Drill unit for drilling wells for piles or other similar building structures Download PDFInfo
- Publication number
- UA74759C2 UA74759C2 UAA200508442A UAA200508442A UA74759C2 UA 74759 C2 UA74759 C2 UA 74759C2 UA A200508442 A UAA200508442 A UA A200508442A UA A200508442 A UAA200508442 A UA A200508442A UA 74759 C2 UA74759 C2 UA 74759C2
- Authority
- UA
- Ukraine
- Prior art keywords
- drilling rig
- drilling
- drill
- rig according
- base structure
- Prior art date
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 116
- 238000009434 installation Methods 0.000 claims abstract description 9
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 3
- 239000002689 soil Substances 0.000 claims abstract description 3
- 230000000284 resting effect Effects 0.000 claims abstract 2
- 239000000463 material Substances 0.000 claims description 6
- 230000008878 coupling Effects 0.000 claims description 2
- 238000010168 coupling process Methods 0.000 claims description 2
- 238000005859 coupling reaction Methods 0.000 claims description 2
- 238000006073 displacement reaction Methods 0.000 abstract 3
- 230000006835 compression Effects 0.000 abstract 2
- 238000007906 compression Methods 0.000 abstract 2
- 238000010276 construction Methods 0.000 description 7
- 239000000446 fuel Substances 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 239000003638 chemical reducing agent Substances 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
Опис винаходуDescription of the invention
Винахід стосується галузі будівництва і може бути застосований для влаштування свердловин під палі, 2 зокрема, в житловому, промисловому та сільському будівництві, а також для влаштування свердловин під інші будівельних конструкцій, які подібні палям.The invention relates to the field of construction and can be used for the installation of wells under piles, 2 in particular, in residential, industrial and rural construction, as well as for the installation of wells under other building structures that are similar to piles.
Відомі машини для занурення кілків, опор ліній електропередачі, паль, які мають власну бурову установку для буріння свердловини, у яку потім занурюється паля чи інша зазначена вище подібна палі конструкція за допомогою власного механізму занурення (палі чи іншої подібної конструкції), наприклад, дивись |описи 70 винаходів до авт. свід СРСР Мо 89590; МПКб: Е21В7/30, ЕО2Е5/20; заявл. 07.02.1950; авт. свід СРСР Мо 263479;Known machines for sinking piles, power line supports, piles, which have their own drilling rig for drilling a well, into which the pile or other pile-like structure mentioned above is then sunk by means of its own sinking mechanism (piles or other similar structure), for example, see | descriptions of 70 inventions by author. ID card of the USSR Mo 89590; MPKb: Е21В7/30, ЕО2Е5/20; statement 07.02.1950; author ID card of the USSR Mo 263479;
МПК: Е2187/30; заявл. 19.09.1968; опубл. 04.02.1970; авт. свід СРСР Мо 335334; МПК: ЕО2а7/20, ЕО2а17/144; заявл. 06.07.1970; опубл. 11.04.1972. Однак зазначені машини не пристосовані для вдавлювання паль із відносно великим зусиллям, що конче необхідне, наприклад, для створення фундаментів із відносно великою несучою здатністю. Із зазначених вище документів неможливо встановити шляхи вирішення проблеми 12 ефективного суміщення в одній машині бурової та вдавлювальної установок так, щоб одночасно вирішити основну та додаткові задачі цього винаходу.IPC: E2187/30; statement 19.09.1968; published 02/04/1970; author ID card of the USSR Mo 335334; IPC: EO2a7/20, EO2a17/144; statement 07/06/1970; published 11.04.1972. However, these machines are not adapted to drive piles with a relatively high force, which is necessary, for example, to create foundations with a relatively high load-bearing capacity. From the above-mentioned documents, it is impossible to establish ways to solve the problem of 12 effective combinations of drilling and pressing units in one machine in such a way as to simultaneously solve the main and additional tasks of the present invention.
Відома бурова установка для буріння свердловин під палі (стовпи огорожі), що має вертикальний стояк, засоби для встановлення бурової установки на рухому базову конструкцію з можливістю її переміщення, засіб для примусового переміщення бурової установки відносно базової конструкції та встановлений на вертикальному стояку буровий механізм із привідним буровим інструментом. На відміну від винаходу у відомій буровій установці засоби для встановлення бурової установки на рухому базову конструкцію виконані у вигляді шарнірно закріпленої на базовій конструкції (рамі трактора) платформи з розпірними тягами, а засіб для примусового переміщення бурової установки відносно базової конструкції - у вигляді гідроциліндра для примусового повороту платформи (Авт. свід СРСР Мо 335334). сA drilling rig for drilling wells under piles (fence posts) is known, having a vertical riser, means for installing the drilling rig on a movable base structure with the possibility of its movement, a means for forced movement of the drilling rig relative to the base structure, and a drilling mechanism installed on a vertical riser with a drive drilling tool. In contrast to the invention in the known drilling rig, the means for installing the drilling rig on a moving base structure are made in the form of a platform hinged to the base structure (tractor frame) with struts, and the means for forced movement of the drilling rig relative to the base structure are in the form of a hydraulic cylinder for forced turning of the platform (Authority record of the USSR Mo 335334). with
Така конструкція бурової установки непридатна для ефективного суміщення бурової та вдавлювальної Ге) установок в одній машині для вдавлювання паль із відносно великим зусиллям внаслідок великих зусиль, які виникають в елементах конструкції, та не ефективного використання до того ж недостатньої ваги машини та контрвантажів.Such a construction of a drilling rig is not suitable for the effective combination of drilling and pressing Ge) installations in one machine for driving piles with a relatively large force due to the large forces that arise in the structural elements, and also inefficient use of the insufficient weight of the machine and counterweights.
