KR20210053497A - Fileless-up wall demolition method - Google Patents
Fileless-up wall demolition method Download PDFInfo
- Publication number
- KR20210053497A KR20210053497A KR1020190139163A KR20190139163A KR20210053497A KR 20210053497 A KR20210053497 A KR 20210053497A KR 1020190139163 A KR1020190139163 A KR 1020190139163A KR 20190139163 A KR20190139163 A KR 20190139163A KR 20210053497 A KR20210053497 A KR 20210053497A
- Authority
- KR
- South Korea
- Prior art keywords
- wall
- pile
- demolition
- piles
- underground
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/08—Wrecking of buildings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2220/00—Temporary installations or constructions
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Mechanical Engineering (AREA)
- Electrochemistry (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Chemical & Material Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
본 발명은 토목분야에 관한 것으로써, 상세하게는 흙막이공사의 지하 옹벽 철거에 있어서 기존 벽체 H-파일이 존치되지 않은 경우에도 지하 철거가 가능하도록 하는 무 파일 올림식 벽체 철거 공법에 관한 것이다. The present invention relates to the field of civil engineering, and more particularly, to a non-pile lifted wall demolition method that enables underground demolition even when the existing wall H-pile does not exist in the demolition of an underground retaining wall of an earthen wall construction.
다음은 무 파일 올림식 벽체 철거 공법의 배경이 되는 기술로써, The following is the technology behind the no-pile lifting wall demolition method,
국내 특허 등록번호 1007362410000 (2007.06.29) '지하옹벽을 제거하기 위한 상향식 순차제거 및 순차매립공법'의 구조 및 시공방법을 나타낸 것이다.Domestic Patent Registration No. 1007362410000 (2007.06.29) It shows the structure and construction method of the'up-down sequential removal and sequential reclamation method for removing the underground retaining wall'.
국내 특허 등록번호 1007362410000 (2007.06.29) '지하옹벽을 제거하기 위한 상향식 순차제거 및 순차매립공법'에 대한 시공방법의 설명은 다음과 같다. Domestic Patent Registration No. 1007362410000 (2007.06.29) The description of the construction method for the'up-down sequential removal and sequential reclamation method for removing the underground retaining wall' is as follows.
1. 기존 벽체 H-파일이 존치되어 있는 것을 전제로 한다.1. It is premised that the existing wall H-pile exists.
2. 우선 슬래브 구멍을 뚫고 중앙파일 및 코너파일을 설치한다.2. First, drill a hole in the slab and install the central pile and corner pile.
3. 구조계산서 설계된 각 층에 잭써포트를 설치한다.3. Install jack supports on each floor for which the structural bill is designed.
4. 벽체 내부에 띠장, 스트러트를 설치한다. 4. Install strips and struts inside the wall.
5. 내부 슬래브 및 기둥을 철거하면서 바닥까지 내려간다. 5. Go down to the floor while removing the inner slab and column.
6. 기초 상단에 포스트파일, 코너파일을 안착시킨다. 6. Place the post pile and corner pile on the top of the foundation.
7. 기초철거 시 되메우기작업과 벽체철거를 각층마다 반복적으로 진행하면서 상부로 올라간다.7. When the foundation is demolished, the backfilling work and the wall dismantling are repeatedly carried out for each floor and climbed to the top.
8. 상단 나대지 상태에서 파일을 인발한 후 토목업체에 인계한다.8. After drawing the file in the top bare ground condition, hand it over to a civil engineering company.
이와 같은 구성을 갖는 종래의 철거방법은 기존 벽체 H-파일이 존치하는 것을 전제로 한 방법이다. 기존 벽체 H-파일이 존치하지 않는 경우, 종래의 철거방법으로는 지하 철거가 불가했다. The conventional demolition method having such a configuration is a method based on the premise that the existing wall H-pile remains. If the existing wall H-pile did not exist, underground demolition was impossible with the conventional demolition method.
