US3736759A - Pile covering - Google Patents
Pile covering Download PDFInfo
- Publication number
- US3736759A US3736759A US00225217A US3736759DA US3736759A US 3736759 A US3736759 A US 3736759A US 00225217 A US00225217 A US 00225217A US 3736759D A US3736759D A US 3736759DA US 3736759 A US3736759 A US 3736759A
- Authority
- US
- United States
- Prior art keywords
- pile
- shell
- foam
- tube
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/60—Piles with protecting cases
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10S—TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10S264/00—Plastic and nonmetallic article shaping or treating: processes
- Y10S264/06—Molding microballoons and binder
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T428/00—Stock material or miscellaneous articles
- Y10T428/24—Structurally defined web or sheet [e.g., overall dimension, etc.]
- Y10T428/24149—Honeycomb-like
- Y10T428/24157—Filled honeycomb cells [e.g., solid substance in cavities, etc.]
Definitions
- Asphalt has the disadvantage that a mixture adjusted for high solidity and hardness does not seal to the underwater surface to be protected so that moisture is likely to creep in between the asphalt and the pile to cause corrosion.
- a viscous asphalt consistency may seal better to the underwater body, but may pollute the surrounding water, like grease, unless the shell is carefully sealed.
- grease and asphalt are quite heavy and require handling of large masses of material to produce such sheaths.
- the invention aims at a protective sheath for piles and other underwater bodies to satisfactorily protect against corrosion without risking pollution of the water and without requiring large masses of filler material to be handled during installation.
- the invention seeks a better and more efficient, corrosion-resistant sheath installed relatively easily and economically.
- the invention applies a water-impervious shell around an underwater body secured to the body at the lower region of the shell and the body filled with a yieldable filler material, and improves on such an arrangement by using a filler material that is an expandible synthetic material expanded in place between the shell and the body to form a closed-cell foam having a snug, sealing bond with the surface of the body.
- FIG. 3 is a partially schematic, horizontal crosssection of a preferred embodiment of the inventive pile covering
- FIG. 4 is a partially schematic, horizontal crosssection of the inventive pile covering applied to a sheet piling.
- FIGS. 5 and 6 are partially schematic, horizontal cross-sections of alternative preferred embodiments of the inventive pile covering.
- pile l is surrounded by a shell or tube 3 of synthetic material extending down to a desired depth of, for example, 2 meters below low tide, and extending above water surface 2 to above the reach of the water.
- Tube 3 is preferably formed of a tough, elastic, thermoplastic material such as, for example, polyvinyl chloride of a Shore D hardness of 82.
- the space between tube 3 and pile 1 is filled with expanded, synthetic resin 4, such as phenol resin foam or polyurethane foam.
- a higher density foam 5 is used to secure a high quality
- Underlying collar or bottom plate 6 can be made permanent and sealed to pile l and shell 3, or plate 6 can be used as a mounting aid and can be removed after sheath installation, because high density foam 5 assured sufficient water impermeability.
- pile 1 is first cleaned in the zone to be protected or at least in the zone to be covered by the lower end of shell 3.
- bottom plate 6, which can be sectioned or segmented, is fitted around pile 1 and sealed to pile by sealing 7.
- tube 3 is seated on collar 6 and sealingly connected to collar 6 by sealing 8.
- the annular space between pile 1 and shell 3 is then pumped empty and dried, using conventional drying agents and means.
- the denser foam 5 is formed in the bottom region of shell 3, and the lighter foam 4 of lower specific gravity is formed above high density foam 5.
- Foams 4 and 5 both form a snug sealing bond with pile 1 and serve to provide both the mechanical bond between pile 1 and shell 3, and the water sealing around pile 1.
- shell 3 and foam 4 are each yieldable to follow any flexure movement of pile 1.
- the light weight of expanded, synthetic filler material 4 has many advantages in simplifying production and installation and presenting fewer problems regarding statics. However, it has also been found that when foam 4 solidifies on pile 1, it becomes sealingly bonded to the surface of p'ile l, and the multitude of closed cells form walls sealingly bonded to the surface to be protected to form a system of consecutive barriers to moisture. It the outer wall of a cell breaks to let in water, further penetration by the water is stopped by subsequent cell walls for an extremely efficient moisture barrier.
