Nothing Special   »   [go: up one dir, main page]

KR20070008124A - Support pile for a pipe pile - Google Patents

Support pile for a pipe pile Download PDF

Info

Publication number
KR20070008124A
KR20070008124A KR1020050063108A KR20050063108A KR20070008124A KR 20070008124 A KR20070008124 A KR 20070008124A KR 1020050063108 A KR1020050063108 A KR 1020050063108A KR 20050063108 A KR20050063108 A KR 20050063108A KR 20070008124 A KR20070008124 A KR 20070008124A
Authority
KR
South Korea
Prior art keywords
pile
tubular
auxiliary
ground
file
Prior art date
Application number
KR1020050063108A
Other languages
Korean (ko)
Inventor
이정재
이준영
정영훈
Original Assignee
만수건설(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 만수건설(주) filed Critical 만수건설(주)
Priority to KR1020050063108A priority Critical patent/KR20070008124A/en
Publication of KR20070008124A publication Critical patent/KR20070008124A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/226Protecting piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1685Shapes cylindrical
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

An auxiliary pile for a tubular pile is provided to preclude the tubular pile from being broken due to the separation of the auxiliary pile by installing a position separation prevention projection in the inner hole of the tubular pile and at the outer surface of the lower cover. An auxiliary pile(20) for a tubular pile(10) is composed of a cylindrical pile body(21); covers(22,23) sealing the upper and lower ends of the pile body; and a position separation prevention projection(24) detachably fitted in an inner hole(10a) of the tubular pile and projected at the outer surface of a lower cover(23) to conform the shaft center of the auxiliary pile to the shaft center of the tubular pile.

Description

관형 파일용 보조파일{Support pile for a pipe pile}Support pile for a pipe pile {Support pile for a pipe pile}

도 1은 항타장비와 종래 보조파일에 의해서 관형 파일이 지반에 박혀진 상태를 도시한 도면,1 is a view showing a state in which the tubular pile is embedded in the ground by the driving device and the conventional auxiliary file,

도 2는 종래 보조파일을 도시한 사시도,2 is a perspective view showing a conventional auxiliary file,

도 3은 종래 보조파일을 이용해서 관형 파일을 지반에 박아넣는 작업을 설명하기 위한 도면,3 is a view for explaining the operation of embedding a tubular file in the ground using a conventional auxiliary file,

도 4는 본 발명에 따른 보조파일을 도시한 사시도,4 is a perspective view showing an auxiliary file according to the present invention;

도 5는 본 발명에 따른 보조파일을 이용해서 관형 파일을 지반에 박아넣는 작업을 설명하기 위한 도면이다.5 is a view for explaining the operation of embedding the tubular file in the ground using the auxiliary file according to the present invention.

- 첨부도면의 주요 부분에 대한 용어 설명 --Explanation of terms for the main parts of the accompanying drawings-

10,10',10" ; 관형 파일, 20 ; 보조파일,10,10 ', 10 "; Tubular file, 20; Secondary file,

21 ; 파일본체, 22,23 ; 덮개,21; Pile body, 22,23; cover,

24 ; 위치이탈방지돌기, 24a ; 가이드부,24; Anti-position projection, 24a; Guide,

24b ; 스토퍼부, 100 ; 항타장비,24b; Stopper portion, 100; Driving Equipment,

110 ; 해머, G ; 지반,110; Hammer, G; Ground,

G1 ; 경질지반, G2 ; 연약지반,G1; Hard ground, G2; Soft Ground,

G3 ; 보강지반, H ; 구멍.G3; Reinforcement ground, H; hole.

본 발명은 관형 파일을 연약지반에 박아넣는데 이용하는 보조파일에 관한 것이다.The present invention relates to an auxiliary file used to drive a tubular file into soft ground.

주지된 바와 같이, 지구상층부의 토층(土層)을 건설공학적 입장에서 분류한 지반은, 토질적으로는 점토지반(粘土地盤)·사질지반(砂質地盤)·사력지반(砂礫地盤) 등으로, 지질적으로는 충적지반(沖積地盤)·홍적지반(洪積地盤) 등으로, 역학적으로는 연약지반(軟弱地盤)·경질지반(硬質地盤) 등으로 구별되며, 지반의 좋고 나쁨은 그 장소의 지질에 따라 결정된다.As is well known, soils classified in the upper part of the earth from the construction engineering point of view are soils, clays, and history of soils. Geologically, it is classified into alluvial and erythmic, and mechanically, it is divided into soft ground and hard ground. It depends on the geology of the place.

한편, 건축물의 밑바닥을 튼튼하게 하기 위해서 기초공사를 수행하는데, 경질지반처럼 구조물에 접한 지반이 이것을 지지하기에 충분한 강도의 강성을 가지고 있는 경우에는, 경질지반에 직접 기초공사를 수행할 수 있지만, 그렇지 못한 연약지반의 경우에는 지반침하가 발생되지 않도록, 파일(Pile ; 말뚝)을 박거나 지반을 개량하는 지정공사를 수행한 후, 이 위에 기초공사를 수행하고 있다.On the other hand, in order to strengthen the base of the building, the foundation work is carried out. If the ground contacting the structure, such as hard ground, has sufficient rigidity to support it, the foundation work can be carried out directly on the hard ground. In the case of the soft ground which is not, the foundation work is carried out after the designation is carried out to fix the pile or improve the ground so that ground settlement does not occur.

상기 파일은 강널파일, 관형 파일, H-형강파일 등과 같이 다양한 형태의 것 들이 적절히 선택되어 사용되고 있지만, 연약지반의 지정공사에는 관형 파일을 사용하는 것이 일반적이며, 이러한 관형 파일은 그 재질에 따라 강관파일이나, PC 파일, PHC 파일 등으로 구분된다.Although various types of files such as steel sheet pile, tubular pile, and H-shaped steel pile are appropriately selected and used, the pile file is generally used for designation of soft ground, and such tubular pile is a steel pipe according to its material. Files, PC files, PHC files and the like.

상기 관형 파일은 낙하해머·증기해머·디젤파일해머 및 진동파일드라이버 등의 항타장비에 의해서 지반에 박히게 된다.The tubular pile is embedded in ground by driving equipment such as a drop hammer, a steam hammer, a diesel pile hammer, and a vibration pile driver.

도 1을 참조하여, 관형 파일(10',10")을 지반에 박아넣는 작업을 설명해 보면 다음과 같다.Referring to Figure 1, the operation of driving the tubular files (10 ', 10 ") into the ground will be described as follows.

우선, 도 1에 도시된 바와 같이, 경질지반(G1) 위에 덮여진 연약지반(G2)이 항타장비(100)를 지지할 수 없을 정도로 지지력이 매우 낮은 경우, 연약지반(G2) 위에 보강지반(G3)을 덮어서 항타장비(100)가 연약지반(G2)에 파묻혀 들어가지 않도록 지반보강공사를 수행한다.First, as shown in FIG. 1, when the support force is very low so that the soft ground G2 covered on the hard ground G1 cannot support the driving device 100, the reinforcement ground on the soft ground G2 ( The ground reinforcement work is performed so that the driving device 100 is not buried in the soft ground by covering the G3).

이러한 상태에서, 관형 파일(10',10")을 박아넣기 위한 위치로 항타장비(100)를 이동시킨 후, 항타장비(100)를 매개로 관형 파일(10',10")을 지반(G)에 박아넣어서, 관형 파일(10',10")을 경질지반(G1)에 견고하게 박아넣는 파일박기공사를 수행한다. 이때, 도 1에 도시된 관형 파일(10')의 경우와 같이, 경질지반(G1)이 지면에서부터 얕은 곳에 위치된 경우에는, 항타장비(100)의 해머(110)로 관형 파일(10')을 타격하여 관형 파일(10')을 직접적으로 지반(G)에 박아넣지만, 도 1에 도시된 강판파일(10")의 경우와 같이, 경질지반(G1)이 지면에서부터 깊은 곳에 위치된 경우에는, 보조파일(20)을 관형 파일(10")에 얹어놓고, 항타장비(100)의 해 머(110)로 보조파일(20)을 타격하여 관형 파일(10")을 간접적으로 지반(G)에 박아넣는다.In this state, after moving the driving device 100 to a position for driving the tubular pile (10 ', 10 "), the ground (10', 10") of the tubular pile (10 ', 10 ") via the ground (G) ) Into the tubular pile (10 ', 10 ") to firmly infiltrate the hard ground (G1). At this time, as in the case of the tubular pile (10') shown in Figure 1, When the hard ground G1 is located at a shallow position from the ground, the tubular pile 10 'is directly driven to the ground G by hitting the tubular pile 10' with the hammer 110 of the driving device 100. However, as in the case of the steel plate pile (10 ") shown in Figure 1, when the hard ground (G1) is located deep from the ground, the auxiliary pile 20 is placed on the tubular pile (10"), By hitting the auxiliary pile 20 with the hammer 110 of the driving device 100, the tubular pile 10 "is indirectly driven into the ground G.

이후, 상기 파일박기공사가 완료되면, 보강지반(G3)과 연약지반(G2)을 걷어내는 터파기작업을 수행한다.Subsequently, when the pile pile construction is completed, the burr work to remove the reinforcement ground (G3) and soft ground (G2) is performed.

상기 터파기작업이 완료되면, 이에 콘크리트 슬리브 등을 타설·양생하는 등의 기초공사를 수행한다.When the excavation work is completed, the foundation works such as pouring and curing concrete sleeves.

참고로, 상기 경질지반(G1)이 지면에서부터 깊은 곳에 위치된 경우, 보조파일(20)을 사용하지 않고, 항타장비(100)의 해머(110)로 관형 파일(10")을 타격하여 관형 파일(10")을 직접적으로 지반(G)에 박아넣게 되면, 터파기작업시에 관형 파일(10")이 경질지반(G1) 외부로 과도하게 돌출되므로, 용접기 등의 절단기를 이용해서 과도하게 돌출되어신 관형 파일(10")을 절단 제거해야 한다. 따라서, 상기 경질지반(G1)이 지면에서부터 깊은 곳에 위치된 경우에 보조파일(20)을 사용하지 않고서 관형 파일(10")을 지반(G)에 직접 박아넣게 되면, 관형 파일(10") 절단작업 등으로 인해서 작업이 상당히 번거로우면서도 난이하고, 작업자의 안전이 크게 위협될 뿐만 아니라, 관형 파일(10")이 불필요하게 낭비되는 문제가 발생된다.For reference, when the hard ground G1 is located deep from the ground, the tubular pile by hitting the tubular pile 10 "with the hammer 110 of the helm device 100 without using the auxiliary pile 20, When the 10 "is directly driven into the ground G, the tubular pile 10" excessively protrudes out of the hard ground G1 during the excavation work, and thus excessively protrudes using a cutter such as a welding machine. The tubular pile 10 "has to be cut off. Therefore, when the hard ground (G1) is located deep from the ground when the tubular pile (10 ") is directly driven into the ground (G) without using the auxiliary file 20, cutting the tubular pile (10") Due to the work or the like, the work is considerably cumbersome and difficult, and the safety of the worker is greatly threatened, and the tubular file 10 "is unnecessarily wasted.

그러나, 상기 종래 관형 파일용 보조파일은, 도 2에 도시된 바와 같이, 원통형의 파일본체(21)와, 파일본체(21)의 상·하단을 각각 밀폐하는 덮개(22,23)로 이루어진 구조를 이루고 있어서, 보조파일(20)을 이용해서 관형 파일(10',10")을 지반(G)에 박아넣게 되면, 관형 파일(10',10")의 상단이 변형·손상되고, 가해지는 외력이 편심되게 전달되어서 파일박기 작업의 효율성이 크게 저하되는 문제가 발생되었다.However, the conventional tubular pile auxiliary file, as shown in Figure 2, a structure consisting of a cylindrical pile body 21 and the cover (22, 23) for sealing the upper and lower ends of the pile body 21, respectively. When the tubular piles 10 'and 10 "are driven into the ground G using the auxiliary pile 20, the upper ends of the tubular piles 10' and 10" are deformed and damaged and applied. Since the external force is transmitted eccentrically, there is a problem that the efficiency of the pile file operation is greatly reduced.

