US20180320487A1 - Lateral completion system with retrievable inner liner - Google Patents
Lateral completion system with retrievable inner liner Download PDFInfo
- Publication number
- US20180320487A1 US20180320487A1 US15/809,401 US201715809401A US2018320487A1 US 20180320487 A1 US20180320487 A1 US 20180320487A1 US 201715809401 A US201715809401 A US 201715809401A US 2018320487 A1 US2018320487 A1 US 2018320487A1
- Authority
- US
- United States
- Prior art keywords
- liner
- upper portion
- assembly
- wellbore
- inner liner
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 230000009977 dual effect Effects 0.000 claims abstract description 41
- 238000000034 method Methods 0.000 claims abstract description 25
- 238000005520 cutting process Methods 0.000 claims description 54
- 239000004568 cement Substances 0.000 claims description 30
- 230000015572 biosynthetic process Effects 0.000 claims description 11
- 238000002955 isolation Methods 0.000 claims description 8
- 238000007789 sealing Methods 0.000 claims description 7
- 239000011148 porous material Substances 0.000 claims description 6
- 239000007787 solid Substances 0.000 claims description 3
- 230000004936 stimulating effect Effects 0.000 claims description 3
- 238000005304 joining Methods 0.000 claims description 2
- 230000007246 mechanism Effects 0.000 description 16
- 238000005755 formation reaction Methods 0.000 description 10
- 239000012530 fluid Substances 0.000 description 9
- 239000000463 material Substances 0.000 description 9
- 230000009545 invasion Effects 0.000 description 7
- 230000004048 modification Effects 0.000 description 7
- 238000012986 modification Methods 0.000 description 7
- 238000003466 welding Methods 0.000 description 6
- 238000004873 anchoring Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 5
- 229920001084 poly(chloroprene) Polymers 0.000 description 5
- 230000000638 stimulation Effects 0.000 description 5
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 4
- 239000002253 acid Substances 0.000 description 4
- 239000004744 fabric Substances 0.000 description 4
- 230000001154 acute effect Effects 0.000 description 3
- 239000000853 adhesive Substances 0.000 description 3
- 230000001070 adhesive effect Effects 0.000 description 3
- 230000002706 hydrostatic effect Effects 0.000 description 3
- 238000003801 milling Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 229920001821 foam rubber Polymers 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 230000005012 migration Effects 0.000 description 2
- 238000013508 migration Methods 0.000 description 2
- 229910052757 nitrogen Inorganic materials 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- 239000004677 Nylon Substances 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000004809 Teflon Substances 0.000 description 1
- 229920006362 Teflon® Polymers 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 210000004907 gland Anatomy 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 238000007373 indentation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000011068 loading method Methods 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000008707 rearrangement Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 230000035945 sensitivity Effects 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 239000007858 starting material Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000003313 weakening effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/08—Screens or liners
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B29/00—Cutting or destroying pipes, packers, plugs or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B29/00—Cutting or destroying pipes, packers, plugs or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
- E21B29/06—Cutting windows, e.g. directional window cutters for whipstock operations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/129—Packers; Plugs with mechanical slips for hooking into the casing
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
Definitions
- the specification is directed to recovery of hydrocarbons from subterranean oil formations and particularly to a multilateral supported junction with double liner.
- FIG. 1 is a schematic illustration of a section through a well showing a wellbore junction of a main wellbore and a lateral wellbore.
- FIG. 2 a (corresponding to FIG. 6a of U.S. Pat. No. 9,644,459) is a schematic illustration of a liner running tool installing a liner in a lateral wellbore.
- FIG. 2 b shows another way of providing a cased lateral borehole through a window.
- FIG. 3 is a diagrammatic representation of a dual liner assembly for a multilateral fracking system.
- FIG. 4 is a diagrammatic representation of a dual liner assembly installed in a lateral wellbore.
- FIG. 5 is a diagrammatic representation of another embodiment of a dual liner assembly.
- FIG. 6 is a diagrammatic representation of cutting a dual liner assembly.
- FIG. 7 is a diagrammatic representation of cutting a dual liner assembly with an upper portion removed.
- FIG. 8 is a diagrammatic representation of another embodiment of a dual liner assembly.
- lateral wellbores are drilled and accessed from a window formed in the casing of the main wellbore.
- liners are run into the lateral wellbores and connected to the main wellbore, the lateral wellbores are accessed through the window, and then the zones are fracked using perforating devices or hydraulic pressurization.
- a window opening is pre-formed in the casing and sometimes the window opening is formed entirely by drilling out from the main wellbore through the casing and cement (if any) through the borehole wall and outward therefrom.
- lateral wellbores with each other and the main wellbore presents some challenges.
- the production zones have different characteristics such as pressure, water content, temperature, etc. These diverse characteristics may result in undesirable production patterns.
- a pressure difference between the lateral and the main wellbore can cause migration of debris from the lateral wellbore into the main wellbore, which can result in plugging of the main wellbore. Therefore, one of the challenges for a multi-lateral junction is to prevent migration of debris and fluids between production zones.
- the fracking of a lateral wellbore is sometimes impeded by the invasion of debris into that lateral wellbore that comes from other open lateral wellbores.
- debris invades a lateral wellbore it may become difficult to seal the lateral wellbore, and therefore necessary to pull out its lateral liner, and reinsert it, which in turn can involve re-supporting the junction between the lateral and the main wellbore, and re-sealing the lateral, which can be costly.
- FIG. 1 is a schematic illustration of a section through a well showing a wellbore junction of a main wellbore and a lateral wellbore.
- the lateral wellbore 10 extends from the main wellbore 12 at a junction.
- the lateral wellbore 10 is accessed through a window 14 removed from a main wellbore wall.
- the window 14 is an opening formed by milling through a casing 15 .
- the lateral wellbore 10 extends beyond the window 14 at an acute angle from the main wellbore 12 , as better seen in FIG. 2 a .
- the cross section of the window 14 has an elliptical or tear-drop shape defined by a lower limit 14 a and an upper limit 14 b where an upper edge 16 of the lateral wellbore 10 extends away from the main wellbore 12 .
- the elliptical shape of the window 14 forms a substantially V-shaped downhole end 14 a.
- FIG. 2 a is a schematic illustration of a liner running tool installing a liner in a lateral wellbore, as described and illustrated in U.S. Pat. No. 9,644,459 (Themig), entitled “Wellbore Lateral Liner Placement System” and issued May 9, 2017, which is incorporated herein by reference.
- U.S. Pat. No. 9,644,459 Themig
- a lateral junction support liner 120 is placed into the lateral wellbore 10 through a window (lateral opening) 114 using a running tool 118 .
- the area around the lateral wellbore near the window is fragile and may be subject to shifting or collapse. Accordingly, a lateral junction support liner 120 deployed with (or without) cementing around it, supports the integrity of the window 114 near the junction between the main wellbore 12 and the lateral wellbore 10 .
- a running tool 118 releasably engaging the lateral junction support liner 120 , is manipulated to run the engaged lateral liner 120 into the lateral wellbore 10 , and then manipulated to release its engagement of the liner 120 , so that the running tool 118 can be withdrawn back to surface from the main wellbore 12 .
- the V-shaped downhole end 114 a of the window leading to the lateral wellbore is located using a key 122 biased to protrude out from the body of the running tool.
- the lateral wellbore 10 can be sealed using a packer 132 for example to enable pressurization and fracking.
- the packer 132 and anchoring slips 134 are used to anchor the liner 120 to the lateral wellbore 10 .
- lateral junction support liner 120 or any associated support structure for the liner 110 is protruding inside the main wellbore.
- Another work string can then be run in through the main wellbore 12 , through the window 114 , and into the lateral wellbore 10 , to execute a number of operations including fracking.
- Another liner (not show in FIG. 2 a ) may extend downhole from the packer 132 .
- the space between the lateral junction support liner 120 and the open hole of the lateral wellbore 10 that is near the window 114 can be cased and/or cemented to provide further support for the open hole region of the lateral wellbore 10 near the window 114 , and thus prevent that region from degenerating and possibly caving in.
- the main wellbore 12 and lateral wellbores 10 are collectively referred to as a multilateral well. Fracking of multilateral wells presents some problems when the main wellbore 12 is left relatively unobstructed, as is the case with the system of FIG. 2 a .
- the fracking of a lateral wellbore 10 can be impeded by the invasion of debris into that lateral wellbore that comes from the main wellbore 12 or other open lateral wellbores connected to the main wellbore 12 .
- U.S. Pat. No. 5,477,925 entitled “Method for multilateral Completion and Cementing the Junction with Lateral Wellbores” issued Dec. 26, 1995 describes another system for multilateral well cementing and completion that attempts to address this debris invasion problem.
- a liner 32 extends down the main wellbore and bends into the lateral wellbore 18 at a window 52 , which results in sealing the opening into the lateral wellbore from debris invasion sourced from other lateral wellbores or the main wellbore.
- Embodiments described herein provide a dual liner assembly for a multilateral fracking system that prevents or reduces significantly invasion of debris into the multilaterals without requiring repeated milling, withdrawal, reinsertion and setting of liners in each lateral wellbore.
- a dual liner assembly for a multilateral fracking system assembly for a multilateral fracking system comprises: a junction support liner adapted to be installed in a lateral wellbore at a junction with a main wellbore; an inner liner with an upper portion and a lower portion, the inner liner being positioned inside the junction support liner and extending beyond the junction support liner within the main wellbore and within the lateral wellbore when the assembly is installed; and a cut and release connector adapted to join the inner liner and the junction support liner and to enable detachment of the upper portion of the inner liner from the assembly at a predefined location with respect to the junction.
- the junction support liner is provided in the lateral wellbore proximate to the window with the main wellbore, and the frack liner, also referred to as the inner liner, comprises an “upper portion” (the portion of the internal liner closer to the surface) and a lower portion (the portion of the internal frack liner farther away from the surface), coupled to each other with a liner connector.
- the upper portion and the lower portion are also referred to as the “upper frack liner” and the “lower frack liner”, respectively.
- a method of multilateral fracking comprises: providing a dual liner assembly comprised of junction support liner and an inner liner including an upper portion and a lower portion releasable engaged with a cut and release connector; lowering the dual liner assembly into a main wellbore and then into a lateral wellbore; installing the dual liner assembly with the junction support liner placed into the lateral wellbore at the junction with the main wellbore and the inner liner extending beyond the junction support liner within the main wellbore and in the lateral wellbore; stimulating the lateral wellbore; cutting the inner liner at a cutting position and releasing engagement between the upper and lower portions; and removing the upper portion.
- an assembly of two connected liners can be used to line both a portion of a main wellbore leading into a lateral wellbore that is to be fracked, and the lateral wellbore itself.
- One of the liners is a lateral junction support liner that is a precut, pre-shaped pipe that is precision located at the junction and supports the integrity of a lateral opening (i.e. window) near the junction between the main wellbore and the lateral wellbore.
- Another longer frack liner is placed inside the junction support liner, and additionally protrudes from the junction support liner beyond both its ends.
- the lateral frack liner extends more deeply into the lateral wellbore and into part of the main wellbore than the junction support liner.
- frack liner present in the part of the main wellbore that leads into the lateral wellbore, fracking can thus occur in the lateral wellbore without significant fluid communication occurring between it and the main wellbore or any of the other lateral wellbores in a formation.
- the upper portion of the frack liner provides extra protection from the debris that may otherwise flow into the lateral wellbore being fracked.
- the lower portion includes seals, packers, valves and other tools necessary to frack the lateral wellbore.
- the upper or lower portions can also be used to run tools into the lateral wellbore for executing a variety of operations.
- the inner (frack) liner is designed to be easily and cleanly severed at a very precise location near the liner connector, and the upper portion can be withdrawn back to surface, leaving the lower portion and the junction support liner in place.
- withdrawal of the upper portion means that the upper portion does not have to be milled through in order to reach lateral wellbores further down the main wellbore.
- the frack liner includes a cut and release sub positioned in the lower portion in the lateral wellbore.
- the cut and release sub facilitate cutting the frack liner at a precise location with respect to the junction to detach the upper portion of the frack liner from the lower portion. The upper portion can then be withdrawn back to surface after detachment from the lower portion, by releasing the packer in the main wellbore.
- a porous media e.g., foam rubber or other spongy material
- the porous media is selected to inhibit the formation of a strong cement structure around the upper portion when it is deployed downhole. If left untreated, such a formation could complicate removal of the upper portion from the main and lateral wellbores, and from the junction support liner to the extent it overlaps with the upper portion, even after the upper portion is detached from the lower portion at the release sub.
- porous media around the upper portion can ease withdrawal of the upper portion from the lateral wellbore support liner after it has been separated from the lower portion, without compromising the cement deployed around the lateral junction support liner (which is used to support the integrity of the lateral opening/window at the junction between the main and lateral wellbores).
- locating keys for enabling deployment of the upper portion, whether or not connected to the lower portion, at a precise spot relative to the window between the main wellbore and lateral wellbore.