- foams 4 and 5 preferably contain materials capable of absorbing any water that enters by penetration or diffusion, thus forming a drying agent rendering such water harmless. Foams 4 and 5 can also contain corrosion inhibitors further protecting pile 1.
- High-density foam 5 aids in preventing penetration of water from below and forms an additional water or vapor barrier at the lower end of shell 3.
- Foam 5 preferably forms a'secure sealing bond with pile l and with shell 3, and also forms a secure bond with foam 4 on top of foam 5.
- the high-density foam 5 forming a moisture barrier at the bottom of shell 3 of FIG. 1, can be supplemented or replaced by a different layer capable of forming a sealing bond with pile 1 and shell 3, and formed, for example, of a permanently plastic or permanently elastic material.
- a highly viscous liquid can be used for a vapor barrier. No special mechanical retaining means is required for a permanently elastic or a comparably stiff, but permanently plastic vapor barrier (although this may be desired in some instances), but a viscous liquid vapor seal is most suitable where the lower end of the sheath is mechanically connected to the underwater surface without any coarse openings allowing leakage.
- the liquid sealant can be at a higher pressure than the outside water pressure. Then any openings or pores in the sheath are blocked from the inside by the highly viscous liquid so that the water cannot enter. Since the expanded foam filler above the. liquid has a low specific gravity, the pressure on the liquid sealant will normally be less than, or at least no higher than the outside water pressure. Then, it must be assumed that the water will penetrate through openings or pores in the sheath and cannot be excluded from the lower joint between the shell and the underwater body. The viscous liquid may nevertheless provide an adequate moisture barrier if the liquid has a lower specific gravity than water.
- the water that penetrates will urge the sealing liquid upward against the foam which forms a mechanical barrier preventing the sealing liquid from rising any higher.
- the viscous liquid is then capable of forming an effective barrier between any water penetrating the sleeve, and the foam disposed above the liquid.
- Suitable filler materials for the inventive sheath are expanded synthetic materials that are resistent to moisture, are capable of being applied to the underwater surface in a liquid or pasty expanded condition, form a closed-cell foam, andform a secure, sealing bond with the underwater surface.
- Somewhat yieldable foams are preferred that are plastic or elastic enough to prevent the foam from peeling off the underwater surface from any deformation or flexure of the sheathed body.
- suitable expandible materials are preferably formed of unsaturated polyester resins such as expanded polyurethane materials composed of polyoles and polyisocyanates in a 1:1 ratio preferred for their stability and elasticity.
- the preferred foams may use fillers such as expanded clay or expanded glass spheres.
- the preferred density of the expanded filler material preferably ranges from 100 to 300 kilograms per cubic meter, and the expanded filler material, and the material of shell 3 are preferably selected so that the foam forms a secure, sealing bond with both pile 1 and shell 3.
- Preferably shell3 is formed of a tough, elastic material such as a thermoplastic synthetic material.
- a preferred example is polyvinyl chloride and copolymers with suitably adjusted hardness.
- Shell 3 for protecting pilings is preferably in the form of a tube as illustrated, and it does not matter whether tube 2 is peripherally closed and telescoped over pile l, or whether a slit or sectioned tube is wrapped around pile l and then closed.
- Shell 3 preferably has internal protrusions or recesses ensuring positive tension and shear resistant engagement with foam materials d and 5 whenever the sealing bond between foams 4 and 5 and shell 3 does not assure an adequate bond without such protrusions.
- Shell 3 must withstand the pressure developed in expanding foam 4 inside shell 3, and also withstand any unsymmetrical external load, preferably without affecting the bond between shell 3 and filler foam 4..A firm bond of shell 3 with foam 4 is particularly important where large underwater surfaces have to be protected by force transmission via the foam.
- suitable protrusions or recesses are preferably in the form of grooves.
- a shell can be made from materials shaped at the site. For example, a filler material can be applied to pile ii and then a liquid or pasty material can be laid over the filler to solidify and form shell 3.
- Preferred materials for such a shell are synthetic materials having a very smooth surface resisting marine growth and reducing the risk of ice formation.
- a marine growth inhibitor can be included in the shell material for further protection.