Задача винаходу полягає в удосконаленні конструкції бурової установки для буріння свердловин під палі або о інші подібні будівельні конструкції та окремих її частин з метою забезпечення можливості ефективного ю суміщення бурової та вдавлювальної установок в одній машині для вдавлювання паль із відносно великим зусиллям, наприклад, порядку двісті п'ятдесяти тон так, щоб забезпечити, зокрема, мінімізацію навантажень, - які виникають в елементах конструкції, та ефективне використання та забезпечення достатності ваги машини та /«ф контрвантажів. До того ж все це повинно забезпечуватись одночасно із високою продуктивністю та зручністю вThe task of the invention is to improve the design of a drilling rig for drilling wells under piles or other similar building structures and its individual parts in order to ensure the possibility of effectively combining drilling and driving rigs in one machine for driving piles with a relatively large effort, for example, of the order of two hundred p 'eighty tons so as to ensure, in particular, the minimization of loads - which occur in the structural elements, and effective use and ensuring the sufficiency of the weight of the machine and /«f counterweights. In addition, all this should be provided at the same time with high productivity and convenience
Зо обслуговуванні бурової установки та машини, в якій застосовується ця установка. -Maintenance of the drilling rig and the machine in which this rig is used. -
Зазначена задача вирішена тим, що у буровій установці (1) для буріння свердловин під палі або інші подібні будівельні конструкції, що містить вертикальний стояк (2), засоби (4) для встановлення бурової установки (1) на рухому базову конструкцію (5) з можливістю її переміщення, засіб (34) для примусового « переміщення бурової установки (1) відносно базової конструкції (5) та встановлений на вертикальному стояку З 50 (4) буровий механізм (19) із привідним буровим інструментом (23), відповідно до винаходу зазначені засоби (4) с для встановлення бурової установки (1) на базову конструкцію (5) пристосовані для встановлення буровоїThe specified task is solved by the fact that in the drilling rig (1) for drilling wells under piles or other similar building structures, which contains a vertical riser (2), means (4) for installing the drilling rig (1) on a movable base structure (5) with the possibility of its movement, a means (34) for forced movement of the drilling rig (1) relative to the base structure (5) and a drilling mechanism (19) with a driven drilling tool (23) installed on a vertical riser Z 50 (4), according to the invention, are specified means (4) for installing the drilling rig (1) on the base structure (5) are adapted for installing the drilling rig
Із» установки (1) на розташовані із зазором (5) одна до одної у горизонтальній площині дві суміжні головні конструкції (7) базової конструкції (5) з можливістю переміщення вздовж них, причому буровий інструмент (23) бурового механізму (19) розміщений в плані в зоні зазору (5) між головними конструкціями (7).From" installation (1) on located with a gap (5) to each other in the horizontal plane two adjacent main structures (7) of the base structure (5) with the possibility of movement along them, and the drilling tool (23) of the drilling mechanism (19) is placed in plan in the area of the gap (5) between the main structures (7).
Така конструкція бурової установки забезпечує можливість ефективного суміщення бурової (1) та це. вдавлювальної (47) установок в одній машині для вдавлювання паль із відносно великим зусиллям, наприклад, «» порядку двісті п'ятдесяти тон так, що забезпечується, зокрема, мінімізація навантажень, які виникають в елементах конструкції, та ефективне використання та забезпечення достатності ваги машини та контрвантажів. і До того ж все це забезпечується одночасно із високою продуктивністю та зручністю в обслуговуванні бурової с 20 установки та машини, в якій застосовується ця установка.This design of the drilling rig provides the possibility of effective combination of the drilling rig (1) and it. of pressing (47) installations in one machine for pressing piles with a relatively large force, for example, "" of the order of two hundred and fifty tons, so that, in particular, the minimization of the loads that occur in the structural elements and the effective use and ensuring the sufficiency of the weight of the machine are ensured and counterweights. and In addition, all this is provided simultaneously with high productivity and ease of maintenance of the drilling rig and the machine in which this rig is used.
