Nothing Special   »   [go: up one dir, main page]

US3568455A - Method of laying pipe in or on a bed of particle material or in a trench - Google Patents

Method of laying pipe in or on a bed of particle material or in a trench Download PDF

Info

Publication number
US3568455A
US3568455A US785941A US3568455DA US3568455A US 3568455 A US3568455 A US 3568455A US 785941 A US785941 A US 785941A US 3568455D A US3568455D A US 3568455DA US 3568455 A US3568455 A US 3568455A
Authority
US
United States
Prior art keywords
pipe
posts
ground
deposit
trench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US785941A
Inventor
Robert E Mclaughlin
Lloyd J Charbonneau
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US3568455A publication Critical patent/US3568455A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes

Definitions

  • a method and apparatus are disclosed for laying pipe, and particularly sectional pipe such as sewer and drain tile, in or on a bed of particle material such as gravel 1 or crushed rock.
  • a series of posts are removably mounted at spaced positions on the ground along the course of the pipe, and the pipe is releasably supported on the posts in a raised condition above BACKGROUND OF THE.
  • INVENTION Field of the invention This invention relates to the laying of pipe, and in particular to the laying of pipe in or on a bed of particle material.
  • the invention is especially applicable to the laying of sectional pipe such as sewer pipe and drain tile, in a trench containing a water pervious medium such as drain rock, gravel or crushed rock.
  • the pipes or tiles vary widely in length and may be of fiber, plastic, steel or concrete, and in most operations, a run of at least 40 feet of the pipe or tiles is laid in a trench which can conveniently accommodate only one or two laborers at a time.
  • the present practice is to lay the run in segments of four or five pipes or tiles at a time, and to align each segment on the desired slope before another is added to the run. Alignment of the tile is accomplished by pressing individual tiles into the backfill material where necessary, and/or by adding more backfill under certain tiles until they all assume a condition of alignment.
  • One object of the present invention is to devise a more efficient procedure for laying such pipe in or on a bed of particle material; and in particular to devise a method and apparatus whereby the pipe can be placed and aligned with one another in a raised condition above the ground, without there first being a deposit of backice fill material therebelow, and in fact, before the backfill material is deposited under the pipe.
  • Another object is to devise a method and apparatus of this nature whereby the pipe laying and backfilling operations can be separated from one another into independent operations, which is desired, can be carried out by difierent laborers operating in different parts of the trench and at different points in time.
  • a further object is to devise a method and apparatus of this nature whereby the pipe laying operation can be conducted in one continuous step over a relatively large distance, such as forty feet or more, before the backfill material is deposited under the pipe.
  • a still further object is to devise a method and apparatus of this nature wherein the pipe laying operation is conducted with a temporary pipe support, and more particularly with a plurality of the same, which can be removed after the backfilling operation and reemployed at another point in the trench.
  • a pipe laying method and apparatus of our invention wherein generally speaking we removably mount a series of posts at spaced positions on the ground along the course of the pipe, and releasably support the pipe on the posts in a raised condition above the ground, while the particle material is deposited under the pipe to at least a depth at which the deposit can sustain the pipe in its raised condition. Then we release the pipe from the support of the posts and remove the posts from the deposit while the deposit sustains the condition of the pipe. In most instances the posts are thereafter carried over into another segment of the operation and/ or reused in a subsequent operation. If the pipe is divided into relatively short sections such as in the case of sewer and drain tile, usually each section is supported on a single post so that the sections can be quickly aligned with one another along the desired slope.
  • the posts When the posts are mounted on the ground, there are means for adjusting the elevation of the pipe above the ground.
  • the posts may be adapted to be driven into the ground, and may have vertically adjustable brackets thereon which abut the surface of the ground as stops.
  • the pipe may be supported on vertically adjustable brackets elevated on the posts.
  • the posts take the form of stakes having pairs of vertically adjustable brackets at spaced elevations thereon.
  • the pipe is supported on the upper brackets of the stakes and the stakes are driven into the ground until the lower brackets abut the surface of the same. The spacings between the brackets thus determines the elevation of the pipe as well as its slope. If necessary, the elevations of the upper brackets can be adjusted to make a closer determination.
  • the lower brackets and their respective posts are displaceable in relation to one another.
  • the lower brackets may be shifted into substantial alignment with the posts by the application of a vertical force thereto, as where each bracket is swung 3 downwardly against its post by the weight of the deposit when the post is lifted therefrom.
  • the lower brackets may be detached from the posts by the application of a rotational force thereto, as where each post is unscrewed from its bracket as it is lifted from the deposit.
  • each upper bracket may have a pair of tongs depending therefrom which assumes a pliers-like grip on the pipe in the operative position thereof.
  • the upper bracket may have a sling depending therefrom which is passed under the pipe and attached to the bracket to clamp the pipe against the bracket in the operative position thereof.
  • each clamping device is adjustable to different pipe diameters.
  • the upper bracket may be adjusted to a higher elevation after the first pipe has been released therefrom, and another pipe may be supported from the bracket while additional particle mate rial is deposited thereunder. If more than one pipe is to be laid at each level, then the upper bracket may have a plurality of clamping devices depending therefrom, at laterally offset positions thereon, to support the pipes in juxtaposition with one another while the particle material is deposited thereunder.
  • FIG. 1 is a perspective view of one of the preferred embodiments of the invention as it appears in operative condition;
