KR20050043877A - Managing system for weak ground construction work, managing apparatus for weak ground construction work and a managing method of managing apparatus for weak ground construction work - Google Patents
Managing system for weak ground construction work, managing apparatus for weak ground construction work and a managing method of managing apparatus for weak ground construction work Download PDFInfo
- Publication number
- KR20050043877A KR20050043877A KR1020050034487A KR20050034487A KR20050043877A KR 20050043877 A KR20050043877 A KR 20050043877A KR 1020050034487 A KR1020050034487 A KR 1020050034487A KR 20050034487 A KR20050034487 A KR 20050034487A KR 20050043877 A KR20050043877 A KR 20050043877A
- Authority
- KR
- South Korea
- Prior art keywords
- mandrel
- construction
- indentation depth
- drain board
- indentation
- Prior art date
Links
Classifications
-
- D—TEXTILES; PAPER
- D06—TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
- D06B—TREATING TEXTILE MATERIALS USING LIQUIDS, GASES OR VAPOURS
- D06B1/00—Applying liquids, gases or vapours onto textile materials to effect treatment, e.g. washing, dyeing, bleaching, sizing or impregnating
- D06B1/02—Applying liquids, gases or vapours onto textile materials to effect treatment, e.g. washing, dyeing, bleaching, sizing or impregnating by spraying or projecting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B1/00—Nozzles, spray heads or other outlets, with or without auxiliary devices such as valves, heating means
-
- D—TEXTILES; PAPER
- D06—TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
- D06C—FINISHING, DRESSING, TENTERING OR STRETCHING TEXTILE FABRICS
- D06C23/00—Making patterns or designs on fabrics
Landscapes
- Engineering & Computer Science (AREA)
- Textile Engineering (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
본 발명은 연약지반 처리공법의 관리시스템, 상기 관리시스템에 제공되는 관리계, 상기 관리계에 의한 시공관리방법에 관한 것으로, 맨드럴의 압입깊이를 정확히 확인하여 시공의 정확성을 향상시키는 기술에 관한 것이다.The present invention relates to a management system of a soft ground treatment method, a management system provided to the management system, and a construction management method by the management system. The present invention relates to a technology for accurately confirming the indentation depth of a mandrel to improve construction accuracy.
Description
본 발명은 연약지반 처리공법용 관리시스템, 연약지반 처리공법용 관리계, 상기 연약지반 처리공법용 관리계에 의한 시공관리방법에 관한 것이다. The present invention relates to a construction management method by the management system for the soft ground treatment method, the management system for the soft ground treatment method, and the management system for the soft ground treatment method.
연약지반 처리공법이란 지반이 연약한 곳, 예를 들면, 갯벌과 같은 곳에 건축물 등을 세우는 건축공사를 하기 전에 지반을 다지기 위한 공법으로 샌드 드레인(Sand drain)공법 및 P.B.D(Paper board drain)공법을 포함하는 각종 공법이 있으며, 특히, 상기 P.B.D공법은 그 시공이 간단하고 공사비용 면에서 저렴하여 국내외에서 널리 시행되어지고 있다. 따라서 상기 P.B.D공법을 일례로 하여 종래의 연약지반 처리공법에 관하여 설명한다.The soft ground treatment method is a method for compacting the ground before building a structure where the ground is soft, for example, a mud flat, and includes a sand drain method and a paper board drain method. There are various construction methods, and in particular, the PBD construction method has been widely implemented at home and abroad due to its simple construction and low construction cost. Therefore, the conventional soft ground treatment method will be described taking the above P.B.D method as an example.
P.B.D공법은 갯벌 등과 같이 수분을 많이 포함하고 있는 지반에 폭95mm, 두께3mm의 연속된 판지(P.B.D-이하 드레인보드라 한다)를 지중에 압입 하여 연약지반 종내의 과잉수를 상기 드레인보드를 통하여 흡수시켜서 모세관현상과 상부성토의 재하에 의해 지면으로 강제 배출시키는 공법이다.In the PBD method, a continuous cardboard (95 mm wide and 3 mm thick) is pressed into the ground containing a lot of moisture, such as a tidal flat, into the ground, and the excess water in the soft ground species is absorbed through the drain board. It is a method of forcibly discharging to the ground by capillary phenomenon and loading of upper fill.
롤에 감겨져 있는 드레인보드의 압입은 이동 가능한 무한괘도트랙터의 리더(Leader)에 장착된 맨드럴 (또는 캐싱-chasing이라고도 한다)및 상기 맨드럴을 적정 깊이까지 강제 압입하는 바이브로해머(또는 유압모터)에 의해 이루어진다.The press-in of the drain board wound on the roll is a mandrel (or also called caching) mounted on the leader of a movable endless tracker and a vibro hammer (or hydraulic motor) forcing the mandrel to a suitable depth. )
도1은 상기와 같은 일반적인 P.B.D공법을 수행 중에 있는 상황에 대해 개략적으로 도시하고 있다. FIG. 1 schematically shows a situation in which the above general P.B.D method is being performed.
일반적으로 P.B.D공법은 다음의 순서에 의한다.In general, the P.B.D method is based on the following procedure.
1. 무한괘도 트랙터(11)를 선정된 작업 위치로 이동시킨다.1. Move the endless track tractor 11 to the selected working position.
2. 상기 무한괘도트랙터(11)와 리더(12)의 경사도를 적절하게 유지시킨다.(맨드럴은 리더에 장착되어 리더의 경사와 같은 경사도를 가지고 지중에 타설 되며, 보통 상기 리더의 경사도는 지면에 수직한 선에서 2도 이하의 경사를 가지도록 한다)2. The inclination of the trackless tractor 11 and the leader 12 is properly maintained. (The mandrel is mounted on the leader and placed in the ground with the same inclination as the inclination of the leader. Usually, the inclination of the leader is ground. Have a slope of 2 degrees or less on a line perpendicular to
3. 롤(13)에 감겨져 있는 드레인보드(14)를 상기 맨드럴(15)에 물려 압입시공을 수행한다.(걸고리 형상의 맨드럴 끝단에 매회 압입시공시마다 마련되는 앵커플레이트에 상기 드레인보드가 물리게 된다)3. The drain board 14 wound on the roll 13 is bitten by the mandrel 15 to perform the press-fitting process. (The drain board is attached to the anchor plate provided at each press-fitting work at the end of the hook-shaped mandrel. Are bitten)
4. 적정 깊이(예를 들면 50m)까지 드레인보드(14)를 압입한 후에는 상기 맨드럴(15)을 인발한다. 이 때, 앵커플레이트와 드레인보드(14)는 압입상태를 유지하나, 일반적으로는 상기 맨드럴(15)의 인발시 상기 드레인보드(14)는 상기 인발되는 맨드럴(15)을 따라서 소정 길이 후퇴된다. 4. After pressing the drain board 14 to a suitable depth (for example, 50 m), the mandrel 15 is drawn out. At this time, the anchor plate and the drain board 14 remain in a press-fit state, but in general, when the mandrel 15 is drawn out, the drain board 14 retreats a predetermined length along the drawn mandrel 15. do.
한편, 상기와 같은 P.B.D공법의 정확성(드레인보드의 수직적 압입정도와 압입깊이의 정확성 등)을 위해서는 시공상황을 파악하여 사용자에게 알림으로서 사용자가 적정한 작업을 수행할 수 있도록 하기 위한 관리시스템이 필요한데, 이러한 관리시스템은 종래 상기 맨드럴의 압입깊이를 감지하기 위한 발신기와, 상기 맨드럴의 압입을 위한 바이브로해머로 흐르는 전류량을 감지하기 위한 전류감지기 또는 상기 맨드럴의 압입을 위한 유압모터의 유압을 감지하는 유압감지기 중 어느 하나와, 상기 감지기들로부터 감지된 정보를 수신하여 아날로그 형태로 전시하는 관리계로 구성된다.On the other hand, for the accuracy of the PBD method (such as the vertical indentation depth and the depth of the indentation depth of the drain board), a management system for grasping the construction situation and notifying the user to the appropriate operation is required, Such a management system is conventionally used to detect the indentation depth of the mandrel, the current sensor for detecting the amount of current flowing into the vibrohammer for indentation of the mandrel or the hydraulic pressure of the hydraulic motor for indentation of the mandrel Any one of the oil pressure sensor to sense, and the management system that receives the information detected from the sensors and displays in analog form.
그런데 상기와 같은 관리시스템은 다음과 같은 문제점이 있었다.However, the management system as described above has the following problems.
첫째, 관리계에 의해 리더의 경사도가 관리되지 않음으로 하여 맨드럴의 압입 경사도가 적정한지를 어림짐작으로 판단하여 시공작업을 수행함으로서 압입시공의 정확성을 떨어뜨렸다.First, since the inclination of the leader was not managed by the management system, the accuracy of the indentation construction was reduced by performing the construction work by judging whether the indentation inclination of the mandrel was appropriate.
둘째, 상기 트랙터의 이동시 상기 트랙터의 경사정도를 감지하기 위하여 원시적인 추를 이용하였기 때문에, 트랙터 운전자가 상기 트랙터의 경사도를 어림짐작으로 판단하여 트랙터를 이동시키고, 또, 상기 트랙터 본체에 비하여 상당한 무게를 가지는 리더의 경사정도를 눈짐작으로 판단하기 때문에 상기 트랙터 이동시에 상기 트랙터가 전복될 위험성이 상당히 높았다. Second, since the primitive weight is used to detect the inclination of the tractor during the movement of the tractor, the tractor driver judges the inclination of the tractor as an approximation and moves the tractor, and a considerable weight compared to the tractor body. Since the degree of inclination of the leader is judged by snow, there is a high risk of the tractor overturning when the tractor moves.
셋째, 상기 관리계는 상기 감지기들로부터 감지된 정보를 아날로그식으로 그대로 전시함으로서 사용자가 압입시공의 정확한 상태를 파악하기 어려웠다. Third, it was difficult for the user to grasp the exact state of the indentation construction by displaying the information detected from the detectors in an analog form.
넷째, 상기 드레인보드의 압입시공이 적절한 범위값 내에서 이루어지는지에 대한 정확한 측정 없이 어림짐작으로 그 시공의 불량여부를 판단하여 공사의 정확성을 떨어트리기 쉬웠다.Fourth, it was easy to reduce the accuracy of the construction by determining whether the construction is defective by guesswork without accurate measurement of whether the indentation construction of the drain board is within an appropriate range value.
다섯째, 불량시공 된 드레인보드를 인발하기 위하여 동원된 인력에 의해 인발작업을 수행함으로서 공사의 원시성에 따른 공사수행의 속도 저하 및 인력낭비를 초래하였다.Fifth, the drawing work was mobilized by the mobilized manpower to draw out the poorly constructed drainboard, which resulted in the slowing of construction work and the waste of manpower.
여섯째, 정하여진 시공순서를 작업자가 암기하여 수행함으로써, 작업자의 기억 상기에 따른 불편함 및 원활한 시공진행에 차질을 가져올 수 있었다.Sixth, by performing the memorized construction order by the operator, it was possible to bring about the inconvenience and smooth construction progress according to the memory of the operator.
일곱째, 맨드럴의 압입깊이를 감지하는 발신기에 장착된 원형풀리의 마모로 인해 발신기에 의해 감지된 압입깊이가 실제 압입깊이에 비해 소정의 오차를 가짐으로서 공사의 정확성을 떨어트렸다.Seventh, due to the wear of the circular pulley mounted on the transmitter for detecting the indentation depth of the mandrel, the indentation depth detected by the transmitter has a predetermined error compared to the actual indentation depth, thereby reducing the accuracy of construction.
여덟째, 맨드럴 압입깊이의 영점은 매 압입시공시마다 지속적으로 흐트러지는데, 이러한 경우 사용자가 눈대중으로 영점을 세팅시켜 맨드럴의 압입깊이를 측정하기 때문에 보다 정교한 시공이 이루어지기 어려웠다.Eighth, the zero point of the mandrel indentation depth is continuously disturbed at every indentation construction. In this case, it is difficult to make more precise construction because the user sets the zero point to the eye mass to measure the indentation depth of the mandrel.