이에 대해서 도 3을 참조하여 설명해 보면 다음과 같다.This will be described with reference to FIG. 3 as follows.

도 3에 도시된 바와 같이, 지반(G)의 구멍(H)에 관형 파일(10)이 끼워지거나 박혀진 상태에서, 보조파일(20)을 지반(G)의 구멍(H)으로 투입해서, 보조파일(20)을 관형 파일(10)에 얹어놓는다. 상기 관형 파일(10)의 외경과 보조파일(20)의 외경은 다소 차이가 있을 수 있지만, 이들의 외경이 일치되도록 하는 것을 원칙으로 하고 있다.As shown in FIG. 3, in the state where the tubular pile 10 is inserted or lodged in the hole H of the ground G, the auxiliary pile 20 is introduced into the hole H of the ground G, The auxiliary file 20 is placed on the tubular file 10. The outer diameter of the tubular pile 10 and the outer diameter of the auxiliary pile 20 may be slightly different, but in principle, the outer diameters of the tubular piles 10 are the same.

이러한 상태에서, 항타장비(100)를 가동해서 해머(110)로 보조파일(20)의 상단 덮개(22)에 외력을 가하게 되면, 해머(110)로부터의 외력이 보조파일(20)을 통해서 관형 파일(10)로 전달되어서, 관형 파일(10)이 지반(G)에 박혀 들어가게 된다. 이때, 상기 지반 구멍(H)의 내경은 관형 파일(10)의 외경과 보조파일(20)의 외경보다 클수 밖에 없어서, 보조파일(20)을 해머(110)로 타격하게 되면, 보조파일(20)이 지반 구멍(H) 내에서 요동치면서 위치변경된다. 이처럼 보조파일(20)이 지반 구멍(H) 내에서 요동치며 위치변경되면, 보조파일(20)의 축중심이 관형 파일(10)의 축중심으로부터 이격되므로, 보조파일(20)과 맞대어지는 관형 파일(10)의 상단이 변형·손상되고, 해머(110)로부터의 외력이 관형 파일(10)의 축중심을 따라서 제대로 전달되지 못하고, 편심되어서 전달될 수밖에 없다.In this state, when the driving device 100 is operated to apply an external force to the top cover 22 of the auxiliary pile 20 with the hammer 110, the external force from the hammer 110 is tubular through the auxiliary pile 20. Passed to the file 10, the tubular file 10 is embedded in the ground (G). At this time, the inner diameter of the ground hole (H) can only be larger than the outer diameter of the tubular pile (10) and the outer diameter of the auxiliary pile (20), when hitting the auxiliary pile (20) with the hammer (110), the auxiliary pile (20) ) Changes position while rocking in the ground hole (H). When the auxiliary file 20 swings in the ground hole H and is changed in position, the shaft center of the auxiliary file 20 is spaced apart from the axis center of the tubular file 10, so that the auxiliary file 20 faces the auxiliary file 20. The upper end of the pile 10 is deformed and damaged, and the external force from the hammer 110 cannot be properly transmitted along the axial center of the tubular pile 10, and is eccentrically transmitted.

이에 본 발명은 상기와 같은 문제를 해소하기 위해 발명된 것으로, 관형 파일의 손상없이, 관형 파일을 보다 적절하게 박아넣을 수 있도록 된 관형 파일용 보조파일을 제공함에 그 목적이 있다.Accordingly, the present invention has been invented to solve the above problems, and an object thereof is to provide an auxiliary file for a tubular file that can be inserted into the tubular file more appropriately without damaging the tubular file.

상기와 같은 목적을 달성하기 위한 본 발명은, 원통형의 파일본체와, 파일본체의 상·하단을 각각 밀폐하는 덮개로 이루어진 관형 파일용 보조파일에 있어서, 상기 보조파일의 축중심과 관형 파일의 축중심이 일치되도록, 관형 파일의 내부홀에 삽탈가능하게 끼워져 고정되는 위치이탈방지돌기가, 하단 덮개의 외면에 돌출되게 구비되어진 것을 특징으로 하는 구조로 되어 있다.The present invention for achieving the above object, in the auxiliary pile for the tubular pile consisting of a cylindrical pile body and a lid for sealing the upper and lower ends of the pile body, respectively, the axis center of the auxiliary pile and the shaft of the tubular pile The position preventing protrusion which is inserted and detachably inserted into the inner hole of the tubular pile so as to coincide with the center is configured to protrude to the outer surface of the bottom cover.

이하 본 발명을 첨부된 예시도면에 의거하여 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 4 및 도 5는 본 발명에 따른 보조파일을 도시한 도면으로서, 종래 기술을 도시한 도 1 내지 도 3과 동일한 부위에는 동일한 참조부호를 붙이면서 그 설명은 생략하기로 한다.4 and 5 are views showing the auxiliary file according to the present invention, the same reference numerals are attached to the same parts as in FIGS. 1 to 3 showing the prior art, and description thereof will be omitted.

도 4에 의하면, 본 고안에 따른 보조파일(20)은, 원통형의 파일본체(21)와 ; 파일본체(21)의 상·하단을 각각 밀폐하는 덮개(22,23) 및; 하단 덮개(23)의 외면에 돌출되게 구비되어, 관형 파일(10)의 내부홀(10a)에 삽탈가능하게 끼워져 고정되어서, 보조파일(20)의 축중심과 관형 파일(10)의 축중심이 일치되도록 하는 위치이탈방지돌기(24)로 이루어진 구조를 이룬다.According to Figure 4, the auxiliary pile 20 according to the present invention, the cylindrical pile body 21 and; Lids 22 and 23 for sealing the upper and lower ends of the pile body 21; It is provided to protrude on the outer surface of the bottom cover 23, is inserted and fixed to the inner hole (10a) of the tubular pile (10), the shaft center of the auxiliary pile 20 and the shaft center of the tubular pile (10) It forms a structure consisting of the displacement preventing projections 24 to be matched.

본 실시예의 경우, 상기 위치이탈방지돌기(24)가, 경사진 가이드부(24a)와, 관형 파일 내부홀(10a)의 내벽면에 맞대어지는 스토퍼부(24b)로 이루어진 평판형태의 프레임이 "十"자 형태를 이루도록 하였다.In the present embodiment, the frame-shaped frame is composed of a guide portion 24a inclined and the stopper portion 24b facing the inner wall surface of the tubular pile inner hole 10a. It was to form the form of 十 ".

도 5를 참조하여, 본 발명에 따른 보조파일을 이용한 관형 파일박기 작업을 설명해 보면 다음과 같다.Referring to Figure 5, when describing the tubular pile operation using the auxiliary file according to the present invention.

도 5에 도시된 바와 같이, 지반(G)의 구멍(H)에 관형 파일(10)이 끼워지거나 박혀진 상태에서, 보조파일(20)을 지반(G)의 구멍(H)으로 투입하게 되면, 보조파일(20)의 위치이탈방지돌기(24)가 관형 파일(10)의 내부홀(10a)에 자연스럽게 끼워지면서, 관형 파일(10)의 상단에 보조파일(20)의 하단 덮개(20)가 맞대어지며 얹혀지게 된다.As illustrated in FIG. 5, when the auxiliary pile 20 is inserted into the hole H of the ground G while the tubular pile 10 is inserted or embedded in the hole H of the ground G, as shown in FIG. , While the position preventing protrusion 24 of the auxiliary file 20 is naturally inserted into the inner hole 10a of the tubular file 10, the lower cover 20 of the auxiliary file 20 on the top of the tubular file 10. Are face to face.

이러한 상태에서, 항타장비(100)를 가동해서 해머(110)로 보조파일(20)의 상단 덮개(22)에 외력을 가하게 되면, 해머(110)로부터의 외력이 보조파일(20)을 통해서 관형 파일(10)로 전달되어서, 관형 파일(10)이 지반(G)에 박혀 들어가게 된다.In this state, when the driving device 100 is operated to apply an external force to the top cover 22 of the auxiliary pile 20 with the hammer 110, the external force from the hammer 110 is tubular through the auxiliary pile 20. Passed to the file 10, the tubular file 10 is embedded in the ground (G).

이때, 상기 관형 파일(10)과 보조파일(20)은 관형 파일(10)의 내부홀(10a)에 삽탈가능하게 끼워진 위치이탈방지돌기(24)에 의해서 축중심이 일치된 상태이므로, 해머(110)로부터의 외력이 관형 파일(10)의 축중심으로 정확하게 전달되고, 또한 해머(110)로부터의 외력이 보조파일(20)의 하단 덮개(23)를 통해서 관형 파일(10)의 상단면 전체에 걸쳐서 고르게 전달되어, 보조파일(20)의 위치이탈로 인한 관형 파일(10)의 변형·손상은 더이상 발생되지 않는다.At this time, the tubular pile 10 and the auxiliary pile 20 is in a state in which the center of the shaft is coincident with the displacement preventing projections 24 which are inserted into the inner hole 10a of the tubular pile 10 so as to be detachable. The external force from 110 is transmitted accurately to the axial center of the tubular pile 10, and the external force from the hammer 110 is transmitted through the bottom cover 23 of the auxiliary pile 20 to the entire upper surface of the tubular pile 10. Evenly distributed over, the deformation and damage of the tubular pile 10 due to the positional deviation of the auxiliary pile 20 no longer occurs.

한편, 미설명부호 "Ga" 및 "Gb"는 관형 파일을 박아넣을 때, 관형 파일에 의해 단단하게 다져진 부분으로, 마치 쐐기처럼 토사나 자갈 등을 관형 파일의 축중심으로부터 주변으로 밀어내는 역할을 한다.On the other hand, the reference numerals "Ga" and "Gb" are a part that is firmly chopped by the tubular pile when injecting the tubular pile, and serves to push the soil, gravel, and the like from the center of the tubular pile to the surroundings as if it is a wedge. do.

본 발명은 상기한 바와 같은 실시예에 한정되지 않고, 이하의 청구범위를 벗어나지 않는 한도내에서, 보다 다양하게 변형 실시될 수 있음은 물론이다.The present invention is not limited to the embodiment as described above, and of course, various modifications can be made without departing from the scope of the following claims.

일예로, 상기 위치이탈방지돌기(24)는 관형 파일(10)의 내부홀(10a)에 삽탈가능하게 끼워져서, 보조파일(20)의 축중심과 관형 파일(10)의 축중심이 일치되도록 할 수 있는 것이라면, 어떠한 모양과 형상의 것이라도 모두 적용 가능하다.In one example, the position preventing protrusion 24 is inserted into the inner hole (10a) of the tubular pile (10) so as to be inserted, so that the axis center of the auxiliary pile 20 and the shaft center of the tubular pile (10) to match. As long as it can be done, any shape and shape can be applied.

이상 상기한 바와 같은 본 발명에 따르면, 관형 파일(10)의 내부홀(10a)에 삽탈가능하게 끼워져 고정되는 위치이탈방지돌기(24)가, 보조파일(20)의 축중심과 관형 파일(10)의 축중심이 일치되도록, 하단 덮개(23)의 외면에 돌출되게 구비되어진 구조로 되어, 해머(110)로부터의 외력이 관형 파일(10)의 축중심으로 정확하게 전달되고, 보조파일(20)의 위치이탈로 인한 관형 파일(10)의 변형·손상이 방지되는 효과가 있다.According to the present invention as described above, the position preventing protrusion 24 is inserted into the inner hole (10a) of the tubular pile (10) to be secured, the shaft center and the tubular pile (10) of the auxiliary pile (20) ), So that the axis center of the coincidence is coincident with the structure of the lower cover 23 so as to protrude, the external force from the hammer 110 is accurately transmitted to the axis center of the tubular pile 10, and the auxiliary pile 20 Deformation and damage of the tubular pile 10 due to the deviation of the position is prevented.

Claims (1)

원통형의 파일본체(21)와, 파일본체(21)의 상·하단을 각각 밀폐하는 덮개(22,23)로 이루어진 관형 파일용 보조파일에 있어서,In the auxiliary pile for the tubular pile consisting of a cylindrical pile body 21 and a lid (22, 23) for sealing the upper and lower ends of the pile body 21, respectively, 상기 보조파일(20)의 축중심과 관형 파일(10)의 축중심이 일치되도록, 관형 파일(10)의 내부홀(10a)에 삽탈가능하게 끼워져 고정되는 위치이탈방지돌기(24)가, 하단 덮개(23)의 외면에 돌출되게 구비되어진 것을 특징으로 하는 관형 파일용 보조파일.Position-preventing projection 24 is inserted and detachably inserted into the inner hole 10a of the tubular pile 10 so that the shaft center of the auxiliary pile 20 and the shaft center of the tubular pile 10 coincide with each other. The auxiliary file for the tubular pile, characterized in that provided to protrude on the outer surface of the cover (23).
KR1020050063108A 2005-07-13 2005-07-13 Support pile for a pipe pile KR20070008124A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050063108A KR20070008124A (en) 2005-07-13 2005-07-13 Support pile for a pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050063108A KR20070008124A (en) 2005-07-13 2005-07-13 Support pile for a pipe pile

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0020370U Division KR200398428Y1 (en) 2005-07-13 2005-07-13 Support pile for a pipe pile

Publications (1)

Publication Number Publication Date
KR20070008124A true KR20070008124A (en) 2007-01-17

Family

ID=38010383

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050063108A KR20070008124A (en) 2005-07-13 2005-07-13 Support pile for a pipe pile

Country Status (1)

Country Link
KR (1) KR20070008124A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094420A (en) * 2011-03-02 2011-06-15 翟宇思 Construction device for rammed bulb pile and construction method using device
KR20160022129A (en) 2014-08-19 2016-02-29 주식회사 제이에스그린 A spiral pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094420A (en) * 2011-03-02 2011-06-15 翟宇思 Construction device for rammed bulb pile and construction method using device
CN102094420B (en) * 2011-03-02 2012-10-17 翟宇思 Construction device for rammed bulb pile and construction method using device
KR20160022129A (en) 2014-08-19 2016-02-29 주식회사 제이에스그린 A spiral pile

Similar Documents

Publication Publication Date Title
KR101766166B1 (en) PHC pile construction method using removeable auxiliary pile
KR200398428Y1 (en) Support pile for a pipe pile
KR20070008124A (en) Support pile for a pipe pile
KR101491746B1 (en) pile foundation and the installation method
JP5414114B2 (en) Steel pier pier reinforcement method
JP2004232436A (en) Pier foundation reinforcing method and pier foundation reinforcing structure
JP6710999B2 (en) Temporary receiving method for existing structures
KR20080083604A (en) Hybrid composite pretentioned pile for concrete pile reinforcement
JP5584373B1 (en) Sheet pile placing method
KR101624896B1 (en) A spiral pile
JP2726241B2 (en) Pile head treatment method of cast-in-place foundation pile and tool for performing this treatment
KR100802164B1 (en) Structure for reinforcing steel pile head of footing foundation structure
JP2010222914A (en) Underground structure using steel sheet pile with frictional projection and method of constructing the same
JP2008057314A (en) Road surface repairing method, rolling compaction board used for the same and guide member
KR20080092010A (en) Pile and piling machine and piling method thereof
JPH11158867A (en) Steel pipe pile and sealing cover thereof
JP2006016777A (en) Rotatingly press-fitted pile
KR102269959B1 (en) Apparatus for cutting penetrated pile recyclable after decommission and the field work procedure and Oprating Method thereof
KR20190070607A (en) Phc pile for soil retaining wall, mold assembly and manufacturing method thereof
JP4512072B2 (en) Water stoppage propulsion structure for wellheads in propulsion work
JPH10114954A (en) Manhole body block applied to small-bore pipe jacking and method of manhole construction
KR200398429Y1 (en) Steel pipe pile
JP2964406B1 (en) Driving protection device for protective fence post
JP3156021B2 (en) Groove excavator for concrete
KR20210081717A (en) Device for vibration hammer

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application