US3852983A - Work strip gauge change during rolling in a tandem rolling mill - Google Patents
Work strip gauge change during rolling in a tandem rolling mill Download PDFInfo
- Publication number
- US3852983A US3852983A US00354288A US35428873A US3852983A US 3852983 A US3852983 A US 3852983A US 00354288 A US00354288 A US 00354288A US 35428873 A US35428873 A US 35428873A US 3852983 A US3852983 A US 3852983A
- Authority
- US
- United States
- Prior art keywords
- gauge
- roll stand
- roll
- stand
- speed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/16—Control of thickness, width, diameter or other transverse dimensions
- B21B37/24—Automatic variation of thickness according to a predetermined programme
- B21B37/26—Automatic variation of thickness according to a predetermined programme for obtaining one strip having successive lengths of different constant thickness
Definitions
- ABSTRACT A control method and apparatus are disclosed for controlling the gauge of strip material being rolled by a Filedi P 1973 tandem rolling mill while the strip is in motion and [21] Appl No; 354,288 moving through the mill.
- a gauge change in the work strip is accomplished by changing, in proper timed se- 1 quence, the stand speed and roll gap openings starting [52] U.S. Cl. 72/12, 72/24-() from the first t the last stand, In order to change [51] Int.
- tandem rolling mill operation including respective X-ray gauge sensing devices operative for thickness control purposes after each of the first and last roll stands, with interstand control apparatus operative ahead of and providing roll opening control for each of the roll stands other than the first roll stand.
- interstand control apparatus operative ahead of and providing roll opening control for each of the roll stands other than the first roll stand.
- continuous rolling operation of a tandem mill is broadly discussed.
- the rolling vmill is operated, when the work strip is passing through the successive roll stands of the rolling mill, such that a first X-ray gauge sensing device positioned after the first roll stand controls the roll opening of that first roll stand to effect a coarse gauge control of the work strip leaving that first roll stand, and a second X-ray gauge sensing device positioned after the last roll stand controls the speed of that last stand to effect a vernier gauge control of the work strip leaving that last roll stand.
- a tension regulating device is positioned to sense the work strip interstand tension after each of the first, second, third and fourth roll stands and is operative respectively to control the roll opening of the following roll stand for maintaining the rolling mill operation in accordance with the well-known mass flow relationship:
- H is the work strip delivery gauge leaving the first roll stand at speed 8
- H is the work strip delivery gauge leaving the second roll stand at speed S and so forth.
- this gauge change point movement can be established and followed in several ways, for example a weld detector can sense physically thegauge change point in the form of a welded joint in the work strip or a provided pulse generator and associated bridle roll arrangement can be operative with a pulse counter to sense the movement of the work strip and after a predetermined number of feet of incoming work strip have passed through the first roll stand in accordance with the first schedule it may be desired to effect a change to the second schedule operation when the predetermined gauge'change point of the work strip arrives at and enters the first roll stand.
- a provided sequence control system prior to this event senses the work strip delivery gauge leaving the last roll stand and senses the operating speed of each roll stand, and then determines by mass flow considerations the work strip delivery gauges respectively leaving each of the first, second, third and fourth roll stands in accordance with the relationship of above equation (I).
- the roll opening of that stand is changed by a predetermined amount by the sequence control system such that the delivery gauge of the work strip leaving the first roll stand is now in accordance with the desired second gauge schedule and since the work strip in accordance with the first schedule is still passing through the remaining subsequent roll stands the speeds of those remaining stands as well as the speed of the first stand are not changed.
- the operating speed of the first roll stand is changed in accordance with the predetermined second schedule of operation, while the speed of the second rollstand is not changed since the work strip in accordance with the first schedule is still passing through the third, fourth and fifth roll stands, and the speeds of the third, fourth and fifth roll stands are not changed so as to continue the desired operation in accordance with the first gauge schedule.
- the gauge change point of the work strip enters the third roll stand, the operating speeds of the previous first and second roll stands are changed in accordance with the second gauge schedule of operation, and the speeds of the third roll stand and the following roll stands are not changed since the work strip in accordance with the first gauge schedule is still operative with those roll stands.
- the speeds of the previous first, second and third roll stands are changed in accordance with the second gauge schedule of operation, and the speeds of the fourth and fifth roll stands are not changed since the work strip in accordance with the first gauge change schedule is still operative with those roll stands.
- the speeds of the previous first, second, third and fourth roll stands are changed in accordance with the second gauge schedule of operation, and the speed of the fifth roll stand is not changed.
- FIG. 1 is a block schematic diagram of a tandem rolling mill and a gauge change sequence control system operative with that rolling mill in accordance with the present invention
- FIG. 2 is a chart illustrating typical speed and work strip gauge or delivery thickness conditions as a gauge change point of the work strip passes through the roll stands 1 to of the rolling mill;
- FIG. 3 is a chart illustrating the operation of the predetermined per unit multipliers to control the speeds of the roll stands in relation to the original gauge schedule and showing the progression of provided speed changes as the gauge change point of the work strip passes through the respective stands of the tandem rolling mill;
- FIGS. 4A and 4B show a flow chart of a suitable instruction control program for a digital control computer included within the gauge change sequence control apparatus shown in FIG. 1.
- the control system shown includes a five-stand tandem rolling mill having stands RS1, RS2, RS3, RS4 and RS5.
- Each stand comprises a pair of work rolls 10 and 12, between which work strip material being rolled is passed. The associated backup rolls for each stand are not shown.
- the strip issuing from the last stand RS5 is wound on a coiler 16, with the direction of strip movement being from left to right as indicated by the arrow 18 in FIG. 1.
- each stand is driven by means of respective drive motors M1, M2, M3, M4, and M5 each controlled by a suitable speed control circuit C1, C2, C3, C4, and C5, respectively.
- the speed of the material issuing from any stand must be greater than that entering the stand in accordance with the well-known constant volume principle of material mass flow. Accordingly, the speed of stand RS2 must be greater than the speed of stand RS1; the speed of stand RS3 must be greater than the speed of stand RS2, and so forth as well known to persons skilled in this art, with the speed of the last stand RS5 being the greatest.
- gauge change sequence control 26 is connected to control each drive motor speed through operation of the respective speed controls. It will be understood that a reference speed signal is supplied to each of the respective speed controls C1 to C5 for this purpose.
- each roll gap opening of each roll stand is determined by respective gap actuators G1, G2, G3, G4 and G5 as shown, and preferably including hydraulic cylinders, such that for each roll stand a hydraulic cylinder provides the necessary roll force at the stand to reduce the strip 14 in delivery gauge or thickness; and it will be understood that only one cylinder may be provided for each stand or there may be hydraulic cylinders on opposite sides of each mill stand, loading the chocks at the opposite ends of the work rolls.
- a mechanical screwdown mechanism including an electrical screwdown motor can be used if desired to effect the required roll force at each stand, but the hydraulic cylinders may be preferred because of their more rapid speed of operation.
- the delivery gauge of strip material passing through the first stand RS1 is measured by means of an X-ray gauge 28 or the like positioned at the delivery side of first stand RS1, which X-ray gauge 28 is operative in conjunction with the automatic gauge control system 30 to control the roll opening of roll stand RS1 to cause the gauge error leaving roll stand RS1 to be reduced to zero.
- the automatic gauge control system 30 is operative with a gauge reference in accordance with the desired exit gauge from stand RS1.
- automatic gauge control system 30 operates in conjunction with X-ray gauge 28 to either increase or decrease the roll opening of stand RS1 to increase or decrease the roll force of stand S1 and thereby vary the roll opening of stand RS1 and thereby vary the delivery gauge of the work strip material issuing from stand RS1 until the delivery gauge matches the desired reference gauge.
- tension control device T1, T2, T3 and T4 which measures tension in the strip between each set of stands, such as the tension in the strip material 14 between stands RS1 and RS2, and produces an electrical signal proportional thereto.
- This tension signal in relation to tension control T1 is compared with a tension reference signal in accordance with desired tension, and which may be supplied by the sequence control apparatus 26, and if the two are not the same, then the tension control device Tl will vary the pressure exerted by the gap actuator G2 for stand RS2, thereby varying the roll gap opening and/or the roll force of stand RS2.
- Each tension control device measures a particular interstand tension and compares it with a desired reference tension, and if the two are not the same, then the roll gap opening for the succeeding stand is varied as required for work strip gauge correction.
