inversely with rating being required. At high ratings, when gas recirculation is reduced to a minimum, reheat steam temperature is effectively'controlled by means of water attemporator.
  • a control system for a power producing unit comprising a vapor generator and a turbine-generator supplied with vapor from said vapor generating unit
  • the combination comprising; a first means generating a first feed forward signal corresponding to the desired power output of the power producing unit, a second means responsive to said first feed forward signal generating a second feed forward signal proportional in value to said first feed forward signal modified by the difference between desired and actual power output of the power producing unit, a third means responsive to said second feed forward signal maintaining the rate of flow of vapor to the turbine proportional to said second feed forward signal, a fourth means responsive to said first feed forward signal maintaining the pressure of the vapor admitted to said turbine at a set point value varying in a first functional relationship to said first feed forward signal and a fifth means responsive to said first feed forward signal maintaining the pressure in said vapor generator at a set point value varying in a second functional relationship to said first feed forward signal.
  • said fifth means includes means venting vapor from said vapor generator as required to inhibit the pressure in said vapor generator from exceeding set point value.
  • said vapor generator is provided with fuel and air supply means and wherein said fifth means includes means adjusting the rates of fuel and air supplied said vapor generator as required to maintain the pressure in said vaporv generator in said second functional relationship to said first feed-forward signal.
  • said fourth means includes manually adjustable means establishing an initial set point value, a final set point value and the desired rate of change in set point value with the magnitude of said first forward signal from said initial set point value to said final set point value.
  • said vapor generator is provided with'a primary superheater, a secondary super-heater and a control valve for regulating the flow of vapor from the primary to the secondary superheater and wherein said turbine is provided with admission valves for regulating the flow of vapor into said turbine and wherein said third means includes means adjusting said admission valves as re.-
  • said fourth means includes means adjusting said control valve as required to maintain the pressure of the vapor on the inlet side of said admission valves at a set point value varying in functional relationship to said first feed forward signal.
  • a start-up system for a power producing unit comprising a vapor generator provided with fuel and air supply means, a primary and a secondary superheater and a reheater, and a turbine-generator comprising a high pressure unit supplied vapor from said secondary superheater, a lower pressure unit supplied vapor from said reheater and a condenser condensing vapor discharged from said lower pressure unit, the combination comprising; means selecting the one of a plurality of measured conditions in said power producing unit having the greatest deviation from set point value generating a control signal varying in functional relationship with said deviation, means responsive to said control signal adjusting the rates of fuel and air supplied said vapor generator as required to maintain said selected one of the plurality of measured conditions at set point value and auxiliary instrumentalities maintaining the other of said plurality of measured conditions at set point values.
  • a start-up system as set forth in claim 6 wherein said vapor generator is provided with a vapor by-pass from the vapor inlet of said secondary superheater to said condenser, one of said plurality of conditions is the vapor pressure at the vapor outlet of said primary superheater and one of said auxiliary instrumentalities includes means responsive to the deviation in said vapor pressure above set point value and means responsive to said last named means adjusting the rate of flow of vapor through said vapor by-pass to reduce said vapor pressure to set point value.
  • a start-up system as set forth in claim 6 wherein said vapor generator is provided with a vapor by-pass from the vapor inlet of said primary superheater to the vapor outlet of said secondary superheater, one of said plurality of conditions is the temperature of the vapor discharged from said secondary superheater and one of said auxiliary instrumentalities includes means responsive to the deviation in said vapor temperature above set point value, and means responsive to said last named means adjusting the rate of flow of vapor through said last named vapor by-pass to reduce said vapor temperature to set point value.
  • one of said plurality of conditions is the temperature or the vapor discharged from said reheater and one of said auxiliary instrumentalities includes means responsive to the deviation in said reheated vapor temperature above set point value, and means responsive to said last named means adjusting the rate of flow of vapor through said last named vapor by-pass to reduce said reheated steam temperature to set point value.
  • vaporgenerator is provided with a valve in the vapor conduit between said primary and secondary superheaters and one of said auxiliary instrumentalities includes means responsive to the deviation in pressure of the vapor at the inlet tosaid high pressure turbine from set point value. and means responsive to said last named means adjusting said valve to maintain said last named pressure at set point value.
  • said plurality of measured conditions includes pressure of the vapor at the inlet to said high pressure turbine, temperature of the flue gas in said vapor generator between said secondary superheater and said reheater, pressure of the vapor is said vapor generator at the outlet of the primary superheater and temperature of the vapor at the inlet to said high pressure turbine.
  • said one of a plurality of measured conditions is the temperature of the flue gas between said primary and secondary superheaters
  • said one of a plurality of measured conditions is the temperature of the flue gas between said primary and secondary superheaters, means responsive to said temperature generating a control signal varying in accordance with changes in said flue gas temperature from set point, means generating a feedforward signal varying in functional relationship with the desired power output from said power producing unit, means responsive to said feedforward signal raising said set point in functional relationship with increases in said feedforward signal, and means responsive to said control signal adjusting the rates of fuel and air supplied said vapor generator as required to maintain said flue gas temperature at set point.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)
  • Control Of Turbines (AREA)
  • Control Of Eletrric Generators (AREA)
  • Discharge Heating (AREA)
  • Control Of Multiple Motors (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

A control system for a power producing unit arranged for cycling operation including means for the rapid loading and unloading of the unit and on-line variable pressure operation throughout a selected load range.

