Nothing Special   »   [go: up one dir, main page]

SU949076A1 - Pile footing anf method for erecting it - Google Patents

Pile footing anf method for erecting it Download PDF

Info

Publication number
SU949076A1
SU949076A1 SU802975698A SU2975698A SU949076A1 SU 949076 A1 SU949076 A1 SU 949076A1 SU 802975698 A SU802975698 A SU 802975698A SU 2975698 A SU2975698 A SU 2975698A SU 949076 A1 SU949076 A1 SU 949076A1
Authority
SU
USSR - Soviet Union
Prior art keywords
shells
foundation
piles
pile
flexible
Prior art date
Application number
SU802975698A
Other languages
Russian (ru)
Inventor
Иседор Исаакович Гинзбург
Юрий Викторович Таран
Original Assignee
Харьковское Отделение Всесоюзного Проектного И Научно-Исследовательского Института Промышленного Транспорта
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Харьковское Отделение Всесоюзного Проектного И Научно-Исследовательского Института Промышленного Транспорта filed Critical Харьковское Отделение Всесоюзного Проектного И Научно-Исследовательского Института Промышленного Транспорта
Priority to SU802975698A priority Critical patent/SU949076A1/en
Application granted granted Critical
Publication of SU949076A1 publication Critical patent/SU949076A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

1one

Изобретение относитс  к строительству и предназначено дл  устройства фундаментов зданий, сооружений.The invention relates to construction and is intended for the construction of foundations of buildings and structures.

Известен свайный фундамент, включающий сваю, пропущенную через имеющую сквозное отверстие щайбу, и гибкие т ги, нижние концы которых соединены с нижними концами сваи, а верхние прикреплены к щайбе по ее периметру, причем шайба выполнена в виде обращенной выпуклостью вверх эластичной оболочки с кольцевым ребром жесткости по периметру 1.A pile foundation is known that includes a pile, passed through a slotted through hole, and flexible rods, the lower ends of which are connected to the lower ends of the pile, and the upper ones are attached to the connector around its perimeter, and the washer is made in the form of an upward convexity of an elastic shell with an annular edge perimeter stiffness 1.

Известен также способ возведени  такого свайного фундамента, включающий забивку свай и т г с заранее прикрепленными к ним гибкими оболочками 1.There is also known a method for erecting such a pile foundation, which includes driving piles and t g with flexible shells 1 previously attached to them.

Однако такой фундамент и способ его возведени  характеризуютс  недостаточной несущей способностью, дополнительным расходом материала (например, железобетона) дл  кольцевого ребра жесткости щайбы и материала гибких т г, а также существенным усложнением работ по забивке сваи с прикрепленными к ее нижнему концу гибкими т гами.However, such a foundation and the method of its construction are characterized by insufficient bearing capacity, additional material consumption (for example, reinforced concrete) for an annular stiffener of a shchyab and material of flexible tg, as well as a significant complication of work on driving piles with flexible ties attached to its lower end.

Наиболее близким к изобретению по технической сущности и достигаемому результату  вл етс  свайный фундамент, включающий забивные сваи, объединенные ростверком , а также способ его возведени , включающий забивку свай и возведение ростверка . Несуща  способность таких свайных фундаментов определ етс  сопротивлением грунта за счет сил трени  по боковой поверхности свай и сопротивлением грунтаClosest to the invention of the technical essence and the achieved result is a pile foundation, including driven piles, combined by a grillage, as well as a method of its construction, including pile driving and the construction of a grillage. The carrying capacity of such pile foundations is determined by the resistance of the soil due to friction forces on the lateral surface of the piles and the resistance of the soil.

10 по острию свай, соответствующим прочности грунта на уровне остри  свай 2.10 on the tip of the pile, corresponding to the strength of the soil at the level of the tip of the pile 2.

Однако данные свайные фундаменты характеризуютс  недостаточной несущей способностью и, следовательно, повыщенной материалоемкостью свай, так как несуща  However, these pile foundations are characterized by insufficient bearing capacity and, consequently, increased material consumption of piles, since

15 способность фундаментов по материалу свай значительно (в 2-3 раза) превыщает несущую способность свай по грунту, что снижает эффективность свайных фундаментов. Цель изобретени  - повышение несущей15, the ability of foundations for the material of piles significantly (2-3 times) exceeds the carrying capacity of piles on the ground, which reduces the efficiency of pile foundations. The purpose of the invention is to increase the carrier

20 способности.20 abilities.