Зазначені вище позитивні технічні та технологічні властивості машини, у набутті яких полягає технічний с результат винаходу, реалізуються, посилюються чи доповнюються іншими позитивними властивостями у конкретних виконаннях машини, які очевидні для спеціаліста із врахування відомостей, що наведені у прикладах здійснення винаходу, та можуть характеризуватися наступним. 29 Зазначені засоби (4) для встановлення бурової установки (1) на базову конструкцію (5) виконані у виглядіThe above-mentioned positive technical and technological properties of the machine, the acquisition of which consists in the technical result of the invention, are realized, strengthened or supplemented by other positive properties in specific implementations of the machine, which are obvious to a specialist taking into account the information given in the examples of the implementation of the invention, and can be characterized as follows . 29 The specified means (4) for installing the drilling rig (1) on the base structure (5) are made in the form of
ГФ) анкерних візків (4), кожен з яких пристосований для встановлення на опорну напрямну (6) головної конструкції (7) та має засіб (14), який пристосований для того, щоб за рахунок упору у, щонайменше, одну нижню поверхню о верхньої частини опорної напрямної (6) перешкоджати підняттю анкерного візка (4) відносно опорної напрямної (6). 60 Зазначений засіб (34) для примусового переміщення бурової установки (1) відносно базової конструкції (5) виконаний у вигляді крокуючого силового механізму (34), який пристосованим для примусового переміщення вздовж опорних напрямних (б).GF) of anchor trolleys (4), each of which is adapted to be installed on the support guide (6) of the main structure (7) and has a means (14) which is adapted so that due to the abutment in at least one lower surface on the upper parts of the support guide (6) prevent the lifting of the anchor trolley (4) relative to the support guide (6). 60 The specified means (34) for forced movement of the drilling rig (1) relative to the base structure (5) is made in the form of a stepping power mechanism (34), which is adapted for forced movement along the support guides (b).
Крокуючий силовий механізм (34) включає в себе гідроциліндр двосторонньої дії (35), який шарнірами з'єднаний із першою (38) та другою (39) балками, при цьому на кінцевих частинах першої балки (38) закріплені бо повзуни (40), які пристосовані для ковзання по верхніх частинах напрямних (б) та на яких закріплені шарнірамиThe stepping power mechanism (34) includes a two-way hydraulic cylinder (35), which is connected by hinges to the first (38) and second (39) beams, while sliders (40) are fixed on the end parts of the first beam (38), which are adapted to slide along the upper parts of the guides (b) and on which are fixed with hinges
(41) поворотні упори (42), пристосовані для обпирання на упори (43), що розміщені із кроком вздовж опорних напрямних (6), а друга балка (39) з'єднана із будь-яким елементом (3, 4), що є частиною вертикального стояка (2) або нерухомо зв'язаний із ним.(41) rotary stops (42) adapted to rest on stops (43) placed in steps along the support guides (6), and the second beam (39) is connected to any element (3, 4) that is part of the vertical riser (2) or immovably connected to it.
Буровий інструмент (23) виконаний у вигляді ущільнюючого бура (23), який пристосований для утворення свердловини, практично, без видалення грунту.The drilling tool (23) is made in the form of a compacting drill (23), which is adapted for the formation of a well, practically, without removing the soil.
Ущільнюючий бур (23) має порожнисте тіло, яке включає конічну нижню кінцеву частину (24) та трубчасту основну частину (25), та гвинтову лопать (26), яка виконана на тілі бура (23).The sealing drill (23) has a hollow body that includes a conical lower end part (24) and a tubular main part (25), and a screw blade (26) that is formed on the drill body (23).
У стінці тіла бура (23) виконані отвори пристосовані для того, щоб заповнювати внутрішню порожнину тіла 7/0 бура баластним матеріалом або видаляти з неї баластний матеріал для регулювання ваги бура (23).The holes made in the wall of the drill body (23) are adapted to fill the internal cavity of the 7/0 drill body with ballast material or to remove ballast material from it to adjust the weight of the drill (23).
Основна частина (25) тіла бура (23) та стояк (2) виконі секційними.The main part (25) of the drill body (23) and the riser (2) are sectional.
Верхній кінець бурового інструмента (23) жорстко або за допомогою гнучкої муфти зв'язаний безпосередньо з вихідним валом привода для його обертання.The upper end of the drilling tool (23) is rigidly or with the help of a flexible coupling connected directly to the output shaft of the drive for its rotation.
Вертикальний стояк (2) має двотавровий переріз, при цьому бічні частини стояка, які лежать у площинах, що /5 паралельні напрямку (10) переміщення бурової установки (1), утворені полицями (15) двотавра, а до розташованих з боку бурового інструмента (23) крайок полиць (15) приварені напрямні (16) так, щоб між ними та стінкою 17 двотавра утворилися напрямні пази, у яких розташовані повзуни (18) підйомної платформи бурового механізму (19), на якій змонтований привід (22) для обертання бурового інструмента (23).The vertical riser (2) has a I-beam cross-section, while the side parts of the riser, which lie in the planes /5 parallel to the direction (10) of movement of the drilling rig (1), are formed by the shelves (15) of the I-beam, and to those located on the side of the drilling tool ( 23) the edges of the shelves (15) are welded guides (16) so that guide grooves are formed between them and the wall 17 of the I-beam, in which the sliders (18) of the lifting platform of the drilling mechanism (19) are located, on which the drive (22) for rotating the drilling rig is mounted tool (23).
Зазначена підйомна платформа має вертикальну (20) та горизонтальну (21) плитоподібні частини, на першій (20) з яких змонтовані зазначені повзуни 18, а на другій (21) - привід (22) для обертання бурового інструмента (23).The specified lifting platform has vertical (20) and horizontal (21) plate-like parts, on the first (20) of which the specified sliders 18 are mounted, and on the second (21) - a drive (22) for rotating the drilling tool (23).
Бурова установка (1) має горизонтальну платформу (3), яка жорстко закріплена до стояка (2), та змонтовану на платформі (3) лебідку (30) підйомного канатного механізму, що пристосований для примусового підйому бурового механізму (19). счThe drilling rig (1) has a horizontal platform (3), which is rigidly fixed to the riser (2), and a winch (30) of the lifting rope mechanism, which is adapted for forced lifting of the drilling mechanism (19), is mounted on the platform (3). high school
Зазначена горизонтальна платформа (3) встановлена на зазначені засоби (4) для встановлення бурової установки (1) на базову конструкцію (5), які закріплені до низу платформи (3) за допомогою роз'ємних і) різьбових з'єднань (11, 12, 13).The specified horizontal platform (3) is installed on the specified means (4) for installing the drilling rig (1) on the base structure (5), which are fixed to the bottom of the platform (3) by means of removable and) threaded connections (11, 12 , 13).
Винахід пояснений кресленнями, на яких: на фіг. 1 представлена бурова установка для буріння свердловин під палі або інші подібні будівельні конструкції, що встановлена на опорні напрямні головних балок базової Ге! зо Конструкції машини для вдавлювання паль, аксонометричне зображення; на фіг. 2 - те саме, вид з переду бурової установки (з торця головних балок); на фіг. З - вузол А за фіг. 1; на фіг. 4 - нижня частина бурової о установки; ї- на фіг. 5 - вид ззаду на крокуючий гідравлічний силовий механізм для переміщення бурової установки; на фіг. 6 - вид збоку на силовий механізм для переміщення бурової установки; на фіг. 7 - варіант машини для «The invention is explained by drawings, in which: fig. 1 presents a drilling rig for drilling wells under piles or other similar constructions, which is installed on the support guides of the main beams of the base Ge! zo Designs of the pile driving machine, axonometric image; in fig. 2 - the same, a view from the front of the drilling rig (from the end of the main beams); in fig. C - node A in fig. 1; in fig. 4 - the lower part of the drilling rig; i- in fig. 5 - rear view of the stepping hydraulic power mechanism for moving the drilling rig; in fig. 6 - side view of the power mechanism for moving the drilling rig; in fig. 7 - machine variant for "
Ззв5 вдавлювання паль чи інших подібних будівельних конструкцій із застосуванням бурової установки, ї- аксонометричне зображення.Fig. 5 pressing of piles or other similar building structures with the use of a drilling rig, and is an axonometric image.
Бурова установка 1 для буріння свердловин під палі або інші подібні будівельні конструкції за фіг. 1 містить вертикальний стояк 2 та горизонтальну платформу 3, передня частина якої жорстко закріплена до нижньої частини стояка 2. Платформа З встановлена, переважно, на два засоби 4, наприклад, анкерні візки 4, « які закріплені до низу платформи З за допомогою роз'ємних різьбових з'єднань та по одному встановлені на ств) с опорні напрямні б двох головних конструкцій 7, наприклад, головних (мостових) балок 7 самохідної базової . конструкції 8 машини для вдавлювання паль чи інших подібних будівельних конструкцій (фіг. 2, 7) так, що и?» бурова установка 1, наприклад, на катках 9 анкерних візків 4 може переміщуватись по опорним напрямним 6 вздовж, по суті, горизонтальних головних (мостових) конструкцій 7, наприклад, двотаврових головних балок 7 у напрямку, який на фіг. 1, 7 позначений стрілкою 10. За необхідності може бути використано більшу кількість -І анкерних візків 4 наприклад, по два відносно коротких візки 4 для кожної опорної напрямної 6. Власне термін "анкерний" використаний у тому значенні, що візок 4 подібно анкерам має засіб (14), наприклад, два зачепи 14, ве які пристосовані для того, щоб за рахунок упору у нижні поверхні голівки (верхньої частини) рейкової опорної -І напрямної 6, перешкоджати підняттю візка 4 відносно напрямної 6, будь-яким зусиллям, що направлене вверх. 5о Зазначені анкерні візки 4 можуть бути виконані аналогічними чи ідентичними анкерним візкам палевої 1 вдавлювальної установки 47 машини. Спеціалісту очевидно, що у інших виконаннях, наприклад, самаDrilling rig 1 for drilling wells for piles or other similar constructions according to fig. 1 contains a vertical riser 2 and a horizontal platform 3, the front part of which is rigidly fixed to the lower part of the riser 2. The platform C is installed, preferably, on two means 4, for example, anchor carts 4, which are fixed to the bottom of the platform C by means of detachable threaded connections, and one is installed on the sv) with the support guides of the two main structures 7, for example, the main (bridge) beams 7 of the self-propelled base. structure 8 of a machine for driving piles or other similar building structures (fig. 2, 7) so that what? the drilling rig 1, for example, on the rollers 9 of the anchor carts 4 can move along the support guides 6 along, in fact, horizontal main (bridge) structures 7, for example, I-beam main beams 7 in the direction shown in fig. 1, 7 is indicated by the arrow 10. If necessary, a larger number of -I anchor carts 4 can be used, for example, two relatively short carts 4 for each support guide 6. Actually, the term "anchor" is used in the sense that the cart 4, like anchors, has a means (14), for example, two hooks 14, which are adapted to prevent the lifting of the trolley 4 relative to the guide 6 by any force directed up 5o The indicated anchor carts 4 can be made similar or identical to the anchor carts of the fuel 1 pressing unit 47 of the machine. It is obvious to a specialist that in other implementations, for example, itself
Ге двотаврова головна балка 7 може бути використана як опорна напрямна 6, при цьому верхня полиця головної балки 7 буде зазначеною верхньою частиною опорної напрямної 6. Також очевидно те, що верхня частина опорної напрямної б може мати одну нижню поверхню, наприклад, у разі виконання її із швелера, а анкерний дв Візок 4 один зачіп 14. Крім того, замість катків 9 можуть бути використані повзуни із антифрикційними полімерними прокладками або інші елементи подібного каткам чи повзунам призначення.The I-beam main beam 7 can be used as a support guide 6, while the upper shelf of the main beam 7 will be the indicated upper part of the support guide 6. It is also obvious that the upper part of the support guide b can have one lower surface, for example, in the case of making it from the channel, and the anchoring dv Cart 4 one hook 14. In addition, instead of rollers 9, sliders with anti-friction polymer gaskets or other elements similar to rollers or sliders can be used.
