US20140319914A1 - Battery system and its control method - Google Patents
Battery system and its control method Download PDFInfo
- Publication number
- US20140319914A1 US20140319914A1 US14/330,107 US201414330107A US2014319914A1 US 20140319914 A1 US20140319914 A1 US 20140319914A1 US 201414330107 A US201414330107 A US 201414330107A US 2014319914 A1 US2014319914 A1 US 2014319914A1
- Authority
- US
- United States
- Prior art keywords
- electric power
- load
- battery
- supply
- generation device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/34—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
- H02J7/35—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/44—Methods for charging or discharging
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/46—Accumulators structurally combined with charging apparatus
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/48—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/0068—Battery or charger load switching, e.g. concurrent charging and load supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E70/00—Other energy conversion or management systems reducing GHG emissions
- Y02E70/30—Systems combining energy storage with energy generation of non-fossil origin
Definitions
- the present invention relates to a battery system that is operable in association with an electrical grid (commercial electric power) and to its control method.
- renewable electric power sources are subject to fluctuations of output electric power that depends on weather conditions, it is preferable that they be used together with a battery system so as to relatively stably supply desired electric power to the users.
- Patent Literature 1 An in-house electric power generation system provided with both a distributed electric power source such as a distributed electric power source or a fuel battery and a battery is described for example in Patent Literature 1.
- the users be able to enjoy high economic effects when they use electric power.
- the power rates of the electric grid be reduced by prioritizing the supply of electric power generated by a renewable electric power source or electric power charged to a battery system to the user's load (electric equipment).
- surplus electric power that is not used for the user's load be sold to an electric power company.
- some users prioritize the use of electric power generated from natural energy (green electric power), not economic effects.
- a renewable electric power source and a battery system be operable in an operation mode that is optimum for each user.
- renewable electric power sources and battery systems are still expensive.
- the user may not implement both a renewable electric power source and a battery system at the same time.
- a renewable electric power source and a battery system be independently operable in association with the electric grid.
- an object of the present invention is to provide a battery system that is independently operable in association with an electric grid and in an operation mode that is optimum for each user and also to provide its control method.
- a battery system is a battery system that is operable in association with an electrical grid, the battery system comprising:
- control section that controls said battery to charge electric power supplied from said electrical grid and to discharge electric power to said electrical grid
- a system controller that controls said control section such that said battery system operates in a first mode where electric power that is generated by a pre-designated distributed electric power source associated with said electrical grid is supplied preferentially to a user's load or in a second mode where electric power that is charged in said battery is supplied preferentially to said user's load.
- a control method for a battery system is a control method for a battery system that is operable in association with an electrical grid, the battery system including:
- control section that controls said battery to charge electric power supplied from said electrical grid and to discharge electric power to said electrical grid
- control method comprising:
- a computer to control said control section such that said battery system operates in a first mode where electric power generated by a pre-designated distributed electric power source associated with said electrical grid is supplied preferentially to a user's load or in a second mode where electric power that is charged in said battery is supplied preferentially to said user's load.
- FIG. 1 is a block diagram showing an example of the structure of a battery system according to the present invention.
- FIG. 2 is a block diagram showing the structure of principal sections of the battery system shown in FIG. 1 .
- FIG. 3 is a flow chart showing an example of a process in which the battery system shown in FIG. 2 performs in a PV priority mode.
- FIG. 4 is a flow chart showing an example of a process in which the battery system shown in FIG. 2 performs in a charging priority mode.
- FIG. 1 is a block diagram showing an example of the structure of a battery system according to the present invention.
- the battery system has battery pack 10 that charges or discharges electric power; BMU (Battery Management Unit) 20 that protects battery pack 10 from overcharging, overdischarging, over current, and so forth; power conditioner (PCS) 30 that converts electric power such that battery pack 10 is operable in association with the electric grid and that controls charging of electric power to battery pack 10 and discharging electric power therefrom; and system controller 40 that controls the overall operations of the battery system including BMU 20 and PCS 30 .
- FIG. 1 shows an example of the structure in which two battery packs 10 are connected in parallel, it should be appreciated that one battery pack 10 or three or more battery packs 10 may be used.
- PV system 50 has PV (Photo Voltaic) panel 51 that uses solar light to generate electric power and PV power conditioner (PV PCS) 52 that converts DC electric power generated by PV panel 51 into AC electric power that can be supplied to the electrical grid.
- PV system 50 is a distributed electric power source (small power generation facility) that is independent from the battery system.
- the battery system and PV system 50 are operated in association with the electrical grid through a distribution board located in the user's house.
- Power conditioner 30 is provided with DC/AC bidirectional inverter 31 that converts AC electric power supplied from the electrical grid to DC electric power that can be charged to battery pack 10 and converts DC electric power discharged from battery pack 10 into AC electric power that can be supplied to the load and the electrical grid; and control section 32 that controls the operation of power conditioner 30 including DC/AC bidirectional inverter 31 corresponding to a command issued from system controller 40 and that monitors the operation of BMU 20 .
- Power conditioner 30 shown in FIG. 1 is operable in association with the electrical grid through electric power line 33 such that power conditioner 30 supplies electric power to the user's load through electric power line 33 .
- Battery pack 10 is provided with a battery (secondary battery) that can charge or discharge electric power.
- the battery is, for example, a lithium ion rechargeable battery, a nickel cadmium (NI—Cd) battery, or a nickel hydrogen (Ni-MH) battery.
- Battery pack 10 contains one battery or a plurality of batteries that are connected in series depending on the desired output voltage.
- the battery system contains one battery or a plurality of batteries that are connected in parallel depending on the desired charging amount.
- the battery system according to the present invention may be provided for example with a metal case type battery (secondary battery). It should be appreciated that the battery system according to the present invention is provided with a metal case type battery (secondary battery).
- BMU 20 can be realized by an electronic circuit containing a known protection IC (Integrated Circuit) and various types of electronic devices corresponding to the battery or batteries of battery pack 10 .
- IC Integrated Circuit
- DC/AC bidirectional inverter 31 can be realized by a DC/AC inverter circuit, an AC/DC converter circuit, a DC/DC converter, a relay (switch) that switches between electrical paths, or the like, each of which is known.
- Control section 32 can be realized by an electronic circuit composed of a known communication circuit that transmits and receives information to and from system controller 40 ; a known current-to-electric power conversion circuit that receives a current value from current sensor 70 that detects the current value (current sensor 70 will be described later) and converts the current value into an electric power value; and a known logic circuit that outputs a control signal that causes the operations of BMU 20 , DC/AC bidirectional inverter 31 , and so forth to be switched corresponding to a command issued from system controller 40 .
- FIG. 1 shows an example of the structure in which control section 32 is located in power conditioner 30 . However, it should be appreciated that control section 32 may be a unit that is independent from power conditioner 30 or a unit that is located in system controller 40 .
- System controller 40 can be realized by an information processing unit (computer) that is provided with a CPU, a storage unit, various types of logic circuits, and a communication means that transmits and receives information to and from control section 32 , BMU 20 , and DC/AC bidirectional inverter 31 .
- System controller 40 executes a process corresponding to a program stored in the storage unit so as to operate the battery system. The operation of the battery system will be described later.
- Distribution switchboard 60 is provided with a plurality of branch electrical paths (not shown) through which electric power is supplied from the electrical grid to the user's load and which has switches corresponding to individual electrical grids and individual branch electrical paths.
- the battery system according to this embodiment is provided with current sensors 70 each of which is located on the electrical path through which electric power is supplied from the electrical grid to the load and on the output electrical path of PV system 50 .
- Electric power supplied from the electrical grid to the user's load and output electric power of PV system 50 are measured based on the current values detected by current sensors 70 .
- Electric power supplied from the electrical grid to the user's load is measured by control section 32 of power conditioner 30 .
- Output electric power of PV system 50 is measured by system controller 40 .
- electric power supplied from the electrical grid to the user's load is measured both on the electrical grid side (node a shown in FIG. 1 ) and the user's load side (node b shown in FIG. 1 ) viewed from the association point of PV system 50 .
- power conditioner 30 is provided with switch 36 that changes over between the connection of current sensor 70 at node a and control section 32 and the connection of current sensor 70 at node b and control section 32 .
- System controller 40 operates switch 36
- FIG. 1 shows an example of the structure in which the battery system is used together with PV system 50 .
- the battery system according to the present invention can perform the foregoing control even if the battery system is used together with a distributed electric power source that is an in-house electric power generator that uses a wind farm electric power generation system, a fuel battery, or fossil energy.
- PV system 50 generates electric power basically depending on weather conditions rather than the total electric power consumption of the user's load and outputs the generated electric power. Thus, if the total electric power consumption becomes low, surplus electric power that is not used for the load is generated by PV system 50 . The surplus electric power that is not used for the load is caused to reversely flow to the electrical grid. Alternatively, the surplus electric power is charged to battery pack 10 through DC/AC bidirectional inverter 31 under the control of system controller 40 .
- Battery pack 10 discharges charged electric power in response to a control signal issued by control section 32 and supplies electric power to the user's load through DC/AC bidirectional inverter 31 .
- a control signal issued by control section 32 it is not permitted that electric power discharged from battery pack 10 is caused to reversely flow to the electrical grid.
- the total electric power consumption of the load is low, the amount of electric power discharged from battery pack 10 is suppressed.
- Battery pack 10 is charged with the foregoing surplus electric power of PV system 50 or electric power supplied from the electrical grid. Electric power may be charged to or discharged from battery pack 10 by the user at his or her convenience. When battery pack 10 is charged with electric power supplied from the electrical grid, nighttime electric power that is inexpensive compared to regular electric power can be used.
- the battery system according to this embodiment is provided with two operation modes in which electric power is supplied to the user's load, a PV priority mode (first mode) in which electric power generated by PV system 50 is prioritized and a charging priority mode (second mode) in which electric power charged to battery pack 10 is prioritized.
- first mode electric power generated by PV system 50
- second mode charging priority mode
- the measured value at node a shown in FIG. 1 is used as electric power P GRID supplied from the electrical grid to the load.
- the measured value at node b shown in FIG. 1 is used as electric power P GRID supplied from the electrical grid to the load.
- system controller 40 causes electric power that is output from PV system 50 to be supplied preferentially to the load. If electric power generated by PV system 50 does not satisfy electric power supplied to the load (P LOAD ⁇ P PV >0), system controller 40 causes battery pack 10 to discharge electric power through power conditioner 30 and supply the electric power to the load. If electric power generated by PV system 50 is equal to or greater than electric power supplied to the load (P LOAD ⁇ P PV ⁇ 0), system controller 40 causes surplus electric power that is not used in the load to reversely flow to the electrical grid or to be charged to battery pack 10 .
- system controller 40 causes electric power that is charged in battery pack 10 to be supplied preferentially to the load. If electric power discharged from battery pack 10 does not satisfy electric power supplied to the load (P LOAD ⁇ P INV >0), system controller 40 causes electric power generated by PV system 50 to be supplied to the load. If electric power discharged from battery pack 10 is equal to or greater than electric power supplied to the load or if it is not necessary to supply all electric power generated by PV system 50 to the load, system controller 40 causes surplus electric power that is not used in the load to reversely flow to the electrical grid or to be charged to battery pack 10 .
- the battery system according to this embodiment is provided with an economy mode (third mode) and a green mode (fourth mode) for the charging priority mode and for the PV priority mode.
- economy mode economy is prioritized; in the green mode, charging to the battery is prioritized.
- system controller 40 causes surplus electric power that is generated by PV system 50 to be sold preferentially to the electric power company.
- system controller 40 causes surplus electric power that is generated by PV system 50 to be charged preferentially to battery pack 10 .
- the PV priority mode, the charging priority mode, the economy mode, and the green mode can be set by the user using switches or the like located on the operation panel (not shown) and data that represents the mode that has been set is stored in the storage unit of system controller 40 .
- FIG. 2 is a block diagram showing the structure of principal sections of the battery system shown in FIG. 1 .
- FIG. 3 is a flow chart showing an example of a process in which the battery system shown in FIG. 2 performs in the PV priority mode.
- FIG. 4 is a flow chart showing an example of a process in which the battery system shown in FIG. 2 performs in the charging priority mode.
- FIG. 2 shows principal sections related to the operations in which the battery system and PV system 50 perform in the PV priority mode and the charging priority mode.
- arrows of P GRID , P LOAD , P INV , and P PV shown in FIG. 2 represent the directions in which currents flow in the forward direction.
- FIG. 1 and FIG. 2 show an example of the structure in which current sensors 70 are located at node a and node b.
- the difference between the measured result at node a and the measured result at node b is whether or not the measured result contains P PV .
- current sensor 70 is located on the output electrical path of PV system 50 and the value of P PV is measured by system controller 40 .
- system controller 40 the battery system according to this embodiment can be controlled.
- Electric power P GRID supplied from the electrical grid to the load is measured by control section 32 of the power conditioner and then transmitted from control section 32 to system controller 40 .
- system controller 40 determines whether the battery system is operating in the PV priority mode or in the charging priority mode (at step S 1 ). If system controller 40 is operating in the charging priority mode, the flow advances to the process shown in FIG. 4 .
- system controller 40 determines whether the battery system is operating in the green mode or in the economy mode (at step S 11 ).
- system controller 40 determines whether or not total electric power consumption in the load (load electric power P LOAD ) is greater than electric power generated by PV system 50 (PV electric power P PV ), namely whether electric power P GRID supplied from the electrical grid to the load is greater than 0 (at step S 12 ).
- system controller 40 controls power conditioner 30 so as to discharge electric power from battery pack 10 corresponding to load electric power P LOAD and to supply supplementary electric power (P LOAD ⁇ P PV ) to the load (at step S 13 ).
- system controller 40 determines whether or not total electric power consumption in the load (load electric power P LOAD ) is greater than electric power generated by P v system 50 (PV electric power P PV ), namely whether electric power P GRID supplied from the electrical grid to the load is greater than 0 (at step S 15 ).
- system controller 40 controls power conditioner 30 so as to discharge electric power from battery pack 10 corresponding to load electric power P LOAD and to supply supplementary electric power (P LOAD ⁇ P PV ) to the load (at step S 16 ).
- system controller 40 determines whether or not the battery system is operating in the green mode or in the economy mode (at step S 21 ).
- system controller 40 determines whether or not total electric power consumption in the load (load electric power P LOAD ) is greater than electric power generated by PV system 50 (PV electric power P PV ), namely whether electric power P GRID supplied from the electrical grid to the load is greater than P PV (at step S 22 ).
- system controller 40 controls power conditioner 30 so as to discharge electric power from battery pack 10 corresponding to load electric power P LOAD and to supply supplementary electric power (P LOAD ⁇ P PV ) to the load.
- system controller 40 determines whether or not the total electric power consumption in the load (load electric power P LOAD ) is greater than the electric power generated by PV system 50 (PV electric power P PV ), namely electric power P GRID supplied from the electrical grid to the load is greater than P PV (at step S 25 ).
- system controller 40 controls power conditioner 30 so as to discharge electric power from battery pack 10 corresponding to load electric power P LOAD and supply supplementary electric power (P LOAD ⁇ P PV ) to the load (at step S 26 ).
- battery pack 10 and power conditioner 30 that controls battery pack 10 to charge or discharge electric power can be operated in association with the electrical grid and independent from a distributed power source such as PV system 50 . Even if a distributed electric power source has been implemented, the battery system can be operated in association with the electrical grid.
- the battery pack is charged with nighttime electric power that is relatively inexpensive and if the battery system is operated during the daytime either in the charging priority mode or the PV priority mode, since electric power supplied from the electrical grid during the daytime is prevented, electric rates can be reduced.
- the battery system is operated in the charging priority mode, since surplus electric power that occurs in the PV system becomes relatively large, the amount of electric power that is sold increases. If the battery system is operated in the PV priority mode, electric power generated by the PV system can mostly satisfy electric power for the user's load. Thus, a battery system can be accomplished with high economic benefits.
- Whether a higher economic benefit can be obtained in the charging priority mode or the PV priority mode in which the battery system operates depends on, for example, the amount of electric power used by the user, his or her electric power use pattern, and weather conditions (sunlight hours, wind force, and so forth) of the region where he or she lives.
- some users may prioritize the use of electric power that is generated from natural energy (green electric power), rather than high economic benefits.
- the battery system according to this embodiment can switch between the foregoing charging priority mode and the PV priority mode.
- the battery system can switch between the economy mode and the green mode.
- the user can optimally select an operation mode in which the battery system operates based upon the preference of the user (i.e. green or economy mode) and so forth.
- the battery system can be operated in association with the electrical grid, but independent from a distributed electric power source.
- a battery system that can be operated in a mode that satisfies the preference of each user can be realized.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- General Chemical & Material Sciences (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Secondary Cells (AREA)
Abstract
A battery system includes a battery, a control section that controls the battery to charge electric power supplied from the electrical grid and to discharge electric power to the electrical grid; and a system controller. The system controller controls the control section such that the battery system operates in a first mode where electric power that is generated by a pre-designated distributed electric power source associated with the electrical grid is supplied preferentially to a user's load or in a second mode where electric power that is charged in the battery is supplied preferentially to the user's load.
Description
- This is a divisional application based upon U.S. patent application Ser. No. 13/818,039 filed Feb. 20, 2013, which is a National Stage of International Application No. PCT/JP2012/064462 filed Jun. 5, 2012, claiming priority based on Japanese Patent Application No. 2011-156561 filed Jul. 15, 2011, the contents of all of which are incorporated herein by reference in their entirety.
- The present invention relates to a battery system that is operable in association with an electrical grid (commercial electric power) and to its control method.
- In order to achieve a low carbon society, distributed electric power sources such as photo voltage generation and wind farms are becoming essential. In addition, battery systems have been implemented so as to effectively use electric power generated by distributed electric power sources and rigid power sources (for example, nuclear power plants) that emit less carbon and that stably generate electric power.
- In particular, since renewable electric power sources are subject to fluctuations of output electric power that depends on weather conditions, it is preferable that they be used together with a battery system so as to relatively stably supply desired electric power to the users.
- An in-house electric power generation system provided with both a distributed electric power source such as a distributed electric power source or a fuel battery and a battery is described for example in
Patent Literature 1. - To accelerate the promotion of the foregoing distributed electric power sources and battery systems, it is preferred that the users be able to enjoy high economic effects when they use electric power. For example, it is preferable that the power rates of the electric grid be reduced by prioritizing the supply of electric power generated by a renewable electric power source or electric power charged to a battery system to the user's load (electric equipment). In addition, it is preferable that surplus electric power that is not used for the user's load be sold to an electric power company. However, some users prioritize the use of electric power generated from natural energy (green electric power), not economic effects. Thus, it is preferable that a renewable electric power source and a battery system be operable in an operation mode that is optimum for each user.
- On the other hand, renewable electric power sources and battery systems are still expensive. Thus, the user may not implement both a renewable electric power source and a battery system at the same time. Thus, it is preferable that a renewable electric power source and a battery system be independently operable in association with the electric grid.
-
- Patent Literature 1: Japanese Patent Laid-Open No. 2011-003449
- Therefore, an object of the present invention is to provide a battery system that is independently operable in association with an electric grid and in an operation mode that is optimum for each user and also to provide its control method.
- To accomplish the foregoing object, a battery system according to an exemplary aspect of the present invention is a battery system that is operable in association with an electrical grid, the battery system comprising:
- a battery that charges or discharges electric power;
- a control section that controls said battery to charge electric power supplied from said electrical grid and to discharge electric power to said electrical grid; and
- a system controller that controls said control section such that said battery system operates in a first mode where electric power that is generated by a pre-designated distributed electric power source associated with said electrical grid is supplied preferentially to a user's load or in a second mode where electric power that is charged in said battery is supplied preferentially to said user's load.
- On the other hand, a control method for a battery system according to an exemplary aspect of the present invention is a control method for a battery system that is operable in association with an electrical grid, the battery system including:
- a battery that charges or discharges electric power; and
- a control section that controls said battery to charge electric power supplied from said electrical grid and to discharge electric power to said electrical grid,
- the control method comprising:
- causing a computer to control said control section such that said battery system operates in a first mode where electric power generated by a pre-designated distributed electric power source associated with said electrical grid is supplied preferentially to a user's load or in a second mode where electric power that is charged in said battery is supplied preferentially to said user's load.
-
FIG. 1 is a block diagram showing an example of the structure of a battery system according to the present invention. -
FIG. 2 is a block diagram showing the structure of principal sections of the battery system shown inFIG. 1 . -
FIG. 3 is a flow chart showing an example of a process in which the battery system shown inFIG. 2 performs in a PV priority mode. -
FIG. 4 is a flow chart showing an example of a process in which the battery system shown inFIG. 2 performs in a charging priority mode. - Next, with reference to the accompanying drawings, the present invention will be described.
-
FIG. 1 is a block diagram showing an example of the structure of a battery system according to the present invention. - As shown in
FIG. 1 , the battery system hasbattery pack 10 that charges or discharges electric power; BMU (Battery Management Unit) 20 that protectsbattery pack 10 from overcharging, overdischarging, over current, and so forth; power conditioner (PCS) 30 that converts electric power such thatbattery pack 10 is operable in association with the electric grid and that controls charging of electric power tobattery pack 10 and discharging electric power therefrom; andsystem controller 40 that controls the overall operations of the battery system including BMU 20 and PCS 30. AlthoughFIG. 1 shows an example of the structure in which twobattery packs 10 are connected in parallel, it should be appreciated that onebattery pack 10 or three ormore battery packs 10 may be used. - The electrical grid is used in association with both
PV system 50 and the battery system.PV system 50 has PV (Photo Voltaic)panel 51 that uses solar light to generate electric power and PV power conditioner (PV PCS) 52 that converts DC electric power generated byPV panel 51 into AC electric power that can be supplied to the electrical grid.PV system 50 is a distributed electric power source (small power generation facility) that is independent from the battery system. The battery system andPV system 50 are operated in association with the electrical grid through a distribution board located in the user's house. -
Power conditioner 30 is provided with DC/ACbidirectional inverter 31 that converts AC electric power supplied from the electrical grid to DC electric power that can be charged tobattery pack 10 and converts DC electric power discharged frombattery pack 10 into AC electric power that can be supplied to the load and the electrical grid; and control section 32 that controls the operation ofpower conditioner 30 including DC/ACbidirectional inverter 31 corresponding to a command issued fromsystem controller 40 and that monitors the operation ofBMU 20.Power conditioner 30 shown inFIG. 1 is operable in association with the electrical grid throughelectric power line 33 such thatpower conditioner 30 supplies electric power to the user's load throughelectric power line 33. -
Battery pack 10 is provided with a battery (secondary battery) that can charge or discharge electric power. The battery is, for example, a lithium ion rechargeable battery, a nickel cadmium (NI—Cd) battery, or a nickel hydrogen (Ni-MH) battery.Battery pack 10 contains one battery or a plurality of batteries that are connected in series depending on the desired output voltage. The battery system contains one battery or a plurality of batteries that are connected in parallel depending on the desired charging amount. The battery system according to the present invention may be provided for example with a metal case type battery (secondary battery). It should be appreciated that the battery system according to the present invention is provided with a metal case type battery (secondary battery). - BMU 20 can be realized by an electronic circuit containing a known protection IC (Integrated Circuit) and various types of electronic devices corresponding to the battery or batteries of
battery pack 10. - DC/AC
bidirectional inverter 31 can be realized by a DC/AC inverter circuit, an AC/DC converter circuit, a DC/DC converter, a relay (switch) that switches between electrical paths, or the like, each of which is known. - Control section 32 can be realized by an electronic circuit composed of a known communication circuit that transmits and receives information to and from
system controller 40; a known current-to-electric power conversion circuit that receives a current value fromcurrent sensor 70 that detects the current value (current sensor 70 will be described later) and converts the current value into an electric power value; and a known logic circuit that outputs a control signal that causes the operations ofBMU 20, DC/ACbidirectional inverter 31, and so forth to be switched corresponding to a command issued fromsystem controller 40.FIG. 1 shows an example of the structure in which control section 32 is located inpower conditioner 30. However, it should be appreciated that control section 32 may be a unit that is independent frompower conditioner 30 or a unit that is located insystem controller 40. -
System controller 40 can be realized by an information processing unit (computer) that is provided with a CPU, a storage unit, various types of logic circuits, and a communication means that transmits and receives information to and from control section 32,BMU 20, and DC/ACbidirectional inverter 31.System controller 40 executes a process corresponding to a program stored in the storage unit so as to operate the battery system. The operation of the battery system will be described later. -
Distribution switchboard 60 is provided with a plurality of branch electrical paths (not shown) through which electric power is supplied from the electrical grid to the user's load and which has switches corresponding to individual electrical grids and individual branch electrical paths. - The battery system according to this embodiment is provided with
current sensors 70 each of which is located on the electrical path through which electric power is supplied from the electrical grid to the load and on the output electrical path ofPV system 50. Electric power supplied from the electrical grid to the user's load and output electric power ofPV system 50 are measured based on the current values detected bycurrent sensors 70. Electric power supplied from the electrical grid to the user's load is measured by control section 32 ofpower conditioner 30. Output electric power ofPV system 50 is measured bysystem controller 40. However, electric power supplied from the electrical grid to the user's load is measured both on the electrical grid side (node a shown inFIG. 1 ) and the user's load side (node b shown inFIG. 1 ) viewed from the association point ofPV system 50. Thus,power conditioner 30 is provided withswitch 36 that changes over between the connection ofcurrent sensor 70 at node a and control section 32 and the connection ofcurrent sensor 70 at node b and control section 32.System controller 40 operatesswitch 36. -
FIG. 1 shows an example of the structure in which the battery system is used together withPV system 50. However, the battery system according to the present invention can perform the foregoing control even if the battery system is used together with a distributed electric power source that is an in-house electric power generator that uses a wind farm electric power generation system, a fuel battery, or fossil energy. - In this structure,
PV system 50 generates electric power basically depending on weather conditions rather than the total electric power consumption of the user's load and outputs the generated electric power. Thus, if the total electric power consumption becomes low, surplus electric power that is not used for the load is generated byPV system 50. The surplus electric power that is not used for the load is caused to reversely flow to the electrical grid. Alternatively, the surplus electric power is charged tobattery pack 10 through DC/ACbidirectional inverter 31 under the control ofsystem controller 40. -
Battery pack 10 discharges charged electric power in response to a control signal issued by control section 32 and supplies electric power to the user's load through DC/ACbidirectional inverter 31. Presently, in Japan, it is not permitted that electric power discharged frombattery pack 10 is caused to reversely flow to the electrical grid. Thus, if the total electric power consumption of the load is low, the amount of electric power discharged frombattery pack 10 is suppressed. -
Battery pack 10 is charged with the foregoing surplus electric power ofPV system 50 or electric power supplied from the electrical grid. Electric power may be charged to or discharged frombattery pack 10 by the user at his or her convenience. Whenbattery pack 10 is charged with electric power supplied from the electrical grid, nighttime electric power that is inexpensive compared to regular electric power can be used. - The battery system according to this embodiment is provided with two operation modes in which electric power is supplied to the user's load, a PV priority mode (first mode) in which electric power generated by
PV system 50 is prioritized and a charging priority mode (second mode) in which electric power charged tobattery pack 10 is prioritized. - In the PV priority mode, the measured value at node a shown in
FIG. 1 is used as electric power PGRID supplied from the electrical grid to the load. In the charging priority mode, the measured value at node b shown inFIG. 1 is used as electric power PGRID supplied from the electrical grid to the load. - Assuming that the total electric power consumption (load electric power) of the user's load is denoted by PLOAD, the electric power supplied from
battery pack 10 to the electrical grid throughpower conditioner 30 is denoted by PINV, and the electric power supplied fromPV system 50 to the electrical grid is denoted by PPV, in the PV priority mode, the relationship of PLOAD=PGRID+PPV+PINV is obtained. In contrast, in the charging priority mode, the relationship of PLOAD=PGRID+PINV is obtained. In other words, in the PV priority mode, PGRID=PLOAD−(PPV+PINV) is measured. In the charging priority mode, PGRID=PLOAD−PINV is measured. - In the PV priority mode,
system controller 40 causes electric power that is output fromPV system 50 to be supplied preferentially to the load. If electric power generated byPV system 50 does not satisfy electric power supplied to the load (PLOAD−PPV>0),system controller 40 causesbattery pack 10 to discharge electric power throughpower conditioner 30 and supply the electric power to the load. If electric power generated byPV system 50 is equal to or greater than electric power supplied to the load (PLOAD−PPV<0),system controller 40 causes surplus electric power that is not used in the load to reversely flow to the electrical grid or to be charged tobattery pack 10. - In the charging priority mode,
system controller 40 causes electric power that is charged inbattery pack 10 to be supplied preferentially to the load. If electric power discharged frombattery pack 10 does not satisfy electric power supplied to the load (PLOAD−PINV>0),system controller 40 causes electric power generated byPV system 50 to be supplied to the load. If electric power discharged frombattery pack 10 is equal to or greater than electric power supplied to the load or if it is not necessary to supply all electric power generated byPV system 50 to the load,system controller 40 causes surplus electric power that is not used in the load to reversely flow to the electrical grid or to be charged tobattery pack 10. - Moreover, the battery system according to this embodiment is provided with an economy mode (third mode) and a green mode (fourth mode) for the charging priority mode and for the PV priority mode. In the economy mode, economy is prioritized; in the green mode, charging to the battery is prioritized.
- In the economy mode,
system controller 40 causes surplus electric power that is generated byPV system 50 to be sold preferentially to the electric power company. In the green mode,system controller 40 causes surplus electric power that is generated byPV system 50 to be charged preferentially tobattery pack 10. The PV priority mode, the charging priority mode, the economy mode, and the green mode can be set by the user using switches or the like located on the operation panel (not shown) and data that represents the mode that has been set is stored in the storage unit ofsystem controller 40. - Next, with reference to the accompanying drawings, the operation of the battery system shown in
FIG. 1 will be described. -
FIG. 2 is a block diagram showing the structure of principal sections of the battery system shown inFIG. 1 . -
FIG. 3 is a flow chart showing an example of a process in which the battery system shown inFIG. 2 performs in the PV priority mode.FIG. 4 is a flow chart showing an example of a process in which the battery system shown inFIG. 2 performs in the charging priority mode. -
FIG. 2 shows principal sections related to the operations in which the battery system andPV system 50 perform in the PV priority mode and the charging priority mode. In addition, arrows of PGRID, PLOAD, PINV, and PPV shown inFIG. 2 represent the directions in which currents flow in the forward direction. -
FIG. 1 andFIG. 2 show an example of the structure in whichcurrent sensors 70 are located at node a and node b. As described above, the difference between the measured result at node a and the measured result at node b is whether or not the measured result contains PPV. On the other hand,current sensor 70 is located on the output electrical path ofPV system 50 and the value of PPV is measured bysystem controller 40. Thus, even ifcurrent sensor 70 is located either at node a or node b, the battery system according to this embodiment can be controlled. - The processes shown in
FIG. 3 andFIG. 4 are executed bysystem controller 40. Electric power PGRID supplied from the electrical grid to the load is measured by control section 32 of the power conditioner and then transmitted from control section 32 tosystem controller 40. - As shown in
FIG. 3 , when the battery system starts discharging electric power,system controller 40 determines whether the battery system is operating in the PV priority mode or in the charging priority mode (at step S1). Ifsystem controller 40 is operating in the charging priority mode, the flow advances to the process shown inFIG. 4 . - If the battery system is operating in the PV priority mode,
system controller 40 determines whether the battery system is operating in the green mode or in the economy mode (at step S11). - If the battery system is operating in the green mode,
system controller 40 determines whether or not total electric power consumption in the load (load electric power PLOAD) is greater than electric power generated by PV system 50 (PV electric power PPV), namely whether electric power PGRID supplied from the electrical grid to the load is greater than 0 (at step S12). - If PGRID is greater than 0,
system controller 40controls power conditioner 30 so as to discharge electric power frombattery pack 10 corresponding to load electric power PLOAD and to supply supplementary electric power (PLOAD−PPV) to the load (at step S13). - If PGRID is 0 or less,
system controller 40 causes surplus electric power (PPV−PLOAD=−PGRID) that is not used in the load of electric power generated byPV system 50 to be charged to battery pack 10 (at step S14). However, ifbattery pack 10 has been fully charged,system controller 40 causes surplus electric power to reversely flow to the electrical grid so as to sell the surplus electric power to the electric power company or the like. - If the battery system is operating in the economy mode,
system controller 40 determines whether or not total electric power consumption in the load (load electric power PLOAD) is greater than electric power generated by Pv system 50 (PV electric power PPV), namely whether electric power PGRID supplied from the electrical grid to the load is greater than 0 (at step S15). - If PGRID is greater than 0,
system controller 40controls power conditioner 30 so as to discharge electric power frombattery pack 10 corresponding to load electric power PLOAD and to supply supplementary electric power (PLOAD−PPV) to the load (at step S16). - If PGRID is 0 or less,
system controller 40 causesbattery pack 10 to stop discharging electric power (at step S17). In this case,system controller 40 causes surplus electric power (PPV−PLOAD=−PGRID) that is not used in the load of electric power generated byPV system 50 to reversely flow to the electrical grid and causes the surplus electric power to be sold to the electric power company or the like. - If the battery system is operating in the charging priority mode as shown in
FIG. 4 ,system controller 40 determines whether or not the battery system is operating in the green mode or in the economy mode (at step S21). - If the battery system is operating in the green mode,
system controller 40 determines whether or not total electric power consumption in the load (load electric power PLOAD) is greater than electric power generated by PV system 50 (PV electric power PPV), namely whether electric power PGRID supplied from the electrical grid to the load is greater than PPV (at step S22). - If PGRID is greater than PPV,
system controller 40controls power conditioner 30 so as to discharge electric power frombattery pack 10 corresponding to load electric power PLOAD and to supply supplementary electric power (PLOAD−PPV) to the load. - If PGRID is equal to or less than PPV or less,
system controller 40 causes surplus electric power (PPV−PLOAD=PPV−PGRID) that is not used in the load of electric power generated inPV system 50 to be charged to battery pack 10 (at step S24). However, ifbattery pack 10 has been fully charged,system controller 40 causes the surplus electric power to reversely flow to the electrical grid and the electric power to be sold to the electric power company or the like. - If the battery system is operating in the economy mode,
system controller 40 determines whether or not the total electric power consumption in the load (load electric power PLOAD) is greater than the electric power generated by PV system 50 (PV electric power PPV), namely electric power PGRID supplied from the electrical grid to the load is greater than PPV (at step S25). - If PGRID is greater than PPV,
system controller 40controls power conditioner 30 so as to discharge electric power frombattery pack 10 corresponding to load electric power PLOAD and supply supplementary electric power (PLOAD−PPV) to the load (at step S26). - If PGRID is equal to or less than PPV,
system controller 40 causesbattery pack 10 to stop discharging electric power (at step S27). In this case,system controller 40 causes surplus electric power that is not used in the load (PPV−PLOAD=PPV−PGRID) of electric power generated inPV system 50 to reversely flow to the electrical grid and the electric power to be sold to the electric power company or the like. - According to this embodiment,
battery pack 10 andpower conditioner 30 that controlsbattery pack 10 to charge or discharge electric power can be operated in association with the electrical grid and independent from a distributed power source such asPV system 50. Even if a distributed electric power source has been implemented, the battery system can be operated in association with the electrical grid. - Moreover, in the battery system according to this embodiment, if the battery pack is charged with nighttime electric power that is relatively inexpensive and if the battery system is operated during the daytime either in the charging priority mode or the PV priority mode, since electric power supplied from the electrical grid during the daytime is prevented, electric rates can be reduced. At this point, if the battery system is operated in the charging priority mode, since surplus electric power that occurs in the PV system becomes relatively large, the amount of electric power that is sold increases. If the battery system is operated in the PV priority mode, electric power generated by the PV system can mostly satisfy electric power for the user's load. Thus, a battery system can be accomplished with high economic benefits.
- Whether a higher economic benefit can be obtained in the charging priority mode or the PV priority mode in which the battery system operates depends on, for example, the amount of electric power used by the user, his or her electric power use pattern, and weather conditions (sunlight hours, wind force, and so forth) of the region where he or she lives. In addition, some users may prioritize the use of electric power that is generated from natural energy (green electric power), rather than high economic benefits.
- The battery system according to this embodiment can switch between the foregoing charging priority mode and the PV priority mode. In addition, the battery system can switch between the economy mode and the green mode. Thus, the user can optimally select an operation mode in which the battery system operates based upon the preference of the user (i.e. green or economy mode) and so forth.
- Thus, the battery system can be operated in association with the electrical grid, but independent from a distributed electric power source. As a result, a battery system that can be operated in a mode that satisfies the preference of each user can be realized.
- With reference to the embodiments, the present invention has been described. However, it should be understood by those skilled in the art that the structure and details of the present invention may be changed in various manners without departing from the scope of the present invention.
Claims (36)
1. A battery system comprising:
a battery configured to charge using electric power supplied from an electrical grid and electric power generated by a photo voltaic generation device, and supply electric power to a load; and
a controller configured to control a supply of electric power generated by said photo voltaic generation device to said load, and configured to control a mode in which surplus electric power generated by said photo voltaic generation device is sold and a mode in which surplus electric power generated by said photo voltaic generation device is supplied to said battery.
2. The battery system according to claim 1 , wherein
said controller is further configured to, if the supply of electric power generated by said photo voltaic generation device to said load is insufficient, control the supply of electric power stored in said battery to said load.
3. The battery system according to claim 2 , wherein
the supply of electric power generated by said photo voltaic generation device to said load has a higher priority that the supply of electric power stored in said battery to said load.
4. The battery system according to claim 1 , wherein
said controller is further configured to control a supply of electric power stored in said battery to said load, and
the supply of electric power stored in said battery to said load has a higher priority than the supply of electric power generated by said photo voltaic generation device to said load.
5. The battery system according to claim 1 , wherein
said surplus electric power is equal to a difference between an amount of electric power generated by said photo voltaic generation device and a total amount of electric power consumed by said load.
6. The battery system according to claim 3 , wherein
the supply of electric power stored in said battery to said load is greater than zero nearer to a side of said electrical grid than an association point where said photo voltaic generation device associates with said electrical grid.
7. The battery system according to claim 4 , wherein
the supply of electric power stored in said battery to said load is greater than zero nearer to a side of said electrical grid than an association point where said photo voltaic generation device associates with said electrical grid.
8. The battery system according to claim 7 , wherein
said controller is further configured to use a measurement result, as electric power that is supplied to said load, on said side of said electrical grid rather than the association point that said photo voltaic generation device associates with said electrical grid.
9. The battery system according to claim 8 , wherein
said controller is further configured to use a measurement result, as electric power that is supplied to said load, on said load side rather than the association point that said photo voltaic generation device associates with said electrical grid.
10. A battery system comprising:
a battery configured to charge using electric power supplied from an electrical grid and electric power generated by a distributed electric power source, and supply electric power to a load; and
a controller configured to control a supply of electric power generated by said distributed electric power source to said load, and configured to control a mode in which surplus electric power generated by said photo voltaic generation device is sold and a mode in which surplus electric power generated by said photo voltaic generation device is supplied to said battery.
11. A battery system comprising:
a battery configured to charge using electric power supplied from an electrical grid and electric power that is generated by a photo voltaic generation device, and supply electric power to a load; and
a controller configured to control a supply of electric power generated by said photo voltaic generation device to said load, and control a supply of electric power stored in said battery to said load, wherein
the supply of electric power generated by said photo voltaic generation device to said load has higher priority than the supply of electric power stored in said battery to said load.
12. A battery system comprising:
a battery configured to charge using electric power supplied from an electrical grid and electric power that is generated by a photo voltaic generation device, and supply electric power to a load; and
a controller configured to control a supply of electric power generated by said photo voltaic generation device to said load, and control a supply of electric power stored in said battery to said load, wherein
the supply of electric power stored in said battery to said load has higher priority than the supply of electric power generated by said photo voltaic generation device to said load.
13. A battery system comprising:
a battery configured to charge using electric power supplied from an electrical grid and electric power that is generated by a photo voltaic generation device, and supply electric power to a load; and
a controller configured to control a supply of electric power generated by said photo voltaic generation device to said load, and control a supply of electric power stored in said battery to said load, wherein
one of the supply of electric power generated by said photo voltaic generation device to said load has higher priority than the supply of electric power stored in said battery to said load and the supply of electric power stored in said battery to said load has higher priority than the supply of electric power generated by said photo voltaic generation device to said load.
14. The battery system according to claim 12 , wherein
the controller is further configured to control a mode in which surplus electric power generated by said photo voltaic generation device is sold and a mode in which surplus electric power generated by said photo voltaic generation device is supplied to said battery.
15. The battery system according to claim 13 , wherein
the controller is further configured to control a mode in which surplus electric power generated by said photo voltaic generation device is sold and a mode in which surplus electric power generated by said photo voltaic generation device is supplied to said battery.
16. The battery system according to claim 14 , wherein
the controller is further configured to control a mode in which surplus electric power generated by said photo voltaic generation device is sold and a mode in which surplus electric power generated by said photo voltaic generation device is supplied to said battery.