Claims (5)

Поставленна  цель достигаетс  тем, что свайный фундамент, включающий забивные сваи, объединенные ростверком, снабжен гибкими криволинейными, обращенными выпуклой поверхностью вверх, напр женными оболочками, прикрепленными к сва м и расположенными между ними под ростверком с зазором относительно его подошвы, заполненным сыпучим материалом. Кажда  из оболочек может быть выполHfeHa в плане в виде прарильного многоугольника , прикрепленного своими вершинами к прилегающим к ним сва м или может быть выполнена в плане в виде полосы, прикрепленной своими концами к двум противосто щим сва м. Высота зазора между подошвой ростверка и оболочками превышает высоту сло  сыпучего материала, которым заполн етс  зазор. При этом согласно способу возведени  свайного фундамента, включающему забивку сваи и возведение ростверка, сваи забивают вначале на часть их длины, после чего к ним прикрепл ют гибкие оболочки, а затем сваи добивают до проектной отметки, а перед возведением ростверка поверх оболочек осуществл ют укладку сыпучего материала . На фиг. 1 изображен фундамент, продольный разрез; на фиг. 2- фундамент, план, вариант выполнени  оболочек в виде правильного многоугольника, прикрепленного своими верщинами к прилегающим к- ним сва м; на фиг. 3 - то же, вариант выполнени  оболочек в виде полосы, прикрепленной своими концами к Двум противосто щим сва м. Предложенный фундамент включает забивные сваи 1, головы которых замоноличены в железобетонной плите 2 свайного ростверка , слой песка 3, расположенный под плитой свайного ростверка, криволинейные напр женные гибкие оболочки 4, кажда  из которых размещена между погруженными в грунт прилегающими к кра м оболочки сва ми 1 и прикреплена к ним. Кажда  оболочка выполнена с выпуклостью вверх, повтор   своим очертанием очертание расположенного под ней грунта основани  5. Гибкие оболочки 4 в плане могут иметь вид правильного многоугольника, например щестиугольника, прикрепленного своими верщинами к прилегающим к ним сва м (фиг. 2). Гибкие оболочки могут также иметь вид полосы 6, прикрепленной своими концами к каждой из двух противосто щих свай 1 (фиг. 3). Гибкие полотнища дл  оболочек могут быть выполнены, например, из стеклопластика или листовой стали. Гибкие обо-, лочки прикрепл ютс  к сва м посредством металлических обойм 7. Обоймы 7 соедин ютс  с гибкими полотнищами и сва ми посредством известных соединений, например болтовых, болтоклеевых и др. (не показаны). Описываемый способ возведени  такого фундамента включает забивку свай 1 вначале на часть их длины, ггосле чего к ним прикрепл ют гибкие оболочки 4, а затем сваи 1 добивают до проектной отметки, после чего поверх оболочек 4 укладывают сыпучий материал 3 и возвод т ростверк 2. Нат жение гибких оболочек 4 происходит вследствие добивки свай 1, к которым заранее прикреплены оболочки. Возведение данного свайного фундамента целесообразно осуш,ествл ть в следующей последовательности: отрывают котлован. забивают сваи, планируют грунтовое основание под гибкие оболочки,; гибкие оболочки из гибких полотнищ укладывают на грунтовом основании и прикрепл ют к сва м, производ т добивку свай, и оболочки засыпают слоем песка, бетонируют плиту свайного ростверка. За счет нат жени  гибких оболочек на грунт основани  обеспечиваетс  плотный контакт между оболочками и грунтом, а оболочки работают совместно со сва ми. воспринима  часть вертикальных, действующих на фундамент нагрузок и передава  их на грунт основани . Кроме того, благодар  обжатию грунта основани  гибкими оболочками повыщаетс  сопротивление грунта по боковой поверхности свай в верхней зоне свайного фундамента, В описанной конструкции свайного фундамента по сравнению с известным исключаетс  необходимость устройства ребер жесткости по периметру каждой гибкой оболочки и гибких т г, соедин ющих эти ребра жесткости со сваей, в результате чего достигаетс  снижение материалоемкости свайного фундамента и трудоемкости погружени  свай в грунт. Применение предлагаемого технического рещени  позвол ет снизить расход цемента ориентировочно на 50-60 кг и арматурной стали на кг на каждый квадратный метр плана фундамента (при средних грунтовых услови х и удельной нагрузке на фундамент 60-70 тс/м). Формула изобретени  I. Свайный фундамент, включающий забивные сваи, объединенные ростверком, отличающийс  тем, что, с целью повыщени несущей способности, он снабжен гибкими криволинейными, обращенными выпуклой поверхностью вверх, напр женными оболочками , прикрепленными к сва м и расположенными между ними под ростверком с зазором относительно его подощвы, заполненным сыпучим материалом.The goal is achieved by the fact that the pile foundation, which includes driving piles, combined by a grillage, is provided with flexible curvilinear, convexly facing upward surfaces, strained shells attached to the piles and located between them under the grillage with a gap relative to its sole, filled with bulk material. Each of the shells can be made HfeHa in the plan in the form of a praral polygon, attached by its vertices to its adjacent piles, or it can be made in the plan in the form of a strip attached at its two ends to the opposing sides of the pile grinder and the shells exceed the height of the bulk material layer with which the gap is filled. In this case, according to the method of erecting a pile foundation, which includes pile driving and erection of the grillage, the piles are first hammered into a part of their length, after which flexible shells are attached to them, and then the piles are finished to the design mark, and before erection of the grillage over the shells, bulk material. FIG. 1 shows a foundation, a longitudinal section; in fig. 2 - the foundation, the plan, the embodiment of the shells in the form of a regular polygon, attached by its vertices to the adjacent pile; in fig. 3 - the same, an embodiment of the shells in the form of a strip attached with their ends to two opposing piles. The proposed foundation includes driven piles 1, whose heads are monolithic in a reinforced concrete slab 2 of the pile grillage, a layer of sand 3, located under the plate of the pile grillage, curvilinear strained flexible shells 4, each of which is placed between its own 1, immersed in the ground adjacent to the edges of the sheath, and attached to them. Each shell is made with a bulge upward, repeating the outline of the ground of the base 5 underneath it. The flexible shells 4 in the plan can have the appearance of a regular polygon, for example a pentacle attached to its adjacent edges by its lines (Fig. 2). The flexible shells may also be in the form of a strip 6 attached at its ends to each of the two opposing piles 1 (Fig. 3). Flexible sheathing sheets can be made, for example, of fiberglass or sheet steel. The flexible sheaths are attached to the shells by means of metal clips 7. The clips 7 are connected to the flexible panels and the webs by means of known connections, for example bolted, bolted, etc. (not shown). The described method of erecting such a foundation involves driving piles 1 at first for a part of their length, after which flexible shells 4 are attached to them, and then piles 1 are finished to the design mark, then bulk material 3 is laid over the shells 4 and the rostver 2 is erected. The life of the flexible shells 4 occurs as a result of the addition of piles 1 to which the shells are pre-attached. It is advisable to dry out the construction of this pile foundation in the following sequence: tear off the foundation pit. pile piles, plan soil foundation for flexible shells ,; flexible shells made of flexible panels are laid on a ground base and attached to the pile, the piling is done, and the shells are covered with a layer of sand, the concrete pile plate is cast into concrete. Due to the tension of the flexible shells on the ground of the base, tight contact between the shells and the ground is provided, and the shells work in conjunction with their own. perceived part of the vertical loads acting on the foundation and transferring them to the foundation ground. In addition, the soil resistance along the lateral surface of the piles in the upper zone of the pile foundation is increased due to the compression of the base of the flexible shells. stiffness with a pile, as a result of which a reduction in the material consumption of the pile foundation and the labor intensity of the pile driving into the ground is achieved. The application of the proposed technical solution allows reducing cement consumption by approximately 50-60 kg and reinforcing steel per kg per square meter of the foundation plan (with average soil conditions and a specific load on the foundation 60-70 tf / m). Claim I. Pile foundation, including driving piles, combined by a grillage, characterized in that, in order to increase the carrying capacity, it is provided with flexible curvilinear, reversed convex surface upwards, with tight shells attached to the sv and located between them under the grill a gap with respect to its base, filled with bulk material. 2. Фундамент по п. 1, отличающийс  тем, что кажда  из оболочек выполнена в плане в виде правильного многоугольника, прикрепленного своими верщинами к прилегающим к ним сва м.2. A foundation according to claim 1, characterized in that each of the shells is made in plan in the form of a regular polygon, attached by its vertices to its adjacent m. 3.Фундамент по п. 1, отличающийс  тем, что кажда  из оболочек выполнена в плане ввиде полосы, прикрепленной своими концами к двум противосто щим сва м.3. The foundation according to claim 1, characterized in that each of the shells is made in terms of a strip attached at its ends to two opposing sides. 4.Фундамент по п. 1, отличающийс  тем, что высота зазора между подошвой ростверка и оболочками превышает высоту сло  сыпучего материала,, которым заполн етс  зазор.4. The foundation of claim 1, characterized in that the height of the gap between the base of the grillage and the shells exceeds the height of the layer of bulk material, which fills the gap. 5.Способ возведени  свайного фундамента , включающий забивку свай и возведение ростверка, отличающийс  тем, что, с целью повышени  несущей способности, сваи забивают вначале на часть их длины, после5. A method of erecting a pile foundation, including driving piles and erecting a grillage, characterized in that, in order to increase the bearing capacity, the piles are first driven into a part of their length, after чего к ним прикрепл ют гибкие оболочки, а затем сваи добивают до проектной отметки а перед возведением ростверка поверх оболочек осуществл ют укладку сыпучего материала . Источники информации,what they attach to the flexible shells, and then the piles are finished to the design mark, and before the construction of the grillage over the shells, the bulk material is laid. Information sources, прин тые во внимание при экспертизеtaken into account in the examination 1.Авторское свидетельство СССР № 676689, кл. Е 02 D 27/12, 1978.1. USSR author's certificate number 676689, cl. E 02 D 27/12, 1978. 2.Васильев Б. Д. Основани  и фундаменты. Основы современного фундаментостроени . Л.-М., Государственное издательство литературы по строительству и архитектуре , 1955, с. 279-281.2. Vasiliev B. D. Foundations and foundations. Fundamentals of modern foundation building. L.-M., State Publishing House of Literature in Construction and Architecture, 1955, p. 279-281. Фиг.FIG. . . «х-Х;“Xx; Т T Фаг. гPhage. g
SU802975698A 1980-08-25 1980-08-25 Pile footing anf method for erecting it SU949076A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802975698A SU949076A1 (en) 1980-08-25 1980-08-25 Pile footing anf method for erecting it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802975698A SU949076A1 (en) 1980-08-25 1980-08-25 Pile footing anf method for erecting it

Publications (1)

Publication Number Publication Date
SU949076A1 true SU949076A1 (en) 1982-08-07

Family

ID=20915423

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802975698A SU949076A1 (en) 1980-08-25 1980-08-25 Pile footing anf method for erecting it

Country Status (1)

Country Link
SU (1) SU949076A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2649352C1 (en) * 2016-12-29 2018-04-02 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Pile-plate foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2649352C1 (en) * 2016-12-29 2018-04-02 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Pile-plate foundation

Similar Documents

Publication Publication Date Title
US4728225A (en) Method of rehabilitating a waterfront bulkhead
CN107975059A (en) A kind of assembled pile foundation wharfs structure and its construction method
AU2007100294A5 (en) Earth Retention and Piling Systems
US20100239375A1 (en) Diaphragm/ sea retaining wall system
KR100768031B1 (en) Complex pile commected integral steel pile to prestressed concrete composite pile and method for working using it
US3352120A (en) Reinforced concrete pile
US5123777A (en) Construction elements
SU949076A1 (en) Pile footing anf method for erecting it
CN107630564B (en) Construction method for reinforced structure of concrete beam
CN113279423B (en) Prefabricated column pier and post-cast strip foundation beam assembly integral construction method
JPH0144852B2 (en)
JPH0367168B2 (en)
US4899502A (en) Building or structure erected on a slope
CN217758906U (en) Assembled anti-settlement beam slab foundation structure
CN216195863U (en) Hollow close-splicing and overlapping bidirectional plate of prestressed concrete steel bar truss
CN115059188B (en) Steel column structure for corner of structural well, building and construction method
AU2012202472B2 (en) Earth Retention and Piling Systems
KR200435076Y1 (en) Complex pile commected integral steel pile to prestressed concrete composite pile
JP2006219848A (en) Precast pc rigid-frame bridge
SU958599A2 (en) Pile foundation
JPS61134422A (en) Method of building precast concrete underground continuous wall
JPS6027324B2 (en) Quay construction method
CN115030210A (en) Fabricated anti-settling beam slab foundation structure and construction method thereof
RU1779710C (en) Method of pile erection
JPH06212646A (en) Preventing method for structure from floating up by use of exisiting pile