KR200183901Y1 - Central control gas supply system - Google Patents
Central control gas supply system Download PDFInfo
- Publication number
- KR200183901Y1 KR200183901Y1 KR2019990027452U KR19990027452U KR200183901Y1 KR 200183901 Y1 KR200183901 Y1 KR 200183901Y1 KR 2019990027452 U KR2019990027452 U KR 2019990027452U KR 19990027452 U KR19990027452 U KR 19990027452U KR 200183901 Y1 KR200183901 Y1 KR 200183901Y1
- Authority
- KR
- South Korea
- Prior art keywords
- gas
- central control
- supply system
- control station
- gas supply
- Prior art date
Links
- 238000003860 storage Methods 0.000 claims abstract description 29
- 238000012544 monitoring process Methods 0.000 claims abstract description 7
- 238000005259 measurement Methods 0.000 claims 1
- 238000000034 method Methods 0.000 claims 1
- 238000001514 detection method Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 3
- 238000005303 weighing Methods 0.000 description 3
- 238000010411 cooking Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D3/00—Arrangements for supervising or controlling working operations
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D3/00—Arrangements for supervising or controlling working operations
- F17D3/18—Arrangements for supervising or controlling working operations for measuring the quantity of conveyed product
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Measuring Volume Flow (AREA)
Abstract
본 고안은 각 가스저장소의 상황을 중앙관제소에서 모니터링하여 보다 효율적으로 관리할 수 있도록 된 중앙관제식 가스공급시스템에 관한 것이다.The present invention relates to a centralized gas supply system that can be managed more efficiently by monitoring the status of each gas storage at the central control station.
본 고안에 따르면, 저장탱크(20)의 가스를 각 수용가의 계량기(50)를 통해 공급할 수 있도록 된 가스공급시스템에 있어서, 각 가스저장소의 저장탱크(20) 내부에 설치되어 저장된 가스잔량에 대응되는 전기적인 신호를 발생시켜주는 잔량게이지(23)와, 상기 잔량게이지(23)와 연결되어 입력된 전기적인 신호를 데이터화하여 전송해주는 단말기(10)와, 중앙관제소에 설치되고 각 단말기(10)로부터 전송된 데이터를 디스플레이해 주는 중앙관리기(80)를 포함하여 구성되며, 중앙관제소에서 각 가스저장소의 가스잔량을 모니터링하여 효율적으로 가스를 공급할 수 있도록 이루어진 것을 특징으로 하는 중앙관제식 가스공급시스템이 제공된다.According to the present invention, in the gas supply system that can supply the gas of the storage tank 20 through the meter 50 of each customer, corresponding to the remaining amount of gas installed in the storage tank 20 of each gas storage Residual gauge 23 for generating an electrical signal to be generated, and a terminal 10 connected to the remaining gauge 23 to convert the input electrical signal into data, and installed in the central control station, each terminal 10 The central control unit 80 is configured to display data transmitted from the central control station, and the central control gas supply system is provided so that the gas can be efficiently supplied by monitoring the gas remaining amount of each gas storage in the central control station. do.
Description
본 고안은 중앙관제식 가스공급시스템에 관한 것으로서, 보다 상세하게는 각 가스저장소의 상황을 중앙관제소에서 모니터링하여 보다 효율적으로 관리할 수 있도록 된 중앙관제식 가스공급시스템에 관한 것이다.The present invention relates to a centralized gas supply system, and more particularly, to a centralized gas supply system that can be managed more efficiently by monitoring the status of each gas storage at the central control station.
일반적으로 LPG가스는 LNG가스(도시가스)에 비해 열량이 높기 때문에 높은 열량을 필요로 하는 장소에서 많이 사용한다. 또한, 최근 체적거래제 시행에 따라 LPG가스를 취사용은 물론 난방용이나 기타 다양한 용도로 사용할 수 있도록 공급하는 업체가 증가되고 있다.In general, LPG gas has a higher calorie value than LNG gas (city gas), so it is frequently used in a place requiring a high calorie value. In addition, with the recent volume trading system, there are a growing number of companies supplying LPG gas for use in cooking, heating, and other various purposes.
이러한 체적거래제에 의한 LPG가스 공급시스템은 가스 저장소에 대형탱크(벌크) 또는 다수개의 소용량 탱크를 서로 연결되도록 설치하고, 이 탱크에 저장된 가스를 소정관로를 통해 각 수용가에 공급하게 된다. 이때, 상기 각 수용가로 인입되는 분기관로에는 계량기가 설치되어 소정기간(한달)동안 가스사용량을 확인할 수 있도록 한다.LPG gas supply system according to the volume trading system is installed so that the large tank (bulk) or a plurality of small capacity tanks are connected to each other in the gas reservoir, and the gas stored in the tank is supplied to each customer through a predetermined pipeline. In this case, a meter is installed in the branch pipes introduced to each of the consumers to check the gas consumption for a predetermined period (month).
그러나, 이러한 가스저장소에는 가스누출 등에 의한 사고를 예방하기 위해 각 가스저장소마다 안전요원을 배치하여야 하고, 체적거래제에 따른 가스비를 청구하기 위해서 매달 검침원이 각 수용가를 방문하여 가스사용량을 검침해야 하는 등 많은 인력과 관리비용이 들게 되는 단점이 있다.However, in order to prevent accidents caused by gas leakage, such gas storages should be equipped with safety personnel at each gas storage, and meter readers should visit each customer to read gas consumption every month in order to claim gas costs according to the volume trading system. The disadvantage is that a lot of manpower and management costs.
또한, 중앙의 가스공급업체에서는 각 가스저장소의 가스잔량에 대한 정보가 없기 때문에 가스공급시기를 미리 예측하여 대비하기 어려운 단점이 있다.In addition, since the central gas supplier does not have information about the remaining amount of gas in each gas storage, it is difficult to predict the gas supply time in advance.
본 고안은 상기의 문제점을 해결하기 위한 것으로서, 본 고안의 목적은 각 가스저장소의 상황을 중앙관제소에서 모니터링할 수 있어 보다 효율적인 안전관리가 이루어지며, 가스잔량을 정확하게 파악하여 원활한 가스공급이 이루어지도록 한 중앙관제식 가스공급시스템을 제공하는 것이다.The present invention is to solve the above problems, the purpose of the present invention is to monitor the status of each gas storage at the central control station to achieve more efficient safety management, to accurately grasp the gas remaining amount to ensure a smooth gas supply It is to provide a centralized gas supply system.
도 1은 본 고안에 따른 중앙관제식 가스공급시스템의 구성도1 is a block diagram of a central control gas supply system according to the present invention
도 2는 본 고안에 따른 중앙관제식 가스공급시스템의 블록구성도Figure 2 is a block diagram of a central gas control system according to the present invention
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
10 : 단말기 13 : 제어부10 terminal 13 control unit
20 : 저장탱크 23 : 잔량게이지20: storage tank 23: remaining gauge
33 : 개방감지센서 43 : 가스누출감지센서33: open detection sensor 43: gas leak detection sensor
45 : 가스차단기 50 : 계량기45: gas circuit breaker 50: meter
53 : 계량센서 60 : 경보기53: Weighing Sensor 60: Alarm
80 : 중앙관리기80: Central manager
본 고안에 따르면, 저장탱크(20)의 가스를 각 수용가의 계량기(50)를 통해 공급할 수 있도록 된 가스공급시스템에 있어서, 각 가스저장소의 저장탱크(20) 내부에 설치되어 저장된 가스잔량에 대응되는 전기적인 신호를 발생시켜주는 잔량게이지(23)와, 상기 잔량게이지(23)와 연결되어 입력된 전기적인 신호를 데이터화하여 전송해주는 단말기(10)와, 중앙관제소에 설치되고 각 단말기(10)로부터 전송된 데이터를 디스플레이해 주는 중앙관리기(80)를 포함하여 구성되며, 중앙관제소에서 각 가스저장소의 가스잔량을 모니터링하여 효율적으로 가스를 공급할 수 있도록 이루어진 것을 특징으로 하는 중앙관제식 가스공급시스템이 제공된다.According to the present invention, in the gas supply system that can supply the gas of the storage tank 20 through the meter 50 of each customer, corresponding to the remaining amount of gas installed in the storage tank 20 of each gas storage Residual gauge 23 for generating an electrical signal to be generated, and a terminal 10 connected to the remaining gauge 23 to convert the input electrical signal into data, and installed in the central control station, each terminal 10 The central control unit 80 is configured to display data transmitted from the central control station, and the central control gas supply system is provided so that the gas can be efficiently supplied by monitoring the gas remaining amount of each gas storage in the central control station. do.
본 고안의 다른 특징에 따르면, 상기 단말기(10)에는 저장탱크(20) 주변에 설치되어 가스누출을 감지하는 가스누출감지센서(43)와, 상기 각 수용가의 계량기(50)에 설치되어 계량기(50)의 사용량에 따른 전기적인 신호를 발생시켜주는 계량센서(53)가 더 연결되며, 가스누출상태와 각 수용가의 가스사용량을 중앙관제소의 중앙관리기(80)에 전송하여 모니터링할 수 있도록 된 것을 특징으로 하는 중앙관제식 가스공급시스템이 제공된다.According to another feature of the present invention, the terminal 10 is installed around the storage tank 20, the gas leak detection sensor 43 for detecting a gas leak, and installed in the meter 50 of each consumer meter ( Weighing sensor 53 for generating an electrical signal according to the amount of use 50 is further connected, and the gas leakage state and the gas consumption of each consumer can be transmitted to the central control unit 80 of the central control station for monitoring A centralized gas supply system is provided.
이하, 본 고안의 바람직한 실시예를 첨부한 도면에 의거하여 설명하면 다음과 같다.Hereinafter, described with reference to the accompanying drawings, preferred embodiments of the present invention is as follows.
도 1과 도 2는 각기 본 고안에 따른 중앙관제식 가스공급시스템의 구성도이다. 이를 참조하면, 상기 중앙관제식 가스공급시스템은 중앙관제소의 중앙관리기(80)와 각 가스저장소에 마련된 단말기(10)가 유선으로 연결되며, 상기 단말기(10)에는 저장탱크(20) 내부에 설치된 잔량게이지(23)와, 저장탱크(20) 주변에 설치된 가스누출감지센서(43)와, 저장소 출입문 시건장치(31)에 설치된 개방감지센서(33)와, 각 수용가의 계량기(50)에 설치된 계량센서(53)에 연결되어 중앙관제소에서 각 가스저장소의 상황을 모니터링할 수 있도록 구성된다.1 and 2 are each a configuration diagram of a central control gas supply system according to the present invention. Referring to this, in the centralized control gas supply system, the central manager 80 of the central control station and the terminal 10 provided in each gas storage are connected by wire, and the terminal 10 has a residual amount installed in the storage tank 20. Gauge 23, the gas leak detection sensor 43 installed around the storage tank 20, the open detection sensor 33 installed in the storage door lock device 31, and the meter 50 installed in each consumer 50 It is connected to the sensor 53 is configured to monitor the situation of each gas storage in the central control station.
또한, 상기 단말기(10)에는 각종센서로부터 입력된 데이터를 처리하기 위한 제어부(13)가 내장되는데, 상기 제어부(13)는 잔량게이지(23)로부터 가스잔량 데이터를 입력받아 중앙관제소의 중앙관리기(80)에 전달하게 되며, 가스누출감지센서(43)로부터 가스누출신호를 입력받아 메인관로(44)상의 가스차단기(45)를 닫아줌과 동시에 경보기(60)를 통해 경보음을 울려주게 되며, 중앙관제소의 중앙관리기(80)에 가스누출신호를 전송해주게 된다.In addition, the terminal 10 has a control unit 13 for processing data input from the various sensors, the control unit 13 receives the gas residual amount data from the remaining gauge 23, the central manager of the central control station ( 80), the gas leakage signal is input from the gas leak detection sensor 43, and closes the gas circuit breaker 45 on the main pipe line 44 and at the same time sounds an alarm sound through the alarm 60, The gas leakage signal is transmitted to the central manager 80 of the central control station.
또한, 상기 제어부(13)는 출입문 시건장치(31)에 구비된 개방감지센서(33)로부터 소정의 전기적인 신호를 입력받아 이를 중앙관제소의 중앙관리기(80)에 전달하게 되며, 경보기(60)를 통해 경보음을 울려주게 된다. 또, 상기 제어부(13)는 중앙관리기(80)로부터 각 수용가의 계량기(50) 사용량에 대한 데이터를 필요로하는 신호가 입력되면, 각 수용가의 계량기(50)에 설치된 계량센서(53)로부터 입력받은 가스 사용량에 대한 데이터를 중앙관리기(80)에 전송하게 된다.In addition, the control unit 13 receives a predetermined electrical signal from the open detection sensor 33 provided in the door lock device 31 and transmits it to the central manager 80 of the central control station, the alarm 60 The alarm will sound through. In addition, the control unit 13 is input from the weighing sensor 53 installed in the meter 50 of each customer, when a signal that requires data on the amount of use of the meter 50 of each customer from the central manager 80 is input. The data on the gas usage received is transmitted to the central manager (80).
그외에도, 상기 제어부(13)는 외부로부터 각종 데이터를 입력하기 위한 데이터입력부(17)와 연결되고, 구동에 필요한 프로그램이나 각종 데이터가 저장된 메모리부(16)와 연결되어 데이터 입출력이 이루어지도록 구성된다.In addition, the control unit 13 is connected to the data input unit 17 for inputting various data from the outside, and is configured to be connected to the memory unit 16 for storing a program or various data necessary for driving to perform data input and output. .
또, 상기 제어부(13)는 별도의 전원부(15)와 연결되어 시스템의 구동에 필요한 전원을 안정적으로 공급받을 수 있도록 이루어진다. 그러나, 경우에 따라서는 별도의 전원부(15)를 구비하지 않고, 전화선을 통한 통화전원을 이용하여 본 장치를 구동할 수 있도록 구성될 수도 있다.In addition, the control unit 13 is connected to a separate power supply unit 15 is made to be stably supplied with the power required to drive the system. However, in some cases, the apparatus may be configured to be able to drive the apparatus by using a call power through a telephone line without providing a separate power supply unit 15.
따라서, 중앙관제소에서는 중앙관리기(80)를 통해 각 가스저장소의 실시간 가스잔량을 정확하게 파악할 수 있어 가스 수급량을 원활하게 조절할 수 있게 된다. 또, 가스누출감지센서(43)에 의해 가스가 누출되는 것이 감지되면, 경보음이 울림과 동시에 메인관로(44)상의 가스차단기(45)가 자동적으로 작동되며, 중앙관제소에 가스누출상태가 전송되어 상주된 안전요원에 의해 신속하게 안전조치 할 수 있다. 또한, 필요시에는 중앙관제소에서 가스누출이 감지된 저장소의 단말기(10)에 차단기(45) 작동신호를 전송할 수도 있다. 따라서, 종래와 같이 각 가스저장소마다 별도의 인원이 배치될 필요가 없이 통합운영이 가능하므로, 인력낭비를 줄일 수 있다.Therefore, the central control center can accurately grasp the real-time gas remaining amount of each gas storage through the central manager 80, thereby smoothly adjusting the gas supply and demand. In addition, when gas leak is detected by the gas leak detection sensor 43, an alarm sounds and at the same time the gas circuit breaker 45 on the main pipe line 44 is automatically operated, and the gas leak state is transmitted to the central control station. As a result, resident safety personnel can quickly take safety measures. In addition, if necessary, the operation of the circuit breaker 45 may be transmitted to the terminal 10 of the reservoir where the gas leak is detected at the central control station. Therefore, since it is possible to integrate operation without having to arrange a separate personnel for each gas storage as in the prior art, manpower waste can be reduced.
또한, 상기 가스저장소의 출입문 시건장치(31)가 개방되면, 중앙관제소의 중앙관리기(80)에 시건장치(31)가 개방되었음이 디스플레이되고, 경보음이 울려 적절한 조치를 취할 수 있게 한다. 또, 상기 중앙관제소에서 각 수용가의 가스사용량 데이터를 전송받아 가스 사용량에 따른 비용을 청구할 수 있기 때문에 종래와 같이 검침원이 일일이 각 수용가마다 방문하여 검침할 필요가 없다.In addition, when the door lock device 31 of the gas reservoir is opened, it is displayed on the central manager 80 of the central control station that the lock device 31 is opened, and an alarm sounds so that appropriate actions can be taken. In addition, since the central control office can receive the gas consumption data of each customer and charge the cost according to the gas usage, the meter reader does not need to visit and read each customer in the conventional manner.
이상의 가스공급시스템은 전화선을 이용하여 구성되었으나, 무선 전송되도록 구성하는 것도 가능하다.The above gas supply system is configured using a telephone line, but can also be configured to be wirelessly transmitted.
이상에서와 같이 본 고안에 의하면, 상기 중앙관제식 가스공급시스템은 각 가스저장소의 상황을 중앙관제소에서 모니터링할 수 있기 때문에 각 가스저장소마다 별도의 인원이 배치되지 않아도 효율적으로 안전관리가 가능하며, 각 가스저장소의 가스잔량을 중앙관제소에서 정확하게 파악하고 대처할 수 있기 때문에 가스공급이 원활하게 이루어질 수 있는 장점이 있다.As described above, according to the present invention, since the central control gas supply system can monitor the status of each gas reservoir at the central control station, safety management can be efficiently performed without requiring separate personnel for each gas reservoir. There is an advantage that the gas supply can be made smoothly because the remaining amount of gas in the gas storage can be accurately identified and coped by the central control station.
또한, 상기 중앙관제식 가스공급시스템은 검침원이 일일이 각 수용가를 방문하여 가스 사용량을 검출하지 않더라도 중앙관제소에서 이를 정확하게 파악하고 청구서를 발행할 수 있어 유지관리비가 줄어드는 장점이 있다.In addition, the centralized control gas supply system has the advantage that the maintenance costs can be reduced because the meter can accurately identify and issue a bill even if the meter reader does not visit each customer to detect the gas usage.
Claims (2)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019990055732A KR20000017784A (en) | 1999-12-08 | 1999-12-08 | Central control gas supply system |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019990055732A Division KR20000017784A (en) | 1999-12-08 | 1999-12-08 | Central control gas supply system |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200183901Y1 true KR200183901Y1 (en) | 2000-06-01 |
Family
ID=19624202
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2019990027452U KR200183901Y1 (en) | 1999-12-08 | 1999-12-08 | Central control gas supply system |
KR1019990055732A KR20000017784A (en) | 1999-12-08 | 1999-12-08 | Central control gas supply system |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019990055732A KR20000017784A (en) | 1999-12-08 | 1999-12-08 | Central control gas supply system |
Country Status (1)
Country | Link |
---|---|
KR (2) | KR200183901Y1 (en) |
-
1999
- 1999-12-08 KR KR2019990027452U patent/KR200183901Y1/en not_active IP Right Cessation
- 1999-12-08 KR KR1019990055732A patent/KR20000017784A/en not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
KR20000017784A (en) | 2000-04-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7106044B1 (en) | Systems, methods, and apparatuses for detecting residential electricity theft in firmware | |
US20090007968A1 (en) | Pipe network, with a hierarchical structure, for supplying water or gas and/or for removing industrial water, process for detecting a leak in such a pipe network and process for determining, with the aid of a computer, the operating life theoretically remaining for a renewable power source for at least one flowmeter in such a pipe network | |
US20110298635A1 (en) | Self dynamo smart flow utility meter and system for flow utility real-time flow usage monitoring and control, self error and leakages monitoring | |
US6404343B1 (en) | Water leakage monitoring apparatus | |
GB2280961A (en) | Commodity metering apparatus | |
JPH1183565A (en) | Gas-meter controller | |
GB2374760A (en) | Transmitting utility meter measurements by mobile telephone | |
KR200182944Y1 (en) | Central control gas supply system | |
KR200183901Y1 (en) | Central control gas supply system | |
KR100550106B1 (en) | Mornitoring system with electronic watthours-meter | |
KR100443825B1 (en) | Electronic watt-hour meter that having perceiving function of surreptitious use of electricity | |
CN114298243A (en) | Data processing method, device and equipment | |
KR101567788B1 (en) | Auto control swichboard system | |
KR20000063234A (en) | Remote inspection of a meter system | |
KR100443824B1 (en) | Watt-hour meter that having electronic and mechanical display device | |
JP5143458B2 (en) | Remaining usable time notification device and fluid supply system | |
CN105184333A (en) | Electric power safety warning method and NFC mobile terminal | |
JP2713820B2 (en) | Gas supply system | |
JP2007316919A (en) | Metering system | |
KR102662242B1 (en) | Digital water meter and water leak detection method using it | |
CN110796793A (en) | Steam flow monitoring heat supply network system and steam flow monitoring method | |
KR200239241Y1 (en) | Remote inspection of a meter system | |
JP2004150921A (en) | Gas meter device | |
JP4737610B2 (en) | Meter | |
Shaikh et al. | Design and Implementation of RFID and GSM based Smart Prepaid Energy Meter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
U107 | Dual application of utility model | ||
N231 | Notification of change of applicant | ||
REGI | Registration of establishment | ||
T201 | Request for technology evaluation of utility model | ||
T701 | Written decision to grant on technology evaluation | ||
FPAY | Annual fee payment |
Payment date: 20060314 Year of fee payment: 7 |
|
LAPS | Lapse due to unpaid annual fee |