과거에는 지하 건축구조물 시공후 사장하였으나(미 인발) 근래에 들어서는 약 50In the past, after the construction of an underground building structure, it was dead (not drawn), but in recent years, about 50
%의 기존 벽체 H-파일이 존치하고 나머지 50%는 기존에 인발했으므로 파일이 존치하지 않아서 지하 철거가 불가능하였으나, 본 발명은 파일이 없어도 지하 철거가 가능하다. % Of the existing wall H-pile survived, and the remaining 50% were previously drawn, so that the pile did not exist, and thus underground demolition was impossible, but the present invention enables underground demolition without a pile.
국내 특허 등록번호 1007362410000 (2007.06.29) '지하옹벽을 제거하기 위한 상향식 순차제거 및 순차매립공법' 역시 기존 벽체 H-파일이 존치되어 있는 것을 전제로 하므로, 기존 벽체 H-파일이 존치되어있지 않을 경우 사실상 지하 철거가 불가하다. Domestic Patent Registration No. 1007362410000 (2007.06.29)'Upward sequential removal and sequential reclamation method for removing the underground retaining wall' also presupposes that the existing wall H-pile remains, so that the existing wall H-pile does not exist. In this case, underground demolition is virtually impossible.
상부에서 기존 벽체 건물 뒤에 CIP, SCW 등 흙막이 공사를 실시하여도 되나, 부득이하게 시가지에서 경계의 여유폭이 없고 기존 벽체와 신설 벽체가 일체형으로 겹치게 될 때 사용한다. It is possible to carry out earth protection work such as CIP and SCW behind the existing wall building from the top, but it is used when there is inevitably no margin of boundary in the city area and the existing wall and the new wall are integrally overlapped.
무 파일 올림식 벽체 철거 공법은 국내 특허 등록번호 1007362410000 (2007.06.29) '지하옹벽을 제거하기 위한 상향식 순차제거 및 순차매립공법'과는 달리 기존 벽체에 H-파일이 존치하지 않을 경우에도 구조적으로 안전하게 지하 철거가 가능한 신 지하옹벽 철거방법을 제시하고자 하는 것이다.Unlike the domestic patent registration number 1007362410000 (2007.06.29)'Upward sequential removal and sequential reclamation method for removing underground retaining walls', the no-pile lifting wall removal method is structurally This is to suggest a new underground retaining wall demolition method that enables safe underground demolition.
무 파일 올림식 벽체 철거 공법은 상술한 바와 같은 목적을 달성하기 위하여, In order to achieve the above-described purpose, the pile-free lifting wall demolition method,
흙막이공사의 지하옹벽 철거에 적합한 다음과 같은 방식을 제시한다. The following method is suggested for the demolition of the underground retaining wall in the earth protection work.
국내 특허 등록번호 1007362410000 (2007.06.29) '지하옹벽을 제거하기 위한 상향식 순차제거 및 순차매립공법' 과 같은 종래의 철거방법은 공사 전 기존 벽체 H-파일이 존치되어 있는 것을 전제로 하나, 본 발명은 공사 전 기존 벽체 H-파일이 존치되어 있지 않는 것 즉, 무 파일을 전제로 한다. Domestic patent registration number 1007362410000 (2007.06.29) Conventional demolition methods such as the'up-down sequential removal and sequential reclamation method for removing the underground retaining wall' are based on the premise that the existing wall H-pile remains before construction, but the present invention The premise is that the existing wall H-pile does not exist before construction, that is, no pile.
국내 특허 등록번호 1007362410000 (2007.06.29) '지하옹벽을 제거하기 위한 상향식 순차제거 및 순차매립공법' 과 같은 종래의 철거방법은 철거용 포스트 파일을 지탱하기 위해서 기초를 가로×세로 : 1M×1M를 남기고, 차후 토목 업체가 처리하게 한다. 반면 본 발명은 철거용 포스트파일을 지탱하기 위해 마이크로파일(봉 지름 21.5CM)을 설치하고 코어 및 소형드릴을 이용하여 이어내린다. Domestic Patent Registration No. 1007362410000 (2007.06.29) Conventional demolition methods such as the'up-down sequential removal and sequential reclamation method for removing the underground retaining wall' are used to support the post pile for demolition. Leave it, and let the civil engineering company handle it later. On the other hand, in the present invention, a micropile (bar diameter 21.5CM) is installed to support the post-pile for demolition, and a core and a small drill are used to connect it.
국내 특허 등록번호 1007362410000 (2007.06.29) '지하옹벽을 제거하기 위한 상향식 순차제거 및 순차매립공법' 과 같은 종래의 철거방법은 벽체 철거 단계에서 벽체에 H-파일 및 토류판 존치로 벽면 토압을 커버하고자 높이7M×폭15M 철거를 하였다. 반면 본 발명은 무 파일이기 때문에 벽체 철거시 가로×세로 : 2M×5M로 철거하는데, 이때 좌측과 우측의 벽체는 간격 5M이상 존치되도록 엇각으로 철거한다.Domestic patent registration number 1007362410000 (2007.06.29) Conventional demolition methods such as the'up-down sequential removal and sequential reclamation method for removing the underground retaining wall' are intended to cover the earth pressure on the wall by retaining the H-pile and earth plate on the wall during the wall demolition step. It was demolished 7M high x 15M wide. On the other hand, since the present invention is a non-pile, the wall is demolished in width x length: 2M x 5M, and at this time, the left and right walls are removed at an oblique angle so as to remain at least 5M apart.
무 파일 올림식 벽체 철거 공법은 이례적으로 기존 벽체 H-파일이 존치하지 않는 경우에도 구조적으로 안전하게 지하 철거가 가능하게 한다. The no-pile lifted wall demolition method allows structurally safe underground demolition even if the existing wall H-pile does not exist unusually.
도1은 흙막이 공사의 지하옹벽 철거에 적합한 무 파일 올림식 벽체 철거 공법을 도시한 것으로써,
도 1은 전체 단면도와 주요부인 A-A부분을 확대한 단면도.
도 2는 무 파일 벽체 철거 방법에 대한 횡전개도. 1 is a diagram showing a pile-free lifting type wall demolition method suitable for the demolition of an underground retaining wall in an earthen block construction,
1 is an enlarged cross-sectional view of the entire cross-sectional view and AA, which is a main part.
Figure 2 is a horizontal exploded view of the method of removing the pile wall.
무 파일 올림식 벽체 철거 공법에 관한 시공방법을 단계적으로 상세히 설명하도록 하겠다. I will explain in detail the construction method for the no-pile lifted wall demolition method step by step.
1. 기존 벽체 H-파일이 존치되어 있지 않는 것을 전제로 한다.1. It is assumed that the existing wall H-pile does not exist.
2. 우선 슬래브 구멍을 뚫고 중앙파일 및 코너파일을 설치한다.2. First, drill a hole in the slab and install the central pile and corner pile.
3. 구조계산서 설계된 각 층에 잭써포트를 설치한다.3. Install jack supports on each floor for which the structural bill is designed.
4. 내부 슬래브 및 내부 잡자재를 철거하면서 내려간다. 4. Go down while removing the internal slab and internal miscellaneous materials.
일반적으로는 300×300×10×15인 스트러트를 사용하나, 지름이 800mm인 강관을 사용하는 PPS공법을 적용하여 구조적 안전감을 제공한다. 또한 일반적으로 사용되어져 온 구조적 증명된 가시설 흙막이공법을 적용하여 안전성을 높였다. In general, struts of 300×300×10×15 are used, but structural safety is provided by applying the PPS method using a steel pipe with a diameter of 800mm. In addition, the safety was improved by applying the structurally proven temporary facility earth protection method that has been used in general.
5. 내부 슬래브 및 기둥을 철거하고 각층마다 WALL, STRUT를 설치하면서 1단에서 6단 바닥까지 내려간다.5. Remove the internal slabs and columns, and install walls and struts on each floor, going down from the 1st to the 6th floor.
6. 철거용 포스트파일을 지탱하기 위해서 마이크로파일(봉 지름 21.5CM)을 설치하고 코어 및 소형드릴을 이용하여 이어내린다. 마이크로파일을 미설치 할 경우에는 기초를 가로×세로 : 1M×1M를 남긴다. 차후 토목 업체가 처리한다. 6. To support the post pile for demolition, install a micropile (bar diameter 21.5CM) and connect it down using a core and a small drill. If the micropile is not installed, the foundation is left with a width x length: 1M x 1M. The civil engineering company will deal with it later.
7. 기초 철거를 휠쏘, 코어, 버스타로 제거한다. 이때 수시로 폐기물을 상차한다. 7. Remove the foundation demolition with a wheel saw, core, and buster. At this time, load the waste from time to time.
8. 수시로 되메우기 및 다짐을 함과 동시에 띠장 및 스트러트를 해체하면서 올라간다.8. Refill and pledge from time to time, and at the same time ascend while dismantling the belt and strut.
9. 지하 기초 철거후 지하 벽체 철거는 WALL, STRUT 최하단을 구조적 문제가 없는 선에서 설계에 맞게 최대한 낮게 설치한다. 9. For the demolition of the basement wall after the basement foundation is removed, install the lower end of the wall and strut as low as possible in accordance with the design in line with no structural problems.
10. 가로×세로 : 2M×5M로 철거할 때 좌측과 우측의 벽체는 간격 5M이상 존치되도록 엇각으로 철거한다.10. Width×length: When demolition in 2M×5M, the left and right walls should be removed at an angle so that they remain at least 5M apart.
그 이유는 다음과 같다. 기존에는 벽체에 H-파일 및 토류판 존치로 벽면 토압을 커버하기 때문에 높이 7M×폭15M 철거를 하였다. 그러나 해당 공법은 무 파일이기 때문에 높이×폭 : 2M×5M로 폭을 줄임으로써 토압을 최소화해서 흙의 무너짐을 방지한다. 지하벽체 뒤에는 무 파일이라도 기존 그라우팅이 1M정도 되어 있어서 토압이 일부분 커버된다. 또한 H-파일 및 토류판 없이 횡으로 연속철거 시에는 구조적으로 토압에 문제가 발생할 수 있으므로 엇각으로 철거한다. The reason for this is as follows. In the past, since the wall covers the earth pressure with H-pile and earth plate preservation, it was demolished 7M high x 15M wide. However, since this method is a non-pile, it minimizes the earth pressure by reducing the width to height × width: 2M × 5M to prevent the collapse of the soil. Even if there is no pile behind the underground wall, the existing grouting is about 1M, so the earth pressure is partially covered. In addition, in the case of horizontal continuous demolition without H-pile and earth plate, there may be structural problems with earth pressure, so it is removed at an angle.
11. 바로 바로 되메우기 및 다짐을 연속 작업한다. 11. Immediately do backfilling and compaction continuously.
12. 상단 나대지후 인발작업을 실시한 다음 토목업체에 인계한다. 12. After carrying out the drawing work after the top bare ground, it is handed over to a civil engineering company.
1 : 철거할 벽체
2 : 계단
3 : 철거용 포스트 : 300×200 파일
4 : 벽체(토사)
5 : 마이크로파일/봉 외경지름 : 21.5CM. 코어 및 소형드릴을 이용하여 이어내린다. 또는 기초를 가로×세로 : 1M×1M를 남길 수도 있다.
6 : 올라가면서 WALL, STRUT 해체 및 되메우기 작업
7 : STRUT
8 : 기존 무 파일 벽체 철거된 부분
9 : 기초 철거 부분
10 : 중앙 포스트 파일 및 코너 파일 : 300×200
11 : 100 TON 작키
12 : 스티프너
13 : WALL
14 : 브라켓트1: Wall to be demolished
2: stairs
3: Post for demolition: 300×200 files
4: wall (soil)
5: Micropile/rod outer diameter: 21.5CM. Use a core and a small drill to connect it down. Alternatively, you can leave the base horizontal x length: 1M x 1M.
6: Dismantling and backfilling walls and struts while climbing
7: STRUT
8: Part of the existing non-pile wall removed
9: foundation demolition part
10: Center post pile and corner pile: 300×200
11: 100 TON jockey
12: stiffener
13: WALL
14: bracket
Claims (6)
공사 전 기존 벽체 H-파일이 존치되어 있지 않는 것을 전제로, 우선 슬래브 구멍을 뚫고 중앙파일 및 코너파일을 설치하고, 구조계산서 설계된 각 층에 잭써포트를 설치하는 공정(제1공정)과;
내부 슬래브 및 내부 잡자재를 철거하면서 내려가는 공정(제2공정)과;
내부 슬래브 및 기둥을 철거하고 각층마다 WALL, STRUT를 설치하면서 1단에서 6단 바닥까지 내려가는 공정(제3공정)과;
마이크로파일(봉 지름 21.5CM)을 설치하는 공정(제4공정)과;
기초 철거를 휠쏘, 코어, 버스타로 제거하고 이때 수시로 폐기물을 상차하면서 수시로 되메우기 및 다짐을 함과 동시에 띠장 및 스트러트를 해체하면서 올라가는 공정(제5공정)과;
지하 기초 철거후 지하 벽체 철거는 WALL, STRUT 최하단을 구조적 문제가 없는 선에서 설계에 맞게 최대한 낮게 설치하는 공정(제6공정)과;
가로×세로 : 2M×5M로 철거할 때 좌측과 우측의 벽체는 간격 5M이상 존치되도록 엇각으로 철거하는 공정(제7공정)과;
바로 바로 되메우기 및 다짐을 연속 작업한 다음, 상단 나대지후 인발작업을 실시하고 토목업체에 인계하는 공정(제8공정)
을 포함하는 것을 특징으로 하는, 흙막이 공사의 지하옹벽 철거에 적합한 무 파일 올림식 벽체 철거 공법.
Conventional methods for demolition of underground structures are all on the premise that piles remain on the wall, but on the contrary, in the case where piles do not exist on the wall,
Assuming that the existing wall H-pile does not exist before construction, first, a slab hole is drilled, the central pile and the corner pile are installed, and the jack support is installed on each floor for which the structural bill is designed (the first step);
A step of descending while removing the internal slab and internal miscellaneous materials (second step);
A step of removing the internal slabs and columns and installing walls and struts on each floor, and descending from the first step to the sixth floor (third step);
A step of installing a micropile (rod diameter 21.5CM) (fourth step);
A step of removing the foundation with a wheel saw, a core, and a buster, and at this time, while loading the waste from time to time, frequently backfilling and compacting, and dismantling the strip and strut while climbing up (Step 5);
The process of installing the bottom of the wall and strut as low as possible in accordance with the design without structural problems for the removal of the basement wall after the basement foundation is removed (Step 6);
Width x length: When demolition in 2M x 5M, the left and right walls are removed at an angle of at least 5M so that they remain at least 5M apart (the 7th step);
Immediately, after continuous work of backfilling and compaction, drawing work is performed after the top bare ground and handed over to a civil engineering company (Step 8)
Characterized in that it comprises a, non-pile lifting type wall demolition method suitable for the demolition of the underground retaining wall of the earthen construction.
상기 제2공정에서 일반적으로는 300×300×10×15인 스트러트를 사용하나, 지름이 800mm인 강관을 사용하는 PPS공법을 적용하여 구조적 안전감을 제공하고, 일반적으로 사용되어져 온 구조적 증명된 가시설 흙막이공법을 적용하여 안전성을 높인 무 파일 올림식 벽체 철거 공법.
The method according to claim 1,
In the second process, a strut of 300×300×10×15 is generally used, but the PPS method using a steel pipe with a diameter of 800 mm is applied to provide a sense of structural safety, and a structurally proven temporary facility that has been generally used. A non-pile lifted wall demolition method with improved safety by applying a construction method.
상기 제4공정에서는 철거용 포스트파일을 지탱하기 위해서 마이크로파일(봉 지름 21.5CM)을 설치하고 코어 및 소형드릴로 이어내리는데, 마이크로파일을 미설치할 경우에는 기초를 가로×세로 : 1M×1M를 남기고 차후 토목 업체가 처리하도록 하는 무 파일 올림식 벽체 철거공법.
The method according to claim 1,
In the fourth step, a micropile (bar diameter 21.5CM) is installed to support the postpile for demolition, and the core and small drill are connected to it.If the micropile is not installed, the foundation is left with a width x length: 1M x 1M. Pile-up wall demolition method to be processed by civil engineering companies in the future.
상기 제7공정에서 높이×폭 : 7M× 15M에서 2M×5M로 폭을 줄임으로써 토압을 최소화해서 흙의 무너짐을 방지하고, 또한 H-파일 및 토류판 없이 횡으로 연속철거 시에는 구조적으로 토압에 문제가 발생할 수 있으므로 엇각으로 철거하는 무 파일 올림식 벽체 철거 공법.
The method according to claim 1,
In the 7th process, height x width: by reducing the width from 7M x 15M to 2M x 5M, the earth pressure is minimized to prevent the collapse of the soil.In addition, when the horizontal continuous demolition without H-pile and earth plate, there is a structural problem of earth pressure. As this may occur, a non-pile lifted wall demolition method that is removed at an angle.
상기 제4공정에서 기초는 휠쏘, 코어작업, 버스타 작업으로 제거하며 중앙파일과 코너파일은 상부는 300×200파일, 하부는 마이크로파일 21.5CM로 보강하는 단계를 거치는 무 파일 올림식 벽체 철거 공법.
The method according to claim 1 or 3,
In the fourth process, the foundation is removed with a wheel saw, core work, and buster work, and the center pile and corner pile are reinforced with 300×200 piles at the top and 21.5CM micro piles at the bottom. .
상기 제8공정에서는 바닥에서부터 토사 되메우기, 다짐, 띠장 해체, 스트러트를 해체하면서 지상으로 올라가고, 끝으로 상부 나대지(되메우기)후 인발작업을 하는 무 파일 올림식 벽체 철거 공법.
The method according to claim 1,
In the eighth process, a pile-up wall demolition method in which soil backfill, compaction, strip strip, and strut are dismantled from the bottom, go up to the ground, and finally the top bare ground (backfill) and then draw work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020190139163A KR102333978B1 (en) | 2019-11-04 | 2019-11-04 | Pileless-up wall demolition method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020190139163A KR102333978B1 (en) | 2019-11-04 | 2019-11-04 | Pileless-up wall demolition method |
Publications (3)
Publication Number | Publication Date |
---|---|
KR20210053497A true KR20210053497A (en) | 2021-05-12 |
KR102333978B1 KR102333978B1 (en) | 2021-12-03 |
KR102333978B9 KR102333978B9 (en) | 2022-01-24 |
Family
ID=75918744
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020190139163A KR102333978B1 (en) | 2019-11-04 | 2019-11-04 | Pileless-up wall demolition method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102333978B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20240020470A (en) * | 2022-08-08 | 2024-02-15 | 동방산업 주식회사 | Top-down and bottom-up parallel decommissioning of existing building |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102551029B1 (en) * | 2022-05-02 | 2023-07-04 | 박차순 | Low noise and low vibration safely cutting and demolishing method of building structure |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060103309A (en) * | 2006-09-07 | 2006-09-28 | 주식회사 백산종합개발 | Gradual bottom-up slice and gradual infilling method for removing underground retaining wall |
KR20100101271A (en) * | 2009-03-09 | 2010-09-17 | 이동희 | Method for removing the superannuated build as top-down type |
KR101481073B1 (en) * | 2014-03-17 | 2015-01-13 | 주식회사 승일토건 | Method for removing underground structure |
-
2019
- 2019-11-04 KR KR1020190139163A patent/KR102333978B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060103309A (en) * | 2006-09-07 | 2006-09-28 | 주식회사 백산종합개발 | Gradual bottom-up slice and gradual infilling method for removing underground retaining wall |
KR100736241B1 (en) | 2006-09-07 | 2007-07-06 | 주식회사 백산종합개발 | Gradual Bottom-up Slice and Gradual Infilling Method for Removing Underground Retaining Wall |
KR20100101271A (en) * | 2009-03-09 | 2010-09-17 | 이동희 | Method for removing the superannuated build as top-down type |
KR101481073B1 (en) * | 2014-03-17 | 2015-01-13 | 주식회사 승일토건 | Method for removing underground structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20240020470A (en) * | 2022-08-08 | 2024-02-15 | 동방산업 주식회사 | Top-down and bottom-up parallel decommissioning of existing building |
Also Published As
Publication number | Publication date |
---|---|
KR102333978B1 (en) | 2021-12-03 |
KR102333978B9 (en) | 2022-01-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101205783B1 (en) | The complex execution method which dismantling work of existing underground structure and constructs of new building simultaneously | |
CN100595395C (en) | Static pressure pile process for construction of existing building basement | |
CN104264683B (en) | Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition | |
KR100877974B1 (en) | Reverse removing method of underground retaining wall using bottom-up cut and gradual land infilling with struts | |
KR20210053497A (en) | Fileless-up wall demolition method | |
CN111456032B (en) | Foundation pit supporting system and construction method thereof | |
CN1279319A (en) | Full-reverse construction technology for basement | |
KR20200122037A (en) | The construction method using a exterio wall of undergound structure | |
CN108222054A (en) | Tower-crane foundation structure and its construction method | |
KR20000058238A (en) | Underground construction method using permanent reinforced concrete girders as temporary struts | |
CN204040042U (en) | A kind of super large ultra-deep support with manually dug piles structure | |
CN216238685U (en) | Support replacing structure for memorial archway in-situ protection foundation | |
CN206873459U (en) | A kind of large-span steel-reinforced concrete foundation ditch support system | |
KR200219236Y1 (en) | A mold assembly for reinforced concrete girders execution | |
KR20210051326A (en) | Batch down wall demolition method | |
CN210216473U (en) | Anti-slide pile for slope treatment | |
CN114215106A (en) | Multi-pile support column structure adopting upper steel structure full-reverse construction method and construction method | |
JP6920039B2 (en) | How to dismantle the existing underground skeleton | |
CN219710338U (en) | Deep foundation pit supporting structure | |
KR100615149B1 (en) | A method of construction top-down for the ground fabric construction | |
CN1058247A (en) | Multi-layer integrate working pile supporting system and job practices | |
CN115262568B (en) | Deepening support and excavation construction method based on zero-field deep foundation pit | |
KR102113117B1 (en) | Structure construction method using guide wall | |
CN215331319U (en) | Scaffold platform device for pipe-jacking open caisson construction | |
CN111021413B (en) | Reverse construction method based on assembly type concept |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AMND | Amendment | ||
E601 | Decision to refuse application | ||
AMND | Amendment | ||
X701 | Decision to grant (after re-examination) | ||
N231 | Notification of change of applicant | ||
GRNT | Written decision to grant | ||
G170 | Re-publication after modification of scope of protection [patent] |