17. A battery system comprising:
a battery is configured to charge using electric power supplied from an electrical grid and electric power that is generated by a distributed electric power source, and supply electric power to a load; and
a controller configured to control a supply of electric power generated by said distributed electric power source to said load, and if the supply of electric power generated by said distributed electric power source to said load is insufficient to satisfy the total electric power requirement of said load, control a supply of electric power stored in said battery to said load.
18. A battery system comprising:
a battery configured to charge using electric power supplied from an electrical grid and electric power that is generated by a distributed electric power source, and supply electric power to a load; and
a controller configured to control the supply of electric power stored in said battery to said load, and if the supply of electric power stored in said battery to said load is insufficient to satisfy the total electric power requirement of said load, control the supply of electric power generated by said distributed electric power source to said load.
19. A battery system comprising:
a battery configured to charge using electric power supplied from an electrical grid and electric power that is generated by a distributed electric power source, and supply electric power to a load; and
a controller configured to one of, control a supply of electric power generated by said distributed electric power source to said load, and if the supply of electric power generated by said distributed electric power source to said load is insufficient to satisfy the total electric power requirement of said load, control a supply of electric power stored in said battery to said load, and control the supply of electric power stored in said battery to said load, and if the supply of electric power stored in said battery to said load is insufficient to satisfy the total electric power requirement of said load, control the supply of electric power generated by said distributed electric power source to said load.
20. The battery system according to claim 18 , wherein
said controller is further configured to one of reversely direct surplus electric power generated by said distributed electric power source to the electrical grid, and control a supply of surplus electric power generated by said distributed electric power source to charge said battery.
21. The battery system according to claim 19 , wherein
said controller is further configured to one of reversely direct surplus electric power generated by said distributed electric power source to the electrical grid, and control a supply of surplus electric power generated by said distributed electric power source to charge said battery.
22. The battery system according to claim 20 , wherein
said controller is further configured to one of reversely direct surplus electric power generated by said distributed electric power source to the electrical grid, and control a supply of surplus electric power generated by said distributed electric power source to charge said battery.
23. A battery control device configured to supply electric power that is generated by a photo voltaic generation device to a load, and configured to supply surplus electric power generated by said photo voltaic generation device to charge a battery system, the battery system comprising
a battery configured to charge using electric power supplied from an electrical grid and electric power that is generated by said photo voltaic generation device, and supply electric power to a load, and
a controller configured to control a supply of electric power generated by said photo voltaic generation device to said load, and configured to control a mode in which surplus electric power generated by said photo voltaic generation device is sold and a mode in which surplus electric power generated by said photo voltaic generation device is supplied to said battery.
24. The battery control device according to claim 23 , wherein
said battery control device is further configured to supply electric power stored in said battery to a load, and
the supply of electric power generated by said photo voltaic generation device to said load has a higher priority that the supply of electric power stored in said battery to said load.
25. The battery control device according to claim 24 , wherein
said battery control device is further configured to supply electric power stored in said battery to said load, and
the supply of electric power stored in said battery to said load has a higher priority than the supply of electric power generated by said photo voltaic generation device to said load.
26. A battery control device configured to supply one of electric power generated by a photo voltaic generation device to a load with a higher priority than electric power stored in a battery system, and supply electric power stored in said battery system to said load with a higher priority than electric power generated by said photo voltaic generation device, said battery system comprising
a battery configured to charge using electric power supplied from an electrical grid and electric power that is generated by said photo voltaic generation device, and supply electric power to a load.
27. The battery control device according to claim 26 , wherein
said battery control device is further configured to control a mode in which surplus electric power generated by said photo voltaic generation device is sold and a mode in which surplus electric power generated by said photo voltaic generation device is supplied to said battery.
28. A control method for a battery system, comprising:
charging a battery using electric power supplied from an electrical grid and electric power that is generated by a photo voltaic generation device;
supplying electric power to a load from said photo voltaic generation device with a higher priority; and
supplying electric power to a load from said battery with a lower priority as compared to the supply of electric power to a load from said photo voltaic generation device.
29. A control method for a battery system, comprising:
charging a battery using electric power supplied from an electrical grid and electric power that is generated by a photo voltaic generation device;
supplying electric power to a load from said battery with a higher priority; and
supplying electric power to a load from said photo voltaic generation device with a lower priority as compared to the supply of electric power to a load from said battery.
30. A control method for a battery system, comprising:
charging a battery using electric power supplied from an electrical grid and electric power that is generated by a photo voltaic generation device;
supplying electric power to a load from said battery; and
supplying electric power to a load from said photo voltaic generation device; wherein
one of the supply of electric power generated by said photo voltaic generation device to said load has higher priority than the supply of electric power stored in said battery to said load and the supply of electric power stored in said battery to said load has higher priority than the supply of electric power generated by said photo voltaic generation device to said load.
31. The control method for a battery system according to claim 29 , further comprising:
operating in a mode in which surplus electric power generated by said photo voltaic generation device is sold, and
operating in a mode in which surplus electric power generated by said photo voltaic generation device is supplied to said battery.
32. The control method for a battery system according to claim 30 , further comprising:
operating in a mode in which surplus electric power generated by said photo voltaic generation device is sold, and
operating in a mode in which surplus electric power generated by said photo voltaic generation device is supplied to said battery.
33. The control method for a battery system according to claim 31 , further comprising:
operating in a mode in which surplus electric power generated by said photo voltaic generation device is sold, and
operating in a mode in which surplus electric power generated by said photo voltaic generation device is supplied to said battery.
34. A control method for a battery system, comprising:
charging a battery using electric power supplied from an electrical grid and electric power that is generated by a pre-designated distributed electric power source;
supplying electric power to a load from said pre-designated distributed electric power source; and
supplying, if electric power supplied to said load from said pre-designated distributed electric power source is insufficient to satisfy the total electric power requirement of said load, electric power stored in said battery to said load.
35. A control method for a battery system, comprising:
charging a battery using electric power supplied from an electrical grid and electric power that is generated by a pre-designated distributed electric power source;
supplying electric power to a load from said battery; and
supplying, if electric power supplied to said load from said battery is insufficient to satisfy the total electric power requirement of said load, electric power that is generated by said pre-designated distributed electric power source to said load.