  • FIG. 2 is a part perspective view of the embodiment as the lower bracket or stop thereon appears in inoperative condition
  • FIG. 3 is a part perspective view of another embodiment having an alternative form of stop thereon;
  • FIG. 4 is a part elevational view of a third embodiment having an adjustable clamping device thereon;
  • FIG. 5 is a part elevational view of a fourth embodiment having a different form of adjustable clamping device thereon;
  • FIG. 6 is an operational perspective view illustrating the tile laying operation in a trench before the backfill material is deposited therein;
  • FIG. 7 is an operational cross-sectional view of the trench after the backfill material has been added
  • FIG. 8 is another operational cross-sectional view of the trench illustrating the manner in which each stake is removed from the trench;
  • FIG. 9 is an operational elevational view illustrating an embodiment of the invention which can lay several runs of tile at one level in a trench;
  • FIG. 10 is a part elevational view of an embodiment of the invention employing a different form of clamping device.
  • FIG. 11 is an operational cross-sectional view of a trench illustrating a still further embodiment of the invention employing a detachable stop which is left under the deposit when the stake is removed.
  • Each tile support 2 comprises an elongated steel spike or stake 4 which has a handle 6 welded to the upper end thereof, and a pointed tip 8 on the lower end thereof adapted to be driven into the ground.
  • the stake is rounded in cross section and has a pair of sleeves 10 and 12 slidably engaged thereon to be fixed at variable elevations on the stake by means of setscrews 14 provided therewith.
  • the lower sleeve 10 has a vertically disposed gusset plate 16 welded thereon which slopes downwardly along its upper edge.
  • a rectangularly shaped stop plate 18 is hinged to the gusset plate to swing between a substantially hori- Zontal position abutting the lower edge of the gusset plate, and a substantially vertical position abutting the lower end of the stake.
  • Corresponding notches 20 and 22 in the gusset and stop plates allow for the swing of the latter.
  • the upper sleeve 12 has a vertically disposed bracket plate 24 welded thereto, and the lower edge of the bracket plate has an arcuate indentation 26 therein adapted to mate with the cylindrical surface of various diameters of fiber, plastic, steel or concrete pipe or tiles 28.
  • a flexible cable 30 is hingedly secured to the lower edge portion of the bracket plate 24 at a point adjacent the stake, and a loop 32 is formed on the loose end thereof to be dropped into a notch 34 on the outer upper edge of the plate, after the cable is passed under the tile.
  • the stop plate 18 abuts the surface of the ground and limits the penetration of the stake.
  • the above-ground elevation of the tile 28 can be determined at the time the stake is driven into the ground. Final adjustment of its elevation is accomplished with the upper sleeve 12.
  • each tile is clamped under the bracket 24 of a stake, and the stakes are driven into the bottom of the trench on the intended course of the run. See FIG. 6.
  • a considerable number of tiles have been stationed in place, such as or feet of the same, they are aligned with one another on a slight slope by adjusting the upper sleeves, and a crushed rock or gravel backfill material 38 is deposited at each side of the run.
  • the backfilling operation is usually terminated, although additional backfill material can be added if desired, depending on the results sought. Normally enough is deposited along the sides of the tile to assure that each tile is fully and immediately supported by the deposit when the stakes are removed.
  • the stop plate has the inverted spadeshaped configuration 18 illustrated in FIG. 3, so as to reduce the resistance still further.
  • bracket plate we prefer to equip the bracket plate with a plurality of inclined notches 40 along the outside upright edge thereof, to allow for different diameter pipe. See FIG. 4.
  • the cable may have a plurality of knots or other enlargements 42 thereon (FIG. 5), to allow for an adjustment when a different diameter pipe is used.
  • the clamping device comprises a pair of arcuate tongs 44 and 46 which are mounted in depending relationship on a bracket plate 48.
  • One of the tongs 44 is permanently positioned on the plate; while the other tong 46 is pivotally articulated with respect to the first at 50.
  • the latter tong can be pinned to the plate at 52 to clamp the tile in position. Removal of the pin (not shown) releases the tile onto the deposit.
  • FIG. 111 an alternative form of stop is illustrated.
  • the tip of the stake 4" has a reduced diameter shank 54 which is joined with the shank 56 of the upper portion by a threaded intermediate section 58 of tapered length.
  • a block of scrap wood material 60 with a boring 62 therein is screwed onto the intermediate section of the shank to form a stop.
  • the stake 4' is lifted from the ground, it is simultaneously rotated in the reverse direction so as to disengage it from the bore of the block which is restrained against rotation by the backfill material (not shown).
  • FIG. 9 illustrates a temporary pipe support which is adapted to lay a plurality of juxtaposed runs.
  • the support comprises a pair of stakes 4" each of which is equipped with a stop such as was previously described.
  • the stakes are joined by a common bracket plate 24' which extends between the upper sleeves 12' thereon.
  • the lower edge of the plate has a plurality of inverted V-shaped indentations 64 therein to receive the pipe sections.
  • the V-shape of each indentation allows for a greater degree of adjustability with respect to pipe size, than that permitted by the series of enlargements 42 alone.
  • the shanks of the stakes in all embodiments are notched at regular intervals to allow for more positive engagement of the setscrews therewith.
  • a method of laying pipe in or on a bed of particle material comprising installing a series of posts along the course of the pipe by driving each post into the ground until a relatively rotatable stop thereon abuts the surface of the ground, releasably supporting the pipe on the posts in a raised condition above the stops, While the particle material is deposited on the ground in the space adjacent the posts between the pipe and the stops, and to a depth such that the deposit can sustain the pipe in its raised condition, releasing the pipe from the support of the posts, and removing the posts from the ground, while rotating the stops and posts in relation to one another so as to free the posts from the deposited material in the space between the pipe and the ground.
  • stops are pivotally mounted on the posts, and are rotated into substantial parallelism with the posts when the posts are removed from the ground.