- a vapor barrier is arranged at the bottom of shell 3 such as the preferred high-density foam 5 as illustrated in FIG. I.
- hose 13 of flexible, tough material such as a fabric-reinforced synthetic sheet or foil.
- Hose 13 is suspended at its upper end in any suitable manner, and its lower end M is tightly bound to pile 11 without any coarse openings.
- a superposed layer 16 of expanded, closed-cell elastic material In the space between pile land hose 13, there is a bottom layer of a highly viscous liq uid 15 forming a liquid seal, a superposed layer 16 of expanded, closed-cell elastic material. Layer I16 preferably rests snugly against pile l and hose 13, but need not be completely sealed to either.
- layer 116 On top of layer 116, is a padding or filler material 17 of expanded foam that fills hose 1 .3 and spaces it from pile l and is preferably yieldable in response to exterior mechanical strain.
- Sealing liquid 15 preferably has a lower specific gravity than water, and it is preferably viscous enough and tough enough so that it will either be pressed out through any gaps around lower end 114 under the pressure of superposed layers of filler material, or pressed upwardly through or past layer 16 under the pressure of water that may enter from below.
- Liquid 15 must be hydrophobic (water-repellent) and have a good adhesiveness to pile l and hose 13 such as some types of oil that would form a safe barrier to water.
- FIG. 2 shows sealing liquid 35 under a pressure exceeding that of the surrounding water with liquid 15 preventing water from penetrating through any gaps around sealing zone M.
- the right side of FIG. 2 shows sealing liquid 15 under pressure less than the surrounding water so that some water 18 has entered through zone M. However, water 18 is retained by seal- .ing liquid 15, which in turn is retained by foam layer 16.
- the inside of shell 33 can be smooth.
- the inner surface of the shell can have protrusions such as the dovetailed ribs 30 illustrated in FIG. 3.
- Such an innerloclring interior surface for the shell is preferred when large surface areas are involved, or when the surface to be protected is planar as in FIG. 4 which shows sheet piling 20 protected by a shell 21 of synthetic material having dovetailed shaped corrugations 22 forming a positive connection between shell 21 and the expanded synthetic material 23 which fills the space between shell 21 and sheath piling 20.
- the protrusions on the shell may be large enough to serve as spacers from the surface to be protected as indicated in FIGS. 5 and 6.
- the shell of FIG. 5 has radial ribs 24 which are spaced away from the surrounded piling by a small clearance. Spaces between ribs 24 are sealed by an expanded synthetic resin.
- Ribs 26 of the embodiment of FIG. 6 are fundamentally similar except for approaching the surrounded pile in a somewhat tangential rather than radial direction in the interests of better yieldability.
- a pile sheathing method comprising:
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Laminated Bodies (AREA)
- Revetment (AREA)
Abstract
Description
Claims (6)
- 2. The method of claim 1 including expanding a high-density, synthetic foam material in the bottom of said tube, and expanding a lower density foam in said tube above said high-density foam.
- 3. The method of claim 1 including expanding a high-density, synthetic foam material to form a closed-cell foam sealing the lower end of said tube to said pile.
- 4. The method of claim 1 including using a permanently elastic material to form a sealing bond between the lower end of said tube and said pile.
- 5. The method of claim 1 including using a permanently plastic material to form a sealing bond between the lower end of said tube and said pile.
- 6. The method of claim 1 including using a water-repellent viscous liquid material to form a seal between the lower end of said tube and said pile.