Description

United States Patent Durrant et a1. 1 1 Dec. 2, 1975 1 1 CONTROL SYSTEM FOR A POWER 1411737 12/1968 Shinskey 60/667 PRODUCING UNIT 3.545.207 12/1970 Barber ct a1. 60/667 6 3,561,216 2/1971 Moore, .Ir. i 60/646 [75] Inven or i r rr n Bath Township; 3,802,189 4/1974 Jenkins,lr. 60/665 Robert R. Walker, Euclid, both of Ohio Primary Examiner-Martin P. Schwadron [73] Asslgnee ggi gfg i Company Assistant ExaminerAllen M. Ostrager Attorney, Agent, or FirmJohn F. Luhrs 122] Filed: Apr. 30, 1974 121 App]. No.1 465,705
[57] ABSTRACT [52] US. Cl. 60/665 [51 lnt. C1. F01K 13/02 A control system for a power producing unit arranged [58] Field of Search 60/660-667, f li g o eration including means for the rapid 6 652; 290/2; 4 loading and unloading of the unit and on-line variable pressure operation throughout a selected load range. [56] References Cited UNITED STATES PATENTS 14 Claims, 3 Drawing Figures 3,338,053 8/1967 Gorzegno ct a1. 60/646 PRIMARY REHEATER El XJNOMIZER CONTROL SYSTEM FOR A POWER PRODUCING UNIT This invention relates to a control system for power producing units and more particularly to a control system for fossil fuel fired electric power producing units such as found in modern central stations. As nuclear units come into operation, there are strong incentives for them to be base loaded because of their low incremental fuel cost and because of operating restrictions. As a result other units in the system must be capable of changing load frequently and rapidly, including complete shutdown during periods of low system demand. Typical cycling units may, for example, be rated at between 400-600 MW with initial steam conditions of 2400 psig and 1000F. In such units, the steam usually passes first through a high pressure turbine, thence through a reheater pass in the steam generator wherein the steam is raised to a hot reheat temperature of 1000F, thence through an intermediate pressure turbine and thence through a low pressure to a condenser.
As such units may be operated at partial load over extended periods of time, it is an objective of our invention to provide a control system wherein throttle pressure is programmed in accordance with load, thereby increasing the thermal efficiency of the unit and maintaining a substantially constant turbine impulse chamber steam temperature throughout the load range, permitting rapid load change without thermal shock to the turbine.
Further, in accordance with our invention, the turbine valves are utilized to obtain short-term transient changes in steam flow to the turbine to thereby satisfy, temporarily, load changes, while firing is adjusted to maintain balance between energy input and output to and from the unit on a relatively long term steady state basis.
Further, in accordance with our invention, firing rate may be controlled to maintain a programmed gas temperature at a selected point in the boiler during start-up and low loads and by MW demand during on-line operation.
Further, in accordance with our invention, during start-up and on-line transient conditions, the demand for energy input to the unit is established to meet the requirements of various conditions such as, but not necessarily limited to load, steam pressure and temperature, by firing the boiler to meet the highest of these requirements, while the lower ranking demands are accommodated by control instrumentalities such as super heater division and super heater by-pass valves, and by steam and water attemerators.
Further, in accordance with our invention, throughout start-up and on-line operation, the steam generating section and primary super heater of the boiler are maintained at set point pressure, thereby maintaining a relatively large amount of energy storage which may be borrowed from or added to to meet rapid load changes and reducing the amount of over firing or under firing required to satisfy load changes and to minimize start-up times.
These and further objectives of our invention will be apparent as the description proceeds in connection with the drawings, in which:
IN THE DRAWINGS FIG. 1 is a block diagram of the basic steam-water cycle of a power producing unit.
FIG. 2 is a block diagram of the air-gas cycle of the boiler shown in FIG. 1.
FIG. 3 is a block diagram of our invention as applied to the power producing unit illustrated in FIGS. 1 and 2.
DETAILED DESCRIPTION Referring to FIG. 1 there is shown the elementary steamwater cycle for a more or less conventional generator-turbine generator power producing unit comprising a steam generator, or boiler, generally indicated at I and a turbine-generator unit generally indciated at 2, having a high pressure (HP) turbine 3, an
intermediate pressure (IP) turbine 4 and a low pressure (LP) turbine 5. As shown, the HP turbine 3, IPturbine 5 drive a single generator 6, producing electric power transmitted therefrom by conductors 7, 8 and 9. Alternately, each turbine unit may be arranged to drive a separate generator all feeding into a common buss. The particular arrangement of turbine-generator which may be used forms no part of the present invention.
Steam discharged from secondary superheater 10 of steam generator 1 passes through I-IP turbine 3, thence through reheater 11. The hot reheat steam then passes through IP turbine 4, LP turbine 5 and is discharged into condenser 12. Condensate from condenser 12 is pumped by condensate pump 13 through a low pressure heater string 14, heated by extraction steam from LP turbine 5, into deaerating heater 15, also heated by extraction steam. Feedwater is drawn from the deaerating heater 15 by boiler feed pump 16 and is discharged through high pressure heaters 17, also heated by extraction steam, into steam generator 1 shown as having an economizer l8, furnace 19 and primary superheater 20 in addition to secondary superheater 10 and reheater 11 previously mentioned. Flow control valve 16A is shown as representative of any one of several conventional control means which may be employed to regulate the flow of feedwater to the boiler.
Referring to FIG. 2 there is shown in elementary form the air-gas cycle for thesteam generator 1. Air for combustion, supplied by forced draft fan 21, passes through an air heater 22 and is discharged into furnace 19. Fuel, which may be oil, gas, coal, or a combination thereof, is discharged into furnace 19 from any conventional means (not shown, but schematically represented by line 23). The gasses of combustion, or flue gas, as it is commonly called, leaving furnace 19, pass through secondary superheater l0, reheater l1, primary superheater 20, economizer 18, air heater 22 and induced draft fan 24 whence they are discharged to the atmosphere through a stack (not shown). Flue gas leaving the economizer 18 may also be recirculated into the furnace 19 by gas recirculating fan 25 as one of controlling the temperature of the hot reheat steam discharged from reheater 11 within part or all of the nor mal operating range of the unit. In general, the rate of flow of recirculated gas is maintained in inverse proportion to the heat or energy input to the steam generator l. The order shown in which the products of combustion pass over the several heating sections is not the exclusive order. The order may be, for example, primary superheater, secondary superheater, and reheater: or secondary superheater, primary superheater,
and reheater.
A by-pass system is provided around the primary and secondary superheaters comprising a conduit 26 having its inlet connected to the inlet of the primary superheater and its discharge opening into the condenser 12 which is arranged to receive and condense the steam transmitted through conduit 26 for return to the feedwater system. Further, as shown, provisions are made for diverting steam from the conduit 26, through a conduit 27, to the outlet of the secondary superheater 10 and from the conduit 26, through a conduit 28 to the outlet of the reheater. The diversion of substantially saturated steam into the superheated and hot reheat steam to the turbine provides a means for moderating the temperatures thereof as may be required during start-up and low load operations.
