Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kryvorizhstal Kryvyi Rih StatefiledCriticalKryvorizhstal Kryvyi Rih State
Priority to UA20031211310ApriorityCriticalpatent/UA67681C2/en
Priority to RU2004110452/02Aprioritypatent/RU2268947C2/en
Publication of UA67681ApublicationCriticalpatent/UA67681A/en
Publication of UA67681C2publicationCriticalpatent/UA67681C2/en
A method for the blast-furnace melting involves loading through the supplies mouth. The furnace is previously put to iron ore materials and coke loading with different supplies increasing coke supply mass from a minimum admissible value. The coal is mixed in every supply at a ratio of more than 6 tons of iron ore materials to 1 ton of coal.
UA20031211310A2003-12-102003-12-10A method for the blast furnace melting
UA67681C2
(en)