- 7. The method of claim 1 including binding the lower end of said tube to said pile to form said collar.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19712107446 DE2107446A1 (en) | 1971-02-17 | 1971-02-17 | Protective covering for objects standing in water, especially stakes |
Publications (1)
Publication Number | Publication Date |
---|---|
US3736759A true US3736759A (en) | 1973-06-05 |
Family
ID=5798961
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US00225217A Expired - Lifetime US3736759A (en) | 1971-02-17 | 1972-02-10 | Pile covering |
Country Status (5)
Country | Link |
---|---|
US (1) | US3736759A (en) |
AU (1) | AU4610672A (en) |
DE (1) | DE2107446A1 (en) |
FR (1) | FR2125880A5 (en) |
NL (1) | NL7201548A (en) |
Cited By (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3999399A (en) * | 1973-06-07 | 1976-12-28 | Walter A. Plummer | Protective guard means for wood piling and a method of installing same under dry working conditions |
US4244156A (en) * | 1978-12-04 | 1981-01-13 | Watts Jr Ridley | Pole and piling protector |
US4708527A (en) * | 1983-08-19 | 1987-11-24 | Central Plastics Company | Plastic pile protector and method of covering a pile with same |
US4713129A (en) * | 1983-08-19 | 1987-12-15 | Central Plastics Company | Plastic pile protector and method of covering a pile with same |
US4779389A (en) * | 1987-03-02 | 1988-10-25 | Landers Phillip G | Method and apparatus for insitu reinforcement, repair and safety enhancement of wooden poles |
US5051285A (en) * | 1988-07-29 | 1991-09-24 | Pillard Products, Inc. | Plastic piling |
US5102265A (en) * | 1990-08-31 | 1992-04-07 | T C Manufacturing Co., Inc. | Adjustable width split sleeve and method of forming ends thereto |
US5180531A (en) * | 1988-07-29 | 1993-01-19 | Vartkes Borzakian | Method of forming plastic piling |
US5226751A (en) * | 1992-02-04 | 1993-07-13 | Doleshal Donald L | Controlling the environment around a submerged pile or other structures by encapsulation, and treating and repairing the encapsulation area |
US5435667A (en) * | 1986-02-20 | 1995-07-25 | Slickbar Products Corp. | Protection of piles |
US5650224A (en) * | 1993-07-12 | 1997-07-22 | Seaward International, Inc. | Elongated structural member and method and appartus for making same |
US5766711A (en) * | 1996-08-29 | 1998-06-16 | Barmakian; Andrew | Composite camel structure and method for manufacture |
US20030000152A1 (en) * | 2001-06-29 | 2003-01-02 | Ryan James P. | Apparatus for protecting a structural column |
US6536991B1 (en) * | 2000-10-11 | 2003-03-25 | Madcon Corporation | Method of structurally reinforcing an assembly of tubular members in a marine environment |
US20040240943A1 (en) * | 2003-05-30 | 2004-12-02 | Spectrum Dock Systems, Inc. | Piling Wrap |
US20050002741A1 (en) * | 2003-05-30 | 2005-01-06 | Spectrum Dock Systems, Inc. | Apparatus and method for dock support or composite piling |
US20050180822A1 (en) * | 2004-02-18 | 2005-08-18 | Andrew Barmakian | Composite structure |
US6997260B1 (en) | 2003-03-06 | 2006-02-14 | Bruce Trader | Method of repairing tubular members on oil and gas wells |
US20060177277A1 (en) * | 2005-02-09 | 2006-08-10 | Thomas Samuel M Jr | Extendible building post |
US20060263557A1 (en) * | 2005-05-18 | 2006-11-23 | Watson William R | Composite pipe |
US20070017626A1 (en) * | 2005-07-19 | 2007-01-25 | Pearson Everett A | Composite structure and method of manufacture |
US20090269145A1 (en) * | 2008-04-24 | 2009-10-29 | William James Castle | Method and Apparatus for Repairing Piles |
US8690482B2 (en) * | 2011-05-03 | 2014-04-08 | Wayne Fey | Pile encapsulation system and method |
US20150204044A1 (en) * | 2014-01-17 | 2015-07-23 | Royal Adhesives & Sealants Canada Ltd. | Polyurethane Foam In Foundation Footings For Load-Bearing Structures |