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

A METHOD AND APPARATUS ARE DISCLOSED FOR LAYING PIPE, AND PARTICULARLY SECTIONAL PIPE SUCH AS SEWER AND DRAIN TILE, IN OR ON A BEAD OF PARTICLE MATERIAL SUCH AS GRAVEL OR CRUSHED ROCK. ACCORDING TO THE METHOD, A SERIES OF POSTS ARE REMOVABLY MOUNTED AT SPACED POSITIONS ON THE GROUND ALONG THE COURSE OF THE PIPE, AND THE PIPE IS RELEASABLY SUPPORTED ON THE POSTS IN A RAISED CONDITION ABOVE THE GROUND, WHILE THE PARTICLE MATERIAL IS DEPOSITED UNDER THE PIPE TO AT LEAST A DEPTH AT WHICH THE DEPOSIT CAN SUSTAIN THE PIPE IN ITS RAISED CONDITION. THEN THE PIPE IS RELEASED FROM THE SUPPORT OF THE POSTS, AND THE POSTS ARE REMOVED FROM THE DEPOSIT WHILE THE DEPOSIT SUSTAINS THE CONDITION OF THE PIPE. WHERE THE PIPE IS DIVIDED INTO SECTIONS, AS IN THE CASE OF SEWER AND DRAIN TILE, EACH SECTION IS SUPPORTED ON A SINGLE POST SO THAT THE SECTIONS CAN BE QUICKLY ALIGNED WITH ONE ANOTHER ALONG THE DESIRED SLOPE.