아홉째, 드레인보드의 압입시공이 이루어진 작업공에 대한 개개의 상세 작업데이터를 얻을 수 없었다. 특히, 지반을 미리 조사하기 위하여 소정 개소에 압입시공을 시험하는 경우 이에 따른 작업공 마다의 상세 정보(지하에서는 깊이에 따라 지반의 연약정도가 다를 수 있고, 또한, 기타 작업 여건이 달라질 수도 있다. 이러한 경우 깊이마다의 시간에 따른 정보가 없고 작업 결과에 대한 데이터만 가지는 게 일반적이었다)를 획득할 수 없어, 지반에 대한 정확한 정보를 얻을 수 없기 때문에 작업설계 상의 착오를 일으킬 수 있었다.Ninth, individual detailed work data could not be obtained for the work hole in which the drain board was press-fitted. In particular, in the case of testing the press-fitted construction at a predetermined position in order to investigate the ground in advance, detailed information for each worker (underground depth may vary depending on depth, and other working conditions may vary. In this case, there was no information over time for each depth and it was common to have only data on the results of the work.
본 발명은, 상기한 바와 같은 문제점을 해결하기 위하여, 맨드럴의 영점 위치를 정확히 파악하여 맨드럴의 압입깊이를 정확하게 파악할 수 있는 연약지반 처리공법용 관리시스템, 상기 관리시스템에 적용되는 관리계 및 상기 관리계에 의한 시공관리방법을 제공하기 위한 것이다.The present invention, in order to solve the problems described above, the management system for the soft ground treatment method that can accurately grasp the position of the mandrel to accurately determine the indentation depth of the mandrel, the management system applied to the management system and the It is to provide a construction management method by the management system.
상기 목적을 달성하기 위하여 본 발명에 따른 연약지반 처리공법용 관리시스템은, 맨드럴의 영점 위치를 감지하는 근접센서; 상기 맨드럴의 압입깊이를 감지하는 발신기 및 상기 발신기로부터 감지된 상기 맨드럴의 압입깊이를 분석 전시하되, 상기 근접센서로부터 감지된 상기 맨드럴의 영점 위치를 세팅하여 상기 맨드럴의 압입깊이를 분석 전시하는 관리계; 를 포함함으로써, 사용자가 맨드럴의 정확한 압입깊이를 파악할 수 있도록 한다.Management system for the soft ground treatment method according to the present invention to achieve the above object, proximity sensor for detecting the zero position of the mandrel; Analyze and display the transmitter to detect the indentation depth of the mandrel and the indentation depth of the mandrel detected from the transmitter, analyze the indentation depth of the mandrel by setting the zero position of the mandrel detected from the proximity sensor Exhibition management system; By including the, the user can determine the exact indentation depth of the mandrel.
또한, 상기한 목적을 달성하기 위한 본 발명에 따른 연약지반 처리공법용 관리계는, 맨드럴의 영점위치를 감지하는 근접센서로부터 수신된 정보에 의해 상기 맨드럴의 영점 위치를 세팅한 후, 맨드럴의 압입깊이를 감지하는 발신기로부터 수신된 정보에 의해 맨드럴의 압입깊이를 분석하는 제어부; 상기 제어부에 의해 분석된 정보를 전시하는 전시부; 및 상기 제어부에 사용자의 지시사항을 입력할 수 있는 입력장치; 를 포함하는 것을 특징으로 한다.In addition, the management system for the soft ground treatment method according to the present invention for achieving the above object, after setting the zero position of the mandrel by the information received from the proximity sensor for detecting the position of the mandrel, the mandrel A control unit for analyzing the indentation depth of the mandrel by the information received from the transmitter for detecting the indentation depth of the mandrel; An exhibition unit displaying the information analyzed by the controller; And an input device for inputting a user's instruction to the controller. Characterized in that it comprises a.
또한, 상기 목적을 달성하기 위한 본 발명에 따른 연약지반 처리공법용 관리계에 의한 시공관리방법은, 맨드럴의 영점위치를 세팅하는 단계; 상기 맨드럴의 압입깊이를 감지하는 단계; 상기 맨드럴의 압입깊이를 분석하는 단계; 및 상기 맨드럴의 압입깊이를 전시하는 단계; 를 포함하는 것을 특징으로 한다.In addition, the construction management method by the management system for the soft ground treatment method according to the present invention for achieving the above object, setting the zero position of the mandrel; Sensing the indentation depth of the mandrel; Analyzing the indentation depth of the mandrel; And displaying the indentation depth of the mandrel. Characterized in that it comprises a.
이하에서는 도면을 참조하여 본 발명에 따른 바람직한 실시 예를 설명한다.Hereinafter, with reference to the drawings will be described a preferred embodiment according to the present invention.
도2는 본 발명의 실시 예에 따른 연약지반 처리공법용 관리시스템에 대한 블록도이다.2 is a block diagram of a management system for a soft ground treatment method according to an embodiment of the present invention.
도2를 참조하면, 본 발명의 실시 예에 따른 연약지반 처리공법용 관리시스템은, 트랙터(11)의 경사도를 감지하는 트랙터경사감지기(21)와, 상기 트랙터(11)의 리더(12)에 대한 경사도를 감지하는 리더경사감지기(22)와, 상기 리더(12)에 장착된 맨드럴(15)의 압입깊이를 감지하는 발신기(23)와, 상기 맨드럴(15)과 함께 압입된 후 상기 맨드럴(15)의 인발에 따라 소정 길이 후퇴되는 드레인보드(14)의 후퇴길이를 감지하는 후퇴길이감지기(24)와, 상기 맨드럴(15)의 압입을 위해 사용되는 바이브로해머로 흐르는 전류량을 감지하기 위한 전류감지기(25)와, 상기 드레인보드(14)의 압입시공이 불량인 경우에 상기 불량 시공된 드레인보드(14)를 인발하는 인발모터(26)와, 상기 인발모터(26)가 상기 압입된 드레인보드(14)를 당기는 경우 상기 드레인보드(14)의 장력을 감지하는 장력감지기(27), 상기 맨드럴(15)의 압입깊이에 대한 영점을 조정하기 위해 상기 맨드럴(15)의 영점 위치를 감지하는 근접센서(28) 및 상기 각종 감지기로부터 수신된 정보를 분석하여 전시하는 관리계(300)를 포함하여 구성되고 있다.2, the management system for the soft ground treatment method according to an embodiment of the present invention, the tractor inclination detector 21 for detecting the inclination of the tractor 11, and the leader 12 of the tractor 11 After being indented together with the reader inclination sensor 22 for detecting the inclination of the gradient, the transmitter 23 for detecting the indentation depth of the mandrel 15 mounted on the reader 12, and the mandrel 15 The amount of current flowing into the retracting length detector 24 for detecting the retracting length of the drain board 14 which is retracted by the drawing of the mandrel 15 and the vibrohammer used for press-fitting the mandrel 15. And a drawing motor 26 for drawing a current sensor 25 for detecting the drawing, a drawing of the drain board 14 which is poor when the press-fitting construction of the drain board 14 is defective, and the drawing motor 26. When pulling the pressurized drain board 14 to sense the tension of the drain board 14 Analyzing the information received from the tension sensor 27, the proximity sensor 28 for detecting the zero position of the mandrel 15 and the various sensors to adjust the zero point of the indentation depth of the mandrel 15 It is comprised including the management system 300 to display.
도3은 상기 관리시스템에 적용된 본 발명의 실시 예에 따른 관리계(300)의 외관을 도시하고 있으며, 도4는 도3의 관리계(300)에 대한 블록도를 도시하고 있다.Figure 3 shows the appearance of the management system 300 according to an embodiment of the present invention applied to the management system, Figure 4 shows a block diagram of the management system 300 of FIG.
상기 도3 및 도4를 참조하면, 도2의 시공 관리시스템에 적용된 본 발명의 실시 예에 따른 관리계(300)는, 외관을 이루는 케이스(31)와, 상기 각종 감지기와 연결되며 상기 케이스(31)의 후면에 구성된 커넥터부(32, 도4)와, 상기 커넥터부(32)를 통해서 상기 각종 감지기로부터 수신된 정보를 분석하여 전시를 명하는 주제어부(33a) 및 상기 각종 감지기로부터 정보를 수신하여 디지털로 정보로 전환하여 상기 주제어부(33a)에 전송하며 상기 주제어부(33a)와 상호 정보의 교환이 가능한 보조제어부(33b)로 이루어진 제어부(33)와, 상기 주제어부(33a)에 연결되며 상기 주제어부(33a)에 의해 분석된 정보를 전시할 수 있는 전시부인 모니터(34)와, 상기 주제어부(33a)에 연결되며 상기 케이스(31) 내의 수납공간(35a)에 수납될 수 있고 상기 주제어부(33a)에 사용자(미도시)의 지시사항을 입력할 수 있는 입력장치인 키보드(35)와, 상기 보조제어부(33b)에 유선으로 연결되며 상기 키보드(35)와 병행하여 상기 주제어부(33a)에 사용자의 지시사항을 입력할 수 있는 보조입력장치인 리모콘(36)과, 상기 주제어부(33a)에 연결되며 상기 주제어부(33a)에 의해 분석된 정보를 저장하기 위한 저장부(41), 상기 주제어부(33a)에 연결되며 상기 주제어부(33a)에 의해 분석된 정보를 별도의 디스켓에 저장하기 위한 드라이버(37)와, 상기 주제어부(33a)에 연결되며 상기 주제어부(33a)에 의해 분석된 정보를 문서로 출력하는 프린터(38)와, 상기 보조제어부(33b)에 연결되며 상기 복수개의 감지기로부터 수신된 정보가 상기 키보드(35)를 통하여 사용자가 미리 입력 설정한 기준값의 범위를 벗어나면 경보음을 발생시키는 경보부(39) 및 상기 제어부(33) 및 모니터(34)와 별개의 전원에 의해 작동되며 상기 리더경사감지기 및 트랙터경사감지기로부터 정보를 수신하여 전시할 수 있는 경사계(40)를 포함하여 구성되어 있다.3 and 4, the management system 300 according to the embodiment of the present invention applied to the construction management system of FIG. 2 is connected to the case 31 and the various detectors forming an appearance, and the case 31. 4), the main controller 33a which commands the exhibition by analyzing the information received from the various sensors through the connector 32, and receives the information from the various sensors. The control unit 33, which is composed of an auxiliary control unit 33b capable of digitally converting information to the main control unit 33a and exchanging information with the main control unit 33a, and connecting the main control unit 33a. And a monitor 34 which is an exhibition unit capable of displaying information analyzed by the main control unit 33a, and connected to the main control unit 33a and stored in the storage space 35a in the case 31. Instruction of a user (not shown) to the main control unit 33a A keyboard 35, which is an input device capable of inputting a matter, and a wired connection to the auxiliary control unit 33b, which can input a user's instructions to the main control unit 33a in parallel with the keyboard 35. It is connected to the remote control unit 36 which is an auxiliary input device, the main control unit 33a, and is connected to a storage unit 41 for storing information analyzed by the main control unit 33a, and the main control unit 33a. A driver 37 for storing the information analyzed by the main control unit 33a on a separate diskette, and a printer connected to the main control unit 33a and outputting the information analyzed by the main control unit 33a as a document. And an alarm unit 39 connected to the auxiliary control unit 33b and generating an alarm sound when information received from the plurality of detectors is out of a range of a reference value previously set by the user through the keyboard 35. ) And the control unit 33 and monitor 34 It is operated by a separate power source and is configured to include an inclinometer 40 that can receive and display information from the leader slope detector and tractor slope detector.
한편 상기 제어부(33)를 주제어부(33a)와 보조제어부(33b)로 나눈 이유는 주제어부(33a)의 분석작업이 보다 원활히 수행되어지게 하기 위함인데, 응용 예에 따라서는 상기 주제어부와 보조제어부가 통합되어 하나의 제어부로 구성될 수도 있다.The reason why the control unit 33 is divided into the main control unit 33a and the auxiliary control unit 33b is to make the analysis work of the main control unit 33a more smoothly. According to an application example, the main control unit and the auxiliary agent may be used. The fisherman may be integrated into one control unit.
이하에서는 도면을 참조하여 상기 본 발명에 따른 연약지반 처리공법용 관리시스템과 이 관리시스템에 적용된 관리계(300)에 의한 P.B.D공법에 대하여 설명한다.Hereinafter, the P.B.D method by the management system for the soft ground treatment method and the management system 300 applied to the management system according to the present invention will be described with reference to the drawings.
사용자는 관리계(300)의 키보드(35)를 조작하여 시공 작업 시 필요한 적정 수치값을 도5에 도시되어진 바와 같이 모니터(34)를 통해 전시된 차트의 측정항목에 따라 입력하여, 제어부(33)가 이를 기억하고 이에 따른 작동을 할 수 있도록 지시한다. 도4에서 측정항목 난과 측정범위 난은 이미 프로그램 되어 있는 난이고, 설계치 설정 난과 경보 설정값 난 및 경보음 난은 사용자가 입력해야 하는 난이다.(물론 도4의 차트는 하나의 일예이다).The user manipulates the keyboard 35 of the management system 300 to input an appropriate numerical value required for the construction work according to the measurement items of the chart displayed through the monitor 34 as shown in FIG. Instructs it to remember it and act accordingly. In FIG. 4, the measurement column and the measurement range column are already programmed columns, and the design value setting column, alarm setting value column and alarm sound column are fields to be input by the user. (Of course, the chart of FIG. 4 is an example. ).