US20160153162A1 (en) * | 2014-01-17 | 2016-06-02 | Royal Adhesives & Sealants Canada Ltd. | Polyurethane Foam in Foundation Footings for Load-Bearing Structures |
US10119238B2 (en) * | 2014-07-07 | 2018-11-06 | Cornerstone Research Group, Inc. | Reinforced syntactic structure |
US20200131799A1 (en) * | 2018-10-26 | 2020-04-30 | ARV Ventures, LLC | Structural footer |
GB2584958A (en) * | 2020-04-30 | 2020-12-23 | Aubin Ltd | Corrosion protection |
US11434619B2 (en) * | 2017-05-23 | 2022-09-06 | Baggermaatschappij Boskalis B.V. | Method and system for forming structures in fluid, especially under water |
US20230366169A1 (en) * | 2022-05-14 | 2023-11-16 | Zhejiang University | Construction method for reinforcing and repairing steel pipe pile for offshore wind power |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1987003318A1 (en) * | 1985-12-02 | 1987-06-04 | Irete S.A. | Device for taking the impression of elements of immersed structures and method using said device |
US5501299A (en) * | 1994-01-05 | 1996-03-26 | U.S. Elevator | Process and apparatus for preventing corrosion of a hydraulic elevator cylinder |
DE102006057746A1 (en) * | 2006-12-07 | 2008-06-12 | Plan B E.K. Inhaber Florian Icard-Reuter | Building foundation and method for producing such a building foundation |
DE102015010765A1 (en) | 2015-08-18 | 2017-02-23 | Ernst Drumm | Foundation pile made of wood with a protective covering that covers this part of the length and method of manufacture |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1013758A (en) * | 1911-08-09 | 1912-01-02 | John P Fox | Method of and apparatus for applying protecting-covering to piles. |
GB279313A (en) * | 1927-03-12 | 1927-10-27 | William Young Chamberlain | Improvements relating to the protection of wood and wooden structures against rot and decay |
US2846852A (en) * | 1955-08-15 | 1958-08-12 | Horace Williams Company Inc W | Mud ring for the development of passive resistance in soft soils |
US2874548A (en) * | 1959-02-24 | Protection against corrosion | ||
US3181300A (en) * | 1960-10-31 | 1965-05-04 | Walter A Plummer | Piling jacket and method of protecting pilings |
US3403520A (en) * | 1967-04-17 | 1968-10-01 | Jack P. Goodman | Method for setting poles |
US3661506A (en) * | 1969-09-03 | 1972-05-09 | Outboard Marine Corp | Means and method of eliminating and controlling marine fouling |
-
1971
- 1971-02-17 DE DE19712107446 patent/DE2107446A1/en active Pending
-
1972
- 1972-02-07 NL NL7201548A patent/NL7201548A/xx unknown
- 1972-02-08 FR FR7204158A patent/FR2125880A5/fr not_active Expired
- 1972-02-10 US US00225217A patent/US3736759A/en not_active Expired - Lifetime
- 1972-08-30 AU AU46106/72A patent/AU4610672A/en not_active Expired
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2874548A (en) * | 1959-02-24 | Protection against corrosion | ||
US1013758A (en) * | 1911-08-09 | 1912-01-02 | John P Fox | Method of and apparatus for applying protecting-covering to piles. |
GB279313A (en) * | 1927-03-12 | 1927-10-27 | William Young Chamberlain | Improvements relating to the protection of wood and wooden structures against rot and decay |
US2846852A (en) * | 1955-08-15 | 1958-08-12 | Horace Williams Company Inc W | Mud ring for the development of passive resistance in soft soils |
US3181300A (en) * | 1960-10-31 | 1965-05-04 | Walter A Plummer | Piling jacket and method of protecting pilings |
US3403520A (en) * | 1967-04-17 | 1968-10-01 | Jack P. Goodman | Method for setting poles |
US3661506A (en) * | 1969-09-03 | 1972-05-09 | Outboard Marine Corp | Means and method of eliminating and controlling marine fouling |
Cited By (43)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3999399A (en) * | 1973-06-07 | 1976-12-28 | Walter A. Plummer | Protective guard means for wood piling and a method of installing same under dry working conditions |
US4244156A (en) * | 1978-12-04 | 1981-01-13 | Watts Jr Ridley | Pole and piling protector |