Ф) Роз'ємне різьбове з'єднання 5, із використанням якого анкерний візок закріплений до платформи 3, (фіг. 3) ка може включати в себе, щонайменше, один анкерний болт 11 з гайками, який має голівку, що розміщена у - 14 - чи А-подібному пазу 12, який виконаний на верхній частині кожного анкерного візка 4. У відповідних бо бічних частинах платформи З виконані отвори 13 для стрижнів анкерних болтів 11.F) Removable threaded connection 5, with the help of which the anchor trolley is fixed to the platform 3, (fig. 3) which can include at least one anchor bolt 11 with nuts, which has a head located in - 14 - or A-shaped groove 12, which is made on the upper part of each anchor trolley 4. Holes 13 for the rods of anchor bolts 11 are made in the corresponding side parts of the platform C.
Стояк 2 має двотавровий переріз, наприклад, стояк 2 виконаний із звичайного прокатного двотавра, при цьому бічні частини стояка, які лежать у площинах, що паралельні напрямку 10 переміщення бурової установки 1, утворені полицями 15 двотавра. До названих умовно передніми крайок полиць 15 приварені напрямні 16 так, щоб між ними та стінкою 17 двотавра утворилися напрямні пази, у яких розташовані повзуни 18 підйомної 65 платформи бурового механізму 19. Зазначена підйомна платформа має вертикальну 20 та горизонтальну 21 плитоподібні частини, на першій з яких змонтовані зазначені повзуни 18. На горизонтальній частини 21 змонтовано електромеханічний привід для обертання бурового інструмента 23, наприклад, мотор-редуктор 22, безпосередньо з вихідним валом якого жорстко або за допомогою гнучкої муфти зв'язаний верхній кінець бурового інструмента 23, переважно, виконаного у вигляді ущільнюючого буру 23. Ущільнюючий бур 23 має порожнисте тіло, яке включає конічну нижню кінцеву частину 24 та трубчасту основну частину 25, яка може бути виконана секційною. У стінці тіла бура 23 можуть бути передбачені отвори пристосовані для того, щоб заповнювати внутрішню порожнину тіла бура баластним матеріалом або видаляти з неї баластний матеріал для регулювання ваги бура 23. На тілі бура 23 виконана гвинтова лопать 26.The riser 2 has a I-beam section, for example, the riser 2 is made of a regular rolled I-beam, while the side parts of the riser, which lie in the planes parallel to the direction 10 of movement of the drilling rig 1, are formed by the shelves 15 of the I-beam. Guides 16 are welded to the conventional front edges of the shelves 15 so that guide grooves are formed between them and the wall 17 of the I-beam, in which the sliders 18 of the lifting platform 65 of the drilling mechanism 19 are located. The specified lifting platform has vertical 20 and horizontal 21 plate-like parts, on the first of on which the specified sliders 18 are mounted. An electromechanical drive for rotating the drilling tool 23 is mounted on the horizontal part 21, for example, a gear motor 22, the upper end of the drilling tool 23, preferably made in in the form of a compacting drill 23. The compacting drill 23 has a hollow body, which includes a conical lower end part 24 and a tubular main part 25, which can be made sectional. In the wall of the drill body 23, holes can be provided adapted to fill the internal cavity of the drill body with ballast material or to remove ballast material from it to adjust the weight of the drill 23. The screw blade 26 is made on the body of the drill 23.
