Nothing Special   »   [go: up one dir, main page]

KR200443819Y1 - Installation structure of facilities post - Google Patents

Installation structure of facilities post Download PDF

Info

Publication number
KR200443819Y1
KR200443819Y1 KR2020080013981U KR20080013981U KR200443819Y1 KR 200443819 Y1 KR200443819 Y1 KR 200443819Y1 KR 2020080013981 U KR2020080013981 U KR 2020080013981U KR 20080013981 U KR20080013981 U KR 20080013981U KR 200443819 Y1 KR200443819 Y1 KR 200443819Y1
Authority
KR
South Korea
Prior art keywords
facility
pillar
support
strut
fixed
Prior art date
Application number
KR2020080013981U
Other languages
Korean (ko)
Inventor
김문숙
Original Assignee
크리너코리아 (주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 크리너코리아 (주) filed Critical 크리너코리아 (주)
Priority to KR2020080013981U priority Critical patent/KR200443819Y1/en
Application granted granted Critical
Publication of KR200443819Y1 publication Critical patent/KR200443819Y1/en
Priority to JP2009242712A priority patent/JP2010101161A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2207Sockets or holders for poles or posts not used
    • E04H12/2215Sockets or holders for poles or posts not used driven into the ground
    • E04H12/2223Sockets or holders for poles or posts not used driven into the ground by screwing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2207Sockets or holders for poles or posts not used
    • E04H12/2215Sockets or holders for poles or posts not used driven into the ground
    • E04H12/223Sockets or holders for poles or posts not used driven into the ground with movable anchoring elements; with separately driven anchor rods

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

본 고안은 시설물 지주의 설치구조에 관한 것으로서, 더욱 상세하게는 시설물의 지주가 시설물 고정구에 설치되는 시설물 지주의 설치구조에 있어서, 상기 시설물 고정구는 상부에는 내측에 공간부가 형성되는 지주끼움부가 형성되고 하부에는 외주연에 나사산이 형성되는 상광하협의 쐐기부가 형성되어 지중에 삽입고정되고 상기 시설물의 지주는 상기 지주끼움부에 삽입고정됨으로써 터파기 작업, 콘크리트 타설 등의 복잡한 작업없이 시설물 고정구가 회전에 의해 지반을 파고들어 지중으로 삽입되고 지주를 지주삽입부에 삽입고정하여 간단하게 시설물의 지주를 설치할 수 있으며, 상기 지주끼움부와 상기 시설물의 지주 사이의 빈공간에 망체가 끼워지고 패킹부재가 채워지거나 중앙부에 지주삽입가이부가 형성된 고정캡이 상기 지주끼움부와 보울트 너트 결합됨으로써 시설물 지주를 견고하게 고정, 결합할 수 있는 시설물 지주의 설치구조에 관한 것이다. The present invention relates to an installation structure of a facility support, and more particularly, to an installation structure of a facility support in which a support of the facility is installed in the facility fixture, wherein the facility fixture is formed with a column- And a wedge portion of a vertical beam having a thread formed on the outer periphery is formed at the lower portion thereof. The wedge portion is inserted and fixed in the ground, and the support of the facility is inserted and fixed in the support portion. Thus, the facility fixture rotates without complicated operations such as tearing work, And the strut is inserted into the ground, and the strut is inserted and fixed in the strut inserting section so that the strut of the facility can be simply installed, and the strut is inserted into the hollow space between the strut fitting part and the strut of the facility, Or a fixed cap formed at the center thereof with a support post insertion portion, By binding ulteu nut relates to a fitting structure of the holding facilities that can be firmly fixed, the coupling holding facility.

본 고안에 의한 본 고안에 의한 시설물 지주의 설치구조에 의하면, 시설물의 지주를 고정하기 위하여 콘크리트를 타설할 필요없이 지주끼움부와 쐐기부로 구성되어 쐐기부의 나사산에 의해 지반을 파고들어 지중으로 삽입되고 지주를 지주끼움부에 삽입고정함으로써 매우 간단하게 시설물의 지주를 설치할 수 있어 시공설치 시간이 현저히 단축시킬 수 있고 유지관리상 보수 및 추가 공사가 용이할 뿐만 아니라 콘트리트 폐기물의 발생이 없어 친환경적이고 경제적이며 종래 콘크리트 타설 에 의해 시설물의 지주를 고정하는 구성보다 매우 경량적이므로 운반이 어려운 지역이나 장비의 진입이 어려운 여건에서도 시공이 가능하다. 또한, 지주끼움부와 시설물의 지주 사이에 빈공간이 생겨 시설물의 지주가 견고하게 고정되지 못하는 경우에는 빈공간에 망체가 끼워지고 패킹부재가 채워지게 하거나 중앙부에 지주삽입가이부가 형성된 고정캡이 상기 지주끼움부와 보울트 너트 결합됨으로써 시설물의 지주를 견고하게 고정, 결합할 수 있다.According to the present invention, there is no need to install concrete in order to fix the pillar of the facility, but the pillar is composed of the pillar and the wedge part and is inserted into the ground by digging the ground by the thread of the wedge part It is possible to install the pillar of the facility very simply by inserting the pillar into the pillar of the pillar and thus the construction installation time can be remarkably shortened and the maintenance and further work can be easily carried out as well as the concrete waste is not generated, Since it is much lighter than the structure that fixes the pillar of the facility by the concrete pouring in the past, it is possible to construct even in a place where the transportation is difficult or a situation where equipment is difficult to enter. In addition, when the pillar of the facility is not firmly fixed due to an empty space between the pillar and the pillar of the facility, the pillar is fitted into the pillar space and the packing member is filled, or the fixed cap, It is possible to firmly fix and fasten the support of the facility by joining with the bolt nut.

시설물 지주, 시설물 고정구, 지주끼움부, 나사산, 쐐기부, 망체, 고정캡 Facility column, facility fixture, column fitting, thread, wedge, net, fixed cap

Description

시설물 지주의 설치구조{Installation structure of facilities post}{Installation structure of facilities post}

본 고안은 시설물 지주의 설치구조에 관한 것으로서, 더욱 상세하게는 시설물의 지주가 시설물 고정구에 설치되는 시설물 지주의 설치구조에 있어서, 상기 시설물 고정구는 상부에는 내측에 공간부가 형성되는 지주끼움부가 형성되고 하부에는 외주연에 나사산이 형성되는 상광하협의 쐐기부가 형성되어 지중에 삽입고정되고 상기 시설물의 지주는 상기 지주끼움부에 삽입고정됨으로써 터파기 작업, 콘크리트 타설 등의 복잡한 작업없이 시설물 고정구가 회전에 의해 지반을 파고들어 지중으로 삽입되고 지주를 지주삽입부에 삽입고정하여 간단하게 시설물의 지주를 설치할 수 있으며, 상기 지주끼움부와 상기 시설물의 지주 사이의 빈공간에 망체가 끼워지고 패킹부재가 채워지거나 중앙부에 지주삽입가이부가 형성된 고정캡이 상기 지주끼움부와 보울트 너트 결합됨으로써 시설물 지주를 견고하게 고정, 결합할 수 있는 시설물 지주의 설치구조에 관한 것이다. The present invention relates to an installation structure of a facility support, and more particularly, to an installation structure of a facility support in which a support of the facility is installed in the facility fixture, wherein the facility fixture is formed with a column- And a wedge portion of a vertical beam having a thread formed on the outer periphery is formed at the lower portion thereof. The wedge portion is inserted and fixed in the ground, and the support of the facility is inserted and fixed in the support portion. Thus, the facility fixture rotates without complicated operations such as tearing work, And the strut is inserted into the ground, and the strut is inserted and fixed in the strut inserting section so that the strut of the facility can be simply installed, and the strut is inserted into the hollow space between the strut fitting part and the strut of the facility, Or a fixed cap formed at the center thereof with a support post insertion portion, By binding ulteu nut relates to a fitting structure of the holding facilities that can be firmly fixed, the coupling holding facility.

일반적으로 조경시설물(조합놀이대, 운동기구, 데크), 건축시설물, 도로시설 물(가로등, 신호등, 전주), 광고시설물 등을 설치할 때 조명이나 식별력을 확보하게 위하여 일정 높이의 유지가 필수적으로 요구되므로 지주 상에 설치되고 지주는 기초부와 결합되어 지면에 입설된 상태의 유지 및 지지가 이루어지도록 하고 있다. 보다 구체적으로는 먼저 기초 콘크리트 타설을 위하여 터파기 작업을 하고, 이 작업을 통해 형성된 구멍 형태의 터에 콘크리트를 타설한 후 양생시켜 기초부를 형성하게 되는데 이 기초부의 상면에 지주의 하단 플랜지를 볼트 결합시키는 것에 의해 일련의 시설물 설치 작업을 완성하게 되는 것이다. Generally, it is essential to maintain a certain height in order to secure lighting and discrimination when installing landscape equipment (combination playground, exercise equipment, deck), building facilities, road facilities (street lamp, traffic light, And the support is combined with the base portion so as to be maintained and supported in a state of being installed on the ground. More specifically, first, a foundation is formed by pouring concrete into a hole formed in the hole formed through the work, and then curing the base to form a foundation concrete. To this end, a bottom flange of the support is bolted A series of facilities installation work is completed.

이러한 종래의 콘크리트 타설에 의한 시설물의 고정은 굴착기를 이용한 터파기와 콘크리트 타설 및 양생, 양생 후 기초 콘크리트에 앵커볼트를 박아 고정하는 등의 작업의 번거로움 및 불편성을 초래할 뿐만 아니라 많은 작업 공수와 시간이 소요됨으로써 작업의 비효율성을 초래하고 되고 또한 비용부담에 따른 경제성 저하를 초래하는 문제점이 있었다. 또한, 습지 및 수공간 등에 타설하는 경우에는 물빼기 작업 등이 공정이 부가되어 설치 시간이 보다 더 소요되고 생태계에 피해를 줄 수 있을 뿐만 아니라 타설된 콘크리트를 제거할 경우에는 콘크리트 폐기물의 처리로 인한 환경오염 등의 문제점이 있었다. Such conventional fixation of the concrete structure by the concrete pouring is not only troublesome and inconvenient for the work such as insertion of the anchor bolts into the foundation concrete after curing, curing and curing of the concrete using the excavator, And thus the inefficiency of the work is caused and the economical efficiency is lowered due to the cost burden. In addition, when pouring in a wetland or a water space, a process of adding water is added, which takes more time to install and can damage the ecosystem. In addition, when the poured concrete is removed, Environmental pollution, and the like.

본 고안은 상기한 바와 같은 종래 콘크리트 타설에 의해 시설물의 지주를 고정하는 구성의 제반 문제점을 해결하기 위하여 안출된 것으로서, 시설물의 지주가 시설물 고정구에 설치되는 시설물 지주의 설치구조에 있어서, 시설물 고정구는 상부에는 내측에 공간부를 갖는 지주끼움부가 형성되고 하부에는 외주연에 나사산이 형성되는 상광하협의 쐐기부가 형성되어 지중에 삽입고정되고 시설물의 지주는 지주끼움부에 삽입고정되게 함으로써 시설물의 지주를 고정하기 위하여 콘크리트를 타설할 필요없이 쐐기부의 나사산에 의해 지반을 파고들어 지중으로 삽입되고 상기 지주를 상기 지주끼움부에 삽입고정하여 매우 간단하게 시설물의 지주를 설치할 수 있을 뿐만 아니라 콘트리트 폐기물의 발생이 없어 친환경적이고 경제적이고, 지주끼움부와 시설물의 지주 사이에 빈공간이 생겨 시설물의 지주가 견고하게 고정되지 못하는 경우에는 지주끼움부와 시설물의 지주 사이의 빈공간에 망체가 끼워지고 패킹부재가 채워지거나 중앙부에 지주삽입가이부가 형성된 고정캡이 상기 지주끼움부와 보울트 너트 결합됨으로써 시설물의 지주를 견고하게 고정, 결합할 수 있는 시설물 지주의 설치구조를 제공하는 것을 목적으로 한다. The present invention has been made in order to solve all the problems of the construction of fixing a support of a facility by the above-mentioned conventional concrete pouring, and in the structure of a support structure in which a support of a facility is installed in a fixture of a facility, And a wedge portion having a vertical light-like shape in which a thread is formed on the outer periphery is formed in the upper portion and inserted and fixed in the ground, and the support of the facility is inserted and fixed in the support portion, The ground is inserted into the ground by the thread of the wedge portion without being poured into the ground, and the support is inserted and fixed in the support portion so that the support can be installed very simply and the concrete waste is not generated Eco-friendly and economical, In the case where the pillar of the facility is not firmly fixed due to the empty space between the pillar of the pillar, the pillar is fitted into the empty space between the pillar and the pillar of the facility and the packing member is filled or the fixed cap And an object of the present invention is to provide an installation structure of a supporting post which is capable of firmly fixing and coupling a support of a facility by being coupled with a bolt nut.