US4708527A (en) * | 1983-08-19 | 1987-11-24 | Central Plastics Company | Plastic pile protector and method of covering a pile with same |
US4713129A (en) * | 1983-08-19 | 1987-12-15 | Central Plastics Company | Plastic pile protector and method of covering a pile with same |
US5435667A (en) * | 1986-02-20 | 1995-07-25 | Slickbar Products Corp. | Protection of piles |
US4779389A (en) * | 1987-03-02 | 1988-10-25 | Landers Phillip G | Method and apparatus for insitu reinforcement, repair and safety enhancement of wooden poles |
US5051285A (en) * | 1988-07-29 | 1991-09-24 | Pillard Products, Inc. | Plastic piling |
US5180531A (en) * | 1988-07-29 | 1993-01-19 | Vartkes Borzakian | Method of forming plastic piling |
US5102265A (en) * | 1990-08-31 | 1992-04-07 | T C Manufacturing Co., Inc. | Adjustable width split sleeve and method of forming ends thereto |
US5226751A (en) * | 1992-02-04 | 1993-07-13 | Doleshal Donald L | Controlling the environment around a submerged pile or other structures by encapsulation, and treating and repairing the encapsulation area |
US5650224A (en) * | 1993-07-12 | 1997-07-22 | Seaward International, Inc. | Elongated structural member and method and appartus for making same |
US5658519A (en) * | 1993-07-12 | 1997-08-19 | Seaward International, Inc. | Reinforced plastic piling and method and apparatus for making same |
US5766711A (en) * | 1996-08-29 | 1998-06-16 | Barmakian; Andrew | Composite camel structure and method for manufacture |
US6045346A (en) * | 1996-08-29 | 2000-04-04 | Barmakian; Andrew | Apparatus for manufacturing a composite camel structure |
US6536991B1 (en) * | 2000-10-11 | 2003-03-25 | Madcon Corporation | Method of structurally reinforcing an assembly of tubular members in a marine environment |
US20030000152A1 (en) * | 2001-06-29 | 2003-01-02 | Ryan James P. | Apparatus for protecting a structural column |
US6997260B1 (en) | 2003-03-06 | 2006-02-14 | Bruce Trader | Method of repairing tubular members on oil and gas wells |
US20040240943A1 (en) * | 2003-05-30 | 2004-12-02 | Spectrum Dock Systems, Inc. | Piling Wrap |
US20050002741A1 (en) * | 2003-05-30 | 2005-01-06 | Spectrum Dock Systems, Inc. | Apparatus and method for dock support or composite piling |
US20050180822A1 (en) * | 2004-02-18 | 2005-08-18 | Andrew Barmakian | Composite structure |
US20060177277A1 (en) * | 2005-02-09 | 2006-08-10 | Thomas Samuel M Jr | Extendible building post |
US7614829B2 (en) * | 2005-02-09 | 2009-11-10 | Thomas Jr Samuel M | Extendible building post |
US7563496B2 (en) | 2005-05-18 | 2009-07-21 | Watson William R | Composite pipe |
US20060263557A1 (en) * | 2005-05-18 | 2006-11-23 | Watson William R | Composite pipe |
US7744974B2 (en) | 2005-07-19 | 2010-06-29 | Pearson Pilings, Llc | Composite structure and method of manufacture |
US20070017626A1 (en) * | 2005-07-19 | 2007-01-25 | Pearson Everett A | Composite structure and method of manufacture |
US8070390B2 (en) | 2008-04-24 | 2011-12-06 | W. J. Castle, P.E. & Associates, P.C. | Method and apparatus for repairing piles |
US20090269145A1 (en) * | 2008-04-24 | 2009-10-29 | William James Castle | Method and Apparatus for Repairing Piles |
US8690482B2 (en) * | 2011-05-03 | 2014-04-08 | Wayne Fey | Pile encapsulation system and method |
US10738435B2 (en) * | 2014-01-17 | 2020-08-11 | Royal Adhesives & Sealants Canada Ltd. | Polyurethane foam in foundation footings for load-bearing structures |
US20150204044A1 (en) * | 2014-01-17 | 2015-07-23 | Royal Adhesives & Sealants Canada Ltd. | Polyurethane Foam In Foundation Footings For Load-Bearing Structures |
US20160153162A1 (en) * | 2014-01-17 | 2016-06-02 | Royal Adhesives & Sealants Canada Ltd. | Polyurethane Foam in Foundation Footings for Load-Bearing Structures |
US10364544B2 (en) * | 2014-01-17 | 2019-07-30 | Royal Adhesives & Sealants Canada Ltd. | Polyurethane foam in foundation footings for load-bearing structures |