Як видно з креслення за фіг. 1 буровий механізм 19 розташований із умовно названого переднім боку стояка /0 2. а платформа З розташована з протилежного заднього боку. Причому у передній частині платформи З виконаний виріз для бура 23. Як видно із креслень, бурова установка 1 орієнтована таким чином, що її буровий механізм 19 по відношенню до її вертикального стояка 2 розташований з боку першого (наприклад, зображеного ближнім на фіг. 1) із двох протилежних торців будь-якої головної балки 7. Однак, у іншому виконанні (на кресленнях не показано), яке є не гіршим бурова установка 1 може бути орієнтована буровим механізмом 19 у /5 протилежний бік, тобто так, що буровий механізм 19 обернений до протилежного другого торця головної балки 7.As can be seen from the drawing in fig. 1, the drilling mechanism 19 is located on the conventionally named front side of the riser /0 2. and the platform C is located on the opposite rear side. Moreover, in the front part of the platform C, a cut-out for a drill 23 is made. As can be seen from the drawings, the drilling rig 1 is oriented in such a way that its drilling mechanism 19 in relation to its vertical riser 2 is located on the side of the first (for example, the one shown near in Fig. 1) from two opposite ends of any main beam 7. However, in another embodiment (not shown in the drawings), which is not worse, the drilling rig 1 can be oriented by the drilling mechanism 19 in /5 the opposite direction, that is, so that the drilling mechanism 19 is turned to the opposite second end of the main beam 7.
На верхній частині стінки 17 стояка 2 закріплений вузол 27 верхніх нерухомих блоків, призначених для запасовування на них канату 28 підйомного канатного механізму, що пристосований для примусового підйому бурового механізму 19. Вузол 29 нижніх рухомих блоків, на які запасований канат 28, закріплений на верхній частині вертикальної частини 20 підйомної платформи бурового механізму 19. Кінець канату 28 намотаний на барабан підйомної лебідки 30, яка встановлена на задній частині платформи З та має звичну для лебідок конструкцію.On the upper part of the wall 17 of the riser 2, a node 27 of the upper fixed blocks, intended for storing the rope 28 of the lifting rope mechanism adapted for forced lifting of the drilling mechanism 19, is fixed on them. The node 29 of the lower movable blocks, on which the rope 28 is stored, is fixed on the upper part of the vertical part 20 of the lifting platform of the drilling mechanism 19. The end of the rope 28 is wound on the drum of the lifting winch 30, which is installed on the rear part of the platform C and has the usual construction for winches.
Якщо основна частина 25 тіла бура 23 виконана секційною із основної та додаткової секцій, стояк 2 також виконаний секційним із основної секції 31 та додаткової нижньої секції. При цьому горизонтальна платформа З жорстко закріплена до нижньої частини основної секції 31 стояка 2, на нижньому кінці якої виконані роз'ємні сч ов З'єднання 32 для стиковки основної секції 31 із додатковою нижньою секцією (на кресленні за фіг. 4) не показана). Роз'ємне з'єднання 32 може бути виконане, наприклад, у вигляді пластин із отворами 33 для болтів. (8)If the main part 25 of the drill body 23 is made sectional from the main and additional sections, the riser 2 is also made sectional from the main section 31 and the additional lower section. At the same time, the horizontal platform Z is rigidly fixed to the lower part of the main section 31 of the riser 2, at the lower end of which there are disconnecting joints Connection 32 for docking the main section 31 with the additional lower section (not shown in the drawing according to Fig. 4) . The removable connection 32 can be made, for example, in the form of plates with holes 33 for bolts. (8)
Для примусового переміщення бурової установи 1 вона може мати окремий індивідуальний засіб 34, наприклад, крокуючий гідравлічний силовий механізм 34 (фіг. 5, 6). Зазначений переміщувальний механізм 34 включає в себе гідроциліндр двосторонньої дії 35, корпус 36 та шток 37 якого шарнірами з'єднані із відповідно Ге! зо першою З8 та другою 39 балками. На кінцевих частинах першої балки 38 закріплені повзуни 40, які пристосовані для ковзання, наприклад, по напрямних 6 головних мостових балок 7, а на повзунах 40 шарнірами 41 закріплені о поворотні упори 42, пристосовані для обпирання на вертикальні поверхні упорів 43, що із кроком встановлені М вздовж головних балок 7, та верхні горизонтальні поверхні 44 останніх. Причому кожний упор 43 приварений до верхньої поверхні 44 головної балки 7 та поверхні підошви рейкового профілю напрямної 6. Таким чином «For forced movement of the drilling rig 1, it can have a separate individual means 34, for example, a stepping hydraulic power mechanism 34 (Fig. 5, 6). The specified moving mechanism 34 includes a double-action hydraulic cylinder 35, the body 36 and the rod 37 of which are connected by hinges to the respective Ge! with the first Z8 and the second 39 beams. On the end parts of the first beam 38, sliders 40 are fixed, which are adapted to slide, for example, along the guides 6 of the main bridge beams 7, and on the sliders 40, hinges 41 are attached to rotary stops 42, adapted to rest on the vertical surfaces of the stops 43, which are installed in steps M along the main beams 7, and the upper horizontal surfaces of the last 44. Moreover, each stop 43 is welded to the upper surface 44 of the main beam 7 and the sole surface of the rail profile of the guide 6. Thus, "
Ззв5 Множина упорів 43 підвищує надійність кріплення напрямної б до верхньої поверхні головної балки 7. Кінці ї- другої балки 39 з'єднані із анкерними візками 4, горизонтальною платформою З або із будь-яким іншим елементом, що є частиною вертикального стояка (2) або нерухомо зв'язаний із ним.Ззв5 The set of stops 43 increases the reliability of fixing the guide b to the upper surface of the main beam 7. The ends of the second beam 39 are connected to the anchor carts 4, the horizontal platform C or any other element that is part of the vertical riser (2) or immovably connected with it.