36. The control method for a battery system according to claim 35 , further comprising:
operating in a mode in which surplus electric power generated by said photo voltaic generation device is sold, and
operating in a mode in which surplus electric power generated by said photo voltaic generation device is supplied to said battery.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/330,107 US20140319914A1 (en) | 2011-07-15 | 2014-07-14 | Battery system and its control method |
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2011156561 | 2011-07-15 | ||
JP2011-156561 | 2011-07-15 | ||
PCT/JP2012/064462 WO2013011758A1 (en) | 2011-07-15 | 2012-06-05 | Storage battery system and method for controlling same |
US201313818039A | 2013-02-20 | 2013-02-20 | |
US14/330,107 US20140319914A1 (en) | 2011-07-15 | 2014-07-14 | Battery system and its control method |
Related Parent Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/818,039 Division US8810202B2 (en) | 2011-07-15 | 2012-06-05 | Battery system and its control method |
PCT/JP2012/064462 Division WO2013011758A1 (en) | 2011-07-15 | 2012-06-05 | Storage battery system and method for controlling same |
Publications (1)
Publication Number | Publication Date |
---|---|
US20140319914A1 true US20140319914A1 (en) | 2014-10-30 |
Family
ID=47557945
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/818,039 Active US8810202B2 (en) | 2011-07-15 | 2012-06-05 | Battery system and its control method |
US14/330,107 Abandoned US20140319914A1 (en) | 2011-07-15 | 2014-07-14 | Battery system and its control method |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/818,039 Active US8810202B2 (en) | 2011-07-15 | 2012-06-05 | Battery system and its control method |
Country Status (6)
Country | Link |
---|---|
US (2) | US8810202B2 (en) |
EP (2) | EP2605359B1 (en) |
JP (3) | JP5327407B2 (en) |
CN (1) | CN103168404A (en) |
BR (1) | BR112013006740A2 (en) |
WO (1) | WO2013011758A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150229138A1 (en) * | 2012-08-06 | 2015-08-13 | Kyocera Corporation | Management system, management method, control apparatus, and power storage apparatus |
US20150244209A1 (en) * | 2014-02-26 | 2015-08-27 | Sanken Electric Co., Ltd. | Islanded operating system |
US10122208B2 (en) | 2016-05-20 | 2018-11-06 | Kabushiki Kaisha Toshiba | Power device |
EP3413431A4 (en) * | 2016-02-03 | 2019-09-25 | Gree Electric Appliances, Inc. of Zhuhai | Photovoltaic energy storage air conditioner, and control method |
Families Citing this family (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140091622A1 (en) * | 2011-04-15 | 2014-04-03 | Deka Products Limited Partnership | Modular Power Conversion System |
DE102011055225A1 (en) * | 2011-11-10 | 2013-05-16 | Evonik Degussa Gmbh | Method of providing control power |
DE102012212654A1 (en) * | 2012-07-19 | 2014-01-23 | Robert Bosch Gmbh | Energy storage for Photovoltaikanalage, energy storage power plant, control device and method for operating an energy storage |
WO2014068874A1 (en) * | 2012-10-31 | 2014-05-08 | パナソニック株式会社 | Power distribution panel and storage cell pack |
JP6157880B2 (en) * | 2013-03-04 | 2017-07-05 | 株式会社東芝 | Secondary battery system having a plurality of batteries and charge / discharge power distribution method |
GB2514092B (en) * | 2013-03-21 | 2017-11-29 | Powervault Ltd | Electrical energy storage device and system |
US10620652B2 (en) * | 2013-05-30 | 2020-04-14 | Toshiba Mitsubishi-Electric Industrial Systems Corporation | Power management device |
CN103401276B (en) * | 2013-06-24 | 2015-07-29 | 宁海县清华电器有限公司 | The micro-power station device of a kind of distributed intelligence |
DE102014003054B4 (en) * | 2013-07-09 | 2022-03-17 | Sew-Eurodrive Gmbh & Co Kg | System power control method and system power control apparatus |
US20150066228A1 (en) | 2013-07-26 | 2015-03-05 | Peaknrg | Building Management and Appliance Control System |
JP6280731B2 (en) * | 2013-11-19 | 2018-02-14 | 大和ハウス工業株式会社 | Power supply system |
KR101516802B1 (en) * | 2014-05-16 | 2015-05-04 | 케이씨코트렐 주식회사 | A Distribution panel for a stand-alone micro-grid |
US20160204610A1 (en) * | 2014-07-04 | 2016-07-14 | Stefan Matan | Intelligent battery backup at a distributed grid node |
US11063431B2 (en) | 2014-07-04 | 2021-07-13 | Apparent Labs Llc | Hierarchical and distributed power grid control |
US10879695B2 (en) | 2014-07-04 | 2020-12-29 | Apparent Labs, LLC | Grid network gateway aggregation |
GB201416414D0 (en) * | 2014-09-17 | 2014-10-29 | Stanton Marc R And Hough Michael | Clean power manager |
JP6365275B2 (en) | 2014-12-04 | 2018-08-01 | オムロン株式会社 | Storage battery control device, power storage system, and storage battery charging method |
JP6030158B2 (en) * | 2015-01-26 | 2016-11-24 | 株式会社東芝 | Power supply system and control method thereof |
US20160299179A1 (en) * | 2015-04-13 | 2016-10-13 | Mediatek Inc. | Scheme capable of estimating available power range according to extra power range and employing available power range as reference of performing power throttling upon a system |
US9793755B2 (en) | 2015-07-28 | 2017-10-17 | Garrity Power Services Llc | Uninterruptible power supply and method for managing power flow in a grid-tied photovoltaic system |
US20160036232A1 (en) * | 2015-10-09 | 2016-02-04 | LT Lighting (Taiwan) Corp. | Maximum energy utilization point tracking technologies |
US10177575B2 (en) * | 2015-10-09 | 2019-01-08 | LT Lighting (Taiwan) Corp. | Maximum energy utilization point tracking technologies |
WO2018031595A1 (en) | 2016-08-08 | 2018-02-15 | Orison, Inc. | Plug and play with smart energy storage units |
JP6673784B2 (en) * | 2016-08-30 | 2020-03-25 | 京セラ株式会社 | Power management device |
JP2017076611A (en) * | 2016-09-30 | 2017-04-20 | 株式会社東芝 | Power supply system and method for controlling the same |
WO2018221347A1 (en) * | 2017-05-29 | 2018-12-06 | 住友電気工業株式会社 | Storage battery system and power display device |
EP3701614A4 (en) * | 2017-10-27 | 2021-04-14 | LT Lighting (Taiwan) Corporation | Photovoltaic power station |
KR20190089289A (en) * | 2018-01-22 | 2019-07-31 | 엘에스산전 주식회사 | System for stabilizing voltage of electric power system |
US11121561B2 (en) * | 2018-08-14 | 2021-09-14 | Comptek Technologies, Llc | Utility pole battery storage system |
JP2020202735A (en) * | 2019-06-13 | 2020-12-17 | 未来工業株式会社 | Power storage battery utilization system |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030047209A1 (en) * | 2001-08-31 | 2003-03-13 | Sanyo Electric Co., Ltd. | Photovoltaic power generation system with storage batteries |
US6570270B2 (en) * | 2001-04-13 | 2003-05-27 | Sharp Kabushiki Kaisha | Power conditioner for solar power generation system |
US20030182023A1 (en) * | 1998-05-21 | 2003-09-25 | The Research Foundation Of State University Of New York | Load controller and method to enhance effective capacity of a photovoltaic power supply using a dynamically determined expected peak loading |
US20040070280A1 (en) * | 2002-10-11 | 2004-04-15 | Sharp Kabushiki Kaisha | Output suppressing method of a plurality of dispersed power sources and dispersed power source managing system |
US20040246085A1 (en) * | 2003-06-06 | 2004-12-09 | Mr. RICK WEST | Device and method for eliminating transformer excitation losses |
US7102251B2 (en) * | 2003-08-22 | 2006-09-05 | Distributed Power, Inc. | Bi-directional multi-port inverter with high frequency link transformer |
US20080167756A1 (en) * | 2007-01-03 | 2008-07-10 | Gridpoint, Inc. | Utility console for controlling energy resources |
US20090076661A1 (en) * | 2007-07-25 | 2009-03-19 | Ken Pearson | Apparatus, system, and method to manage the generation and use of hybrid electric power |
US20090152947A1 (en) * | 2007-12-17 | 2009-06-18 | Shay-Ping Thomas Wang | Single chip solution for solar-based systems |
US20100231045A1 (en) * | 2009-02-13 | 2010-09-16 | First Solar, Inc. | Photovoltaic Power Plant Output |
US7800247B2 (en) * | 2008-05-30 | 2010-09-21 | Chun-Chieh Chang | Storage system that maximizes the utilization of renewable energy |
US20110068624A1 (en) * | 2009-09-22 | 2011-03-24 | Noribachi Llc | Solar powered system with grid backup |
US20110115292A1 (en) * | 2009-11-16 | 2011-05-19 | Tetsuya Yoneda | Power operation system, power operation method and photovoltaic power generator |
US20110232714A1 (en) * | 2010-03-23 | 2011-09-29 | Vijay Bhavaraju | Power conversion system and method providing maximum efficiency of power conversion for a photovoltaic system, and photovoltaic system employing a photovoltaic array and an energy storage device |
Family Cites Families (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6450723A (en) | 1987-08-20 | 1989-02-27 | Mitsubishi Electric Corp | Solar power generator |
JPH11178237A (en) * | 1997-12-10 | 1999-07-02 | Nissan Motor Co Ltd | Household power supply system |
JP2002369406A (en) * | 2001-06-08 | 2002-12-20 | Hitachi Ltd | System-interconnected power system |
JP2004180467A (en) * | 2002-11-29 | 2004-06-24 | Hitachi Home & Life Solutions Inc | Systematically interconnecting power supply system |
US6949843B2 (en) | 2003-07-11 | 2005-09-27 | Morningstar, Inc. | Grid-connected power systems having back-up power sources and methods of providing back-up power in grid-connected power systems |
JP2005151662A (en) * | 2003-11-13 | 2005-06-09 | Sharp Corp | Inverter device and distributed power supply system |
JP4253598B2 (en) * | 2004-02-20 | 2009-04-15 | 株式会社明電舎 | Solar power generation system with power storage function |
JP4468881B2 (en) * | 2005-10-28 | 2010-05-26 | 株式会社正興電機製作所 | Power storage system, route generation device, and route generation method |
JP4619298B2 (en) * | 2006-02-02 | 2011-01-26 | シャープ株式会社 | Power converter |
JP5072378B2 (en) * | 2007-01-25 | 2012-11-14 | 中国電力株式会社 | Power storage device and system |
JP4856692B2 (en) * | 2008-11-28 | 2012-01-18 | 株式会社正興電機製作所 | Power supply system and power switching device |
JP2011003449A (en) | 2009-06-19 | 2011-01-06 | Tokai Koshi:Kk | Power generation system |
JP2011050131A (en) * | 2009-08-25 | 2011-03-10 | Hot Plan:Kk | Residential power supply system, and power supply controller therefor |
DE102009040090A1 (en) | 2009-09-04 | 2011-03-10 | Voltwerk Electronics Gmbh | Island unit for a power grid with a control unit for controlling an energy flow between the power generation unit, the energy storage unit, the load unit and / or the power grid |
JP2011091985A (en) | 2009-10-26 | 2011-05-06 | Panasonic Electric Works Co Ltd | Dc power feeding apparatus and dc power feeding system |
KR101093956B1 (en) * | 2009-12-04 | 2011-12-15 | 삼성에스디아이 주식회사 | Energy Storage System |
JP2011135651A (en) * | 2009-12-22 | 2011-07-07 | Panasonic Electric Works Co Ltd | Power supply system |
JP5539750B2 (en) * | 2010-02-17 | 2014-07-02 | トヨタホーム株式会社 | Residential power system |
US8509976B2 (en) * | 2010-02-18 | 2013-08-13 | University Of Delaware | Electric vehicle equipment for grid-integrated vehicles |
JP5782233B2 (en) * | 2010-06-14 | 2015-09-24 | 大和ハウス工業株式会社 | Energy management system and energy management method |
JP5613538B2 (en) * | 2010-11-19 | 2014-10-22 | トヨタホーム株式会社 | Apartment house and power supply system for apartment house |
JP2012249476A (en) * | 2011-05-30 | 2012-12-13 | Panasonic Corp | Power supply system |
-
2012
- 2012-06-05 JP JP2013506968A patent/JP5327407B2/en active Active
- 2012-06-05 BR BR112013006740A patent/BR112013006740A2/en not_active IP Right Cessation
- 2012-06-05 US US13/818,039 patent/US8810202B2/en active Active
- 2012-06-05 WO PCT/JP2012/064462 patent/WO2013011758A1/en active Application Filing
- 2012-06-05 EP EP12814869.9A patent/EP2605359B1/en active Active
- 2012-06-05 CN CN2012800034897A patent/CN103168404A/en active Pending
- 2012-06-05 EP EP16194566.2A patent/EP3151331A1/en not_active Withdrawn
-
2013
- 2013-06-03 JP JP2013116926A patent/JP6156919B2/en active Active
-
2014
- 2014-07-14 US US14/330,107 patent/US20140319914A1/en not_active Abandoned
-
2015
- 2015-05-07 JP JP2015094915A patent/JP2015159726A/en active Pending
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030182023A1 (en) * | 1998-05-21 | 2003-09-25 | The Research Foundation Of State University Of New York | Load controller and method to enhance effective capacity of a photovoltaic power supply using a dynamically determined expected peak loading |
US6570270B2 (en) * | 2001-04-13 | 2003-05-27 | Sharp Kabushiki Kaisha | Power conditioner for solar power generation system |
US20030047209A1 (en) * | 2001-08-31 | 2003-03-13 | Sanyo Electric Co., Ltd. | Photovoltaic power generation system with storage batteries |
US20040070280A1 (en) * | 2002-10-11 | 2004-04-15 | Sharp Kabushiki Kaisha | Output suppressing method of a plurality of dispersed power sources and dispersed power source managing system |
US20040246085A1 (en) * | 2003-06-06 | 2004-12-09 | Mr. RICK WEST | Device and method for eliminating transformer excitation losses |
US7102251B2 (en) * | 2003-08-22 | 2006-09-05 | Distributed Power, Inc. | Bi-directional multi-port inverter with high frequency link transformer |
US20080167756A1 (en) * | 2007-01-03 | 2008-07-10 | Gridpoint, Inc. | Utility console for controlling energy resources |
US20090076661A1 (en) * | 2007-07-25 | 2009-03-19 | Ken Pearson | Apparatus, system, and method to manage the generation and use of hybrid electric power |
US20090152947A1 (en) * | 2007-12-17 | 2009-06-18 | Shay-Ping Thomas Wang | Single chip solution for solar-based systems |
US7800247B2 (en) * | 2008-05-30 | 2010-09-21 | Chun-Chieh Chang | Storage system that maximizes the utilization of renewable energy |
US20100231045A1 (en) * | 2009-02-13 | 2010-09-16 | First Solar, Inc. | Photovoltaic Power Plant Output |
US20110068624A1 (en) * | 2009-09-22 | 2011-03-24 | Noribachi Llc | Solar powered system with grid backup |
US20110115292A1 (en) * | 2009-11-16 | 2011-05-19 | Tetsuya Yoneda | Power operation system, power operation method and photovoltaic power generator |
US20110232714A1 (en) * | 2010-03-23 | 2011-09-29 | Vijay Bhavaraju | Power conversion system and method providing maximum efficiency of power conversion for a photovoltaic system, and photovoltaic system employing a photovoltaic array and an energy storage device |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150229138A1 (en) * | 2012-08-06 | 2015-08-13 | Kyocera Corporation | Management system, management method, control apparatus, and power storage apparatus |
US10541540B2 (en) * | 2012-08-06 | 2020-01-21 | Kyocera Corporation | Management system, management method, control apparatus, and power storage apparatus |
US20150244209A1 (en) * | 2014-02-26 | 2015-08-27 | Sanken Electric Co., Ltd. | Islanded operating system |
US9899871B2 (en) * | 2014-02-26 | 2018-02-20 | Sanken Electric Co., Ltd. | Islanded operating system |
EP3413431A4 (en) * | 2016-02-03 | 2019-09-25 | Gree Electric Appliances, Inc. of Zhuhai | Photovoltaic energy storage air conditioner, and control method |
US10122208B2 (en) | 2016-05-20 | 2018-11-06 | Kabushiki Kaisha Toshiba | Power device |
Also Published As
Publication number | Publication date |
---|---|
US8810202B2 (en) | 2014-08-19 |
WO2013011758A1 (en) | 2013-01-24 |
JPWO2013011758A1 (en) | 2015-02-23 |
BR112013006740A2 (en) | 2019-09-24 |
JP2013179836A (en) | 2013-09-09 |
EP2605359A1 (en) | 2013-06-19 |
CN103168404A (en) | 2013-06-19 |
JP2015159726A (en) | 2015-09-03 |
EP3151331A1 (en) | 2017-04-05 |
US20130154570A1 (en) | 2013-06-20 |
EP2605359B1 (en) | 2016-12-28 |
JP5327407B2 (en) | 2013-10-30 |
JP6156919B2 (en) | 2017-07-05 |
EP2605359A4 (en) | 2014-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8810202B2 (en) | Battery system and its control method | |
KR101074785B1 (en) | A battery management system and control method thereof, and energy storage system including the battery management system | |
US8941263B2 (en) | Energy storage system and method of controlling the same | |
US8810066B2 (en) | Power storage system and method of controlling the same | |
KR101243909B1 (en) | System for energy storage and control method thereof | |
KR101156533B1 (en) | Energy storage system and method for controlling thereof | |
KR101084216B1 (en) | Energy storage system and method for controlling thereof | |
US8837182B2 (en) | Apparatus and method for tracking maximum power point and method of operating grid-tied power storage system using the same | |
US20130187466A1 (en) | Power management system | |
US20130169064A1 (en) | Energy storage system and controlling method of the same | |
US20120094151A1 (en) | Battery management system and method thereof, and power storage apparatus using the same | |
US9269989B2 (en) | Electric power supply system | |
JP2015195674A (en) | Power storage battery assembly control system | |
US8957545B2 (en) | Prioritization circuit and electric power supply system | |
CN102545291A (en) | Solar power storage system and solar power supply system | |
JP2015192566A (en) | Power system and dc power transmission method | |
JP2003289629A (en) | Voltage equalizer in capacitor and power storage system equipped with the device | |
KR20150005040A (en) | Apparatus and method for energy storage system controlling operating mode | |
KR101215396B1 (en) | Hybrid smart grid uninterruptible power supply using discharge current control | |
KR102463396B1 (en) | Energy storage system | |
JP3530519B2 (en) | Voltage equalizing device for power storage device and power storage system provided with the device | |
KR101523941B1 (en) | Energy storage system | |
KR20140058770A (en) | Method and system for operation mode decision of power management system | |
KR20230073820A (en) | Solar battery driving system and driving method using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |