Nothing Special   »   [go: up one dir, main page]

KR20100128579A - Device for fixing panels on the wall - Google Patents

Device for fixing panels on the wall Download PDF

Info

Publication number
KR20100128579A
KR20100128579A KR1020090047050A KR20090047050A KR20100128579A KR 20100128579 A KR20100128579 A KR 20100128579A KR 1020090047050 A KR1020090047050 A KR 1020090047050A KR 20090047050 A KR20090047050 A KR 20090047050A KR 20100128579 A KR20100128579 A KR 20100128579A
Authority
KR
South Korea
Prior art keywords
wall
finishing material
building
fixing device
holder
Prior art date
Application number
KR1020090047050A
Other languages
Korean (ko)
Inventor
김종성
Original Assignee
김종성
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김종성 filed Critical 김종성
Priority to KR1020090047050A priority Critical patent/KR20100128579A/en
Publication of KR20100128579A publication Critical patent/KR20100128579A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0832Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
    • E04F13/0833Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable
    • E04F13/0835Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable the fastening elements extending into the back side of the covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0832Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
    • E04F13/0833Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable
    • E04F13/0851Hooking means on the back side of the covering elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The present invention relates to a fixing device for the installation of building finishing materials to make the installation of the building finishing material on the wall of the building more easily and stably. The fixing device for building finishing material installation according to the present invention is fixed to the wall side through the anchor bolt embedded in the wall while the vertical side is extended to the wall member, the horizontal member is formed toward the outside through the anchor bolt embedded in the building finishing material The finishing member, which is fixedly installed but whose holder is deflected toward the wall side, the horizontal part is assembled to the wall member so that the wall member and the finishing member can be interconnected, while the vertical part of the connecting member and the wall side member are inserted into the insertion space inside the holder. In the fixing device for building finishing material installation comprising a fastening bolt for allowing the horizontal portion of the horizontal portion and the connecting member to be assembled with each other, the holder of the finishing member-side member is gradually enlarged from the top to the lower side with the building finishing material Number of connecting members that are refracted in an inclined structure and inserted into the insertion space inside the holder The direct part corresponds to the insertion space and is formed in an inclined structure such that one side thereof is reduced in thickness from the lower part to the upper part, and the vertical part of the vertical part is in direct contact with the building finish, while the inclined part of the vertical part is in the inner surface of the holder. It may be composed of a structure in contact.

Description

Device for fixing panels on the wall}

The present invention relates to a fixing device for installing a building finishing material, and more particularly, to a fixing device for installing a building finishing material to make the installation of the building finishing material on the wall of the building more easily and stably.

Marble, which is commonly used as a building finishing material, is fixedly attached to the wall of a building with a fixing device and anchor bolt for installing a separate building finishing material in a state of being manufactured in a certain shape and size. In other words, the building finishing material, such as marble, which has a considerable weight and is manufactured in the form of a plate, is fixed to the wall of the building through a fixing device for installing the building finishing material.

Regarding the conventional fixing device for building finishing materials, 'Patent bracket and fixing device of stone panel' of Korean Utility Model Registration No. 20-0166400, 'Exterior panel fixing device of building' of Korean Utility Model Registration No. 20-0378283 and It can be seen through the 'building exterior fixing device' of the Republic of Korea Patent Office Patent Registration No. 10-0609472.

1 is a view for explaining the configuration of the exterior panel fixing device of the building of the Republic of Korea Patent Office Registration Utility Model Publication No. 20-0378283. As shown in FIG. 1, the anchor bolt 12 is embedded on the wall 10 on which the building finishing material 20 is to be installed, while the anchor bolt 22 is also embedded on the rear side of the building finishing material 20. Installation of the building finishing material 20 using the fixing device 30 for installation is made. That is, between the anchor bolt 12 buried on the wall 10 of the building and the anchor bolt 22 buried on the building finishing material 20, a separate fixing device 30 for installing the building finishing material is interposed, thereby providing a building finishing material ( 20 can be maintained fixed to the wall (10) of the building.

As shown in the drawings, the conventional construction finishing material installation fixing device 30 has a vertical portion fixed to the wall 10 with anchor bolts 12 and fixed to the horizontal portion as shown in the drawings. Fastening hole is fixed to the building finishing material 20 through the anchor bolt 22 embedded in the wall member 32, the building finishing material 20, the through-hole is formed, but a predetermined portion of the intermediate spaced apart toward the wall The horizontal 34 is fastened to the horizontal portion of the wall member 32 in a form in which the holder 34a which is refracted by the furnace 34 and the wall member 32 and the wall member 32 are integrally refracted. 38, the bolt fastening hole for assembly is formed through, while the vertical portion includes a connecting member 36 inserted into the insertion space 34b provided inside the holder 34a of the finishing member side member 34. do.

However, in the fixing device for installing the building finishing material configured as described above, the space between the insertion spaces provided inside the holder of the finishing material side member is equally formed in the upper part and the lower part, and the thickness of the vertical part of the connecting member is also formed uniformly. Initial attachment of the connecting member to the insertion space of the finishing member side for attachment was not easily made, but there was a problem that the assembly state of both members was also unstable.

The present invention was made to solve all the problems of the prior art as described above, to provide a fastening device for building finishing material installation to facilitate the installation work in the process of attaching the building finishing material on the wall of the building There is a purpose.

Another object of the present invention is to provide a fastening device for building finishing material installation to maintain the installation state of the building finishing material to be more stable by allowing the surfaces facing each other between the finishing member side and the connecting member is formed in an inclined structure at a predetermined angle. There is.

The present invention configured to achieve the above object is as follows. That is, the fixing device for installing the building finishing material according to the present invention is built through the anchor bolt embedded in the building member, the wall side member is horizontally extended to the outside while the vertical portion is fixed to the wall through the anchor bolt embedded in the wall The finishing member is fixed to the finishing material, the holder member is refracted toward the wall side, the horizontal member is assembled to the wall member so that the wall member and the finishing member can be interconnected while the vertical member is inserted into the insertion space inside the holder and the wall side In the fixing device for building finishing material installation comprising a fastening bolt for allowing the horizontal portion of the member and the horizontal portions of the connecting member to be assembled with each other, the distance between the building member and the finishing member as the holder from the top toward the lower gradually Connecting member inserted into the insertion space inside the holder while being refracted by an enlarged inclined structure The vertical part is formed in a shape corresponding to the insertion space so that one side is inclined to decrease in thickness from the bottom to the upper part. The vertical part of the vertical part is in direct contact with the building finishing material, while the inclined surface of the vertical part is in the inner surface of the holder. It may be composed of a structure in contact.

Finishing member side member of the fixing device for building finishing material installation according to the present invention may be formed in the same width of the left and right width of the holder and the left and right width of the fixing part.

In the fixing device for installing the building finishing material according to the present invention, a rectangular bolt fastening hole may be formed through the horizontal portion of the connecting member so as to allow length adjustment in the front and rear directions with respect to the wall member.

According to the fixing device for installing the building finishing material according to the present invention has a great advantage that can be easily installed in the process of attaching the building finishing material to the wall of the building.

According to the fixing device for building finishing material installation according to the present invention has the advantage that the state of the building finishing material attached to the wall of the building can be maintained more stable.

In addition, the fixing device for building finishing material installation according to the present invention has the effect that the manufacturing cost can be lowered as the production is made relatively simple.

Hereinafter will be described in more detail with respect to the configuration and operation of the fixing device for building finishing material installation according to an embodiment of the present invention.

2 is a perspective view of a fixing device for building finishing material installation according to an embodiment of the present invention, Figure 3 is an exploded perspective view of a fixing device for building finishing material installation according to an embodiment of the present invention, Figure 4 is a building finishing material installation according to an embodiment of the present invention Side view of the fixing device, Figure 5 is a view showing a state in which the building finishing material is installed through the fixing device for installing the building finishing material according to an embodiment of the present invention, Figure 6 by the fixing device for building finishing material installation according to an embodiment of the present invention The drawing shows the state of construction finishing material installed. Reference numeral 100 shown in the drawings indicates a fixing device for building finishing material installation according to an embodiment of the present invention, while some of the reference numerals are cited symbols used in the description of the background art.

Fixing device 100 for installing the building finishing material according to an embodiment of the present invention is interposed between the building wall 10 and the building finishing material 20 as shown in the drawings building finishing material 20 for the wall 10 of the building Is used to keep the installed state.

To this end, the building finishing material installation fixing device 100 according to an embodiment of the present invention is a wall side member 110 is fixed to the wall 10, the finishing member side member 120 is fixed to the building finishing material 20 side, The coupling member 130 and the horizontal portion of the wall member 110 and the horizontal portion of the connecting member 130 to be connected to each other between the wall member 110 and the finish member side 120 is maintained in the assembled state The bolt 140 is configured.

In particular, in the process of assembling between the finishing member side member 120 and the connecting member 130 of the building finishing material installation fixing device 100 according to an embodiment of the present invention, the finishing member side member ( The surface in contact with each other between the 120 and the connecting member 130 is formed as an inclined surface.

First, the wall member 110 of the fixing device 100 for installing the building finishing material according to the embodiment of the present invention is formed in a shape that is bent in a substantially 'b' shape, the vertical portion 112 is anchored to the wall 10 While being fixed by the bolt 12, the horizontal portion 114 is formed in a structure extending a predetermined length toward the outside. An anchor bolt assembling hole 112a for assembling the anchor bolt 12 is formed through the vertical portion 112 of the wall side member 110, and the fastening bolt 140 is formed on the horizontal portion 114 of the wall side member 110. The bolt fastening hole 114a for fastening is formed through.

And the finishing member side member 120 of the building finishing material installation fixing device 100 according to an embodiment of the present invention is the fixing portion 122 of the upper is fixed to the building finishing material 20 by the anchor bolt 22 On the other hand, the lower portion is formed in a form in which the middle is refracted so that a predetermined interval with respect to the building finish material 20. The lower part refracted with respect to the fixing part 122 is a holder 124, and the inside of the holder 124 is an insertion space 126 into which the vertical part 134 of the connecting member 130 is inserted. In particular, the insertion space 126 provided inside the holder 124 is formed in an inclined structure such that the interval with the building finish material 20 gradually increases from the upper side to the lower side of the holder 124.

On the other hand, the holder 124 of the finishing member side member 120 according to an embodiment of the present invention has a width equal to the left and right width of the fixing portion 122. Therefore, the manufacturing process can be made relatively simple, and the cost according to the manufacturing can be reduced.

The finishing member side member 120 configured as described above is attached to the rear surface of the building finishing material 20 through the anchor bolt 22 embedded in the building finishing material (20).

In addition, the connecting member 130 of the building finishing material installation fixing device 100 according to an embodiment of the present invention is in a form that is bent in a substantially 'b' shape in the direction corresponding to the wall member 110, as shown in the figure Formation.

In particular, the vertical portion 134 of the connecting member 130 has a form in which the thickness decreases from the lower side to the upper side corresponding to the insertion space 126 provided inside the holder 124 of the finishing member side member 120. The vertical portion 134 of the connection member 130 described above has a vertical surface 134a which is in direct surface contact with the building finish 20, while the inclined surface 134b has a surface contact with the inner surface of the holder 124. It is installed.

On the other hand, on the horizontal portion 132 of the connecting member 130 according to an embodiment of the present invention, the rectangular bolt fastening hole 136 is formed to penetrate the length of the wall member 110 in the front and rear direction. .

The wall side member 110 of the building finishing material installation fixing device 100 configured as described above is fixed to the wall 10 through the anchor bolt 12 embedded in the wall 10 while the finishing member side member 120 is It is fixed to the building finish material 20 through the anchor bolt 22 embedded in the building finish material (20).

In addition, the horizontal portion 132 of the connection member 130 is fastened through the fastening bolt 140 and the fastening nut 142 in a state where a predetermined section is overlapped on the horizontal portion 114 of the wall member 110. At this time, the position of the connection member 130 with respect to the wall side member 110, that is, it is possible to adjust the spacing of the building finishing material 20 with respect to the wall (10).

On the other hand, the installer installing the building finishing material is in the state of lifting the building finishing material 20 in the state in which the finishing member side 120 is attached, as shown in Figure 5 the upper portion of the vertical portion 134 of the connection member 130 The position of the insertion space 126 provided inside the holder 124 of the finishing member side member 120 is aligned. In this process, although the thickness of the upper end of the vertical portion 134 of the connecting member 130 is relatively thin, the insertion space 126 provided in the finishing member-side member 120 is relatively wide, so that initial insertion is easily performed. .

As described above, after the initial insertion of the finishing member 120 to the connecting member 130 is made, the assembly of the finishing member 120 to the connecting member 130 is naturally performed.

Meanwhile, as shown in FIG. 6, as the portion where the finishing member side member 120 and the vertical part 134 of the connecting member 130 contact each other is formed as an inclined surface, a more stable assembly state is maintained.

In addition, the finishing member side member 120 of the building finishing material installation fixing device 100 according to an embodiment of the present invention is made of a relatively simple structure, so that the manufacturing cost and the like can be relatively reduced.

The present invention is not limited to the above embodiments, and various modifications can be made within the scope of the technical idea of the present invention.

1 is a view for explaining a conventional technology.

Figure 2 is a perspective view of a fixing device for building finishing materials installation according to an embodiment of the present invention.

Figure 3 is an exploded perspective view of the fixing device for building finishing materials installation according to an embodiment of the present invention.

Figure 4 is a side view of the fixing device for building finishing material installation according to an embodiment of the present invention.

5 is a view showing a state in which the building finishing material is installed through the fixing device for building finishing material installation according to an embodiment of the present invention.

6 is a view showing a state in which the building finishing material is installed by the fixing device for building finishing material installation according to an embodiment of the present invention.

[Description of Code for Major Parts of Drawing]

10. Wall 12. Anchor Bolt

20. Finishing materials for construction 22. Anchor bolts

100. Fixture for installation of building finishing materials 110. Wall member

112. Vertical part of wall member 114. Horizontal part of wall member

120. Finishing member 122. Fixing part

124. Holder 126. Insertion space

130. Connecting member 132. Horizontal part of connecting member

134. Vertical part of connecting member 140. Tightening bolt

Claims (3)

The wall part member is vertically fixed to the wall by anchor bolts embedded in the wall, and the wall side member is extended horizontally outward, and is fixed to the building finishing material by anchor bolts embedded in the building finishing material. The horizontal member is assembled to the wall member so that the finishing member, the wall member and the finishing member can be interconnected, while the vertical member is connected to the insertion space inside the holder, and the horizontal member and the connecting member of the wall member In the fixing device for building finishing material installation comprising a fastening bolt for the horizontal parts to be assembled together, The holder of the finishing member side is refracted in an inclined structure in which the distance from the finishing material is gradually enlarged from the top to the bottom, while the vertical part of the connecting member inserted into the insertion space inside the holder corresponds to the insertion space. One side is formed in an inclined structure in such a way that the thickness is reduced from the lower portion toward the upper portion, wherein the vertical surface of the vertical portion is in direct contact with the building finishing material while the inclined surface of the vertical portion is in contact with the inner surface of the holder. Fixing device for installation of building finishing materials, characterized in that. According to claim 1, The finishing material side member is a fixing device for building finishing material installation, characterized in that the left and right width of the holder and the left and right width of the fixing portion is formed in the same width. The fixing device for building finishing materials according to claim 1 or 2, wherein a rectangular bolt fastening hole is formed on the horizontal portion of the connecting member so that the length of the wall member can be adjusted in the front and rear directions.
KR1020090047050A 2009-05-28 2009-05-28 Device for fixing panels on the wall KR20100128579A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090047050A KR20100128579A (en) 2009-05-28 2009-05-28 Device for fixing panels on the wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090047050A KR20100128579A (en) 2009-05-28 2009-05-28 Device for fixing panels on the wall

Publications (1)

Publication Number Publication Date
KR20100128579A true KR20100128579A (en) 2010-12-08

Family

ID=43505440

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090047050A KR20100128579A (en) 2009-05-28 2009-05-28 Device for fixing panels on the wall

Country Status (1)

Country Link
KR (1) KR20100128579A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102956431A (en) * 2011-08-26 2013-03-06 东京毅力科创株式会社 Ring-shaped shield member, components thereof and substrate mounting table
CN103362282A (en) * 2013-04-11 2013-10-23 厦门大端工业设计有限公司 Dry-hanging wall slab structure
CN105569308A (en) * 2016-02-06 2016-05-11 付春宇 Modern guard wall structure
CN110042999A (en) * 2019-04-29 2019-07-23 五冶集团上海有限公司 A kind of facade aluminium side is logical to fix device and fixing means
KR20220169114A (en) * 2021-06-18 2022-12-27 한국건설기술연구원 Exterior material fixing device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102956431A (en) * 2011-08-26 2013-03-06 东京毅力科创株式会社 Ring-shaped shield member, components thereof and substrate mounting table
CN102956431B (en) * 2011-08-26 2015-09-30 东京毅力科创株式会社 Ring shielding parts, its constituent part and substrate-placing platform
CN103362282A (en) * 2013-04-11 2013-10-23 厦门大端工业设计有限公司 Dry-hanging wall slab structure
WO2014166407A1 (en) * 2013-04-11 2014-10-16 Leng Luhao Dry hanging wall panel structure
CN105569308A (en) * 2016-02-06 2016-05-11 付春宇 Modern guard wall structure
CN110042999A (en) * 2019-04-29 2019-07-23 五冶集团上海有限公司 A kind of facade aluminium side is logical to fix device and fixing means
KR20220169114A (en) * 2021-06-18 2022-12-27 한국건설기술연구원 Exterior material fixing device

Similar Documents

Publication Publication Date Title
US11021868B2 (en) Finishing panel fixing device
KR100825883B1 (en) Structure of fixing using wooddeck plate
KR20100128579A (en) Device for fixing panels on the wall
KR200410714Y1 (en) facing of constrution fixture
KR101964426B1 (en) Constructing member
KR20100086726A (en) Device for fixing panels on the wall
KR20110043113A (en) A wall panel and fix bracket and establishment method thereof
KR20150120203A (en) manufacturing method for internal and external construction materials fixing device and the internal and external construction materials fixing device thereof
KR100758926B1 (en) A fixing device for a out side panel of building
KR200264132Y1 (en) A fixture of ornament pannel for building
KR101059957B1 (en) Curtain wall fixture
KR101204208B1 (en) A Wall Panel Assembly
KR100996345B1 (en) A fixing device for a out side panel of building
KR101435603B1 (en) Interior and exterior material, bracket for enhancing aseismicity
KR101770393B1 (en) clip for fixing interior materials
KR200186960Y1 (en) A fixing device for a marble panel
KR200378284Y1 (en) Building of out side panel fixing device
KR102126921B1 (en) Installation bracket for exterior panel
KR200432715Y1 (en) sectional panel
KR102124412B1 (en) Exterior panel
KR200414076Y1 (en) Exterior panel fixing device of building
KR20070076381A (en) Building of out side panel fixing device
KR200381607Y1 (en) A fixing device for a out side panel of building
JP4456447B2 (en) Wall support structure
KR101787246B1 (en) Assembly of outside panels on the wall

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application