Бурову установку використовують таким чином.The drilling rig is used in this way.
На підготовленій основі будівельного майданчики із рейкових полотен 45 укладають рейкову колію 46, на « 770 якій із окремих вузлів збирають необхідний конструктивний варіант базової конструкції 5 машини для в с вдавлювання паль чи інших подібних будівельних конструкцій. На головні балки 7 встановлюють палевуA rail track 46 is laid on the prepared base of the construction site from rail sheets 45, on which the necessary structural variant of the basic structure 5 of the machine for pressing piles or other similar building structures is assembled from individual nodes. Fallow is installed on the main beams 7
Й вдавлювальну установку 47, що пристосована для вдавлювання паль чи інших подібних будівельних и?» конструкцій, та бурову установку 1. Далі встановлюють блокові контрвантажі 48 та гідростанцію із пультом управління 49, здійснюючи усі необхідні електричні та гідравлічні підключення.And the pressing unit 47, which is adapted for pressing in piles or other similar building materials? structures, and drilling rig 1. Next, block counterweights 48 and a hydraulic station with a control panel 49 are installed, making all the necessary electrical and hydraulic connections.
Після закінчення робіт із складання та налагодження машини її за допомогою електромеханічних приводів 50 -І візків 51 машину переміщують вздовж рейкової колії 46 до місця виконання робіт у напрямку, що позначений на фіг. 7 стрілкою 52. За допомогою крокуючого гідравлічного силового механізму 34 переміщують бурову установку ве 1 вздовж головних балок 7 у напрямку, який на фіг. 71, 7 позначений стрілкою 10 та є, по суті, -І перпендикулярним напрямку 52, до встановлення ущільнюючого буру 23 над точкою вдавлювання палі. За необхідності для реверсування напрямку переміщення бурової установки 1 перекидають поворотні упори 42 у о необхідне положення так, щоб вони мали змогу упиратися на праві або ліві вертикальні поверхні упорів 43.After the assembly and adjustment of the machine is completed, the machine is moved along the rail track 46 to the place of work in the direction indicated in fig. 7 with arrow 52. Using the stepping hydraulic power mechanism 34, the drilling rig ve 1 is moved along the main beams 7 in the direction shown in fig. 71, 7 is indicated by the arrow 10 and is, in fact, perpendicular to the direction 52, before the installation of the compacting drill 23 above the point of pile depression. If necessary, in order to reverse the direction of movement of the drilling rig 1, turn the rotary stops 42 to the required position so that they can rest on the right or left vertical surfaces of the stops 43.
Ге) Для буріння свердловини обертають бур 23 за допомогою мотор-редуктора 22 та забезпечують опускання бурового механізму 19 під власною вагою підйомним канатним механізмом, обертаючи барабан лебідки 30 у напрямку змотування канату 28. Після завершення буріння свердловини, обертаючи бур 23 у напрямку, що протилежний напрямку його обертання при бурінні, та одночасно піднімаючи буровий механізм 19 підйомним канатним механізмом, обертаючи барабан лебідки 30 у напрямку намотування канату 28, виймають бур 23 із (Ф, свердловини та підіймають буровий механізм у верхнє положення підйомним канатним механізмом. ка У виконаннях машини, що показані на фіг. 1, 2 та характеризуються тим, що палева вдавлювальна 47 та бурова 1 установки встановлені на спільні головні балки 7 та для одночасного спільного примусового бор переміщення з'єднані між собою, наприклад, за допомогою жорсткого елемента, після буріння свердловини за допомогою спільного для обох установок 47, 1 крокуючого гідравлічного силового механізму 34 відводять бурову установку 1 вздовж головних балок 7 від свердловини. Вантажопідйомним краном палю встановлюють у свердловину та тим же механізмом 34 палеву вдавлювальну установку 47 пересувають на палю до введення Її в середину її стояка 53, а потім вдавлюють палю за допомогою пальового покрокового вдавлювального механізму 65 (на кресленнях не показаний) будь-якої відомої конструкції, який пристосований для обпирання на оголовок палі та вдавлювальної силової дії на нього.Ge) To drill a well, rotate the drill bit 23 with the help of a motor-reducer 22 and ensure the lowering of the drilling mechanism 19 under its own weight by a lifting rope mechanism, rotating the drum of the winch 30 in the direction of winding the rope 28. After completing the drilling of the well, rotating the drill bit 23 in the opposite direction direction of its rotation during drilling, and at the same time lifting the drilling mechanism 19 with the lifting rope mechanism, rotating the drum of the winch 30 in the direction of winding the rope 28, remove the drill 23 from (F, the well and raise the drilling mechanism to the upper position with the lifting rope mechanism. ka In versions of the machine, which are shown in Fig. 1, 2 and are characterized by the fact that the fuel press 47 and drilling 1 units are installed on common main beams 7 and for simultaneous joint forced movement of the drill are connected to each other, for example, with the help of a rigid element, after drilling a well by with the help of 47, 1 stepping hydraulic power unit common to both units mechanism 34 divert the drilling rig 1 along the main beams 7 from the well. The pile is installed in the well with a load-lifting crane, and with the same mechanism 34, the pile pressing unit 47 is moved onto the pile until it is inserted into the middle of its riser 53, and then the pile is pressed in using the step-by-step pile pressing mechanism 65 (not shown in the drawings) of any known design, which is adapted to rest on the head of the pile and exert compressive force on it.
У виконанні машини, що показане на фіг. 7 та характеризується тим, що палева вдавлювальна 47 та бурова 1 установки встановлені на окремі дві пари головних балок 7, після буріння свердловини переміщують машину вздовж рейкової колії 2 до встановлення свердловини в зоні зазору 5 між тими головними балками 7, на якіIn the execution of the machine shown in fig. 7 and is characterized by the fact that the fuel press 47 and drilling 1 units are installed on separate two pairs of main beams 7, after drilling the well, the machine is moved along the rail track 2 until the well is installed in the gap zone 5 between those main beams 7, on which
Встановлена пальова вдавлювальна установка 47. Вантажопідйомним краном палю встановлюють у свердловину та механізмом 34 палеву вдавлювальну установку 47 пересувають на палю та здійснюють вдавлювання палі будь-яким відомим способом.Installed pile driver 47. The pile is installed in the well using a crane, and the pile driver 47 is moved to the pile using mechanism 34 and the pile is driven in any known way.
Claims (13)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UAA200508442A UA74759C2 (en) | 2005-08-30 | 2005-08-30 | Drill unit for drilling wells for piles or other similar building structures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UAA200508442A UA74759C2 (en) | 2005-08-30 | 2005-08-30 | Drill unit for drilling wells for piles or other similar building structures |
Publications (1)
Publication Number | Publication Date |
---|---|
UA74759C2 true UA74759C2 (en) | 2006-01-16 |
Family
ID=37454481
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
UAA200508442A UA74759C2 (en) | 2005-08-30 | 2005-08-30 | Drill unit for drilling wells for piles or other similar building structures |
Country Status (1)
Country | Link |
---|---|
UA (1) | UA74759C2 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8016536B2 (en) | 2008-04-04 | 2011-09-13 | Canrig Drilling Technology Ltd. | Pipe-handling apparatus and methods |
US8033779B2 (en) | 2008-01-31 | 2011-10-11 | Canrig Drilling Technology Ltd. | Pipe handling apparatus and methods |
US8215887B2 (en) | 2005-06-01 | 2012-07-10 | Canrig Drilling Technology Ltd. | Pipe-handling apparatus and methods |
-
2005
- 2005-08-30 UA UAA200508442A patent/UA74759C2/en unknown
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8215887B2 (en) | 2005-06-01 | 2012-07-10 | Canrig Drilling Technology Ltd. | Pipe-handling apparatus and methods |
US8033779B2 (en) | 2008-01-31 | 2011-10-11 | Canrig Drilling Technology Ltd. | Pipe handling apparatus and methods |
US8016536B2 (en) | 2008-04-04 | 2011-09-13 | Canrig Drilling Technology Ltd. | Pipe-handling apparatus and methods |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110952550B (en) | Suspended self-supporting pile driving method and pile driver | |
US8060966B2 (en) | Method and apparatus for bridge construction | |
CN109183620B (en) | Telescopic bracket, steel box girder hoisting equipment and hoisting method | |
DE2850990C2 (en) | Closed ring formwork for the construction of tunnels with in-situ concrete | |
CN111851313A (en) | Pile-driving bridge erecting construction all-in-one machine and construction method thereof | |
CN108797379B (en) | Synchronous construction method for variable-spacing double-frame bridge by adopting segment assembly bridge girder erection machine | |
UA74759C2 (en) | Drill unit for drilling wells for piles or other similar building structures | |
KR20060091615A (en) | Railroad crane and method for carrying out replacement of an upper structure of a railway bridge utilizing the same | |
KR100656959B1 (en) | Apparatus for transporting concrete structure and caisson carrying vehicle, using monolithic vertical and horizontal hydraulic jack | |
CN212612030U (en) | Pile bridge erection construction all-in-one | |
CN103924921A (en) | Height and counterweight steplessly adjustable rear-type rotary drilling rig for full-hydraulic masts | |
CN117026829A (en) | Beam lifting equipment for erecting high pier beam plates in mountain areas | |
JP5187969B2 (en) | Overhead viaduct construction equipment and construction method | |
UA10858U (en) | Drilling unit for drilling wells for piles or other like building structures | |
CN205840765U (en) | The operation platform of rotary drilling rig in foundation ditch | |
CN216074786U (en) | Adjustable T-beam bridge girder erection machine transverse moving rail | |
RU2476645C1 (en) | Bulldozer with retractable blade | |
CN112281681B (en) | Pile driver for bridge girder and using method thereof | |
CN106121507A (en) | The operation platform of rotary drilling rig in foundation ditch | |
UA75013C2 (en) | Machine for driving piles, sheet piles or other similar building structures | |
CN110725653A (en) | Piling device for building | |
CN220285757U (en) | Bidirectional adjustment hydraulic trolley for construction of partition wall steel bars in tunnel | |
UA10856U (en) | Machine for pressing-in piles, sheet piles or other similar building structures | |
CN109630029B (en) | Mast of rotary drilling rig and mast lifting method | |
CN213476639U (en) | Hydraulic amplitude-variable type pile-driving bridge erecting integrated machine |