US20050211469A1 - Elongated coil assembly for electromagnetic borehole surveying - Google Patents
Elongated coil assembly for electromagnetic borehole surveying Download PDFInfo
- Publication number
- US20050211469A1 US20050211469A1 US10/918,698 US91869804A US2005211469A1 US 20050211469 A1 US20050211469 A1 US 20050211469A1 US 91869804 A US91869804 A US 91869804A US 2005211469 A1 US2005211469 A1 US 2005211469A1
- Authority
- US
- United States
- Prior art keywords
- borehole
- coil
- core
- drilling
- magnetic field
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005553 drilling Methods 0.000 claims abstract description 51
- 238000000034 method Methods 0.000 claims abstract description 33
- 230000005484 gravity Effects 0.000 claims abstract description 16
- 239000013598 vector Substances 0.000 claims description 46
- 230000005291 magnetic effect Effects 0.000 claims description 28
- 238000004804 winding Methods 0.000 claims description 9
- 230000005284 excitation Effects 0.000 claims 1
- 238000005259 measurement Methods 0.000 abstract description 25
- 230000005672 electromagnetic field Effects 0.000 abstract description 16
- 238000004458 analytical method Methods 0.000 abstract description 4
- 229910000831 Steel Inorganic materials 0.000 description 4
- 230000006870 function Effects 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 239000004020 conductor Substances 0.000 description 3
- 239000011159 matrix material Substances 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000010354 integration Effects 0.000 description 2
- 229920003023 plastic Polymers 0.000 description 2
- 229920000122 acrylonitrile butadiene styrene Polymers 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012067 mathematical method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 239000003507 refrigerant Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000002441 reversible effect Effects 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 230000035945 sensitivity Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 238000010561 standard procedure Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/024—Determining slope or direction of devices in the borehole
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
- E21B47/0228—Determining slope or direction of the borehole, e.g. using geomagnetism using electromagnetic energy or detectors therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/003—Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/04—Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
Definitions
- the present invention relates to a method and apparatus for drilling generally horizontal boreholes, and more particularly to a guidance system for drilling such boreholes to a close tolerance along a specified path.
- the boreholes may be, for example, 150 mm in diameter, with about 40 boreholes positioned around the circumference of the tunnel to form a circle of boreholes about 20 meters in diameter.
- the holes are drilled into the region, such as a hill or mountain, in which the tunnel is to be excavated, and each hole is cased with steel pipe.
- Refrigerant is then pumped through the casings for an extended period, for example, one month, to freeze the soil. Thereafter, the earth inside the circle formed by the boreholes is excavated using conventional techniques to produce a tunnel in which frozen earth temporarily holds the tunnel excavation open until a permanent supporting structure of concrete or steel is put into place.
- a major problem with the forgoing technique is the need to drill a large number of boreholes around the circumference of a tunnel while keeping the boreholes accurately spaced and parallel to each other so as to properly define the tunnel along its entire length and with the spacing between adjacent boreholes being substantially constant to ensure that the freezing process will produce a continuous shell around the location where the tunnel is to be excavated.
- Another approach for achieving the required parallel drilling has been to drill a sacrificial borehole, for example, in the center of a desired tunnel, using, for example, gyroscopic methods for surveying. A single current-carrying wire is then deployed into this borehole and is connected electrically to a ground at its far end.
- This method can work well, though it may suffer from difficulties in making the required ground connection, for the method depends upon a uniform flow of return current in the ground. Often it is not possible to achieve a uniform flow, and any uncertainty in the return current flow means that highly accurate boreholes cannot be guaranteed.
- the present invention is directed to a method and apparatus for drilling boreholes along predetermined paths, and particularly for boring multiple generally horizontal boreholes along linear or curved predetermined paths with a high degree of accuracy. More particularly, the invention is directed to a guidance system for drilling one or more linear or curved boreholes along predetermined paths at locations spaced from a reference guide path, and, when multiple parallel boreholes are drilled, will be parallel to each other within a tolerance of plus or minus a third of a meter over an indefinite length. In accordance with a preferred form of the present invention, one or more boreholes are drilled from known starting points along desired paths with a high degree of accuracy through the use of an elongated electromagnetic field source coil deployed in a reference borehole.
- the system includes a source coil assembly that is fabricated by winding a wire longitudinally around a tubular carrier so the coil windings extend along diametrically opposite sides of the carrier. The assembly is then deployed in the reference borehole.
- the roll angle of the coil in the reference well is determined by making inclinometer measurements inside the tubular carrier or, if the carrier is short enough, by noting its roll angle where it enters the reference borehole.
- the measurements and data generated by the method and apparatus of the invention provides a system for drilling one or more generally horizontal boreholes in closely spaced relationship to a predetermined path.
- FIG. 1 is an end view of a tunnel site, illustrating a central guide borehole and a multiplicity of surrounding boreholes defining the circumference of the tunnel;
- FIG. 2 is a diagrammatic illustration of a tubular carrier on which conductors are wound to form an elongated coil
- FIG. 3 is a diagrammatic perspective view showing the construction of an elongated coil and carrier assembly
- FIG. 4 is a side elevation of the coil assembly of FIG. 3 ;
- FIG. 5 is an end view of the coil assembly of FIG. 3 ;
- FIG. 6 is a diagrammatic cut-away side elevation view of a guide borehole and a parallel borehole being drilled using the elongated coil assembly of FIG. 3 , in accordance with the invention
- FIG. 7 is a schematic block diagram of electronic circuitry for the system of the invention.
- FIG. 8 is a diagrammatic illustration showing the relationship between sensor xyz and borehole gbr coordinate systems
- FIG. 9 is a diagrammatic illustration showing the relationships of the location vectors of sensor tool location and wire segments constituting the elongated coil in a surveyor's aer coordinate system
- FIG. 10 is a diagrammatic illustration showing the relationship between the gbr and the aer coordinate systems.
- FIG. 1 a drilling site 10 located in a ground feature 12 , such as a hillside, a mountain, or other entryway for one or more generally horizontal boreholes.
- a ground feature 12 such as a hillside, a mountain, or other entryway for one or more generally horizontal boreholes.
- a plurality of parallel, spaced boreholes defining the circumference of a tunnel to be excavated are illustrated, although it will be understood that the techniques described herein may be used for guiding the drilling of any number of boreholes.
- a reference, or guide borehole 14 is first drilled into the earth using known drilling, borehole guidance and logging techniques.
- the guide borehole may be drilled in a straight line into the side of a mountain, as illustrated in FIG.
- the guide borehole preferably is cased with a plastic pipe 16 , and preferably is approximately 150 millimeters in diameter.
- a carrier assembly 20 such as that illustrated in FIGS. 3 through 6 is installed in the guide borehole.
- the carrier assembly includes an elongated core 22 on which is wound a longitudinal coil 24 , to be described in greater detail below.
- the core element is generally tubular, and preferably an ABS plastic.
- a particularly suitable core is a plastic tube known as “inclinometer tubing” and manufactured by SIREG, SpA which, as illustrated in FIG.
- the groove 2 is approximately 90 millimeters in diameter and is fabricated with a plurality of grooves, such as the fourgrooves 26 , 28 , 30 and 32 and corresponding ridges 34 , 36 , 38 and 40 on the outside of the pipe at the locations of the groove.
- the grooves and ribs are equally spaced around the circumference of the tube, with grooves 26 and 20 and grooves 28 and 32 being diametrically opposed to each other.
- the grooves on the inside of the core permit an inclinometer to be deployed along the length of the core to measure the roll angle of the core as it is inserted into a borehole, and thus to determine the roll angle of the coil wound on the core, while the ridges on the outside surface of the core serve as guides for securing the coil.
- the coil 24 is formed by wrapping multiple turns of a wire cable 50 longitudinally around the core using opposed ridges such as the ridges 36 and 40 to align the coil with the longitudinal axis 52 of the core.
- the coil 24 preferably incorporates five or more turns of a wire conductor which may pass around both ends of the core, as illustrated at 54 at a first end 56 of the core.
- the coil does not pass around the second end 58 of the core, but instead stops short of end 58 , with the cable passing over the core as illustrated at 60 in FIGS. 3 and 4 to provide a continuous coil.
- a first turn of the coil begins at a connector 62 , extends along the left hand side of core 22 , (as viewed in FIG.
- the longitudinally extending coil 24 is wrapped around the core adjacent diametrically opposed ridges such as ridges 36 and 40 and are secured by crimped stainless steel straps 70 spaced along the length of the assembly every half meter or so. Although only two turns are illustrated in the figures, any number of turns may be provided; it is usually desirable to make up a multi-turn coil rather than using a single turn loop for power supply impedance matching purposes.
- the end 58 of the core extends beyond the coil and additional lengths of core may be connected to it so that the coil 24 can be positioned at an appropriate depth within the guide borehole 14 with respect to the drilling which is to take place.
- the carrier assembly may be constructed as it is being inserted into the guide borehole, if desired.
- the coil assembly 20 When the coil assembly 20 is inserted into a guide borehole, some twisting may occur, so it is desirable to measure its roll angle by means of a steering tool or an inclinometer which may be positioned in, and moved along, the internal grooves of the tubing 22 , as illustrated at 72 in FIG. 5 .
- the inclinometer may be moved along the length of the core 22 after the coil assembly has been installed in the guide hole, with measurements being taken along the length of the coil. Normally a precise gyroscopic hole survey is made for the reference guide borehole before the coil assembly is inserted.
- a survey may be constructed at the same time that the roll angle of the core is measured by noting at each point of measurement the inclination and azimuth and the earth's magnetic field as a function of depth. With these measurements, a precise wire file can be made, giving precise wire coordinates of the elongated coil in the guide borehole as a function of depth, and from this file the magnetic field produced by a known current in the coil can be computed for any point in space.
- the coil assembly 20 is placed in it and positioned to produce a magnetic field for use in guiding the drilling of one or more additional boreholes, such as the borehole 80 illustrated in FIG. 6 .
- the boreholes 80 may be 150 millimeters in diameter and drilled with their center axes spaced 11 ⁇ 2 meters apart.
- adjacent boreholes such as the boreholes 40 ′ and 40 ′′ are drilled along paths having parallel axes 82 and 84 that are spaced apart by a distance d, where d is about 11 ⁇ 2 meters.
- the resulting tunnel would have a radius of about 10 meters between the axis 86 of guide borehole 14 and the axis 82 of borehole 80 ′, for example.
- Different borehole diameters and spacing may be utilized for different tunnel sizes, as will be apparent to those of skill in the art.
- the boreholes 80 are drilled directionally by a drill tool 90 that incorporates a drill bit 92 and steering tool package 94 in known manner.
- the package 94 includes provisions for directional control of the drilling direction and for the measurement of AC electromagnetic fields and the direction of gravity, utilizing conventional magnetometers and accelerometers.
- a suitable drilling machine 96 drives the drill bit 92 through a shaft 98 in known manner to produce the borehole 80 in the desired location.
- the exact location of the borehole is regulated in accordance with the measurements made in the steering tool package, as will be explained below.
- the usual procedure for drilling such a borehole is to alternately determine, electromagnetically, the location and direction of drilling, to make an adjustment to the face of the drill bit 92 to control the direction of further drilling, and then to drill a short interval and repeat the process.
- the “away distance” or distance from the well head, or borehole entry point 100 to the drill tool 90 is known.
- the magnetic field produced by the elongated coil assembly 20 is measured by a down-hole AC steering tool 102 ( FIG. 7 ) that is located in the steering tool package 94 .
- a suitable steering tool is manufactured by Vector Magnetics, LLC of Ithaca, N.Y.
- This steering tool incorporates gravity sensors 104 , which are orthogonally related inclinometers for sensing the x, y and z components of gravity, three orthogonally related magnetometers 106 for sensing the x, y and z components of the magnetic field at the location of the tool, and, in a preferred form of the invention, three AC amplifiers 108 for amplifying the x, y and z outputs of the magnetometers 106 .
- gravity sensors 104 are orthogonally related inclinometers for sensing the x, y and z components of gravity
- three orthogonally related magnetometers 106 for sensing the x, y and z components of the magnetic field at the location of the tool
- three AC amplifiers 108 for amplifying the x, y and z outputs of the magnetometers 106 .
- the inclinometers and the magnetometers measure the vector components of the gravity and of the total magnetic field at the location of the tool along orthogonal x, y and z axes.
- the z axis is along the tool axis and points along the borehole in the direction of drilling.
- the y and z axes are perpendicular to the axis of the borehole.
- Output signals corresponding to the measured AC magnetic field vector components which are produced by the three axis magnetometer are amplified in the instrument package by amplifiers 108 , are supplied to a multiplexer and analog-to-digital converter 110 and are transmitted digitally by way of line 112 uphole to a computer 114 located at the well head of the borehole.
- a known current is supplied by an AC source 120 to the coil assembly coils 24 by way of cable 66 , producing a corresponding magnetic field in the earth surrounding the guide borehole 14 .
- This magnetic field is detected by the magnetometers 106 and a digital stream of AC magnetic field measurements, which are made near the drill bit 92 , is supplied uphole to the computer 114 .
- the magnetic field measurements are made at a sampling rate greater than the appropriate Nyquist frequency and are transmitted to the computer by way of line 112 .
- instantaneous measurements of the current supplied to the elongated coils 24 are supplied to the computer by way of line 122 .
- the AC source may provide current at a frequency of 3 Hz at an amplitude I, and using typical data analysis, the values of the AC current and the corresponding AC magnetic field amplitudes for each field component are determined.
- the AC current source is connected by way of lines 122 and 123 to a reference circuit 124 to produce an output reference signal on line 126 that is in phase with the AC current source 120 .
- the AC source output on line 122 is supplied by way of line 127 to a digital data stream circuit 128 and then to a current mixer and low pass filter 130 to produce at 132 a measure of the current I.
- the output of the multiplexer 110 from the steering tool is supplied by way of line 112 to a demultiplexer which produces signals representing the x, y and z vectors of the earth's field at 134 , and produces signals representing the x, y and z vectors of the earth's gravity at 136 .
- the digital data stream on line 112 representing the xyz vectors of the measured AC magnetic field is demodulated at 138 and is supplied through mixer and low pass filter 140 where the measured field is combined with the measured source current to produce magnetic field vectors MHx, MHy, and MHz, as illustrated at 142 .
- the earth's field measurements at 134 and the gravity measurements at 136 are used to determine, at 144 , the steering tool azimuth, inclination and roll angle. It will be understood that these determinations are implemented by software utilizing standard methods. It is noted that the gravity data sensors 104 directly give the three components of the measured gravity vector MGx, MGy, and MGz at 136 .
- An important aspect of the invention is the mathematical method by which the measurements of the gravity vector, MGx, MGy, and MGz, and those of the electromagnetic field, MHx, MHy and MHz, generated by the elongated coil 24 are used to determine the location and direction of drilling.
- the location coordinates of the drill head 90 and its drilling tool package 94 and the azimuthal direction of the borehole are determined by matching computed electromagnetic field components based on the current supplied to the coil with actual measurements made at package 94 , using the approximation method of Newton Cotes.
- An appropriate sensing tool coordinate system, in the borehole being drilled, is the gbr system illustrated in FIG. 8 .
- This coordinate system is defined by the xyz sensor tool axis coordinate system and by the gravity measurements 104 at the drill head location 90 .
- Measurements of the AC electromagnetic field components, in the xyz coordinate system of the sensors 106 are transformed to the gbr coordinate system. These values are equated in order to compute field values to find the parameters of interest.
- references to the coordinate system of the measuring tool, as defined by the sensor axes, are denoted with “xyz”.
- the z-axis points along the tool axis, where a positive value indicates the direction of drilling.
- the measured values of the electromagnetic field vector MH are denoted by a 3 row, 1 column, i.e., a 3 ⁇ 1 matrix MHxyz of the measured values of MHx, MHy, and MHz.
- the measured values of the gravity vector MG are denoted by a 3 ⁇ 1 column vector of MGx, MGy, and MGz.
- the function “cross” denotes the vector cross product, and “mag” the magnitude of its vector argument.
- the next task is computation of the theoretical electromagnetic field TH at a sensor tool 94 location Rtl, shown diagrammatically in FIG. 9 , where the field is generated by the N turn, elongated coil 24 carrying an electric current I.
- the location coordinate system used for the coil and the boreholes is that used by surveyors; i.e., away, elevation and right (aer).
- the coil 24 can be defined by a matrix tabulation of this aer representation of the coordinates of the Nn nodes defining the coil.
- the relationship of the aer coordinate system and the gbr coordinate system is illustrated in FIG. 10 .
- the location of the steering tool Rst and the azimuth of direction of drilling; i.e., the angle Az, are found by equating the 3 ⁇ 1 THgbr vector components to the measured MHgbr components.
- THgbr at ElRghtAz 0 as TH 0 and that at the neighboring point ElRghtAz 1 as TH 1 ;
- dEIRghtAz [dTHdEl′; dTHdRght′; dTHdAz′] ⁇ (MHgbr ⁇ TH 0 ).
- ElRghtAz 1 ElRghtAz 0 +dElRghtAz
- the above procedure requires an independent specification of the away distance of the drill bit at the point of the survey.
- a new survey is performed as each new section of drill stem 98 is added. Noting the location coordinates of the borehole entry point 100 , and the lengths of drill stem 98 between surveys, the away location for each new survey is readily found using known surveying integration methods, using the previously found elevation and right location parameters along borehole 80 , and using the Az value at the survey location just before that of the new survey being taken.
- the away distance of the drill bit can also be measured directly without depending upon this integration procedure.
- measurement data from two neighboring drill locations with known borehole lengths between them are used. The method described below works particularly well close to the ends of the coil 24 .
- the vector TH12gbr is expanded in a Taylor series in the neighborhood of the first guess 4 ⁇ 1 parameter vector AwElRghtAz 0 to give TH12gbr 1 .
- the error vector dAwElRghtAz is solved for to make TH12gbr 1 equal to the measurement vector MH12gbr as well as possible.
- the set of 6 linear equations being solved is over-determined; thus, the solution gives a “least squares” fit for each dAwElRghtAz error vector. This is done iteratively, as above, to find all four parameters; i.e., the Away, Elevation, Right coordinates of the tool and the tool Azimuth relative to the Away.
- the method of the present invention operates particularly well where the value of TH12gbr 0 changes significantly as the away parameter of the tool changes.
- attempting to determine the Away parameter at points close to the ends of the coil 24 as compared to the radial distance away and the length of the coil, works well.
- the electromagnetic field does not vary significantly with changes in away distance. The result can be an unstable system of equations that can cause the entire computation to fail. Fortunately, it is easy to test for this condition beforehand by noting the relative value of the derivative of TH12gbr with respect to the away parameter near the first guess value AwElRghtAz 0 .
- spaced boreholes are accurately drilled along precise paths by first drilling a guide borehole using conventional drilling, surveying and guidance techniques at a drilling site.
- a coil carrier assembly incorporating plural turns of a coil wrapped longitudinally around an elongated core is inserted in the guide hole.
- the location and the roll angle of the coil is measured, as by an inclinometer inserted into the core, and the coil is energized by an AC source, preferably operating at a low frequency, to produce a corresponding AC magnetic field that will extend to the region where a second borehole is to be drilled along a specified path.
- the drilling of the second borehole is guided by periodic measurements of the AC field vectors, the earth's gravity vectors, and the distance of the drill head from the second borehole entry point (the “away” distance) and by iteratively calculating the theoretical location of the drill head and comparing these calculations with the measurements of its actual location. When these values match, the location of the drill head with respect to the borehole is known, and the direction of further drilling is determined. This process is repeated periodically to produce a second borehole that follows a selected path with respect to the known path of the guide borehole. Multiple boreholes may be drilled at spaced locations from the guide borehole.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Fluid Mechanics (AREA)
- Electromagnetism (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
An apparatus and method for surveying the path of a borehole includes three single-axis electromagnetic field sensors and three single axis gravity direction sensors in the borehole being surveyed. A pair of closely spaced, parallel guide wires carrying oppositely directed electric current in a reference borehole generate a known electromagnetic field, which is detected by the sensors. Mathematical analysis of electromagnetic and gravity measurements determines the lateral location and the direction of drilling in the neighboring borehole.
Description
- This application claims the benefit of U.S. Provisional Application No. 60/555,676, filed Mar. 24, 2004, the disclosure of which is hereby incorporated herein by reference.
- The present invention relates to a method and apparatus for drilling generally horizontal boreholes, and more particularly to a guidance system for drilling such boreholes to a close tolerance along a specified path.
- The technology for drilling boreholes into or through hills or mountains, under rivers, and the like has been well developed over the years. However, unique problems arise when it becomes necessary to drill such a borehole in an area that is inaccessible, such as beneath a ship's channel in a river, or where multiple boreholes must be drilled parallel to each other with a high degree of accuracy. In such situations, ordinary techniques for guiding the drilling of boreholes are not always satisfactory.
- An example of the need for a high degree of accuracy in drilling boreholes is found in a recently developed procedure for boring horizontal tunnels in unstable earth. This procedure requires drilling a number of parallel boreholes of small diameter with a high degree of accuracy around the circumference of the proposed tunnel. The boreholes may be, for example, 150 mm in diameter, with about 40 boreholes positioned around the circumference of the tunnel to form a circle of boreholes about 20 meters in diameter. The holes are drilled into the region, such as a hill or mountain, in which the tunnel is to be excavated, and each hole is cased with steel pipe. Refrigerant is then pumped through the casings for an extended period, for example, one month, to freeze the soil. Thereafter, the earth inside the circle formed by the boreholes is excavated using conventional techniques to produce a tunnel in which frozen earth temporarily holds the tunnel excavation open until a permanent supporting structure of concrete or steel is put into place.
- A major problem with the forgoing technique is the need to drill a large number of boreholes around the circumference of a tunnel while keeping the boreholes accurately spaced and parallel to each other so as to properly define the tunnel along its entire length and with the spacing between adjacent boreholes being substantially constant to ensure that the freezing process will produce a continuous shell around the location where the tunnel is to be excavated.
- One approach to solving the problem of drilling spaced, parallel boreholes has involved the use of grids on the surface of the earth for producing magnetic fields to guide the borehole drilling, but if access to the surface above the borehole is not available, this technique cannot be used effectively. The guidance fields produced by such grids also have a limited range and may not be effective if the borehole being drilled is too deep. In an urban environment it is often not possible to lay the desired grid on the surface of the earth along the path of the boreholes because of buildings, roads etc. In addition, the presence of large amounts of steel, which is often present between the surface and the desired tunnel path, severely limits these methods. Therefore, an improved technique for drilling parallel boreholes is needed to overcome these shortcomings.
- Another approach for achieving the required parallel drilling has been to drill a sacrificial borehole, for example, in the center of a desired tunnel, using, for example, gyroscopic methods for surveying. A single current-carrying wire is then deployed into this borehole and is connected electrically to a ground at its far end. This method can work well, though it may suffer from difficulties in making the required ground connection, for the method depends upon a uniform flow of return current in the ground. Often it is not possible to achieve a uniform flow, and any uncertainty in the return current flow means that highly accurate boreholes cannot be guaranteed.
- Thus, there is a need to provide a simple, easy-to-use, effective and accurate method and system for guiding the drilling of boreholes, and more particularly to guiding the drilling of boreholes that follow a predetermined path within small tolerances and in any location.
- The present invention is directed to a method and apparatus for drilling boreholes along predetermined paths, and particularly for boring multiple generally horizontal boreholes along linear or curved predetermined paths with a high degree of accuracy. More particularly, the invention is directed to a guidance system for drilling one or more linear or curved boreholes along predetermined paths at locations spaced from a reference guide path, and, when multiple parallel boreholes are drilled, will be parallel to each other within a tolerance of plus or minus a third of a meter over an indefinite length. In accordance with a preferred form of the present invention, one or more boreholes are drilled from known starting points along desired paths with a high degree of accuracy through the use of an elongated electromagnetic field source coil deployed in a reference borehole.
- The system includes a source coil assembly that is fabricated by winding a wire longitudinally around a tubular carrier so the coil windings extend along diametrically opposite sides of the carrier. The assembly is then deployed in the reference borehole. The roll angle of the coil in the reference well is determined by making inclinometer measurements inside the tubular carrier or, if the carrier is short enough, by noting its roll angle where it enters the reference borehole.
- An alternating current of a few amperes is passed through the coil. Measurements are made of the resulting alternating electromagnetic field and of the direction of gravity near a drill tool in a borehole being drilled. Mathematical analysis of these measurements at a single drill tool location suffices to determine the lateral location of the drill and the azimuth of the direction of drilling. Analysis of data from two locations allows the additional determination of the “away distance” component of the location; for example, the distance from the borehole entry to the drill bit.
- The measurements and data generated by the method and apparatus of the invention provides a system for drilling one or more generally horizontal boreholes in closely spaced relationship to a predetermined path.