본 고안에 의한 시설물 지주의 설치구조는 시설물의 지주가 시설물 고정구에 설치되는 시설물 지주의 설치구조에 있어서, 상기 시설물 고정구는 상부에는 내측 에 공간부를 갖는 지주끼움부가 형성되고 하부에는 외주연에 나사산이 형성되는 상광하협의 쐐기부가 형성되어 지중에 삽입고정되고 상기 시설물의 지주는 상기 지주끼움부에 삽입고정되며, 상기 지주끼움부와 상기 삽입고정된 시설물의 지주 사이의 빈공간에 망체가 끼워지고 패킹부재가 채워지는 것을 특징으로 한다. According to the present invention, there is provided a structure of a supporting structure in which a support of a facility is installed in a fixture of a facility, the support fixture having a column-fitting portion having an inner space at an upper portion thereof, A wedge portion having a lower light-tight shape is formed and inserted and fixed in the ground, the wedge of the facility is inserted and fixed in the wedge fitting portion, the mesh is fitted in a hollow space between the stanchion fitting portion and the wedge of the inserted and fixed facility, And the member is filled.

삭제delete

본 고안에 의한 본 고안에 의한 시설물 지주의 설치구조에 의하면, 시설물의 지주를 고정하기 위하여 콘크리트를 타설할 필요없이 지주끼움부와 쐐기부로 구성되어 쐐기부의 나사산에 의해 지반을 파고들어 지중으로 삽입되고 지주를 지주끼움 부에 삽입고정함으로써 매우 간단하게 시설물의 지주를 설치할 수 있어 시공설치 시간이 현저히 단축시킬 수 있고 유지관리상 보수 및 추가 공사가 용이할 뿐만 아니라 콘트리트 폐기물의 발생이 없어 친환경적이고 경제적이며 종래 콘크리트 타설에 의해 시설물의 지주를 고정하는 구성보다 매우 경량적이므로 운반이 어려운 지역이나 장비의 진입이 어려운 여건에서도 시공이 가능하다.According to the present invention, there is no need to install concrete in order to fix the pillar of the facility, but the pillar is composed of the pillar and the wedge part and is inserted into the ground by digging the ground by the thread of the wedge part It is possible to install the pillar of the facility very simply by inserting the pillar into the pillar of the pillar and thus the construction installation time can be remarkably shortened and the maintenance and further work can be easily carried out as well as the concrete waste is not generated, Since it is much lighter than the structure that fixes the pillar of the facility by the concrete pouring in the past, it is possible to construct even in a place where the transportation is difficult or a situation where equipment is difficult to enter.

또한, 지주끼움부와 시설물의 지주 사이에 빈공간이 생겨 시설물의 지주가 견고하게 고정되지 못하는 경우에는 빈공간에 망체가 끼워지고 패킹부재가 채워지게 하거나 중앙부에 지주삽입가이부가 형성된 고정캡이 상기 지주끼움부와 보울트 너트 결합됨으로써 시설물의 지주를 견고하게 고정, 결합할 수 있다. In addition, when the pillar of the facility is not firmly fixed due to an empty space between the pillar and the pillar of the facility, the pillar is fitted into the pillar space and the packing member is filled, or the fixed cap, It is possible to firmly fix and fasten the support of the facility by joining with the bolt nut.

이하, 본 고안에 의한 시설물 지주의 설치구조를 첨부한 도면을 참조하여 상세히 설명하면 다음과 같다.Hereinafter, the installation structure of the facility support according to the present invention will be described in detail with reference to the accompanying drawings.

도1은 본 고안에 의한 시설물 지주의 설치구조의 시설물 고정구의 사시도이고 도2는 본 고안에 의한 시설물 지주의 설치구조의 부분 종단면도이며, 도3은 본 고안에 의한 시설물 지주의 설치구조의 부분 종단면도이고 도4는 본 고안에 의한 시설물 지주의 설치구조의 고정캡의 사시도이다.Fig. 1 is a perspective view of a facility fixture of the installation structure of the facility support according to the present invention, Fig. 2 is a partial longitudinal sectional view of the installation structure of the facility support according to the present invention, And FIG. 4 is a perspective view of the fixed cap of the installation structure of the facility support according to the present invention.

본 고안에 의한 시설물 지주의 설치구조는 도1 내지 도2에서 도시한 바와 같이 시설물의 지주(10)가 시설물 고정구(20)에 설치되는 시설물 지주의 설치구조(100)에 있어서, 상기 시설물 고정구(20)는 상부에는 내측에 공간부(301)를 갖는 지주끼움부(30)가 형성되고 하부에는 외주연에 나사산(401)이 형성되는 상광하협의 쐐기부(40)가 형성되어 지중에 삽입고정되고 상기 시설물의 지주(10)는 상기 지주끼움부(30)에 삽입고정되며, 상기 지주끼움부(30)와 상기 삽입고정된 시설물의 지주(10) 사이의 빈공간에 망체(50)가 끼워지고 패킹부재(60)가 채워지는 것을 특징으로 한다. As shown in FIGS. 1 and 2, the installation structure of the facility support according to the present invention is such that the support 10 of the facility is installed in the facility fixture 20, 20 has a column fitting portion 30 having an inner space portion 301 at its upper portion and a wedge portion 40 having a vertical light lowering formed at its lower portion with a thread 401 at its outer periphery, The struts 10 of the facility are inserted and fixed in the strut 30 and the net 50 is inserted into a space between the strut 30 and the struts 10 of the inserted and fixed facilities And the packing member 60 is filled.

이에 의하면, 상기 시설물 고정구(20)는 상기 공간부(301)를 갖는 속이 비고 원추형태의 강관체로 형성되고 외주연에 하단의 꼭지점으로부터 일정 높이까지 상기 나사산(401)이 형성되고 굴착기 등의 기계를 이용하여 상기 시설물 고정구(20)를 가압 및 회전하여 시공하는 것으로서 별도의 터파기, 콘크리트 타설 작업 없이 상기 나사산(401)에 의해 회전하면서 직접 지면을 파고 들어가 지중에 매설될 수 있도록 형성되어 지반과의 마찰력이 증대되어 지지력이 극대화될 수 있으며 상기 지주끼움부(30)의 내부는 속이 비어 상기 공간부(301)가 형성되어 상기 시설물의 지주(10)가 삽입고정되고 상기 시설물의 지주(10)의 폭 내지는 직경이 상기 지주끼움부(30)보다 작거나 지면과 수직이 맞지 않은 경우에 상기 지주끼움부(30)와 상기 삽입고정된 시설물의 지주(10) 사이의 빈공간에 자갈, 패킹 등의 상기 패킹부재(60)가 채워져서 상기 시설물의 지주(10)를 지지하게 되는데 상기 패킹부재(60) 는 상기 지주끼움부(30)와 상기 삽입고정된 시설물의 지주(10) 사이의 빈공간에 끼워진 철망 등의 상기 망체(50)의 틈새 사이 사이에 끼워지고 상기 망체(50)가 상기 패킹부재(60)들 상호간을 단단히 결속시킴으로써 상기 시설물의 지주(10)는 상기 지주끼움부(30)에 견고하게 고정, 결합되게 된다. In this case, the facility fixture 20 is formed as a hollow tubular steel pipe having the hollow portion 301, and the thread 401 is formed on the outer periphery from the vertex of the lower end to a predetermined height, The facility fixture 20 is pressed and rotated so that it can be directly buried in the ground while being rotated by the screw thread 401 without using a separate tester or concrete pouring operation, The supporting force can be maximized to increase the frictional force and the inside of the stalk fitting part 30 is hollow to form the space part 301 so that the stalk 10 of the facility is inserted and fixed, When the width or diameter is smaller than the stalk fitting portion 30 or is not perpendicular to the ground surface, the stalk fitting portion 30 and the stalk 10 of the inserted and fixed facilities The packing member 60 such as gravel or packing is filled in the empty space to support the support 10 of the facility. The packing member 60 supports the support member 30 and the insertion / And the netting 50 is sandwiched between the clearances of the net 50 such as a wire mesh sandwiched in the empty space between the supports 10 and the netting 50 tightly binds the packing members 60, Is firmly fixed and coupled to the stalk fitting part (30).

또한, 본 고안에 의한 시설물 지주의 설치구조는 도1, 도3 내지 도4에서 도시한 바와 같이 시설물의 지주(10)가 시설물 고정구(20)에 설치되는 시설물 지주의 설치구조(100)에 있어서, 상기 시설물 고정구(20)는 상부에는 내측에 공간부(301)를 갖는 지주끼움부(30)가 형성되고 하부에는 외주연에 나사산(401)이 형성되는 상광하협의 쐐기부(40)가 형성되어 지중에 삽입고정되고 상기 시설물의 지주(10)는 상기 지주끼움부(30)에 삽입고정되며, 상기 지주끼움부(30)의 상단부는 외측으로 절곡되어 플랜지부(302)가 형성되고 상기 플랜지부(302)에는 보울트 통공(303)이 형성되며 중앙부에 상기 시설물의 지주(10)에 대응하는 형상으로 파이프 형태의 지주삽입가이드부(701)가 형성되고 상기 지주삽입가이드부(701)의 외측으로 고정캡플랜지부(702)가 형성되며 상기 고정캡플랜지부(702)에는 상기 보울트 통공(303)에 대응하는 통공(703)이 형성된 고정캡(70)이 상기 지주끼움부(30)의 상기 플랜지부(302)와 보울트 너트 결합되는 것을 특징으로 한다. In addition, as shown in Figs. 1, 3 to 4, the installation structure of the facility support according to the present invention is such that the support 10 of the facility is installed in the facility fixture 20, And the upper portion of the facility fixture 20 is formed with a column fitting portion 30 having an inner space portion 301 and a lower wedge portion 40 having a lower light- And the upper end of the stalk fitting part 30 is bent outward to form a flange part 302 and the upper end of the stalk fitting part 30 is fixed to the flange part 302, A bolt through hole 303 is formed in the support portion 302 and a pipe support insertion guide portion 701 is formed at a central portion corresponding to the support 10 of the facility and the outer side of the support post insertion guide portion 701 A fixed cap flange portion 702 is formed, A fixing cap 70 having a through hole 703 corresponding to the bolt through hole 303 is coupled to the flange portion 302 of the holding fitting portion 30 by a bolt nut.

이에 의하면, 상기 시설물 고정구(20)는 상기 공간부(301)를 갖는 속이 비고 원추형태의 강관체로 형성되고 외주연에 꼭지점부터 일정 높이까지 상기 나사 산(401)을 형성되고 굴착기 등의 기계를 이용하여 상기 시설물 고정구를 가압 및 회전하여 시공하는 것으로서 별도의 터파기, 콘크리트 타설 작업 없이 상기 나사산(401)에 의해 회전하면서 직접 지면을 파고 들어가 지중에 매설될 수 있도록 형성되어 지반과의 마찰력이 증대되어 지지력이 극대화될 수 있으며 상기 지주끼움부(30)의 내부는 속이 비어 상기 공간부(301)가 형성되어 상기 시설물의 지주(10)가 삽입고정되는데 상기 시설물의 지주(10)의 폭 내지는 직경이 상기 지주끼움부(30)보다 작은 경우에 상기 시설물 고정구(20)와 상기 시설물의 지주(10) 사이에 상기 고정캡(70)을 개재함으로써 상기 시설물의 지주(10)를 지지할 수 있게 된다. In this case, the facility fixture 20 is formed as a hollow tubular steel pipe having a hollow portion 301 having the space portion 301, the screw thread 401 is formed on the outer periphery from a vertex to a predetermined height, and a machine such as an excavator is used So that the facility fixture can be pushed into and directly buried in the ground while being rotated by the screw thread 401 without the need of a separate turf machine or concrete pouring work, and the frictional force with the ground is increased The supporting force can be maximized and the inside of the stalk fitting part 30 is hollowed and the space part 301 is formed and the stalk 10 of the facility is inserted and fixed. The width or diameter of the stalk 10 of the facility The fixing cap 70 is interposed between the fixture 20 and the support 10 of the facility when the fixture 30 is smaller than the support fitting 30, A holding (10) is able to support.

즉, 상기 고정캡(70)은 상기 시설물 고정구(20)에 상기 지주끼움부(30)의 상단부에 형성된 플랜지부(302)와 상기 고정캡 플랜지부(702)가 상호 보울트 너트로 결합되어 형성되고 상기 지주삽입가이드부(701)는 상기 시설물의 지주(10)의 단면과 동일한 형상의 파이프 형태로 형성되어 상기 시설물의 지주가 꼭 맞게 삽입되면서 상기 고정캡(70)에 의해 지지되며 상기 지주끼움부(30)에 삽입고정됨으로써 상기 시설물의 지주(10)는 상기 시설물 고정구(20)에 견고하게 고정, 결합되게 된다.That is, the fixed cap 70 is formed in the facility fixture 20 with the flange portion 302 formed at the upper end of the stalk fitting portion 30 and the fixed cap flange portion 702 coupled to each other by a bolt nut The support post insertion guide portion 701 is formed in the shape of a pipe having the same shape as the end surface of the support 10 of the facility and is supported by the support cap 70 while being inserted into the support post tightly, The support 10 of the facility is fixedly coupled to the facility fixture 20 by being inserted and fixed to the facility fixture 30.

또한, 상기한 바와 같이 상기 고정캡(70)만을 구성하는 것 외에 상기 망체(50)와 패킹부재(60)로 구성되는 상기 시설물 지주의 설치구조(100)에 상기 고정캡(70)을 부가하는 구성 또한 가능하다.The fixed cap 70 may be attached to the installation structure 100 of the facility strut 100 including the net 50 and the packing member 60 as described above, Configuration is also possible.

한편, 본 고안은 그에 관한 최선의 구성상태를 열거하였으나 이에 국한되는 것은 아니며 이하 첨부되는 청구범위의 범주를 벗어나지 않고 실시될 수 있다면 이전까지 서술된 구성예의 변경을 고려해 볼 수 있음은 물론이다.While the present invention has been described with reference to the preferred embodiments thereof, it will be understood by those skilled in the art that various changes and modifications may be made without departing from the scope of the invention as defined in the appended claims.

도1은 본 고안에 의한 시설물 지주의 설치구조의 시설물 고정구의 사시도.Fig. 1 is a perspective view of a fixture of the installation structure of a facility support according to the present invention; Fig.

도2는 본 고안에 의한 시설물 지주의 설치구조의 부분 종단면도.Fig. 2 is a partial vertical cross-sectional view of the installation structure of the facility support according to the present invention; Fig.

도3은 본 고안에 의한 시설물 지주의 설치구조의 부분 종단면도.Fig. 3 is a partial vertical cross-sectional view of the installation structure of the facility support according to the present invention; Fig.

도4는 본 고안에 의한 시설물 지주의 설치구조의 고정캡의 사시도.Fig. 4 is a perspective view of the fixed cap of the installation structure of the facility support according to the present invention; Fig.

<도면의 주요부분에 대한 부호의 설명>Description of the Related Art

10. 시설물의 지주 20. 시설물 고정구10. Holding of the facility 20. Installation of the facility

30. 지주끼움부 301. 공간부30. Stowage fitting part 301. Space part

302. 플랜지부 303. 보울트 통공302. Flange 303. Bolt hole

40. 쐐기부 401. 나사산40. Wedge 401. Threaded

50. 망체 50. The net

60. 패킹부재60. The packing member

70. 고정캡 701. 지주삽입가이드부70. Fixed cap 701. Post insertion guide portion

702. 고정캡플랜지부 703. 통공702. Fixed cap flange part 703. Through hole

100. 시설물 지주의 설치구조100. Installation structure of facilities

Claims (2)

시설물의 지주(10)가 시설물 고정구(20)에 설치되는 시설물 지주의 설치구조(100)에 있어서, A supporting structure (100) for a supporting structure in which a support (10) of a facility is installed in a facility fixture (20) 상기 시설물 고정구(20)는 상부에는 내측에 공간부(301)를 갖는 지주끼움부(30)가 형성되고 하부에는 외주연에 나사산(401)이 형성되는 상광하협의 쐐기부(40)가 형성되어 지중에 삽입고정되고 상기 시설물의 지주(10)는 상기 지주끼움부(30)에 삽입고정되며, 상기 지주끼움부(30)와 상기 삽입고정된 시설물의 지주(10) 사이의 빈공간에 망체(50)가 끼워지고 패킹부재(60)가 채워지는 것을 특징으로 하는 시설물 지주의 설치구조.The facility fixture 20 is formed with a column fitting portion 30 having an inner space portion 301 at an upper portion thereof and a wedge portion 40 having an upper light lowering portion at which a thread 401 is formed at an outer periphery thereof. And the support 10 of the facility is inserted and fixed in the support fitting 30 and is inserted into the hollow space between the support fitting 30 and the support 10 of the installation and fixture, 50) are fitted and the packing member (60) is filled. 삭제delete
KR2020080013981U 2008-10-21 2008-10-21 Installation structure of facilities post KR200443819Y1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR2020080013981U KR200443819Y1 (en) 2008-10-21 2008-10-21 Installation structure of facilities post
JP2009242712A JP2010101161A (en) 2008-10-21 2009-10-21 Institution support fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020080013981U KR200443819Y1 (en) 2008-10-21 2008-10-21 Installation structure of facilities post

Publications (1)

Publication Number Publication Date
KR200443819Y1 true KR200443819Y1 (en) 2009-03-13

Family

ID=41347093

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020080013981U KR200443819Y1 (en) 2008-10-21 2008-10-21 Installation structure of facilities post

Country Status (1)

Country Link
KR (1) KR200443819Y1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101057700B1 (en) 2009-07-10 2011-08-18 크리너코리아 (주) Central axis correction device and correction method of fixture
KR200458741Y1 (en) * 2009-03-30 2012-03-07 크리너코리아 (주) Fixing Device for Facilities that is easy to extend length
KR20160017523A (en) * 2014-08-06 2016-02-16 정연석 A improved separate fixed picket
KR101674435B1 (en) 2015-06-17 2016-11-09 민용 the establishment installation support for poor ground
KR20190074142A (en) * 2017-12-19 2019-06-27 (주)우정넷 Apparatus for embedding pipe support
KR20200014572A (en) 2018-08-01 2020-02-11 나종순 Screw type underground support device of solar power generation device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200458741Y1 (en) * 2009-03-30 2012-03-07 크리너코리아 (주) Fixing Device for Facilities that is easy to extend length
KR101057700B1 (en) 2009-07-10 2011-08-18 크리너코리아 (주) Central axis correction device and correction method of fixture
KR20160017523A (en) * 2014-08-06 2016-02-16 정연석 A improved separate fixed picket
KR101685050B1 (en) * 2014-08-06 2016-12-14 정연석 A improved separate fixed picket
KR101674435B1 (en) 2015-06-17 2016-11-09 민용 the establishment installation support for poor ground
KR20190074142A (en) * 2017-12-19 2019-06-27 (주)우정넷 Apparatus for embedding pipe support
KR102019917B1 (en) * 2017-12-19 2019-09-11 (주)우정넷 Apparatus for embedding pipe support
KR20200014572A (en) 2018-08-01 2020-02-11 나종순 Screw type underground support device of solar power generation device

Similar Documents

Publication Publication Date Title
KR200443819Y1 (en) Installation structure of facilities post
KR100611553B1 (en) Connecting structure of street lamp prop
KR101408770B1 (en) Street lights or modular integrated antenna mounting device support structures object and construction methods
KR101066030B1 (en) Pillar and hand hole cover apparatus for easy adjusting hight and gradient
KR20090006744A (en) Road lamp
KR100885131B1 (en) A fixing structure of pillar and construction method thereof
KR100991886B1 (en) A fixing structure of pillar
KR20150093423A (en) Pillar fixing equipment
KR101114840B1 (en) Assembly for support which is reinforced
KR101707170B1 (en) Structure for connecting support
KR100795084B1 (en) Post supporting base
KR200433150Y1 (en) upholder for street lamppost
KR101044022B1 (en) Supporting structure
KR100908802B1 (en) Framework for foundation of pole and foudation and pole thereof
KR101007729B1 (en) A Multipurpose Pole
KR100662883B1 (en) Reinforce structure of steel tower
KR100949908B1 (en) Pillar for grounding stone
KR200445403Y1 (en) Institution support fixing device
KR101594785B1 (en) Insert type transportation facilities steel pole fixed structure
KR100902293B1 (en) No basis upright steel tower
KR101474736B1 (en) A roadlamp post fixing apparatus
KR101148172B1 (en) Street Lighting Pole Laying Footing Structure and Electing Method of Street Lighting Pole using the same
KR20190002728U (en) Structures for support
KR101077971B1 (en) Elementary Block for Supporting of Steel Pipe
JP4698661B2 (en) Concrete block for standing upright

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20130311

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20140407

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160127

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20170308

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20180412

Year of fee payment: 10

EXPY Expiration of term