- the final delivery output gauge of the strip material passing through the tandem rolling mill is measured by means of an X-ray gauge 42 or the like, which produces an electrical signal proportional to the actual and measured output work strip gauge error. If the actual output gauge does not match the desired reference gauge, then the gauge error signal is applied to the speed control circuit C5 to increase or decrease as required the speed of drive motor MS of stand RS5, which in turn changes the tension between the last two stands to correct for the variation from thedesired delivery gauge. Ifthe correction is large enough to exceed the provided tension control dead band, the tension control device T4 will appropriately increase or decrease the roll gap of the last stand RS5 as required for correction of the interstand tension. In most cases, however, speed and tension control for varying final output gauge is desired on the last stand and the roll gap is changed only when the delivery gauge error is very large.
- rolling mills of this general arrangement have in the past been generally operative to roll a continuous length of strip on a coil to a single specified thickness of delivery gauge along the entire length of the strip.
- one or more delivery gauge changes can be effected during rolling of a single work strip, by initially changing the roll gap setting of the first stand RS1 to change thedelivery gauge of the strip material issuing from the first stand. Thereafter and in timed sequence, the respective control speed references of succeeding stands are changed until all roll gap settings and speeds of the stands in the mill have been set to accommodate the desired new delivery gauge. In this respect, it is necessary only to change the gauge references to the first stand RS1 and the X-ray gauge positioned after the first stand. For all other stands, it is necessary only to change the speed reference provided for the stand. The roll gap opening of each stand following the first stand is controlled and varied as required by means of the tension control devices T1 to T4.
- the change from one delivery gauge to another is done in a way to preserve the required constant mass flow of work strip through the stands of the rolling mill for both the first delivery gauge schedule and the second delivery gauge schedule. Since the mill has no facility to store work stripmaterial between stands, the original mill setup was required to satisfy the mass flow relationship of above equation (1), where the product of the speed S times the strip delivery gauge or height H for each of the stands is equal to this same product for the-other stands. The thickness is decreased as it passes through each stand, so the speed increases to provide the wellknown constant volume flow operation.
- the speed S of stand RS2 is shown to be the initial schedule value to satisfy the speed requirements of the first gauge or height schedule.
- the new speed S for stand RS1 is chosen to satisfy the constant mass flow requirements of the second gauge or height schedule,
- the reference stand speeds, roll openings, and interstand tensions are preset and adjusted to the desired work and deliver the required gauge out of the first stand and the last stand, and the gauge being delivered from each of the other stands is determined by the relationship between the stand speeds.
- the speed pattern is directly related to the respective delivery gauges being produced, so the rolling schedule for each work strip is primarily established by the desired speed relationship pattern and the roll gaps and tensions are preset and adjusted to suit that desired speed relationship.
- FIG. 2 there is provided a chart to illustrate typical sequential changes in the rolling mill operating conditions as a work strip gauge change point moves through the roll stands of that rolling mill.
- the first gauge schedule operation with the first stand speed S (stand one and first schedule) equal to 446 and delivery gauge H equal to 0.085 being indicated, as well as the second stand speed 8 (stand two and first schedule) equal to 583 and delivery gauge H equal to 0.065, the third stand speed S equal to 758 and delivery gauge H equal to 0.050 and so forth.
- the gauge change sequence control apparatus 26 When the gauge change point or transition of the work strip arrives at the first roll stand, the gauge change sequence control apparatus 26 as shown in FIG. 1 provides a different delivery gauge reference H (stand one and second schedule) to the automatic gauge control system 30 and the associated gap actuator G] of the first stand RS1, such that the delivery gauge H now equals 0.070.
- the first stand speed S is still equal to 446 and the operational conditions for the remaining stands two through five stay the same.
- the delivery gauge from the second stand now becomes H equal to 0.050.
- the second stand speed remains the same, with S equal to 583, and the operating conditions for the subsequent third, fourth and fifth stands remain the same.
- the gauge change sequence control apparatus provides adifferent speed reference to each of the first and second roll stands, such that the first stand speed S is equal to 390 and the second stand speed Sm is equal to 546.
- the delivery gauge for the second schedule from each of the first and second roll stands remainsunchanged such that the first stand gauge H is equal to 0.070 and the second stand gauge H is equal to 0.050.
- the tension control device T2 the delivery gauge from the third roll stand RS3 changes such that this gauge H is equal to 0.036.
- the third stand speed S remains the same at 758, and the operating conditions for the fourth and fifth stands do not change.
- the gauge change sequence control apparatus provides a different speed reference to each of the first, second and third stands, such that the first stand speed S is equal to 310, the second stand speed S is equal to 433 and the third stand speed S is equal to 602.
- the delivery gauge from each of the first, second and third roll stands remains unchanged, such that the first stand gauge H is equal to 0.070, the second stand gauge H is equal to 0.050 and the third stand gauge H is equal to 0.036.
- the tension control device T3 the delivery gauge from the fourth roll stand S4 changes such that this gauge H is equal to 0.024.
- the fourth stand speed remains the same at 903 and the operations of the fifth stand do not change.
- the gauge change sequence control apparatus provides a different speed reference to each of the first, second, third and fourth roll stands, such that the first stand speed S is equal to 286, the second stand speed S is equal to 400, the third stand speed S is equal to 555 and the fourth stand speed S is equal to 833.
- the delivery gauges from respectively the first, second, third and fourth roll stands remain unchanged, however through operation of the tensioon control device T4 the delivery gauge from the fifth roll stand RS5 changes such that this gauge H is equal to 0.20.
- the fifth stand speed S remains the same at 1000.
- FIG. 3 there is provided a chart to illustrate the predetermined ratio multipliers that are utilized to establish the adjustments made in the previous stand speeds when the gauge change point of the work strip arrives at a particular roll stand. More specifically,
- the speed of the first roll stand RS1 is adjusted by the multiplier (S )(H )/(S, )(H
- the respective speeds of the first and second roll stands RS1 and RS2 are adjusted by the multiplier ai)( a2)/( 2i)( 22)- when the g g changepoint arrives at the fourth roll stand RS4
- the respective speeds of the first, second and third roll stands RS1, RS2 and RS3 are adjusted by the multiplier (S,,)(H )/(S ,)(H
- the respective speeds of the first, second, third and fourth stands RS1, RS2, RS3 and RS4 are adjusted by the ratio multiplier (S ,)(H )/(S )(H This completes the desired transition from rolling the work strip at the first gauge schedule
- the initial first schedule is rolled on a five stand mill going from an input gauge of 0.l inch to a finished gauge of 0.038 inch, with the drafting pattern in the respective roll stands as shown.
- the second gauge schedule of operation will roll the work strip from an input gauge of 0.100 inch to a delivery gauge of 0.020 inch leaving the mill.
- the delivery speed from the fifth and lastroll stand RS5 is held constant at 1,000 feet per minute during the schedule change.
- the second schedule parameters can be provided by the operator or determined by the control computer within the sequence control apparatus prior to the selected time for a gauge schedule change, and these parameter values will be stored in the computer memory or suitable storage locations until needed.
- the various per unit speed multipliers as illustrated in FIG. 3 can then be determined before the gauge schedule change is started.
- the speed of the first roll stand RS1 will be changed by the multiplier such that the speed of the first roll stand will be changed to (0.933) 446 416 FPM.
- the speed of the first roll stand RS1 and the speed of the second roll stand RS2 will be changed by the multiplier 3i)( a2)/( 21)( 22) )/583)( r 0.937,
- the control operation logic flow chart shown in FIG. 4 is illustrative of one suitable embodiment of the present invention is provided by operation of the sequence control apparatus.
- a stored program digital computer could be utilized for this purpose if desired or a hardwired controlled apparatus could be provided if desired.
- a determination is made from provided input information of the desired length of work strip in the first gauge schedule.
- a counter is set with a predetermined count level to effect a desired slow down of the rolling mill operation to a selected transition speed just prior to the gauge change point of the work strip arriving at the first roll stand RS1.
- the pulses from a pulse generator operative with the entry bridle or the delivery bridle positioned ahead of the first roll stand RS1, are counted to track the gauge change point movement, and when a predetermined slowdown initiate count is reached in the counter the rolling mill is decelerated to a selected transition speed at step 406.
- a reading is made of the delivery gauge leaving the last roll stand RS5 through operation of the X-ray gauge device and the respective speeds of all the roll stands through operation of the pilot generator operative with each roll stand.
- the gauge change point movement is tracked to arrive at the first roll stand RS1 through operation of perhaps a weld detector positioned a known distance ahead of the first roll stand to initiate counting of output pulses from the bridle roll pulse generator.
- the first roll stand roll opening is adjusted from the first schedule delivery gauge H setting to the second schedule delivery gauge I'I setting.
- the gauge reference for the X-ray gauge device 28 is changed to the second schedule gauge H
- X-ray monitor operation provided by operation of the X-ray gauge device 42, is released from the first roll stand RS1, since the X-ray gauge device 42 is still operating with the first gauge schedule and the first roll stand is now operative with the second gauge schedule.