- a locating key is preferably provided on the upper portion, rather than on a separate running tool, the lower portion or the junction support liner.
- a junction liner terms “upper”, “back”, “rear” are used to refer to a being on or closer to the surface side (upwell side) of the junction liner relative to a corresponding feature that is “lower”, “forward”, “front” features.
- an “upper” end of a liner generally refers to the feature relatively closer to the (surface side of the junction liner) than a corresponding “lower” end.
- both or neither of the “upper” and “lower” ends may be on the “upper” half of the junction liner assembly.
- a feature that may be referred to as an “upper” feature relative to a “lower” feature even if the features are vertically aligned may occur, for example, in a horizontal well.
- “fracking” generally refers to a wellbore stimulation technique.
- a frack liner may be suitable for delivering stimulation fluids (e.g., acid, gelled acid, gelled water, gelled oil, CO2, nitrogen, proppant laden fluids and/or other fluids) to stimulate the wellbore—that is, to increase the flow capability of the (natural or damaged) wellbore—using a variety of techniques including, but not limited hydraulic fracturing.
- FIGS. 1, 2 a and 2 b were described in the Background section of this specification.
- FIG. 3 illustrates an embodiment of a dual liner assembly for a multilateral fracking system 100 proposed in this specification.
- a wellbore includes a main wellbore 10 and a lateral wellbore 12 branching off from the main wellbore 10 . Only one lateral wellbore is shown in FIG. 3 for simplicity, but the system 100 may include a plurality of such lateral wellbores.
- the main wellbore 10 is cased and the lateral wellbore 12 is lined with a steel pipe.
- the lateral wellbore 12 may be accessed from the main wellbore 10 through a window 101 on FIG. 3 .
- the junction between the lateral wellbore 12 and the main wellbore 10 needs to be supported adjacent to the window 101 and the lateral wellbore 12 needs to be sealed using a packer 132 for example to enable pressurization and fracking.
- the multilateral fracking system 100 includes a packer 102 , a frack liner 110 that can be separated into an upper portion 111 and lower portion 112 at a cutting position 150 , and a junction support liner 120 .
- the junction support liner 120 may be coupled to the frack liner 110 to form a dual liner assembly 105 .
- the frack liner 110 can be a 4-5 inches diameter liner
- the junction support liner 120 can be a larger, 6-7 inches diameter precut/pre-shaped junction pipe.
- other sizes of liners can be used.
- frack liner 110 may extend further into the lateral wellbore 12 and include a number of tools, such as packers (e.g., packer 132 and additional packers), valves (e.g., sliding sleeve valves and other valves) and other tools used in fracturing operations. In other embodiments, there may be no additional tools below packer 132 .
- a continuous inner bore can be formed such that frack liner 110 can be used to provide stimulation fluids to stimulate the lateral wellbore.
- the multilateral fracking system 100 can include installation structures positioned in the main wellbore 10 and lateral wellbore 12 .
- the packer 102 is provided to seal the main wellbore 10 above the lateral wellbore 12 to be fracked.
- the packer 102 may be settable to seal against the main wellbore 10 casing to achieve pressure isolation.
- the packer 102 may be a swell packer or mechanically extrudable packer, and may be settable in various ways such as by hydraulic, hydrostatic or mechanical actuation.
- An installation structure can also be positioned along the length of the lower frack liner 112 , spaced from the end of the junction support liner 120 .
- the installation structure in the illustrated embodiment includes an open hole packer 132 and anchoring slips 134 .
- the open hole packer 132 is provided for sealing an annulus 130 between the frack liner 110 (more particularly the lower frack liner 112 ) and the lateral wellbore wall, for anchoring the frack liner to the formation, and for achieving pressure isolation of the lateral wellbore 12 below packer 132 .
- the anchoring slips 134 are used for securing the liner in the lateral wellbore 12 .
- the packer 132 and anchoring slips 134 act against the open hole wall of the lateral wellbore 12 or a cemented lateral wellbore.
- the packer 132 may be a swell packer or mechanically extrudable packer, and may be settable in various ways such as by hydraulic, hydrostatic or mechanical actuation.
- a swell packer may also be installed just above the cutting position 150 to further support the assembly against the formation.
- the multilateral fracking system 100 preferably comprises a dual liner assembly 105 proximate to the window 101 .
- a portion of the junction support liner 120 forms an outer liner having an inner bore with a diameter that is greater than the outer diameter of an upper portion 111 and lower portion 112 of the frack liner 110 that passes at least in part into the junction support liner 120 .
- the junction support liner 120 helps support the lateral wellbore 12 near the window 101 , to prevent the lateral wellbore 12 from collapsing.
- cement may be deployed around the outside of the junction support liner for support of the formation around the window 101 .
- the frack liner 110 extends downhole out of the junction support liner 120 into the lateral wellbore 12 , and extends uphole out of the junction support liner into the main wellbore toward the surface, and thus protects the lateral wellbore 12 from invasion of debris that may otherwise flow into the lateral wellbore 12 during fracking.
- the junction support liner 120 can have an upper end 120 a that is wedge-shaped.
- the junction support liner's upper end 120 a can have an upper edge that extends at an angle relative to its long axis such that it tapers to an upper tip (end) 120 b .
- the upper end 120 a of the liner 120 may be formed to follow the shape of the upper limit of the lateral window 101 in which it is to be positioned.
- the liner upper end 120 a may be cut at a angle across its long axis such that it has a tapering tip 120 b . The angle may correspond to the angle at which the lateral wellbore 12 branches off from the main wellbore 10 .
- the end may also be concavely shaped from side to side to follow the curvature of the main wellbore 10 .
- the upper end can be wedge shaped tapering toward tip 120 b .
- the junction support liner 120 can be installed so it is positioned entirely within the limits of the lateral wellbore 12 and does not protrude into the main wellbore 10 .
- the multilateral fracking system 100 isolates the lateral wellbore 12 being fracked from the other lateral wellbores. As a result, each lateral wellbore 12 can be fracked without debris from the other lateral wellbores entering into the lateral that is being fracked. Such isolation results in substantial costs savings in completing the fracking step, and ultimately, in completing all the steps of the production process, for that lateral wellbore.
- the frack liner 110 (more particularly upper portion 111 ) can be used to facilitate precise positioning of the junction support liner 120 .
- the frack liner 110 includes a locating key for locating the V-shaped downhole end 120 a of the window 101 leading to the lateral wellbore 12 . Since the shape and form of the lower end of a lateral window formed by drilling is generally known, the key can be formed accordingly.
- the key 122 may be formed to locate the window as by selection of one or more of: (i) the angle ⁇ at which it extends from the upper portion body, (ii) the side to side and base to tip cross sectional shape, and (iii) the longitudinal (top to bottom) cross sectional shape. Selection of one or more of these factors can allow the key 122 to positively land on and become releasably retained on the downhole V-shaped end 120 b of the window 101 .
- the key 122 may extend from the frack liner 110 and have a downhole overhanging end, which in particular extends at an acute angle from the liner body.
- the downhole end of the key may have a substantially V-shape in longitudinal section, wherein the side walls to some degree taper toward the lower end of the key.
- the key 122 may be selected to have a low friction interaction with the window.
- it may have smooth curved sides without sharp angles so that the key 122 can travel more easily along the edges of the window such that the key 122 can move down along the window after the key catches on the edge.
- the key 122 is positioned on the frack liner 110 such that when the frack liner 110 is coupled to the junction support liner 120 , the key 122 is exposed above the junction support liner 120 for operation to locate the window 101 .
- the frack liner 110 and junction support liner 120 can be coupled such that the force generated by rotation of the frack liner 110 is communicated to the junction support liner 120 .
- any rotation of the frack liner 110 with the key 122 results in similar rotation of the junction support liner 120 to ensure proper placement of the junction support liner 120 in the lateral wellbore 12 .
- the key 122 extends out from the body of the upper portion 111 , effectively increasing the diameter of the frack liner 110 at the location of the key 122 to a diameter greater than the diameter of the lateral wellbore 12 in which it is to be run.
- the size of key 122 is selected to obstruct further advancement of liner 110 in the lateral wellbore 12 , when the key 122 arrives at the window 101 .
- key 122 catches on the window's edge to obstruct the tool from being advanced further through the window 101 .
- the key 122 stops the liner from being rotated in a direction that moves the key 122 against the edge of the window 101 .
- the key 122 may protrude permanently from the body of frack liner 110 or may be biased to normally protrude from the liner body but to collapse if sufficient force is applied to overcome the biasing force.
- the key 122 may also be normally retracted, but releasable, when desired, to an extended position (biased or not) when it is desired that the key 122 assumes the extended position.
- the key 122 is biased to protrude out from the body of frack liner 110 .
- the key 122 can be collapsed by application of force thereto to reduce its protruded length but is biased to pop out to its fully extended length, when it is free of a constraining force.
- the key 122 therefore can be forced inwardly to allow the upper portion 111 to move through casing in the main wellbore 10 but will pop out when it is moved into an open area adjacent the window 101 , such as when it rounds the corner from the main wellbore 10 to the lateral wellbore 12 .
- An expandable key may be driven by a mechanism that holds the key 122 in an inactive position, for example substantially retracted, and then releases it to assume an active position.
- the mechanism may operate by electrical, hydraulics, biasing and/or mechanical means and may be actuated by electrical, signaling, hydraulic pressure, sensitivity to wellbore conditions (hydrostatic pressure) or by a timer.
- the key 122 has a downhole overhanging end that extends to define an acute angle between it and the outer surface of frack liner 110 .
- the key 122 may also have side walls that come together such that the width of the key tapers toward the lower end.
- the side walls at the key 122 can be generally smooth from top to bottom such that they have a low friction interaction with the wellbore wall about the window edges.
- the side walls from the base to outer end extend at an angle, such as a right angle, that permits them to catch on the edges of the window 101 . In one embodiment, obtuse angling between these parts is avoided as this may create a ramp-like surface permitting the key to pass through the window 101 .
- the key 122 is shown above the junction support liner 120 being also used to guide and align junction support liner 120 into position relative to the window 101 .
- the junction support liner 120 may include a positioning notch shaped to accommodate the shape of the key 122 such that junction support liner 120 can be readily and properly positioned on the frack liner 110 .
- the notch may be positioned on the junction support liner 120 at the portion of the junction support liner 120 which is to be positioned at the V-shaped bottom end of the window and ensures that the tapering tip 120 b of the junction support liner 120 is positioned on the upper liner 110 such that tip 120 b becomes positioned adjacent the upper region of the window.
- the frack liner 110 is adapted to be cut at one or more precisely located cutting points.
- Upper frack liner 111 can then be removed from the lateral wellbore 12 , leaving junction support liner 120 and lower frack liner 112 in the lateral wellbore 12 .
- the frack liner 110 can be cut at a point that leaves a polished bore receptacle (PBR), threaded connection, or other connection exposed in the lateral wellbore so that a new/replacement upper frack liner (or other liner) can be reconnected to the lower frack liner 112 if needed.
- PBR polished bore receptacle
- the frack liner 110 can be cut at cutting positions 150 , 152 using a cutting mechanism that can precisely cut the frack liner 110 .
- a cut and release sub 140 and the packer 102 have respective locating profiles so that a cutting tool can precisely locate cutting the positions 150 , 152 .
- the window 101 can be created by milling through a main wellbore casing.
- the frack liner 110 can be run in with a liner running tool using packer 102 as a liner hanger.
- the frack liner 110 and junction support liner 120 can be lowered into the lateral wellbore 12 using locator key 122 to locate the downhole end of window 101 .
- the Frack liner 110 will extend into the main wellbore to the packer 102 .
- the packer 132 can be set to help support the lower portion of the frack liner 110 and isolate the lateral wellbore 12 .
- a swell packer (not shown) may also be provided above the cut position 150 to further support the dual liner assembly in the lateral wellbore.
- frack liner 110 can include a cementing tool 190 located proximate to upper end 120 a of the junction support liner 120 for cleaning out cement above the window 101 .
- the cementing tool is a StackFRACK Cementor stage tool from Packers Plus of Calgary, Alberta, Canada, though, as one of skill in the art would appreciate, other ported tools could be used.
- Stimulation fluid e.g., acid, gelled acid, gelled water, gelled oil, CO2, nitrogen and/or proppant laden fluids
- Stimulation fluid may be pumped down a liner 170 into the frack liner 110 to treat the lateral wellbore 12 .
- Treatment of the lateral wellbore 12 may occur in zones as is understood in the art.
- fracking other laterals are protected from debris from the lateral wellbore being fracked by the double liner.
- cut and release tool 140 can be run into the lateral wellbore 12 to cut frack liner 110 at cutting position 150 .
- the packer 102 may be a cut-to-release packer that can be cut at cutting position 152 .
- the upper portion 111 and packer 102 can be removed. Removing the upper portion 111 also removes the key 122 since, the key 122 is connected to the upper frack liner 111 .
- the key 122 is used to locate and help support the junction support liner 120 initially and can be left in while fracking occurs. After fracking is done, the key 122 can be removed.
- the location of the cutting position 150 at which the frack liner 110 Is separated into a lower frack liner 112 and upper frack liner 111 , can be precision-tied back to the junction. This is because the junction support liner 120 has a precise location with respect to the junction as taught in U.S. Pat. No. 9,644,459 (Themig), the frack liner 110 through its connection by the connector 141 to the junction support liner has a precise location with respect to the junction support liner, and the cut point has a precise location with respect to the frack liner by providing the tool 140 with a locating feature used to locate cutting position 150 so that the cuts occur at the correct depth.
- the locating features on the cutting tool can locate profiles on the inner bore of frack liner 110 (e.g., the inner bore of cut and release sub 140 ), which itself was properly located using the locator keys 122 , to precisely cut the frack liner 110 at cutting position 150 . Therefore, the precise location of the cutting position 150 and the uphole end of the lower portion 112 , can be tied back to a known distance from the junction.
- the uphole packer 102 may be removed with the upper portion 111 .
- Removal of upper portion 111 can be facilitated by the use of a porous material (e.g., a sponge like substance) that is prewrapped around the outer surface of upper portion 111 before it is run into the main and lateral wellbores.
- a porous material e.g., a sponge like substance
- Use of porous media can inhibit the attachment of a very strong cement structure to the frack liner 110 .
- the porous media ends up between the upper portion 111 and lateral junction support liner (i.e., the outer liner in the lateral wellbore) and between the upper portion 111 and any cement in the main wellbore 10 , and discourage cement build up between the cement casing and the frack liner that would make it difficult to withdraw the upper portion 111 .
- the frack liner can thus be easily withdrawn without compromising the casing around the main wellbore 10 , or the cement that is deployed around the lateral support liner at the junction between the main wellbore 10 and lateral wellbore 12 to support the integrity of the lateral opening (i.e., the window) at that junction.
- chemicals may be added to the porous material to make cement that directly contacts it dissolvable when exposed to oil, for example.
- This weakening treatment can be applied anywhere where it is undesirable to have cement present, hardened and attached to the frack liner.
- a polished bore receptacle or other connection to the uphole end of the lower portion 112 is provided in the lateral wellbore to tie back into at a later time if necessary.
- a new frack liner, junction support liner and lower portion can be run in to the next lateral wellbore to be fracked.
- Embodiments described herein provide several advantages. First, because the frack liner 110 and junction support liner 120 are run in together, the operator will not have to run tools past the lateral until the operator is done with all the completion procedures in the lateral. Because no subsequent trips are required for a particular completion (i.e., installation of the frack string and junction support liner only require one trip into the lateral wellbore), once the frack liner 110 and junction support liner 120 are installed, there is no chance that the operator will accidently pass the lateral as can occur when multiple trips are involved.
- the operator can frack one lateral wellbore at a time, without worrying about invasion of debris from other lateral wellbores. Debris cannot easily migrate into the lateral and junction support liner 120 being worked upon, due to the location of the double liner (.i. comprising the frack liner 110 ).
- each lateral wellbore 12 is pressure isolated by the frack liner 110 and junction support liner 120 .
- the operator has full wellbore control, meaning that the operator can circulate in a given lateral using coil tubing, or other technology to clean out the debris because there is pressure isolation of the laterals. The operator can thus clean out one lateral wellbore at a time.
- debris cannot go anywhere except into a location from which debris can easily be pumped out, (because of the pressure isolation.
- the ability to maintain a clean lateral wellbore opening means that an operator can clean out sand or any other debris by running coil tubing or wireline tools back in to the lateral wellbore, operating them and then pulling them back out, in and out over and over again. Moreover, the operator can also easily mill out seats if necessary. In short, in preparation for a fracking job in a lateral wellbore, the operator can perform all sorts of tasks inside the frack liner and junction support liner, then simply clean up by applying cuts and retrieving the frack liner 110 up-hole packer 102 .
- Another advantage of the described embodiments is that the only debris that are likely to infiltrate a given lateral wellbore is the debris resulting from cutting the frack liner 110 and the packer at the end of the frack process for that lateral wellbore. But the major pieces of debris that would be generated from the cutting—namely the packer and upper portion 111 —are designed to be pulled free back to surface and thus do not become debris. As such, the system can leave a very clean lateral wellbore.
- each lateral can be pressure isolated, fracking of each lateral wellbore can advantageously occur using standard completion procedures known in the art.
- FIGS. 4-7 are diagrammatic representations of embodiments of a dual liner assembly 200 formed by the frack liner 110 and junction support liner 120 , and the operation thereof.
- FIG. 4 is a diagrammatic representation of a dual liner assembly
- FIG. 5 is a diagrammatic representation of another embodiment of a dual liner assembly.
- FIG. 6 is a diagrammatic representation of cutting a dual liner assembly
- FIG. 7 is a diagrammatic representation of cutting a dual liner assembly with an upper portion 111 removed.
- These figures do not illustrate a dual liner assembly 200 bent to adapt to the angle presented by the lateral wellbore; however, one of ordinary skill in the art would understand that the dual liner assembly 200 would be bent to match up with the lateral wellbore, out in the field. It can be shipped out however from the factory in a straight-line shape.
- the dual liner assembly 200 includes an inner liner 125 comprising one or more tubulars forming frack liner 110 , and an outer liner 121 comprising the junction support liner 120 .
- the upper portion 111 is intended to be removed from within outer liner 121 , by cutting through the frack liner 110 and pulling out of its underlapping position within the outer liner 121 .
- the inner diameter (or shape) of the junction support liner 120 is selected to be larger than the outer diameter (or shape) of the frack liner 110 , at least where the wellbore junction support liner 120 and frack liner 110 overlap at the dual liner assembly, such that there is an annular space 123 between the wellbore junction support liner 120 and frack liner 110 .
- This enables fluid pressure equalization between the portions of the main wellbore and the lateral wellbore that are proximate to the window 101 .
- assembly 200 comprises one or more tubulars forming a cut and release dual liner connector 141 having an inner bore from a first end 222 a to a second end 222 b .
- the upper end 222 a of the connector is coupled to the junction support liner 120 , e.g. by an outer liner connection 224 (threading, or other connection interval, other connection, or welding), being formed as a part of the outer liner 121 of a dual liner assembly 200 .
- the connector 141 may further connect to inner liner 125 , e.g. by an inner liner connection 146 (threading or other connection interval or other connector, or welding), being formed on upper portion 111 as a part of inner liner 125 .
- the inner liner 125 comprises a portion of frack liner 110 that will become upper portion 111 when cut.
- lower end 222 b of connector 141 is further adapted for connection to a downhole tubular, such as connection to the lower portion 112 of frack liner 110 , which is left in the lateral wellbore when upper portion 111 is removed, as discussed in connection with FIG. 3 .
- Dual liner connector 141 may include one or more PBR (Polished Bore Receptacles) tubulars, such as e.g., PBR 143 , providing a first PBR 144 and a second PRB 148 , of different diameters.
- the inner diameter of the first PBR 144 may be greater than the inner diameter of the second PBR 148 .
- the inner diameter of the second polished bore receptacle 148 matches the inner diameter of upper portion 111 .
- a polished bore may be used to provide a sealing surface against which external annular seals on a tubular can be seated.
- the outer liner 121 or other portion of dual liner assembly intended to be left in the lateral wellbore 12 may include a connection structure such as a threaded or interlocking interval that is exposed when upper portion 111 is removed.
- the inner diameter of connector 141 may include a locating profile 149 provided to facilitate appropriate positioning of any cut along the frack liner 110 .
- Locating profile 149 may be formed along or below the bottom end of inner liner 125 such that a positioning portion of a cutting device may land in the profile with a cutting mechanism spaced a set distance from the positioning portion.
- Profile 149 may be useful for tool locating and may for example include one or more glands, such as annular indentations having a larger inner diameter into which a dog or resilient member on a tool can drop and become secured.
- the profile can be positioned below a location to be cut, generally indicated by reference numeral 150 .
- the profile 149 can be located in the axial bore of cut and release sub 140 below the connection point with the inner liner 125 .
- the cutting position 150 occurs between the first polished bore receptacle 144 and the second polished bore receptacle 148 at point where annular space 123 exists between the inner liner 125 and the outer liner 121 .
- the cutting mechanism is preferably selected such that cuts can be precisely located.
- the cutting mechanism is a mechanical cutting mechanism that can cut inner liner 125 at a precise location.
- Such cutter mechanisms may cut through the frack liner 110 so that the upper portion 111 can be removed.
- the outer tubular may be abraded, but care may be taken to select a cutting procedure that does not cut the outer liner 121 through.
- the cutting tool in some embodiments, can be run on wireline.
- the cutting tool can be used to make cuts at locations 150 , 152 (see FIG. 3 ) so that the upper liner packer 102 and the upper portion 111 can be pulled out.
- the cutting mechanism may be for example, a mechanical cutting mechanism.
- the dual liner connector 141 includes an outer liner connection 224 in the form of outer threads or another connection mechanism to connect to the junction support liner 120 .
- the upper portion of the connector 141 may form at least a portion of the junction support liner 120 .
- the connector 141 may be integrated with the junction support liner 120 .
- Other connection options include, but are not limited to, various threaded connections and welding the parts together.
- Liner connector 141 and junction support liner 120 form the outer liner 121 that may be concentrically arranged about the portion of frack liner 110 that forms the inner liner 125 .
- the outer liner 121 overlaps by at least a length L frack liner 110 .
- the overlapping length L can be varied as desired.
- the cutting position 150 is preferably located in length L.
- connector 141 include an inner liner connection 146 in the form of inner threads or other inner connection mechanism to connect to the lower portion 112 of the frack liner 110 which forms inner liner 125 .
- the frack liner 110 may connect in various ways, such as by threading the tubulars together, using, for example, latch threads or using welding.
- the lower portion of connector 141 can couple to other tubulars.
- Other connection options include, but are not limited to, threaded connections, and, welding the parts.
- Liner connector 141 provides a strong connection such that frack liner 110 can be used as a running tool to push and pull junction support liner 120 during installation.
- a connector 141 with a triple threaded connection may be used, with threads for connecting to the junction support liner 120 , the lower portion tubular 112 of the frack liner 110 , and the cut and release sub 140 (seen FIG. 3 ).
- a triple threaded connector 141 can provide full mechanical strength.
- PBR tubular 143 comprising a first PBR 144 and a second PBR 148 can provide a triple thread connector if a thread for the cut and release tool 140 is further provided on this tubular.
- the PBRs may comprise other tubulars.
- connector 141 may not include a PBR.
- cement 204 may be introduced in the annulus 130 to help better connect junction support liner 120 with the formation, and seal the annulus of the lateral wellbore from the main wellbore.
- excess cement may impede the ability to pull the upper portion 111 of frack liner 110 free from the junction support liner 120 or connector 141 .
- the upper portion 111 can be coated with materials that prevent cement from sticking to the metal outer surface or that reduces the structural integrity of any cement that comes into direct contact with the materials.
- the withdrawal of upper portion 111 needs to happen neatly and quickly even though a lot of cement might be deployed near the junction and elsewhere to keep it in place in the main wellbore and lateral.
- This neat withdrawal of the upper portion 111 may be effected by the use of the release sub 140 and the use of a porous media 202 between the inner and outer liners in the lateral wellbore 12 , and between the cement 204 and the liner in the main wellbore 10 , to inhibit the formation of a strong cement structure that would complicate removal of the upper frack liner 111 .
- Deployment of the porous media 202 results in weak/brittle cement formation, thus making it easier to withdraw the upper frack liner 111 .
- the porous media 202 can be any suitable porous material such as a foam rubber or other spongy material.
- the porous media 202 may extend over the length of the upper portion 111 .
- the porous media 202 may be a porous material with an open cell structure in which interconnected pockets within the material permit the passage of gasses or liquids between the cells.
- the porous media 202 in some embodiments, may be an open cell or combined open cell and closed cell foam or sponge.
- the porous media 202 can be selected such that, while some cement solids may penetrate the porous media, there will be insufficient particulates for the cement to set up as a cement solid in the porous media, or so that any cement that does form in the media will be weak or brittle thus making it easy to withdraw the upper portion 111 from the outer liner 121 .
- the porous media 222 can be formed of a stretchable neoprene fabric with nylon fabric covering and perforations.
- the neoprene fabric may be neoprene fabric available from Marco International of Irvine, Calif. with an Airprene finish (see Appendix D). The generally soft nature of neoprene in combination with the perforations is believed to prevent undue pressure distribution that would cause increased fracturing pressures.
- the neoprene jacket may be adhered to the outer surface of upper portion 111 using a suitable adhesive, including, but not limited to 3M-SCOTCH WELD-Weather Stripping and Gasket Adhesive 1300 from 3M Corporation of St. Paul, Minn. or Permatex Super Weatherstrip Adhesive #81850 by Permatex of Hartford, Conn.
- the entire outer diameter (OD) of the upper portion of the frack liner 110 can be coated with a Teflon coating to also help prevent cement from sticking to it. This could be done, in some embodiments, as a substitute, in addition or as a backup to the porous media 202 wrapping on the running tool.
- Each lateral wellbore frack job can involve, after fracking is complete, a precision cut with the cutting tool at the connector 141 and another precision cut at the up-hole packer 102 (which also includes a locating profile for the cutter to match up with), prior to removal of the upper portion 111 and the up-hole packer 102 .
- FIG. 6 a diagrammatic representation illustrating cutting of the frack liner 110 is provided.
- a cutting tool 250 having locating keys 255 and cutters 260 is illustrated.
- the locating keys 255 are adapted to locate locating profiles 149 of cut and release sub 140 and are spaced from the cutters 260 such that the cutters 260 will cut at the cutting position 150 when the profiles 149 are located.
- the cut can be precisely located.
- the packer 102 of FIG. 3 can incorporate similar profiles so that the frack liner 110 can be precisely cut at cutting position 152 .
- the locator keys 255 on the cutting tool 250 allow the operator to figure out the depth to which to run in the cutting tool 250 before applying a cut.
- the locator keys 255 may be spring loaded and match the locating profile 149 , and can engage the profile 149 upon application of a substantial force (e.g., a 90001 b force) that overcomes the spring loading.
- the spring-loaded cutter can be used over and over for different cut and release subs in different lateral wellbores, by each time positioning the cutter exactly where it needs to be when a cut is applied. According to one embodiment, the cut will always occur just above the connection to the inner liner 125 .
- FIG. 7 is a diagrammatic representation of the dual liner assembly 200 with the upper portion 111 removed. It can be noted that removing the upper portion 111 can reveal first PBR 144 . As such, either first PBR 144 or second PBR 148 can be used to connect a new/replacement upper portion when needed. Moreover, since first PBR 144 and second PBR 148 have different inner diameters, this means that different sizes of upper liners 111 can be connected. Furthermore, in some embodiments, the connector 141 may include threads or interlocking mechanisms such that cutting and removing the upper portion 111 from the dual liner assembly can leave these threads exposed. Therefore, a new upper frack string can be threaded back into the dual liner connector 141 .
- the dual liner connector 141 may include seals that are left in place when the upper portion 111 is removed.
- the threaded connection (or other connection interval) of the one or more PBRs and/or remaining seals can provide a mechanism for connecting a new upper frack string without exotic sealing devices.
- the dual liner connector 141 , locating profile 149 and the use of standard size liners all work together to do away with the need for complicated seals, in an economical and simple manner.
- an operator can insert the lower end of a new replacement upper portion into the PBR 144 or 148 that was previously left in the lateral wellbore, to seal back into the lower portion.
- junction support liner 120 is coupled to a connection 144 to act as an outer tubular and the lower end of upper portion 111 may be coupled to a connection 148 to act as an inner tubular.
- connection 148 may be coupled to an inner tubular.
- Other cut and release arrangements may also be used.
- FIG. 8 one embodiment of a dual liner assembly is illustrated, showing a triple threaded connector similar to the two-sided threaded connector of the incorporated U.S. Pat. No. 7,992,645.
- a connection is provided for the upper portion 111
- another connection is provided for the junction support liner
- a third connection provides the locating profile for the cut and release tool.
- the outer tubular, the junction support liner 120 , and the inner tubular is a portion of the frack liner 110 , namely the lower portion 112 .
- a third tubular may provide locating profile 149 .
- the outer tubular may include threads or other connection mechanism such as liner connection 141 .
- the junction support liner 120 can be wrapped in a swell material for both an open hole application (e.g., TAML Level 3) or a cemented application (TAML Level 4).
- a swell packer in conjunction with a junction support is described in U.S. Provisional Patent Application No. 62/237,0162, entitled “Swellable Wellbore Junction Liner for Multilateral Junctions”, filed Aug. 2, 2016, attached hereto as Appendix E, which is incorporated as part of this disclosure for all purposes.
- the terms “comprises,” “comprising,” “includes,” “including,” “has,” “having,” or any other variation thereof, are intended to cover a non-exclusive inclusion.
- a process, product, article, or apparatus that comprises a list of elements is not necessarily limited only those elements but may include other elements not expressly listed or inherent to such process, product, article, or apparatus.
- the term “or” as used herein is generally intended to mean “and/or” unless otherwise indicated. For example, a condition A or B is satisfied by any one of the following: A is true (or present) and B is false (or not present), A is false (or not present) and B is true (or present), and both A and B are true (or present).
- a term preceded by “a” or “an” includes both singular and plural of such term, unless clearly indicated otherwise (i.e., that the reference “a” or “an” clearly indicates only the singular or only the plural).
- the meaning of “in” includes “in” and “on” unless the context clearly dictates otherwise.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
A dual liner assembly for a multilateral fracking system, comprises a junction support liner adapted to be installed in a lateral wellbore at a junction with a main wellbore; an inner liner with an upper portion and a lower portion, the inner liner being positioned inside the junction support liner and extending beyond the junction support liner within the main wellbore and within the lateral wellbore when the assembly is installed; and a cut and release connector adapted to join the inner liner and the junction support liner and to enable detaching of the upper portion of the inner liner from the assembly. A method of multilateral fracking is also described.
Description
- This patent application is based on Provisional Patent Application Ser. No. 62/420,363, filed Nov. 10, 2016 the content of which is hereby incorporated by reference in its entirety.
- The specification is directed to recovery of hydrocarbons from subterranean oil formations and particularly to a multilateral supported junction with double liner.
- The drawings accompanying and forming part of this specification are included to depict certain aspects of the invention. A clearer impression of the invention, and of the components and operation of systems provided with the invention, will become more readily apparent by referring to the exemplary, and therefore non-limiting, embodiments illustrated in the drawings, wherein identical reference numerals designate the same components. Note that the features illustrated in the drawings are not necessarily drawn to scale.
- Several aspects of the present invention are illustrated by way of example, and not by way of limitation, in detail in the figures, wherein:
-
FIG. 1 is a schematic illustration of a section through a well showing a wellbore junction of a main wellbore and a lateral wellbore. -
FIG. 2a (corresponding to FIG. 6a of U.S. Pat. No. 9,644,459) is a schematic illustration of a liner running tool installing a liner in a lateral wellbore. -
FIG. 2b (corresponding to FIG. 4 of U.S. Pat. No. 5,477,925) shows another way of providing a cased lateral borehole through a window. -
FIG. 3 is a diagrammatic representation of a dual liner assembly for a multilateral fracking system. -
FIG. 4 is a diagrammatic representation of a dual liner assembly installed in a lateral wellbore. -
FIG. 5 is a diagrammatic representation of another embodiment of a dual liner assembly. -
FIG. 6 is a diagrammatic representation of cutting a dual liner assembly. -
FIG. 7 is a diagrammatic representation of cutting a dual liner assembly with an upper portion removed. -
FIG. 8 is a diagrammatic representation of another embodiment of a dual liner assembly. - Most wellbores are drilled with deviated or horizontal wells that extend through different production zones from a main wellbore. Typically, lateral wellbores are drilled and accessed from a window formed in the casing of the main wellbore. Then, liners are run into the lateral wellbores and connected to the main wellbore, the lateral wellbores are accessed through the window, and then the zones are fracked using perforating devices or hydraulic pressurization. Sometimes a window opening is pre-formed in the casing and sometimes the window opening is formed entirely by drilling out from the main wellbore through the casing and cement (if any) through the borehole wall and outward therefrom.
- However, interconnecting such lateral wellbores with each other and the main wellbore presents some challenges. Inherently, the production zones have different characteristics such as pressure, water content, temperature, etc. These diverse characteristics may result in undesirable production patterns. For example, a pressure difference between the lateral and the main wellbore can cause migration of debris from the lateral wellbore into the main wellbore, which can result in plugging of the main wellbore. Therefore, one of the challenges for a multi-lateral junction is to prevent migration of debris and fluids between production zones.
- The fracking of a lateral wellbore is sometimes impeded by the invasion of debris into that lateral wellbore that comes from other open lateral wellbores. When debris invades a lateral wellbore, it may become difficult to seal the lateral wellbore, and therefore necessary to pull out its lateral liner, and reinsert it, which in turn can involve re-supporting the junction between the lateral and the main wellbore, and re-sealing the lateral, which can be costly.
- Another technical problem that arises in multilateral completion jobs, is that it is sometimes necessary to cut liners in order to remove equipment from a lateral wellbore. When this becomes necessary, it is difficult to elegantly remove liners, and additionally, difficult to apply a cut at the right depth inside the lateral wellbore.
-
FIG. 1 is a schematic illustration of a section through a well showing a wellbore junction of a main wellbore and a lateral wellbore. As shown inFIG. 1 , thelateral wellbore 10 extends from themain wellbore 12 at a junction. Thelateral wellbore 10 is accessed through awindow 14 removed from a main wellbore wall. In this example, thewindow 14 is an opening formed by milling through acasing 15. Thelateral wellbore 10 extends beyond thewindow 14 at an acute angle from themain wellbore 12, as better seen inFIG. 2a . The cross section of thewindow 14 has an elliptical or tear-drop shape defined by alower limit 14 a and anupper limit 14 b where anupper edge 16 of thelateral wellbore 10 extends away from themain wellbore 12. The elliptical shape of thewindow 14 forms a substantially V-shaped downhole end 14 a. -
FIG. 2a is a schematic illustration of a liner running tool installing a liner in a lateral wellbore, as described and illustrated in U.S. Pat. No. 9,644,459 (Themig), entitled “Wellbore Lateral Liner Placement System” and issued May 9, 2017, which is incorporated herein by reference. A short description of the system and method for placing a wellbore liner in a lateral wellbore, also described in the '459 patent, is provided in connection withFIG. 2 a. - As also described in the U.S. Pat. No. 9,644,459 at FIG. 6a for example, a lateral
junction support liner 120 is placed into thelateral wellbore 10 through a window (lateral opening) 114 using arunning tool 118. The area around the lateral wellbore near the window is fragile and may be subject to shifting or collapse. Accordingly, a lateraljunction support liner 120 deployed with (or without) cementing around it, supports the integrity of thewindow 114 near the junction between themain wellbore 12 and thelateral wellbore 10. Arunning tool 118, releasably engaging the lateraljunction support liner 120, is manipulated to run the engagedlateral liner 120 into thelateral wellbore 10, and then manipulated to release its engagement of theliner 120, so that therunning tool 118 can be withdrawn back to surface from themain wellbore 12. The V-shaped downhole end 114 a of the window leading to the lateral wellbore is located using akey 122 biased to protrude out from the body of the running tool. - The
lateral wellbore 10 can be sealed using apacker 132 for example to enable pressurization and fracking. Thepacker 132 and anchoringslips 134 are used to anchor theliner 120 to thelateral wellbore 10. - After the running
tool 118 is withdrawn, no part of the lateraljunction support liner 120 or any associated support structure for theliner 110 is protruding inside the main wellbore. Another work string can then be run in through themain wellbore 12, through thewindow 114, and into thelateral wellbore 10, to execute a number of operations including fracking. Another liner (not show inFIG. 2a ) may extend downhole from thepacker 132. The space between the lateraljunction support liner 120 and the open hole of thelateral wellbore 10 that is near thewindow 114 can be cased and/or cemented to provide further support for the open hole region of thelateral wellbore 10 near thewindow 114, and thus prevent that region from degenerating and possibly caving in. - When a plurality of lateral wellbores extends from the
main wellbore 12, themain wellbore 12 andlateral wellbores 10 are collectively referred to as a multilateral well. Fracking of multilateral wells presents some problems when themain wellbore 12 is left relatively unobstructed, as is the case with the system ofFIG. 2a . The fracking of alateral wellbore 10 can be impeded by the invasion of debris into that lateral wellbore that comes from themain wellbore 12 or other open lateral wellbores connected to themain wellbore 12. When debris invades thelateral wellbore 10, it may become difficult to seal it, and therefore necessary to pull out thelateral liner 120, and reinsert theliner 120, which in turn can involve re-supporting the junction near thewindow 114 with cement. This is both costly and time consuming. - U.S. Pat. No. 5,477,925 (Trahan et al) entitled “Method for multilateral Completion and Cementing the Junction with Lateral Wellbores” issued Dec. 26, 1995 describes another system for multilateral well cementing and completion that attempts to address this debris invasion problem. As illustrated in FIG. 4 of the '925 patent, reproduced as
FIG. 2b , aliner 32 extends down the main wellbore and bends into thelateral wellbore 18 at awindow 52, which results in sealing the opening into the lateral wellbore from debris invasion sourced from other lateral wellbores or the main wellbore. - In the system of
FIG. 2b , however, in order to reach parts of the well belowwindow 52, theliner 32 and some of its supporting cement must be milled open. This operation takes a long time to perform and can generate debris that causes malfunctions. - Embodiments described herein provide a dual liner assembly for a multilateral fracking system that prevents or reduces significantly invasion of debris into the multilaterals without requiring repeated milling, withdrawal, reinsertion and setting of liners in each lateral wellbore.
- In accordance with one aspect described in this specification, a dual liner assembly for a multilateral fracking system assembly for a multilateral fracking system, comprises: a junction support liner adapted to be installed in a lateral wellbore at a junction with a main wellbore; an inner liner with an upper portion and a lower portion, the inner liner being positioned inside the junction support liner and extending beyond the junction support liner within the main wellbore and within the lateral wellbore when the assembly is installed; and a cut and release connector adapted to join the inner liner and the junction support liner and to enable detachment of the upper portion of the inner liner from the assembly at a predefined location with respect to the junction.
- Thus, the junction support liner is provided in the lateral wellbore proximate to the window with the main wellbore, and the frack liner, also referred to as the inner liner, comprises an “upper portion” (the portion of the internal liner closer to the surface) and a lower portion (the portion of the internal frack liner farther away from the surface), coupled to each other with a liner connector. The upper portion and the lower portion are also referred to as the “upper frack liner” and the “lower frack liner”, respectively.
- According to another aspect described in this specification, a method of multilateral fracking is presented. The method comprises: providing a dual liner assembly comprised of junction support liner and an inner liner including an upper portion and a lower portion releasable engaged with a cut and release connector; lowering the dual liner assembly into a main wellbore and then into a lateral wellbore; installing the dual liner assembly with the junction support liner placed into the lateral wellbore at the junction with the main wellbore and the inner liner extending beyond the junction support liner within the main wellbore and in the lateral wellbore; stimulating the lateral wellbore; cutting the inner liner at a cutting position and releasing engagement between the upper and lower portions; and removing the upper portion.
- In accordance with one aspect of the present disclosure, an assembly of two connected liners can be used to line both a portion of a main wellbore leading into a lateral wellbore that is to be fracked, and the lateral wellbore itself. One of the liners is a lateral junction support liner that is a precut, pre-shaped pipe that is precision located at the junction and supports the integrity of a lateral opening (i.e. window) near the junction between the main wellbore and the lateral wellbore. Another longer frack liner is placed inside the junction support liner, and additionally protrudes from the junction support liner beyond both its ends. Thus, the lateral frack liner extends more deeply into the lateral wellbore and into part of the main wellbore than the junction support liner. With part of the frack liner present in the part of the main wellbore that leads into the lateral wellbore, fracking can thus occur in the lateral wellbore without significant fluid communication occurring between it and the main wellbore or any of the other lateral wellbores in a formation.
- The upper portion of the frack liner provides extra protection from the debris that may otherwise flow into the lateral wellbore being fracked. The lower portion includes seals, packers, valves and other tools necessary to frack the lateral wellbore. The upper or lower portions can also be used to run tools into the lateral wellbore for executing a variety of operations.
- According to another aspect presented in this specification, the inner (frack) liner is designed to be easily and cleanly severed at a very precise location near the liner connector, and the upper portion can be withdrawn back to surface, leaving the lower portion and the junction support liner in place. This enables access to the lateral wellbore for performing additional operations and work with tool lowered from surface. Advantageously, withdrawal of the upper portion means that the upper portion does not have to be milled through in order to reach lateral wellbores further down the main wellbore.
- Still further, a cut-to-release packer provided in the main wellbore to help secure the upper portion to the main wellbore is described. Furthermore, according to one embodiment, the frack liner includes a cut and release sub positioned in the lower portion in the lateral wellbore. The cut and release sub facilitate cutting the frack liner at a precise location with respect to the junction to detach the upper portion of the frack liner from the lower portion. The upper portion can then be withdrawn back to surface after detachment from the lower portion, by releasing the packer in the main wellbore.
- In accordance with still another aspect, once the frack liner has been cut and separated into an upper portion and a lower portion, neat withdrawal of the upper portion from the lateral wellbore and main wellbores back to surface can be facilitated if a porous media (e.g., foam rubber or other spongy material) is pre-wrapped around the upper portion prior to lowering it into the main and lateral wellbores. The porous media is selected to inhibit the formation of a strong cement structure around the upper portion when it is deployed downhole. If left untreated, such a formation could complicate removal of the upper portion from the main and lateral wellbores, and from the junction support liner to the extent it overlaps with the upper portion, even after the upper portion is detached from the lower portion at the release sub. By wrapping the porous media around the upper portion, the porous media ends up deployed:
-
- between the cement casing of the main wellbore and the upper portion when looking further uphole near the junction/window, and between the junction support liner and the upper portion when looking further downhole and farther away from the junction/window, from a radial perspective; and,
- between the junction/window, at where cement is deployed for support of the open-hole region, and the cut release sub joining the upper and lower portions together (until fracking is completed), from an axial perspective.
- Use of the porous media around the upper portion can ease withdrawal of the upper portion from the lateral wellbore support liner after it has been separated from the lower portion, without compromising the cement deployed around the lateral junction support liner (which is used to support the integrity of the lateral opening/window at the junction between the main and lateral wellbores).
- Also described herein is use of locating keys for enabling deployment of the upper portion, whether or not connected to the lower portion, at a precise spot relative to the window between the main wellbore and lateral wellbore. Such a locating key is preferably provided on the upper portion, rather than on a separate running tool, the lower portion or the junction support liner.
- It is to be understood that other aspects of the present invention will become readily apparent to those skilled in the art from the following detailed description, wherein various embodiments of the invention are shown and described by way of illustration. As will be realized, the invention is capable for other and different embodiments and its several details are capable of modification in various other respects, all without departing from the spirit and scope of the present invention. Accordingly, the drawings and detailed description are to be regarded as illustrative in nature and not as restrictive.
- This disclosure and the various features and advantageous details thereof are explained more fully with reference to the non-limiting embodiments that are illustrated in the accompanying drawings and detailed in the following description. Descriptions of well-known starting materials, processing techniques, components and equipment are omitted so as not to unnecessarily obscure the disclosure in detail. Skilled artisans should understand, however, that the detailed description and the specific examples, while disclosing preferred embodiments, are given by way of illustration only and not by way of limitation. Various substitutions, modifications, additions or rearrangements within the scope of the underlying inventive concept(s) will become apparent to those skilled in the art after reading this disclosure. Furthermore, any dimensions provided are provided by way of example and not limitation.
- Before proceeding further, it should be noted that, at least with respect to a junction liner, terms “upper”, “back”, “rear” are used to refer to a being on or closer to the surface side (upwell side) of the junction liner relative to a corresponding feature that is “lower”, “forward”, “front” features. For example, an “upper” end of a liner generally refers to the feature relatively closer to the (surface side of the junction liner) than a corresponding “lower” end. However, both or neither of the “upper” and “lower” ends may be on the “upper” half of the junction liner assembly. A feature that may be referred to as an “upper” feature relative to a “lower” feature even if the features are vertically aligned may occur, for example, in a horizontal well. Furthermore, “fracking” generally refers to a wellbore stimulation technique. One of ordinary skill in the art would understand that a number of wellbore stimulation techniques can also be used. A frack liner may be suitable for delivering stimulation fluids (e.g., acid, gelled acid, gelled water, gelled oil, CO2, nitrogen, proppant laden fluids and/or other fluids) to stimulate the wellbore—that is, to increase the flow capability of the (natural or damaged) wellbore—using a variety of techniques including, but not limited hydraulic fracturing.
-
FIGS. 1, 2 a and 2 b were described in the Background section of this specification. -
FIG. 3 illustrates an embodiment of a dual liner assembly for amultilateral fracking system 100 proposed in this specification. As seen inFIG. 2a , a wellbore includes amain wellbore 10 and alateral wellbore 12 branching off from themain wellbore 10. Only one lateral wellbore is shown inFIG. 3 for simplicity, but thesystem 100 may include a plurality of such lateral wellbores. Although not called out, in general themain wellbore 10 is cased and thelateral wellbore 12 is lined with a steel pipe. Thelateral wellbore 12 may be accessed from themain wellbore 10 through awindow 101 onFIG. 3 . The junction between thelateral wellbore 12 and themain wellbore 10 needs to be supported adjacent to thewindow 101 and thelateral wellbore 12 needs to be sealed using apacker 132 for example to enable pressurization and fracking. - In the embodiment of
FIG. 3 , themultilateral fracking system 100 includes apacker 102, afrack liner 110 that can be separated into anupper portion 111 andlower portion 112 at acutting position 150, and ajunction support liner 120. Thejunction support liner 120 may be coupled to thefrack liner 110 to form adual liner assembly 105. According to one embodiment, thefrack liner 110 can be a 4-5 inches diameter liner, whereas thejunction support liner 120 can be a larger, 6-7 inches diameter precut/pre-shaped junction pipe. However, one of ordinary skill in the art would understand that other sizes of liners can be used. - Although not shown, the
frack liner 110 may extend further into thelateral wellbore 12 and include a number of tools, such as packers (e.g.,packer 132 and additional packers), valves (e.g., sliding sleeve valves and other valves) and other tools used in fracturing operations. In other embodiments, there may be no additional tools belowpacker 132. A continuous inner bore can be formed such thatfrack liner 110 can be used to provide stimulation fluids to stimulate the lateral wellbore. - The
multilateral fracking system 100 can include installation structures positioned in themain wellbore 10 andlateral wellbore 12. According to one embodiment, thepacker 102 is provided to seal themain wellbore 10 above the lateral wellbore 12 to be fracked. Thepacker 102 may be settable to seal against themain wellbore 10 casing to achieve pressure isolation. Thepacker 102 may be a swell packer or mechanically extrudable packer, and may be settable in various ways such as by hydraulic, hydrostatic or mechanical actuation. - An installation structure can also be positioned along the length of the
lower frack liner 112, spaced from the end of thejunction support liner 120. The installation structure in the illustrated embodiment includes anopen hole packer 132 and anchoring slips 134. Theopen hole packer 132 is provided for sealing anannulus 130 between the frack liner 110 (more particularly the lower frack liner 112) and the lateral wellbore wall, for anchoring the frack liner to the formation, and for achieving pressure isolation of thelateral wellbore 12 belowpacker 132. The anchoring slips 134 are used for securing the liner in thelateral wellbore 12. Thepacker 132 and anchoring slips 134 act against the open hole wall of thelateral wellbore 12 or a cemented lateral wellbore. Thepacker 132 may be a swell packer or mechanically extrudable packer, and may be settable in various ways such as by hydraulic, hydrostatic or mechanical actuation. A swell packer may also be installed just above thecutting position 150 to further support the assembly against the formation. - As indicated above, the
multilateral fracking system 100 preferably comprises adual liner assembly 105 proximate to thewindow 101. In accordance with one embodiment, a portion of thejunction support liner 120 forms an outer liner having an inner bore with a diameter that is greater than the outer diameter of anupper portion 111 andlower portion 112 of thefrack liner 110 that passes at least in part into thejunction support liner 120. Thejunction support liner 120 helps support thelateral wellbore 12 near thewindow 101, to prevent the lateral wellbore 12 from collapsing. As indicated above, cement may be deployed around the outside of the junction support liner for support of the formation around thewindow 101. Thefrack liner 110 extends downhole out of thejunction support liner 120 into thelateral wellbore 12, and extends uphole out of the junction support liner into the main wellbore toward the surface, and thus protects thelateral wellbore 12 from invasion of debris that may otherwise flow into thelateral wellbore 12 during fracking. - The
junction support liner 120 can have anupper end 120 a that is wedge-shaped. In particular, the junction support liner'supper end 120 a can have an upper edge that extends at an angle relative to its long axis such that it tapers to an upper tip (end) 120 b. More particularly, in some embodiments, theupper end 120 a of theliner 120 may be formed to follow the shape of the upper limit of thelateral window 101 in which it is to be positioned. The linerupper end 120 a may be cut at a angle across its long axis such that it has atapering tip 120 b. The angle may correspond to the angle at which the lateral wellbore 12 branches off from themain wellbore 10. The end may also be concavely shaped from side to side to follow the curvature of themain wellbore 10. The upper end can be wedge shaped tapering towardtip 120 b. Thejunction support liner 120 can be installed so it is positioned entirely within the limits of thelateral wellbore 12 and does not protrude into themain wellbore 10. - The
multilateral fracking system 100 isolates thelateral wellbore 12 being fracked from the other lateral wellbores. As a result, eachlateral wellbore 12 can be fracked without debris from the other lateral wellbores entering into the lateral that is being fracked. Such isolation results in substantial costs savings in completing the fracking step, and ultimately, in completing all the steps of the production process, for that lateral wellbore. - In accordance with one embodiment, the frack liner 110 (more particularly upper portion 111) can be used to facilitate precise positioning of the
junction support liner 120. In this embodiment, thefrack liner 110 includes a locating key for locating the V-shapeddownhole end 120 a of thewindow 101 leading to thelateral wellbore 12. Since the shape and form of the lower end of a lateral window formed by drilling is generally known, the key can be formed accordingly. - The key 122 may be formed to locate the window as by selection of one or more of: (i) the angle α at which it extends from the upper portion body, (ii) the side to side and base to tip cross sectional shape, and (iii) the longitudinal (top to bottom) cross sectional shape. Selection of one or more of these factors can allow the key 122 to positively land on and become releasably retained on the downhole V-shaped
end 120 b of thewindow 101. For example, the key 122 may extend from thefrack liner 110 and have a downhole overhanging end, which in particular extends at an acute angle from the liner body. Alternately or in addition, the downhole end of the key may have a substantially V-shape in longitudinal section, wherein the side walls to some degree taper toward the lower end of the key. - Alternately or in addition, the key 122 may be selected to have a low friction interaction with the window. For example, it may have smooth curved sides without sharp angles so that the key 122 can travel more easily along the edges of the window such that the key 122 can move down along the window after the key catches on the edge.
- The key 122 is positioned on the
frack liner 110 such that when thefrack liner 110 is coupled to thejunction support liner 120, the key 122 is exposed above thejunction support liner 120 for operation to locate thewindow 101. Thefrack liner 110 andjunction support liner 120 can be coupled such that the force generated by rotation of thefrack liner 110 is communicated to thejunction support liner 120. As such, any rotation of thefrack liner 110 with the key 122 results in similar rotation of thejunction support liner 120 to ensure proper placement of thejunction support liner 120 in thelateral wellbore 12. - As mentioned above, the key 122 extends out from the body of the
upper portion 111, effectively increasing the diameter of thefrack liner 110 at the location of the key 122 to a diameter greater than the diameter of thelateral wellbore 12 in which it is to be run. The size ofkey 122 is selected to obstruct further advancement ofliner 110 in thelateral wellbore 12, when the key 122 arrives at thewindow 101. For example, as thefrack liner 110 moves through the window into thelateral wellbore 12, key 122 catches on the window's edge to obstruct the tool from being advanced further through thewindow 101. Furthermore, the key 122 stops the liner from being rotated in a direction that moves the key 122 against the edge of thewindow 101. - The key 122 may protrude permanently from the body of
frack liner 110 or may be biased to normally protrude from the liner body but to collapse if sufficient force is applied to overcome the biasing force. The key 122 may also be normally retracted, but releasable, when desired, to an extended position (biased or not) when it is desired that the key 122 assumes the extended position. - According to the expandable key embodiment, the key 122 is biased to protrude out from the body of
frack liner 110. The key 122 can be collapsed by application of force thereto to reduce its protruded length but is biased to pop out to its fully extended length, when it is free of a constraining force. The key 122 therefore can be forced inwardly to allow theupper portion 111 to move through casing in themain wellbore 10 but will pop out when it is moved into an open area adjacent thewindow 101, such as when it rounds the corner from themain wellbore 10 to thelateral wellbore 12. - An expandable key may be driven by a mechanism that holds the key 122 in an inactive position, for example substantially retracted, and then releases it to assume an active position. The mechanism may operate by electrical, hydraulics, biasing and/or mechanical means and may be actuated by electrical, signaling, hydraulic pressure, sensitivity to wellbore conditions (hydrostatic pressure) or by a timer.
- Preferably, the key 122 has a downhole overhanging end that extends to define an acute angle between it and the outer surface of
frack liner 110. The key 122 may also have side walls that come together such that the width of the key tapers toward the lower end. The side walls at the key 122 can be generally smooth from top to bottom such that they have a low friction interaction with the wellbore wall about the window edges. The side walls from the base to outer end, extend at an angle, such as a right angle, that permits them to catch on the edges of thewindow 101. In one embodiment, obtuse angling between these parts is avoided as this may create a ramp-like surface permitting the key to pass through thewindow 101. - In the illustrated embodiment of
FIG. 3 , the key 122 is shown above thejunction support liner 120 being also used to guide and alignjunction support liner 120 into position relative to thewindow 101. Thejunction support liner 120 may include a positioning notch shaped to accommodate the shape of the key 122 such thatjunction support liner 120 can be readily and properly positioned on thefrack liner 110. The notch may be positioned on thejunction support liner 120 at the portion of thejunction support liner 120 which is to be positioned at the V-shaped bottom end of the window and ensures that thetapering tip 120 b of thejunction support liner 120 is positioned on theupper liner 110 such thattip 120 b becomes positioned adjacent the upper region of the window. When the upper portion is pulled out of the wellbore after fracking, the key 122 is also removed and it does not remain in the wellbore indefinitely. Therefore, key 122 will not adversely affect the diameter of themain wellbore 10 for future operations. - U.S. Pat. No. 9,644,459 (Themig), which is hereby fully incorporated as part of this disclosure for all purposes, describes embodiments of a wellbore lateral junction support liner placement system, which applies in this application to placement of the junction support liner. Embodiments described herein may incorporate features and methods described in the above-mentioned US patent.
- The detachment of the upper frack liner from the lower frack liner is next described in further detail. As indicated above, the
frack liner 110 is adapted to be cut at one or more precisely located cutting points.Upper frack liner 111 can then be removed from thelateral wellbore 12, leavingjunction support liner 120 andlower frack liner 112 in thelateral wellbore 12. Preferably, thefrack liner 110 can be cut at a point that leaves a polished bore receptacle (PBR), threaded connection, or other connection exposed in the lateral wellbore so that a new/replacement upper frack liner (or other liner) can be reconnected to thelower frack liner 112 if needed. - In the embodiment illustrated in
FIG. 3 , thefrack liner 110 can be cut at cuttingpositions frack liner 110. In some embodiments, a cut andrelease sub 140 and thepacker 102 have respective locating profiles so that a cutting tool can precisely locate cutting thepositions - In operation, the
window 101 can be created by milling through a main wellbore casing. Thefrack liner 110 can be run in with a liner runningtool using packer 102 as a liner hanger. Thefrack liner 110 andjunction support liner 120 can be lowered into thelateral wellbore 12 usinglocator key 122 to locate the downhole end ofwindow 101. TheFrack liner 110 will extend into the main wellbore to thepacker 102. Thepacker 132 can be set to help support the lower portion of thefrack liner 110 and isolate thelateral wellbore 12. A swell packer (not shown) may also be provided above thecut position 150 to further support the dual liner assembly in the lateral wellbore. - The area around
frack liner 110 andannulus 130 can be cemented using methods known in the art. A plug or other mechanism can be used to prevent cementing belowwindow 101 in the main wellbore. Furthermore,frack liner 110 can include acementing tool 190 located proximate toupper end 120 a of thejunction support liner 120 for cleaning out cement above thewindow 101. One example of the cementing tool is a StackFRACK Cementor stage tool from Packers Plus of Calgary, Alberta, Canada, though, as one of skill in the art would appreciate, other ported tools could be used. After cementing theannulus 130, thejunction support liner 120, and thepacker 102 can be set. - Stimulation fluid (e.g., acid, gelled acid, gelled water, gelled oil, CO2, nitrogen and/or proppant laden fluids) may be pumped down a
liner 170 into thefrack liner 110 to treat thelateral wellbore 12. Treatment of thelateral wellbore 12 may occur in zones as is understood in the art. During fracking, other laterals are protected from debris from the lateral wellbore being fracked by the double liner. - After fracking is completed, cut and
release tool 140 can be run into thelateral wellbore 12 to cutfrack liner 110 at cuttingposition 150. In addition, thepacker 102 may be a cut-to-release packer that can be cut at cuttingposition 152. Then, theupper portion 111 andpacker 102 can be removed. Removing theupper portion 111 also removes the key 122 since, the key 122 is connected to theupper frack liner 111. Thus, the key 122 is used to locate and help support thejunction support liner 120 initially and can be left in while fracking occurs. After fracking is done, the key 122 can be removed. - The location of the
cutting position 150, at which thefrack liner 110 Is separated into alower frack liner 112 andupper frack liner 111, can be precision-tied back to the junction. This is because thejunction support liner 120 has a precise location with respect to the junction as taught in U.S. Pat. No. 9,644,459 (Themig), thefrack liner 110 through its connection by theconnector 141 to the junction support liner has a precise location with respect to the junction support liner, and the cut point has a precise location with respect to the frack liner by providing thetool 140 with a locating feature used to locate cuttingposition 150 so that the cuts occur at the correct depth. The locating features on the cutting tool can locate profiles on the inner bore of frack liner 110 (e.g., the inner bore of cut and release sub 140), which itself was properly located using thelocator keys 122, to precisely cut thefrack liner 110 at cuttingposition 150. Therefore, the precise location of thecutting position 150 and the uphole end of thelower portion 112, can be tied back to a known distance from the junction. In some embodiments, theuphole packer 102 may be removed with theupper portion 111. - Removal of
upper portion 111 can be facilitated by the use of a porous material (e.g., a sponge like substance) that is prewrapped around the outer surface ofupper portion 111 before it is run into the main and lateral wellbores. Use of porous media can inhibit the attachment of a very strong cement structure to thefrack liner 110. The porous media ends up between theupper portion 111 and lateral junction support liner (i.e., the outer liner in the lateral wellbore) and between theupper portion 111 and any cement in themain wellbore 10, and discourage cement build up between the cement casing and the frack liner that would make it difficult to withdraw theupper portion 111. The frack liner can thus be easily withdrawn without compromising the casing around themain wellbore 10, or the cement that is deployed around the lateral support liner at the junction between themain wellbore 10 andlateral wellbore 12 to support the integrity of the lateral opening (i.e., the window) at that junction. - In some embodiments, chemicals may be added to the porous material to make cement that directly contacts it dissolvable when exposed to oil, for example. This weakening treatment can be applied anywhere where it is undesirable to have cement present, hardened and attached to the frack liner.
- In any event, after removing the
upper portion 111, a polished bore receptacle (PBR) or other connection to the uphole end of thelower portion 112 is provided in the lateral wellbore to tie back into at a later time if necessary. - After fracking a particular
lateral wellbore 12 and removingupper portion 111, a new frack liner, junction support liner and lower portion can be run in to the next lateral wellbore to be fracked. - Embodiments described herein provide several advantages. First, because the
frack liner 110 andjunction support liner 120 are run in together, the operator will not have to run tools past the lateral until the operator is done with all the completion procedures in the lateral. Because no subsequent trips are required for a particular completion (i.e., installation of the frack string and junction support liner only require one trip into the lateral wellbore), once thefrack liner 110 andjunction support liner 120 are installed, there is no chance that the operator will accidently pass the lateral as can occur when multiple trips are involved. - Second, the operator can frack one lateral wellbore at a time, without worrying about invasion of debris from other lateral wellbores. Debris cannot easily migrate into the lateral and
junction support liner 120 being worked upon, due to the location of the double liner (.i. comprising the frack liner 110). - Third, even if debris moves from one
lateral wellbore 12 to another, because eachlateral wellbore 12 is pressure isolated by thefrack liner 110 andjunction support liner 120, the operator has full wellbore control, meaning that the operator can circulate in a given lateral using coil tubing, or other technology to clean out the debris because there is pressure isolation of the laterals. The operator can thus clean out one lateral wellbore at a time. Moreover, debris cannot go anywhere except into a location from which debris can easily be pumped out, (because of the pressure isolation. - The ability to maintain a clean lateral wellbore opening means that an operator can clean out sand or any other debris by running coil tubing or wireline tools back in to the lateral wellbore, operating them and then pulling them back out, in and out over and over again. Moreover, the operator can also easily mill out seats if necessary. In short, in preparation for a fracking job in a lateral wellbore, the operator can perform all sorts of tasks inside the frack liner and junction support liner, then simply clean up by applying cuts and retrieving the
frack liner 110 up-hole packer 102. - Another advantage of the described embodiments is that the only debris that are likely to infiltrate a given lateral wellbore is the debris resulting from cutting the
frack liner 110 and the packer at the end of the frack process for that lateral wellbore. But the major pieces of debris that would be generated from the cutting—namely the packer andupper portion 111—are designed to be pulled free back to surface and thus do not become debris. As such, the system can leave a very clean lateral wellbore. - Furthermore, since each lateral can be pressure isolated, fracking of each lateral wellbore can advantageously occur using standard completion procedures known in the art.
-
FIGS. 4-7 are diagrammatic representations of embodiments of adual liner assembly 200 formed by thefrack liner 110 andjunction support liner 120, and the operation thereof. Thus,FIG. 4 is a diagrammatic representation of a dual liner assembly andFIG. 5 is a diagrammatic representation of another embodiment of a dual liner assembly.FIG. 6 is a diagrammatic representation of cutting a dual liner assembly andFIG. 7 is a diagrammatic representation of cutting a dual liner assembly with anupper portion 111 removed. These figures do not illustrate adual liner assembly 200 bent to adapt to the angle presented by the lateral wellbore; however, one of ordinary skill in the art would understand that thedual liner assembly 200 would be bent to match up with the lateral wellbore, out in the field. It can be shipped out however from the factory in a straight-line shape. - As seen e.g. in
FIG. 4 , thedual liner assembly 200 includes aninner liner 125 comprising one or more tubulars formingfrack liner 110, and anouter liner 121 comprising thejunction support liner 120. As indicated above, theupper portion 111 is intended to be removed from withinouter liner 121, by cutting through thefrack liner 110 and pulling out of its underlapping position within theouter liner 121. As such, the inner diameter (or shape) of thejunction support liner 120 is selected to be larger than the outer diameter (or shape) of thefrack liner 110, at least where the wellborejunction support liner 120 andfrack liner 110 overlap at the dual liner assembly, such that there is anannular space 123 between the wellborejunction support liner 120 andfrack liner 110. This enables fluid pressure equalization between the portions of the main wellbore and the lateral wellbore that are proximate to thewindow 101. - In the embodiment of
FIG. 4 ,assembly 200 comprises one or more tubulars forming a cut and releasedual liner connector 141 having an inner bore from a first end 222 a to a second end 222 b. In this embodiment, the upper end 222 a of the connector is coupled to thejunction support liner 120, e.g. by an outer liner connection 224 (threading, or other connection interval, other connection, or welding), being formed as a part of theouter liner 121 of adual liner assembly 200. Theconnector 141 may further connect toinner liner 125, e.g. by an inner liner connection 146 (threading or other connection interval or other connector, or welding), being formed onupper portion 111 as a part ofinner liner 125. Theinner liner 125 comprises a portion offrack liner 110 that will becomeupper portion 111 when cut. - In this embodiment, lower end 222 b of
connector 141 is further adapted for connection to a downhole tubular, such as connection to thelower portion 112 offrack liner 110, which is left in the lateral wellbore whenupper portion 111 is removed, as discussed in connection withFIG. 3 . -
Dual liner connector 141, according to one embodiment, may include one or more PBR (Polished Bore Receptacles) tubulars, such as e.g.,PBR 143, providing afirst PBR 144 and asecond PRB 148, of different diameters. The inner diameter of thefirst PBR 144 may be greater than the inner diameter of thesecond PBR 148. In some embodiments, the inner diameter of the secondpolished bore receptacle 148 matches the inner diameter ofupper portion 111. As will be appreciated, a polished bore may be used to provide a sealing surface against which external annular seals on a tubular can be seated. Alternately or in addition, theouter liner 121 or other portion of dual liner assembly intended to be left in thelateral wellbore 12 may include a connection structure such as a threaded or interlocking interval that is exposed whenupper portion 111 is removed. - Further, as illustrated, the inner diameter of
connector 141 may include a locatingprofile 149 provided to facilitate appropriate positioning of any cut along thefrack liner 110. Locatingprofile 149 may be formed along or below the bottom end ofinner liner 125 such that a positioning portion of a cutting device may land in the profile with a cutting mechanism spaced a set distance from the positioning portion.Profile 149 may be useful for tool locating and may for example include one or more glands, such as annular indentations having a larger inner diameter into which a dog or resilient member on a tool can drop and become secured. In one embodiment, as shown, the profile can be positioned below a location to be cut, generally indicated byreference numeral 150. For example, theprofile 149 can be located in the axial bore of cut andrelease sub 140 below the connection point with theinner liner 125. In one embodiment, thecutting position 150 occurs between the firstpolished bore receptacle 144 and the secondpolished bore receptacle 148 at point whereannular space 123 exists between theinner liner 125 and theouter liner 121. - The cutting mechanism is preferably selected such that cuts can be precisely located. In accordance with one embodiment, the cutting mechanism is a mechanical cutting mechanism that can cut
inner liner 125 at a precise location. Such cutter mechanisms may cut through thefrack liner 110 so that theupper portion 111 can be removed. During such cutting, the outer tubular may be abraded, but care may be taken to select a cutting procedure that does not cut theouter liner 121 through. The cutting tool, in some embodiments, can be run on wireline. The cutting tool can be used to make cuts atlocations 150, 152 (seeFIG. 3 ) so that theupper liner packer 102 and theupper portion 111 can be pulled out. In other embodiments, the cutting mechanism may be for example, a mechanical cutting mechanism. - As indicated above, the
dual liner connector 141 includes anouter liner connection 224 in the form of outer threads or another connection mechanism to connect to thejunction support liner 120. It can be noted that in another embodiment, the upper portion of theconnector 141 may form at least a portion of thejunction support liner 120. Put another way, theconnector 141 may be integrated with thejunction support liner 120. Other connection options include, but are not limited to, various threaded connections and welding the parts together.Liner connector 141 andjunction support liner 120 form theouter liner 121 that may be concentrically arranged about the portion offrack liner 110 that forms theinner liner 125. Theouter liner 121 overlaps by at least a lengthL frack liner 110. The overlapping length L can be varied as desired. Thecutting position 150 is preferably located in length L. - As indicated above,
connector 141 include aninner liner connection 146 in the form of inner threads or other inner connection mechanism to connect to thelower portion 112 of thefrack liner 110 which formsinner liner 125. Thefrack liner 110 may connect in various ways, such as by threading the tubulars together, using, for example, latch threads or using welding. The lower portion ofconnector 141 can couple to other tubulars. Other connection options include, but are not limited to, threaded connections, and, welding the parts. -
Liner connector 141 provides a strong connection such thatfrack liner 110 can be used as a running tool to push and pulljunction support liner 120 during installation. - According to one embodiment, a
connector 141 with a triple threaded connection may be used, with threads for connecting to thejunction support liner 120, thelower portion tubular 112 of thefrack liner 110, and the cut and release sub 140 (seenFIG. 3 ). A triple threadedconnector 141 can provide full mechanical strength. As seen inFIG. 4 , PBR tubular 143 comprising afirst PBR 144 and asecond PBR 148 can provide a triple thread connector if a thread for the cut andrelease tool 140 is further provided on this tubular. In yet other embodiments, the PBRs may comprise other tubulars. Furthermore,connector 141 may not include a PBR. - With reference to
FIG. 5 ,cement 204 may be introduced in theannulus 130 to help better connectjunction support liner 120 with the formation, and seal the annulus of the lateral wellbore from the main wellbore. However, excess cement may impede the ability to pull theupper portion 111 offrack liner 110 free from thejunction support liner 120 orconnector 141. According to one embodiment, theupper portion 111 can be coated with materials that prevent cement from sticking to the metal outer surface or that reduces the structural integrity of any cement that comes into direct contact with the materials. - The withdrawal of
upper portion 111 needs to happen neatly and quickly even though a lot of cement might be deployed near the junction and elsewhere to keep it in place in the main wellbore and lateral. This neat withdrawal of theupper portion 111 may be effected by the use of therelease sub 140 and the use of aporous media 202 between the inner and outer liners in thelateral wellbore 12, and between thecement 204 and the liner in themain wellbore 10, to inhibit the formation of a strong cement structure that would complicate removal of theupper frack liner 111. Deployment of theporous media 202 results in weak/brittle cement formation, thus making it easier to withdraw theupper frack liner 111. In one embodiment, theporous media 202 can be any suitable porous material such as a foam rubber or other spongy material. - In some embodiments, the
porous media 202 may extend over the length of theupper portion 111. In accordance with one embodiment, theporous media 202 may be a porous material with an open cell structure in which interconnected pockets within the material permit the passage of gasses or liquids between the cells. Theporous media 202, in some embodiments, may be an open cell or combined open cell and closed cell foam or sponge. Theporous media 202 can be selected such that, while some cement solids may penetrate the porous media, there will be insufficient particulates for the cement to set up as a cement solid in the porous media, or so that any cement that does form in the media will be weak or brittle thus making it easy to withdraw theupper portion 111 from theouter liner 121. - In one implementation, the
porous media 222 can be formed of a stretchable neoprene fabric with nylon fabric covering and perforations. By way of example, but not limitation, the neoprene fabric may be neoprene fabric available from Marco International of Irvine, Calif. with an Airprene finish (see Appendix D). The generally soft nature of neoprene in combination with the perforations is believed to prevent undue pressure distribution that would cause increased fracturing pressures. The neoprene jacket may be adhered to the outer surface ofupper portion 111 using a suitable adhesive, including, but not limited to 3M-SCOTCH WELD-Weather Stripping and Gasket Adhesive 1300 from 3M Corporation of St. Paul, Minn. or Permatex Super Weatherstrip Adhesive #81850 by Permatex of Hartford, Conn. - In addition, or in the alternative, the entire outer diameter (OD) of the upper portion of the
frack liner 110 can be coated with a Teflon coating to also help prevent cement from sticking to it. This could be done, in some embodiments, as a substitute, in addition or as a backup to theporous media 202 wrapping on the running tool. - Each lateral wellbore frack job can involve, after fracking is complete, a precision cut with the cutting tool at the
connector 141 and another precision cut at the up-hole packer 102 (which also includes a locating profile for the cutter to match up with), prior to removal of theupper portion 111 and the up-hole packer 102. - With reference to
FIG. 6 , a diagrammatic representation illustrating cutting of thefrack liner 110 is provided. In the illustrated embodiment, acutting tool 250 having locatingkeys 255 andcutters 260 is illustrated. The locatingkeys 255 are adapted to locate locatingprofiles 149 of cut andrelease sub 140 and are spaced from thecutters 260 such that thecutters 260 will cut at thecutting position 150 when theprofiles 149 are located. Thus, the cut can be precisely located. It can be noted that thepacker 102 ofFIG. 3 can incorporate similar profiles so that thefrack liner 110 can be precisely cut at cuttingposition 152. - According to one embodiment, the
locator keys 255 on thecutting tool 250 allow the operator to figure out the depth to which to run in thecutting tool 250 before applying a cut. Thelocator keys 255 may be spring loaded and match the locatingprofile 149, and can engage theprofile 149 upon application of a substantial force (e.g., a 90001 b force) that overcomes the spring loading. The spring-loaded cutter can be used over and over for different cut and release subs in different lateral wellbores, by each time positioning the cutter exactly where it needs to be when a cut is applied. According to one embodiment, the cut will always occur just above the connection to theinner liner 125. -
FIG. 7 is a diagrammatic representation of thedual liner assembly 200 with theupper portion 111 removed. It can be noted that removing theupper portion 111 can revealfirst PBR 144. As such, eitherfirst PBR 144 orsecond PBR 148 can be used to connect a new/replacement upper portion when needed. Moreover, sincefirst PBR 144 andsecond PBR 148 have different inner diameters, this means that different sizes ofupper liners 111 can be connected. Furthermore, in some embodiments, theconnector 141 may include threads or interlocking mechanisms such that cutting and removing theupper portion 111 from the dual liner assembly can leave these threads exposed. Therefore, a new upper frack string can be threaded back into thedual liner connector 141. In addition or in the alternative, thedual liner connector 141 may include seals that are left in place when theupper portion 111 is removed. The threaded connection (or other connection interval) of the one or more PBRs and/or remaining seals can provide a mechanism for connecting a new upper frack string without exotic sealing devices. - The
dual liner connector 141, locatingprofile 149 and the use of standard size liners all work together to do away with the need for complicated seals, in an economical and simple manner. In one embodiment, an operator can insert the lower end of a new replacement upper portion into thePBR - U.S. Pat. No. 7,992,645, which is incorporated as part of this disclosure for all purposes, describes one embodiment of a cut and release sub using a two-sided threaded connection. As mentioned before, other options are possible such as by forming the parts, welding the parts, etc. According to this embodiment,
junction support liner 120 is coupled to aconnection 144 to act as an outer tubular and the lower end ofupper portion 111 may be coupled to aconnection 148 to act as an inner tubular. Other cut and release arrangements may also be used. - With brief reference to
FIG. 8 , one embodiment of a dual liner assembly is illustrated, showing a triple threaded connector similar to the two-sided threaded connector of the incorporated U.S. Pat. No. 7,992,645. In this embodiment, a connection is provided for theupper portion 111, another connection is provided for the junction support liner and a third connection provides the locating profile for the cut and release tool. In one embodiment, the outer tubular, thejunction support liner 120, and the inner tubular is a portion of thefrack liner 110, namely thelower portion 112. A third tubular may provide locatingprofile 149. Furthermore, as illustrated, the outer tubular may include threads or other connection mechanism such asliner connection 141. - Furthermore, in some embodiments, the
junction support liner 120 can be wrapped in a swell material for both an open hole application (e.g., TAML Level 3) or a cemented application (TAML Level 4). One embodiment of using a swell packer in conjunction with a junction support is described in U.S. Provisional Patent Application No. 62/237,0162, entitled “Swellable Wellbore Junction Liner for Multilateral Junctions”, filed Aug. 2, 2016, attached hereto as Appendix E, which is incorporated as part of this disclosure for all purposes. - Although the invention has been described with respect to specific embodiments thereof, these embodiments are merely illustrative, and not restrictive of the invention. Rather, the description is intended to describe illustrative embodiments, features and functions in order to provide a person of ordinary skill in the art context to understand the invention without limiting the invention to any particularly described embodiment, feature or function. While specific embodiments of, and examples for, the invention are described herein for illustrative purposes only, various equivalent modifications are possible within the spirit and scope of the invention, as those skilled in the relevant art will recognize and appreciate. As indicated, these modifications may be made to the invention in light of the foregoing description of illustrated embodiments of the invention and are to be included within the spirit and scope of the invention. Thus, while the invention has been described herein with reference to particular embodiments thereof, a latitude of modification, various changes and substitutions are intended in the foregoing disclosures, and it will be appreciated that in some instances some features of embodiments of the invention will be employed without a corresponding use of other features without departing from the scope and spirit of the invention as set forth. Therefore, many modifications may be made to adapt a particular situation or material to the essential scope and spirit of the invention.
- Reference throughout this specification to “one embodiment”, “an embodiment”, or “a specific embodiment” or similar terminology means that a particular feature, structure, or characteristic described in connection with the embodiment is included in at least one embodiment and may not necessarily be present in all embodiments. Thus, respective appearances of the phrases “in one embodiment”, “in an embodiment”, or “in a specific embodiment” or similar terminology in various places throughout this specification are not necessarily referring to the same embodiment. Furthermore, the particular features, structures, or characteristics of any particular embodiment may be combined in any suitable manner with one or more other embodiments. It is to be understood that other variations and modifications of the embodiments described and illustrated herein are possible in light of the teachings herein and are to be considered as part of the spirit and scope of the invention.
- In the description herein, numerous specific details are provided, such as examples of components and/or methods, to provide a thorough understanding of embodiments of the invention. One skilled in the relevant art will recognize, however, that an embodiment may be able to be practiced without one or more of the specific details, or with other apparatus, systems, assemblies, methods, components, materials, parts, and/or the like. In other instances, well-known structures, components, systems, materials, or operations are not specifically shown or described in detail to avoid obscuring aspects of embodiments of the invention. While the invention may be illustrated by using a particular embodiment, this is not and does not limit the invention to any particular embodiment and a person of ordinary skill in the art will recognize that additional embodiments are readily understandable and are a part of this invention.
- As used herein, the terms “comprises,” “comprising,” “includes,” “including,” “has,” “having,” or any other variation thereof, are intended to cover a non-exclusive inclusion. For example, a process, product, article, or apparatus that comprises a list of elements is not necessarily limited only those elements but may include other elements not expressly listed or inherent to such process, product, article, or apparatus.
- Furthermore, the term “or” as used herein is generally intended to mean “and/or” unless otherwise indicated. For example, a condition A or B is satisfied by any one of the following: A is true (or present) and B is false (or not present), A is false (or not present) and B is true (or present), and both A and B are true (or present). As used herein, a term preceded by “a” or “an” (and “the” when antecedent basis is “a” or “an”) includes both singular and plural of such term, unless clearly indicated otherwise (i.e., that the reference “a” or “an” clearly indicates only the singular or only the plural). Also, as used in the description herein, the meaning of “in” includes “in” and “on” unless the context clearly dictates otherwise.
Claims (21)
1. A dual liner assembly for a multilateral fracking system, comprising:
a junction support liner adapted to be installed in a lateral wellbore proximate to a junction with a main wellbore;
an inner liner having an upper portion and a lower portion, the inner liner adapted to be positioned inside the junction support liner so that the upper portion extends uphole beyond the junction support liner into the main wellbore, and so that the lower portion extends downhole beyond the junction support liner into the lateral wellbore; and
a cut and release connector adapted to enable detachment of the upper portion from the assembly.
2. The assembly as claimed in claim 1 , wherein the cut and release connector includes one or more tubulars having a bore therethrough and one or more interlocking intervals.
3. The assembly as claimed in claim 1 , wherein the cut and release connector comprises:
a first connection at the upper end of the connector for engaging an outer liner connection on the junction support liner; and
a second connection at the lower end of the connector for engaging an inner liner connection on the upper portion.
4. The assembly of claim 3 , wherein the cut and release connector further comprises a third connection for engaging a cutting tool operated to cut the inner liner into the upper portion and the lower portion.
5. The assembly of claim 1 , wherein the cut and release connector comprises a locating profile for engaging a cutting tool to cut the inner liner at a cutting position above the cut and release connector.
6. The assembly of claim 1 , wherein the cut and release connector comprises an outer liner receptacle in the form of inner threads to enable connection of a further inner liner once the upper portion of the inner liner has been removed.
7. The assembly of claim 1 , wherein the cut and release connector comprises an inner liner receptacle in the form of outer threads to enable connection of a further inner liner once the upper portion of the inner liner has been removed.
8. The assembly off claim 1 , wherein the cut and release connector comprises
an outer liner receptacle in the form of inner threads to enable connection of a further inner liner once the upper portion of the inner liner has been removed; and
an inner liner receptacle in the form of outer threads to enable connection of a further inner liner once the upper portion of the inner liner has been removed.
9. The assembly of claim 8 , wherein the outer liner receptacle and the inner liner receptacle are each is polished bore receptacles (PBR).
10. The assembly of claim 1 , wherein the inner liner comprises a window locating key biased to protrude from the outer surface of the inner liner to locate and engage a window formed the at the junction between the main wellbore and the lateral wellbore.
11. The assembly of claim 10 , wherein the inner liner is coupled with the junction support liner, the locating key causing the assembly to position the upper end of the window support liner over the window.
12. The assembly of claim 10 , wherein the window locating key is positioned on the upper portion of the inner liner be removed with the upper portion.
13. The assembly of claim 1 , further comprising a porous material wrapped on the outer surface of the upper portion, the porous material selected to inhibit formation of cement solids.
14. The assembly of claim 1 , further comprising an uphole isolation packer in the main wellbore, coupled to the upper portion.
15. The assembly of claim 14 , wherein the upper portion comprises a further locating profile for engaging a cutting tool to cut the inner liner at a second cutting position downhole end of the isolation packer.
16. A method of multilateral fracking comprising:
providing a dual liner assembly comprised of a junction support liner, and an inner liner including an upper portion and a lower portion that are releasably engaged with each other by a cut and release connector;
lowering the dual liner assembly into a main wellbore and then into a lateral wellbore;
hanging the dual liner assembly from an uphole packer, with the junction support liner placed into the lateral wellbore at the junction with the main wellbore, and the inner liner extending downhole beyond the junction support liner within the main wellbore, and uphole beyond the junction support liner in the lateral wellbore until it reaches the uphole packer;
stimulating the lateral wellbore;
cutting the inner liner at the cut and release connector so as to release the engagement between the upper and lower portions; and
removing the upper portion.
17. The method of claim 16 , wherein lowering the dual liner assembly comprises joining the inner liner coupled to the junction support liner using the connector.
18. The method of claim 16 , wherein cutting the inner liner comprises:
running-in a cutting tool in the inner liner;
engaging the cutting tool with a locating profile provided in the connector;
cutting the inner liner into the lower portion and upper portions; and
releasing the upper portion from engagement with the lower portion and the junction support liner.
19. The method of claim 16 , further comprising connecting a further upper portion to the assembly using a polished bore receptacle (PBR) provided on the inner surface of the junction support liner, the PBR becoming accessible by removal of to the upper portion.
20. The method of claim 16 , further comprising connecting a further upper portion to the assembly using a polished bore receptacle (PBR) provided on the outer surface of the second portion, the PBR becoming accessible by removal of to the upper portion.
21. The method of claim 16 , further comprising, prior to stimulating,
sealing the uphole isolation packer in the main wellbore above the window to the lateral wellbore; and
sealing a downhole packer in the lateral wellbore, wherein the uphole packer is removed with the upper portion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/809,401 US20180320487A1 (en) | 2016-11-10 | 2017-11-10 | Lateral completion system with retrievable inner liner |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201662420363P | 2016-11-10 | 2016-11-10 | |
US15/809,401 US20180320487A1 (en) | 2016-11-10 | 2017-11-10 | Lateral completion system with retrievable inner liner |
Publications (1)
Publication Number | Publication Date |
---|---|
US20180320487A1 true US20180320487A1 (en) | 2018-11-08 |
Family
ID=64013581
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/809,401 Abandoned US20180320487A1 (en) | 2016-11-10 | 2017-11-10 | Lateral completion system with retrievable inner liner |
Country Status (1)
Country | Link |
---|---|
US (1) | US20180320487A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20190128115A1 (en) * | 2017-11-02 | 2019-05-02 | Saudi Arabian Oil Company | Casing system having sensors |
CN112360421A (en) * | 2020-12-01 | 2021-02-12 | 中国石油天然气股份有限公司 | Full-drift-diameter well completion fracturing method for low-permeability reservoir sidetracking well |
US11078756B2 (en) * | 2018-07-25 | 2021-08-03 | Halliburton Energy Services, Inc. | Method and apparatus for introducing a junction assembly including a transition joint and a load transfer device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3578084A (en) * | 1969-06-23 | 1971-05-11 | Exxon Production Research Co | Thermal well completion method and apparatus |
US3992496A (en) * | 1974-03-15 | 1976-11-16 | Sumitomo Chemical Company, Limited | Process for producing porous thermoplastic resin sheet |
US20090205835A1 (en) * | 2008-02-20 | 2009-08-20 | Packers Plus Energy Services Inc. | Cut release sub and method |
US20130126165A1 (en) * | 2010-07-28 | 2013-05-23 | Packers Plus Energy Services Inc. | Wellbore lateral liner placement system |
US20140102716A1 (en) * | 2012-10-16 | 2014-04-17 | Halliburton Energy Services, Inc. | Multilateral bore junction isolation |
-
2017
- 2017-11-10 US US15/809,401 patent/US20180320487A1/en not_active Abandoned
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3578084A (en) * | 1969-06-23 | 1971-05-11 | Exxon Production Research Co | Thermal well completion method and apparatus |
US3992496A (en) * | 1974-03-15 | 1976-11-16 | Sumitomo Chemical Company, Limited | Process for producing porous thermoplastic resin sheet |
US20090205835A1 (en) * | 2008-02-20 | 2009-08-20 | Packers Plus Energy Services Inc. | Cut release sub and method |
US20130126165A1 (en) * | 2010-07-28 | 2013-05-23 | Packers Plus Energy Services Inc. | Wellbore lateral liner placement system |
US20140102716A1 (en) * | 2012-10-16 | 2014-04-17 | Halliburton Energy Services, Inc. | Multilateral bore junction isolation |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20190128115A1 (en) * | 2017-11-02 | 2019-05-02 | Saudi Arabian Oil Company | Casing system having sensors |
US10662762B2 (en) * | 2017-11-02 | 2020-05-26 | Saudi Arabian Oil Company | Casing system having sensors |
US11078756B2 (en) * | 2018-07-25 | 2021-08-03 | Halliburton Energy Services, Inc. | Method and apparatus for introducing a junction assembly including a transition joint and a load transfer device |
CN112360421A (en) * | 2020-12-01 | 2021-02-12 | 中国石油天然气股份有限公司 | Full-drift-diameter well completion fracturing method for low-permeability reservoir sidetracking well |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2158291C (en) | Method for multi-lateral completion and cementing the juncture with lateral wellbores | |
US11125060B2 (en) | Multi-zone single trip completion system | |
CA3029191C (en) | Expandable reentry completion device | |
CA2915624A1 (en) | Tool assembly and process for drilling branched or multilateral wells with whipstock | |
US10605027B2 (en) | Retaining sealing element of wellbore isolation device with slip elements | |
US20180320487A1 (en) | Lateral completion system with retrievable inner liner | |
EP2905419B1 (en) | Open hole expandable junction | |
WO1998009054A9 (en) | Cement reinforced inflatable seal for a junction of a multilateral | |
WO1998009054A1 (en) | Cement reinforced inflatable seal for a junction of a multilateral | |
US11047196B2 (en) | Production tubing conversion device and methods of use | |
CA2999197C (en) | Method of well completion | |
US11708745B2 (en) | Method for incorporating scrapers in multi zone packer assembly | |
CA2985312A1 (en) | Lateral completion system with retrievable inner liner | |
EP3551840B1 (en) | Methods and apparatus for creating wellbores | |
US10683734B2 (en) | Dissolvable casing liner | |
US11993992B2 (en) | Modified cement retainer with milling assembly | |
NO20240428A1 (en) | Systems and methods for multilateral completions | |
US20180355678A1 (en) | A downhole tubular verification and centralizing device, and method | |
US20160369603A1 (en) | Redressing method and redressed completion system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: PACKERS PLUS ENERGY SERVICES INC., CANADA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:THEMIG, DANIEL JON;REEL/FRAME:044092/0586 Effective date: 20171110 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |