Nothing Special   »   [go: up one dir, main page]

KR101872485B1 - Apparatus for preventing arching of pavement in upper area of culvert and construction method thereof - Google Patents

Apparatus for preventing arching of pavement in upper area of culvert and construction method thereof Download PDF

Info

Publication number
KR101872485B1
KR101872485B1 KR1020150147608A KR20150147608A KR101872485B1 KR 101872485 B1 KR101872485 B1 KR 101872485B1 KR 1020150147608 A KR1020150147608 A KR 1020150147608A KR 20150147608 A KR20150147608 A KR 20150147608A KR 101872485 B1 KR101872485 B1 KR 101872485B1
Authority
KR
South Korea
Prior art keywords
culvert
heat insulating
insulating layer
layer
width
Prior art date
Application number
KR1020150147608A
Other languages
Korean (ko)
Other versions
KR20170047124A (en
Inventor
김홍종
도종남
남문석
Original Assignee
한국도로공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국도로공사 filed Critical 한국도로공사
Priority to KR1020150147608A priority Critical patent/KR101872485B1/en
Publication of KR20170047124A publication Critical patent/KR20170047124A/en
Application granted granted Critical
Publication of KR101872485B1 publication Critical patent/KR101872485B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/16Reinforcements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/002Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/004Sealing liners
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Architecture (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to an apparatus for preventing uplift of upper and lower troughs and a method of constructing the same. A heat insulating layer located on the upper surface of the culvert and blocking heat transfer; And a waterproof layer positioned on the upper surface of the heat insulating layer and having a waterproof function, wherein the width of the heat insulating layer is larger than the crown width. According to the present invention, it is possible to prevent freezing and melting of a clayey soil (low-to-fat area) corresponding to a top surface area of a culvert buried in a road, and the construction is easy and simple.

Description

BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to an apparatus for preventing uplift of an upper-

The present invention relates to an apparatus for preventing uplift of upper and lower troughs and a construction method thereof.

Underground passageways and water and sewerage passages passing under the road (highway) or under the embankment of the railway are made by concrete culvert. Generally, the cross-sectional shape of the culvert is rectangular and has a certain thickness. The concrete culvert is constructed by pouring and curing the concrete on the floor, installing the base concrete, installing the inner formwork and the outer formwork on the base concrete, pouring and curing the concrete on the inner formwork and the outer formwork, .

Fig. 1 is a cross-sectional view of a road in which a concrete culvert is installed, and Fig. 2 is a longitudinal sectional view of a road in which a concrete culvert is installed. As shown in Figs. 1 and 2, a structure in which a concrete culvert 10 is installed on a road in the lateral direction of a road in a furnace A1 of a road, And the packaging layer 20 is packed on the upper surface of the embankment layer with a packaging material such as ascon. The embankment layer is divided into upper and lower zones (A1) and (A2). The clay layer corresponding to the upper surface area of the concrete culvert 10 is referred to as topiere and the escape of less than 3 m in which the breakage frequency of the winter pavement is high is referred to as low toe A. The concrete culvert 10 serves as a passage in the lateral direction of the road .

However, due to the cold waves and heavy snow in winter, moisture penetrates through the packing layer 20 and the embankment layer corresponding to the upper surface area of the concrete culvert 10 and stays on the upper surface of the concrete culvert 10 As the concrete culvert 10 is cooled by cold air while the cold air flows through the concrete culvert 10, the number of residues staying in the filler layer on the upper surface side of the concrete culvert 10 is frozen So that the volume of the embankment layer expands and the package layer 20 rises. As a result, the flatness of the road and the driving comfort are poor, thereby causing a traffic accident. In addition, when relatively unavailable air flows through the concrete culvert 10, the temperature of the concrete culvert 10 rises and the frozen residuum is melted to reduce the volume of the embankment layer on the upper side of the concrete culvert 10, So that the ridge of the second electrode 20 does not fall. If the freezing and thawing of the staying water is repeated, the uplifting of the packaging layer 20 is repeated and cracks are generated in the packaging layer 20.

SUMMARY OF THE INVENTION It is an object of the present invention to provide an apparatus for preventing a freezing and thawing of a clayey soil region (a low-toothed region) corresponding to an upper surface area of a culvert buried in a road, and a construction method thereof.

Another object of the present invention is to provide a simple low toe pile upper package uplifting prevention device which is easy to construct and a construction method thereof.

In order to achieve the object of the present invention, there is provided a culvert; A heat insulating layer located on the upper surface of the culvert and blocking heat transfer; And a waterproof layer positioned on the upper surface of the heat insulating layer and having a waterproof function, wherein the width of the heat insulating layer is larger than the culvert width.

The width of the heat insulating layer is preferably 2.5 to 3.5 times the culvert width.

Preferably, the heat insulating layer has a plate shape in which blocks of EPS (Expandable PolyStrene) are connected to each other.

The thickness of the heat insulating layer is preferably 5 to 15 cm.

The waterproof layer is preferably a vinyl sheet.

The size of the waterproof layer is preferably equal to the size of the heat insulating layer.

Further comprising: constructing a culvert; Filling a backfill material on both outer sides of the culvert; Constructing a heat insulating layer over the upper surface of the culvert and the upper surface of the backfilling material; Forming a waterproof layer on an upper surface of the heat insulating layer; Embedding an embankment layer on an upper surface of the waterproof layer; And packaging the packaging layer, wherein the low toe culvert upper pavement preventive construction method is provided.

The width of the heat insulating layer is preferably 2.5 to 3.5 times the width of the culvert.

Preferably, the insulation layer is constructed by connecting blocks of EPS (Expandable PolyStrene) to each other.

The size of the waterproof layer is preferably equal to the size of the heat insulating layer.

The present invention provides a thermal insulation layer and a waterproof layer on the upper part of the culvert to prevent cold water from being transferred from the culvert to the low-pile fatigue, and to prevent the infiltration of water into the low- Thereby preventing frozen water from being frozen. As a result, it is possible to prevent expansion of the low-tongue in the upper surface area of the culvert and to prevent the packing material from being bulged, thereby maintaining the flatness of the road and the running comfort, and also preventing the cracking of the packaging material.

In addition, since the culvert is buried and the heat dissipation layer and the waterproof layer are installed on the upper surface of the culvert, the construction is easy and simple to shorten the construction period, and when the EPS material is applied as the heat insulating layer and the vinyl sheet is applied as the waterproof layer It is possible to significantly reduce the construction cost compared with the existing method of replacing the entire low toe portion with the non-coherent material.

1 is a cross-sectional view of a road in which a culvert is installed,
2 is a longitudinal sectional view of a road in which a culvert is installed,
3 is a cross-sectional view showing a state in which a packing layer of a road is raised,
FIG. 4 is a front sectional view showing an embodiment of the low toe pavement upper packaging uprights prevention device according to the present invention,
FIG. 5 is a flow chart showing an embodiment of a method for preventing uplift of the lower toe culvert over the bottom according to the present invention,
6 is a cross-sectional view showing an operating state of an embodiment of the low toe pile upper packaging up-and-down preventing device according to the present invention.

DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of a low toe pavement upper packaging uplifting prevention device and a construction method thereof according to the present invention will be described with reference to the accompanying drawings.

FIG. 4 is a front sectional view showing an embodiment of a low toe pavement upper packaging uplift prevention apparatus according to the present invention.

As shown in FIG. 4, an embodiment of the low toe trough upper packaging uplifting prevention apparatus according to the present invention includes a culvert 10, a heat insulating layer 30, and a waterproof layer 40.

The culvert 10 is buried in the roof of the road. The culvert 10 is embedded in the lateral direction of the road so as to cross the road. The cross-sectional shape of the culver 10 is rectangular and has a predetermined thickness. The culvert 10 is made of concrete. The culvert 10 becomes a passage across the road. The length corresponding to the lateral length of the road in the culvert 10 is referred to as the length of the culvert 10 and the length in the longitudinal direction of the road is referred to as the width of the culver 10. Backfill material A3 is filled in both widthwise side surfaces of culvert 10 respectively.

The heat insulating layer (30) is located on the upper surface of the culvert (10) to block heat transfer. The heat insulating layer 30 has a uniform thickness and has a set area. The length of one side of the insulation layer 30 corresponds to the length of the culvert 10 and the length of the other side of the insulation layer 30 corresponds to 2.5 to 3.5 times the width of the culvert 10. The side corresponding to the length of the culvert 10 in the heat insulating layer 30 is referred to as a heat insulating layer 30 and the side corresponding to the width of the culvert 10 is referred to as a width. That is, the width of the heat insulating layer 30 is preferably 2.5 to 3.5 times the width of the culvert 10. The central portion in the width direction of the heat insulating layer 30 is brought into contact with the upper surface of the culvert 10. Both portions of the central portion in the width direction of the insulating layer 30 cover the backfilling material A3. The thickness of the heat insulating layer 30 is preferably 5 to 15 cm. As an example of the heat insulating layer 30, the heat insulating layer 30 is preferably made of EPS (Expandable PolyStrene). It is preferable that the heat insulating layer 30 is formed in a plate shape in which blocks of the EPS material are connected to each other.

The waterproof layer 40 is placed in contact with the upper surface of the heat insulating layer 30 to function as a waterproofing member. The size of the waterproof layer 40 is preferably equal to the size of the heat insulating layer 30. As an example of the waterproof layer 40, the waterproof layer 40 is preferably a vinyl sheet. In another example of the waterproofing layer 40, the waterproofing layer 40 may be a waterproof coating film coated on the upper surface of the heat insulating layer 30. [

The embankment layer is formed above the waterproof layer 40 so as to cover the heat insulating layer 30 and the waterproof layer 40. [ The embankment layer area corresponding to the upper surface area of the culvert 10 is referred to as low topography. The embankment layer may be divided into a furnace body (A1) and a hearth (A2) in the vertical direction.

On the upper surface of the embankment layer, a packaging layer 20 packed with a packing material such as ascon is placed.

FIG. 5 is a flowchart illustrating an embodiment of a method for preventing uplift of a low-toe culvert over pavement according to the present invention.

As shown in FIG. 5, in an embodiment of the method for preventing uplift of the low toe culvert upper pavement according to the present invention, the step S1 of burying the culvert 10 in the furnace A1 of the road proceeds first. For example, a space larger than the width of the culvert 10 is provided in a part of the furnace body A1, and the culvert 10 is installed in the space.

After the culvert 10 is installed, a step S2 is performed to backfill each of the outer side surfaces in the width direction of the culvert 10 with a backfill material. The backfill material A3 filled on both sides of the culvert 10 is backfilled so as to be flush with the upper surface of the culvert 10.

After the back filling, a step S3 is carried out to construct the heat insulating layer 30 over the upper surface of the cage 10 and the upper surface of the back filling material A3. It is preferable that the heat insulating layer 30 is formed to have a uniform thickness. The length of one side of the insulation layer 30 corresponds to the length of the culvert 10 and the length of the other side of the insulation layer 30 corresponds to 2.5 to 3.5 times the width of the culvert 10. That is, the width of the heat insulating layer 30 is preferably 2.5 to 3.5 times the width of the culvert 10. The central portion in the widthwise direction of the insulating layer 30 is brought into contact with the upper surface of the culvert 10 and both portions of the central portion in the widthwise direction of the insulating layer 30 cover the backfilling material A3. The thickness of the heat insulating layer 30 is preferably 5 to 15 cm. As an example of the heat insulating layer 30, the heat insulating layer 30 is preferably made of EPS (Expandable PolyStrene). It is preferable that the heat insulating layer 30 is formed in a plate shape in which blocks of the EPS material are connected to each other.

A step S4 of forming a waterproof layer 40 on the upper surface of the heat insulating layer 30 is performed after the heat insulating layer 30 is formed. The waterproof layer 40 is applied to the upper surface of the heat insulating layer 30 so as to be in contact with the upper surface of the heat insulating layer 30. The size of the waterproof layer 40 is preferably equal to the size of the heat insulating layer 30. As an example of the waterproof layer 40, the waterproof layer 40 is preferably a vinyl sheet.

After the waterproof layer 40 is formed, a step S5 of embedding the embankment layer on the upper surface of the waterproof layer 40 proceeds. The embankment layer is filled up with the waterproof layer (40) so as to cover the insulating layer (30) and the waterproof layer (40). The embankment layer area corresponding to the upper surface area of the culvert 10 is referred to as low topography.

The embedding layer is formed and then the packaging layer 20 is wrapped (S6). The packaging layer 20 is packed with a packaging material such as an ascon.

Hereinafter, the operation and effect of the apparatus for preventing uplift of the low toe pavement upper packaging according to the present invention and the construction method thereof will be described.

The vehicle travels along a road provided with the low toe pile upper packing up-and-down preventing device according to the present invention, and the culvert 10 provided on the road functions as a passage. When water (water) penetrates through the packing layer 20 and the embankment layer corresponding to the upper surface area of the concrete culvert 10 due to cold waves and heavy snow in winter, as shown in FIG. 6, The waterproof layer 40 rests on the waterproof layer 40 and does not flow into the upper surface of the heat insulating layer 30 or the culvert 10. In addition, even if the culvert 10 is cooled by the cold air while the cold air flows through the culvert 10, the cold air transmitted to the culvert 10 is blocked by the heat insulating layer 30 and is not transmitted to the staying water, It is possible to prevent freezing of the number of residues in the upper surface area of the culvert 10 due to the cold air transmitted from the indoor unit 10. Particularly, the heat insulating layer 30 and the waterproof layer 40 are sufficiently larger than the top surface area of the culvert 10 so that the cold air of the culvert 10 is transferred to the low-toe side or the water infiltrating into the low- .

As described above, according to the present invention, the heat insulation layer 30 and the waterproof layer 40 are provided on the culvert 10 to prevent cold air from being transmitted to the culvert 10 from the culvert 10, 10 so that only the upper surface region of the culver 10 can be prevented from freezing the infiltrated water into the low-toe. As a result, it is possible to prevent the low-tongue portion of the upper surface area of the culvert 10 from expanding and to prevent the packing layer 20 from being bulged, thereby maintaining the flatness and running comfort of the road, .

Since the culvert 10 is buried and the heat insulating layer 30 and the waterproof layer 40 are formed on the upper surface of the culvert 10, it is easy to construct and shorten the construction time, If the EPS material is applied and the vinyl sheet is applied to the waterproof layer (40), the construction cost can be significantly reduced compared with the existing method in which the entire low toe portion is replaced with the non-cohesive material.

10; Culvert 20; Pavement layer
30; Insulating layer 40; Waterproof layer

Claims (10)

A culvert having a cross-sectional shape that is embedded in the furnace body of the road so as to penetrate in a transverse direction of the road so as to form a passage;
A heat insulating layer disposed on the upper surface of the culvert and preventing the cool air transferred to the culvert from being transmitted to the embankment layer located on the upper surface of the culvert to prevent frozen water staying in the embankment layer located on the upper surface of the culvert;
And a waterproof layer positioned on the upper surface of the heat insulating layer to prevent water infiltrating into the filler layer located on the upper surface of the culvert to flow into the heat insulating layer,
Wherein the heat insulating layer is a flat plate having a uniform thickness, the width of the heat insulating layer is larger than the culvert width,
Wherein a widthwise center portion of the heat insulating layer is in contact with an upper surface of the culvert and both portions of the widthwise central portion of the heat insulating layer are respectively filled in both widthwise sides of the culvert, And the width of the lower toe pile upper packaging bump prevention device is 2.5 to 3.5 times as wide as the width.
delete [2] The apparatus according to claim 1, wherein the heat insulating layer is a plate-like shape in which blocks of EPS (Expandable PolyStrene) are connected to each other. The apparatus of claim 1, wherein the thickness of the heat insulating layer is 5 to 15 cm. The apparatus according to claim 1, wherein the waterproof layer is a vinyl sheet. The apparatus according to claim 1, wherein the size of the waterproof layer is equal to the size of the heat insulating layer. delete delete delete delete
KR1020150147608A 2015-10-22 2015-10-22 Apparatus for preventing arching of pavement in upper area of culvert and construction method thereof KR101872485B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020150147608A KR101872485B1 (en) 2015-10-22 2015-10-22 Apparatus for preventing arching of pavement in upper area of culvert and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150147608A KR101872485B1 (en) 2015-10-22 2015-10-22 Apparatus for preventing arching of pavement in upper area of culvert and construction method thereof

Publications (2)

Publication Number Publication Date
KR20170047124A KR20170047124A (en) 2017-05-04
KR101872485B1 true KR101872485B1 (en) 2018-06-28

Family

ID=58743438

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020150147608A KR101872485B1 (en) 2015-10-22 2015-10-22 Apparatus for preventing arching of pavement in upper area of culvert and construction method thereof

Country Status (1)

Country Link
KR (1) KR101872485B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926855A (en) * 2020-06-28 2020-11-13 中国一冶集团有限公司 Underground building structure

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05203083A (en) * 1992-01-29 1993-08-10 Sekisui Chem Co Ltd Laying structure for pipe unit
JP3384948B2 (en) * 1996-06-06 2003-03-10 古河電気工業株式会社 Insulated pipe cover

Also Published As

Publication number Publication date
KR20170047124A (en) 2017-05-04

Similar Documents

Publication Publication Date Title
CN107747261A (en) A kind of new Soft Clay seasonal frozen soil region highway subgrade structure and construction method
KR102299784B1 (en) Precast concrete panel having heating module and black ice preventive road packing method using this same
KR101877843B1 (en) Power-saving typed snow melting system for road
CN106981855A (en) A kind of high ferro roadbed cable tank systems
KR101872485B1 (en) Apparatus for preventing arching of pavement in upper area of culvert and construction method thereof
CN104612721A (en) Deep buried central gutterway inspection well structure for cold region tunnel
CN105568779B (en) Railway bed waterproof construction and its laying method
CN206834684U (en) A kind of high ferro roadbed cable tank systems
KR20120120586A (en) Pavement structure and construction method therof
KR20120108250A (en) Construction method for pavement structure
CN214362570U (en) Ballastless track connecting structure
RU154137U1 (en) ROAD DESIGN
CN210238158U (en) Plateau high-ice-content frozen soil section railway cutting structure
JP3648656B2 (en) Filling method for cohesive soil using natural cold in winter
KR101016193B1 (en) Road on low supporting force ground
JP2006144280A (en) Water-retentive pavement structure
CN206428543U (en) A kind of frozen earth roadbed insulation discharge structure
CN112176814A (en) Water accumulation preventing plateau asphalt highway and construction method
JPH0551912A (en) Repairing method for paved road and structure thereof
CN216615353U (en) Highway tunnel heat preservation road surface structure
KR20100003438A (en) Blocks for subbase and road paving method with the same blocks
JP2005299256A (en) Expansion joint structure in expansion gap between bridge floor slabs
JP4833107B2 (en) Snow melting pavement, gap member used therefor, and method of constructing snow melting pavement
KR101216157B1 (en) Paving method for geothermal snow melting pavement
JP7369408B1 (en) Floor heater device, installation method of floor heater device, and heater placement material

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right