- the gauge change point movement is tracked until arrival at the second roll stand RS2, through counting of output pulses from the pulse generator coupled with the first roll stand RS1.
- the speed reference for the speed control C1 operative with the first roll stand RS1 is adjusted by the per unit multiplier shown in FIG.
- the gauge change point movement is tracked to arrive at the third roll stand RS3, through counting of output pulses from the pilot generator coupled to the second roll stand RS2.
- the speed references for the respective speed controls Cl and C2 are adjusted by the per unit multiplier shown in FIG. 3 such that the first and second roll stands are now operative at the desired speed relationship in accordance with the second gauge schedule.
- the gauge change point movement is tracked to arrive at the fourth roll stand RS4, through counting of output pulses from the pilot generator coupled to the third roll stand RS3.
- the speed references for the respective speed controls C1, C2 and C3 are adjusted by the per unit multiplier shown in FIG. 3 such that the first, second and third roll stands are now operative at the desired speed relationship in accordance with the second gauge schedule.
- the gauge change point movement is tracked to arrive at the fifth roll stand RS5, through counting of output pulses from the pilot generator coupled to the fourth roll stand RS4.
- the speed references for the respective speed controls C1, C2, C3 and C4 are adjusted by the per unit multiplier shown in FIG.
- step 434 the rolling mill is' accelerated to a predetermined run speed of operation, and the control program then ends.
- a gauge control system for a tandem rolling mill having a plurality of roll stands operative to reduce the gauge of a work strip having a gauge change point and being passed through said rolling mill, the combination of means for controlling the operating speed of a first roll stand, and means responsive to the work strip movement for sensing the arrival of said gauge change point at a second roll stand for providing a predetermined change in the operating speed of said first roll stand while maintaining the present operating speed of the second roll stand, with said predetermined change being in accordance with a relationship including the present operating speed of the second roll stand and the new desired work strip delivery gauge from at least one of said first and second roll stands.
- the gauge control system of claim 1 including means for controlling the operating speed of said second roll stand, with said work strip movement responsive means sensing the arrival of said gauge change point at a third roll stand for providing desired changes respectively in the operating speed of said first roll stand and in the operating speed of said second roll stand while maintaining the present operating speed of the third roll stand, with said desired changes being in accordance with a second relationship including the present operating speed of the third roll stand and the new desired work strip delivery gauge from at least one of said second and third roll stands.
- the gauge control system of claim 1 including means for determining the operating speed of each of said roll stands and the workstrip delivery gauge from each of said roll stands before said gauge change point arrives at said first roll stand.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control Of Metal Rolling (AREA)
Abstract
A control method and apparatus are disclosed for controlling the gauge of strip material being rolled by a tandem rolling mill while the strip is in motion and moving through the mill. A gauge change in the work strip is accomplished by changing, in proper timed sequence, the stand speed and roll gap openings starting from the first to the last stand. In order to change gauge or thickness of the work strip material during rolling, as the gauge change point engers the first stand the roll gap opening of the first stand is initially changed. As the gauge change point enters each succeeding stand, the speeds of all the previous stands are adjusted for the changed schedule and the tension controlling roll gap system senses the change in tension at the entry side of the gauge change stand and adjusts the gauge change stand roll gap to maintain the desired tension and consequently the desired change in delivery gauge leaving that roll stand.
Description
United States Patent 1 Cook John W. Cook, Williamsville, NY.
Westinghouse Electric Corporation, Pittsburgh, Pa.
[751 inventor:
[73] Assignee:
[ 1 Dec. 10, 1974 Primary ExaminerMilton S. Mehr Attorney, Agent, or FirmR. G. Brodahl 5 7] ABSTRACT A control method and apparatus are disclosed for controlling the gauge of strip material being rolled by a Filedi P 1973 tandem rolling mill while the strip is in motion and [21] Appl No; 354,288 moving through the mill. A gauge change in the work strip is accomplished by changing, in proper timed se- 1 quence, the stand speed and roll gap openings starting [52] U.S. Cl. 72/12, 72/24-() from the first t the last stand, In order to change [51] Int. Cl B211) 37/00, 1321b 37/14 gauge or thickness of the work strip material during [58] Field of Search 72/6l2, l6, rolling, as the gauge change point engers the first 72/ 1 stand the roll gap opening of the first stand is initially changed. As the gauge change point enters eachsuc- References Cited ceeding stand, the speeds of all the previous stands are UNITED STATES PATENTS adjusted for the changed schedule and the tension 3,722.244 3/1973 Fujii et a1 72/16 cfmtrolling 8 1? System Senses the, Change in 3,727,441 4/1973 Morooka et a1. 72/6 at the entry slde 0f the gauge Change Stand and 3,750,437 8/1973 Fujii et al 72/12 adjusts the gauge change stand roll gap to maintain 3,760,621 9/1973 Fujii et a1 72/9 the desired tension and consequently the desired 3,762,195 10/1973 Kitanosono et a1 72/11 hang in d livery gauge leaving that roll stand,
13 Claims, 5 Drawing Figures ROL SYST {G1 [G2 [G3 [G4 (G5 GAP GAP GAP GAP ACTUATOR ACTUATOR ACTUATOR ACTUATOR ACTUATOR e3 i a mm 8 RsI GAUGE RS2 l 1 TENsIoN 1 SPEED SPEED sPEED sPEED 'sPEED CONTROL CONTROL CONTROL CONTROL CONTROL 1 OI 1 c2 c5 1 c4 J cs TENSION TENSION CONTROL CONTROL CONTROL M2 T2 M5 T3 M4 T4 M5 TENSION TENsIoN TENSION REF. REF. REF.
GAUGE CHANGE SEQUENCE CONTROL APPARATUS INPUT OF DESIRED sPEED L 26 AND GAUGE REFERENCES WORK STRIP GAUGE CHANGE DURING ROLLING IN A TANDEM ROLLING MILL CROSS REFERENCE TO RELATED I APPLICATIONS Reference is made to the following related patent applications which are assigned to the present assignee:
Ser. No. 293,618, filed Sept. 29, 1972, by .l.J. Connors, now issued as US. Pat. No. 3,807,206 and entitled Strip Gauge Change During Rolling In A Tandem Rolling Mill.
Ser. No. 354,286 filed Apr. 25, 1973 filed concurrently herewith by A.W. Smith, Jr. and entitled Work Strip Gauge Change During Rolling In A Tandem Rolling Mill BACKGROUND OF THE INVENTION In-the operation of prior art tendem rolling mills, it has been the common practice to roll the entire length of metal strip material in one coil to a single desired and specified gauge (sometimes spelled gage) or thickness. That is, there was no satisfactory way of changing gauge while the strip material was in motion and passing through the rolling mill. One complete coil had to be rolled to a specified thickness; and the roll gap and speed settings in relation to a succeeding and different gauge coil then changed for the respective stands while the mill was not in use and before the succeeding coil was rolled to a different delivery gauge. As a result, small single coil orders of different delivery gauges meant small and separate coils and a resultant reduced production efficiency. Furthermore, it has not been too successful with prior art systems to weld together several lengths of strip material of varying thicknesses and roll them to a constant, final delivery gauge.
In an article published in the 1966 Iron and Steel Engineer Year Book, at pages 659 to 667, there is a disclosure of a tandem rolling mill operation including respective X-ray gauge sensing devices operative for thickness control purposes after each of the first and last roll stands, with interstand control apparatus operative ahead of and providing roll opening control for each of the roll stands other than the first roll stand. In addition, continuous rolling operation ofa tandem mill is broadly discussed. I
In US. Pat. No. 3,170,344 there is disclosed a tandem mill operation including X-ray gauge sensing devices operative after each of the first and last roll stands, with interstand tension control apparatus operative ahead of and providing roll opening control for each of the 'roll stands of the mill other than the first roll stand and the last roll stand.
In an article published in the 1966 Iron andSteel Engineer Year Book, at pages 328 to 334, there is a disclosure of digital computer program organization for the control of a rolling mill, including the sequencing of desired operations.
In an article published in the January, 1969 Westinghouse Engineer, at pages 2 to 8, there is a disclosure of integrated process control for more efficient and more effective control of modern rolling mills, by use of a stored program digital control computer.
SUMMARY OF THE INVENTION When it is desired for a given work strip to pass through the successive roll stands of a particular rolling mill, for example a five stand tandem rolling mill, initially at a first schedule of operationwhereby a first delivery gauge leaves the last stand of the rolling mill and then subsequently at a second and different schedule of operation whereby a second delivery gauge leaves the last stand of the rolling mill, a controlled sequence of successive predetermined operations for the respective roll stands is here provided for this purpose.
The rolling vmill is operated, when the work strip is passing through the successive roll stands of the rolling mill, such that a first X-ray gauge sensing device positioned after the first roll stand controls the roll opening of that first roll stand to effect a coarse gauge control of the work strip leaving that first roll stand, and a second X-ray gauge sensing device positioned after the last roll stand controls the speed of that last stand to effect a vernier gauge control of the work strip leaving that last roll stand. A tension regulating device is positioned to sense the work strip interstand tension after each of the first, second, third and fourth roll stands and is operative respectively to control the roll opening of the following roll stand for maintaining the rolling mill operation in accordance with the well-known mass flow relationship:
(1) where H, is the work strip delivery gauge leaving the first roll stand at speed 8,, where H is the work strip delivery gauge leaving the second roll stand at speed S and so forth.
When it is desired to change the operation of the rolling mill from the initial first gauge schedule of operation to the second gauge schedule of operation as a predetermined gaugechange point of the work strip passes through the successive roll stands, this gauge change point movement can be established and followed in several ways, for example a weld detector can sense physically thegauge change point in the form of a welded joint in the work strip or a provided pulse generator and associated bridle roll arrangement can be operative with a pulse counter to sense the movement of the work strip and after a predetermined number of feet of incoming work strip have passed through the first roll stand in accordance with the first schedule it may be desired to effect a change to the second schedule operation when the predetermined gauge'change point of the work strip arrives at and enters the first roll stand. A provided sequence control system prior to this event senses the work strip delivery gauge leaving the last roll stand and senses the operating speed of each roll stand, and then determines by mass flow considerations the work strip delivery gauges respectively leaving each of the first, second, third and fourth roll stands in accordance with the relationship of above equation (I).
When the gauge change point of the work strip arrives at the first roll stand the roll opening of that stand is changed by a predetermined amount by the sequence control system such that the delivery gauge of the work strip leaving the first roll stand is now in accordance with the desired second gauge schedule and since the work strip in accordance with the first schedule is still passing through the remaining subsequent roll stands the speeds of those remaining stands as well as the speed of the first stand are not changed. When the gauge change point of the work strip enters the second roll stand, the operating speed of the first roll stand is changed in accordance with the predetermined second schedule of operation, while the speed of the second rollstand is not changed since the work strip in accordance with the first schedule is still passing through the third, fourth and fifth roll stands, and the speeds of the third, fourth and fifth roll stands are not changed so as to continue the desired operation in accordance with the first gauge schedule. When the gauge change point of the work strip enters the third roll stand, the operating speeds of the previous first and second roll stands are changed in accordance with the second gauge schedule of operation, and the speeds of the third roll stand and the following roll stands are not changed since the work strip in accordance with the first gauge schedule is still operative with those roll stands. When the gauge change point of the work strip enters the fourth roll stand, the speeds of the previous first, second and third roll stands are changed in accordance with the second gauge schedule of operation, and the speeds of the fourth and fifth roll stands are not changed since the work strip in accordance with the first gauge change schedule is still operative with those roll stands. When the gauge change point of the work strip enters the fifth roll stand, the speeds of the previous first, second, third and fourth roll stands are changed in accordance with the second gauge schedule of operation, and the speed of the fifth roll stand is not changed. It is important to note here that the above described sequential operations, for a five stand tandem rolling mill, have resulted in four speed changes of the first roll stand, three speed changes of the second roll stand, two speed changes of the third roll stand and one speed change of the fourth roll stand. The rolling mill is now operative with the work strip in accordance with the second gauge schedule. If it should be desired to undertake a third gauge schedule of operation, the sequential control changes made to the respective roll stands would again be similarly provided in this manner.
BRIEF DESCRIPTION OF THE DRAWINGS The above and other advantages and features of the present invention will become more apparent from the following detailed description taken in conjunction with the accompanying drawings which form a part of this specification, and in which:
FIG. 1 is a block schematic diagram of a tandem rolling mill and a gauge change sequence control system operative with that rolling mill in accordance with the present invention;
FIG. 2 is a chart illustrating typical speed and work strip gauge or delivery thickness conditions as a gauge change point of the work strip passes through the roll stands 1 to of the rolling mill;
FIG. 3 is a chart illustrating the operation of the predetermined per unit multipliers to control the speeds of the roll stands in relation to the original gauge schedule and showing the progression of provided speed changes as the gauge change point of the work strip passes through the respective stands of the tandem rolling mill; and
FIGS. 4A and 4B show a flow chart of a suitable instruction control program for a digital control computer included within the gauge change sequence control apparatus shown in FIG. 1.
DESCRIPTION OF THE PREFERRED EMBODIMENTS With reference particularly to FIG. 1 of the drawings, the control system shown includes a five-stand tandem rolling mill having stands RS1, RS2, RS3, RS4 and RS5. Each stand comprises a pair of work rolls 10 and 12, between which work strip material being rolled is passed. The associated backup rolls for each stand are not shown. The strip issuing from the last stand RS5 is wound on a coiler 16, with the direction of strip movement being from left to right as indicated by the arrow 18 in FIG. 1.
The rolls of each stand are driven by means of respective drive motors M1, M2, M3, M4, and M5 each controlled by a suitable speed control circuit C1, C2, C3, C4, and C5, respectively. In this respect, and since each of the stands in the mill is reducing the strip in thickness, the speed of the material issuing from any stand must be greater than that entering the stand in accordance with the well-known constant volume principle of material mass flow. Accordingly, the speed of stand RS2 must be greater than the speed of stand RS1; the speed of stand RS3 must be greater than the speed of stand RS2, and so forth as well known to persons skilled in this art, with the speed of the last stand RS5 being the greatest.
It should be noted that the gauge change sequence control 26 is connected to control each drive motor speed through operation of the respective speed controls. It will be understood that a reference speed signal is supplied to each of the respective speed controls C1 to C5 for this purpose.
In the embodiment of the invention shown herein, the roll gap opening of each roll stand is determined by respective gap actuators G1, G2, G3, G4 and G5 as shown, and preferably including hydraulic cylinders, such that for each roll stand a hydraulic cylinder provides the necessary roll force at the stand to reduce the strip 14 in delivery gauge or thickness; and it will be understood that only one cylinder may be provided for each stand or there may be hydraulic cylinders on opposite sides of each mill stand, loading the chocks at the opposite ends of the work rolls. A mechanical screwdown mechanism including an electrical screwdown motor can be used if desired to effect the required roll force at each stand, but the hydraulic cylinders may be preferred because of their more rapid speed of operation.
The delivery gauge of strip material passing through the first stand RS1 is measured by means of an X-ray gauge 28 or the like positioned at the delivery side of first stand RS1, which X-ray gauge 28 is operative in conjunction with the automatic gauge control system 30 to control the roll opening of roll stand RS1 to cause the gauge error leaving roll stand RS1 to be reduced to zero. The automatic gauge control system 30 is operative with a gauge reference in accordance with the desired exit gauge from stand RS1. If the actual gauge at the output of stand RS1 does not match the desired reference gauge, then automatic gauge control system 30 operates in conjunction with X-ray gauge 28 to either increase or decrease the roll opening of stand RS1 to increase or decrease the roll force of stand S1 and thereby vary the roll opening of stand RS1 and thereby vary the delivery gauge of the work strip material issuing from stand RS1 until the delivery gauge matches the desired reference gauge.
Between successive pairs of the roll stands are tension control device T1, T2, T3 and T4 which measures tension in the strip between each set of stands, such as the tension in the strip material 14 between stands RS1 and RS2, and produces an electrical signal proportional thereto. This tension signal in relation to tension control T1 is compared with a tension reference signal in accordance with desired tension, and which may be supplied by the sequence control apparatus 26, and if the two are not the same, then the tension control device Tl will vary the pressure exerted by the gap actuator G2 for stand RS2, thereby varying the roll gap opening and/or the roll force of stand RS2. Similar tension control operations are provided for stands RS3 and RS5, respectively, Each tension control device measures a particular interstand tension and compares it with a desired reference tension, and if the two are not the same, then the roll gap opening for the succeeding stand is varied as required for work strip gauge correction.
For illustration, let us assume that the work strip tension increases between stand RS2 and stand RS3. Under these circumstances, comparison of the increased tension signal within the tension control device T2 with the desired reference tension act to decrease the roll gap and increase the roll force of the rolls on stand RS3 until the work strip tension between stands RS2 and RS3 is reduced to the desired value. Similarly, if the tension between stands RS2 and RS3 should fall, then this provided tension control operation will act to increase the roll gap and decrease the force until the tension rises to the desired value. All of this, of course,
assumes that the relative speeds of the stands remain unchanged.
The final delivery output gauge of the strip material passing through the tandem rolling mill is measured by means of an X-ray gauge 42 or the like, which produces an electrical signal proportional to the actual and measured output work strip gauge error. If the actual output gauge does not match the desired reference gauge, then the gauge error signal is applied to the speed control circuit C5 to increase or decrease as required the speed of drive motor MS of stand RS5, which in turn changes the tension between the last two stands to correct for the variation from thedesired delivery gauge. Ifthe correction is large enough to exceed the provided tension control dead band, the tension control device T4 will appropriately increase or decrease the roll gap of the last stand RS5 as required for correction of the interstand tension. In most cases, however, speed and tension control for varying final output gauge is desired on the last stand and the roll gap is changed only when the delivery gauge error is very large.
As was discussed above, rolling mills of this general arrangement have in the past been generally operative to roll a continuous length of strip on a coil to a single specified thickness of delivery gauge along the entire length of the strip.
However, situations arise where it is desired to change the gauge of the strip material on a single and perhaps larger coil while it is in motion through the rolling mill and being rolled. As was explained above, this may happen, for example, on small orders where, in the past, it has been necessary to roll a single coil of strip material of limited length, and this previously required stopping the mill between successive, small coils, and resetting the respective stand speed and gauge references after each such limited length coil was rolled. The requirement for making gauge schedule changes while rolling will also apply for the'new continuous operating rolling mills which roll work strips made up of several individual coils attached together end to end to eliminate the previous need for threading the in dividual work strip coils through the roll stands of the rolling mill. I
In accordance with the present invention, one or more delivery gauge changes can be effected during rolling of a single work strip, by initially changing the roll gap setting of the first stand RS1 to change thedelivery gauge of the strip material issuing from the first stand. Thereafter and in timed sequence, the respective control speed references of succeeding stands are changed until all roll gap settings and speeds of the stands in the mill have been set to accommodate the desired new delivery gauge. In this respect, it is necessary only to change the gauge references to the first stand RS1 and the X-ray gauge positioned after the first stand. For all other stands, it is necessary only to change the speed reference provided for the stand. The roll gap opening of each stand following the first stand is controlled and varied as required by means of the tension control devices T1 to T4.
In accordance with the present invention, the change from one delivery gauge to another is done in a way to preserve the required constant mass flow of work strip through the stands of the rolling mill for both the first delivery gauge schedule and the second delivery gauge schedule. Since the mill has no facility to store work stripmaterial between stands, the original mill setup was required to satisfy the mass flow relationship of above equation (1), where the product of the speed S times the strip delivery gauge or height H for each of the stands is equal to this same product for the-other stands. The thickness is decreased as it passes through each stand, so the speed increases to provide the wellknown constant volume flow operation. When the gauge change transition point passes midway between stands 2 and 3, for example, there are two heights between stands 2 and 3, the original work strip height H and the new work strip height H where H is the delivery gauge leaving stand RS2, H is for the first schedule and H is for the second schedule. The first value of the above set of equations no longer applies since the initial value H of the delivery gauge from stand 1 no longer exists but the remainder of the equation will still apply because the portion of the strip entering stand 3 is still the original height H This means that speeds S S S and S are still maintained at the original values to satisfy the requirementsof that portion of the initial schedule that is still in that portion of the mill.
The constant mass flow relationship, for the second schedule of work strip heights H and H being rolled in the stands 1 and 2 is:
The speed S of stand RS2 is shown to be the initial schedule value to satisfy the speed requirements of the first gauge or height schedule. The new speed S for stand RS1 is chosen to satisfy the constant mass flow requirements of the second gauge or height schedule,
after the first sequential speed change for the first roll stand RS1.
Similarly, when the gauge change point is betweenstands RS3 and RS4, the speed of stand RS3 must be maintained until all of the original gauge schedule passes to stand RS4, and the speeds of stands RS1 and RS2 must satisfy the constant mass flow relationships for the new height schedule so that:
(3) and so forth.
In the actual operation of such a mill, the reference stand speeds, roll openings, and interstand tensions are preset and adjusted to the desired work and deliver the required gauge out of the first stand and the last stand, and the gauge being delivered from each of the other stands is determined by the relationship between the stand speeds. The speed pattern is directly related to the respective delivery gauges being produced, so the rolling schedule for each work strip is primarily established by the desired speed relationship pattern and the roll gaps and tensions are preset and adjusted to suit that desired speed relationship.
The initial speed pattern in relation to the first gauge schedule product before the desired gauge change has to be determined and also the second gauge schedule pattern of speeds that is required after all of the stands are filled with the second gauge product after the desired gauge change. This might be done by the operator using his experience and judgement, by a wired basic sequence controller, or by a predetermined and stored control program operative with an on line digital computer. In accordance with the teachings of the present invention, there is provided the desired sequential control of the rolling mill operation during the transition period as the gauge change enters each roll stand of the mill and passes successively from stand to stand.
In FIG. 2 there is provided a chart to illustrate typical sequential changes in the rolling mill operating conditions as a work strip gauge change point moves through the roll stands of that rolling mill. At the top of the chart there is shown the first gauge schedule operation, with the first stand speed S (stand one and first schedule) equal to 446 and delivery gauge H equal to 0.085 being indicated, as well as the second stand speed 8 (stand two and first schedule) equal to 583 and delivery gauge H equal to 0.065, the third stand speed S equal to 758 and delivery gauge H equal to 0.050 and so forth.
When the gauge change point or transition of the work strip arrives at the first roll stand, the gauge change sequence control apparatus 26 as shown in FIG. 1 provides a different delivery gauge reference H (stand one and second schedule) to the automatic gauge control system 30 and the associated gap actuator G] of the first stand RS1, such that the delivery gauge H now equals 0.070. The first stand speed S is still equal to 446 and the operational conditions for the remaining stands two through five stay the same.
due to the operation of the tension regulating device T1, the delivery gauge from the second stand now becomes H equal to 0.050. The second stand speed remains the same, with S equal to 583, and the operating conditions for the subsequent third, fourth and fifth stands remain the same.
When the gauge change point or transition of the work strip arrives at the third roll stand RS3, the gauge change sequence control apparatus provides adifferent speed reference to each of the first and second roll stands, such that the first stand speed S is equal to 390 and the second stand speed Sm is equal to 546. The delivery gauge for the second schedule from each of the first and second roll stands remainsunchanged such that the first stand gauge H is equal to 0.070 and the second stand gauge H is equal to 0.050. However, through operation of the tension control device T2 the delivery gauge from the third roll stand RS3 changes such that this gauge H is equal to 0.036. The third stand speed S remains the same at 758, and the operating conditions for the fourth and fifth stands do not change.
When the gauge change point of the work strip arrives at the fourth roll stand RS4, the gauge change sequence control apparatus provides a different speed reference to each of the first, second and third stands, such that the first stand speed S is equal to 310, the second stand speed S is equal to 433 and the third stand speed S is equal to 602. The delivery gauge from each of the first, second and third roll stands remains unchanged, such that the first stand gauge H is equal to 0.070, the second stand gauge H is equal to 0.050 and the third stand gauge H is equal to 0.036. However, through operation of the tension control device T3 the delivery gauge from the fourth roll stand S4 changes such that this gauge H is equal to 0.024. The fourth stand speed remains the same at 903 and the operations of the fifth stand do not change.
When the gauge change point of the work strip arrives at the fifth roll stand RS5, the gauge change sequence control apparatus provides a different speed reference to each of the first, second, third and fourth roll stands, such that the first stand speed S is equal to 286, the second stand speed S is equal to 400, the third stand speed S is equal to 555 and the fourth stand speed S is equal to 833. The delivery gauges from respectively the first, second, third and fourth roll stands remain unchanged, however through operation of the tensioon control device T4 the delivery gauge from the fifth roll stand RS5 changes such that this gauge H is equal to 0.20. The fifth stand speed S remains the same at 1000.
In FIG. 3 there is provided a chart to illustrate the predetermined ratio multipliers that are utilized to establish the adjustments made in the previous stand speeds when the gauge change point of the work strip arrives at a particular roll stand. More specifically,
' when the gauge change point arrives at the second roll When the gauge change point or transition arrives at v stand RS2, the speed of the first roll stand RS1 is adjusted by the multiplier (S )(H )/(S, )(H, When the gauge change point arrives at the third roll stand RS3, the respective speeds of the first and second roll stands RS1 and RS2 are adjusted by the multiplier ai)( a2)/( 2i)( 22)- when the g g changepoint arrives at the fourth roll stand RS4, the respective speeds of the first, second and third roll stands RS1, RS2 and RS3 are adjusted by the multiplier (S,,)(H )/(S ,)(H When the gauge change point arrives at the fifth roll and RS5, the respective speeds of the first, second, third and fourth stands RS1, RS2, RS3 and RS4 are adjusted by the ratio multiplier (S ,)(H )/(S )(H This completes the desired transition from rolling the work strip at the first gauge schedule and rolling the work strip at the second gauge schedule.
The initial first schedule is rolled on a five stand mill going from an input gauge of 0.l inch to a finished gauge of 0.038 inch, with the drafting pattern in the respective roll stands as shown. When a desired gauge change is to be made, and when the selected gauge change point along the length of the work strip is passing through the roll stands, the second gauge schedule of operation will roll the work strip from an input gauge of 0.100 inch to a delivery gauge of 0.020 inch leaving the mill. The delivery speed from the fifth and lastroll stand RS5 is held constant at 1,000 feet per minute during the schedule change. The first schedule parameters shown in FIG. 3 can be determined by the sequence control apparatus reading the speed of each stand as provided by the respective stand pilot generator signals prior to the schedule change, and then using the volumetric flow relationship of above equation (1) the work strip thickness leaving each of the first, second, third and fourth roll stands can be established. The second schedule parameters can be provided by the operator or determined by the control computer within the sequence control apparatus prior to the selected time for a gauge schedule change, and these parameter values will be stored in the computer memory or suitable storage locations until needed. The various per unit speed multipliers as illustrated in FIG. 3 can then be determined before the gauge schedule change is started. Thusly, when the gauge change point arrives at the first roll stand, the second schedule delivery gauge from the first roll stand has previously been determined to be 0.070 inch and a suitable roll gap opening reference is applied to control the first stand. When the gauge change point arrives at the second roll stand RS2, the speed of the first roll stand RS1 will be changed by the multiplier such that the speed of the first roll stand will be changed to (0.933) 446 416 FPM. When the gauge change point arrives at the third roll stand RS3, the speed of the first roll stand RS1 and the speed of the second roll stand RS2 will be changed by the multiplier 3i)( a2)/( 21)( 22) )/583)( r 0.937,
(5) such that the speed of the first roll stand will be changed to (0.937) 416 390 FPM and the speed of the second roll stand will be changed to (0.937) 583 546 FPM. The speed changes that occur when the gauge change point arrives at the fourth roll stand RS4 and then arrives at the fifth roll stand RS5 are similarly established and illustrated in the chart of FIG. 3. It should be noted that all roll stands ahead of the gauge change transition point are maintaining a correct speed relationship for the first gauge schedule and all roll stands behind the gauge change transition point are maintaining a correct speed relationship for the second gauge schedule.
The control operation logic flow chart shown in FIG. 4 is illustrative of one suitable embodiment of the present invention is provided by operation of the sequence control apparatus. A stored program digital computer could be utilized for this purpose if desired or a hardwired controlled apparatus could be provided if desired. When it is desired to enter the control program illustrated by this flow chart, at step 400 a determination is made from provided input information of the desired length of work strip in the first gauge schedule. At step 402 a counter is set with a predetermined count level to effect a desired slow down of the rolling mill operation to a selected transition speed just prior to the gauge change point of the work strip arriving at the first roll stand RS1. At step 404 the pulses from a pulse generator operative with the entry bridle or the delivery bridle positioned ahead of the first roll stand RS1, are counted to track the gauge change point movement, and when a predetermined slowdown initiate count is reached in the counter the rolling mill is decelerated to a selected transition speed at step 406. At step 408 a reading is made of the delivery gauge leaving the last roll stand RS5 through operation of the X-ray gauge device and the respective speeds of all the roll stands through operation of the pilot generator operative with each roll stand. At step 410 a determination is made of the delivery gauge from each of the first, second, third and fourth roll stands by operation of the mass flow relationship of above equation (1). At step 412 a determination is made by the sequence control apparatus of the required transition speed per unit multipliers, as shown in FIG. 3. At step 414 the gauge change point movement is tracked to arrive at the first roll stand RS1 through operation of perhaps a weld detector positioned a known distance ahead of the first roll stand to initiate counting of output pulses from the bridle roll pulse generator. When the gauge change point arrives at the first roll stand RS1, at step 416 the first roll stand roll opening is adjusted from the first schedule delivery gauge H setting to the second schedule delivery gauge I'I setting. At this time, allowing for necessary transport time delay, the gauge reference for the X-ray gauge device 28 is changed to the second schedule gauge H At step 417 and X-ray monitor operation, provided by operation of the X-ray gauge device 42, is released from the first roll stand RS1, since the X-ray gauge device 42 is still operating with the first gauge schedule and the first roll stand is now operative with the second gauge schedule. At step 418 the gauge change point movement is tracked until arrival at the second roll stand RS2, through counting of output pulses from the pulse generator coupled with the first roll stand RS1. At step 420 the speed reference for the speed control C1 operative with the first roll stand RS1 is adjusted by the per unit multiplier shown in FIG. 3 such that the first roll stand is now operative at the desired speed relationship in accordance with the seocnd gauge schedule. At step 422 the gauge change point movement is tracked to arrive at the third roll stand RS3, through counting of output pulses from the pilot generator coupled to the second roll stand RS2. At step 424 and when the gauge change point arrives at the third roll stand RS3, the speed references for the respective speed controls Cl and C2 are adjusted by the per unit multiplier shown in FIG. 3 such that the first and second roll stands are now operative at the desired speed relationship in accordance with the second gauge schedule. At step 426 the gauge change point movement is tracked to arrive at the fourth roll stand RS4, through counting of output pulses from the pilot generator coupled to the third roll stand RS3. At step 428 and when the gauge change point arrives at the fourth roll stand, the speed references for the respective speed controls C1, C2 and C3 are adjusted by the per unit multiplier shown in FIG. 3 such that the first, second and third roll stands are now operative at the desired speed relationship in accordance with the second gauge schedule. At step 430 the gauge change point movement is tracked to arrive at the fifth roll stand RS5, through counting of output pulses from the pilot generator coupled to the fourth roll stand RS4. At step 432 and when the gauge change point arrives at the fifth roll stand, the speed references for the respective speed controls C1, C2, C3 and C4 are adjusted by the per unit multiplier shown in FIG. 3 such that the first, second, third and fourth roll stands, as well as the fifth roll stand, are now operative at the desired speed relationship in accordance with the second gauge schedule. At step 434 the rolling mill is' accelerated to a predetermined run speed of operation, and the control program then ends.
The following is an illustrative example of an instruction program listing that has been prepared of the respective roll stands in accordance with the functional logic flow chart shown in FIG. 4.
I claim:
1. In a gauge control system for a tandem rolling mill having a plurality of roll stands operative to reduce the gauge of a work strip having a gauge change point and being passed through said rolling mill, the combination of means for controlling the operating speed of a first roll stand, and means responsive to the work strip movement for sensing the arrival of said gauge change point at a second roll stand for providing a predetermined change in the operating speed of said first roll stand while maintaining the present operating speed of the second roll stand, with said predetermined change being in accordance with a relationship including the present operating speed of the second roll stand and the new desired work strip delivery gauge from at least one of said first and second roll stands.
2. The gauge control system of claim 1, including means for controlling the operating speed of said second roll stand, with said work strip movement responsive means sensing the arrival of said gauge change point at a third roll stand for providing desired changes respectively in the operating speed of said first roll stand and in the operating speed of said second roll stand while maintaining the present operating speed of the third roll stand, with said desired changes being in accordance with a second relationship including the present operating speed of the third roll stand and the new desired work strip delivery gauge from at least one of said second and third roll stands.
3. The gauge controlsystem of claim 1, with said predetermined change in the operating speed of said first roll stand being in accordance with the relationship where 5, is the new desired operating speed for said first roll stand, S is the present operating speed for the second roll stand, H2 is the new desired work strip delivery gauge from the second roll stand and H... is the new desired work strip delivery gauge from the first roll stand.
4. The gauge control system of claim 1, including means for determining the operating speed of each of said roll stands and the workstrip delivery gauge from each of said roll stands before said gauge change point arrives at said first roll stand.
5. The gauge control system of claim 1, with said means responsive to the work strip movement being operative to provide said change in the operating speed of said first roll stand in accordance with the relationship S original speed (N-l)* (original speed N)(final gauge N)/(original speed where S is the speed reference for said first roll stand after said gauge point has arrived at said second roll stand, original speed N-l is the speed reference of said first roll stand before said gauge point arrives at said second roll stand, original speed N is the speed reference of said second roll stand before said gauge point arrives at said second roll stand, final gauge N is the work strip delivery gauge from said second roll stand after said gauge point arrives at said second roll stand and final gauge N-l is the work strip delivery gauge from said first roll stand after said gauge point arrives at said second roll stand.
6. In a gauge controlsystem'for a tandem rolling mill having a plurality of roll stands operative to reduce the gauge of a work strip having a gauge change point and being passed through said rolling mill, the combination of means for controlling the operating speed of each of said roll stands,
means responsive to the movement of said work strip sensing the arrival of said gauge change point at roll stand N of said rolling mill for providing a change in the operating speed of previous roll stand X while maintaining the present operating speed of roll stand N, with said change being in accordance with the relationship where S is the new speed reference for previous roll stand X, S is the present speed reference for roll stand N, H is the new delivery gauge desired from roll stand N and H is the new delivery gauge desired from previous roll stand X.
7. The gauge control system of claim 6, with said means responsive to the movement of said work strip being operative to provide a change in the operating speed of each roll stand previous to roll stand N in accordance with said relationship.
8. The gauge control system of claim 6, including means for controlling the roll opening of at least said roll stand N,
with said means responsive to the movement of said work strip providing a predetermined change in the roll opening ofsaid roll stand N when said gauge determining the arrival of said gauge change point at a first roll stand,
providing a first predetermined change in the roll opening of said first roll stand when said gauge change point arrives at said first roll stand, determining the arrival of said gauge change point at a second roll stand, and
providing a second predetermined change in the operating speed of said first roll stand when said gauge change point arrives at said second roll stand. 10. The method of claim 9, including the steps of determining the arrival of said gauge change point at a third roll stand, and
providing an additional change in the operating speed of said first roll stand when said gauge change point arrives at said third roll stand.
11. A method of controlling the work strip gauge leaving a tandem rolling mill having a plurality of roll stands, with said work strip having a gauge change point at which it is desired for the gauge of the work strip leaving the rolling mill to change from a first delivery gauge schedule to a second delivery gauge schedule, the steps of said method comprising determining the arrival of said gauge change point at a selected roll stand of said rolling mill subsequent to at least the first roll stand of said rolling millr and controlling the operating speed of each roll stand of said rolling mill prior to said selected roll stand when said gauge change point arrives at said selected roll stand in accordance with a predetermined relationship including the operating speed of said selected roll stand for said first schedule and the new desired work strip delivery gauge for said second schedule from at least said selected roll stand.
12. The method of claim 11, including the step of controlling the roll opening of said first roll stand by measuring the actual workpiece delivery gauge for said second schedule leaving said first roll stand in comparison to a desired reference delivery gauge for the work strip leaving said first roll stand.
13. The method of claim 11, including the step of sensing the work strip tension before each of predetermined roll stands of said rolling mill and controlling the roll opening of each of said predetermined roll stands for maintaining respective desired tension conditions in relation to said predetermined roll stands.
Claims (13)
1. In a gauge control system for a tandem rolling mill having a plurality of roll stands operative to reduce the gauge of a work strip having a gauge change point and being passed through said rolling mill, the combination of means for controlling the operating speed of a first roll stand, and means responsive to the work strip movement for sensing the arrival of said gauge change point at a second roll stand for providing a predetermined change in the operating speed of said first roll stand while maintaining the present operating speed of the second roll stand, with said predetermined change being in accordance with a relationship including the present operating speed of the second roll stand and the new desired work strip delivery gauge from at least one of said first and second roll stands.
2. The gauge control system of claim 1, including means for controlling the operating speed of said second roll stand, with said work strip movement responsive means sensing the arrival of said gauge change point at a third roll stand for providing desired changes respectively in the operating speed of said first roll stand and in the operating speed of said second roll stand while maintaining the present operating speed of the third roll stand, with said desired changes being in accordance with a second relationship including the present operating speed of the third roll stand and the new desired work strip delivery gauge from at least one of said second and third roll stands.
3. The gauge control system of claim 1, with said predetermined change in the operating speed of said first roll stand being in accordance with the relationship S12 (S21)(H22)/H12 where S12 is the new desired operating spEed for said first roll stand, S21 is the present operating speed for the second roll stand, H22 is the new desired work strip delivery gauge from the second roll stand and H12 is the new desired work strip delivery gauge from the first roll stand.
4. The gauge control system of claim 1, including means for determining the operating speed of each of said roll stands and the workstrip delivery gauge from each of said roll stands before said gauge change point arrives at said first roll stand.
5. The gauge control system of claim 1, with said means responsive to the work strip movement being operative to provide said change in the operating speed of said first roll stand in accordance with the relationship SN-1 original speed (N-1)* (original speed N)(final gauge N)/(original speed N-1)(final gauge N-1) where SN-1 is the speed reference for said first roll stand after said gauge point has arrived at said second roll stand, original speed N-1 is the speed reference of said first roll stand before said gauge point arrives at said second roll stand, original speed N is the speed reference of said second roll stand before said gauge point arrives at said second roll stand, final gauge N is the work strip delivery gauge from said second roll stand after said gauge point arrives at said second roll stand and final gauge N-1 is the work strip delivery gauge from said first roll stand after said gauge point arrives at said second roll stand.
6. In a gauge control system for a tandem rolling mill having a plurality of roll stands operative to reduce the gauge of a work strip having a gauge change point and being passed through said rolling mill, the combination of means for controlling the operating speed of each of said roll stands, means responsive to the movement of said work strip sensing the arrival of said gauge change point at roll stand N of said rolling mill for providing a change in the operating speed of previous roll stand X while maintaining the present operating speed of roll stand N, with said change being in accordance with the relationship SX2 (SN1)(HN2)/HX2 where SX2 is the new speed reference for previous roll stand X, SN1 is the present speed reference for roll stand N, HN2 is the new delivery gauge desired from roll stand N and HX2 is the new delivery gauge desired from previous roll stand X.
7. The gauge control system of claim 6, with said means responsive to the movement of said work strip being operative to provide a change in the operating speed of each roll stand previous to roll stand N in accordance with said relationship.
8. The gauge control system of claim 6, including means for controlling the roll opening of at least said roll stand N, with said means responsive to the movement of said work strip providing a predetermined change in the roll opening of said roll stand N when said gauge change point arrives at said roll stand N.
9. A method for controlling the work strip gauge leaving a tandem rolling mill having a plurality of roll stands, with said work strip having a gauge change point passing through said roll stands, the steps of said method comprising determining the arrival of said gauge change point at a first roll stand, providing a first predetermined change in the roll opening of said first roll stand when said gauge change point arrives at said first roll stand, determining the arrival of said gauge change point at a second roll stand, and providing a second predetermined change in the operating speed of said first roll stand when said gauge change point arrives at said second roll stand.
10. The method of claim 9, including the steps of determining the arrival of said gauge change point at a third roll stand, and providing an additional change in the operating speed of said first rolL stand when said gauge change point arrives at said third roll stand.
11. A method of controlling the work strip gauge leaving a tandem rolling mill having a plurality of roll stands, with said work strip having a gauge change point at which it is desired for the gauge of the work strip leaving the rolling mill to change from a first delivery gauge schedule to a second delivery gauge schedule, the steps of said method comprising determining the arrival of said gauge change point at a selected roll stand of said rolling mill subsequent to at least the first roll stand of said rolling mill, and controlling the operating speed of each roll stand of said rolling mill prior to said selected roll stand when said gauge change point arrives at said selected roll stand in accordance with a predetermined relationship including the operating speed of said selected roll stand for said first schedule and the new desired work strip delivery gauge for said second schedule from at least said selected roll stand.
12. The method of claim 11, including the step of controlling the roll opening of said first roll stand by measuring the actual workpiece delivery gauge for said second schedule leaving said first roll stand in comparison to a desired reference delivery gauge for the work strip leaving said first roll stand.
13. The method of claim 11, including the step of sensing the work strip tension before each of predetermined roll stands of said rolling mill and controlling the roll opening of each of said predetermined roll stands for maintaining respective desired tension conditions in relation to said predetermined roll stands.
Priority Applications (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US00354288A US3852983A (en) | 1973-04-25 | 1973-04-25 | Work strip gauge change during rolling in a tandem rolling mill |
CA196,713A CA1034665A (en) | 1973-04-25 | 1974-04-03 | Work strip gauge change during rolling in a tandem rolling mill |
AR253423A AR214382A1 (en) | 1973-04-25 | 1974-04-23 | ROLLING GAUGE VARIATOR APPARATUS IN A MOVING ROLLER TRAIN |
FR7414191A FR2227065B1 (en) | 1973-04-25 | 1974-04-24 | |
IT41579/74A IT1010800B (en) | 1973-04-25 | 1974-04-24 | DEVICE AND PROCEDURE FOR ADJUSTING THE THICKNESS OF A ROLLING BELT |
JP49047079A JPS5013248A (en) | 1973-04-25 | 1974-04-25 | |
BE1005908A BE814143A (en) | 1973-04-25 | 1974-04-25 | DEVICE FOR CHANGING THE SIZE OF A TAPE DURING ROLLING |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US00354288A US3852983A (en) | 1973-04-25 | 1973-04-25 | Work strip gauge change during rolling in a tandem rolling mill |
Publications (1)
Publication Number | Publication Date |
---|---|
US3852983A true US3852983A (en) | 1974-12-10 |
Family
ID=23392638
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US00354288A Expired - Lifetime US3852983A (en) | 1973-04-25 | 1973-04-25 | Work strip gauge change during rolling in a tandem rolling mill |
Country Status (7)
Country | Link |
---|---|
US (1) | US3852983A (en) |
JP (1) | JPS5013248A (en) |
AR (1) | AR214382A1 (en) |
BE (1) | BE814143A (en) |
CA (1) | CA1034665A (en) |
FR (1) | FR2227065B1 (en) |
IT (1) | IT1010800B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4011743A (en) * | 1976-04-20 | 1977-03-15 | Westinghouse Electric Corporation | Stand speed reference circuit for a continuous tandem rolling mill |
US4335435A (en) * | 1978-11-01 | 1982-06-15 | Mitsubishi Denki Kabushiki Kaisha | Method of changing rolling schedule during rolling in tandem rolling mill |
US4878368A (en) * | 1987-12-04 | 1989-11-07 | General Electric Company | Adaptive roll formed system and method |
US4887343A (en) * | 1987-05-29 | 1989-12-19 | Fuji Photo Film Co., Ltd. | Method and apparatus for roller leveler |
US20080223100A1 (en) * | 2005-05-11 | 2008-09-18 | Corus Staal Bv | Method and Apparatus for Producing Strip Having a Variable Thickness |
IT202000000316A1 (en) * | 2020-01-10 | 2021-07-10 | Danieli Off Mecc | METHOD AND APPARATUS FOR THE PRODUCTION OF FLAT METALLIC PRODUCTS |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60196217A (en) * | 1984-03-16 | 1985-10-04 | Sumitomo Light Metal Ind Ltd | Continuous rolling method of metallic pipe |
CN114472544B (en) * | 2022-03-07 | 2023-06-16 | 宝钢湛江钢铁有限公司 | Hot rolling gap control method, system, computer equipment and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3722244A (en) * | 1970-03-07 | 1973-03-27 | Nippon Kokan Kk | Method of controlling continuous rolling of metal strips |
US3727441A (en) * | 1970-03-16 | 1973-04-17 | Hitachi Ltd | Thickness control apparatus for rolling mill |
US3750437A (en) * | 1970-03-07 | 1973-08-07 | Nippon Kk | Method and apparatus for controlling continuous tandem rolling mills |
US3760621A (en) * | 1970-08-26 | 1973-09-25 | Nippon Kokan Kk | Control method of tension in rolling mills (1) |
US3762195A (en) * | 1970-03-09 | 1973-10-02 | Hitachi Ltd | Thickness control apparatus for rolling mill |
-
1973
- 1973-04-25 US US00354288A patent/US3852983A/en not_active Expired - Lifetime
-
1974
- 1974-04-03 CA CA196,713A patent/CA1034665A/en not_active Expired
- 1974-04-23 AR AR253423A patent/AR214382A1/en active
- 1974-04-24 IT IT41579/74A patent/IT1010800B/en active
- 1974-04-24 FR FR7414191A patent/FR2227065B1/fr not_active Expired
- 1974-04-25 BE BE1005908A patent/BE814143A/en not_active IP Right Cessation
- 1974-04-25 JP JP49047079A patent/JPS5013248A/ja active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3722244A (en) * | 1970-03-07 | 1973-03-27 | Nippon Kokan Kk | Method of controlling continuous rolling of metal strips |
US3750437A (en) * | 1970-03-07 | 1973-08-07 | Nippon Kk | Method and apparatus for controlling continuous tandem rolling mills |
US3762195A (en) * | 1970-03-09 | 1973-10-02 | Hitachi Ltd | Thickness control apparatus for rolling mill |
US3727441A (en) * | 1970-03-16 | 1973-04-17 | Hitachi Ltd | Thickness control apparatus for rolling mill |
US3760621A (en) * | 1970-08-26 | 1973-09-25 | Nippon Kokan Kk | Control method of tension in rolling mills (1) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4011743A (en) * | 1976-04-20 | 1977-03-15 | Westinghouse Electric Corporation | Stand speed reference circuit for a continuous tandem rolling mill |
US4335435A (en) * | 1978-11-01 | 1982-06-15 | Mitsubishi Denki Kabushiki Kaisha | Method of changing rolling schedule during rolling in tandem rolling mill |
US4887343A (en) * | 1987-05-29 | 1989-12-19 | Fuji Photo Film Co., Ltd. | Method and apparatus for roller leveler |
US4878368A (en) * | 1987-12-04 | 1989-11-07 | General Electric Company | Adaptive roll formed system and method |
US20080223100A1 (en) * | 2005-05-11 | 2008-09-18 | Corus Staal Bv | Method and Apparatus for Producing Strip Having a Variable Thickness |
IT202000000316A1 (en) * | 2020-01-10 | 2021-07-10 | Danieli Off Mecc | METHOD AND APPARATUS FOR THE PRODUCTION OF FLAT METALLIC PRODUCTS |
CN113102504A (en) * | 2020-01-10 | 2021-07-13 | 达涅利机械设备股份公司 | Method and apparatus for producing flat metal products |
WO2021140531A1 (en) * | 2020-01-10 | 2021-07-15 | Danieli & C. Officine Meccaniche S.P.A. | Method and apparatus for producing flat metal products |
US20230042075A1 (en) * | 2020-01-10 | 2023-02-09 | Danieli & C. Officine Meccaniche S.P.A. | Method and apparatus for producing flat metal products |
CN113102504B (en) * | 2020-01-10 | 2024-01-02 | 达涅利机械设备股份公司 | Method and apparatus for producing flat metal products |
US12064799B2 (en) * | 2020-01-10 | 2024-08-20 | Danieli & C. Officine Meccaniche S.P.A. | Method and apparatus for producing flat metal products |
Also Published As
Publication number | Publication date |
---|---|
FR2227065A1 (en) | 1974-11-22 |
FR2227065B1 (en) | 1978-01-20 |
CA1034665A (en) | 1978-07-11 |
BE814143A (en) | 1974-10-25 |
IT1010800B (en) | 1977-01-20 |
JPS5013248A (en) | 1975-02-12 |
AR214382A1 (en) | 1979-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3694636A (en) | Digital computer process control with operational learning procedure | |
USRE25075E (en) | Rolling mills | |
US4335435A (en) | Method of changing rolling schedule during rolling in tandem rolling mill | |
GB982232A (en) | Improvements in or relating to automatic strip gauge control for a rolling mill | |
GB1292845A (en) | Predictive gauge control method and apparatus with adaptive plasticity determination for metal rolling mills | |
US3905216A (en) | Strip temperature control system | |
US3852983A (en) | Work strip gauge change during rolling in a tandem rolling mill | |
US5560236A (en) | Method of rolling and cutting endless hot-rolled steel strip | |
US4011743A (en) | Stand speed reference circuit for a continuous tandem rolling mill | |
US3934438A (en) | Method of long-edge shape control for tandem rolling mill | |
US4087859A (en) | Apparatus for measuring and controlling interstand tensions of continuous rolling mills | |
US3650135A (en) | Control for rolling means having successine rolling stands | |
US3722244A (en) | Method of controlling continuous rolling of metal strips | |
US3603124A (en) | Computer control system for rolling metal strips using feed-forward and prediction | |
US4506532A (en) | Method for controlling continuous rolling mill and control apparatus therefor | |
US3618348A (en) | Method of controlling rolling of metal strips | |
US4063438A (en) | Method of controlling tandem rolling mills | |
US3267709A (en) | Method and apparatus for controlling temperature of the workpiece during rolling | |
US3733866A (en) | Method of controlling a continuous hot rolling mill | |
US3290912A (en) | Rolling mill control apparatus | |
US3213656A (en) | Rolling mill motor speed control apparatus | |
US3807206A (en) | Strip gage change during rolling in a tanden rolling mill | |
EP0109235B1 (en) | Rolling mill control for tandem rolling | |
US3212310A (en) | Automatic gauge and tension control system | |
US3913363A (en) | Method and apparatus for shape control of metal products in continuous rolling mill |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: AEG WESTINGHOUSE INDUSTRIAL AUTOMATION CORPORATION Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:WESTINGHOUSE ELECTRIC CORPORATION;REEL/FRAME:005424/0551 Effective date: 19900313 |