- The foregoing, and additional objects, features and advantages of the present invention will become apparent to those of skill in the art from a consideration of the following detailed description of preferred embodiments thereof, taken in conjunction with the accompanying drawings, in which:
-
FIG. 1 is an end view of a tunnel site, illustrating a central guide borehole and a multiplicity of surrounding boreholes defining the circumference of the tunnel; -
FIG. 2 is a diagrammatic illustration of a tubular carrier on which conductors are wound to form an elongated coil; -
FIG. 3 is a diagrammatic perspective view showing the construction of an elongated coil and carrier assembly; -
FIG. 4 is a side elevation of the coil assembly ofFIG. 3 ; -
FIG. 5 is an end view of the coil assembly ofFIG. 3 ; -
FIG. 6 is a diagrammatic cut-away side elevation view of a guide borehole and a parallel borehole being drilled using the elongated coil assembly ofFIG. 3 , in accordance with the invention; -
FIG. 7 is a schematic block diagram of electronic circuitry for the system of the invention; -
FIG. 8 is a diagrammatic illustration showing the relationship between sensor xyz and borehole gbr coordinate systems; -
FIG. 9 is a diagrammatic illustration showing the relationships of the location vectors of sensor tool location and wire segments constituting the elongated coil in a surveyor's aer coordinate system; -
FIG. 10 is a diagrammatic illustration showing the relationship between the gbr and the aer coordinate systems. - Turning now to a more detailed description of a preferred embodiment of the present invention, there is illustrated in
FIG. 1 a drilling site 10 located in aground feature 12, such as a hillside, a mountain, or other entryway for one or more generally horizontal boreholes. In the embodiment illustrated in this figure, a plurality of parallel, spaced boreholes defining the circumference of a tunnel to be excavated are illustrated, although it will be understood that the techniques described herein may be used for guiding the drilling of any number of boreholes. In this embodiment, a reference, orguide borehole 14 is first drilled into the earth using known drilling, borehole guidance and logging techniques. The guide borehole may be drilled in a straight line into the side of a mountain, as illustrated inFIG. 6 , for example, or may be curved, as when drilling under an obstacle such as a river, lake, or the like, in known manner. The guide borehole preferably is cased with aplastic pipe 16, and preferably is approximately 150 millimeters in diameter. - After the
guide borehole 14 has been drilled along the desired path of the excavation, or adjacent the path of one or more parallel boreholes to be drilled, acarrier assembly 20 such as that illustrated inFIGS. 3 through 6 is installed in the guide borehole. The carrier assembly includes anelongated core 22 on which is wound alongitudinal coil 24, to be described in greater detail below. The core element is generally tubular, and preferably an ABS plastic. A particularly suitable core is a plastic tube known as “inclinometer tubing” and manufactured by SIREG, SpA which, as illustrated inFIG. 2 , is approximately 90 millimeters in diameter and is fabricated with a plurality of grooves, such as thefourgrooves corresponding ridges grooves grooves - The
coil 24 is formed by wrapping multiple turns of awire cable 50 longitudinally around the core using opposed ridges such as theridges longitudinal axis 52 of the core. Thecoil 24 preferably incorporates five or more turns of a wire conductor which may pass around both ends of the core, as illustrated at 54 at afirst end 56 of the core. Alternatively, in the illustrated preferred embodiment, the coil does not pass around thesecond end 58 of the core, but instead stops short ofend 58, with the cable passing over the core as illustrated at 60 inFIGS. 3 and 4 to provide a continuous coil. Thus, for example, a first turn of the coil begins at aconnector 62, extends along the left hand side ofcore 22, (as viewed inFIG. 3 ), crosses the core atend 56, extends along the right-hand side of the core (as viewed inFIG. 3 ) to the region of the connector to complete a first turn of the coil. The conductor loops over the core as at 64, again extends along the length of the core, crosses over theend 56, and extends back along the length of the core toconnector 62, to complete a second turn. Any desired number of turns are provided, and the free ends of the coil are fastened, atconnector 62, to asupply cable 66 that extends out of the borehole. Thelongitudinally extending coil 24 is wrapped around the core adjacent diametrically opposed ridges such asridges end 58 of the core extends beyond the coil and additional lengths of core may be connected to it so that thecoil 24 can be positioned at an appropriate depth within theguide borehole 14 with respect to the drilling which is to take place. The carrier assembly may be constructed as it is being inserted into the guide borehole, if desired. - When the
coil assembly 20 is inserted into a guide borehole, some twisting may occur, so it is desirable to measure its roll angle by means of a steering tool or an inclinometer which may be positioned in, and moved along, the internal grooves of thetubing 22, as illustrated at 72 inFIG. 5 . The inclinometer may be moved along the length of the core 22 after the coil assembly has been installed in the guide hole, with measurements being taken along the length of the coil. Normally a precise gyroscopic hole survey is made for the reference guide borehole before the coil assembly is inserted. If such a survey is not available, and if the earth's magnetic field is not severely distorted by nearby steel, a survey may be constructed at the same time that the roll angle of the core is measured by noting at each point of measurement the inclination and azimuth and the earth's magnetic field as a function of depth. With these measurements, a precise wire file can be made, giving precise wire coordinates of the elongated coil in the guide borehole as a function of depth, and from this file the magnetic field produced by a known current in the coil can be computed for any point in space. - After the guide borehole, such as the
borehole 14, has been drilled and preferably surveyed, thecoil assembly 20 is placed in it and positioned to produce a magnetic field for use in guiding the drilling of one or more additional boreholes, such as the borehole 80 illustrated inFIG. 6 . In the case where multiple boreholes are to be drilled around the circumference of a region that is to be excavated to form a tunnel, such as the tunnel arrangement illustrated in FIG. 1, theboreholes 80 may be 150 millimeters in diameter and drilled with their center axes spaced 1½ meters apart. Thus, as illustrated inFIG. 1 , adjacent boreholes, such as theboreholes 40′ and 40″ are drilled along paths havingparallel axes axis 86 ofguide borehole 14 and theaxis 82 ofborehole 80′, for example. Different borehole diameters and spacing may be utilized for different tunnel sizes, as will be apparent to those of skill in the art. - As illustrated in
FIG. 6 , theboreholes 80 are drilled directionally by adrill tool 90 that incorporates adrill bit 92 andsteering tool package 94 in known manner. Thepackage 94 includes provisions for directional control of the drilling direction and for the measurement of AC electromagnetic fields and the direction of gravity, utilizing conventional magnetometers and accelerometers. Asuitable drilling machine 96 drives thedrill bit 92 through ashaft 98 in known manner to produce the borehole 80 in the desired location. The exact location of the borehole is regulated in accordance with the measurements made in the steering tool package, as will be explained below. - The usual procedure for drilling such a borehole is to alternately determine, electromagnetically, the location and direction of drilling, to make an adjustment to the face of the
drill bit 92 to control the direction of further drilling, and then to drill a short interval and repeat the process. The “away distance” or distance from the well head, orborehole entry point 100 to thedrill tool 90 is known. To determine the current location and direction of drilling during the construction of theborehole 80, the magnetic field produced by theelongated coil assembly 20 is measured by a down-hole AC steering tool 102 (FIG. 7 ) that is located in thesteering tool package 94. A suitable steering tool is manufactured by Vector Magnetics, LLC of Ithaca, N.Y. This steering tool incorporatesgravity sensors 104, which are orthogonally related inclinometers for sensing the x, y and z components of gravity, three orthogonally relatedmagnetometers 106 for sensing the x, y and z components of the magnetic field at the location of the tool, and, in a preferred form of the invention, threeAC amplifiers 108 for amplifying the x, y and z outputs of themagnetometers 106. Although a steering tool without ACelectromagnetic field amplifiers 108 can be used together with a “reversible” DC current source instead ofcurrent source 120, vastly improved sensitivity results are obtained with the use of the AC method. The inclinometers and the magnetometers measure the vector components of the gravity and of the total magnetic field at the location of the tool along orthogonal x, y and z axes. The z axis is along the tool axis and points along the borehole in the direction of drilling. The y and z axes are perpendicular to the axis of the borehole. Output signals corresponding to the measured AC magnetic field vector components which are produced by the three axis magnetometer are amplified in the instrument package byamplifiers 108, are supplied to a multiplexer and analog-to-digital converter 110 and are transmitted digitally by way ofline 112 uphole to acomputer 114 located at the well head of the borehole. - A known current is supplied by an
AC source 120 to the coil assembly coils 24 by way ofcable 66, producing a corresponding magnetic field in the earth surrounding theguide borehole 14. This magnetic field is detected by themagnetometers 106 and a digital stream of AC magnetic field measurements, which are made near thedrill bit 92, is supplied uphole to thecomputer 114. The magnetic field measurements are made at a sampling rate greater than the appropriate Nyquist frequency and are transmitted to the computer by way ofline 112. In addition, instantaneous measurements of the current supplied to the elongated coils 24 are supplied to the computer by way ofline 122. In one example of the present invention, the AC source may provide current at a frequency of 3 Hz at an amplitude I, and using typical data analysis, the values of the AC current and the corresponding AC magnetic field amplitudes for each field component are determined. - As illustrated in
FIG. 7 , the AC current source is connected by way oflines reference circuit 124 to produce an output reference signal online 126 that is in phase with the ACcurrent source 120. In addition, the AC source output online 122 is supplied by way ofline 127 to a digitaldata stream circuit 128 and then to a current mixer andlow pass filter 130 to produce at 132 a measure of the current I. The output of themultiplexer 110 from the steering tool is supplied by way ofline 112 to a demultiplexer which produces signals representing the x, y and z vectors of the earth's field at 134, and produces signals representing the x, y and z vectors of the earth's gravity at 136. The digital data stream online 112, representing the xyz vectors of the measured AC magnetic field is demodulated at 138 and is supplied through mixer andlow pass filter 140 where the measured field is combined with the measured source current to produce magnetic field vectors MHx, MHy, and MHz, as illustrated at 142. The earth's field measurements at 134 and the gravity measurements at 136 are used to determine, at 144, the steering tool azimuth, inclination and roll angle. It will be understood that these determinations are implemented by software utilizing standard methods. It is noted that thegravity data sensors 104 directly give the three components of the measured gravity vector MGx, MGy, and MGz at 136. - An important aspect of the invention is the mathematical method by which the measurements of the gravity vector, MGx, MGy, and MGz, and those of the electromagnetic field, MHx, MHy and MHz, generated by the
elongated coil 24 are used to determine the location and direction of drilling. The location coordinates of thedrill head 90 and itsdrilling tool package 94 and the azimuthal direction of the borehole are determined by matching computed electromagnetic field components based on the current supplied to the coil with actual measurements made atpackage 94, using the approximation method of Newton Cotes. The theoretical electromagnetic field and the first derivatives of these field values with respect to elevation, right and azimuth of the drilling direction are computed for an assumed, or approximated, tool package location and drilling direction. Values for the parameters of interest, i.e., elevation, right and azimuth of the drilling direction being sought are then systematically adjusted using an iterative procedure to give convergence between the measured values of the fields and the exactly computed theoretical values. - An appropriate sensing tool coordinate system, in the borehole being drilled, is the gbr system illustrated in
FIG. 8 . This coordinate system is defined by the xyz sensor tool axis coordinate system and by thegravity measurements 104 at thedrill head location 90. Measurements of the AC electromagnetic field components, in the xyz coordinate system of thesensors 106, are transformed to the gbr coordinate system. These values are equated in order to compute field values to find the parameters of interest. - References to the coordinate system of the measuring tool, as defined by the sensor axes, are denoted with “xyz”. The z-axis points along the tool axis, where a positive value indicates the direction of drilling. The measured values of the electromagnetic field vector MH are denoted by a 3 row, 1 column, i.e., a 3×1 matrix MHxyz of the measured values of MHx, MHy, and MHz. The measured values of the gravity vector MG are denoted by a 3×1 column vector of MGx, MGy, and MGz. Throughout the following discussion, the notation conventions and function designations conform to those defined by the MATLAB language of computing.
- The unit vectors gUv, bhUv, rsUv, which define the gbr coordinate system, are represented in the xyz coordinate system as:
gUv=MGxyz/mag(MGxyz);
rsUv=cross(gUv, [0 0 1]′)/mag(cross(gUv,[0 0 1]′);
bhUv=cross(gUV,rsUv); - The function “cross” denotes the vector cross product, and “mag” the magnitude of its vector argument. The measured electromagnetic field can be transformed and represented in the gbr system as:
MHgbr=[gUv′; rsUv′; bhUv′]*MHxyz - The next task is computation of the theoretical electromagnetic field TH at a
sensor tool 94 location Rtl, shown diagrammatically inFIG. 9 , where the field is generated by the N turn,elongated coil 24 carrying an electric current I. The location coordinate system used for the coil and the boreholes is that used by surveyors; i.e., away, elevation and right (aer). Thecoil 24 can be defined by a matrix tabulation of this aer representation of the coordinates of the Nn nodes defining the coil. NotingFIG. 9 , a 3×Nn matrix of vectors to the coil nodes is:
Rc=[Rn1 Rn2 Rn3 . . . RnNn]. - Vectors defining the Nn straight elements connecting the nodes give the 3×Nn matrices of wire segment vectors, and their associated unit vectors are given by:
Ws=diff ([Rc Rn1]);
WsUv=Ws./(ones(3,1)*mag(Ws)). - 3×Nn matrices of the vectors Rsttl from the start node of each wire segment to the tool and their unit vectors is are given by:
Rsttl=(Rtl*ones(1,Nn))−Rc;
RsftlUv=Rsttl./(ones(3,1)*mag(Rsftl)). - Vectors from the end node of each segment to the tool and their unit vectors are given by:
Rendtl=(Rtl*ones(1,Nn))−[Rc(:,2:end) Rc(:,1)];
RendtlUv=Rentl./(ones(3,1)*mag(Rendtl). - The theoretical electromagnetic field, at the tool, in the aer coordinates THaer, is computed using the sequence of computations:
Aaer=(cross(WsUv,Rsttl)./(ones3,1)*dot(cross(WsUv,Rsttl), cross(WsUv,Rsttl));
THaer1=(Nt*l/(4*pi))*Aer.*(ones(3,1)*(dot(RsttlUv,WsUv)−dot(RendtlUv,WsUv));
THaer=(sum(THaer1′)′. - THaer is transformed to the gbr coordinates using the relationship:
THgbr=[0−1 0; cos(Az) 0 sin(Az); −sin(Az) 0 cos(Az)]*Thaer. - The relationship of the aer coordinate system and the gbr coordinate system is illustrated in
FIG. 10 . The location of the steering tool Rst and the azimuth of direction of drilling; i.e., the angle Az, are found by equating the 3×1 THgbr vector components to the measured MHgbr components. - The spirit of the analysis is that of the known Newton Cotes method, which starts with an approximate location and borehole direction and slightly changes the parameters being sought until the measured and computed values for the electromagnetic field equal each other.
- Begin by defining a three parameter column vector of elevation, right and Azimuth; ElRghtAz=[El Rght Az]′ and the differential parameter vector dElRghtAz=[dEl dRght dAz]. The first approximate value of this vector is defined as ElRghtAz 0; a neighboring vector is ElRghtAz1=ElRghtAz0+dElRghtAz. Denote the value of THgbr at ElRghtAz0 as TH0 and that at the neighboring point ElRghtAz1 as TH1; the Taylor expansion value of TH1 is:
TH1=TH0+[dTHdEl′; dTHdRght′; dTHdAz′]*dElRghtAz
where dTHdEl, dTHRght, dTHdAz are the first derivatives of the column vector THgbr with respect to elevation, right and Azimuth; each derivative is evaluated at the approximate parameter vector ElRghtAz0. The computed value TH1 at the neighboring location is equated to the measured value MHgbr and the resulting equations are solved for the differential parameter vector dEIRghtAz, i.e.:
dElRghtAz=[dTHdEl′; dTHdRght′; dTHdAz′]\(MHgbr−TH0). - An improvement to the approximate value ElRghtAzo for ElRghtAz is given by:
ElRghtAz1=ElRghtAz0+dElRghtAz - This new ElRghtAz1 is used for a new ElrghtAz0 and is iterated to get the solution for the value for the parameter vector ElRghtAz until THgbr=MHgbr with any desired precision.
- The above procedure requires an independent specification of the away distance of the drill bit at the point of the survey. As drilling progresses a new survey is performed as each new section of
drill stem 98 is added. Noting the location coordinates of theborehole entry point 100, and the lengths ofdrill stem 98 between surveys, the away location for each new survey is readily found using known surveying integration methods, using the previously found elevation and right location parameters alongborehole 80, and using the Az value at the survey location just before that of the new survey being taken. - The away distance of the drill bit can also be measured directly without depending upon this integration procedure. When it is desired to do so, measurement data from two neighboring drill locations with known borehole lengths between them are used. The method described below works particularly well close to the ends of the
coil 24. - Computation of the four parameters, Away, Elevation, Right and Azimuth, from electromagnetic measurements is done by fitting a composite data vector from two
neighboring locations first guess 4×1 parameter vector AwElRghtAz0 to give TH12gbr1. The error vector dAwElRghtAz is solved for to make TH12gbr1 equal to the measurement vector MH12gbr as well as possible. The set of 6 linear equations being solved is over-determined; thus, the solution gives a “least squares” fit for each dAwElRghtAz error vector. This is done iteratively, as above, to find all four parameters; i.e., the Away, Elevation, Right coordinates of the tool and the tool Azimuth relative to the Away. - The method of the present invention operates particularly well where the value of TH12gbr0 changes significantly as the away parameter of the tool changes. Thus, attempting to determine the Away parameter at points close to the ends of the
coil 24, as compared to the radial distance away and the length of the coil, works well. At the center of the coil, the electromagnetic field does not vary significantly with changes in away distance. The result can be an unstable system of equations that can cause the entire computation to fail. Fortunately, it is easy to test for this condition beforehand by noting the relative value of the derivative of TH12gbr with respect to the away parameter near the first guess value AwElRghtAz0. - In operation, spaced boreholes are accurately drilled along precise paths by first drilling a guide borehole using conventional drilling, surveying and guidance techniques at a drilling site. A coil carrier assembly incorporating plural turns of a coil wrapped longitudinally around an elongated core is inserted in the guide hole. The location and the roll angle of the coil is measured, as by an inclinometer inserted into the core, and the coil is energized by an AC source, preferably operating at a low frequency, to produce a corresponding AC magnetic field that will extend to the region where a second borehole is to be drilled along a specified path. The drilling of the second borehole is guided by periodic measurements of the AC field vectors, the earth's gravity vectors, and the distance of the drill head from the second borehole entry point (the “away” distance) and by iteratively calculating the theoretical location of the drill head and comparing these calculations with the measurements of its actual location. When these values match, the location of the drill head with respect to the borehole is known, and the direction of further drilling is determined. This process is repeated periodically to produce a second borehole that follows a selected path with respect to the known path of the guide borehole. Multiple boreholes may be drilled at spaced locations from the guide borehole.
- While the invention is described herein with reference to illustrative embodiments for particular applications, it should be understood that the invention is not limited thereto. Those having ordinary skill in the art and access to the teachings provided herein will recognize additional modifications, applications and embodiments with the scope thereof and additional fields in which the present invention would be of significant utility.
Claims (12)
1. Apparatus for guiding the drilling of a borehole in the earth in spaced relationship to a guide borehole in the earth, comprising:
a coil assembly incorporating an elongated core carrying a longitudinal coil winding located in the guide borehole;
a source of current connected to said coil to produce a magnetic field in the earth surrounding the guide borehole and in the region of the borehole being drilled;
sensors in said borehole being drilled for detecting vectors of gravity and of the generated magnetic field; and
a controller responsive to the generated magnetic field and the measured magnetic field vectors to control the direction of further drilling.
2. The apparatus of claim 1 , where the coil assembly core is generally tubular with a longitudinal axis and incorporates diametrically opposite external ridges parallel to said axis for receiving and positioning said coil winding.
3. The apparatus of claim 2 , wherein said coil includes multiple windings positioned by said ridges to lie in a plane that includes said axis.
4. The apparatus of claim 3 , wherein said coil passes around a first, distal end of said core, and passes over the exterior of said core to cause the second, near end of the core to extend out of the coil.
5. The apparatus of claim 4 , wherein said near end of said core is extendable to permit said coil to be positioned at any location in said guide borehole.
6. The apparatus of claim 5 , wherein said core includes internal grooves for receiving and guiding instrumentation along the length of the core.
7. The apparatus of claim 6 , wherein said instrumentation includes an inclinometer for measuring the roll angle of said coil.
8. The apparatus of claim 7 , wherein said instrumentation is a survey instrument for surveying said guide borehole.
9. The apparatus of claim 5 , further including spaced straps for securing said coil winding on said core.
10. The apparatus of claim 4 , further including a cable connected to said winding for connecting said winding to said source of alternating current.
11. The apparatus of claim 10 , wherein said controller includes a computer for iteratively calculating theoretical magnetic fields produced by said coil and comparing the theoretical fields with magnetic fields measured by said sensors for determining the location of said sensors with respect to said coil.
12. A method for controlling the drilling of a borehole with respect to a guide borehole, comprising:
drilling a guide borehole;
obtaining a survey of said guide borehole to determine its path;
inserting in said guide borehole a coil assembly including a tubular, nonmagnetic core and at least one winding wound externally on said core in a plane parallel to the longitudinal axis of the core;
energizing said core with an excitation current to produce a corresponding magnetic field;
partially drilling with a drilling tool a second borehole near said guide borehole;
detecting the produced magnetic field at the drill head of the drilling tool;
iteratively comparing the detected magnetic field with theoretical magnetic fields calculated from said current and the location of said coil assembly to determine the location of the drill head with respect to said coil assembly; and
guiding the further drilling of said second borehole in accordance with the calculated location of the drill head.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/918,698 US20050211469A1 (en) | 2004-03-24 | 2004-08-16 | Elongated coil assembly for electromagnetic borehole surveying |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US55567604P | 2004-03-24 | 2004-03-24 | |
US10/918,698 US20050211469A1 (en) | 2004-03-24 | 2004-08-16 | Elongated coil assembly for electromagnetic borehole surveying |
Publications (1)
Publication Number | Publication Date |
---|---|
US20050211469A1 true US20050211469A1 (en) | 2005-09-29 |
Family
ID=35197036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/918,698 Pending US20050211469A1 (en) | 2004-03-24 | 2004-08-16 | Elongated coil assembly for electromagnetic borehole surveying |
Country Status (2)
Country | Link |
---|---|
US (1) | US20050211469A1 (en) |
WO (1) | WO2005103434A1 (en) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090255661A1 (en) * | 2008-04-10 | 2009-10-15 | Brian Clark | System and method for drilling multilateral wells using magnetic ranging while drilling |
US20090260878A1 (en) * | 2008-04-17 | 2009-10-22 | Schlumberger Technology Corporation | Method for drilling wells in close relationship using magnetic ranging while drilling |
US20090260879A1 (en) * | 2008-04-18 | 2009-10-22 | Schlumberger Technology Corporation | Magnetic ranging while drilling using an electric dipole source and a magnetic field sensor |
