Nothing Special   »   [go: up one dir, main page]

US3426844A - Method of drilling underwater wells - Google Patents

Method of drilling underwater wells Download PDF

Info

Publication number
US3426844A
US3426844A US603202A US3426844DA US3426844A US 3426844 A US3426844 A US 3426844A US 603202 A US603202 A US 603202A US 3426844D A US3426844D A US 3426844DA US 3426844 A US3426844 A US 3426844A
Authority
US
United States
Prior art keywords
conductor pipe
drill string
conductor
pipe
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US603202A
Inventor
Alan R Mcdaniel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Texaco Inc
Original Assignee
Texaco Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Texaco Inc filed Critical Texaco Inc
Application granted granted Critical
Publication of US3426844A publication Critical patent/US3426844A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/12Underwater drilling
    • E21B7/128Underwater drilling from floating support with independent underwater anchored guide base

Definitions

  • This invention relates to a method of drilling underwater wells and, more particularly, to an improved method of inserting conductor pipe at an ocean bottom location where the ocean bottom is relatively soft or unconsolidated.
  • One method of inserting conductor pipe in unconsolidated ocean bottom locations consists of jetting the conductor into place using a jet string.
  • the long length of conductor pipe is suspended from a floating drilling ship and the jet string run therein and attached to the conductor pipe. Both are lowered to the ocean floor where the jetting operation takes place.
  • Drilling fluid or other fluid such as salt water is pumped down the jet string and out through the jetting ring to wash away the ocean bottom material at the bottom of the conductor pipe such that the conductor pipe sinks into the hole made by the jetting operation.
  • the material dislodged by the jetting operation is circulated up the conductor pipe.
  • the jet string is attached to the conductor pipe so that the weight thereof and additional weight such as leaded collars and barite cans which are inserted in the jet string can apply suflicient force to the conductor pipe to cause it to sink into the formation.
  • additional weight such as leaded collars and barite cans which are inserted in the jet string can apply suflicient force to the conductor pipe to cause it to sink into the formation.
  • the required weight is dependent on the formation at the ocean bottom into which the conductor pipe is being jetted. It is usual for long conductor pipes of wide diameter to be made up in short sections. Thus, it is necessary on the drilling ship or barge to make up the long length of conductor pipe and then to handle the same. It will be appreciated that wide diameter conductor pipe is expensive and very difficult to handle.
  • the present invention overcomes the problems mentioned above by providing an improved method of inserting the conductor pipe in unconsolidated formations which eliminates the necessity of having a long length of wide diameter conductor pipe. In most cases the length of the wide diameter conductor pipe can be cut in half, thus, reducing the expense as well as the handling problems. Furthermore, this improved method eliminates the need to provide a jet string and a pet ring along with the leaded collars and barite cans. Also, the method of the present invention reduces the number of operations necessary to insert the conductor pipe in unconsolidated formations thus cutting down on the amount of time necessary, accordingly cutting costs.
  • a method for inserting conductor pipe in unconsolidated underwater locations in which a relatively short length of a large diameter conductor pipe is arranged such that a drill string containing a drill bit may be run therein and detachably connected thereto at the lower end thereof.
  • the conductor pipe is lowered from the floating vessel by means of the drill string to the ocean bottom.
  • Drilling fluid is pumped down the drill string'and out through the drilling head so a to act as a jetting tool for jetting a hole in the unconsolidated formation. This jetting action allows the conductor pipe to settle into the hole made thereby thus sinking the pipe to the desired depth.
  • the drill string is detached from the conductor pipe and the drilling operation proceeds into the formation below the wide diameter conductor pipe.
  • the drill strong and head are pulled and the smaller diameter conductor pipe is lowered from the floating vessel into the wide diameter conductor pipe and evenually into the hole made thereofor.
  • This conductor pipe is then cemented into position by pumping cement from the drilling vessel through the conductor pipe so that cement is forced up outside of the conductor pipe to form a good bond between the formation and the pipe.
  • cement is circulated down a cement pipe so that the annular space between the learge diameter conductor pipe and the smaller diameter conductor pipe is filled.
  • the well head equipment is attached to the upper end of the smaller diameter conductor pipe.
  • FIG. 1 is a schematic representation of a conductor pipe being lowered into the ocean by means of the drill string from a floating vesel.
  • FIG. 2. is a vertical sectional view of the conductor pipe of FIG. 1 showing the drill string detachably connected within the conductor pipe.
  • FIG. 3 is a cross sectional view taken along line 33 of FIG. 2 showing more details of the support plate and the detachable connection between the drill string and conductor pipe.
  • FIG. 4 is a schematic representation of the conductor pipe cemented in position in the Well with the well head equipment attached to the inner conductor pipe.
  • the numeral indicates the earth formations into which it is desired to drill a well. These earth formations underlie a body of water 11 which may be several hundreds of feet in depth. Although the present invention could be used in shallow water as well as deep water, it is depicted in a deep water location wherein the drilling operation is carried out from a floating drilling structure such as a barge or vessel 12.
  • the vessel or barge 12 is maintained in position over the well site, for example, by anchoring to the bottom.
  • Anchoring cables 14 are shown extending from the vessel, however, the anchors are not shown.
  • the vessel or barge 12 has mounted on it the power source 13, derrick 16, rotary table 15, and other equipment normally used in a rotary drilling operation.
  • the derrick 16 is shown as being provided with a travelling block 18 to which is secured a hook 20 or other suitable means for suspending a drill string 22 during drilling operations.
  • a flexible hose 24 is provided and is adapted to be secured to the top of the drill string 22 by means of a swivel 26 of a conventional type whereby drilling fluid may be circulated down through the drill string 22 during the drilling operation.
  • the flexible hose 24 is in communication with the pump 28 which is adapted to circulate the drilling mud 30.
  • the derrick 16 is positioned over a drilling slot or well 32 which extends vertically through the vessel or barge 12 in a conventional manner.
  • the slot 32 in the barge 12 may be either centrally located or extended from one edge. Operations with the apparatus of the present invention may be carried out over the side of the barge or thru a slot 32.
  • a large diameter conductor pipe 34 is shown in FIG- URE 1 suspended from the derrick 16 by means of a drill string 22.
  • the large diameter conductor pipe 34 may be prepared by hanging the conductor pipe 34 from the vessel 12 by suitable means and running the drill pipe or drill collars 22 therein.
  • the conductor pipe 34 can be previously prepared by having a support ring 36 welded therein at the lower end and may also have a further support ring 38 welded therein near the upper end (see FIG. 2).
  • a pair of pad eyes 40 may be attached to each side of the upper end of the conductor pipe 34.
  • the support plates 44 and 46 which sur round the drill string 22 and which may be put on the drill string 22 before the bit 42 is attached, may be connected.
  • the lower support plate 44 shown nearest the drill bit 42 is attached to the lower support ring 36 and to the drill string 22 by means of shear pins 48 and 48A, respectively.
  • the shear pins 48A are inserted prior to the running of the drill string in the conductor while the shear pins 48 are inserted when the drill string 22 within the conductor 34 is supported on the seat 52 of support ring 36. At this time the shear pins 48 are driven into openings provided in the conductor 34 so that they pass thru an opening in the support ring 36 till they enter the hole provided in the support plate 44.
  • the drill string 22 carrying the support plate 44 attached thereto by shear pins 48A may have to be turned to align the hole in the support plate 44 with the shear pin 48 being inserted.
  • the pins may be preinserted in support plate 44 and spring loaded for automatic insertion.
  • the springs urging the pins outwardy of the support plate 44.
  • the support ring 36 would be curved so that the shear pins are forced in against the spring when the support plate 44 is approaching seat 52.
  • the drill string can be turned until the shear pins 48 are aligned with a hole provided in the support ring 36.
  • the pins will be pushed into this corresponding hole by the spring force.
  • the upper support or stabilizing plate 46 is connected to the upper support ring 38 also by means of shear pins 50.
  • the upper support late 46 is not connected to the drill string 22 and thus merely serves as a stabilizing or guide plate.
  • the support rings 36, 38 each have seats 52 thereon upon which the support plates 44, 46 when in position are seated.
  • the lower support plate 44 is of a smaller diameter than the upper support or stabilizing plate 46 so that the lower support plate 44 when removed by pulling the drill string 22 will easily pass the upper support ring 38.
  • a heavy jet string and jet ring are utilized which, once the conductor pipe is in position, are withdrawn and the jetting string and ring are replaced, with the drill string and bit which are lowered into the conductor pipe to proceed with the drilling of the hole.
  • the full weight of the drill string 22 and bit 42 is now applied to the shear pins 48A of support plate 44 which are desighed to shear at this particular weight.
  • the shear pins 48A may also be designed to shear because of torque which can be applied thereto by applying the turning force to the drill string 22 by means of the draw works 56 etc. located on the drilling barge 12 above. In any event, once the drill bit 42 and string 22 are detached from the support plate 44, the drilling of a hole suitable for inserting the further conductor pipe 58 can commence.
  • the hole beneath the large diameter conductor pipe 34 is drilled to a depth such that the further conductor pipe 58 when inserted therein will sit on the bottom of the hole and extend to the mud line 60 up through the large diameter conductor pipe 34.
  • the drill string 22 and drill bit 42 are pulled from the hole by means of the derrick 16 on the floating barge 12.
  • the support plate 44 and the stabilizing plate 46 are removed from the conductor pipe 34 along with the drill string 22 and drill bit 42.
  • the further conductor pipe 58 is now made up at the drilling vessel 12 and lowered by means of the derrick 16 from the surface toward the ocean bottom.
  • the further conductor pipe 58 as it is lowered from the vessel 12 is guided along the guide lines 54 by guide means, not shown, such that the further conductor pipe 58 will enter the large diameter conductor pipe 34 and proceed therethrough.
  • this conductor pipe 58 is cemented to the formation in the known manner.
  • cement 62 is introduced into the annular space between the further conductor 58 and the large diameter conductor pipe 34. This is easily accomplished by providing one or more cement lines 64 which extend into the space between the two conductor pipes 34, 58 thus allowing cement 62 in a fluid state to flow from the barge 12 into the annular space.
  • the two conductors 34, 58 cemented into position are shown in FIG. 4. It will be appreciated, that even though the formation 10 through which the large diameter conductor pipe 34 has been inserted is very soft and unconsolidated, the large diameter conductor pipe 34 is not only held in position by the surrounding formation 10 but is supported by the deeper extending further conductor pipe 58 which is cemented into the formation and also cemented to the large diameter conductor pipe 34.
  • the Well head equipment 66 such as the blow out preventers etc., is attached to the top of the further conductor 58 that extends through the large diameter conductor 34 to the mud line or ocean bottom.
  • the weight of the well head 66 is not, therefore, applied directly to the large diameter conductor pipe 34 but is distributed through the cement 62 to the large diameter conductor pipe 34 and to the further conductor pipe 58 which is seated deeper in the more dense formations and which is cemented therein.
  • a shorter length of large diameter conductor pipe 34 can be used in this arrangement than has been the case heretofore in unconsolidated formations.
  • a method of inserting conductor pipe in an unconsolidated underwater formation comprising the steps of (a) locating a floating drilling structure over the well site,

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Description

Feb. H, 1969 A. R. MCDANIEL 3,426,844
METHOD OF DRILLING UNDERWATER WELLS Filed Dec. 20, 1966 Sheet of 2 Feb. 11, 1969 A. R; McDANlEL METHOD OF DRILLING UNDERWATER WELLS Sheet Filed Dec. 20, 1966 United States Patent 8 Claims ABSTRACT OF THE DISCLOSURE An improved method for inserting conductor pipe in an unconsolidated underwater location by detachably connecting a drill string carrying a drill bit to the inside of a relatively short length of conductor pipe and jetting the pipe into the unconsolidated underwater formations. After the conductor pipe is in place the drill string is detached from the conductor pipe and the hole drilled for receiving a further length of smaller diameter conductor pipe. The smaller length of conductor pipe is cemented to the formation and the annular space between the conductor pipe and the smaller diameter conductor pipe is filled with cement. The well head equipment is attached to the top of the smaller diameter conductor pipe.
This invention relates to a method of drilling underwater wells and, more particularly, to an improved method of inserting conductor pipe at an ocean bottom location where the ocean bottom is relatively soft or unconsolidated.
One method of inserting conductor pipe in unconsolidated ocean bottom locations consists of jetting the conductor into place using a jet string. The long length of conductor pipe is suspended from a floating drilling ship and the jet string run therein and attached to the conductor pipe. Both are lowered to the ocean floor where the jetting operation takes place. Drilling fluid or other fluid such as salt water is pumped down the jet string and out through the jetting ring to wash away the ocean bottom material at the bottom of the conductor pipe such that the conductor pipe sinks into the hole made by the jetting operation. The material dislodged by the jetting operation is circulated up the conductor pipe. The jet string is attached to the conductor pipe so that the weight thereof and additional weight such as leaded collars and barite cans which are inserted in the jet string can apply suflicient force to the conductor pipe to cause it to sink into the formation. Of course, the required weight is dependent on the formation at the ocean bottom into which the conductor pipe is being jetted. It is usual for long conductor pipes of wide diameter to be made up in short sections. Thus, it is necessary on the drilling ship or barge to make up the long length of conductor pipe and then to handle the same. It will be appreciated that wide diameter conductor pipe is expensive and very difficult to handle.
It is necessary in real soft bottom locations to extend a large diameter conductor casing quite deep to get a good footing or grip in the more consolidated formations. Often times cementing the large diameter casing to the formation does not help. The large diameter conductor pipe must be sufiiciently held to support the weight of the well head equipment, such as blow out preventers etc.
The present invention overcomes the problems mentioned above by providing an improved method of inserting the conductor pipe in unconsolidated formations which eliminates the necessity of having a long length of wide diameter conductor pipe. In most cases the length of the wide diameter conductor pipe can be cut in half, thus, reducing the expense as well as the handling problems. Furthermore, this improved method eliminates the need to provide a jet string and a pet ring along with the leaded collars and barite cans. Also, the method of the present invention reduces the number of operations necessary to insert the conductor pipe in unconsolidated formations thus cutting down on the amount of time necessary, accordingly cutting costs.
It is the main object of the present invention to provide a method of inserting conductor pipe in unconsolidated underwater location in which a shorter length of wide diameter conductor pipe is utilized.
It is another object of the present invention to provide a method of inserting a conductor pipe in unconsolidated underwater locations wherein the need for a separate jetting string and a jetting ring are eleminated.
It is a further object of the present invention to provide a method of inserting conductor pipe in unconsolidated underwater locations wherein fewer operations are necessary.
It is another object of the present invention to provide a method of inserting conductor pipe in unconsolidated underwater locations in less time and at less expense than was heretofore possible.
According to the invention there is provided a method for inserting conductor pipe in unconsolidated underwater locations in which a relatively short length of a large diameter conductor pipe is arranged such that a drill string containing a drill bit may be run therein and detachably connected thereto at the lower end thereof. The conductor pipe is lowered from the floating vessel by means of the drill string to the ocean bottom. Drilling fluid is pumped down the drill string'and out through the drilling head so a to act as a jetting tool for jetting a hole in the unconsolidated formation. This jetting action allows the conductor pipe to settle into the hole made thereby thus sinking the pipe to the desired depth. The drill string is detached from the conductor pipe and the drilling operation proceeds into the formation below the wide diameter conductor pipe. Once the hole has been drilled to the desired depth the drill strong and head are pulled and the smaller diameter conductor pipe is lowered from the floating vessel into the wide diameter conductor pipe and evenually into the hole made thereofor. This conductor pipe is then cemented into position by pumping cement from the drilling vessel through the conductor pipe so that cement is forced up outside of the conductor pipe to form a good bond between the formation and the pipe. Also, cement is circulated down a cement pipe so that the annular space between the learge diameter conductor pipe and the smaller diameter conductor pipe is filled. The well head equipment is attached to the upper end of the smaller diameter conductor pipe.
The above-mentioned and other features and objectives of this inventiion and the manner of obtaining them will become more apparent and the invention itself will be best understood by reference to the following description of an embodiment taken in conjunction with the accompanying drawings:
FIG. 1 is a schematic representation of a conductor pipe being lowered into the ocean by means of the drill string from a floating vesel.
FIG. 2. is a vertical sectional view of the conductor pipe of FIG. 1 showing the drill string detachably connected within the conductor pipe.
FIG. 3 is a cross sectional view taken along line 33 of FIG. 2 showing more details of the support plate and the detachable connection between the drill string and conductor pipe.
FIG. 4 is a schematic representation of the conductor pipe cemented in position in the Well with the well head equipment attached to the inner conductor pipe.
Referring to the embodiment of the invention illustrated in FIG. 1, the numeral indicates the earth formations into which it is desired to drill a well. These earth formations underlie a body of water 11 which may be several hundreds of feet in depth. Although the present invention could be used in shallow water as well as deep water, it is depicted in a deep water location wherein the drilling operation is carried out from a floating drilling structure such as a barge or vessel 12.
Once the offshore site has been selected, the vessel or barge 12 is maintained in position over the well site, for example, by anchoring to the bottom. Anchoring cables 14 are shown extending from the vessel, however, the anchors are not shown.
The vessel or barge 12 has mounted on it the power source 13, derrick 16, rotary table 15, and other equipment normally used in a rotary drilling operation. In this instance, the derrick 16 is shown as being provided with a travelling block 18 to which is secured a hook 20 or other suitable means for suspending a drill string 22 during drilling operations. A flexible hose 24 is provided and is adapted to be secured to the top of the drill string 22 by means of a swivel 26 of a conventional type whereby drilling fluid may be circulated down through the drill string 22 during the drilling operation. The flexible hose 24 is in communication with the pump 28 which is adapted to circulate the drilling mud 30.
The derrick 16 is positioned over a drilling slot or well 32 which extends vertically through the vessel or barge 12 in a conventional manner. When using the equipment of the present invention, the slot 32 in the barge 12 may be either centrally located or extended from one edge. Operations with the apparatus of the present invention may be carried out over the side of the barge or thru a slot 32.
A large diameter conductor pipe 34 is shown in FIG- URE 1 suspended from the derrick 16 by means of a drill string 22. The large diameter conductor pipe 34 may be prepared by hanging the conductor pipe 34 from the vessel 12 by suitable means and running the drill pipe or drill collars 22 therein. The conductor pipe 34 can be previously prepared by having a support ring 36 welded therein at the lower end and may also have a further support ring 38 welded therein near the upper end (see FIG. 2). Also, a pair of pad eyes 40 may be attached to each side of the upper end of the conductor pipe 34. Once the drill string 22 is in position within the conductor pipe 34, that is, with the drill bit 42 near the lower end of the conductor pipe 34, the support plates 44 and 46 which sur round the drill string 22 and which may be put on the drill string 22 before the bit 42 is attached, may be connected. The lower support plate 44 shown nearest the drill bit 42, is attached to the lower support ring 36 and to the drill string 22 by means of shear pins 48 and 48A, respectively.
The shear pins 48A are inserted prior to the running of the drill string in the conductor while the shear pins 48 are inserted when the drill string 22 within the conductor 34 is supported on the seat 52 of support ring 36. At this time the shear pins 48 are driven into openings provided in the conductor 34 so that they pass thru an opening in the support ring 36 till they enter the hole provided in the support plate 44. The drill string 22 carrying the support plate 44 attached thereto by shear pins 48A may have to be turned to align the hole in the support plate 44 with the shear pin 48 being inserted.
In the event it is not convenient to insert the shear pins 48 as just outlined, the pins may be preinserted in support plate 44 and spring loaded for automatic insertion. The springs urging the pins outwardy of the support plate 44. The support ring 36 would be curved so that the shear pins are forced in against the spring when the support plate 44 is approaching seat 52. At this time the drill string can be turned until the shear pins 48 are aligned with a hole provided in the support ring 36. When alignment of the pins and holes are made, the pins will be pushed into this corresponding hole by the spring force.
The upper support or stabilizing plate 46 is connected to the upper support ring 38 also by means of shear pins 50. The upper support late 46 is not connected to the drill string 22 and thus merely serves as a stabilizing or guide plate. It should be noted that the support rings 36, 38 each have seats 52 thereon upon which the support plates 44, 46 when in position are seated. It should be noted that the lower support plate 44 is of a smaller diameter than the upper support or stabilizing plate 46 so that the lower support plate 44 when removed by pulling the drill string 22 will easily pass the upper support ring 38.
Once the large diameter conductor pipe 34 is made up with the drill string 22 detachably connected therein, guide lines 34 are attached to the previously installed pad eyes 40 and the conductor pipe 34 lowered by means of the drill string 22 to the ocean bottom 33 where it is desired to drill the well. Since this particular method is to be utilized in connection with ocean bottoms where the formations are unconsolidated, that is, where they are soft, the conductor pipe 34 due to its own weight will sink somewhat into the bottom. Drilling mud 30 or other fluid is now pumped down the drill string 22 and out the drill bit 42 to provide a jetting action for jetting a hole in the unconsolidated formations 10 into which the attached conductor pipe 34 settles. In the usual jetting operation for conductor pipe, a heavy jet string and jet ring are utilized which, once the conductor pipe is in position, are withdrawn and the jetting string and ring are replaced, with the drill string and bit which are lowered into the conductor pipe to proceed with the drilling of the hole. In the present invention the full weight of the drill string 22 and bit 42 is now applied to the shear pins 48A of support plate 44 which are desighed to shear at this particular weight. The shear pins 48A may also be designed to shear because of torque which can be applied thereto by applying the turning force to the drill string 22 by means of the draw works 56 etc. located on the drilling barge 12 above. In any event, once the drill bit 42 and string 22 are detached from the support plate 44, the drilling of a hole suitable for inserting the further conductor pipe 58 can commence.
The hole beneath the large diameter conductor pipe 34 is drilled to a depth such that the further conductor pipe 58 when inserted therein will sit on the bottom of the hole and extend to the mud line 60 up through the large diameter conductor pipe 34. Once this hole is drilled, the drill string 22 and drill bit 42 are pulled from the hole by means of the derrick 16 on the floating barge 12. As previously mentioned, the support plate 44 and the stabilizing plate 46 are removed from the conductor pipe 34 along with the drill string 22 and drill bit 42. The further conductor pipe 58 is now made up at the drilling vessel 12 and lowered by means of the derrick 16 from the surface toward the ocean bottom.
The further conductor pipe 58 as it is lowered from the vessel 12 is guided along the guide lines 54 by guide means, not shown, such that the further conductor pipe 58 will enter the large diameter conductor pipe 34 and proceed therethrough. After the further conductor pipe 58 is set on the bottom of the hole, this conductor pipe 58 is cemented to the formation in the known manner. Also, cement 62 is introduced into the annular space between the further conductor 58 and the large diameter conductor pipe 34. This is easily accomplished by providing one or more cement lines 64 which extend into the space between the two conductor pipes 34, 58 thus allowing cement 62 in a fluid state to flow from the barge 12 into the annular space.
The two conductors 34, 58 cemented into position are shown in FIG. 4. It will be appreciated, that even though the formation 10 through which the large diameter conductor pipe 34 has been inserted is very soft and unconsolidated, the large diameter conductor pipe 34 is not only held in position by the surrounding formation 10 but is supported by the deeper extending further conductor pipe 58 which is cemented into the formation and also cemented to the large diameter conductor pipe 34. The Well head equipment 66, such as the blow out preventers etc., is attached to the top of the further conductor 58 that extends through the large diameter conductor 34 to the mud line or ocean bottom. The weight of the well head 66 is not, therefore, applied directly to the large diameter conductor pipe 34 but is distributed through the cement 62 to the large diameter conductor pipe 34 and to the further conductor pipe 58 which is seated deeper in the more dense formations and which is cemented therein. Thus, a shorter length of large diameter conductor pipe 34 can be used in this arrangement than has been the case heretofore in unconsolidated formations.
Obviously, many modifications and variations of the invention as hereinabove set forth, may be made without departing from the spirit and scope thereof, and therefore, only such limitations should be imposed as are indicated in the appended claims.
I claim:
1. The method of inserting conductor pipe in uncon solidated ocean bottom formations comprising the steps of:
(a) locating a floating drilling structure over the proposed well site,
(b) positioning a wide diameter length of conductor pipe for lowering to the ocean bottom,
(0) running a drill string having a drill bit attached thereto through the wide diameter conductor pipe,
(d) detachably connecting said drill string to the conductor pipe near the bottom thereof;
(e) attaching guide lines to the top of the conductor (f) lowering the conductor pipe bottom first from the floating drilling structure to the ocean bottom by means of said drilling string,
(g) pumping fluid down the drill string and out of the drill bit to provide jetting action to wash out a hole in the ocean bottom underneath said conductor pipe so that the conductor pipe is inserted in the ocean bottom to the desired depth,
(h) detaching said drill string from said conductor (i) drilling a hole with said drill string and drill bit to a desired depth for a second conductor pipe having a narrower diameter than said wide diameter conductor pipe,
(j) pulling said drill string from the well,
(k) lowering said second conductor pipe from said vessel into said well, said second conductor pipe extending through said first conductor pipe and being concentric therewith when in position,
(1) cementing said second conductor into the formation,
(In) filling the annular space between said first and second conductor with cement,
(n) and attaching the well head equipment to the top of said second conductor.
2. The method ac-cording to claim 1, wherein said drill string is detached from said conductor pipe by applying the full weight of said drill string and at the same time time applying torque to the drill string from said vessel.
3. The method according to claim 1, wderein cement is pumped down said second conductor and forced up outside said conductor to provide a cement seal of said conductor pipe to the adjacent earth formations.
4. The method according to claim 1, wherein said second conductor pipe is guided by said guide lines from said vessel to said first conductor for entry therein.
5. The method according to claim 1, wherein said drill string is detachably connected to said conductor pipe by locating a support ring in said conductor pipe and locating a circular support plate about said drill string, and connecting said support plate to said drill string and said support ring by shear pins.
6. The method according to claim 1, wherein said drill string is maintained in the middle of said conductor pipe by a guide plate detachably connected to said conductor pipe.
7. The method according to claim 6 wherein said guide plate is detached from said conductor pipe by said drill bit when the drill string is being removed from said conductor pipe after drilling the hole the second conductor pipe and both said support plate and guide plate are removed with said drill string.
8. A method of inserting conductor pipe in an unconsolidated underwater formation comprising the steps of (a) locating a floating drilling structure over the well site,
(b) positioning a wide diameter length of conductor pipe for lowering to the ocean bottom,
(0) running a drill string having a drill bit attached thereto through the wide diameter conductor pipe,
(d) detachably connecting said'drill string to the conductor pipe near the bottom thereof,
(e) attaching guide lines to the top of the conductor (f) lowering said conductor pipe bottom first from the floating structure to the underwater well location by means of said drill string,
(g) pumping fluid down the drill string and out of the drill bit to provide jetting action to wash out a hole in the ocean bottom at the bottom of said conductor pipe so that the conductor pipe descends therein to the desired position,
(h) detaching said drill string from said conductor (i) drilling a hole with said drill string and drill bit to a desired depth for the second conductor pipe,
(j) pulling said drill string from the well,
(k) lowering said second conductor pipe from said vessel and guiding it by means of said guide lines into said well, said second conductor pipe extending through said first conductor pipe and being concentric therewith when in position,
(1) cementing said second conductor pipe into the formation,
(in) filling the annular space between said first and second conductors with cement,
(n) and attaching the well head equipment to the top of said second conductor.
References Cited UNITED STATES PATENTS 2,808,229 10/1957 Bauer et al -7 2,891,770 6/1959 Bauer et al 175-257 X 2,929,610 3/1960 Stratton 175-171 X 3,145,775 8/1964 McCarty 166-.5 3,292,694 12/1966 Lacy et a1. 166-.5 3,338,303 8/1969 Hoch et al 166-.5 3,340,928 9/1967 Brown 166-.5 3,376,922 5/1968 Leonhardt 166-.5
CHARLES E. OCONNELL, Primary Examiner. R. E, FAVREAU, Assistant Examiner.
US. Cl. X.R. 175-7, 171, 67
US603202A 1966-12-20 1966-12-20 Method of drilling underwater wells Expired - Lifetime US3426844A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US60320266A 1966-12-20 1966-12-20

Publications (1)

Publication Number Publication Date
US3426844A true US3426844A (en) 1969-02-11

Family

ID=24414464

Family Applications (1)

Application Number Title Priority Date Filing Date
US603202A Expired - Lifetime US3426844A (en) 1966-12-20 1966-12-20 Method of drilling underwater wells

Country Status (4)

Country Link
US (1) US3426844A (en)
DE (1) DE1583006A1 (en)
GB (1) GB1200066A (en)
NL (1) NL6717433A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3519071A (en) * 1967-12-21 1970-07-07 Armco Steel Corp Method and apparatus for casing offshore wells
US3608652A (en) * 1968-11-13 1971-09-28 A Z Int Tool Co Underwater drilling apparatus
US3610346A (en) * 1970-06-01 1971-10-05 Texaco Inc Method for oriented emplacement of well casing to achieve directional drilling
US3621910A (en) * 1968-04-22 1971-11-23 A Z Int Tool Co Method of and apparatus for setting an underwater structure
US3690166A (en) * 1969-05-09 1972-09-12 C Fitzhugh Grice Apparatus for measuring subsurface soil characteristics
US3973635A (en) * 1974-12-02 1976-08-10 Exxon Production Research Company Method and apparatus for offshore drilling operations
US6659182B1 (en) * 2002-07-11 2003-12-09 Halliburton Energy Services, Inc. Retrievable suction embedment chamber assembly
US20060169491A1 (en) * 2003-03-13 2006-08-03 Ocean Riser Systems As Method and arrangement for performing drilling operations
US20090200037A1 (en) * 2003-03-13 2009-08-13 Ocean Riser Systems As Method and arrangement for removing soils, particles or fluids from the seabed or from great sea depths
DK178777B1 (en) * 2014-03-04 2017-01-16 Maersk Drilling As Conductor pipe support system for an off-shore platform
US9903172B2 (en) * 2014-11-18 2018-02-27 Aarbakke Innovation As Subsea slanted wellhead system and BOP system with dual injector head units
WO2018146571A1 (en) * 2017-02-07 2018-08-16 Neodrill A.S. Wellbore cement management system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2372765A (en) * 2001-02-27 2002-09-04 Philip Head Use of coiled tubing and jet drilling to install a casing

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2808229A (en) * 1954-11-12 1957-10-01 Shell Oil Co Off-shore drilling
US2891770A (en) * 1955-01-13 1959-06-23 Shell Oil Co Anchoring method and apparatus
US2929610A (en) * 1954-12-27 1960-03-22 Shell Oil Co Drilling
US3145775A (en) * 1958-01-30 1964-08-25 Jersey Prod Res Co Method and apparatus for conducting offshore drilling operations
US3292694A (en) * 1962-09-13 1966-12-20 Shell Oil Co Well drilling method and apparatus
US3338303A (en) * 1965-01-22 1967-08-29 Phillips Petroleum Co Oil well completion
US3340928A (en) * 1965-06-01 1967-09-12 Cicero C Brown Submarine drilling method
US3376922A (en) * 1966-06-08 1968-04-09 Mobil Oil Corp Jet string and weight can assembly

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2808229A (en) * 1954-11-12 1957-10-01 Shell Oil Co Off-shore drilling
US2929610A (en) * 1954-12-27 1960-03-22 Shell Oil Co Drilling
US2891770A (en) * 1955-01-13 1959-06-23 Shell Oil Co Anchoring method and apparatus
US3145775A (en) * 1958-01-30 1964-08-25 Jersey Prod Res Co Method and apparatus for conducting offshore drilling operations
US3292694A (en) * 1962-09-13 1966-12-20 Shell Oil Co Well drilling method and apparatus
US3338303A (en) * 1965-01-22 1967-08-29 Phillips Petroleum Co Oil well completion
US3340928A (en) * 1965-06-01 1967-09-12 Cicero C Brown Submarine drilling method
US3376922A (en) * 1966-06-08 1968-04-09 Mobil Oil Corp Jet string and weight can assembly

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3519071A (en) * 1967-12-21 1970-07-07 Armco Steel Corp Method and apparatus for casing offshore wells
US3621910A (en) * 1968-04-22 1971-11-23 A Z Int Tool Co Method of and apparatus for setting an underwater structure
US3608652A (en) * 1968-11-13 1971-09-28 A Z Int Tool Co Underwater drilling apparatus
US3690166A (en) * 1969-05-09 1972-09-12 C Fitzhugh Grice Apparatus for measuring subsurface soil characteristics
US3610346A (en) * 1970-06-01 1971-10-05 Texaco Inc Method for oriented emplacement of well casing to achieve directional drilling
US3973635A (en) * 1974-12-02 1976-08-10 Exxon Production Research Company Method and apparatus for offshore drilling operations
US6659182B1 (en) * 2002-07-11 2003-12-09 Halliburton Energy Services, Inc. Retrievable suction embedment chamber assembly
US7513310B2 (en) * 2003-03-13 2009-04-07 Ocean Riser Systems As Method and arrangement for performing drilling operations
US20060169491A1 (en) * 2003-03-13 2006-08-03 Ocean Riser Systems As Method and arrangement for performing drilling operations
US20090200037A1 (en) * 2003-03-13 2009-08-13 Ocean Riser Systems As Method and arrangement for removing soils, particles or fluids from the seabed or from great sea depths
US7950463B2 (en) 2003-03-13 2011-05-31 Ocean Riser Systems As Method and arrangement for removing soils, particles or fluids from the seabed or from great sea depths
DK178777B1 (en) * 2014-03-04 2017-01-16 Maersk Drilling As Conductor pipe support system for an off-shore platform
US9903172B2 (en) * 2014-11-18 2018-02-27 Aarbakke Innovation As Subsea slanted wellhead system and BOP system with dual injector head units
AU2015350412B2 (en) * 2014-11-18 2018-09-06 Aarbakke Innovation A.S. Subsea slanted wellhead system and bop system with dual injector head units
WO2018146571A1 (en) * 2017-02-07 2018-08-16 Neodrill A.S. Wellbore cement management system
US10724309B2 (en) 2017-02-07 2020-07-28 Neodrill As Wellbore cement management system
AU2018218542B2 (en) * 2017-02-07 2021-02-25 Neodrill A.S. Wellbore cement management system

Also Published As

Publication number Publication date
NL6717433A (en) 1968-06-21
GB1200066A (en) 1970-07-29
DE1583006A1 (en) 1970-04-23

Similar Documents

Publication Publication Date Title
US2906500A (en) Completion of wells under water
US3259198A (en) Method and apparatus for drilling underwater wells
US3380520A (en) Drilling and production platform
US3004612A (en) Submerged elevated well head structure
US2891770A (en) Anchoring method and apparatus
US4062313A (en) Installation of vertically moored platforms
US3426844A (en) Method of drilling underwater wells
EP1050661B1 (en) Improvements relating to subsea drilling of boreholes
US3976021A (en) Installation of vertically moored platform
US3672447A (en) Marine well drilling method and apparatus
US3262508A (en) Hydraulic drilling and casing setting tool
US3145775A (en) Method and apparatus for conducting offshore drilling operations
US3163238A (en) Underwater well drilling method and apparatus
US3252528A (en) Method of drilling from a fully floating platform
US2237387A (en) Drilling barge
US3220477A (en) Guide system for underwater wells
US3163220A (en) Underwater well drilling apparatus and method
US3554277A (en) Underwater wells
US3376922A (en) Jet string and weight can assembly
US3236308A (en) Drilling apparatus and method
US3340928A (en) Submarine drilling method
US3424242A (en) Method and apparatus for drilling offshore wells
US8833463B2 (en) Above mudline whipstock for marine platform drilling operations
GB814520A (en) Method and apparatus for offshore drilling
US3315742A (en) Offshore deep drilling method from a floating platform