Description

March 9, 1971 MGLAUGHLIN ET AL 3,568,455
METHOD OF LAYING PIPE IN OR ON A BED OF PARTICLE MATERIAL OR IN A TRENCH Filed Dec. 23, 1968 2 Sheets-Sheet 1 //V|/EN rm.- AUBERT E. MHZ/6H0 Brigg J. (HA/m/v/vE/w KW A TTOF/YE Y6 March 9, 1971 R. E- MCLAUGHLIN ET AL METHOD OF LAYING PIPE IN OR ON A BED OF PARTICLE MATERIAL OR IN A TRENCH Filed Dec. 23, 1968 2 Sheets-Sheet m a if United States Patent METHOD OF lLAYlNG PIPE IN OR ON A BED OF PARTICLE MATERIAL OR IN A TRENCH Robert E. McLaughlin, Rte. 1, Box 52, Sedro Woolley, Wash. 98284, and Lloyd J. Charbonneau, 321 316th NE, Stanwood, Wash. 98292 Filed Dec. 23, 1968, Ser. No. 785,941 Int. Cl. B631) 35/04 lU-S. Cl. 61-721 Claims ABSTRACT OF THE DISCLOSURE A method and apparatus are disclosed for laying pipe, and particularly sectional pipe such as sewer and drain tile, in or on a bed of particle material such as gravel 1 or crushed rock. According to the method, a series of posts are removably mounted at spaced positions on the ground along the course of the pipe, and the pipe is releasably supported on the posts in a raised condition above BACKGROUND OF THE. INVENTION Field of the invention This invention relates to the laying of pipe, and in particular to the laying of pipe in or on a bed of particle material. The invention is especially applicable to the laying of sectional pipe such as sewer pipe and drain tile, in a trench containing a water pervious medium such as drain rock, gravel or crushed rock.
Description of the prior art When laying such sectional pipe, the individual sections or tiles must be aligned with one another on a slope to assure that liquid will flow therein. The pipes or tiles vary widely in length and may be of fiber, plastic, steel or concrete, and in most operations, a run of at least 40 feet of the pipe or tiles is laid in a trench which can conveniently accommodate only one or two laborers at a time. The present practice is to lay the run in segments of four or five pipes or tiles at a time, and to align each segment on the desired slope before another is added to the run. Alignment of the tile is accomplished by pressing individual tiles into the backfill material where necessary, and/or by adding more backfill under certain tiles until they all assume a condition of alignment. Understandably, the overall procedure is highly inefficient since a laborer no sooner picks up his shovel to spread more backfill material, then he must lay it down again to procure more tile, or to align the tile, or to check the slope of the run; and a great deal of time is lost in shifting from one step to another, and from one segment of the run to the next.
OBJECTS OF THE INVENTION One object of the present invention is to devise a more efficient procedure for laying such pipe in or on a bed of particle material; and in particular to devise a method and apparatus whereby the pipe can be placed and aligned with one another in a raised condition above the ground, without there first being a deposit of backice fill material therebelow, and in fact, before the backfill material is deposited under the pipe. Another object is to devise a method and apparatus of this nature whereby the pipe laying and backfilling operations can be separated from one another into independent operations, which is desired, can be carried out by difierent laborers operating in different parts of the trench and at different points in time. A further object is to devise a method and apparatus of this nature whereby the pipe laying operation can be conducted in one continuous step over a relatively large distance, such as forty feet or more, before the backfill material is deposited under the pipe. A still further object is to devise a method and apparatus of this nature wherein the pipe laying operation is conducted with a temporary pipe support, and more particularly with a plurality of the same, which can be removed after the backfilling operation and reemployed at another point in the trench. Other objects include the provision of a method and apparatus of this nature wherein the pipe laying operation is quickly and easily efiected, whether the run is open jointed or close jointed; wherein the temporary pipe support used in the operation is durable and reliable, is inexpensive to manufacture, and is capable of adapting to pipe of different diameters; and wherein a plurality of runs can be juxtaposed with one another on the ground, and/or stacked in successive tiers above one another. Still further objects will be apparent from a description of the invention which follows hereafter.
SUMMARY OF THE INVENTION These objects and advantages are realized by a pipe laying method and apparatus of our invention wherein generally speaking we removably mount a series of posts at spaced positions on the ground along the course of the pipe, and releasably support the pipe on the posts in a raised condition above the ground, while the particle material is deposited under the pipe to at least a depth at which the deposit can sustain the pipe in its raised condition. Then we release the pipe from the support of the posts and remove the posts from the deposit while the deposit sustains the condition of the pipe. In most instances the posts are thereafter carried over into another segment of the operation and/ or reused in a subsequent operation. If the pipe is divided into relatively short sections such as in the case of sewer and drain tile, usually each section is supported on a single post so that the sections can be quickly aligned with one another along the desired slope.
When the posts are mounted on the ground, there are means for adjusting the elevation of the pipe above the ground. For example, the posts may be adapted to be driven into the ground, and may have vertically adjustable brackets thereon which abut the surface of the ground as stops. Or the pipe may be supported on vertically adjustable brackets elevated on the posts. In preferred embodiments of the invention, the posts take the form of stakes having pairs of vertically adjustable brackets at spaced elevations thereon. The pipe is supported on the upper brackets of the stakes and the stakes are driven into the ground until the lower brackets abut the surface of the same. The spacings between the brackets thus determines the elevation of the pipe as well as its slope. If necessary, the elevations of the upper brackets can be adjusted to make a closer determination.
When the posts are removed from their mounted positions on the ground, the lower brackets and their respective posts are displaceable in relation to one another. For example, the lower brackets may be shifted into substantial alignment with the posts by the application of a vertical force thereto, as where each bracket is swung 3 downwardly against its post by the weight of the deposit when the post is lifted therefrom. Or the lower brackets may be detached from the posts by the application of a rotational force thereto, as where each post is unscrewed from its bracket as it is lifted from the deposit.
The posts may have clamping devices thereon for releasably suspending the pipe from the upper brackets. For example, each upper bracket may have a pair of tongs depending therefrom which assumes a pliers-like grip on the pipe in the operative position thereof. Or the upper bracket may have a sling depending therefrom which is passed under the pipe and attached to the bracket to clamp the pipe against the bracket in the operative position thereof. Preferably, each clamping device is adjustable to different pipe diameters.
If a plurality of pipes are to be stacked on top of one another in the bed of particle material, the upper bracket may be adjusted to a higher elevation after the first pipe has been released therefrom, and another pipe may be supported from the bracket while additional particle mate rial is deposited thereunder. If more than one pipe is to be laid at each level, then the upper bracket may have a plurality of clamping devices depending therefrom, at laterally offset positions thereon, to support the pipes in juxtaposition with one another while the particle material is deposited thereunder.
BRIEF DESCRIPTION OF THE DRAWINGS These and other features of the invention will be better understood by reference to the accompanying drawings wherein:
FIG. 1 is a perspective view of one of the preferred embodiments of the invention as it appears in operative condition;
FIG. 2 is a part perspective view of the embodiment as the lower bracket or stop thereon appears in inoperative condition;
FIG. 3 is a part perspective view of another embodiment having an alternative form of stop thereon;
FIG. 4 is a part elevational view of a third embodiment having an adjustable clamping device thereon;
FIG. 5 is a part elevational view of a fourth embodiment having a different form of adjustable clamping device thereon;
FIG. 6 is an operational perspective view illustrating the tile laying operation in a trench before the backfill material is deposited therein;
FIG. 7 is an operational cross-sectional view of the trench after the backfill material has been added;
FIG. 8 is another operational cross-sectional view of the trench illustrating the manner in which each stake is removed from the trench;
FIG. 9 is an operational elevational view illustrating an embodiment of the invention which can lay several runs of tile at one level in a trench;
FIG. 10 is a part elevational view of an embodiment of the invention employing a different form of clamping device; and
FIG. 11 is an operational cross-sectional view of a trench illustrating a still further embodiment of the invention employing a detachable stop which is left under the deposit when the stake is removed.
DESCRIPTION OF THE PREFERRED EMBODIMENTS Referring to the drawings, it will be seen that the tile laying operation is conducted with a plurality of temporary tile supports each designated generally at 2. Each tile support 2 comprises an elongated steel spike or stake 4 which has a handle 6 welded to the upper end thereof, and a pointed tip 8 on the lower end thereof adapted to be driven into the ground. The stake is rounded in cross section and has a pair of sleeves 10 and 12 slidably engaged thereon to be fixed at variable elevations on the stake by means of setscrews 14 provided therewith. The lower sleeve 10 has a vertically disposed gusset plate 16 welded thereon which slopes downwardly along its upper edge. A rectangularly shaped stop plate 18 is hinged to the gusset plate to swing between a substantially hori- Zontal position abutting the lower edge of the gusset plate, and a substantially vertical position abutting the lower end of the stake. Corresponding notches 20 and 22 in the gusset and stop plates allow for the swing of the latter.
The upper sleeve 12 has a vertically disposed bracket plate 24 welded thereto, and the lower edge of the bracket plate has an arcuate indentation 26 therein adapted to mate with the cylindrical surface of various diameters of fiber, plastic, steel or concrete pipe or tiles 28. A flexible cable 30 is hingedly secured to the lower edge portion of the bracket plate 24 at a point adjacent the stake, and a loop 32 is formed on the loose end thereof to be dropped into a notch 34 on the outer upper edge of the plate, after the cable is passed under the tile.
When the stake 4 is driven into the bottom of the trench 36, the stop plate 18 abuts the surface of the ground and limits the penetration of the stake. Thus, by adjusting the vertical spacing between the sleeves 10 and 12, the above-ground elevation of the tile 28 can be determined at the time the stake is driven into the ground. Final adjustment of its elevation is accomplished with the upper sleeve 12.
In a typical tile laying operation, each tile is clamped under the bracket 24 of a stake, and the stakes are driven into the bottom of the trench on the intended course of the run. See FIG. 6. After a considerable number of tiles have been stationed in place, such as or feet of the same, they are aligned with one another on a slight slope by adjusting the upper sleeves, and a crushed rock or gravel backfill material 38 is deposited at each side of the run. When the deposit 38 reaches an elevation at which it can assume the weight of the tiles, the backfilling operation is usually terminated, although additional backfill material can be added if desired, depending on the results sought. Normally enough is deposited along the sides of the tile to assure that each tile is fully and immediately supported by the deposit when the stakes are removed. If necessary, a final adjustment in elevation can be made with the upper sleeves at this time, although no further adjustment is ordinarily needed. Also, slips of building paper (not shown) are added over the joints between tiles, if they were not previously added. Thereafter, the next step is to progressively unsling each tile, and to lift or pull the corresponding stake until the full run of tiles has been released onto the bed of material. See FIG. 8. The installation is now complete and ready for an earth backfill. Usually a blanket cover such as a newspaper cover (not shown), is added in advance of the earth.
As each stake is lifted, the weight of the deposit displaces the stop plate 18 into the vertical position illustrated in FIGS. 2 and 8. The result is to produce a stake which offers little resistance to being disengaged from the deposit, so that there is little risk of dislodging the tile.
Preferably, the stop plate has the inverted spadeshaped configuration 18 illustrated in FIG. 3, so as to reduce the resistance still further.
Also, we prefer to equip the bracket plate with a plurality of inclined notches 40 along the outside upright edge thereof, to allow for different diameter pipe. See FIG. 4. Alternatively, the cable may have a plurality of knots or other enlargements 42 thereon (FIG. 5), to allow for an adjustment when a different diameter pipe is used.
In the embodiment of FIG. 10, a different clamping device is employed. The clamping device comprises a pair of arcuate tongs 44 and 46 which are mounted in depending relationship on a bracket plate 48. One of the tongs 44 is permanently positioned on the plate; while the other tong 46 is pivotally articulated with respect to the first at 50. When closed about a tile, the latter tong can be pinned to the plate at 52 to clamp the tile in position. Removal of the pin (not shown) releases the tile onto the deposit.
In FIG. 111, an alternative form of stop is illustrated. In this case, the tip of the stake 4" has a reduced diameter shank 54 which is joined with the shank 56 of the upper portion by a threaded intermediate section 58 of tapered length. In use a block of scrap wood material 60 with a boring 62 therein, is screwed onto the intermediate section of the shank to form a stop. When the stake 4' is lifted from the ground, it is simultaneously rotated in the reverse direction so as to disengage it from the bore of the block which is restrained against rotation by the backfill material (not shown).
FIG. 9 illustrates a temporary pipe support which is adapted to lay a plurality of juxtaposed runs. The support comprises a pair of stakes 4" each of which is equipped with a stop such as was previously described. In addition, the stakes are joined by a common bracket plate 24' which extends between the upper sleeves 12' thereon. The lower edge of the plate has a plurality of inverted V-shaped indentations 64 therein to receive the pipe sections. The V-shape of each indentation allows for a greater degree of adjustability with respect to pipe size, than that permitted by the series of enlargements 42 alone.
Preferably, the shanks of the stakes in all embodiments are notched at regular intervals to allow for more positive engagement of the setscrews therewith.
What is claimed is:
1. A method of laying pipe in or on a bed of particle material, comprising installing a series of posts along the course of the pipe by driving each post into the ground until a relatively rotatable stop thereon abuts the surface of the ground, releasably supporting the pipe on the posts in a raised condition above the stops, While the particle material is deposited on the ground in the space adjacent the posts between the pipe and the stops, and to a depth such that the deposit can sustain the pipe in its raised condition, releasing the pipe from the support of the posts, and removing the posts from the ground, while rotating the stops and posts in relation to one another so as to free the posts from the deposited material in the space between the pipe and the ground.
2. The method according to claim 1 wherein the stops are pivotally mounted on the posts, and are rotated into substantial parallelism with the posts when the posts are removed from the ground.
3. The method according to claim 1 wherein the posts are threadably engaged with the stops, and are unscrewed from the stops as they are removed fromv the ground.
'4. The method according to claim 1 wherein the pipe is suspended from brackets at raised positions on the posts.
5. The method according to claim 1 wherein there is a trench in the ground along the course of the pipe, into the bottom of which the posts are driven, and the particle material is deposited in the trench, substantially across the bottom thereof, between the pipe and the stops.
References Cited UNITED STATES PATENTS 2,106,956 2/1938 Nakamura 24849 2,355,966 8/1944 Goff 6172.1
2,472,654 6/1949 =Engelke 24849 2,948,121 8/1960 Karst 61-48 2,978,840 4/1961 Tatsch 138-106 FOREIGN PATENTS 274,724 5/1930 Italy 138-105 JACOB SHAPIRO, Primary Examiner US. Cl. X.R.
US785941A 1968-12-23 1968-12-23 Method of laying pipe in or on a bed of particle material or in a trench Expired - Lifetime US3568455A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US78594168A 1968-12-23 1968-12-23

Publications (1)

Publication Number Publication Date
US3568455A true US3568455A (en) 1971-03-09

Family

ID=25137098

Family Applications (1)

Application Number Title Priority Date Filing Date
US785941A Expired - Lifetime US3568455A (en) 1968-12-23 1968-12-23 Method of laying pipe in or on a bed of particle material or in a trench

Country Status (1)

Country Link
US (1) US3568455A (en)

Cited By (61)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3765184A (en) * 1971-03-08 1973-10-16 Petroles And Tech Louis Menard Device and method for the attachment of pipelines to an underwater surface
US3810364A (en) * 1971-12-30 1974-05-14 T Johnson Ground anchor
US3890791A (en) * 1973-04-16 1975-06-24 Ballast Nedam Groep Nv Method of building a tunnel and tunnel built according to said method
US3895496A (en) * 1973-10-05 1975-07-22 Lloyd J Perrott Tool for installation of flexible ground conduit
US4043139A (en) * 1975-11-19 1977-08-23 Scott Winfield B Pipe holding tool
US4068488A (en) * 1975-04-30 1978-01-17 Rader Companies, Inc. Method of backfilling pipeline trenches
US4090686A (en) * 1977-02-07 1978-05-23 Yarbrough Ted G Pipe-laying apparatus
US4126012A (en) * 1976-07-15 1978-11-21 James W. Green Method and apparatus for supporting pipe in filled dirt
US4195669A (en) * 1976-01-12 1980-04-01 United States Steel Corporation Method of arresting crack propagation in line pipe characterized by ductile fracture
US4230676A (en) * 1979-05-14 1980-10-28 Lrs Research Composting apparatus
US4265566A (en) * 1978-07-28 1981-05-05 Saipem, S.P.A. Apparatus for supporting pipes suspended over depressions in the sea bed, including those situated at great depth, and the method for installing it
US4268189A (en) * 1979-09-26 1981-05-19 Good William C Apparatus and method for supporting and positioning pipe during the construction of drain fields and the like
US4377925A (en) * 1981-03-21 1983-03-29 Able, Inc. Bracket for conduit trenches
US4389034A (en) * 1980-07-21 1983-06-21 Anchoring International, Inc. Underwater pipe anchoring device
US4492493A (en) * 1982-08-16 1985-01-08 Webb Brian C Pipeline anchor hook
US4519124A (en) * 1983-09-12 1985-05-28 Burghardt Stanley M Method of positioning a U-bolt on a conduit
US4601447A (en) * 1984-10-29 1986-07-22 Lof Plastics Inc. Conduit spacer anchoring system
US4826111A (en) * 1987-08-25 1989-05-02 Ismert Daniel A Ground anchor device
WO1990011406A1 (en) * 1989-03-17 1990-10-04 Beamer John V Method and apparatus for forming a trench
WO1990011405A1 (en) * 1989-03-17 1990-10-04 Beamer John V Apparatus for forming a trench
US4979462A (en) * 1988-11-14 1990-12-25 Mkh3 Enterprises, Inc. Systems and methods for indicating the location of various structural members in concrete members
US5007768A (en) * 1990-04-17 1991-04-16 Waller George W Anchoring structure for underground pipes
US5163642A (en) * 1988-10-27 1992-11-17 Bev Torrens Pipe support bridge
WO1993016252A1 (en) * 1992-02-18 1993-08-19 Haemaelaeinen Eero Fastener
US5348421A (en) * 1991-02-08 1994-09-20 Abt, Inc. Trench forming assembly and method
US5350253A (en) * 1993-03-24 1994-09-27 John Cunningham Method for supporting distribution means
US5372457A (en) * 1993-04-02 1994-12-13 Rante; Raymond M. Method and apparatus for installing drainage channels
US5399047A (en) * 1993-09-13 1995-03-21 Abt, Inc. Trench forming assemblies having enhanced anchoring means
US5437424A (en) * 1994-05-09 1995-08-01 Netz, Sr.; John H. Septic pipe field drain holders
US5478169A (en) * 1993-09-13 1995-12-26 Stegall; Lannie L. Method and apparatus for forming a trench
US5509758A (en) * 1993-10-18 1996-04-23 Anderson; Donald W. Method and apparatus for padmount transformer installation
US5549415A (en) * 1995-06-05 1996-08-27 Dixie Septic Tank, Inc. Septic tank drainfield installation device and method
US5553975A (en) * 1995-05-15 1996-09-10 Elkins; Michael L. Method of installing underground pipes for sewer lines
US5573350A (en) * 1994-07-13 1996-11-12 Abt, Inc. Method for cutting complexly shaped foamed plastic bodies from a workpiece and foam body products
USD377308S (en) * 1995-10-17 1997-01-14 Mcnamara James E Pipe retainer
US5735637A (en) * 1996-06-03 1998-04-07 Abt, Inc. Method and apparatus for supporting and anchoring drainage channel sections
US5788192A (en) * 1995-12-13 1998-08-04 Poole, Jr.; Roy L. Portable splicing rack and apparatus to secure a bracket
US5829916A (en) * 1995-06-05 1998-11-03 Dixie Septic Tank, Inc. Of Orange City Drainfield pipe
US5895175A (en) * 1996-11-18 1999-04-20 Philip Cox Pipe-laying device
US5927900A (en) * 1996-02-06 1999-07-27 Ingenieurs Bureau "Oranjewoud" B.V. Method for placing a system of ducts
US5971664A (en) * 1998-03-30 1999-10-26 Wilson Family Trust Apparatus and method for accurately positioning a conduit
US6250847B1 (en) * 1999-03-24 2001-06-26 Thomas R. Bingham, Jr. Pipe holder apparatus
US6336770B1 (en) 1995-06-05 2002-01-08 Kelvin Todd Evans Drainfield pipe installation device
US6527246B1 (en) 2000-01-04 2003-03-04 Thomas M. Stinnett Positioning and anti-movement support stake including marking means for underground pipes
US6679655B2 (en) * 2000-11-16 2004-01-20 Chart Inc. Permafrost support system and method for vacuum-insulated pipe
US6901716B1 (en) * 2003-07-31 2005-06-07 Sioux Chief Manufacturing Co, Inc. Ground stake for holding drain pipe
US6941890B1 (en) * 2001-10-05 2005-09-13 Michael P. Cristo, Jr. Underground marking systems and methods for identifying a location of an object underground
US7029201B1 (en) 2003-08-28 2006-04-18 Ch2M Hill, Inc. Utility line bedding for storm water management and storm water management system and method
US20060264274A1 (en) * 2003-09-04 2006-11-23 Bryant Olan W Jr Adjustable and portable soccer goal and molded joint connectors associated therewith
US7150437B1 (en) * 2001-11-15 2006-12-19 Teeters James D Conduit support attachable to a cementitious material form
US20070074775A1 (en) * 2005-10-04 2007-04-05 Ronald Logan Apparatus for diverting flow of a liquid from an air conditioning condensate line drain
US20080310922A1 (en) * 2007-06-12 2008-12-18 Hubbell Incorporated Pipeline buoyancy control assembly and tiedown
US20090136299A1 (en) * 2006-01-16 2009-05-28 Santos Silvino Pompeu Tunnel supported on bearing blocks
GB2494923A (en) * 2011-09-26 2013-03-27 Dagless Ltd A support assembly for use in the ground
FR2987418A1 (en) * 2012-02-28 2013-08-30 Louis Betrgeron Mobile device for laying underground pipe e.g. water supply pipe, at bottom of trench, has distal cradle and proximal cradle rigidly connected to each other for supporting pipe, where forward ends of cradles are flared
US20140061395A1 (en) * 2012-09-05 2014-03-06 James John Allivato, SR. Duct Mounting System and Kit
US8894021B1 (en) * 2011-08-26 2014-11-25 Southwire Company, Llc Cable support
US10045605B2 (en) * 2015-10-05 2018-08-14 Marc Salvador-Zamora Multi-use support for outdoor activities
US10520111B2 (en) * 2018-06-04 2019-12-31 Airlift Concrete Experts, LLC System and method for straightening underground pipes
AU2016202783B2 (en) * 2015-04-30 2021-02-18 Gareth Mark Allen A pipe support and method for supporting and orientating a pipe
US11006588B1 (en) * 2020-04-29 2021-05-18 Terry B. Jordan Hillside agricultural irrigation apparatus

Cited By (72)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3765184A (en) * 1971-03-08 1973-10-16 Petroles And Tech Louis Menard Device and method for the attachment of pipelines to an underwater surface
US3810364A (en) * 1971-12-30 1974-05-14 T Johnson Ground anchor
US3890791A (en) * 1973-04-16 1975-06-24 Ballast Nedam Groep Nv Method of building a tunnel and tunnel built according to said method
US3895496A (en) * 1973-10-05 1975-07-22 Lloyd J Perrott Tool for installation of flexible ground conduit
US4068488A (en) * 1975-04-30 1978-01-17 Rader Companies, Inc. Method of backfilling pipeline trenches
US4043139A (en) * 1975-11-19 1977-08-23 Scott Winfield B Pipe holding tool
US4195669A (en) * 1976-01-12 1980-04-01 United States Steel Corporation Method of arresting crack propagation in line pipe characterized by ductile fracture
US4126012A (en) * 1976-07-15 1978-11-21 James W. Green Method and apparatus for supporting pipe in filled dirt
US4090686A (en) * 1977-02-07 1978-05-23 Yarbrough Ted G Pipe-laying apparatus
US4265566A (en) * 1978-07-28 1981-05-05 Saipem, S.P.A. Apparatus for supporting pipes suspended over depressions in the sea bed, including those situated at great depth, and the method for installing it
US4230676A (en) * 1979-05-14 1980-10-28 Lrs Research Composting apparatus
US4268189A (en) * 1979-09-26 1981-05-19 Good William C Apparatus and method for supporting and positioning pipe during the construction of drain fields and the like
US4389034A (en) * 1980-07-21 1983-06-21 Anchoring International, Inc. Underwater pipe anchoring device
US4377925A (en) * 1981-03-21 1983-03-29 Able, Inc. Bracket for conduit trenches
US4492493A (en) * 1982-08-16 1985-01-08 Webb Brian C Pipeline anchor hook
US4519124A (en) * 1983-09-12 1985-05-28 Burghardt Stanley M Method of positioning a U-bolt on a conduit
US4601447A (en) * 1984-10-29 1986-07-22 Lof Plastics Inc. Conduit spacer anchoring system
US4826111A (en) * 1987-08-25 1989-05-02 Ismert Daniel A Ground anchor device
US5163642A (en) * 1988-10-27 1992-11-17 Bev Torrens Pipe support bridge
US5335887A (en) * 1988-10-27 1994-08-09 Beverly Torrens Pipe support bridge
US4979462A (en) * 1988-11-14 1990-12-25 Mkh3 Enterprises, Inc. Systems and methods for indicating the location of various structural members in concrete members
EP0463092A4 (en) * 1989-03-17 1992-11-19 John V. Beamer Apparatus for forming a trench
WO1990011406A1 (en) * 1989-03-17 1990-10-04 Beamer John V Method and apparatus for forming a trench
EP0463092A1 (en) * 1989-03-17 1992-01-02 Casting Co. Construction Apparatus for forming a trench
US4993878A (en) * 1989-03-17 1991-02-19 Construction Casting Company Method and apparatus for forming a trench
WO1990011405A1 (en) * 1989-03-17 1990-10-04 Beamer John V Apparatus for forming a trench
US5007768A (en) * 1990-04-17 1991-04-16 Waller George W Anchoring structure for underground pipes
US5348421A (en) * 1991-02-08 1994-09-20 Abt, Inc. Trench forming assembly and method
US5393171A (en) * 1991-02-08 1995-02-28 Abt, Inc. Trench forming assembly and method
WO1993016252A1 (en) * 1992-02-18 1993-08-19 Haemaelaeinen Eero Fastener
US5350253A (en) * 1993-03-24 1994-09-27 John Cunningham Method for supporting distribution means
WO1994021952A1 (en) * 1993-03-24 1994-09-29 John Cunningham Method for supporting distribution means
US5372457A (en) * 1993-04-02 1994-12-13 Rante; Raymond M. Method and apparatus for installing drainage channels
US5399047A (en) * 1993-09-13 1995-03-21 Abt, Inc. Trench forming assemblies having enhanced anchoring means
US5478169A (en) * 1993-09-13 1995-12-26 Stegall; Lannie L. Method and apparatus for forming a trench
US5509758A (en) * 1993-10-18 1996-04-23 Anderson; Donald W. Method and apparatus for padmount transformer installation
US5437424A (en) * 1994-05-09 1995-08-01 Netz, Sr.; John H. Septic pipe field drain holders
US5573350A (en) * 1994-07-13 1996-11-12 Abt, Inc. Method for cutting complexly shaped foamed plastic bodies from a workpiece and foam body products
US5553975A (en) * 1995-05-15 1996-09-10 Elkins; Michael L. Method of installing underground pipes for sewer lines
US6120209A (en) * 1995-06-05 2000-09-19 Dixie Septic Tank, Inc. Of Orange City Method of installing drainfield pipe
US5549415A (en) * 1995-06-05 1996-08-27 Dixie Septic Tank, Inc. Septic tank drainfield installation device and method
US5829916A (en) * 1995-06-05 1998-11-03 Dixie Septic Tank, Inc. Of Orange City Drainfield pipe
US6336770B1 (en) 1995-06-05 2002-01-08 Kelvin Todd Evans Drainfield pipe installation device
USD377308S (en) * 1995-10-17 1997-01-14 Mcnamara James E Pipe retainer
US5788192A (en) * 1995-12-13 1998-08-04 Poole, Jr.; Roy L. Portable splicing rack and apparatus to secure a bracket
US5927900A (en) * 1996-02-06 1999-07-27 Ingenieurs Bureau "Oranjewoud" B.V. Method for placing a system of ducts
US5735637A (en) * 1996-06-03 1998-04-07 Abt, Inc. Method and apparatus for supporting and anchoring drainage channel sections
US5895175A (en) * 1996-11-18 1999-04-20 Philip Cox Pipe-laying device
US5971664A (en) * 1998-03-30 1999-10-26 Wilson Family Trust Apparatus and method for accurately positioning a conduit
US6250847B1 (en) * 1999-03-24 2001-06-26 Thomas R. Bingham, Jr. Pipe holder apparatus
US6527246B1 (en) 2000-01-04 2003-03-04 Thomas M. Stinnett Positioning and anti-movement support stake including marking means for underground pipes
US6679655B2 (en) * 2000-11-16 2004-01-20 Chart Inc. Permafrost support system and method for vacuum-insulated pipe
US6941890B1 (en) * 2001-10-05 2005-09-13 Michael P. Cristo, Jr. Underground marking systems and methods for identifying a location of an object underground
US7150437B1 (en) * 2001-11-15 2006-12-19 Teeters James D Conduit support attachable to a cementitious material form
US6901716B1 (en) * 2003-07-31 2005-06-07 Sioux Chief Manufacturing Co, Inc. Ground stake for holding drain pipe
US7029201B1 (en) 2003-08-28 2006-04-18 Ch2M Hill, Inc. Utility line bedding for storm water management and storm water management system and method
US20060264274A1 (en) * 2003-09-04 2006-11-23 Bryant Olan W Jr Adjustable and portable soccer goal and molded joint connectors associated therewith
US20070074775A1 (en) * 2005-10-04 2007-04-05 Ronald Logan Apparatus for diverting flow of a liquid from an air conditioning condensate line drain
US20090136299A1 (en) * 2006-01-16 2009-05-28 Santos Silvino Pompeu Tunnel supported on bearing blocks
US20080310922A1 (en) * 2007-06-12 2008-12-18 Hubbell Incorporated Pipeline buoyancy control assembly and tiedown
US8092119B2 (en) 2007-06-12 2012-01-10 Hubbell Incorporated Pipeline buoyancy control assembly and tiedown
US8894021B1 (en) * 2011-08-26 2014-11-25 Southwire Company, Llc Cable support
GB2494923A (en) * 2011-09-26 2013-03-27 Dagless Ltd A support assembly for use in the ground
GB2494923B (en) * 2011-09-26 2017-04-12 Dagless Ltd Set of support assemblies
FR2987418A1 (en) * 2012-02-28 2013-08-30 Louis Betrgeron Mobile device for laying underground pipe e.g. water supply pipe, at bottom of trench, has distal cradle and proximal cradle rigidly connected to each other for supporting pipe, where forward ends of cradles are flared
US20140061395A1 (en) * 2012-09-05 2014-03-06 James John Allivato, SR. Duct Mounting System and Kit
US9347587B2 (en) * 2012-09-05 2016-05-24 James John Allivato, SR. Duct mounting system and kit
AU2016202783B2 (en) * 2015-04-30 2021-02-18 Gareth Mark Allen A pipe support and method for supporting and orientating a pipe
US10045605B2 (en) * 2015-10-05 2018-08-14 Marc Salvador-Zamora Multi-use support for outdoor activities
US10520111B2 (en) * 2018-06-04 2019-12-31 Airlift Concrete Experts, LLC System and method for straightening underground pipes
US11006588B1 (en) * 2020-04-29 2021-05-18 Terry B. Jordan Hillside agricultural irrigation apparatus
US11503781B1 (en) * 2020-04-29 2022-11-22 Terry B. Jordan Hillside agricultural irrigation apparatus

Similar Documents

Publication Publication Date Title
US3568455A (en) Method of laying pipe in or on a bed of particle material or in a trench
US4084385A (en) Pile handing methods
US5605419A (en) Underground duct banks
US4591466A (en) Method for positioning and stabilizing a concrete slab
US3797260A (en) Pipeline anchoring system
US4081087A (en) Pipe laydown and pickup machine
CN111350878B (en) Long-distance oil and gas pipeline laying, installing and constructing method
CA2069566C (en) Concrete pouring and leveling devices and method of using
US5492656A (en) Apparatus and method for manhole collar construction
US4268189A (en) Apparatus and method for supporting and positioning pipe during the construction of drain fields and the like
US3841105A (en) Method and apparatus for anchoring underwater pipelines
US4711603A (en) Slab jacking process and apparatus
GB2337312A (en) Joining together pipe ends in pipe laying
US4419030A (en) Apparatus for and method of constructing a sheet piling shoring structure
US4280770A (en) Apparatus for compacting soil
US3605419A (en) Method and apparatus for laying pipe
US2739850A (en) Telescopic tower jack
US2777294A (en) Method of laying pipe
US2728600A (en) Cesspool bricking machine
US11028576B1 (en) Lift and fill concrete raising system
CN211735679U (en) Urban sewage pipeline treatment device
EP0600894B1 (en) Method for changing railway sleepers and equipment for applying the method
US5741088A (en) Apparatus for underground excavation
CN219341453U (en) Curb stone transport fixture
CN218845316U (en) Water conservancy pipeline strutting arrangement