Referring now to FIG. 3, the control system as applied to the power generating unit illustrated in FIGS. 1 and 2 is shown in block diagram form. The control components so represented or hardware, as it is sometimes called, are commercially available and their operation well understood by those familiar with the art. Furthermore we have chosen to represent the control system in block diagram form to avoid identification of the control system with any particular type of control, such as pneumatic hydraulic, electronic, electric or any combination of these, as the invention may be incorporated in any one of these. The primary controllers shown in FIG. 3 have been referred into FIGS. 1 and 2 as have the final control elements. Further, in the interests of brevity, conventional local feedback control loops customarily associated with final control elements have been omitted, their purpose being to maintain the value of the controlled variable in predetermined functional relationship to the value of the control signal. It should also be understood that conventional control actions such as set point, summing, integral, derivitive and reset are to be considered as included in the various control loops when as and if required, their use and application being well understood.
In the operation of cycling units there are two types of start-up which may be defined as, cold start and hot start. Regardless of the boiler-turbine condition i.e. whether hot or cold or at an intermediate temperature, on-line operation can be reached most quickly by firing the boiler to satisfy the most citical requirement and satisfying the other requirements by auxiliary control instrumentalities. For example, for a hot start it may be assumed that the steam generating section and primary superheater of the boiler are at relatively high pressure and at saturation temperature whereas the secondary superheater and reheater are at relatively low temperature, under such conditions the most critical requirement is uperheated steam temperature, accordingly the boiler is fired to raise this temperature at the maximum allowable rate, and if necessary steam may be dumped to the condenser to maintain boiler pressure at the desired value. Conversely under cold start conditions it is necessary to heat up the boiler to generate steam flow. This consequently raises steam temperatures when the turbine is cold and accordingly needs to be reduced. Thus under cold start conditions the critical requirement is boiler pressure which controls the firing rate whereas excessive steam temperatures are reduced by the use of steam and water attemperators. Regardless of the type of start the control system automatically selects the critical requirement and controls firing accordingly while maintaining other critical conditions at set point values through selected control instrumentalities.
Referring to FIG. 3, the unit load demand signal may be established by an automatic load dispatch system as shown as 29, or by other automatic or manual means, inputing to a primary control signal generator 30, the purpose of which is to generate a feed forward control signal corresponding to the desired energy output of the power producing unit. The feed forward primary control signal transmitted over signal conductor 31, as modified in Load Error Correct Unit 32, generates a steam flow demand signal transmitted over line 33. Also inputing into unit 32 is a signal corresponding to megawatts output generated in transmitter 34 which signal may be considered a feedback signal and the unit 32 generating an output demand signal as required to maintain equality between the two signals inputing thereto.
The primary control signal is also transmitted over line 31 to a Throttle Pressure Ramp Development Unit 35 provided with manually adjustable selectors 36, 38, and 37 whereby the minimum, maximum and rarnp throttle pressures respectively may be established. As an example, max. throttle pressure may be set at 2400 psi, min. throttle pressure at 600 psi, and the ramp set to vary the throttle pressure from 600 psi to 2400 psi from 20% full load to full load. That is to say, unit 35 develops a turbine throttle pressure demand signal transmitted over line 39, demanding, until the 20% load point is reached a constant pressure of 600 psi, and thence a throttle pressure increasing as load demand increases until the 70% load point is reached and thereafter to full load a constant pressure of 2400 psi. Adjusters 36, 37 and 38 enable an operator to set, as desired, the minimum, and maximum throttle pressures and the load span covered by the ramp.
The steam flow demand signal transmitted over line 33, after modification as here and after described, adjusts in parallel fuel flow control valve 40 and air flow control damper unit 41 to thereby maintain energy input to the unit in accordance with energy demand. The steam flow demand signal is also transmitted over line 33 to turbine steam flow control valves 42 to maintain a rate of flow of steam to high pressure turbine 3 in accordance with steam flow demand. By virtue of the variable pressure operation, the turbine valves will, for the min., and max. and ramp pressures heretofore described remain approximately 70% open from min. pressure to max. pressure as established at the 70% load point and thereafter proportionality as load demand increases. However, throughout the min. and ramp pressures, the control valves will modulate from the 70% open position to immediately satisfy demands for increasing or decreasing steam flow, but will be restored to the 70% open position as such changes in demand are satisfied by changes in firing rate. That is to say, transient changes in load demand are satisfied by borrowing from or giving to the energy storage in the boiler and the energy storage is then brought to its desired level by appropriate changes in the firing rate.
The throttle pressure demand signal is transmitted through line 39 to a Throttle Pressure and Sequence Unit 43, also receiving a signal proportional to actual throttle pressure generated in pressure controller 44 and generating an output signal transmitted along line 45 to position valve 46, located between primary superheater 20 and secondary superheater 10 as required to maintain throttle pressure at the desired value. in general terms it may said that valve 46 acts as a down stream pressure regulator to maintain throttle pressure at the programmed value as established in unit 35.
The throttle pressure program control signal is also transmitted along line 39 to a Boiler Pressure Program Control Unit 47, also receiving a signal proportional to actual primary superheater outlet pressure generated in pressure controller 48, and generating an output signal, varying in functional relationship to turbine pressure, transmitted along line 49, which after various modifying devices is effective, through summing unit 50, to modulate the firing rate as required to maintain steam pressure at the primary superheater outlet at the desired value.
During start-up, as heretofore described firing rate must be modified to maintain the most critical condition at desired value and maintain other conditions at desired value by various auxiliary control instrumentalities. At one extreme there is the so called hot-start wherein boiler pressure through the primary superheater is at approximately the desired value, and at the other extreme the so called cold-start wherein boiler and turbine are at low temperatures. Regardless of the type of start, the primary consideration is that mismatch between steam temperatures and turbine metal temperatures must be maintained within acceptable limits, while raising steam and metal temperatures as rapidly as possible to bring the unit on line in minimum time.
During start-up regardless of whether a cold, hot or intermediate start, the unit is fired as required to maintain the condition, among the conditions such as, but not necessarily limited to throttle pressure, gas temperature at the steam outlets of the secondary superheater and reheater and superheated steam pressure, having the greatest demand at the programmed value. To this end, for example, a control signal upon valve 46 being unable to satisfy the demand for throttle pressure, is transmitted through line 51 to a high signal selector 52 into which is also introduced a control signal, through line 53, proportional to the deviation in gas temperature from the programmed value and a control signal through line 54 proportional to the deviation in throttle pressure from the programmed value. The highest of these signals is then transmitted through line 55 to summing unit 50 and effective to modify the firing rate as required to maintain the selected condition at the programmed value.
The gas temperature control signal, transmitted through line 33, is generated in a programming unit 56 which is responsive to the steam flow demand signal transmitted through line 33 and signal corresponding to actual gas temperature generated in temperature controller 57. At low steam flow as generated during startup, steam temperature at the outlets of the secondary superheater and reheater is substantially equal to the gas temperature at that point, hence as shown in FIG. 2, the temperature controller 57 responds to the gas temperature at this point. As gas temperature can be used as an index of steam temperature only under startup and low flow conditions, conveniently the gas temperature controller 57 may be of the retractable type and withdrawn from the gas duct during operation of the unit in the normal operating range, when gas temperatures may be far in excess of the superheat and reheat steam temperatures.
If while gas temperature and influentially steam temperature is the critical condition and firing is being modified to maintain gas temperature at the programmed value, excessive steam pressure results, the latter is maintained at the programmed value by passing steam around the superheater sections 20 and 10 through conduit 26 to condenser 12, the flow therethrough being controlled by valve 57 responsive to the control signal generated in sequence control unit 58.
Our invention further comprehends controlling super-heated steam temperature by instrumentalities now to be described when the critical condition is throttle pressure, or gas temperature or superheated steam pressure during start-up conditions, as well as maintaining steam temperature at desired value during normal on-line operation. Temperature Rate of Change Development Unit 59, responsive to manually set signals generated in stations 60, 61 and 62 establish a signal corresponding to initial desired steam temperature and increasing at an adjustable rate until corresponding in value to the desired on-line operation temperature. The initial temperature is ordinarily set to give a desired temperature differential between steam and turbine metal temperatures and the rate of change set to increase steam temperature from initial to final value as required to maintain the difference between steam temperature and turbine metal temperature within prescribed limits. Thus, for example, the initial temperature may be 6001 the rate of change F per hour and the final temperature 10001 Control unit 64 generated an output signal corresponding to the difference between the signals generated in unit 59 and superheated steam temperature controller 63 which may further be modified by a feed forward signal generated in flow controller 65 responsive to the rate of air flow to the furnace 19. During start-up and low load operation the output signal from unit 64 controls saturated steam attemporator valve 66 introducing relatively cool steam into the superheated steam to thereby restore the steam temperature to the desired value. Conversely if during the start-up and low load operations actual steam temperature decreases below the programmed value' the control signal generated in unit 64 is effective through control unit 67 to adjust the firing rate in an increasing sense. The control arrangement is such that the signal values corresponding to the decrease in actual steam temperature below the programmed value is effective for modulating the firing rate, whereas only signal values corresponding to the increase in actual steam temperature above the programmed value is effective for modulating, by means of valve 66, the flow of saturated steam into the superheat steam. Further, at about the termination of the low range operation, normally about 20% of full load, the use of saturated steam to control superheated steam temperature becomes ineffective, the valve 66 being positioned to a closed position, thereafter superheated steam temperature may be controlled throughout the normal operating range by introducing water as required through water attemporator valve 68 responsive to a signal generated in unit 64 corresponding to deviation in actual superheated steam temperature from the programmed value (normally the final steam temperature as set in manual station 62).
Reheat steam temperature control is generally similar to that described for superheat steam temperature control. A signal output from temperature ramp unit 59 through line 68 is transmitted to control unit 69 wherein it is compared with a signal corresponding to actual steam reheat temperature generated in temperature controller 70. Also introduced into control unit 69 is the feed forward signal, transmitted along line 71, from air flow controller 65. The output signal generated in control unit 69 is transmitted to a sequence controller 72, operating in sequence steam attemporator valve 73, gas recirculating control damper unit 74 and reheat water attemporator control valve 75. Similar to the operation of the superheat steam control instrumentalities, the steam attemporator is effective during certain start-up conditions when firing to maintain the most critical condition produces a high reheat temperature. Within the normal operating range gas recirculation is effective to control reheat temperature, in general a rate of recirculation varying inversely with rating being required. At high ratings, when gas recirculation is reduced to a minimum, reheat steam temperature is effectively'controlled by means of water attemporator.
We claim:
1. In a control system for a power producing unit comprising a vapor generator and a turbine-generator supplied with vapor from said vapor generating unit, the combination comprising; a first means generating a first feed forward signal corresponding to the desired power output of the power producing unit, a second means responsive to said first feed forward signal generating a second feed forward signal proportional in value to said first feed forward signal modified by the difference between desired and actual power output of the power producing unit, a third means responsive to said second feed forward signal maintaining the rate of flow of vapor to the turbine proportional to said second feed forward signal, a fourth means responsive to said first feed forward signal maintaining the pressure of the vapor admitted to said turbine at a set point value varying in a first functional relationship to said first feed forward signal and a fifth means responsive to said first feed forward signal maintaining the pressure in said vapor generator at a set point value varying in a second functional relationship to said first feed forward signal.
2. In a control system as set forth in claim 1 wherein said fifth means includes means venting vapor from said vapor generator as required to inhibit the pressure in said vapor generator from exceeding set point value. 3. In a control system as set forth in claim 1 wherein said vapor generator is provided with fuel and air supply means and wherein said fifth means includes means adjusting the rates of fuel and air supplied said vapor generator as required to maintain the pressure in said vaporv generator in said second functional relationship to said first feed-forward signal.
4. In a control system as set forth in claim 1 wherein said fourth means includes manually adjustable means establishing an initial set point value, a final set point value and the desired rate of change in set point value with the magnitude of said first forward signal from said initial set point value to said final set point value.
5. In a control system as set forth in claim 1 wherein said vapor generator is provided with'a primary superheater, a secondary super-heater and a control valve for regulating the flow of vapor from the primary to the secondary superheater and wherein said turbine is provided with admission valves for regulating the flow of vapor into said turbine and wherein said third means includes means adjusting said admission valves as re.-
quired to maintain the rate of flow of vapor to the turbine proportional to said second feed forward signal and said fourth means includes means adjusting said control valve as required to maintain the pressure of the vapor on the inlet side of said admission valves at a set point value varying in functional relationship to said first feed forward signal.
6. In a start-up system for a power producing unit comprising a vapor generator provided with fuel and air supply means, a primary and a secondary superheater and a reheater, and a turbine-generator comprising a high pressure unit supplied vapor from said secondary superheater, a lower pressure unit supplied vapor from said reheater and a condenser condensing vapor discharged from said lower pressure unit, the combination comprising; means selecting the one of a plurality of measured conditions in said power producing unit having the greatest deviation from set point value generating a control signal varying in functional relationship with said deviation, means responsive to said control signal adjusting the rates of fuel and air supplied said vapor generator as required to maintain said selected one of the plurality of measured conditions at set point value and auxiliary instrumentalities maintaining the other of said plurality of measured conditions at set point values.
7. In a start-up system as set forth in claim 6 wherein said vapor generator is provided with a vapor by-pass from the vapor inlet of said secondary superheater to said condenser, one of said plurality of conditions is the vapor pressure at the vapor outlet of said primary superheater and one of said auxiliary instrumentalities includes means responsive to the deviation in said vapor pressure above set point value and means responsive to said last named means adjusting the rate of flow of vapor through said vapor by-pass to reduce said vapor pressure to set point value.
8. In a start-up system as set forth in claim 6 wherein said vapor generator is provided with a vapor by-pass from the vapor inlet of said primary superheater to the vapor outlet of said secondary superheater, one of said plurality of conditions is the temperature of the vapor discharged from said secondary superheater and one of said auxiliary instrumentalities includes means responsive to the deviation in said vapor temperature above set point value, and means responsive to said last named means adjusting the rate of flow of vapor through said last named vapor by-pass to reduce said vapor temperature to set point value.
9. In a start-up system as set forth in claim 6 wherein said vapor generator is provided with a vapor by-pass from the vapor inlet of said primary superheater to the vapor outlet of said reheater, one of said plurality of conditions is the temperature or the vapor discharged from said reheater and one of said auxiliary instrumentalities includes means responsive to the deviation in said reheated vapor temperature above set point value, and means responsive to said last named means adjusting the rate of flow of vapor through said last named vapor by-pass to reduce said reheated steam temperature to set point value.
10. In a start-up system as set forth in claim 6 wherein said vaporgenerator is provided with a valve in the vapor conduit between said primary and secondary superheaters and one of said auxiliary instrumentalities includes means responsive to the deviation in pressure of the vapor at the inlet tosaid high pressure turbine from set point value. and means responsive to said last named means adjusting said valve to maintain said last named pressure at set point value.
11. In a start-up control system as set forth in claim 8 wherein the set point value of the superheat steam is established by manually adjustable means establishing an initial set point value, a final set point value and the desired rate of change with time in set point value from said initial set point value to said final set point value.
12. In a start-up system as set forth in claim 6 wherein said plurality of measured conditions includes pressure of the vapor at the inlet to said high pressure turbine, temperature of the flue gas in said vapor generator between said secondary superheater and said reheater, pressure of the vapor is said vapor generator at the outlet of the primary superheater and temperature of the vapor at the inlet to said high pressure turbine.
13. In a start-up system as set forth in claim 6 wherein said one of a plurality of measured conditions is the temperature of the flue gas between said primary and secondary superheaters, means generating a feedforward signal varying in functional relationship with the energy demand from said power producing unit, means responsive to the temperature of the flue gas between said primary and secondary superheaters, and means under the joint control of said last two named means adjusting the fuel and air supplied said vapor generator to maintain said flue gas temperature at desired value.
14. In a control system as set forth in claim 6 wherein said one of a plurality of measured conditions is the temperature of the flue gas between said primary and secondary superheaters, means responsive to said temperature generating a control signal varying in accordance with changes in said flue gas temperature from set point, means generating a feedforward signal varying in functional relationship with the desired power output from said power producing unit, means responsive to said feedforward signal raising said set point in functional relationship with increases in said feedforward signal, and means responsive to said control signal adjusting the rates of fuel and air supplied said vapor generator as required to maintain said flue gas temperature at set point.
@233? UNITED STATES PATENT OFFICE CERTIFICATE OF CORRECTION Patent N 3 322, 3C? Dated Ji -:2. 5., .i
In nt fls) Uli'ier a. ijlll'i'df-t. .x" Hebert It is certified that error appears in the above-identified patent and that said Letters Patent are hereby corrected as shown below:
Zulu-'11:; 3, line 33,, change "uperizeaied" tr: sizgtnzrifl ufii d C01 man -1, lines 6'5 and 66, delete "traz'zij-zmiited along 1 im- 1.
pus-I ti an" and insert posit inning Column 0, line I, change "influentially Iu izzreren-e i114 -y 3. im; 31 change "generated" to generates I inure 353 and bi? change "attumporator" to attemperatm' Column 7, lines 8, 1G, 12 and 20 change "attiamgrnfetz-rsr" to attemoertor I I Claim 7, line 3, cancel "sr'mmdary" and ineez't prrlizxary 3 Claim Q, line FE, change "or" to 0f Signed and Scaled this twenty-third I) 17' of March 1976 [SEAL] Attest:
RUTH C. MASON C. MARSHALL DANN

Claims (14)

1. In a control system for a power producing unit comprising a vapor generator and a turbine-generator supplied with vapor from said vapor generating unit, the combination comprising; a first means generating a first feed forward signal corresponding to the desired power output of the power producing unit, a second means responsive to said first feed forward signal generating a second feed forward signal proportional in value to said first feed forward signal modified by the difference between desired and actual power output of the power producing unit, a third means responsive to said second feed forward signal maintaining the rate of flow of vapor to the turbine proportional to said second feed forward signal, a fourth means responsive to said first feed forward signal maintaining the pressure of the vapor admitted to said turbine at a set point value varying in a first functional relationship to said first feed forward signal and a fifth means responsive to said first feed forward signal maintaining the pressure in said vapor generator at a set point value varying in a second functional relationship to said first feed forward signal.
2. In a control system as set forth in claim 1 wherein said fifth means includes means venting vapor from said vapor generator as required to inhibit the pressure in said Vapor generator from exceeding set point value.
3. In a control system as set forth in claim 1 wherein said vapor generator is provided with fuel and air supply means and wherein said fifth means includes means adjusting the rates of fuel and air supplied said vapor generator as required to maintain the pressure in said vapor generator in said second functional relationship to said first feed-forward signal.
4. In a control system as set forth in claim 1 wherein said fourth means includes manually adjustable means establishing an initial set point value, a final set point value and the desired rate of change in set point value with the magnitude of said first forward signal from said initial set point value to said final set point value.
5. In a control system as set forth in claim 1 wherein said vapor generator is provided with a primary superheater, a secondary super-heater and a control valve for regulating the flow of vapor from the primary to the secondary superheater and wherein said turbine is provided with admission valves for regulating the flow of vapor into said turbine and wherein said third means includes means adjusting said admission valves as required to maintain the rate of flow of vapor to the turbine proportional to said second feed forward signal and said fourth means includes means adjusting said control valve as required to maintain the pressure of the vapor on the inlet side of said admission valves at a set point value varying in functional relationship to said first feed forward signal.
6. In a start-up system for a power producing unit comprising a vapor generator provided with fuel and air supply means, a primary and a secondary superheater and a reheater, and a turbine-generator comprising a high pressure unit supplied vapor from said secondary superheater, a lower pressure unit supplied vapor from said reheater and a condenser condensing vapor discharged from said lower pressure unit, the combination comprising; means selecting the one of a plurality of measured conditions in said power producing unit having the greatest deviation from set point value generating a control signal varying in functional relationship with said deviation, means responsive to said control signal adjusting the rates of fuel and air supplied said vapor generator as required to maintain said selected one of the plurality of measured conditions at set point value and auxiliary instrumentalities maintaining the other of said plurality of measured conditions at set point values.
7. In a start-up system as set forth in claim 6 wherein said vapor generator is provided with a vapor by-pass from the vapor inlet of said secondary superheater to said condenser, one of said plurality of conditions is the vapor pressure at the vapor outlet of said primary superheater and one of said auxiliary instrumentalities includes means responsive to the deviation in said vapor pressure above set point value and means responsive to said last named means adjusting the rate of flow of vapor through said vapor by-pass to reduce said vapor pressure to set point value.
8. In a start-up system as set forth in claim 6 wherein said vapor generator is provided with a vapor by-pass from the vapor inlet of said primary superheater to the vapor outlet of said secondary superheater, one of said plurality of conditions is the temperature of the vapor discharged from said secondary superheater and one of said auxiliary instrumentalities includes means responsive to the deviation in said vapor temperature above set point value, and means responsive to said last named means adjusting the rate of flow of vapor through said last named vapor by-pass to reduce said vapor temperature to set point value.
9. In a start-up system as set forth in claim 6 wherein said vapor generator is provided with a vapor by-pass from the vapor inlet of said primary superheater to the vapor outlet of said reheater, one of said plurality of conditions is the temperature or the vapor discharged from said reheater and one oF said auxiliary instrumentalities includes means responsive to the deviation in said reheated vapor temperature above set point value, and means responsive to said last named means adjusting the rate of flow of vapor through said last named vapor by-pass to reduce said reheated steam temperature to set point value.
10. In a start-up system as set forth in claim 6 wherein said vapor generator is provided with a valve in the vapor conduit between said primary and secondary superheaters and one of said auxiliary instrumentalities includes means responsive to the deviation in pressure of the vapor at the inlet to said high pressure turbine from set point value, and means responsive to said last named means adjusting said valve to maintain said last named pressure at set point value.
11. In a start-up control system as set forth in claim 8 wherein the set point value of the superheat steam is established by manually adjustable means establishing an initial set point value, a final set point value and the desired rate of change with time in set point value from said initial set point value to said final set point value.
12. In a start-up system as set forth in claim 6 wherein said plurality of measured conditions includes pressure of the vapor at the inlet to said high pressure turbine, temperature of the flue gas in said vapor generator between said secondary superheater and said reheater, pressure of the vapor is said vapor generator at the outlet of the primary superheater and temperature of the vapor at the inlet to said high pressure turbine.
13. In a start-up system as set forth in claim 6 wherein said one of a plurality of measured conditions is the temperature of the flue gas between said primary and secondary superheaters, means generating a feedforward signal varying in functional relationship with the energy demand from said power producing unit, means responsive to the temperature of the flue gas between said primary and secondary superheaters, and means under the joint control of said last two named means adjusting the fuel and air supplied said vapor generator to maintain said flue gas temperature at desired value.
14. In a control system as set forth in claim 6 wherein said one of a plurality of measured conditions is the temperature of the flue gas between said primary and secondary superheaters, means responsive to said temperature generating a control signal varying in accordance with changes in said flue gas temperature from set point, means generating a feedforward signal varying in functional relationship with the desired power output from said power producing unit, means responsive to said feedforward signal raising said set point in functional relationship with increases in said feedforward signal, and means responsive to said control signal adjusting the rates of fuel and air supplied said vapor generator as required to maintain said flue gas temperature at set point.
US465705A 1974-04-30 1974-04-30 Control system for a power producing unit Expired - Lifetime US3922859A (en)

Priority Applications (12)

Application Number Priority Date Filing Date Title
US465705A US3922859A (en) 1974-04-30 1974-04-30 Control system for a power producing unit
DE19752518353 DE2518353A1 (en) 1974-04-30 1975-04-25 CONTROL SYSTEM FOR ENERGY GENERATORS
CA225,992A CA1011198A (en) 1974-04-30 1975-04-29 Control system for a power producing unit
IT09419/75A IT1028815B (en) 1974-04-30 1975-04-29 COMMAND AND CONTROL SYSTEM FOR POWER PRODUCTION UNIT
AU80626/75A AU484728B2 (en) 1974-04-30 1975-04-29 Control system fora power producing unit
ES437201A ES437201A1 (en) 1974-04-30 1975-04-29 Control system for a power producing unit
GB17970/75A GB1509743A (en) 1974-04-30 1975-04-30 Power producing units
ZA00752786A ZA752786B (en) 1974-04-30 1975-04-30 Improvements in or relating to power producing units
BE156002A BE828640A (en) 1974-04-30 1975-04-30 IMPROVEMENTS TO ENERGY GENERATING GROUPS
SE7505065A SE407258B (en) 1974-04-30 1975-04-30 CONTROL SYSTEM FOR A POWER GENERATION SYSTEM WITH AN ANGENER GENERATOR AND ONE WITH ANGA FROM THIS SUPPLIED TURBO GENERATOR
FR7513505A FR2269633B1 (en) 1974-04-30 1975-04-30
JP50051606A JPS6224608B2 (en) 1974-04-30 1975-04-30

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US465705A US3922859A (en) 1974-04-30 1974-04-30 Control system for a power producing unit

Publications (1)

Publication Number Publication Date
US3922859A true US3922859A (en) 1975-12-02

Family

ID=23848843

Family Applications (1)

Application Number Title Priority Date Filing Date
US465705A Expired - Lifetime US3922859A (en) 1974-04-30 1974-04-30 Control system for a power producing unit

Country Status (11)

Country Link
US (1) US3922859A (en)
JP (1) JPS6224608B2 (en)
BE (1) BE828640A (en)
CA (1) CA1011198A (en)
DE (1) DE2518353A1 (en)
ES (1) ES437201A1 (en)
FR (1) FR2269633B1 (en)
GB (1) GB1509743A (en)
IT (1) IT1028815B (en)
SE (1) SE407258B (en)
ZA (1) ZA752786B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4287430A (en) * 1980-01-18 1981-09-01 Foster Wheeler Energy Corporation Coordinated control system for an electric power plant
US20100077970A1 (en) * 2008-09-29 2010-04-01 General Electric Company Inter-stage attemperation system and method
US20120131917A1 (en) * 2010-11-30 2012-05-31 General Electric Company Methods and Systems for Loading a Steam Turbine
US20120255303A1 (en) * 2010-12-20 2012-10-11 Invensys Systems, Inc. Feedwater Heater Control System for Improved Rankine Cycle Power Plant Efficiency
CN104612767A (en) * 2014-12-25 2015-05-13 中国电力工程顾问集团华东电力设计院 Method for setting impulse starting pressure setting value of ultra-high pressure cylinder
US9316122B2 (en) 2010-12-20 2016-04-19 Invensys Systems, Inc. Feedwater heater control system for improved Rankine cycle power plant efficiency
WO2019205278A1 (en) * 2018-04-28 2019-10-31 深圳大学 Bus running state data adjustment processing method, smart terminal and storage medium
US20220341588A1 (en) * 2021-04-25 2022-10-27 Southeast University Method for setting parameters of load feedforward controller for superheated steam temperature control

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5833392Y2 (en) * 1978-03-20 1983-07-26 三洋電機株式会社 Slow ignition device for gas water heater
DE3235909A1 (en) * 1981-03-06 1983-02-24 Clayton Manufacturing Co CONTROL DEVICE FOR STEAM OR HOT WATER GENERATING SYSTEMS WITH SEVERAL STEAM OR HOT WATER PRODUCERS
GB8528261D0 (en) * 1985-11-15 1985-12-18 Burgess Eng Ltd G N Sealing device
CN106524131B (en) * 2016-09-23 2018-08-31 华北电力大学(保定) A kind of feed forward control method of fired power generating unit vapor (steam) temperature
CN114063437B (en) * 2021-10-22 2023-08-08 北京京能科技有限公司 Control method for flue gas baffle of reheater of supercritical unit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3338053A (en) * 1963-05-20 1967-08-29 Foster Wheeler Corp Once-through vapor generator start-up system
US3417737A (en) * 1966-09-20 1968-12-24 Foxboro Co Once-through boiler control system
US3545207A (en) * 1969-07-23 1970-12-08 Leeds & Northrup Co Boiler control system
US3561216A (en) * 1969-03-19 1971-02-09 Gen Electric Thermal stress controlled loading of steam turbine-generators
US3802189A (en) * 1972-01-13 1974-04-09 Leeds & Northrup Co Boiler-turbine control system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3338053A (en) * 1963-05-20 1967-08-29 Foster Wheeler Corp Once-through vapor generator start-up system
US3417737A (en) * 1966-09-20 1968-12-24 Foxboro Co Once-through boiler control system
US3561216A (en) * 1969-03-19 1971-02-09 Gen Electric Thermal stress controlled loading of steam turbine-generators
US3545207A (en) * 1969-07-23 1970-12-08 Leeds & Northrup Co Boiler control system
US3802189A (en) * 1972-01-13 1974-04-09 Leeds & Northrup Co Boiler-turbine control system

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4287430A (en) * 1980-01-18 1981-09-01 Foster Wheeler Energy Corporation Coordinated control system for an electric power plant
US20100077970A1 (en) * 2008-09-29 2010-04-01 General Electric Company Inter-stage attemperation system and method
US8904972B2 (en) * 2008-09-29 2014-12-09 General Electric Company Inter-stage attemperation system and method
US20120131917A1 (en) * 2010-11-30 2012-05-31 General Electric Company Methods and Systems for Loading a Steam Turbine
RU2592569C2 (en) * 2010-11-30 2016-07-27 Дженерал Электрик Компани Method and device for loading steam turbine
US8843240B2 (en) * 2010-11-30 2014-09-23 General Electric Company Loading a steam turbine based on flow and temperature ramping rates
US9316122B2 (en) 2010-12-20 2016-04-19 Invensys Systems, Inc. Feedwater heater control system for improved Rankine cycle power plant efficiency
US9091182B2 (en) * 2010-12-20 2015-07-28 Invensys Systems, Inc. Feedwater heater control system for improved rankine cycle power plant efficiency
US20120255303A1 (en) * 2010-12-20 2012-10-11 Invensys Systems, Inc. Feedwater Heater Control System for Improved Rankine Cycle Power Plant Efficiency
CN104612767B (en) * 2014-12-25 2016-03-16 中国电力工程顾问集团华东电力设计院有限公司 The method of setting ultra-high pressure cylinder red switch pressure set points
CN104612767A (en) * 2014-12-25 2015-05-13 中国电力工程顾问集团华东电力设计院 Method for setting impulse starting pressure setting value of ultra-high pressure cylinder
WO2019205278A1 (en) * 2018-04-28 2019-10-31 深圳大学 Bus running state data adjustment processing method, smart terminal and storage medium
US20220341588A1 (en) * 2021-04-25 2022-10-27 Southeast University Method for setting parameters of load feedforward controller for superheated steam temperature control

Also Published As

Publication number Publication date
SE407258B (en) 1979-03-19
CA1011198A (en) 1977-05-31
ZA752786B (en) 1976-12-29
AU8062675A (en) 1976-11-04
DE2518353A1 (en) 1975-11-13
ES437201A1 (en) 1977-05-16
IT1028815B (en) 1979-02-10
JPS50152230A (en) 1975-12-08
BE828640A (en) 1975-10-30
JPS6224608B2 (en) 1987-05-29
SE7505065L (en) 1975-10-31
GB1509743A (en) 1978-05-04
FR2269633B1 (en) 1981-04-10
FR2269633A1 (en) 1975-11-28

Similar Documents

Publication Publication Date Title
US3922859A (en) Control system for a power producing unit
EP0033713B1 (en) Controlling steam temperature to turbines
US3575002A (en) Combination fossil fuel and superheated steam nuclear power plant
US4039846A (en) Control of a steam-heating power plant
US3894396A (en) Control system for a power producing unit
MXPA96002485A (en) Method and conversion apparatus of a water vapor turbine energy plant with thermal regeneration cycle to a combined cycle power plant without regeneration
GB2166199A (en) Heat recovery steam generator outlet temperature control system for a combined cycle power plant
US3837167A (en) Control system for a two boiler, single turbine generator power producing unit
US3017870A (en) Steam or vapor generator having at least two firing systems
US3286466A (en) Once-through vapor generator variable pressure start-up system
US3411300A (en) Method and apparatus for sliding pressure operation of a vapor generator at subcritical and supercritical pressure
US3882680A (en) By-pass system
US4015430A (en) Electric power plant and turbine acceleration control system for use therein
US3691760A (en) Method and means for improving the operation of a steam gas plant including a gas turbine and a steam turbine with a steam generator at the downstream end
US3937024A (en) Control system for a two boiler, single turbine generator power producing unit
FI58681B (en) MED ELDSTAD FOERSEDD ELLER MED GAS UPPVAERMBAR AONGGENERATOR
US3055181A (en) Method of operating a power plant system
US4007596A (en) Dual turbine power plant and method of operating such plant, especially one having an HTGR steam supply
US3667217A (en) Steam gas turbine including a gas turbine and a steam turbine with a steam generator at the downstream end
US3155078A (en) Double reheat power plant arrangement
US3053049A (en) Power plant installation
US3186175A (en) Heat absorption balancing system for a steam generator having a primary steam circuit and a reheating steam circuit
US3105357A (en) Steam power plant comprising a steam generator and a plural stage steam consuming machine
US3362163A (en) Steam power stations
US3999390A (en) HTGR power plant turbine-generator load control system