첫 번째, DEPTH의 설계치 설정 난에는 압입될 맨드럴(15)의 적정한 압입깊이를 입력하고, 경보 설정값에 적정 압입깊이 범위를 입력한 후, 경보음 난에 체크를 한다. 일반적으로 작업은 기계적이고 지반 각 지점의 여러 상황이 다르기 때문에 입력된 적정 수치값에 대응하여 동일한 깊이 정도로 맨드럴(15)의 압입이 정확하게 이루어지기기는 대단히 힘들다. 따라서 경보 설정값에 적정 수치값을 포함하는 최소한의 적정 범위를 정하고, 이러한 적정 범위를 벗어나는 경우에는 불량 시공으로 간주하여 경보부를 통해 경보음을 울리도록 할 것이나 말 것이냐를 경보음 난을 통해 입력시키는 것이다.First, in the DEPTH design value setting column, an appropriate indentation depth of the mandrel 15 to be indented is input, an appropriate indentation depth range is input in the alarm set value, and a check is made in the alarm sound column. In general, since the work is mechanical and various situations at each ground point are different, it is very difficult for the mandrel 15 to be press-fitted precisely to the same depth in response to the input numerical value. Therefore, set the minimum appropriate range that includes the appropriate numerical value in the alarm set value, and if it is out of this proper range, it will be regarded as poor construction and the alarm will be sounded through the alarm unit. will be.
두 번째, PAPER의 설계치 설정 난에는 적정한 드레인보드(14)의 적정 압입깊이를 입력하고, 경보 설정값 난에 드레인보드(14)의 적정 압입범위를 입력한 후, 경보음 난에 드레인보드(14)의 압입깊이가 상기 적정 압입범위를 벗어난 경우 이를 사용자에게 알리기 위해 경보음을 발생시킬 것이냐 아니냐를 입력한다. 이와 같이 맨드럴(15)의 적정 압입깊이값과 드레인보드(14)의 적정 압입깊이값을 달리 입력하는 이유는 맨드럴(15)이 드레인보드(14)를 물고 압입된 후 인발되는 경우 상기 드레인보드(14)의 후퇴가 발생하는 것이 일반적이기 때문에 맨드럴(15)의 압입깊이와 드레인보드(14)가 실제 압입된 깊이는 대부분 일치하지 않기 때문이다.Second, input the proper indentation depth of the drain board 14 in the design value setting column of PAPER, input the appropriate indentation range of the drain board 14 in the alarm setting value column, and then enter the drain board 14 in the alarm sound column. If the indentation depth of) is out of the appropriate indentation range input whether or not to generate an alarm sound to inform the user. As such, the reason for inputting the proper indentation depth value of the mandrel 15 and the appropriate indentation depth value of the drain board 14 is that when the mandrel 15 is drawn after being press-fitted with the drain board 14, the drain Since the retraction of the board 14 generally occurs, the indentation depth of the mandrel 15 and the depth in which the drain board 14 is actually indented do not coincide most of the time.
세 번째, SPEED의 설계치 설정 난에는 적정한 맨드럴(15)의 압입속도를 입력하고, 마찬가지로 경보 설정 난 및 경보음 난을 입력한다. 일반적으로 맨드럴(15)은 바이브로해머 또는 유압모터에 의해 타설되는데, 지반이 약한 곳에서는 그 압입속도가 빠르고, 지반이 강한 곳에서는 그 압입속도가 느려야한다. 따라서 사용자는 시공 전에 지반의 약하고 강함 정도를 조사하여 맨드럴(15)의 적정압입속도를 계산한다. 그런데 맨드럴(15)의 압입속도가 계산된 적정 압입속도보다 빠른 경우에는 지반의 저항으로 인하여 맨드럴(15)이 지중에서 휘게 되기 때문에 불량 시공이 이루어질 수 있는 개연성이 대단히 크다. 따라서 맨드럴(15)의 압입속도를 체크하는 것은 정확한 시공을 위해 요구되는 필요한 사항인 것이다.Third, in the design value setting column of the SPEED, an appropriate indentation speed of the mandrel 15 is input, and an alarm setting column and an alarm sound column are similarly inputted. In general, the mandrel 15 is poured by vibro hammer or a hydraulic motor, where the indentation speed is high where the ground is weak, and the indentation speed is low where the ground is strong. Therefore, the user calculates the appropriate indentation speed of the mandrel 15 by examining the degree of weakness and strength of the ground before construction. However, when the indentation speed of the mandrel 15 is faster than the calculated proper indentation speed, the probability of poor construction can be great because the mandrel 15 is bent in the ground due to the ground resistance. Therefore, checking the indentation speed of the mandrel 15 is a necessary matter required for accurate construction.
네 번째, PRES 또는 AMPERE를 입력한다. 이 때, 맨드럴(15)의 압입을 위해, 바이브로해머가 사용되는 경우에는 AMPERE에 입력하고, 유압모터를 사용하는 경우에는 PRES에 체크하고 입력하면 된다. 따라서 이에 따른 적정 설계치 설정값과 경보 설정값 및 경보음 난을 입력한다. 일반적으로 지반의 사전 조사는 필요하지만, 눈에 보이지 않는 상황은 존재하는 것이므로, 예상외로 소정 깊이 이하에서 단단한 지반이 구성되어질 수도 있는 것이다. 이때, 사용자가 미리 설정한 맨드럴(15)의 압입깊이 값까지 맨드럴(15)을 강제 압입시킬 필요는 없을 것이다. 따라서 맨드럴(15)에 가해지는 지반의 저항 압력을 파악하기 위해 바이브로해머로 흐르는 전류감지기(25)나 유압모터의 유압을 감지하고 이를 파악할 필요가 있는 것이다.Fourth, enter PRES or AMPERE. At this time, in order to press-fit the mandrel 15, it inputs to AMPERE when a vibro hammer is used, and checks and inputs to PRES when using a hydraulic motor. Therefore, input appropriate design value, alarm setting and alarm sound. In general, it is necessary to pre-investigate the ground, but since there is an invisible situation, hard ground may be constructed unexpectedly below a predetermined depth. In this case, the user may not be forced to press the mandrel 15 up to the preset press-in depth value of the mandrel 15. Therefore, in order to grasp the resistance pressure of the ground applied to the mandrel 15, it is necessary to detect the hydraulic pressure of the current sensor 25 or the hydraulic motor flowing to the vibro hammer.
다섯 번째, 트랙터(11) 및 리더(12)의 경사도를 입력시키는 데, 이는 지면을 XY좌표평면으로 하고 맨드럴(15)이 압입되는 지점을 (0,0)점으로 하여 상기 트랙터(11) 및 리더(12)가 상기 XY축에 수직한 축으로부터 기울어진 정도, 즉, "X"축의 경사도와 "Y"축의 경사도에 대한 적정 설계치 설정값과 경보 설정값 및 경보음 난을 입력한다(도5 상에는 트랙터의 경사도 입력 난이 BASE난으로 도시되어 있다).Fifth, inputting the inclination of the tractor 11 and the leader 12, which is the XY coordinate plane and the point where the mandrel 15 is pressed into (0,0) point the tractor 11 And inputting an appropriate design value set value, an alarm set value, and an alarm sound value for the degree in which the reader 12 is inclined from the axis perpendicular to the XY axis, that is, the inclination of the "X" axis and the inclination of the "Y" axis (Fig. In Fig. 5 the slope input column of the tractor is shown as the BASE column).
여섯 번째, BACK의 설계치 설정 난에는 상기 맨드럴(15)의 인발 시 소정 정도 후퇴되는 드레인보드(14)의 적정 값을 입력하고, 경보 설정값 및 경보음 난을 입력한다. 일반적으로 드레인보드(14)는 맨드럴(15)에 물려 압입되기 때문에 드레인보드(14)의 최고 압입깊이는 맨드럴(15)의 압입깊이와 일치한다. 그러나 추후 맨드럴(15)의 인발에 따라 드레인보드(14)가 소정 정도 후퇴되기 때문에 드레인보드(14)의 실제 압입깊이는 맨드럴(15)의 압입깊이와는 차이가 나기 마련이다. 따라서 사용자는 실제 드레인보드(14)의 압입깊이를 감안하여 맨드럴(15)의 압입깊이를 결정할 필요가 있는 것이고, 맨드럴(15)의 적정 압입깊이를 설정할 필요가 있는 것이며, 드레인보드(14)의 압입깊이를 별개로 분석할 필요가 있는 것이다. Sixth, in the design value setting column of the BACK, an appropriate value of the drain board 14 that is retracted by a predetermined degree when the mandrel 15 is drawn out is input, and an alarm set value and an alarm sound column are input. In general, since the drain board 14 is press-fitted by the mandrel 15, the maximum indentation depth of the drain board 14 coincides with the indentation depth of the mandrel 15. However, since the drain board 14 is retracted to some extent as the mandrel 15 is pulled out later, the actual indentation depth of the drain board 14 is different from the indentation depth of the mandrel 15. Therefore, the user needs to determine the indentation depth of the mandrel 15 in view of the actual indentation depth of the drain board 14, and needs to set an appropriate indentation depth of the mandrel 15, and the drain board 14. It is necessary to analyze the indentation depth of) separately.
일곱 번째, BACK TIME난에 맨드럴(15)의 인발한 후 인발모터(26)를 작동시켜 드레인보드(14)에 인발력을 가하기 위한 소정의 시간을 입력한다. 압입된 드레인보드(14)에 소정 시간동안 인발력을 가하여 봄으로써 드레인보드(14)가 적정하게 압입되었는지 알 수 있게 하기 위함이다. 만일 차후에 설명하는 바와 같이 소정 시간동안의 인발력에 의해 드레인보드(14)가 인발되면 이는 불량시공된 것이기 때문에 드레인보드(14)를 완전히 인발 또는 재시공을 하여야 한다.Seventh, after drawing the mandrel 15 in the BACK TIME column, the drawing motor 26 is operated to input a predetermined time for applying the drawing force to the drain board 14. This is to apply the drawing force to the pressurized drain board 14 for a predetermined time so that the drain board 14 can be properly indented. If the drain board 14 is drawn by the drawing force for a predetermined time as described later, the drain board 14 must be completely drawn out or rebuilt because it is poorly constructed.
여덟 번째, 그 외에 필요한 사항을 입력한 후 저장키를 누른다.Eighth, enter any other necessary information and press the Save key.
물론, 상기와 같은 입력 사항은 필요에 따라 더 많은 입력 난을 가질 수도 있다. Of course, the above input items may have more input columns as necessary.
상기와 같은 적정 수치값을 입력하기 전이나 입력한 후에 사용자는 시공순서를 결정하여 이를 키보드(35)를 통해 입력한다. 이러한 시공순서의 입력은 이미 몇 가지 형태로 프로그래밍 된 자동화 된 작업 순서를 선택하는 좌표 자동 설정 입력을 택하여 이루어질 수 있으며, 사용자가 일일이 작업의 순서를 정하는 좌표 수동 설정 입력을 택하여 이루어질 수 있다.Before or after inputting the appropriate numerical value as described above, the user determines the construction order and inputs it through the keyboard 35. The input of the construction sequence can be made by selecting a coordinate automatic setting input for selecting an automated work sequence that has already been programmed in several forms, or by selecting a manual setting input for setting the order of the tasks manually.
먼저, 좌표 자동 설정 입력은 도6a에 도시되어진 바와 같이 모니터(34)에 전시되는 차트를 통해 입력한다. 작업의 형태 난에 이미 프로그래밍 된 여러 가지 타입(A타입, B타입, C타입.....)중 하나를 선택하여 입력하고, 작업의 줄 수 난에 압입시공을 위한 줄 수(도6a의 예에서는 3줄로 되어 있다)를 입력한 후 홀수의 증/감 난에 작업을 A->D 방향으로 진행시킬 것이면 +를 D->A 방향으로 진행시킬 것이면 -를 입력한다. 다음 초기좌표 입력 난에 초기에 시공될 좌표를 선택하여 입력하면, 도6a의 좌측 난에 작업순서 및 좌표가 자동으로 띄워지게 된다.First, the automatic coordinate setting input is input through a chart displayed on the monitor 34 as shown in FIG. 6A. Select and enter one of the various types (A type, B type, C type .....) already programmed in the job type column, and the number of lines for press-in construction in the job number column. In the example, it is 3 lines), and then enter-if you want to move the job in the A-> D direction for odd increase / decrease and + for D-> A direction. In the next initial coordinate input column, if a coordinate to be initially constructed is selected and inputted, the work order and coordinates are automatically displayed in the left column of FIG. 6A.
한편, 좌표 수동 설정 입력은 도6b에 도시되어진 바와 같이 사용자가 첫 번째 시공 좌표부터 마지막 시공 좌표까지 일일이 그 시공순서를 정하여 입력하고, 또한, 필요한 난을 입력한 후 저장키를 누른다.On the other hand, as shown in FIG. 6B, the manual setting input of coordinates is input by setting the construction order one by one from the first construction coordinates to the last construction coordinates, and also pressing a storage key after inputting a required column.
또, 사용자는 맨드럴(15)의 압입깊이를 감지하는 발신기(23)에 장착 마련되는 원형풀리(23a)의 마모정도를 계산하기 위해 시험을 하여 풀리세팅을 할 필요가 있다. 도7에는 상기와 같은 발신기(23)가 도시되어 있는데, 일반적으로 원형풀리(23a)는 원주길이가 153cm로 원형풀리(23a)가 한바퀴 돌면 맨드럴(15)이 50cm 압입된다. 그러나 발신기의 오랜 사용으로 인하여 원형풀리(23a)가 마모되면 그 원주길이가 짧아지게 된다. 예를 들어, 맨드럴(15)을 10m 정도 압입시켰을 때 원형풀리(23a)가 20바퀴를 돌고 이에 따라 발신기(23)에서 감지되는 압입깊이가 10m이면 정상적이나, 만일 맨드럴(15)의 실제 압입깊이가 10m인데도 원형풀리(23a)가 24바퀴를 돌아 발신기가 맨드럴(15)의 압입깊이를 12m로 감지하면 원형풀리(23a)의 마모가 발생한 것이다. 즉, 원형풀리(23a)의 마모가 없는 정상적인 발신기(23)일 때는 맨드럴(15)의 실제 압입깊이가 10m이면 발신기(23)는 압입깊이를 10m로 감지하겠지만, 원형풀리(23a)의 마모가 발생한 발신기(23)일 경우에는 맨드럴(15)의 실제 압입깊이가 10m인 경우에도 발신기(23)는 12m가 압입되었다고 감지를 하게 되는 것이다.In addition, the user needs to perform a test and pulley setting to calculate the degree of wear of the circular pulley 23a provided on the transmitter 23 for detecting the indentation depth of the mandrel 15. In FIG. 7, the transmitter 23 as described above is illustrated. In general, the circular pulley 23a has a circumferential length of 153 cm, and the mandrel 15 is press-fitted 50 cm when the circular pulley 23a is turned around. However, when the circular pulley 23a is worn out due to long use of the transmitter, the circumferential length thereof becomes short. For example, when the mandrel 15 is press-fitted about 10m, the circular pulley 23a rotates 20 wheels and thus the press-in depth sensed by the transmitter 23 is 10m, but it is normal if the mandrel 15 is actually used. Even though the indentation depth is 10 m, when the circular pulley 23a turns 24 wheels and the transmitter detects the indentation depth of the mandrel 15 as 12 m, wear of the circular pulley 23a occurs. That is, in the case of the normal transmitter 23 without the wear of the circular pulley 23a, if the actual indentation depth of the mandrel 15 is 10 m, the transmitter 23 will detect the indentation depth as 10 m, but the wear of the circular pulley 23a will not occur. If the transmitter 23 is generated, even if the actual indentation depth of the mandrel 15 is 10m, the transmitter 23 will detect that 12m is pressurized.
따라서 상기와 같이 원형풀리(23a)의 마모가 발생한 경우에 사용자는 발신기(23)에서 감지되는 12m값을 제어부에서 10m로 판단하도록 지시 입력해야 정확한 시공여부를 판단할 수 있는 것이다. 물론, 이러한 입력은 모니터(34)를 통해 전시되는 소정의 차트에 의해 편리하게 입력된다. 따라서 실제 맨드럴(15)의 압입시공 시 제어부(33)에서는 발신기(23)에서 수신된 정보가 12m이면 이 정보를 사용자가 입력한 지시사항, 즉, 원형풀리(23a)의 마모정도를 감안하여 맨드럴(15)의 실제 압입깊이를 산출하고, 이런 산출된 맨드럴(15)의 실제 압입깊이가 모니터(34)를 통해 전시되는 것이다. 물론 12m로 감지되는 경우 10m이기 때문에 발신기(23)에서 감지되는 모든 압입깊이 값들은 12:10의 비율로 계산된 값으로 산출되어 전시된다.Therefore, when the wear of the circular pulley (23a) as described above, the user must input the instruction to determine the 12m value detected by the transmitter 23 as 10m in order to determine whether the correct construction. Of course, this input is conveniently input by a predetermined chart displayed through the monitor 34. Therefore, when the pressurized construction of the actual mandrel 15, the control unit 33, if the information received from the transmitter 23 is 12m in consideration of the instructions entered by the user, that is, the wear of the circular pulley 23a The actual indentation depth of the mandrel 15 is calculated, and the calculated indentation depth of the mandrel 15 is displayed on the monitor 34. Of course, since it is 10m when detected as 12m, all the indentation depth values detected by the transmitter 23 are calculated and displayed in a value calculated by the ratio of 12:10.
또한, 압입시공 관리를 위해 필요한 기타의 사항들을 입력한다.In addition, enter other items necessary for indentation management.
상기와 같은 기본값의 설정 및 필요한 사용자의 지시 및 명령 사항을 관리계(300)에 입력한 후에는 다음과 같은 구체적인 시공 작업이 이루어진다. 실제 시공 작업 시에는 키보드(35) 보다는 작업의 편리성을 위해 보조제어부(33b)에 유선으로 연결되어 마련된 리모콘(36)을 통해서 각종 필요한 관리가 이루어진다. After setting the default value and inputting the user's instructions and instructions to the management system 300, the following specific construction work is performed. In the actual construction work, various necessary management is made through the remote control 36 is connected to the auxiliary control unit 33b by wire for convenience of work rather than the keyboard 35.
Ⅰ. 트랙터(11)의 이동I. Movement of the tractor 11
먼저 사용자는 리모콘(36)을 통해서 좌표보기 버튼을 누르면, 관리계(300)의 모니터(34)에는 도6a 및 6b를 참조하여 상술한 바와 같이 사용자가 미리 입력한 시공순서에 따른 좌표가 전시되고, 이에 따라 사용자는 트랙터(11)를 운전하여 시공 순서에 따른 좌표로 이동한다. 이와 같이 모니터(34)에 전시되는 시공 순서에 따른 좌표의 일예가 도8에 도시되어 있다. 검은 부분은 현재 작업이 이루어지는 좌표를 나타내고, 일점쇄선 부분은 다음 시공이 이루어질 좌표를 나타내고 있다. 물론 응용 예에 따라서는 색상을 달리 선택하도록 할 수도 있을 것이다. 이러한 명확한 구별 표시는 사용자가 알아보기 쉽도록 현재 시공이 이루어지는 좌표와 다음 시공이 이루어져야 하는 좌표를 다른 좌표지점과 구분될 수 있도록 표시하기 위한 것으로, 사용자는 다음 시공을 위해 이동해야 하는 위치를 현재의 위치와 비교하여 보다 쉽게 파악할 수 있다.First, when the user presses the coordinate view button through the remote controller 36, the monitor 34 of the management system 300 displays the coordinates according to the construction order previously input by the user as described above with reference to FIGS. 6A and 6B. Accordingly, the user drives the tractor 11 to move to the coordinates according to the construction order. One example of the coordinates according to the construction order displayed on the monitor 34 is shown in FIG. The black portion represents the coordinates at which the current work is to be performed, and the dashed-dotted portion represents the coordinates at which the next construction is to be performed. Of course, depending on the application may be to choose a different color. This clear marking is used to display the coordinates of the current construction and the coordinates of the next construction so that the user can easily distinguish them from other coordinate points. It is easier to identify compared to the location.
한편, 트랙터(11)의 이동시에 사용자는 관리계(300)의 경사계(40) 전원만 ON시킬 수 있다(물론, 응용 예에 따라서는 하나의 전원에 의해 관리계의 모든 장치가 작동되도록 하는 구성을 취할 수도 있지만, 본 실시 예는 불필요한 모니터 및 제어부의 작동과 이에 따른 전력의 소모 등을 방지하기 위해 상기한 바와 같이 경사계를 모니터 및 제어부와 별개의 전원에 의해 작동될 수 있도록 하였다). 트랙터경사감지기(21) 및 리더경사감지기(22)에 연결된 경사계(40)에는 사용자의 선택에 따라 트랙터(11) 또는 리더(12)의 경사도가 전시된다 (물론, 응용 예에 따라서는 트랙터 및 리더의 경사도가 모두 전시되도록 구성시킬 수도 있다). 이 때, 사용자는 트랙터(11) 및 리더(12)의 경사도를 확인해가면서 트랙터(11)의 전복을 방지하는 운전을 행하여 시공 순서에 맞는 시공 좌표지점으로 이동한다.On the other hand, during the movement of the tractor 11, the user can turn on only the inclinometer 40 power of the management system 300 (of course, depending on the application example, take a configuration such that all the devices of the management system is operated by one power supply). Although, the present embodiment may allow the inclinometer to be operated by a separate power source from the monitor and the control unit as described above in order to prevent unnecessary operation of the monitor and the control unit and the consumption of power. Inclinometer 40 connected to tractor inclination sensor 21 and reader inclination sensor 22 displays the inclination of tractor 11 or leader 12 according to the user's choice (of course, tractor and reader depending on application) Can also be configured to display all the slopes of At this time, while the user checks the inclination of the tractor 11 and the leader 12, the user performs an operation to prevent the tractor 11 overturning, and moves to the construction coordinate point corresponding to the construction order.
Ⅱ. 트랙터(11)의 경사도 맞추기II. Adjusting the Slope of the Tractor 11
시공 위치로 이동한 후에는 트랙터(11)의 경사도를 맞추게 된다. 트랙터(11)의 경사도는 압입시공 전에 전체 장비의 균형을 맞춘 후에 안정적인 시공작업을 수행하기 위한 것이다.After moving to the construction position, the inclination of the tractor 11 is adjusted. The inclination of the tractor 11 is to perform a stable construction work after balancing the entire equipment before the indentation construction.
먼저, 사용자는 관리계(300)의 전체 전원을 ON시켜 제어부(33) 및 모니터(34)를 작동시킨 후 리모콘(36)을 통해 트랙터(11)의 경사도를 전시시킨다. 모니터(34)의 전시는 도9a에 도시되어진 바와 같이 사용자의 선택에 따라 디지털식 정보와 함께 2차원적인 그래프로 전시될 수 있다. First, the user turns on the total power of the management system 300 to operate the control unit 33 and the monitor 34 and then display the inclination of the tractor 11 through the remote control 36. The display of the monitor 34 may be displayed as a two-dimensional graph with digital information according to the user's selection as shown in FIG. 9A.
도9a를 설명하면 현재 트랙터(11)는 X축으로 0.71도의 경사도를 가지며, Y축으로는 0.50도의 경사도를 가진다. 한편, 일점쇄선으로 표시된 지점은 적정한 작업에 필요한 트랙터(12)의 경사 한계치이며, 이를 벗어나면 사용자는 트랙터(11)의 경사도를 상기 일점쇄선의 범위 내로 맞출 필요가 있는 것이다. 9A, the current tractor 11 has a slope of 0.71 degrees on the X axis, and a slope of 0.50 degrees on the Y axis. On the other hand, the point indicated by the dashed line is the inclination limit value of the tractor 12 required for proper work, if out of this the user needs to fit the inclination of the tractor 11 within the range of the dashed line.
Ⅲ. 리더(12)의 경사도 맞추기III. Matching the Slope of the Reader 12
트랙터의 경사도를 맞춘 후에는 리더(12)의 경사도를 맞추게 된다. 리더(12)의 경사도는 맨드럴(15)이 압입되는 경사도를 결정하고, 맨드럴(15)이 압입되는 경사도는 드레인보드(14)가 압입되는 경사도를 결정하기 때문에 리더(12)의 적정한 경사도의 결정은 적정한 압입시공을 위해 반드시 필요하다. After the inclination of the tractor is adjusted, the inclination of the leader 12 is adjusted. The inclination of the leader 12 determines the inclination in which the mandrel 15 is press-fitted, and the inclination in which the mandrel 15 is press-fitted determines the inclination in which the drainboard 14 is press-fitted. Determination is necessary for proper indentation.
먼저, 사용자는 리모콘(36)을 통해 리더(12)의 경사도를 전시시킨다. 모니터(34)의 전시는 도9b에 도시되어진 바와 같이 전시된다. First, the user displays the inclination of the reader 12 through the remote control 36. The display of the monitor 34 is displayed as shown in Fig. 9B.
마찬가지로, 일점쇄선으로 표시된 지점은 적정한 작업에 필요한 리더(12)의 경사 한계치이며, 이를 벗어나면 사용자는 트랙터(11)에 마련되는 리더 경사조정장치를 통해 리더(12)의 경사도를 상기 일점쇄선의 범위 내로 맞출 필요가 있는 것이다. 일반적으로 종래기술에서 설명되었다시피, 리더(12)의 경사도는 지면에 수직한 선에서 2도의 범위 내로 맞추는 것이 적정한 시공작업을 하기 위해 바람직하므로, 일점쇄선으로 표시된 한계치도 2도의 범위 내로 맞추는 것이 바람직하다.Similarly, the point indicated by the dashed line is the inclination limit value of the leader 12 necessary for proper work, and if it is out of this, the user may change the inclination of the leader 12 through the leader inclination adjusting device provided in the tractor 11. It needs to fit within range. In general, as described in the prior art, it is preferable that the inclination of the leader 12 is within a range of 2 degrees in a line perpendicular to the ground for proper construction work, so that the limit value indicated by a dashed line is also within a range of 2 degrees. Do.
한편, 트랙터 및 리더의 경사도는 상호 영향을 미칠 수 있으므로, 응용 예에 따라서는 도9a 및 도9b를 하나의 창에 띄워놓고, 트랙터와 리더의 경사도 맞춤을 동시에 진행시킬 수도 있다. On the other hand, since the inclination of the tractor and the leader may have a mutual influence, depending on the application example, it is also possible to float the tilt of the tractor and the leader at the same time by floating Figure 9a and 9b in one window.
Ⅳ. 압입시공Ⅳ. Indentation Construction
리더(12)의 경사도가 적정하면 사용자는 드레인보드(14)를 압입하는 시공을 수행한다. 이러한 압입 시공을 순서적으로 살펴본다.If the inclination of the reader 12 is appropriate, the user presses the drain board 14. This press-in construction is examined in order.
1. 작업상황 차트 띄우기1. Displaying Work Status Chart
이 때, 사용자는 리모콘(36)을 통해 모니터(34)에서 각종 감지기로부터 감지된 정보를 한꺼번에 전시시킬 수 있는 작업상황 차트를 띄우게 한다.At this time, the user to display the work situation chart that can display the information detected from the various sensors on the monitor 34 at a time through the remote control 36.
이러한 차트는 도10 또는 도11에 도시되어진 바와 같다.This chart is as shown in FIG. 10 or FIG.
먼저 도10을 좌측부터 살펴본다.First, FIG. 10 will be described from the left.
DEPTH에는 발신기(23)로부터 감지된 맨드럴(15)의 압입깊이가 제어부(33)에 의해 분석되어 전시된다. 따라서 디지털식으로 전시되는 칸에는 맨드럴(15)의 압입깊이가 숫자로 전시되고, 그 하측에는 막대그래프로 맨드럴(15)의 압잎깊이가 전시 된다. 이 때, 제어부(33)는 상기에서 설명한 바와 같이 상기 발신기(23)로부터 감지된 정보에 원형풀리(23a)의 마모정도를 감안하여 분석 전시시키게 된다. In the DEPTH, the indentation depth of the mandrel 15 detected from the transmitter 23 is analyzed and displayed by the controller 33. Therefore, the indentation depth of the mandrel 15 is displayed numerically in the compartment displayed digitally, and the indentation depth of the mandrel 15 is displayed in the bar graph at the lower side thereof. At this time, the control unit 33 will be displayed by analyzing the information detected from the transmitter 23 in consideration of the wear of the circular pulley (23a) as described above.
PAPER는 드레인보드(14)의 실제 압입깊이를 말한다. 따라서 디지털식으로 전시되는 칸에는 맨드럴(15)의 압입깊이에서 맨드럴(15)의 인발시 드레인보드(14)가 후퇴된 길이를 제한 드레인보드(14)의 실제 압입깊이가 전시되고, 그 하측에는 막대그래프로 맨드럴(15)의 압입깊이가 전시된다. 이 때, 제어부(33)는 상기에서 설명한 바와 같이 맨드럴(15)의 인발시 드레인보드(14)의 후퇴길이를 감지하는 후퇴길이감지기(24)로부터 감지된 정보에 원형풀리(23a)의 마모정도를 감안하여 분석 전시시키게 된다. PAPER refers to the actual indentation depth of the drain board 14. Therefore, in the cell that is displayed digitally, the actual indentation depth of the drain board 14 is limited to the length in which the drain board 14 is retracted when the mandrel 15 is drawn out from the indentation depth of the mandrel 15. On the lower side, the indentation depth of the mandrel 15 is displayed in a bar graph. At this time, the control unit 33 wears the circular pulley 23a on the information detected from the retracting length detector 24 for detecting the retracting length of the drain board 14 when the mandrel 15 is drawn as described above. In view of the degree, the analysis will be displayed.
APERE에는 맨드럴(15)을 타설하는 바이브로해머로 흐르는 전류량을 감지하는 전류감지기(25)로부터 감지된 값을 제어부(33)에서 분석하여 시간에 따라 실시간으로 전시시키게 된다. 물론, 맨드럴(15)의 타설을 위해 유압모터가 사용되는 경우에는 PRESSURE난이 전시되어 유압이 전시되어 진다.In the APERE, the controller 33 analyzes the detected value from the current sensor 25 for sensing the amount of current flowing to the vibrohammer for placing the mandrel 15 and displays it in real time according to time. Of course, when the hydraulic motor is used for placing the mandrel 15, the PRESSURE column is displayed and the hydraulic pressure is displayed.
X는 리더(12)의 X축 경사도가, Y는 리더(12)의 Y축 경사도가 시간에 따라 실시간으로 리더경사감지기(22)에 의해 감지된 값을 제어부(33)가 분석 전시시킨다.X is the X-axis inclination of the reader 12, Y is the Y-axis inclination of the reader 12, the control unit 33 analyzes and displays the value detected by the leader inclination sensor 22 in real time.
SPEED는 맨드럴(15)의 압입속도가 시간에 따라 실시간으로 전시된다. 상술한 바와 같이 맨드럴(15)의 압입깊이와 발신기(23)의 원형풀리(23a)가 회전하는 회전량은 비례하고, 또한, 원형풀리(23a)의 회전속도와 맨드럴(15)의 압입속도는 비례하기 때문에, 제어부(33)는 발신기(23)의 원형풀리(23a)가 회전하는 속도 및 원형풀리(23a)의 마모정도를 분석하여 맨드럴(15)의 압입속도를 판단할 수 있는 것이고 이러한 값이 전시되는 것이다.The SPEED is displayed in real time with the indentation speed of the mandrel 15. As described above, the indentation depth of the mandrel 15 and the rotational amount of rotation of the circular pulley 23a of the transmitter 23 are proportional, and the rotation speed of the circular pulley 23a and the indentation of the mandrel 15 are also proportional to each other. Since the speed is proportional, the control unit 33 can determine the indentation speed of the mandrel 15 by analyzing the speed at which the circular pulley 23a of the transmitter 23 rotates and the degree of wear of the circular pulley 23a. And these values are displayed.
B/PAPER는 맨드럴(15)의 인발시에 드레인보드(14)의 후퇴되는 길이가 전시된다.The B / PAPER exhibits the length of retraction of the drain board 14 upon drawing of the mandrel 15.
사용자는 상기와 같은 값들이 전시되는 작업상황 차트를 모니터(34)에 띄워 현재 시공에 따른 작업상태를 일목요연하게 확인하고 그 시공의 불량여부를 즉각적으로 판단할 수 있다.The user can display a work situation chart in which the above values are displayed on the monitor 34 to check the work status according to the current construction at a glance, and immediately determine whether the construction is defective.
일반적으로 디지털식 정보는 사용자에게 정교한 수치를 전시하여 알릴 수 있지만, 극히 짧은 시간 동안 수치가 연속적으로 변화하는 경우에는 아날로그식 그래프 표기가 사용자에게 더 유용하고 정보를 정확히 파악할 수 있는 장점이 있다. 즉, 시공작업이 완료된 상태에서는 디지털식 정보에 의해 전시되는 것이 사용자에게 편리하지만, 시공작업이 진행되고 있는 상황에서는 오히려 아날로그식으로 전시하는 것이 사용자에게 편리한 것이다. 따라서 본 실시 예에 따른 관리계(300)는 상기와 같은 아날로그식 전시와 디지털식 전시의 장점을 모두 살릴 수 있도록 병행하여 전시시킨다. In general, digital information can be displayed to the user by displaying a sophisticated value, but when the numerical value is continuously changed for a very short time, the analog graph notation is more useful to the user and has the advantage of accurately identifying the information. That is, while the construction work is completed, it is convenient for the user to be displayed by digital information, but in the situation where the construction work is in progress, it is more convenient for the user to display in analog form. Therefore, the management system 300 according to the present embodiment displays them in parallel so that the advantages of the analog and digital displays can be utilized.
도11은 상기와 같은 작업상황 차트에서 맨드럴(15)의 압입속도를 전시할 수 있는 부분, 드레인보드(14)의 앞입깊이를 전시할 수 있는 부분 및 드레인보드(14)의 후퇴길이를 전시할 수 있는 부분이 빠져 있으며, 나머지는 상기 도10을 참조하여 설명한 바와 같다. FIG. 11 shows a part capable of exhibiting the indentation speed of the mandrel 15, a part capable of displaying the front mouth depth of the drain board 14, and a retraction length of the drain board 14 in the work situation chart as described above. The parts that can be omitted are omitted, and the rest are as described above with reference to FIG. 10.
한편, 매 시공시마다의 시공완료에 따른 작업상황 차트는 저장부(41)에 저장된다. 이러한 매 시공시마다의 작업상황 차트는 차후 사용자가 어떤 특정한 시공에 대한 상황 자료를 필요로 하는 경우 유용하게 사용된다. 도10 및 도11에 도시되어진 바와 같이 본 작업상황 차트에는 지중의 각 지점에서의 지반의 저항 압력, 경사도 등이 제어부에 의해 시공작업 진행에 따라 실시간으로 분석되어 나타나 있기 때문이다. 예를 들면, 어느 지역에 대하여 연약지반 공사를 수행하고자 하는 경우에 그 지역의 지반 정보를 알기 위하여 몇 군데 지점을 시공해보는 시험이 필요하다. 이러한 경우 지중의 각 지점마다의 지반 상황이 실시간으로 분석되고, 이 분석된 정보가 작업상황 차트에 기록되어 저장부(41)에 저장되기 때문에, 추후 사용자가 이를 출력하여 실제 작업에 필요한 정보(드레인보드의 압입깊이, 맨드럴의 압입속도 등)를 추출해 낼 수 있는 것이다.On the other hand, the work situation chart according to the construction completion at each construction time is stored in the storage unit 41. This work situation chart is useful when the user needs situation data for a specific construction. This is because, as shown in FIG. 10 and FIG. 11, in the present work situation chart, the ground resistance pressure, the slope and the like at each point of the ground are analyzed and displayed in real time as the construction work progresses by the control unit. For example, if you want to carry out soft ground work for a certain area, you need to test the construction of several points in order to know the ground information of that area. In this case, the ground situation of each point of the ground is analyzed in real time, and the analyzed information is recorded in the work situation chart and stored in the storage unit 41, so that the user later outputs it and needs information for actual work (drain The indentation depth of the board, the indentation speed of the mandrel, etc. can be extracted.
2. 압입과정2. Indentation Process
모니터(34)에 상기와 같은 작업상황 차트를 띄운 사용자는 본격적으로 드레인보드(14) 압입 시공을 한다.The user who floats the above work status chart on the monitor 34 performs the press-fitting construction of the drain board 14 in earnest.
먼저, 근접센서(28)에서는 맨드럴(15)의 매회 압입시공시에 영점위치를 감지하고, 제어부(33)에서는 상기 근접센서(18)로부터 수신된 정보에 의해 영점위치를 세팅한다. 따라서, 맨드럴의 압입깊이는 영점세팅된 때부터 계산되어 진다. First, the proximity sensor 28 detects the zero position at every press-fitting operation of the mandrel 15, and the controller 33 sets the zero position by the information received from the proximity sensor 18. Therefore, the indentation depth of the mandrel is calculated from the zero setting.
바이브로해머는 맨드럴(15)을 타설하고, 맨드럴(15)은 그 끝에 마련된 앵커플레이트에 의해 물려져 있는 드레인보드(14)와 함께 지중에 압입되기 시작한다.The vibrohammer pours the mandrel 15, and the mandrel 15 begins to be pressed into the ground together with the drain board 14 which is bitten by the anchor plate provided at the end thereof.
이 때, 상기 작업상황 차트에는 시간에 따라 변하는 현재 작업상황에 따른 각종 수치 값이 입력되기 시작한다.At this time, in the work situation chart, various numerical values according to the current work situation that changes with time start to be input.
또, 상기의 시공 작업 중 사용자가 기 입력한 적정 수치 값의 범위를 벗어나는 경우 경고부(39)에서 경고음이 울릴 수 있다.In addition, if the user is out of the range of the appropriate numerical value previously input during the construction work, the warning unit 39 may sound a warning sound.
3. 맨드럴(15) 인발과정3. Mandrel (15) Drawing Process
맨드럴(15)이 설정된 적정 값까지 압입되면, 맨드럴(15)을 인발시킨다. 이 때, 상술한 바와 같이 드레인보드(14)가 소정정도 후퇴되는데, 이러한 드레인보드(14)의 후퇴길이와 드레인보드(14)의 실제 압입깊이가 상기 작업상황 차트에 표시된다.When the mandrel 15 is press-fitted to a set appropriate value, the mandrel 15 is pulled out. At this time, as described above, the drain board 14 is retracted by a predetermined degree, and the retraction length of the drain board 14 and the actual press-in depth of the drain board 14 are displayed in the working situation chart.
4. 시공의 적정성 판단 및 불량 시공 된 드레인보드(14)의 인발4. Determination of adequacy of construction and drawing out of drain board 14
맨드럴(15)의 인발이 모두 끝나고, 상기 작업상황 차트에 드레인보드(14)의 실제 압입깊이 등이 적정한 범위 내에서 표시되어져 있으면, 상술한 바와 같이 사용자는 리모콘(36)을 통하여 인발모터(26)에 소정시간동안 드레인보드(14)의 인발 지시를 내린다. 물론 응용 예에 따라서는 이러한 작업이 자동으로 이루어지게 할 수도 있다.When the drawing of the mandrel 15 is completed and the actual indentation depth of the drain board 14 and the like are displayed in an appropriate range in the work situation chart, as described above, the user can use the drawing motor ( 26, the drawing instruction of the drain board 14 is given for a predetermined time. Of course, depending on the application, this can be done automatically.
이 때, 인발모터(26)에 의해 가해지는 인발력에 의해 드레인보드(14)에 발생하는 장력이 장력감지기(27)로부터 감지되고, 이를 수신한 제어부(33)는 모니터(34)에 이러한 장력값을 전시시킨다. 전시된 장력값이 소정의 값 이상이면 적정한 시공이 이루어진 것이고, 소정의 값 이하이면 불량시공이 이루어진 것이다.At this time, the tension generated in the drain board 14 by the drawing force applied by the drawing motor 26 is detected from the tension sensor 27, the control unit 33 receives this tension value to the monitor 34 Display it. If the displayed tension value is greater than or equal to the predetermined value, proper construction is achieved, and if less than or equal to the predetermined value, poor construction is performed.
응용 예에 따라서는 즉각적으로 사용자가 불량여부를 알도록 하기 위해 경보부(39)를 통해 경보음을 발생시키도록 구성할 수도 있다.Depending on the application, it may be configured to generate an alarm sound through the alarm unit 39 so that the user immediately knows whether or not the failure.
상기와 같은 불량시공에 따른 드레인보드(14)의 인발 예 중 하나에 대하여 살펴본다.It looks at one of the drawing example of the drain board 14 according to the poor construction as described above.
사용자는 키보드(35)를 통해 미리 드레인보드(14)의 적정 장력값을 설정해 놓을 수 있고, 상기와 같이 소정시간 드레인보드(14)를 잡아당길 때 제어부(33)는 장력감지기(27)로부터 수신된 드레인보드(14)의 장력값이 적정 장력값 아래에 있는 경우 인발모터(26)가 계속해서 드레인보드(14)를 잡아당기게 지시한다. 이와 같이 하여 불량시공 된 드레인보드(14)를 인발시킬 수 있다.The user may set an appropriate tension value of the drain board 14 in advance through the keyboard 35, and when the user pulls the drain board 14 for a predetermined time as described above, the control unit 33 receives from the tension sensor 27. If the tension value of the drain board 14 is below the proper tension value, the drawing motor 26 instructs to pull the drain board 14 continuously. In this way, the poorly constructed drain board 14 can be drawn out.
물론, 응용 예에 따라서는 사용자가 모니터(34)를 통해 전시된 드레인보드(14)의 장력값을 보고, 드레인보드(14)의 불량시공여부를 판단하여 리모콘(36)을 통해 인발모터(26)를 가동시킬 수도 있을 것이다.Of course, depending on the application example, the user looks at the tension value of the drain board 14 displayed through the monitor 34, determines whether the drain board 14 is defective or not, and draws the motor 26 through the remote controller 36. ) May be enabled.
이상과 같이 하나의 시공작업이 모두 끝나면, 사용자는 트랙터(11)를 운전하여 다음의 시공 위치로 이동한다.As described above, when one construction work is completed, the user drives the tractor 11 to move to the next construction position.
물론, 상기에서 설명한 Ⅰ,Ⅱ,Ⅲ과정은 드레인보드(14)의 매회 압입시공시마다 적용되는 과정이다.Of course, the above-described processes I, II, and III are processes applied to each press-fitting of the drain board 14.
한편, 상술한 바와 같은 모니터(34)에 띄워지는 모든 차트와 모든 작업상황을 일목요연하게 파악할 수 있도록 하기 위한 차트를 문서화하여 프린터(38)로 출력하도록 할 수도 있으며, 또, 드라이버(37)에 의해 디스켓에 저장될 수 있는데, 이러한 출력 및 저장은 사용자가 키보드(35) 또는 리모콘(36)을 통해 수행되도록 할 수 있다.On the other hand, it is also possible to document and output to the printer 38 all the charts displayed on the monitor 34 as described above and charts to be able to grasp all working conditions at a glance, and also by the driver 37 It can be stored on the diskette, such output and storage can be performed by the user via the keyboard 35 or the remote control 36.
다음은 실제 시공작업(일례로 영종도 공항 부지 조성 공사라 하면)에 있어서 모든 작업상황을 일목요연하게 보여주는 프린터(38)의 출력 문서의 일예를 보여준다.The following shows an example of the output document of the printer 38 showing all the working conditions at a glance in actual construction work (for example, Yeongjong-do airport site construction work).
처음 맨드럴(15)을 압입하여 일정한 설정값에 도달하는 압입이 이루어지면 부저가 울리고 맨드럴(15)의 인발이 이루어진다. 이 때 프린터(38)는 다음과 같이 프린트한다.When the first press is made to press the mandrel 15 to reach a certain set value, the buzzer sounds and the mandrel 15 is drawn out. At this time, the printer 38 prints as follows.
-------------------------------- --------------------------------
DAILY WORK RECORD SHEET DAILY WORK RECORD SHEET
-------------------------------- --------------------------------
PROJECT: 영종도 공항 부지 조성 PROJECT: Establishment of Yeongjongdo Airport
AREA: 03-05 공구 AREA: 03-05 tool
METHOD: P.B.D공법 METHOD: P.B.D
CONTRACTOR: 현대건설 CONTRACTOR: Hyundai E & C
SUB-CONT: 우성건설 SUB-CONT: Woosung Construction
MODEL/NO: 본 관리계의 명칭과 번호 MODEL / NO: Name and number of this management system
DATE: 2002/ 04/ 09 P : 001 DATE: 2002/04/09 P: 001
-------------------------------- --------------------------------
NO M-DEPTH P-DEPTH P-BACK NO M-DEPTH P-DEPTH P-BACK
-------------------------------- --------------------------------
001 20.23m 20.20m 0.03m 001 20.23m 20.20m 0.03m
09: 24.25 X-0.4ㅀ Y-0.3ㅀ 09: 24.25 X-0.4 ㅀ Y-0.3 ㅀ
PR. 284kg/cm2 PR. 284 kg / cm 2
상기의 출력물을 살펴보면, P : 001은 영종도 부지공사의 처음시작부터 끝날 때까지 프린트화 된 용지의 일련번호, NO는 드레인보드(14) 압입 번호, M-DEPTH는 맨드럴(15)의 압입 깊이, P-DEPTH는 드레인보드(14)의 압입깊이, P-BACK은 드레인보드(14)의 압입 후 후퇴된 길이이다. 숫자들은 순서대로 001은 처음 압입시공 한 작업 번호, 20.23m는 처음 압입한 경우의 맨드럴(15)의 압입깊이, 20.20m는 드레인보드(14)의 압입깊이, 09: 24.25는 처음 압입 작업이 이루어진 시간, X-0.4ㅀ는 지면에 수직한 축으로부터 X축 방향으로의 경사도, Y-0.3ㅀ는 지면에 수직한 축으로부터 Y축 방향으로의 경사도를 말한다. PR. 284kg/cm2 는 압입지점에서의 지반의 저항압력을 말하는데, 유압모터 대신에 바이브로햄머를 사용할 경우에는 이 부분이 전류의 수치로 나오게 될 것이다. 즉, Cu. 284A 와 같이 프린트 되어질 것이다.Looking at the above output, P: 001 is the serial number of the printed paper from the beginning to the end of the Yeongjong Island site construction, NO is the drain board 14 indentation number, M-DEPTH is the indentation depth of the mandrel 15 , P-DEPTH is the indentation depth of the drain board 14, P-BACK is the length retracted after the indentation of the drain board (14). The numbers are in the order of 001 for the first indentation, 20.23m for the first indentation depth of the mandrel 15, 20.20m for the drain board 14, 09: 24.25 for the first indentation operation. The time made, X-0.4 ms, is the inclination in the X-axis direction from the axis perpendicular to the ground, and Y-0.3 ms is the inclination in the Y-axis direction from the axis perpendicular to the ground. PR. 284 kg / cm 2 is the resistive pressure of the ground at the indentation point. If a vibrohammer is used instead of the hydraulic motor, this part will be the current value. That is, Cu. Will print as 284A.
두 번째의 압입이 이루어지게 되고 나면, 프린터(38)는 처음 프린트된 뒤의 부분에 두 번째의 시공상황을 프린트하게 된다. 즉 다음과 같다.After the second indentation is made, the printer 38 prints the second construction situation on the part after the first printing. That is as follows.
-------------------------------- --------------------------------
DAILY WORK RECORD SHEET DAILY WORK RECORD SHEET
-------------------------------- --------------------------------
PROJECT: 영종도 공항 부지 조성 PROJECT: Establishment of Yeongjongdo Airport
AREA: 03-05 공구 AREA: 03-05 tool
METHOD: P.B.D공법 METHOD: P.B.D
CONTRACTOR: 현대건설 CONTRACTOR: Hyundai E & C
SUB-CONT: 우성건설 SUB-CONT: Woosung Construction
MODEL/NO: 본 관리계의 명칭과 번호 MODEL / NO: Name and number of this management system
DATE: 2002/ 04/ 09 P : 001 DATE: 2002/04/09 P: 001
-------------------------------- --------------------------------
NO M-DEPTH P-DEPTH P-BACK NO M-DEPTH P-DEPTH P-BACK
-------------------------------- --------------------------------
001 20.23m 20.20m 0.03m 001 20.23m 20.20m 0.03m
09: 24.25 X-0.4ㅀ Y-0.3ㅀ 09: 24.25 X-0.4 ㅀ Y-0.3 ㅀ
PR. 284kg/cm2 PR. 284 kg / cm 2
002 20.23m 20.19m 0.04m 002 20.23m 20.19m 0.04m
09: 24.25 X-0.4ㅀ Y-0.3ㅀ 09: 24.25 X-0.4 ㅀ Y-0.3 ㅀ
PR. 283kg/cm2 PR. 283kg / cm 2
이와 같이 시공순서에 따라 순차적으로 작업상황이 요약되어 문서로 출력되어진다.In this way, the work status is sequentially summarized according to the construction order and output as a document.
도12는 상기와 같이 순차적으로 작업상황이 요약되어 문서로 출력된 현황문서의 일예를 보여주고 있다. 12 shows an example of a status document outputted as a document in which work statuses are sequentially summarized as described above.
한편, 도13이하를 참조하여 본 발명에 따르는 관리시스템과 이에 적용된 관리계(300)를 이용한 P.B.D공법에 대하여 살펴본다.Meanwhile, the P.B.D method using the management system and the management system 300 applied thereto will be described with reference to FIG. 13 or below.
1. 맨드럴(15) 및 드레인보드(14)의 실제 압입깊이 산출 시(도13 참조)1.Calculation of the actual indentation depth of the mandrel 15 and the drain board 14 (see Fig. 13)
사용자는 상술한 바와 같은 일정한 실험, 즉, 실제 맨드럴의 압입깊이가 10m인데 발신기로부터 감지되는 압입깊이가 12m로 표시된 경우와 같은 원형풀리의 마모 정도를 알아내기 위한 실험을 거쳐, 상기 예에서와 같이 오차가 발생한 경우 사용자는 발신기(23)로부터 수신된 깊이를 12m당 10m로 인식할 것을 제어부에 지시입력하면,The user undergoes a constant experiment as described above, i.e., an experiment to find the degree of wear of the circular pulley such as when the indentation depth of the actual mandrel is 10 m and the indentation depth detected from the transmitter is indicated by 12 m. When the error occurs as the user inputs to the control unit to recognize the depth received from the transmitter 23 to 10m per 12m,
첫째, 제어부(33)는 이러한 사용자의 지시사항을 인식하고 분석하여 원형풀리(23a)의 마모정도를 산출한다.First, the control unit 33 recognizes and analyzes the user's instructions to calculate the degree of wear of the circular pulley 23a.
둘째, 압입시공에 따라서 맨드럴(15)을 압입을 시작한다.Second, press the mandrel (15) in accordance with the indentation construction.
셋째, 맨드럴(15)의 영점위치를 감지하고 이를 세팅한다.Third, the zero position of the mandrel 15 is detected and set.
넷째, 상기 발신기(23)에 의해 압입시공에 따른 맨드럴(15)의 압입깊이를 감지한다.Fourth, by the transmitter 23 detects the indentation depth of the mandrel 15 according to the indentation construction.
다섯째, 제어부(33)는 상기 발신기(23)로부터 수신된 맨드럴(15)의 압입깊이에 상기에서 산출된 원형풀리(23a)의 마모정도를 감안하여 맨드럴(15)의 실제 압입깊이를 산출한다.Fifth, the control unit 33 calculates the actual indentation depth of the mandrel 15 in consideration of the wear degree of the circular pulley 23a calculated above to the indentation depth of the mandrel 15 received from the transmitter 23. do.
물론 이렇게 산출된 정확한 맨드럴(15)의 실제 압입깊이는 제어부(33)의 지시에 의해 모니터(34)에 전시된 작업상황 차트에 표시되는 것이다.Of course, the actual indentation depth of the calculated mandrel 15 is displayed on the work situation chart displayed on the monitor 34 by the instruction of the control unit 33.
한편, 상기와 같이 맨드럴(15)의 실제 압입깊이를 산출한 후,On the other hand, after calculating the actual indentation depth of the mandrel 15 as described above,
여섯째, 맨드럴(15)의 인발시 맨드럴(15)과 함께 소정정도 후퇴되는 드레인보드(14)의 후퇴길이를 감지한다.Sixth, when the mandrel 15 is drawn out, the retracted length of the drain board 14 that is retracted with the mandrel 15 to some extent is sensed.
일곱째, 맨드럴(15)의 실제 압입깊이와 상기 드레인보드(14)의 후퇴길이를 비교분석하여 드레인보드(14)의 실제 압입깊이를 산출하고 전시한다. Seventh, the actual indentation depth of the mandrel 15 and the retreat length of the drain board 14 are analyzed to calculate and display the actual indentation depth of the drain board 14.
2. 적정 시공 여부 판단 및 불량시공 된 드레인보드(14) 인발 시(도14 및 15참조)2. Determination of proper construction and drawing of drain board 14 which is poor construction (see Fig. 14 and 15)
드레인보드(14)는 불량시공 될 다양한 개연성이 있다. 드레인보드(14)의 불량시공의 예로는 지중에서 맨드럴(15)의 압입속도가 빨라 맨드럴(15)이 휘게 됨으로써 드레인보드가 휜 상태로 압입되거나, 헐겁게 압입된 경우, 리더(12)의 경사도가 적정하지 못한 상태에서 압입시공이 이루어진 경우 및 설정된 적정 압입깊이 이하로 압입된 경우 등을 들 수 있다. 이러한 경우 중 헐겁게 압입된 경우의 불량여부 판단 일예는, 도14를 참조하는 바와 같이,The drain board 14 has various possibilities to be poorly constructed. An example of poor construction of the drain board 14 is that the mandrel 15 is pressurized in the ground so that the mandrel 15 is bent so that the drain board is pressurized or loosely pressurized. And the case where the press-fitting construction is performed in a state where the inclination is not proper, and the press-fitting is performed under the set proper press-in depth. As one example of whether or not a defect is determined in the case of being loosely indented, as shown in FIG. 14,
첫째, 압입된 드레인보드(14)에 인발모터(26)를 통하여 인발력을 가한다.First, drawing force is applied to the press-fitted drain board 14 through the drawing motor 26.
둘째, 상기 인발력이 가해지는 드레인보드(14)의 장력을 감지한다.Secondly, the tension of the drain board 14 to which the drawing force is applied is sensed.
셋째, 상기 드레인보드(14)의 장력을 소정의 기준값과 비교분석하여 상기 드레인보드(14)의 불량시공 여부를 판단한다.Third, by comparing the tension of the drain board 14 with a predetermined reference value to determine whether or not the drain board 14 is defective construction.
넷째, 상기 장력값이 상기 소정의 기준값 이하이면 상기 인발모터(26)를 지속적으로 작동시키고, 상기 장력값이 상기 소정의 기준값 이상이면 상기 인발모터(26)의 작동을 정지시킨다.Fourth, if the tension value is less than or equal to the predetermined reference value, the drawing motor 26 is continuously operated. If the tension value is greater than or equal to the predetermined reference value, the drawing motor 26 is stopped.
상기와 같은 예 이외에도 상술한 바와 같이 제어부(33)는 드레인보드(14)의 압입깊이 등을 분석하기 때문에 적정 설계치 값에 이르지 못하는 시공에 대하여는 불량여부를 판단한다. 따라서 도15를 참조하면 불량시공된 드레인보드의 인발은, In addition to the above-described examples, as described above, the control unit 33 analyzes the indentation depth of the drain board 14 and the like and determines whether the construction fails to reach an appropriate design value. Therefore, referring to Figure 15 is drawn out of the poorly constructed drain board,
첫째, 제어부(33)는 각종 감지기로부터 감지된 값들을 분석하여 드레인보드(14)의 불량시공 여부를 판단한다.First, the controller 33 analyzes the values sensed by the various detectors to determine whether the drain board 14 is defective.
둘째, 드레인보드의 시공이 적정하면 당해 시공작업이 종결되겠지만, 드레인보드(14)가 불량시공 되었다고 판단되는 경우 제어부(33)는 인발모터(26)에 지시하여 불량시공 된 드레인보드(14)를 인발하도록 명한다.Second, if the construction of the drain board is appropriate, the construction work will be terminated, but if it is determined that the drain board 14 is defective, the control unit 33 instructs the drawing motor 26 to fix the poorly constructed drain board 14. Command to draw.
셋째, 상기와 같은 제어부(33)의 명에 의해 인발모터(26)가 작동하여 드레인보드(14)를 인발한다.Third, the drawing motor 26 is operated by the command of the control unit 33 as described above to draw the drain board (14).
3. 경사도 감지 및 전시(도16 참조)3. Slope detection and display (see Fig. 16)
트랙터(11)의 이동 시 및 드레인보드(14)의 압입시공 시에는 트랙터(11)의 전복 방지 및 시공의 정확성을 위해서 트랙터(11) 및 리더(12)의 경사도를 감지하고 이를 전시하는데,During the movement of the tractor 11 and the press-fitting construction of the drain board 14, the slope of the tractor 11 and the leader 12 is sensed and displayed in order to prevent overturning and construction of the tractor 11,
첫째, 트랙터(11) 및 리더(12)의 경사감지기(21, 22)로부터 트랙터(11) 및 리더(12)의 경사도를 감지한다.First, the inclination of the tractor 11 and the leader 12 is detected from the inclination detectors 21 and 22 of the tractor 11 and the leader 12.
둘째, 트랙터(11) 및 리더(12)의 경사도를 분석한다.Second, the inclination of the tractor 11 and the leader 12 is analyzed.
셋째, 상기 트랙터(11) 및 리더(12)의 경사도를 2차원적으로 전시하여 사용자가 상기 트랙터(11) 및 리더(12)의 경사도를 인지할 수 있도록 한다.Third, the inclinations of the tractor 11 and the leader 12 are displayed in two dimensions so that the user can recognize the inclination of the tractor 11 and the leader 12.
넷째, 사용자는 상기 전시된 트랙터(11) 및 리더(12)의 경사도를 보면서 트랙터(11) 및 리더(12)의 경사도를 조정한다. Fourth, the user adjusts the inclination of the tractor 11 and the leader 12 while looking at the inclination of the displayed tractor 11 and the leader 12.
4. 시공순서를 전시하는 경우(도17 참조)4. In case of exhibiting construction order (see Fig. 17)
첫째, 사용자는 키보드(35)를 통해 제어부(33)에 드레인보드(14)의 압입시공 순서를 입력한다.First, the user inputs the press-fitting construction order of the drain board 14 to the control unit 33 through the keyboard 35.
둘째, 제어부(33)는 사용자가 입력한 시공 순서를 분석한다.Second, the control unit 33 analyzes the construction order input by the user.
셋째, 분석된 시공순서를 모니터(34)를 통해 전시한다. 여기서, 전시는 도8에 도시되어진 바와 같이 2차원적인 좌표로 전시될 수 있으며, 현재의 시공순서 또는 다음의 시공순서 중 적어도 하나 이상은 타 좌표와 구별되게 전시하는 것이 바람직하다.Third, the analyzed construction order is displayed on the monitor 34. Here, the exhibition may be displayed in two-dimensional coordinates, as shown in Figure 8, it is preferable to display at least one or more of the current construction order or the following construction order distinguished from other coordinates.
넷째, 전시된 시공순서에 따라 시공작업을 수행한다.Fourth, construction work should be carried out according to the displayed construction order.
5. 맨드럴(15)의 압입속도의 판단 및 압입속도 조절 시(도18 참조)5. Judging the indentation speed of the mandrel 15 and adjusting the indentation speed (see FIG. 18).
첫째, 제어부(33)는 사용자가 입력하는 시공지역의 지반압력에 따른 맨드럴(15)의 적정 압입속도에 비례하는 원형풀리(23a)의 적절한 회전속도에 대한 기준값을 결정한다.First, the control unit 33 determines a reference value for the appropriate rotational speed of the circular pulley 23a proportional to the proper indentation speed of the mandrel 15 according to the ground pressure of the construction area input by the user.
둘째, 맨드럴(15)을 압입한다.Second, inject the mandrel (15).
셋째, 원형풀리(23a)의 회전속도를 수신한다.Third, the rotational speed of the circular pulley 23a is received.
넷째, 상기에서 수신된 원형풀리(23a)의 회전속도를 상기 기준값과 비교한다. 다섯째, 원형풀리(23a)의 회전속도가 기준값 이상인 경우에는 맨드럴(15)의 압입속도를 낮춘다. 여기서 기준값은 일정한 속도범위로 주어질 수 있으며, 또한, 넷째 단계는 사용자의 별도의 명령에 의해 이루어지거나 프로그램에 의해 제어부에서 자동적으로 이루어질 수 있다.Fourth, the rotation speed of the circular pulley 23a received above is compared with the reference value. Fifth, when the rotational speed of the circular pulley 23a is equal to or greater than the reference value, the indentation speed of the mandrel 15 is lowered. Here, the reference value may be given in a constant speed range, and the fourth step may be made by a separate command of a user or automatically by a controller by a program.
이상에서 설명한 것 외에도 본 발명에 따른 관리시스템 및 이에 적용되는 관리계는 상술한 실시 예를 응용한 다양한 응용 실시 예를 가질 수 있고, 또한, 상술한 방법도 다양한 응용 방법을 가질 수 있음을 본 발명이 속하는 기술분야에서 통상의 지식을 가진 사람은 충분히 알 수 있고, 따라서 상술한 실시 예를 응용 한 본 발명의 범주에 속하는 응용 예를 실시 할 수 있을 것이다.In addition to the above description, the management system and the management system applied thereto may have various application embodiments to which the above-described embodiments are applied, and the present invention may also have various application methods. One of ordinary skill in the art can fully know, and therefore, the application example which belongs to the scope of the present invention to which the above-described embodiment is applied can be implemented.
본 발명 따르면, 맨드럴의 영점위치를 정확히 파악할 수 있어서 시공의 정확성을 도모할 수 있는 효과가 있다.According to the present invention, it is possible to accurately grasp the position of the zero point of the mandrel has the effect of achieving the accuracy of the construction.
도1은 시공 작업 중에 있는 장치에 대한 개략도이다.1 is a schematic view of a device in construction.
도2는 본 발명의 실시 예에 따른 연약지반 처리공법용 관리시스템에 대한 블록도이다.2 is a block diagram of a management system for a soft ground treatment method according to an embodiment of the present invention.
도3은 도1의 관리시스템에 적용된 본 발명의 실시 예에 따른 관리계의 외관에 대한 사시도이다.3 is a perspective view of an appearance of a management system according to an exemplary embodiment of the present invention applied to the management system of FIG. 1.
도4는 도2의 관리계에 대한 블록도이다.4 is a block diagram of the management system of FIG.
도5는 모니터에 전시된 기준값 설정 입력 차트의 일예이다.5 is an example of a reference value setting input chart displayed on a monitor.
도6a는 모니터에 전시된 시공순서의 좌표를 자동 설정 입력하는 차트의 일예이다.6A is an example of the chart which automatically sets and inputs the coordinates of the construction sequence displayed on the monitor.
도6b는 모니터에 전시된 시공순서의 좌표를 수동 설정 입력하는 차트의 일예이다.6B is an example of a chart for manually setting and inputting the coordinates of the construction sequence displayed on the monitor.
도7은 발신기가 도시된 사시도이다.7 is a perspective view of the transmitter.
도8은 모니터에 전시된 시공순서에 대해 좌표로 표시된 일실시 예이다.8 is an embodiment represented by coordinates with respect to the construction sequence displayed on the monitor.
도9a는 모니터에 전시된 트랙터의 경사도에 대한 2차원적인 그래프의 예이다.9A is an example of a two-dimensional graph of the inclination of a tractor displayed on a monitor.
9b는 모니터에 전시된 리더의 경사도에 대한 2차원적인 그래프의 예이다.9b is an example of a two-dimensional graph of the tilt of a reader displayed on a monitor.
도10 및 도11은 모니터에 전시된 작업상황 차트의 일예이다.10 and 11 are examples of work situation charts displayed on the monitor.
도12는 프린터에 의해 문서화되어 출력된 시공에 대한 현황문서이다.Fig. 12 is a status document on construction documented and output by a printer.
도13은 맨드럴 및 드레인보드의 실제 압입깊이 산출방법에 대한 흐름도이다.13 is a flowchart of a method of calculating an actual indentation depth of a mandrel and a drain board.
도14 및 도15는 드레인보드의 불량시공 여부의 판단 및 불량시공된 드레인보드의 인발 방법에 대한 흐름도이다.14 and 15 are flowcharts of a method of determining whether or not a drain board is poorly constructed and a drawing method of a poorly constructed drain board.
도16은 트랙터 및 리더의 경사도를 조정하는 방법에 대한 흐름도이다.16 is a flowchart of a method for adjusting the inclination of the tractor and the leader.
도17은 시공의 순서적 진행 방법에 대한 흐름도이다.17 is a flowchart of a method of sequentially proceeding construction.
도18은 압입되는 맨드럴의 압입속도의 판단 및 압입속도 조절 방법에 대한 흐름도이다.18 is a flowchart illustrating a method of determining the indentation speed of the mandrel being pressed and adjusting the indentation speed.
*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *
11: 트랙터 12: 리더11: tractor 12: leader
13: 롤 14: 드레인보드13: roll 14: drainboard
15: 맨드럴 21: 트랙터경사감지기15: Mandrel 21: Tractor Slope Detector
22: 리더경사감지기 23: 발신기22: Leader tilt detector 23: Transmitter
24: 후퇴길이감지기 25: 전류감지기24: Retract length sensor 25: Current sensor
26: 인발모터 27: 장력감지기26: drawing motor 27: tension sensor
28: 근접센서 30: 관리계28: proximity sensor 30: management system
41: 저장부 32: 커넥터부41: storage portion 32: connector portion
33: 제어부 33a: 주제어부33: control unit 33a: main control unit
33b: 보조제어부 34: 모니터33b: auxiliary control unit 34: monitor
35: 키보드 36: 리모콘35: keyboard 36: remote control
37: 드라이버 38: 프린터37: Driver 38: Printer
39: 경보부 40: 경사계39: alarm unit 40: inclinometer
Claims (3)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020020026355 | 2002-05-14 | ||
KR1020020026355 | 2002-05-14 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020030012361A Division KR20030088850A (en) | 2002-05-14 | 2003-02-27 | A managing system for weak ground construction work, A managing equipment for weak ground construction work, A managing method of weak ground construction work and A method of weak ground construction work |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20050043877A true KR20050043877A (en) | 2005-05-11 |
Family
ID=32382646
Family Applications (8)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020030012361A KR20030088850A (en) | 2002-05-14 | 2003-02-27 | A managing system for weak ground construction work, A managing equipment for weak ground construction work, A managing method of weak ground construction work and A method of weak ground construction work |
KR1020050034487A KR20050043877A (en) | 2002-05-14 | 2005-04-26 | Managing system for weak ground construction work, managing apparatus for weak ground construction work and a managing method of managing apparatus for weak ground construction work |
KR1020050034485A KR20050045978A (en) | 2002-05-14 | 2005-04-26 | Managing system for weak ground construction work and managing apparatus for weak ground construction work |
KR1020050034489A KR20050043878A (en) | 2002-05-14 | 2005-04-26 | Managing system for weak ground construction work, managing apparatus for weak ground construction work and a managing method of managing apparatus for weak ground construction work |
KR1020050034491A KR100737834B1 (en) | 2002-05-14 | 2005-04-26 | Managing system for weak ground construction work, managing apparatus for weak ground construction work and a managing method of managing apparatus for weak ground construction work |
KR1020050034494A KR100737835B1 (en) | 2002-05-14 | 2005-04-26 | Managing system for weak ground construction work, managing apparatus for weak ground construction work and a managing method of managing apparatus for weak ground construction work |
KR1020050034486A KR20050043876A (en) | 2002-05-14 | 2005-04-26 | Managing system for weak ground construction work, managing apparatus for weak ground construction work and a managing method of managing apparatus for weak ground construction work |
KR1020050034495A KR20050059009A (en) | 2002-05-14 | 2005-04-26 | Managing apparatus for weak ground construction work and a managing method of managing apparatus for weak ground construction work |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020030012361A KR20030088850A (en) | 2002-05-14 | 2003-02-27 | A managing system for weak ground construction work, A managing equipment for weak ground construction work, A managing method of weak ground construction work and A method of weak ground construction work |
Family Applications After (6)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020050034485A KR20050045978A (en) | 2002-05-14 | 2005-04-26 | Managing system for weak ground construction work and managing apparatus for weak ground construction work |
KR1020050034489A KR20050043878A (en) | 2002-05-14 | 2005-04-26 | Managing system for weak ground construction work, managing apparatus for weak ground construction work and a managing method of managing apparatus for weak ground construction work |
KR1020050034491A KR100737834B1 (en) | 2002-05-14 | 2005-04-26 | Managing system for weak ground construction work, managing apparatus for weak ground construction work and a managing method of managing apparatus for weak ground construction work |
KR1020050034494A KR100737835B1 (en) | 2002-05-14 | 2005-04-26 | Managing system for weak ground construction work, managing apparatus for weak ground construction work and a managing method of managing apparatus for weak ground construction work |
KR1020050034486A KR20050043876A (en) | 2002-05-14 | 2005-04-26 | Managing system for weak ground construction work, managing apparatus for weak ground construction work and a managing method of managing apparatus for weak ground construction work |
KR1020050034495A KR20050059009A (en) | 2002-05-14 | 2005-04-26 | Managing apparatus for weak ground construction work and a managing method of managing apparatus for weak ground construction work |
Country Status (1)
Country | Link |
---|---|
KR (8) | KR20030088850A (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111364440A (en) * | 2020-03-20 | 2020-07-03 | 浙江智握领程科技股份有限公司 | Vacuum preloading construction monitor and working method thereof |
KR102656648B1 (en) | 2023-12-07 | 2024-04-11 | 주식회사 한울지오텍 | Earthwork management system based on ground coordinates |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60119813A (en) * | 1983-12-01 | 1985-06-27 | Kajima Corp | Co-rising alarm for paper draining material |
JPS61246417A (en) * | 1985-04-24 | 1986-11-01 | Penta Ocean Constr Co Ltd | Monitoring/management device for paper drain driving work |
KR200233703Y1 (en) * | 2001-03-28 | 2001-10-18 | 김다영 | Safety device of toy automobile |
KR100380800B1 (en) * | 2002-04-04 | 2003-04-18 | 석정건설주식회사 | Automatic Leader Angle Control Unit for Construction Piling and Drilling Equipments and Method of the Control |
-
2003
- 2003-02-27 KR KR1020030012361A patent/KR20030088850A/en not_active Application Discontinuation
-
2005
- 2005-04-26 KR KR1020050034487A patent/KR20050043877A/en not_active Application Discontinuation
- 2005-04-26 KR KR1020050034485A patent/KR20050045978A/en not_active Application Discontinuation
- 2005-04-26 KR KR1020050034489A patent/KR20050043878A/en not_active Application Discontinuation
- 2005-04-26 KR KR1020050034491A patent/KR100737834B1/en not_active IP Right Cessation
- 2005-04-26 KR KR1020050034494A patent/KR100737835B1/en not_active IP Right Cessation
- 2005-04-26 KR KR1020050034486A patent/KR20050043876A/en not_active Application Discontinuation
- 2005-04-26 KR KR1020050034495A patent/KR20050059009A/en not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
KR20050045978A (en) | 2005-05-17 |
KR20030088850A (en) | 2003-11-20 |
KR100737834B1 (en) | 2007-07-12 |
KR20050043876A (en) | 2005-05-11 |
KR20050059009A (en) | 2005-06-17 |
KR20050059008A (en) | 2005-06-17 |
KR20050043879A (en) | 2005-05-11 |
KR100737835B1 (en) | 2007-07-12 |
KR20050043878A (en) | 2005-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2009389A1 (en) | Tread depth sensing device and tread depth measuring method | |
JP5422465B2 (en) | Workmanship management system and workmanship management method | |
CN111021732B (en) | Concrete vibrating rod positioning method based on optical fiber sensing | |
KR101478906B1 (en) | auto measurement equipment of standard penetration test | |
US8380461B2 (en) | Construction modulus testing apparatus and method | |
CN116193076A (en) | Monitoring method and monitoring device for pile foundation construction process | |
CN113654522A (en) | Method for measuring verticality of rotary drilling pile hole while drilling | |
KR100737834B1 (en) | Managing system for weak ground construction work, managing apparatus for weak ground construction work and a managing method of managing apparatus for weak ground construction work | |
JP3647445B1 (en) | Pile construction management device | |
JP2004270212A (en) | Execution management device of pile driving method | |
CN104458420A (en) | Testing device of rock-soil body in-situ strength bearing plate and usage method of testing device | |
KR20210016202A (en) | Paper drain board installing equipment with mandrel pressure measuring system using load cell | |
CN115977170A (en) | Pore-forming quality detection device and detection method for cast-in-situ bored pile | |
JPH05163727A (en) | Application controller for foundation pile | |
JP3224686B2 (en) | Drilling rig depth detector | |
DE19806047A1 (en) | Trench inclination measuring method when digging trench in ground | |
JP4695056B2 (en) | Construction management device | |
KR200286244Y1 (en) | managing apparutus for construction work | |
JPS61246417A (en) | Monitoring/management device for paper drain driving work | |
JPS6011194Y2 (en) | Drilling record monitoring device | |
CN215810708U (en) | Pile hole side wall verticality measuring device | |
CN114396253B (en) | Auxiliary positioning and information monitoring system and method for deep hole precast fracture under coal mine | |
KR100727046B1 (en) | Drain boards construction apparatus capable of high quality construction | |
KR200348946Y1 (en) | Automatic trace-tracking system for boring | |
JPH11270268A (en) | Ground drilling angle detecting method and device, ground drilling angle control method, ground drilling method and chemical grouting hole angle control method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A107 | Divisional application of patent | ||
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E90F | Notification of reason for final refusal | ||
E601 | Decision to refuse application | ||
J201 | Request for trial against refusal decision | ||
J301 | Trial decision |
Free format text: TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20061012 Effective date: 20070531 |