US20100271232A1 (en) * | 2007-07-20 | 2010-10-28 | Brian Clark | Anti-collision method for drilling wells |
GB2484432A (en) * | 2008-01-18 | 2012-04-11 | Halliburton Energy Serv Inc | Parallel drilling method with source in separate borehole |
US9157315B2 (en) | 2006-12-15 | 2015-10-13 | Halliburton Energy Services, Inc. | Antenna coupling component measurement tool having a rotating antenna configuration |
JP2015203193A (en) * | 2014-04-11 | 2015-11-16 | 大成建設株式会社 | tunnel construction method |
US20160041293A1 (en) * | 2014-08-07 | 2016-02-11 | Schlumberger Technology Corporation | Method and Apparatus for Magnetic Ranging While Rotating |
US9310508B2 (en) | 2010-06-29 | 2016-04-12 | Halliburton Energy Services, Inc. | Method and apparatus for sensing elongated subterranean anomalies |
WO2017065731A1 (en) * | 2015-10-12 | 2017-04-20 | Halliburton Energy Services, Inc. | Magnetic field gradient sensor calibration |
US20170152739A1 (en) * | 2013-06-24 | 2017-06-01 | Motive Drilling Technologies Inc. | Tvd corrected geosteer |
US9851467B2 (en) | 2006-08-08 | 2017-12-26 | Halliburton Energy Services, Inc. | Tool for azimuthal resistivity measurement and bed boundary detection |
US10061049B2 (en) | 2015-06-22 | 2018-08-28 | Saudi Arabian Oil Company | Systems, methods, and apparatuses for downhole lateral detection using electromagnetic sensors |
US10119388B2 (en) | 2006-07-11 | 2018-11-06 | Halliburton Energy Services, Inc. | Modular geosteering tool assembly |
CN109653735A (en) * | 2019-03-01 | 2019-04-19 | 西南石油大学 | Device and signal down transmission method are passed under a kind of drilling well signal based on current loop |
US10358911B2 (en) | 2012-06-25 | 2019-07-23 | Halliburton Energy Services, Inc. | Tilted antenna logging systems and methods yielding robust measurement signals |
CN111322077A (en) * | 2020-03-04 | 2020-06-23 | 中国建筑第四工程局有限公司 | Super-underexcavation control energy-gathering water pressure smooth blasting construction method for slate tunnel |
US10844705B2 (en) | 2016-01-20 | 2020-11-24 | Halliburton Energy Services, Inc. | Surface excited downhole ranging using relative positioning |
JP2021531468A (en) * | 2018-08-07 | 2021-11-18 | レイセオン カンパニー | Inductive sensor device with local analog-to-digital converter |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108915692A (en) * | 2018-05-24 | 2018-11-30 | 国网山东省电力公司济南供电公司 | Cable tunnel gaging hole coverage measurement method based on BOTDR optical fiber sensing technology |
Citations (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3076930A (en) * | 1961-03-23 | 1963-02-05 | Erick O Schonstedt | Adjustable magnetic core |
US3316651A (en) * | 1965-01-22 | 1967-05-02 | Josiah J Godbey | Inclinometers |
US3529682A (en) * | 1968-10-03 | 1970-09-22 | Bell Telephone Labor Inc | Location detection and guidance systems for burrowing device |
US3589454A (en) * | 1968-12-27 | 1971-06-29 | Bell Telephone Labor Inc | Mole guidance system |
US3907045A (en) * | 1973-11-30 | 1975-09-23 | Continental Oil Co | Guidance system for a horizontal drilling apparatus |
US4323848A (en) * | 1980-03-17 | 1982-04-06 | Cornell Research Foundation, Inc. | Plural sensor magnetometer arrangement for extended lateral range electrical conductivity logging |
US4443762A (en) * | 1981-06-12 | 1984-04-17 | Cornell Research Foundation, Inc. | Method and apparatus for detecting the direction and distance to a target well casing |
US4502010A (en) * | 1980-03-17 | 1985-02-26 | Gearhart Industries, Inc. | Apparatus including a magnetometer having a pair of U-shaped cores for extended lateral range electrical conductivity logging |
US4700142A (en) * | 1986-04-04 | 1987-10-13 | Vector Magnetics, Inc. | Method for determining the location of a deep-well casing by magnetic field sensing |
US4791373A (en) * | 1986-10-08 | 1988-12-13 | Kuckes Arthur F | Subterranean target location by measurement of time-varying magnetic field vector in borehole |
US4858704A (en) * | 1986-05-16 | 1989-08-22 | Gas Research Institute | Guided earth boring tool |
US4933640A (en) * | 1988-12-30 | 1990-06-12 | Vector Magnetics | Apparatus for locating an elongated conductive body by electromagnetic measurement while drilling |
US5074365A (en) * | 1990-09-14 | 1991-12-24 | Vector Magnetics, Inc. | Borehole guidance system having target wireline |
US5107938A (en) * | 1989-08-31 | 1992-04-28 | Kabushiki Kaisha Komatsu Seisakusho Corporation | Apparatus for detecting position of underground excavator |
US5469155A (en) * | 1993-01-27 | 1995-11-21 | Mclaughlin Manufacturing Company, Inc. | Wireless remote boring apparatus guidance system |
US5513710A (en) * | 1994-11-07 | 1996-05-07 | Vector Magnetics, Inc. | Solenoid guide system for horizontal boreholes |
US5515931A (en) * | 1994-11-15 | 1996-05-14 | Vector Magnetics, Inc. | Single-wire guidance system for drilling boreholes |
US5589775A (en) * | 1993-11-22 | 1996-12-31 | Vector Magnetics, Inc. | Rotating magnet for distance and direction measurements from a first borehole to a second borehole |
US5725059A (en) * | 1995-12-29 | 1998-03-10 | Vector Magnetics, Inc. | Method and apparatus for producing parallel boreholes |
US5767678A (en) * | 1991-03-01 | 1998-06-16 | Digital Control, Inc. | Position and orientation locator/monitor |
US5923170A (en) * | 1997-04-04 | 1999-07-13 | Vector Magnetics, Inc. | Method for near field electromagnetic proximity determination for guidance of a borehole drill |
US6095260A (en) * | 1997-04-16 | 2000-08-01 | Digital Control Incorporated | System, arrangements and associated methods for tracking and/or guiding an underground boring tool |
US6102136A (en) * | 1996-01-16 | 2000-08-15 | Archambeault; John T. | Bore location system having mapping capability |
US6417666B1 (en) * | 1991-03-01 | 2002-07-09 | Digital Control, Inc. | Boring tool tracking system and method using magnetic locating signal and wire-in-pipe data |
US6466020B2 (en) * | 2001-03-19 | 2002-10-15 | Vector Magnetics, Llc | Electromagnetic borehole surveying method |
US6626252B1 (en) * | 2002-04-03 | 2003-09-30 | Vector Magnetics Llc | Two solenoid guide system for horizontal boreholes |
US6927741B2 (en) * | 2001-11-15 | 2005-08-09 | Merlin Technology, Inc. | Locating technique and apparatus using an approximated dipole signal |
-
2004
- 2004-08-16 US US10/918,698 patent/US20050211469A1/en active Pending
- 2004-08-16 WO PCT/US2004/024377 patent/WO2005103434A1/en active Application Filing
Patent Citations (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3076930A (en) * | 1961-03-23 | 1963-02-05 | Erick O Schonstedt | Adjustable magnetic core |
US3316651A (en) * | 1965-01-22 | 1967-05-02 | Josiah J Godbey | Inclinometers |
US3529682A (en) * | 1968-10-03 | 1970-09-22 | Bell Telephone Labor Inc | Location detection and guidance systems for burrowing device |
US3589454A (en) * | 1968-12-27 | 1971-06-29 | Bell Telephone Labor Inc | Mole guidance system |
US3907045A (en) * | 1973-11-30 | 1975-09-23 | Continental Oil Co | Guidance system for a horizontal drilling apparatus |
US4502010A (en) * | 1980-03-17 | 1985-02-26 | Gearhart Industries, Inc. | Apparatus including a magnetometer having a pair of U-shaped cores for extended lateral range electrical conductivity logging |
US4323848A (en) * | 1980-03-17 | 1982-04-06 | Cornell Research Foundation, Inc. | Plural sensor magnetometer arrangement for extended lateral range electrical conductivity logging |
US4443762A (en) * | 1981-06-12 | 1984-04-17 | Cornell Research Foundation, Inc. | Method and apparatus for detecting the direction and distance to a target well casing |
US4700142A (en) * | 1986-04-04 | 1987-10-13 | Vector Magnetics, Inc. | Method for determining the location of a deep-well casing by magnetic field sensing |
US4858704A (en) * | 1986-05-16 | 1989-08-22 | Gas Research Institute | Guided earth boring tool |
US4858704B1 (en) * | 1986-05-16 | 1997-01-07 | Gas Res Inst | Guided earth boring tool |
US4791373A (en) * | 1986-10-08 | 1988-12-13 | Kuckes Arthur F | Subterranean target location by measurement of time-varying magnetic field vector in borehole |
US4933640A (en) * | 1988-12-30 | 1990-06-12 | Vector Magnetics | Apparatus for locating an elongated conductive body by electromagnetic measurement while drilling |
US5107938A (en) * | 1989-08-31 | 1992-04-28 | Kabushiki Kaisha Komatsu Seisakusho Corporation | Apparatus for detecting position of underground excavator |
US5074365A (en) * | 1990-09-14 | 1991-12-24 | Vector Magnetics, Inc. | Borehole guidance system having target wireline |
US5767678A (en) * | 1991-03-01 | 1998-06-16 | Digital Control, Inc. | Position and orientation locator/monitor |
US6756784B2 (en) * | 1991-03-01 | 2004-06-29 | Merlin Technology, Inc. | Orientation sensor arrangement and method for use in a system for monitoring the orientation of an underground boring tool |
US6417666B1 (en) * | 1991-03-01 | 2002-07-09 | Digital Control, Inc. | Boring tool tracking system and method using magnetic locating signal and wire-in-pipe data |
US5469155A (en) * | 1993-01-27 | 1995-11-21 | Mclaughlin Manufacturing Company, Inc. | Wireless remote boring apparatus guidance system |
US5589775A (en) * | 1993-11-22 | 1996-12-31 | Vector Magnetics, Inc. | Rotating magnet for distance and direction measurements from a first borehole to a second borehole |
US5513710A (en) * | 1994-11-07 | 1996-05-07 | Vector Magnetics, Inc. | Solenoid guide system for horizontal boreholes |
US5657826A (en) * | 1994-11-15 | 1997-08-19 | Vector Magnetics, Inc. | Guidance system for drilling boreholes |
US5515931A (en) * | 1994-11-15 | 1996-05-14 | Vector Magnetics, Inc. | Single-wire guidance system for drilling boreholes |
US5725059A (en) * | 1995-12-29 | 1998-03-10 | Vector Magnetics, Inc. | Method and apparatus for producing parallel boreholes |
US6102136A (en) * | 1996-01-16 | 2000-08-15 | Archambeault; John T. | Bore location system having mapping capability |
US5923170A (en) * | 1997-04-04 | 1999-07-13 | Vector Magnetics, Inc. | Method for near field electromagnetic proximity determination for guidance of a borehole drill |
US6095260A (en) * | 1997-04-16 | 2000-08-01 | Digital Control Incorporated | System, arrangements and associated methods for tracking and/or guiding an underground boring tool |
US6466020B2 (en) * | 2001-03-19 | 2002-10-15 | Vector Magnetics, Llc | Electromagnetic borehole surveying method |
US6927741B2 (en) * | 2001-11-15 | 2005-08-09 | Merlin Technology, Inc. | Locating technique and apparatus using an approximated dipole signal |
US6626252B1 (en) * | 2002-04-03 | 2003-09-30 | Vector Magnetics Llc | Two solenoid guide system for horizontal boreholes |
Cited By (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10119388B2 (en) | 2006-07-11 | 2018-11-06 | Halliburton Energy Services, Inc. | Modular geosteering tool assembly |
US9851467B2 (en) | 2006-08-08 | 2017-12-26 | Halliburton Energy Services, Inc. | Tool for azimuthal resistivity measurement and bed boundary detection |
US9157315B2 (en) | 2006-12-15 | 2015-10-13 | Halliburton Energy Services, Inc. | Antenna coupling component measurement tool having a rotating antenna configuration |
US20100271232A1 (en) * | 2007-07-20 | 2010-10-28 | Brian Clark | Anti-collision method for drilling wells |
US8462012B2 (en) | 2007-07-20 | 2013-06-11 | Schlumberger Technology Corporation | Anti-collision method for drilling wells |
GB2484432A (en) * | 2008-01-18 | 2012-04-11 | Halliburton Energy Serv Inc | Parallel drilling method with source in separate borehole |
GB2468734B (en) * | 2008-01-18 | 2012-08-08 | Halliburton Energy Serv Inc | Em-guided drilling relative to an existing borehole |
GB2484432B (en) * | 2008-01-18 | 2012-08-29 | Halliburton Energy Serv Inc | EM-guided drilling relative to an existing borehole |
US9732559B2 (en) | 2008-01-18 | 2017-08-15 | Halliburton Energy Services, Inc. | EM-guided drilling relative to an existing borehole |
US8695730B2 (en) | 2008-04-10 | 2014-04-15 | Schlumberger Technology Corporation | System and method for drilling multilateral wells using magnetic ranging while drilling |
US8307915B2 (en) | 2008-04-10 | 2012-11-13 | Schlumberger Technology Corporation | System and method for drilling multilateral wells using magnetic ranging while drilling |
US20090255661A1 (en) * | 2008-04-10 | 2009-10-15 | Brian Clark | System and method for drilling multilateral wells using magnetic ranging while drilling |
US8827005B2 (en) | 2008-04-17 | 2014-09-09 | Schlumberger Technology Corporation | Method for drilling wells in close relationship using magnetic ranging while drilling |
US20090260878A1 (en) * | 2008-04-17 | 2009-10-22 | Schlumberger Technology Corporation | Method for drilling wells in close relationship using magnetic ranging while drilling |
US8596382B2 (en) | 2008-04-18 | 2013-12-03 | Schlumbeger Technology Corporation | Magnetic ranging while drilling using an electric dipole source and a magnetic field sensor |
US20090260879A1 (en) * | 2008-04-18 | 2009-10-22 | Schlumberger Technology Corporation | Magnetic ranging while drilling using an electric dipole source and a magnetic field sensor |
US9310508B2 (en) | 2010-06-29 | 2016-04-12 | Halliburton Energy Services, Inc. | Method and apparatus for sensing elongated subterranean anomalies |
US10358911B2 (en) | 2012-06-25 | 2019-07-23 | Halliburton Energy Services, Inc. | Tilted antenna logging systems and methods yielding robust measurement signals |
US12037890B2 (en) | 2013-06-24 | 2024-07-16 | Motive Drilling Technologies, Inc. | TVD corrected geosteer |
US20170152739A1 (en) * | 2013-06-24 | 2017-06-01 | Motive Drilling Technologies Inc. | Tvd corrected geosteer |
US11066924B2 (en) * | 2013-06-24 | 2021-07-20 | Motive Drilling Technologies, Inc. | TVD corrected geosteer |
JP2015203193A (en) * | 2014-04-11 | 2015-11-16 | 大成建設株式会社 | tunnel construction method |
US20160041293A1 (en) * | 2014-08-07 | 2016-02-11 | Schlumberger Technology Corporation | Method and Apparatus for Magnetic Ranging While Rotating |
US10337293B1 (en) | 2015-06-22 | 2019-07-02 | Saudi Arabian Oil Company | Systems, methods, and apparatuses for downhole lateral detection using electromagnetic sensors |
US10324221B2 (en) | 2015-06-22 | 2019-06-18 | Saudi Arabian Oil Company | Systems, methods, and apparatuses for downhole lateral detection using electromagnetic sensors |
US10344589B1 (en) | 2015-06-22 | 2019-07-09 | Saudi Arabian Oil Company | Systems, methods, and apparatuses for downhole lateral detection using electromagnetic sensors |
US10061049B2 (en) | 2015-06-22 | 2018-08-28 | Saudi Arabian Oil Company | Systems, methods, and apparatuses for downhole lateral detection using electromagnetic sensors |
US10677955B2 (en) | 2015-10-12 | 2020-06-09 | Halliburton Energy Services, Inc. | Two part magnetic field gradient sensor calibration |
WO2017065731A1 (en) * | 2015-10-12 | 2017-04-20 | Halliburton Energy Services, Inc. | Magnetic field gradient sensor calibration |
US10844705B2 (en) | 2016-01-20 | 2020-11-24 | Halliburton Energy Services, Inc. | Surface excited downhole ranging using relative positioning |
JP2021531468A (en) * | 2018-08-07 | 2021-11-18 | レイセオン カンパニー | Inductive sensor device with local analog-to-digital converter |
JP7119207B2 (en) | 2018-08-07 | 2022-08-16 | レイセオン カンパニー | Inductive sensor device with local analog-to-digital converter |
CN109653735A (en) * | 2019-03-01 | 2019-04-19 | 西南石油大学 | Device and signal down transmission method are passed under a kind of drilling well signal based on current loop |
CN111322077A (en) * | 2020-03-04 | 2020-06-23 | 中国建筑第四工程局有限公司 | Super-underexcavation control energy-gathering water pressure smooth blasting construction method for slate tunnel |
Also Published As
Publication number | Publication date |
---|---|
WO2005103434A1 (en) | 2005-11-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20050211469A1 (en) | Elongated coil assembly for electromagnetic borehole surveying | |
US10746892B2 (en) | System for determining offset and orientation from a planar loop antenna | |
EP0792407B1 (en) | Single-wire guidance system for drilling boreholes | |
US5589775A (en) | Rotating magnet for distance and direction measurements from a first borehole to a second borehole | |
US7209093B2 (en) | Locating technique and apparatus using an approximated dipole signal | |
US7510030B2 (en) | Elongated cross coil assembly for use in borehole location determination | |
US6466020B2 (en) | Electromagnetic borehole surveying method | |
US5343152A (en) | Electromagnetic homing system using MWD and current having a funamental wave component and an even harmonic wave component being injected at a target well | |
US5305212A (en) | Alternating and static magnetic field gradient measurements for distance and direction determination | |
US8528636B2 (en) | Instantaneous measurement of drillstring orientation | |
US9151150B2 (en) | Apparatus and methods for well-bore proximity measurement while drilling | |
US9121967B2 (en) | Method and apparatus for well-bore proximity measurement while drilling | |
US11965408B2 (en) | Magnetic borehole surveying method and apparatus | |
GB1585479A (en) | Surveying bodies having magnetic and/or electric fields | |
WO2002050400A2 (en) | Method for determining magnetometer errors during wellbore surveying | |
US7219749B2 (en) | Single solenoid guide system | |
US11299979B2 (en) | Magnetic distance and direction measurements from a first borehole to a second borehole | |
WO2008005222A2 (en) | Elongated cross coil assembly for use in borehole location determination |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: VECTOR MAGNETICS LLC, NEW YORK Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KUCKES, ARTHUR F.;TEER, JOHN;REEL/FRAME:015993/0297;SIGNING DATES FROM 20041102 TO 20041105 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |