US20190009864A1 - Oil Tanker - Google Patents
Oil Tanker Download PDFInfo
- Publication number
- US20190009864A1 US20190009864A1 US15/641,609 US201715641609A US2019009864A1 US 20190009864 A1 US20190009864 A1 US 20190009864A1 US 201715641609 A US201715641609 A US 201715641609A US 2019009864 A1 US2019009864 A1 US 2019009864A1
- Authority
- US
- United States
- Prior art keywords
- cargo
- pipe
- upper deck
- oil
- cargo oil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B25/00—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
- B63B25/02—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
- B63B25/08—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
- B63B25/082—Arrangements for minimizing pollution by accidents
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/24—Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines
- B63B27/25—Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines for fluidised bulk material
Definitions
- the present invention relates to an oil tanker, that is, a dedicated oil tanker carrying only crude oil, and a dual-purpose oil tanker carrying not only crude oil but also solid cargo such as ore and coal, and in particular, to an oil tanker having a cargo oil pipe and other piping structure.
- a cargo oil pump 17 is arranged in a pump room 16 provided in front of an engine room 18 in a stern, and a cargo oil suction pipe 57 , which communicates with each cargo tank, and a cargo oil delivery pipe 50 , which is connected to a shore connection 48 provided on an upper deck in the central portion of a hull, are connected to the cargo oil pump 17 , respectively.
- oil crude oil
- oil in each cargo oil tank is sucked by the cargo oil pump 17 through the cargo oil suction pipe 57 and then is sent to the shore connection 48 through the cargo oil delivery pipe 50 and is sent out of the shore connection 48 to an onshore receiving facility.
- the cargo oil suction pipe 57 is usually passed through a portion as low as possible in the cargo tank so as to increase a suction efficiency.
- the cargo oil delivery pipe 50 is raised up to the upper deck 30 from the pump room and is passed over the upper deck 30 as it is and is extended to the central portion of the hull.
- the cargo oil delivery pipe 50 laid on the upper deck has a weak point in safety in terms of marine pollution of a leak accident from a cargo oil pipe and easily corrodes when exposed to waves and sea breeze and requires a large amount of money for a maintenance and inspection work.
- the cargo oil delivery pipe 50 laid on the upper deck is laid near the central portion of the upper deck, so that the cargo oil delivery pipe 50 obstructs the effective use of the huge upper deck and a passage of a crew and a working car in the left and right direction on the upper deck and reduces the work efficiency of a crew.
- Pipes laid along the upper deck in addition to the cargo oil delivery pipe include a fuel oil loading pipe, a cargo oil stripper pipe, a fire main pipe, a tank cleaning pipe, and a conduit pipe.
- a crude oil tanker is provided with an inert gas device for preventing an explosion accident and hence has an inert gas main pipe laid on the upper deck near to a bow, the inert gas main pipe being laid from an inert gas generating device arranged in a rear portion of the hull. This also presents the same problem.
- a dual-purpose oil tanker capable of carrying ore and bulk has a hatchway provided in an upper deck and hence presents a more problem for passage on the upper deck.
- the core and the coal drop on the pipes, which presents also problems such that the pipes need to be covered with a protection cover and that a lot of time is required to remove the dropped ore and coal piled under the protective cover after loading the ore and the coal.
- the problem of the present invention is to eliminate various pipes such as a cargo oil pipe from an upper deck of an oil tanker to thereby reduce marine pollution, and use effectively an area on the upper deck, as well as facilitate a passage of a crew and a working car and workability of thereof.
- a cargo oil piping structure includes: a cargo oil delivery pipe connecting a cargo oil pump in a pump room arranged in front of an engine room in a rear portion of a hull, to a shore connection provided nearly in a central portion on an upper deck of the hull.
- the cargo oil delivery pipe is extended forward from the pump room, through a plurality of cargo tanks located below the upper deck of the hull, and goes up through the upper deck so as to be connected to a cross pipe which is coupled to the shore connection.
- FIG. 1 is a schematic side view of an oil tanker.
- FIG. 2 is a cross sectional view of the oil tanker.
- FIG. 3 is an expanded side view of a main portion of the oil tanker.
- FIG. 4 is a cross sectional view to show an another example.
- FIG. 5 is a schematic side view of a ship, which shows an example of another arrangement position of a cargo oil delivery pipe.
- FIG. 6 is a schematic plan view to show an arrangement of a cross pipe.
- FIG. 7 is a schematic side view to show a construction example of a cargo tank of an oil tanker.
- FIG. 8 is a cross sectional view of an oil tanker for carrying ore and oil.
- FIG. 9 is a schematic side view of a ship, which shows a reference example.
- a dedicated oil tanker carrying only crude oil will be described.
- a hull is partitioned by transverse bulkheads 10 and a bow portion 12 , a cargo tank area 14 , a pump room 16 , an engine room 18 , and a stern portion 20 are arranged in this order.
- An accommodation area 22 and a wheelhouse 24 are located above the engine room 18 .
- the cargo tank area 14 has both of the bottom and the side of the ship constructed of a double hull structure and their interiors are constructed of ballast tanks 26 , 28 , respectively.
- a space surrounded by the double hull structure and an upper deck 30 is partitioned into a center cargo tank 34 and left and right cargo tanks 36 by longitudinal bulkheads 32 extended longitudinally on the left and right sides.
- a cargo oil delivery pipe 50 connecting a cargo oil pump 16 A in a pump room 16 arranged in front of the engine room 18 in a rear portion of the hull, to a shore connection 48 provided nearly at center of the upper deck 30 of the hull.
- the cargo oil delivery pipe 50 is extended forward from the pump room 16 , through a cargo tank area located below the upper deck 30 of the hull and goes up through the upper deck 30 so as to be connected to a cross pipe 52 , which is coupled to the shore connection 48 .
- the number of pipes of the cargo oil delivery pipe 50 is appropriately selected.
- cargo oil suction pipes 57 connecting the cargo oil pump 16 A to, for example, the center cargo tank 34 .
- the number of pipes of the cargo oil suction pipe 57 is appropriately selected.
- a pipe tunnel is not provided but the cargo oil delivery pipe 50 is extended forward from the pump room 16 , through a plurality of cargo tanks in the cargo tank area 14 without being covered with anything and changes the direction by going up through the upper deck 30 so as to be connected to the cross pipe 52 which is coupled to the shore connection 48 .
- the cargo oil delivery pipe 50 is structured without providing a pipe tunnel 42 which is extended through the cargo tank area and without being covered with anything.
- the cargo oil delivery pipe 50 is extended through a plurality of the cargo tanks nearly to a central portion in a horizontal direction and is turned upwardly through the upper deck and to connect to the cross pipe.
- the cargo tank area 14 has a plurality of cargo tanks in a front and rear direction; the plurality of cargo tanks are linearly arranged; the pipe tunnel 42 is arranged in such a way as to pass through the plurality of cargo tanks and to be in contact with a longitudinal bulkhead 32 of the plurality of cargo tanks; and an uppermost portion of the longitudinal bulkhead constructs a one-side surrounding wall of the pipe tunnel 42 .
- An inert gas main pipe 58 for sending an inert gas from an inert gas generating device to each cargo tank can be also laid in the pipe tunnel.
- the pipe tunnel 42 can be passed not only the cargo oil delivery pipes but also almost all kinds of pipes laid in a front and rear direction on the upper deck in a conventional ship such as an inert gas pipe, a tank cleaning pipe, a fire main pipe, a conduit pipe, a cargo oil stripper pipe, and a fuel oil loading pipe.
- This can solve almost all problems such as passage, cleaning, and the corrosion and deterioration of the pipes on the upper deck.
- the inert gas pipe, the tank cleaning pipe, and the fire main pipe need to be laid to a position close to the bow, so it is desirable to extend the pipe tunnel in which these pipes are passed to the position close to the bow.
- the cargo oil delivery pipe is laid below the upper deck, or the pipe tunnel is provided and the cargo oil delivery pipe is received in the pipe tunnel.
- the cargo oil delivery pipe is not laid on the upper deck, which can hence facilitate the passage of a crew or a working car.
- the cargo oil delivery pipe passed through the pipe tunnel contributes to prevention of marine pollution and is not exposed to waves and sea breeze and is reduced in the generation of rust and hence is reduced in a maintenance cost, which is different from a case where the cargo oil delivery pipes are laid on the upper deck.
- a ship-side ballast tank 28 is provided; the pipe tunnel 42 is arranged in such a way as to be in contact with the ship-side ballast tank 28 ; and the one-side surrounding wall of the pipe tunnel 42 is formed of an inner longitudinal bulkhead of the ship-side ballast tank 28 .
- a pipe tunnel 42 is provided in such a way as to extend forward from a position of the cross pipe 52 through the cargo tank area and the cargo oil delivery pipes 50 are laid in the pipe tunnel 42 .
- a dual-purpose oil tanker capable of loading a solid cargo such as ore and coal can be used.
- the upper deck 30 has a hatchway 38 formed therein so as to load also an ore cargo in the cargo tank 34 and the hatchway 38 is provided with an oil-tight hatch cover 40 and the pipe tunnel 42 can have its one-side surrounding wall constructed of a hatch side girder 46 which is provided on a lower surface of the upper deck in such a way to pass by a side edge of the hatchway 38 .
- a pipe tunnel 42 of a sealing structure having a nearly rectangular section is formed in such a way as to be sandwiched between an upper portion of the center cargo tank 34 and the longitudinal bulkhead 32 extended longitudinally and the hatchway 38 .
- a surrounding wall surrounding the pipe tunnel 42 has its upper side constructed of the upper deck 30 and has its outside constructed of the longitudinal bulkhead 32 extended longitudinally, and an inner surrounding wall is formed by the use of a hatch side girder 46 provided on a lower surface of the upper deck 30 .
- the pipe tunnel 42 has its three faces constructed of hull structure members, specifically speaking, the longitudinal bulkheads 32 extended longitudinally, the upper deck 30 and the hatch side girder 46 which are used in combination, so that the pipe tunnel 42 can be constructed at a low cost.
- the pipe tunnels 42 are formed on both sides of the ship on the back of the upper deck 30 and various pipes laid conventionally on the upper deck are laid in the pipe tunnels 42 .
- the number of the cargo oil delivery pipes 50 extended from the pump room 16 and toward the shore connection 48 in the central portion of the hull is three in total in the case of this ship. As shown in FIG. 8 , two of the three cargo oil delivery pipes 50 are passed through the pipe tunnel 42 on the left side of the ship and the remaining one of them is passed through the pipe tunnel 42 on the right side of the ship.
- the shore connections 48 on the left side and on the right side of the ship are coupled to each other by the cross pipe 52 and the cargo oil delivery pipes 50 passed through pipe tunnels 42 , 42 are pulled out to the top of the upper deck 30 in the central portion of the hull and are connected to the cross pipe 52 .
- the pipe tunnels 42 can receive also pipes 54 connected to the shore connections 48 , for example, a fuel oil loading pipe and a cargo oil stripper pipe.
- This ship is constructed in such a way as to suck an inert gas (which is acquired by processing the exhaust gas of a main boiler and hardly contains oxygen) in place of outside air into the cargo tank so as to prevent an explosion accident of the cargo tank when the cargo tank is brought into a negative pressure at the time of unloading or during voyage.
- a pipe for sending the inert gas (inert gas pipe 58 ) is a large diameter pipe having a diameter nearly equal to a diameter of the cargo oil delivery pipe 50 and the inert gas pipe 58 is laid to a portion close to the bow through the pipe tunnel 42 .
- the inert gas pipe 58 has a branch pipe (not shown in the drawing) branched therefrom and the branch pipe is passed over the upper deck and is extended to the respective cargo tanks 34 , 36 .
- An operation of opening or closing a valve and a maintenance and inspection work are conducted in the pipe tunnel 42 , so that the pipe tunnel 42 can have a plurality of doorways provided therein so as to make it possible for a crew to come in and out of the pipe tunnel 42 from the upper deck 30 and the doorways are constructed in such a way as to be closed by a water-tight door. Further, it is also important to make the interior of the pipe tunnel 42 large enough for a crew to pass through.
- the pipe tunnel 42 In order to prevent a combustible gas from storing and causing a fire accident, it is preferable to provide the pipe tunnel 42 with a ventilation device, a gas sensor, and a fire extinguisher (for example, carbon dioxide type).
- a ventilation device for example, a gas sensor, and a fire extinguisher (for example, carbon dioxide type).
- the pipe tunnels 42 are provided in the uppermost portion of the longitudinal bulkhead 32 extended longitudinally, but the pipe tunnels 42 can be arranged at appropriate positions selected in the cross section of the hull.
- a group of stringer members 60 can be provided by welding on the outer surfaces of the respective longitudinal bulkheads 32 extended longitudinally of the cargo tank 34 along a longitudinal direction, and the group of stringer members 60 is joined to the hull by welding.
- rigidity can be increased not only by the group of stringer members 60 but also preferably by the pipe tunnels 42 .
- the group of stringer members 60 are not provided on the inner surface of the cargo tank 34 , or even in a case where the group of stringer members 60 are provided, if the group of stringer members 60 are reduced in number, it is possible to prevent sludge from depositing in the cargo tank 34 and hence to increase the amount of the cargo oil. This can facilitate a crude oil cleaning, a tank cleaning, and a sludge unloading and, in particular, can remarkably simplify various works before docking.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Health & Medical Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Public Health (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
An oil tanker is provided with a cargo oil delivery pipe for connecting a cargo oil pump in a pump room arranged in front of an engine room in a rear portion of a hull to a shore connection provided nearly in a central portion on the upper deck of the hull, and a cargo suction pipe for connecting the cargo oil pump to a cargo oil tank. The cargo oil delivery pipe is passed through a cargo tank area below the upper deck of the hull and is extended forward from the pump room and is passed through the upper deck and is connected to a cross pipe and is coupled to the shore connection.
Description
- The present invention relates to an oil tanker, that is, a dedicated oil tanker carrying only crude oil, and a dual-purpose oil tanker carrying not only crude oil but also solid cargo such as ore and coal, and in particular, to an oil tanker having a cargo oil pipe and other piping structure.
- In an oil tanker, as shown in
FIG. 9 , acargo oil pump 17 is arranged in apump room 16 provided in front of anengine room 18 in a stern, and a cargooil suction pipe 57, which communicates with each cargo tank, and a cargooil delivery pipe 50, which is connected to ashore connection 48 provided on an upper deck in the central portion of a hull, are connected to thecargo oil pump 17, respectively. When oil (crude oil) is unloaded, oil in each cargo oil tank is sucked by thecargo oil pump 17 through the cargooil suction pipe 57 and then is sent to theshore connection 48 through the cargooil delivery pipe 50 and is sent out of theshore connection 48 to an onshore receiving facility. The cargooil suction pipe 57 is usually passed through a portion as low as possible in the cargo tank so as to increase a suction efficiency. On the other hand, the cargooil delivery pipe 50 is raised up to theupper deck 30 from the pump room and is passed over theupper deck 30 as it is and is extended to the central portion of the hull. - In this type of piping, the cargo
oil delivery pipe 50 laid on the upper deck has a weak point in safety in terms of marine pollution of a leak accident from a cargo oil pipe and easily corrodes when exposed to waves and sea breeze and requires a large amount of money for a maintenance and inspection work. In addition, the cargooil delivery pipe 50 laid on the upper deck is laid near the central portion of the upper deck, so that the cargooil delivery pipe 50 obstructs the effective use of the huge upper deck and a passage of a crew and a working car in the left and right direction on the upper deck and reduces the work efficiency of a crew. - However, it is not only the cargo oil delivery pipe that obstructs the passage on the upper deck in the conventional oil tanker. Pipes laid along the upper deck in addition to the cargo oil delivery pipe include a fuel oil loading pipe, a cargo oil stripper pipe, a fire main pipe, a tank cleaning pipe, and a conduit pipe. Further, a crude oil tanker is provided with an inert gas device for preventing an explosion accident and hence has an inert gas main pipe laid on the upper deck near to a bow, the inert gas main pipe being laid from an inert gas generating device arranged in a rear portion of the hull. This also presents the same problem.
- In particular, a dual-purpose oil tanker capable of carrying ore and bulk has a hatchway provided in an upper deck and hence presents a more problem for passage on the upper deck. In addition, when ore and coal are loaded, the core and the coal drop on the pipes, which presents also problems such that the pipes need to be covered with a protection cover and that a lot of time is required to remove the dropped ore and coal piled under the protective cover after loading the ore and the coal.
- In a case where a cargo oil delivery pipe is broken by an accident of a cargo oil pipe, there is a possibility that marine pollution will be caused.
- The problem of the present invention is to eliminate various pipes such as a cargo oil pipe from an upper deck of an oil tanker to thereby reduce marine pollution, and use effectively an area on the upper deck, as well as facilitate a passage of a crew and a working car and workability of thereof.
- A cargo oil piping structure according to the present invention includes: a cargo oil delivery pipe connecting a cargo oil pump in a pump room arranged in front of an engine room in a rear portion of a hull, to a shore connection provided nearly in a central portion on an upper deck of the hull. The cargo oil delivery pipe is extended forward from the pump room, through a plurality of cargo tanks located below the upper deck of the hull, and goes up through the upper deck so as to be connected to a cross pipe which is coupled to the shore connection.
- As described above, according to the present invention, it is possible to eliminate the cargo oil delivery pipe from the upper deck of the oil tanker to thereby reduce marine pollution, and use effectively the area on the upper deck, as well as facilitate a passage of a crew.
-
FIG. 1 is a schematic side view of an oil tanker. -
FIG. 2 is a cross sectional view of the oil tanker. -
FIG. 3 is an expanded side view of a main portion of the oil tanker. -
FIG. 4 is a cross sectional view to show an another example. -
FIG. 5 is a schematic side view of a ship, which shows an example of another arrangement position of a cargo oil delivery pipe. -
FIG. 6 is a schematic plan view to show an arrangement of a cross pipe. -
FIG. 7 is a schematic side view to show a construction example of a cargo tank of an oil tanker. -
FIG. 8 is a cross sectional view of an oil tanker for carrying ore and oil. -
FIG. 9 is a schematic side view of a ship, which shows a reference example. - Hereinafter, embodiments of the present invention will be described with reference to the drawings.
- First, a dedicated oil tanker carrying only crude oil will be described. As shown in
FIG. 1 andFIG. 2 , a hull is partitioned bytransverse bulkheads 10 and abow portion 12, acargo tank area 14, apump room 16, anengine room 18, and astern portion 20 are arranged in this order. Anaccommodation area 22 and awheelhouse 24 are located above theengine room 18. - The
cargo tank area 14, as shown inFIG. 2 , has both of the bottom and the side of the ship constructed of a double hull structure and their interiors are constructed ofballast tanks upper deck 30 is partitioned into acenter cargo tank 34 and left andright cargo tanks 36 bylongitudinal bulkheads 32 extended longitudinally on the left and right sides. - According to the present invention, there is provided a cargo
oil delivery pipe 50 connecting acargo oil pump 16A in apump room 16 arranged in front of theengine room 18 in a rear portion of the hull, to ashore connection 48 provided nearly at center of theupper deck 30 of the hull. The cargooil delivery pipe 50 is extended forward from thepump room 16, through a cargo tank area located below theupper deck 30 of the hull and goes up through theupper deck 30 so as to be connected to across pipe 52, which is coupled to theshore connection 48. - Here, the number of pipes of the cargo
oil delivery pipe 50 is appropriately selected. - Further, there are provided cargo
oil suction pipes 57 connecting thecargo oil pump 16A to, for example, thecenter cargo tank 34. The number of pipes of the cargooil suction pipe 57 is appropriately selected. - In the examples shown in
FIG. 2 andFIG. 3 , a pipe tunnel is not provided but the cargooil delivery pipe 50 is extended forward from thepump room 16, through a plurality of cargo tanks in thecargo tank area 14 without being covered with anything and changes the direction by going up through theupper deck 30 so as to be connected to thecross pipe 52 which is coupled to theshore connection 48. - It is desirable that the cargo
oil delivery pipe 50 is structured without providing apipe tunnel 42 which is extended through the cargo tank area and without being covered with anything. - Further, it is also desirable that the cargo
oil delivery pipe 50 is extended through a plurality of the cargo tanks nearly to a central portion in a horizontal direction and is turned upwardly through the upper deck and to connect to the cross pipe. - There can be employed a structure in which: the
cargo tank area 14 has a plurality of cargo tanks in a front and rear direction; the plurality of cargo tanks are linearly arranged; thepipe tunnel 42 is arranged in such a way as to pass through the plurality of cargo tanks and to be in contact with alongitudinal bulkhead 32 of the plurality of cargo tanks; and an uppermost portion of the longitudinal bulkhead constructs a one-side surrounding wall of thepipe tunnel 42. - An inert gas
main pipe 58 for sending an inert gas from an inert gas generating device to each cargo tank can be also laid in the pipe tunnel. - In the
pipe tunnel 42 can be passed not only the cargo oil delivery pipes but also almost all kinds of pipes laid in a front and rear direction on the upper deck in a conventional ship such as an inert gas pipe, a tank cleaning pipe, a fire main pipe, a conduit pipe, a cargo oil stripper pipe, and a fuel oil loading pipe. This can solve almost all problems such as passage, cleaning, and the corrosion and deterioration of the pipes on the upper deck. In this regard, the inert gas pipe, the tank cleaning pipe, and the fire main pipe need to be laid to a position close to the bow, so it is desirable to extend the pipe tunnel in which these pipes are passed to the position close to the bow. - In this way, the cargo oil delivery pipe is laid below the upper deck, or the pipe tunnel is provided and the cargo oil delivery pipe is received in the pipe tunnel. Hence, when oil leaks from the cargo oil delivery pipe, it is possible to prevent the oil from quickly flowing out into the sea and hence to improve safety. Further, the cargo oil delivery pipe is not laid on the upper deck, which can hence facilitate the passage of a crew or a working car. Still further, the cargo oil delivery pipe passed through the pipe tunnel contributes to prevention of marine pollution and is not exposed to waves and sea breeze and is reduced in the generation of rust and hence is reduced in a maintenance cost, which is different from a case where the cargo oil delivery pipes are laid on the upper deck.
- There can be employed a construction in which: a ship-
side ballast tank 28 is provided; thepipe tunnel 42 is arranged in such a way as to be in contact with the ship-side ballast tank 28; and the one-side surrounding wall of thepipe tunnel 42 is formed of an inner longitudinal bulkhead of the ship-side ballast tank 28. - In another example, as shown in
FIG. 4 andFIG. 5 , apipe tunnel 42 is provided in such a way as to extend forward from a position of thecross pipe 52 through the cargo tank area and the cargooil delivery pipes 50 are laid in thepipe tunnel 42. - As shown in
FIG. 8 , a dual-purpose oil tanker capable of loading a solid cargo such as ore and coal can be used. In this dual-purpose oil tanker, theupper deck 30 has ahatchway 38 formed therein so as to load also an ore cargo in thecargo tank 34 and thehatchway 38 is provided with an oil-tight hatch cover 40 and thepipe tunnel 42 can have its one-side surrounding wall constructed of ahatch side girder 46 which is provided on a lower surface of the upper deck in such a way to pass by a side edge of thehatchway 38. - A
pipe tunnel 42 of a sealing structure having a nearly rectangular section is formed in such a way as to be sandwiched between an upper portion of thecenter cargo tank 34 and thelongitudinal bulkhead 32 extended longitudinally and thehatchway 38. A surrounding wall surrounding thepipe tunnel 42 has its upper side constructed of theupper deck 30 and has its outside constructed of thelongitudinal bulkhead 32 extended longitudinally, and an inner surrounding wall is formed by the use of ahatch side girder 46 provided on a lower surface of theupper deck 30. In this way, thepipe tunnel 42 has its three faces constructed of hull structure members, specifically speaking, thelongitudinal bulkheads 32 extended longitudinally, theupper deck 30 and thehatch side girder 46 which are used in combination, so that thepipe tunnel 42 can be constructed at a low cost. - In this way, the
pipe tunnels 42 are formed on both sides of the ship on the back of theupper deck 30 and various pipes laid conventionally on the upper deck are laid in thepipe tunnels 42. - The number of the cargo
oil delivery pipes 50 extended from thepump room 16 and toward theshore connection 48 in the central portion of the hull is three in total in the case of this ship. As shown inFIG. 8 , two of the three cargooil delivery pipes 50 are passed through thepipe tunnel 42 on the left side of the ship and the remaining one of them is passed through thepipe tunnel 42 on the right side of the ship. Theshore connections 48 on the left side and on the right side of the ship are coupled to each other by thecross pipe 52 and the cargooil delivery pipes 50 passed throughpipe tunnels upper deck 30 in the central portion of the hull and are connected to thecross pipe 52. - In addition, the
pipe tunnels 42 can receive alsopipes 54 connected to theshore connections 48, for example, a fuel oil loading pipe and a cargo oil stripper pipe. - This ship is constructed in such a way as to suck an inert gas (which is acquired by processing the exhaust gas of a main boiler and hardly contains oxygen) in place of outside air into the cargo tank so as to prevent an explosion accident of the cargo tank when the cargo tank is brought into a negative pressure at the time of unloading or during voyage. A pipe for sending the inert gas (inert gas pipe 58) is a large diameter pipe having a diameter nearly equal to a diameter of the cargo
oil delivery pipe 50 and theinert gas pipe 58 is laid to a portion close to the bow through thepipe tunnel 42. Theinert gas pipe 58 has a branch pipe (not shown in the drawing) branched therefrom and the branch pipe is passed over the upper deck and is extended to therespective cargo tanks - An operation of opening or closing a valve and a maintenance and inspection work are conducted in the
pipe tunnel 42, so that thepipe tunnel 42 can have a plurality of doorways provided therein so as to make it possible for a crew to come in and out of thepipe tunnel 42 from theupper deck 30 and the doorways are constructed in such a way as to be closed by a water-tight door. Further, it is also important to make the interior of thepipe tunnel 42 large enough for a crew to pass through. - In order to prevent a combustible gas from storing and causing a fire accident, it is preferable to provide the
pipe tunnel 42 with a ventilation device, a gas sensor, and a fire extinguisher (for example, carbon dioxide type). - In the embodiment described above, the
pipe tunnels 42 are provided in the uppermost portion of thelongitudinal bulkhead 32 extended longitudinally, but thepipe tunnels 42 can be arranged at appropriate positions selected in the cross section of the hull. - On the other hand, as shown in
FIG. 7 , a group ofstringer members 60 can be provided by welding on the outer surfaces of the respectivelongitudinal bulkheads 32 extended longitudinally of thecargo tank 34 along a longitudinal direction, and the group ofstringer members 60 is joined to the hull by welding. - In this example, rigidity can be increased not only by the group of
stringer members 60 but also preferably by thepipe tunnels 42. Hence, if the group ofstringer members 60 are not provided on the inner surface of thecargo tank 34, or even in a case where the group ofstringer members 60 are provided, if the group ofstringer members 60 are reduced in number, it is possible to prevent sludge from depositing in thecargo tank 34 and hence to increase the amount of the cargo oil. This can facilitate a crude oil cleaning, a tank cleaning, and a sludge unloading and, in particular, can remarkably simplify various works before docking. -
- 16 Pump room
- 28 Ballast tank (Double hull structure of the side of ship)
- 30 Upper deck
- 32 Longitudinal bulkhead extended longitudinally
- 34 Center cargo tank
- 36 Left and right cargo tanks
- 38 Hatchway
- 42 Pipe tunnel
- 46 Hatch side girder
- 48 Shore connection
- 50 Cargo oil delivery pipe
- 57 Cargo oil suction pipe
- 58 Inert gas pipe
Claims (3)
1. An oil tanker comprising:
a cargo oil delivery pipe for connecting a cargo oil pump in a pump room arranged in front of an engine room in a rear portion of a hull to a shore connection provided nearly in a central portion on an upper deck of the hull, and
a cargo oil suction pipe for connecting the cargo oil pump to a cargo oil tank,
wherein the cargo oil delivery pipe is passed through a cargo tank area below the upper deck of the hull and is extended forward from the pump room and is passed through the upper deck and is connected to a cross pipe and is coupled to the shore connection.
2. The oil tanker as claimed in claim 1 ,
wherein the cargo oil delivery pipe is passed through the cargo tank area without providing a pipe tunnel and without being covered with anything and is extended forward from the pump room and is passed through the upper deck and is connected to the cross pipe and is coupled to the shore connection.
3. The oil tanker as claimed in claim 1 ,
wherein the cargo tank area is partitioned so as to have a plurality of cargo tanks and the pipe tunnel is passed from the pump room through a plurality of the cargo tanks and is extended nearly to the central portion in a horizontal direction and is turned upwardly through the upper deck and to connect to the cross pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/641,609 US20190009864A1 (en) | 2017-07-05 | 2017-07-05 | Oil Tanker |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/641,609 US20190009864A1 (en) | 2017-07-05 | 2017-07-05 | Oil Tanker |
Publications (1)
Publication Number | Publication Date |
---|---|
US20190009864A1 true US20190009864A1 (en) | 2019-01-10 |
Family
ID=64904141
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/641,609 Abandoned US20190009864A1 (en) | 2017-07-05 | 2017-07-05 | Oil Tanker |
Country Status (1)
Country | Link |
---|---|
US (1) | US20190009864A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109322752A (en) * | 2018-09-29 | 2019-02-12 | 南通航海机械集团有限公司 | A kind of marine fuel oil intelligence control system and control method |
CN110254624A (en) * | 2019-06-27 | 2019-09-20 | 中船澄西船舶修造有限公司 | Structure between a kind of hydraulic pump of chemical tanker |
CN116834892A (en) * | 2023-06-25 | 2023-10-03 | 南通中远海运船务工程有限公司 | Cargo oil tank arrangement structure of crude oil ship |
-
2017
- 2017-07-05 US US15/641,609 patent/US20190009864A1/en not_active Abandoned
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109322752A (en) * | 2018-09-29 | 2019-02-12 | 南通航海机械集团有限公司 | A kind of marine fuel oil intelligence control system and control method |
CN110254624A (en) * | 2019-06-27 | 2019-09-20 | 中船澄西船舶修造有限公司 | Structure between a kind of hydraulic pump of chemical tanker |
CN116834892A (en) * | 2023-06-25 | 2023-10-03 | 南通中远海运船务工程有限公司 | Cargo oil tank arrangement structure of crude oil ship |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101528537B (en) | Piping structure for oil tanker | |
JP4357555B2 (en) | Oil tank piping structure | |
CN107000814B (en) | Floating body structure with liquefied gas storage device | |
JP4388119B2 (en) | Ships equipped with an automatic ballast system using tubes | |
US20190009864A1 (en) | Oil Tanker | |
US11118734B2 (en) | Cold-box system and apparatus for power management aboard ships | |
WO2012007900A1 (en) | A ship including a tank space | |
CN102398672A (en) | Pneumatic drainage system for sewage well of cargo hold of ship | |
CN104159816A (en) | Floating body, in particular container ship | |
KR102595978B1 (en) | Container Ship including Bunkering Station | |
NO175424B (en) | Procedures and vessels for offshore oil loading | |
TWI449648B (en) | Oil tank allowing the type of ship to be easily changed | |
JP2022171622A (en) | Roll-on/roll-off ship equipped with tank for storing liquefied gas | |
WO2014013584A1 (en) | Ship | |
JP2019089469A (en) | Banker station ventilation structure using broadside water curtain hydraulic pressure of banker station of gas fuel vessel | |
KR20060056947A (en) | Gas expansion trunk for marine vessels | |
JP2012153334A (en) | Ship | |
KR20240136096A (en) | Piping structure for oil tanker | |
KR101519535B1 (en) | Loading/unloading piping system and crude oil carrier having the same | |
CN216153988U (en) | Floating oil storage ship with independently communicated cabins | |
CN116215766A (en) | Internal oil pipeline system of large ocean tanker | |
KR102605383B1 (en) | A system for supplying fuel | |
Sivriu Doinea et al. | Specific facilities plans for ships tanker | |
KR20150009273A (en) | Oil loading and unloading equipments in tanker | |
RU2412079C1 (en) | Mooring hose-rope for ship one-support mooring and transfer of fluid there over |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |