KR20020001481A - Steel form for cross beam concrete applicable to a P.C. beam method - Google Patents
Steel form for cross beam concrete applicable to a P.C. beam method Download PDFInfo
- Publication number
- KR20020001481A KR20020001481A KR1020000039676A KR20000039676A KR20020001481A KR 20020001481 A KR20020001481 A KR 20020001481A KR 1020000039676 A KR1020000039676 A KR 1020000039676A KR 20000039676 A KR20000039676 A KR 20000039676A KR 20020001481 A KR20020001481 A KR 20020001481A
- Authority
- KR
- South Korea
- Prior art keywords
- body panel
- main body
- slider
- assay
- formwork
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
본 발명은 P.C.빔(Pre-Concrete Beam)공법에 적용되는 크로스빔 거푸집에 관한 것으로, 보다 상세하게는 교량에 적용되는 강재 크로스빔 거푸집에 관한 것이다.The present invention relates to a cross-beam formwork applied to the P.C. beam (Pre-Concrete Beam) method, and more particularly to a steel cross-beam formwork applied to the bridge.
종래의 크로스빔 거푸집은 PC빔 사이의 간격과 높이의 차이에 따라 크로스빔의 너비 및 높이를 조절할 수 없는 문제점이 있다.Conventional crossbeam formwork has a problem in that it is not possible to adjust the width and height of the crossbeam according to the difference in distance and height between the PC beams.
따라서 이 문제를 해결하기 위해 테이프를 사용하거나, 용접하고, 못을 사용하고, 목재와 같은 보완재를 적당히 끼워넣거나 하는 다양한 방식을 사용하여 왔으나, 이러한 방법들은 모두 현장에서 보완 작업을 해야하므로 현장 작업량이 많아짐은 물론이고, 피씨빔 사이의 폭과 높이 차이에 정확히 맞추어 거푸집의 너비 및 조절하기가 원천적으로 불가능하였다.Therefore, to solve this problem, there have been various methods of using tape, welding, nailing, and properly inserting complementary materials such as wood, but all of these methods have to be supplemented in the field, so In addition to the increase, it was fundamentally impossible to adjust the width and the formwork of the form to exactly match the difference in width and height between the PC beams.
또한 해체 작업을 함에 있어서도 용접을 사용하므로 이를 해체하는 공정이 불편하였다.In addition, the welding process is also used for dismantling, which is inconvenient to dismantle it.
즉, 종래의 크로스빔 거푸집은 실제 현장에서 PC빔의 높이와 너비가 다른 상황, 특히 스큐된 상황에서는 제대로 대처할 수 없는 문제점이 있었다.That is, the conventional crossbeam formwork has a problem that can not cope properly in the situation where the height and width of the PC beam is different, in particular skewed in the actual site.
본 발명은 상기와 같은 종래의 크로스빔 거푸집의 문제점을 해결하기 위하여안출된 것으로, 본 발명의 목적은 피씨빔의 조건에 따라 너비와 높이 조절이 가능한 크로스빔 거푸집을 제공하는 것이다.The present invention has been made to solve the problems of the conventional crossbeam formwork as described above, an object of the present invention is to provide a crossbeam formwork capable of adjusting the width and height according to the conditions of the PC beam.
본 발명의 다른 목적은 설치 및 해체가 간단한 교량용 크로스빔 거푸집을 제공하는 것이다.Another object of the present invention is to provide a crossbeam formwork for bridges that is simple to install and dismantle.
기타 본 발명의 목적은 여러 가지가 있으나, 이는 이하 설명하는 상세한 설명과 도면을 통해 이해될 수 있을 것이다.Other purposes of the present invention may be various, but will be understood through the detailed description and drawings described below.
도 1은 본 발명에 따른 월러 어세이의 정면도1 is a front view of a waller assay according to the present invention;
도 2는 본 발명의 거푸집이 피씨빔에 장착되어 크로스빔 콘크리트를 타설한 형상을 도시한 사시도Figure 2 is a perspective view showing a form in which the formwork of the present invention is mounted on the PC beam and poured cross-beam concrete
도 3은 본 발명에 따른 하부 필러의 정면도3 is a front view of the lower filler according to the present invention.
도 4는 본 발명에 따른 하부 판넬 어세이의 정면도4 is a front view of a lower panel assay according to the present invention.
도 5는 본 발명의 크로스빔 거푸집의 다른 실시예에 대한 사시도5 is a perspective view of another embodiment of a crossbeam formwork of the present invention
* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings
10 : 본체 판넬 20 : 찬넬10: main body panel 20: channel
31, 32: 측면 필러 P : P.C.빔31, 32: side pillar P: P.C. beam
40 : 얼라인 부재 50 : 상부 연결 부재40: alignment member 50: upper connecting member
70 : 하부 필러 80 : 하부 판넬 어세이70: lower filler 80: lower panel assay
100 : 월러 어세이 110 : 판넬 연결 부재100: Waller assay 110: Panel connection member
상기 목적을 달성하기 위하여, 본 발명은 한 쌍의 피씨빔 사이에 설치되어 각각 크로스빔 거푸집의 전면과 후면을 이루는 한쌍의 월러 어세이와; 상기 각각의 월러 어세이의 하부 일끝단에 결합되어 상기 거푸집의 밑면을 이루는 하부 판넬 어세이와; 상기 각각의 월러 어세이를 연결하는 연결 부재를 포함하고 있으며,In order to achieve the above object, the present invention is a pair of wall arrays are provided between the pair of PC beams to form the front and rear of the cross beam formwork, respectively; A lower panel assay coupled to a lower end of each wall assay to form a bottom of the formwork; It includes a connecting member for connecting each wall assay,
상기 월러 어세이는, 거푸집의 전면과 후면의 대부분을 차지하는 본체 판넬과; 상기 본체 판넬 좌, 우에 결합되고 거푸집의 전면과 후면의 일부분을 차지하며 상기 본체 판넬로 향한 복수개의 슬라이더를 가지고 있는 제 1, 2 측면 필러와; 상기 측면 필러의 슬라이더를 가이드하는 가이드부와; 상기 슬라이더를 고정하는 고정부와; 상기 본체 판넬에 결합되어 상기 본체 판넬을 상기 피씨빔에 고정하고 높이를 맞추는 얼라인 부재를 포함하고 있으며,The waller assay comprises: a main body panel occupying most of the front and rear of the formwork; First and second side pillars coupled to the left and right sides of the main body panel and occupying a part of the front and rear sides of the formwork and having a plurality of sliders directed to the main body panel; A guide part for guiding the slider of the side pillar; A fixing part for fixing the slider; And an alignment member coupled to the main body panel to fix the main body panel to the PC beam and to adjust the height.
상기 하부 판넬 어세이는, 상기 월러 어세이의 하부 일끝단에 결합되고 거푸집의 밑면의 대부분을 차지하는 하부 판넬과; 상기 하부 판넬에 결합되어 하부 판넬의 길이 방향으로 슬라이드될 수 있고 거푸집의 밑면의 일부분을 차지하는 하부 필러를 포함하고 있는 크로스빔용 거푸집을 제공한다.The lower panel assay comprises: a lower panel coupled to the lower end of the wall assay and occupying most of the underside of the formwork; It is coupled to the lower panel provides a cross beam formwork which includes a lower filler which can slide in the longitudinal direction of the lower panel and occupies a portion of the bottom of the formwork.
본 발명에서 상기 월러 어세이의 고정부는 본체 판넬의 좌, 우측 끝단에 위치하며, 너트공이 형성된 앵글과 상기 너트공에 고정된 제 1 너트를 포함하고 있고, 상기 가이드부는 상기 고정부의 내측에 형성되어 상기 슬라이더가 슬라이드되고, 상기 제 1 너트를 통해 볼트가 삽입되어 상기 필러의 슬라이더를 밀착 고정한다.In the present invention, the fixing part of the wall assembly is located at the left and right ends of the main body panel, and includes an angle formed with a nut hole and a first nut fixed to the nut hole, and the guide part is formed inside the fixing part. The slider slides, and a bolt is inserted through the first nut to tightly fix the slider of the filler.
본 발명에서 상기 본체판넬의 상,하 좌,우측에는 각각 상기 각 측면필러를 상기 각 피씨빔의 측면에 밀착시킬 수 있는 스큐 조절부를 가지고 있다.In the present invention, the upper, lower, left and right sides of the main body panel each have a skew control unit capable of bringing the respective side pillars into close contact with the side surfaces of the PC beams.
이하, 본 발명에 따른 바람직한 실시예를 첨부된 도면을 참조하여 설명한다.Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings.
본 발명에 따른 크로스빔 거푸집은 피씨빔 사이에 설치된 크로스빔 철근 구조물의 앞, 뒤 양측에 위치하는 두 개의 월러(waller) 어세이와 상기 크로스빔 철근 구조물의 하부에 위치하는 하부 판넬로 구성되어 있다.The crossbeam formwork according to the present invention is composed of two waller assays positioned at both the front and rear sides of the crossbeam reinforcement structure installed between the PC beams and a lower panel positioned at the bottom of the crossbeam reinforcement structure. .
도 1은 본 발명의 하나의 월러 어세이의 정면도이고, 도 2는 피씨빔에 설치된 두 개의 월러 어세이를 포함한 크로스빔 거푸집과 상기 크로스빔 거푸집에 타설된 크로스빔 콘크리트의 사시도로서, 도시한 바와 같이, 월러 어세이(100)는 거푸집의 전, 후면의 대부분을 이루는 본체 판넬(10)과, 상기 본체 판넬(10)에 고정되어 본체 판넬(10)에서 상부로 돌출된 찬넬(channel)(20)과, 상기 본체 판넬(10) 좌, 우에 위치한 제 1, 2 측면 필러(31)(32)와, 상기 찬넬(20)에 결합되어 상기 본체판넬(10)을 피씨빔에 고정하고 피씨빔 간의 높이 차이를 보정하기 위한 얼라인부재(40)를 구비하고 있다. 여기서 상기 제 1 측면 필러(31)와 제 2 측면 필러(32)는 실질적으로 동일한 모양을 가지고 있으므로 설명의 편의를 위해 추후 제 1 측면 필러(31)쪽만 설명한다.FIG. 1 is a front view of one wall assay of the present invention, and FIG. 2 is a perspective view of a cross beam formwork including two wall assays installed on a PC beam and cross beam concrete placed on the cross beam form. Likewise, the wall assembly 100 is a main body panel 10 which forms most of the front and rear of the formwork, and a channel 20 which is fixed to the main body panel 10 and protrudes upward from the main body panel 10. And the first and second side pillars 31 and 32 positioned at the left and right sides of the main body panel 10 and the channel 20 to fix the main body panel 10 to the PC beam, An alignment member 40 for correcting the height difference is provided. Here, since the first side pillar 31 and the second side pillar 32 have substantially the same shape, only the first side pillar 31 will be described later for convenience of description.
상기 본체 판넬(10)은 스틸 재질이고, 좌, 우측 가장자리에 상기 제 1, 2 측면 필러(31)(32)가 슬라이드되는 가이드부(12)와, 측면 필러(31)를 고정하는 고정부(14)가 있다. 상기 고정부(14)는 "ㄴ"자 형상인 앵글이고, 제 1 너트(14a)가 장착되어 있다. 상기 가이드부(12)는 "ㅁ"자 형상으로 추후 설명하는 필러(31)의 슬라이더가 슬라이드되는 부분으로, 보강판과 함께 상기 본체에 용접결합될 수 있다.The main body panel 10 is made of steel, and guide parts 12 on which the first and second side pillars 31 and 32 slide on left and right edges, and fixing portions fixing the side pillars 31 ( 14) There is. The fixing portion 14 is an angle having a "b" shape, and the first nut 14a is mounted. The guide portion 12 is a portion in which the slider of the filler 31 which will be described later in the shape of “ㅁ” is slid, and may be welded to the main body together with the reinforcing plate.
한편, 이 고정부(14)와 가이더부(12)는 일체로 형성될 수도 있는 바, "ㅁ"자 형상의 하나의 가이더 겸용 고정부를 설치하고, 본체 판넬에 고정된 보강판 위에 고정될 수 있다.Meanwhile, the fixing part 14 and the guider part 12 may be integrally formed. The fixing part 14 and the guider part 12 may be installed integrally, and may be fixed on a reinforcing plate fixed to the main body panel by installing a single guider fixing part having a shape of “ㅁ”. have.
본체판넬(10)은 또한 PC빔의 측면이 스큐(skew)되는 것을 고려하여, 스큐 조절부(16)를 가지고 있는 바, 상기 스큐 조절부(16)는 본체판넬(10) 양측으로 너트공(16a)이 형성된 수직 플레이트(16c)와 상기 너트공(16a)에 장착된 푸쉬 볼트(16b)로 이루어져 있고, 수직플레이트(16c)의 너트공(16a)은 바람직하게는 좌,우측에 각각 상,하로 하나씩 모두 4개가 설치되어 있다. 이 너트공(16a)을 통해 푸쉬 볼트(16b)를 조절함으로써 상기 필러(31)를 좌,우측 피씨빔(P)에 고정하여 스큐된 경우(PC빔이 경사진 경우)에도 필러(31)의 상, 하부가 모두 밀착되도록 할 수 있다.The main body panel 10 also has a skew adjusting part 16 in consideration of skewing of the side surface of the PC beam, and the skew adjusting part 16 has a nut hole on both sides of the main body panel 10. 16a is formed of a vertical plate 16c and a push bolt 16b mounted to the nut hole 16a, and the nut hole 16a of the vertical plate 16c is preferably on the left and right sides, respectively. Four of them are installed one by one. By adjusting the push bolt 16b through the nut hole 16a, the filler 31 is fixed to the left and right PC beams P and skewed (when the PC beam is inclined). Both upper and lower sides may be in close contact.
또한, 이 스큐 조절부(16)는 상기 가이드부(12)의 끝단에 수직벽을 두고 푸쉬 볼트로 상기 필러(31)의 상, 하측 슬라이더를 밀어내는 구조로도 달성될 수 있음은 물론이다.In addition, the skew adjusting unit 16 may be achieved in a structure that pushes the upper and lower sliders of the pillar 31 with a push bolt while having a vertical wall at the end of the guide unit 12.
상기 필러(31)에는 상기 본체 판넬(10)의 방향으로 돌출된 슬라이더(34)가 복수개 형성되어 있고, 상기 본체 판넬(10)의 가이드부(12)에 삽입된다.The filler 31 is provided with a plurality of sliders 34 protruding in the direction of the main body panel 10, and is inserted into the guide portion 12 of the main body panel 10.
상기 슬라이더(34)의 끝단 부근에는 상기 본체 판넬(10)의 정면방향으로 너트공이 위치하도록 제 2 너트(34a)가 고정되어 있다.The second nut 34a is fixed near the end of the slider 34 so that the nut hole is located in the front direction of the main body panel 10.
상기 제 1,2 너트(14a)(34a)를 이용한 필러(31)와 본체 판넬(10)과의 결합관계를 설명하면, PC빔(P) 사이의 간격을 고려하여 필러(31)의 슬라이더(34)가 상기 가이드부(12)내에서 위치를 정한 후, 제 1 너트(14a)에 볼트를 체결하고, 볼트의 끝이 상기 필러(31)의 슬라이더(34)의 측면에 강제 밀착되도록 한다. 이때 가이드부와 고정부가 일체가 아닌 경우에는 가이드부에도 볼트공이 형성되는 것은 당연하다.Referring to the coupling relationship between the filler 31 and the main body panel 10 using the first and second nuts 14a and 34a, the slider of the filler 31 in consideration of the distance between the PC beams P is described. After the 34 is positioned in the guide 12, the bolt is fastened to the first nut 14a, and the end of the bolt is forced to the side of the slider 34 of the filler 31. At this time, if the guide portion and the fixed portion is not integral, it is natural that the bolt hole is formed in the guide portion.
제 1 너트(14a)만 사용하여도 무방하지만, 필러(31)가 정면으로 돌출될 수도 있으므로, 필러(31)의 슬라이더(34)끝단에 고정된 제 2 너트(34a)를 이용하여 본체 판넬(10)에 강제 밀착시키는 것이 필러(31)의 위치가 안정되기 위해서는 바람직하다.Although only the first nut 14a may be used, since the filler 31 may protrude to the front, the main body panel (using the second nut 34a fixed to the end of the slider 34 of the filler 31) may be used. It is preferable to force close contact with 10) in order for the position of the pillar 31 to be stabilized.
한편, 도면에 도시한 바와 같이, 필러(31)의 상측에는 일부 절곡되어 있는 바, 이는 PC빔의 상부형상을 고려하여 가능한 PC빔에 밀착될 수 있도록 한 것이다.On the other hand, as shown in the figure, the upper part of the filler 31 is bent in part, which is to be as close as possible to the PC beam in consideration of the upper shape of the PC beam.
상기 찬넬(20)은 상기 본체판넬(10)의 정면 즉, 외벽에 고정되어 있는 바, 찬넬(20)에는 수직으로 배열된 복수개의 제 1 볼트공(20a)과 제 2 볼트공(22)이 형성되어 있고, 상기 제 1 볼트공(20a)은 상기 얼라인 부재(40)에 상기 찬넬(20)을 고정하여 상기 본체 판넬(10)을 지지하고, 타설될 크로스빔 콘크리트의 높이를 결정하기 위함이며, 상기 제 2 볼트공(22)은 본체 판넬(10)의 동위치에 형성된 볼트공(미도시)과 함께 도 2에서 설명될 제 2 연결 부재(110)에 의한 각 월러 어세이(100)의 결합에 사용된다.The channel 20 is fixed to the front of the body panel 10, that is, the outer wall, the channel 20 has a plurality of first bolt holes 20a and second bolt holes 22 arranged vertically The first bolt hole 20a is formed to support the main body panel 10 by fixing the channel 20 to the alignment member 40 and to determine the height of the crossbeam concrete to be poured. The second bolt hole 22 is a wall hole assembly 100 by the second connection member 110 to be described in FIG. 2 together with a bolt hole (not shown) formed at the same position of the main body panel 10. Used to combine
상기 얼라인 부재(40)는 PC빔(P)의 상부면에 놓여지는 바, 얼라인 부재(40)의 양끝단에는 조절 볼트(adjust bolt)(42)가 있어 피씨빔 간의 높이 차이가 있을 경우 본체 판넬(10)의 좌, 우측 높이를 미세하게 조절하여 상기 피씨빔 간의 높이 차이를 보정하여 주는 것이 바람직하다.When the alignment member 40 is placed on the upper surface of the PC beam (P), there is an adjustment bolt (42) at both ends of the alignment member 40, there is a height difference between the PC beam It is preferable to correct the height difference between the PC beam by finely adjusting the left and right height of the main body panel 10.
한편, 도 2에 도시된 바와 같이, 각 월러 어세이(100)의 상부를 연결하는 제 1 연결부재(50)가 있고, 이는 바람직하게 좌,우측에 각각 1개씩 위치하고 있어 본체 판넬(10)의 상측을 서로 연결하고 있다. 또한, 본체 판넬(10)의 각 찬넬(20) 상에 일정 간격 이격된 제 2 볼트공(22)을 관통하여 각 월러 어세이(100)를 연결하며, 볼트(110a)와 너트(110b) 및 워셔(110c)로 구성되는 제 2 연결 부재(110)가 있다.On the other hand, as shown in Figure 2, there is a first connecting member 50 for connecting the upper portion of each wall assay 100, which is preferably located one each on the left and right sides of the main body panel 10 The upper side is connected to each other. In addition, through the second bolt hole 22 spaced apart at regular intervals on each channel 20 of the main body panel 10 to connect each wall array assay 100, the bolt 110a and the nut (110b) and There is a second connecting member 110 composed of the washer 110c.
또한 본 거푸집의 하부에는 하부 판넬과, 하부 판넬의 좌,우측 끝단쪽에 각각 위치한 하부 필러를 포함한 하부 판넬 어세이가 위치하는 바, 하부 필러(70)는 도 3에 도시한 바와 같이, 중앙부(71)와 가장자리부(72)를 가지고 있으며, 가장자리부(72)에는 상기 하부 판넬 어세이의 너비 조절을 위한 좌,우로 연장된 장홈(73)을 가지고 있고, 상기 중앙부(71)와 가장자리부(72)는 서로 단차지는 것이 바람직하다.In addition, a lower panel assembly including a lower panel and lower pillars positioned at left and right ends of the lower panel, respectively, is located at the bottom of the formwork, and the lower pillar 70 has a center portion 71 as shown in FIG. 3. ) And an edge portion 72, and an edge portion 72 has a long groove 73 extending left and right for adjusting the width of the lower panel assay, and the center portion 71 and the edge portion 72. ) Are preferably stepped together.
도 4에 도시한 바와 같이, 하부 판넬 어세이(80)는 하부 필러(70)와 하부 판넬(82)로 구성되며, 상기 하부 필러(70)의 장홈(73)의 위치에 볼트공(84)이 형성되어 상기 하부 필러(70)의 위치 고정 후, 하부 판넬(82)의 저면으로부터 하부 판넬의 볼트공(81)과 하부필러(70)의 장홈(73)을 볼트 등의 수단으로 체결할 수 있도록 하고 있다.As shown in FIG. 4, the lower panel assay 80 includes a lower pillar 70 and a lower panel 82, and bolt holes 84 at positions of the long grooves 73 of the lower pillar 70. After the lower pillar 70 is fixed in position, the bolt hole 81 of the lower panel and the long groove 73 of the lower pillar 70 may be fastened from the bottom of the lower panel 82 by means of bolts or the like. To make it work.
또한 하부 판넬(82)의 가장자리에는 다수개의 볼트공(86)이 상기 월러 어세이(100)가 각각 위치하는 곳에 형성되어 있어, 상기 다수개의 볼트공(86)을 통해 상기 하부 판넬 어세이(80)는 상기 각 월러 어세이의 본체 판넬(10)에 결합된다.In addition, a plurality of bolt holes 86 are formed at the edges of the lower panel 82 where the waller assay 100 is located, respectively, and the lower panel assay 80 is provided through the plurality of bolt holes 86. ) Is coupled to the body panel 10 of each waller assay.
이러한 구조의 하부 필러와 하부 플레이트는 상기 제 1, 2 측면 필러(31)(32)에 의해 거푸집의 전면과 후면의 너비가 조절됨과 같이 하부 필러의 에 의해 거푸집의 밑면의 너비가 조절될 수 있도록 구성한 것이다.The lower pillar and the lower plate of such a structure can be adjusted so that the width of the bottom of the formwork by the lower pillars such that the width of the front and rear of the formwork is adjusted by the first and second side pillars 31 and 32. It is made up.
도 5는 본 발명에 따른 크로스빔 강재 거푸집의 다른 실시예에 대한 사시도로서, 도시한 바와 같이, 얼라인 부재(40)와 찬넬(20) 및 제 1 연결 부재(50)의 구조가 변경된 것 외에는 도 2의 실시예와 동일한 형상이다.Figure 5 is a perspective view of another embodiment of a crossbeam steel formwork according to the present invention, as shown, except that the structure of the alignment member 40, the channel 20 and the first connecting member 50 is changed It is the same shape as the embodiment of FIG.
상기 얼라인 부재(40)는 본체 판넬(10)의 상부에 본체 판넬(10)의 너비 방향으로 직접 결합된 가이더(40b)와, 상기 가이더(40b)에 길이 방향으로 삽입되어 미끄럼 이동을 할 수 있는 슬라이더(40a)로 구성된다.The alignment member 40 is a guider 40b directly coupled to the upper portion of the main body panel 10 in the width direction of the main body panel 10, and inserted into the guider 40b in the longitudinal direction to slide. Consisting of a slider 40a.
상기 찬넬(20)은 도 1의 실시예와는 달리 상기 얼라인 부재(40)와 결합되지 않으므로, 상기 본체 판넬(10)의 상부로 돌출되는 부위 없이, 상기 본체 판넬(10)의 높이와 동일한 길이를 갖는다.Since the channel 20 is not coupled to the alignment member 40 unlike the embodiment of FIG. 1, the channel 20 is the same as the height of the body panel 10 without protruding from the upper portion of the body panel 10. Has a length.
상기 얼라인 부재(40)의 슬라이더(40a)는 피씨빔 사이의 간격에 맞추어 상기 가이더(40b)와의 상대적 위치가 결정된다.The slider 40a of the alignment member 40 is determined relative to the guider 40b according to the interval between the PC beams.
상기 제 1 연결 부재(50)는 상기 각각의 가이드(40b)의 상부에 수평면이 직접 결합된 "ㄴ"자 형상의 브라켓(50b)과, 서로 다른 월러 어세이(10)에 위치하고 대향적인 한 쌍의 브라켓(50b)의 수직면에 볼트나 리벳 등의 체결 수단을 통해 결합되는 앵글(50a)로 구성된다.The first connection member 50 is a pair of “b” shaped brackets 50b having a horizontal surface directly coupled to the upper portions of the respective guides 40b and a pair of opposite wall positioned at different waller assays 10. It consists of an angle (50a) coupled to the vertical surface of the bracket (50b) through fastening means such as bolts or rivets.
이상에서 살펴본 바와 같이, 본 발명에 따른 크로스빔 콘크리트 타설용 거푸집은 너비와 높이 및 스큐 조절이 원할하여 별도의 보충재 없이도 PC빔에 완전밀착되도록 조절할 수 있는 이점이 있다.As described above, the cross-beam concrete pouring form according to the present invention has the advantage that the width and height and skew adjustment can be adjusted to be completely in close contact with the PC beam without a separate supplement.
아울러, 스큐된 도로나 PC빔 간격과 높이가 일정치 않은 조건에서 원할하게 거푸집을 설치할 수 있는 이점이 있다.In addition, there is an advantage that the formwork can be smoothly installed in the condition that the skewed road or PC beam spacing and height are not constant.
테이프나, 못, 용접 등을 설치현장에서 사용하지 않으므로, 해체와 설치가 용이한 이점이 있다.Since tapes, nails, welds, etc. are not used at the installation site, there is an advantage of easy disassembly and installation.
이상에서 본 발명에 따른 바람직한 실시예를 설명하고 있으나, 이는 예시이며, 본 발명의 정신은 여기에 한정되는 것이 아니며, 본 발명의 정신을 벗어나지 않고 다양한 변화와 변형이 가능하고, 이 다양한 변화와 변형은 모두 본 발명의 권리범위에 속하게 됨은 첨부된 청구범위를 통해 알 수 있을 것이다.Although preferred embodiments according to the present invention have been described above, this is merely an example, and the spirit of the present invention is not limited thereto, and various changes and modifications may be made without departing from the spirit of the present invention, and the various changes and modifications may be made. All belong to the scope of the present invention will be seen through the appended claims.
Claims (5)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20000036692 | 2000-06-26 | ||
KR1020000036692 | 2000-06-26 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020000019994U Division KR200213556Y1 (en) | 2000-07-12 | 2000-07-12 | Steel form for cross beam concrete applicable to a P.C. beam method |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20020001481A true KR20020001481A (en) | 2002-01-09 |
KR100401015B1 KR100401015B1 (en) | 2003-10-11 |
Family
ID=19675008
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2000-0039676A KR100401015B1 (en) | 2000-06-26 | 2000-07-11 | Steel form for cross beam concrete applicable to a P.C. beam method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100401015B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100500979B1 (en) * | 2002-07-11 | 2005-07-18 | 이문일 | Wedge panel system for cross beam of pre cast concrete beam |
KR101634934B1 (en) * | 2015-08-31 | 2016-06-30 | 신성구조이엔지 주식회사 | Prestressed Concrete Beam For connection Cross Beam Construction Apparatus |
-
2000
- 2000-07-11 KR KR10-2000-0039676A patent/KR100401015B1/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100500979B1 (en) * | 2002-07-11 | 2005-07-18 | 이문일 | Wedge panel system for cross beam of pre cast concrete beam |
KR101634934B1 (en) * | 2015-08-31 | 2016-06-30 | 신성구조이엔지 주식회사 | Prestressed Concrete Beam For connection Cross Beam Construction Apparatus |
Also Published As
Publication number | Publication date |
---|---|
KR100401015B1 (en) | 2003-10-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20070041668A (en) | A slab formwork system | |
KR101400226B1 (en) | Angle type light weigt steel material cross beam structure | |
KR200415593Y1 (en) | mold supporter for concrete beam | |
KR100401015B1 (en) | Steel form for cross beam concrete applicable to a P.C. beam method | |
KR200213556Y1 (en) | Steel form for cross beam concrete applicable to a P.C. beam method | |
KR100845459B1 (en) | Support device of concrete crossbeam panel | |
JP2010031577A (en) | Form of panel zone | |
KR20020036198A (en) | A temporary bracket for construction of precast concrete beam bridge and the temporary work method using the same | |
KR101778060B1 (en) | Connection bracket for exterior panel support pipe | |
KR100764418B1 (en) | Under exterior panel set up structure for bridge | |
KR100336713B1 (en) | Steel form to be constructed inside of cross beam which is to connect precast concrete beam of pir using reinforced concrete | |
JP3462374B2 (en) | Beam formwork structure | |
JPH0129940B2 (en) | ||
CN220058831U (en) | Building square column template clamping tool | |
KR20040082480A (en) | Steel molding flask for a cross beam concrete foundation between pre-concrete beams | |
KR100276864B1 (en) | Formwork corner bar and formwork installation method using the same | |
KR200394623Y1 (en) | Clamp for euro-form reinforcement | |
KR100276865B1 (en) | Wall formwork support bar and formwork installation method using the same | |
JPH0579151A (en) | Erecting method for plate-like architectural material | |
KR100333510B1 (en) | Planing machine of bridge building | |
JP2597981Y2 (en) | Thick wood for connecting | |
JPH074261Y2 (en) | Wall mounting hardware | |
JPH06307081A (en) | Beam receiving bracket and its usage | |
JP2883307B2 (en) | Floor panel support structure | |
JPH04105348U (en) | Plate mounting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20070522 Year of fee payment: 5 |
|
LAPS | Lapse due to unpaid annual fee |