US20190390433A1 (en) * | 2014-01-17 | 2019-12-26 | Royal Adhesives & Sealants Canada Ltd | Polyurethane foam in foundation footings for load-bearing structures |
US11060257B2 (en) * | 2014-01-17 | 2021-07-13 | Royal Adhesives & Sealants Canada Ltd. | Polyurethane foam in foundation footings for load-bearing structures |
US10119238B2 (en) * | 2014-07-07 | 2018-11-06 | Cornerstone Research Group, Inc. | Reinforced syntactic structure |
US11434619B2 (en) * | 2017-05-23 | 2022-09-06 | Baggermaatschappij Boskalis B.V. | Method and system for forming structures in fluid, especially under water |
US10851561B2 (en) * | 2018-10-26 | 2020-12-01 | ARV Ventures, LLC | Structural footer |
US20200131799A1 (en) * | 2018-10-26 | 2020-04-30 | ARV Ventures, LLC | Structural footer |
GB2584958A (en) * | 2020-04-30 | 2020-12-23 | Aubin Ltd | Corrosion protection |
GB2584958B (en) * | 2020-04-30 | 2021-06-23 | Aubin Ltd | Corrosion protection for offshore foundation structure |
US20230366169A1 (en) * | 2022-05-14 | 2023-11-16 | Zhejiang University | Construction method for reinforcing and repairing steel pipe pile for offshore wind power |
US11993909B2 (en) * | 2022-05-14 | 2024-05-28 | Zhejiang University | Construction method for reinforcing and repairing steel pipe pile for offshore wind power |
Also Published As
Publication number | Publication date |
---|---|
FR2125880A5 (en) | 1972-09-29 |
DE2107446A1 (en) | 1972-08-31 |
AU4610672A (en) | 1974-03-07 |
NL7201548A (en) | 1972-08-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3736759A (en) | Pile covering | |
US4019301A (en) | Corrosion-resistant encasement for structural members | |
US4555201A (en) | Sediment dike apparatus and methods | |
US4695188A (en) | Lined rock cistern or tunnel | |
US3708982A (en) | System and barrier for containing an oil spill | |
US3370432A (en) | Ice protective sleeve for pilings | |
US4453857A (en) | Method for storing hazardous or toxic waste material | |
US4512683A (en) | Piling protector | |
US4068480A (en) | Liquid storage systems | |
DE69422067T2 (en) | Underground container with a single fluid-tight housing for storing e.g. a liquid gas, and the arrangement of such containers | |
US3785158A (en) | Hydraulic engineering installations | |
US4622790A (en) | Device for relieving floors on ground in buildings | |
JPS6145239Y2 (en) | ||
US4074485A (en) | Safety wall for a storage tank | |
US20040044126A1 (en) | Security system | |
AT228717B (en) | Protective tray | |
CN221626972U (en) | Water conservancy bank protection reinforcing apparatus | |
JPH0912089A (en) | Structure for protecting liquid-proofing dike of tank | |
JPH0941435A (en) | Cistern | |
JP7296730B2 (en) | Tank waterproofing and retention structure | |
US3075357A (en) | Soil consolidator | |
JP3613442B2 (en) | Seismic isolation structure of structure | |
FI81652C (en) | YTBELAGD BERGSBEHAOLLARE ELLER TUNNEL. | |
RU2245975C2 (en) | Storage structure for liquid hazardous materials | |
FI67427C (en) | VAETSKE- ELLER GASBEHAOLLARE AV STAOLBETONGKONSTRUKTION |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: CITIBANK, N.A., 399 PARK AVENUE, NEW YORK, NEW YOR Free format text: SECURITY INTEREST;ASSIGNOR:SLT NORTH AMERICA, INC.,;REEL/FRAME:004795/0897 Effective date: 19871105 |
|
AS | Assignment |
Owner name: S L T NORTH AMERICA INC. Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:SCHLEGEL CORPORATION, A NY CORP.;REEL/FRAME:004853/0545 Effective date: 19871105 Owner name: SCHLEGEL LINING TECHNOLOGY GMBH Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:SCHLEGEL GMBH;REEL/FRAME:005011/0257 Effective date: 19871105 |
|
AS | Assignment |
Owner name: SLT NORTH AMERICA, INC., (SLT), 200 SOUTH TRADE CE Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:SCHLEGEL CORPORATION;REEL/FRAME:004977/0059 Effective date: 19881101 |