Nothing Special   »   [go: up one dir, main page]

KR101627279B1 - Biased soil pressure reinforcement rigid-frame bridge and construction method of the same - Google Patents

Biased soil pressure reinforcement rigid-frame bridge and construction method of the same Download PDF

Info

Publication number
KR101627279B1
KR101627279B1 KR1020130122927A KR20130122927A KR101627279B1 KR 101627279 B1 KR101627279 B1 KR 101627279B1 KR 1020130122927 A KR1020130122927 A KR 1020130122927A KR 20130122927 A KR20130122927 A KR 20130122927A KR 101627279 B1 KR101627279 B1 KR 101627279B1
Authority
KR
South Korea
Prior art keywords
side wall
slope
alternation
wall alternation
installing
Prior art date
Application number
KR1020130122927A
Other languages
Korean (ko)
Other versions
KR20150043913A (en
Inventor
김효례
Original Assignee
김효례
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김효례 filed Critical 김효례
Priority to KR1020130122927A priority Critical patent/KR101627279B1/en
Publication of KR20150043913A publication Critical patent/KR20150043913A/en
Application granted granted Critical
Publication of KR101627279B1 publication Critical patent/KR101627279B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 편토압에 저항하고 보강토의 변위를 최대한 흡수하며 수압이 미치지 않도록 하여 안전성과 시공성이 우수한 편토압 보강 라멘교의 시공 방법을 제공한다. 본 발명의 적절한 실시 형태에 따른 편토압 보강 라멘교의 시공 방법은, 절토된 사면측과 이로부터 교폭만큼 떨어진 부분에 각기 터파기 한 후 터파기가 이루어진 지반에 기초파일을 일정 간격으로 근입하는 단계와; 양쪽 기초파일의 상부에 철근 콘크리트를 타설하여 확대기초를 시공하고, 확대기초의 상면에 힌지형 라멘 구조가 되도록 각기 레벨유지용 패드를 설치하는 단계와; 상기 레벨유지용 패드에 사면측 벽체교대와 개방측 벽체교대를 각기 거치 입설하여 임시 고정 후 이음부에 몰탈을 타설하는 단계와; 상부거더를 상기 사면측 및 개방측 벽체교대의 상면에 거치시켜 놓는 단계와; 상부거더와 상기 사면측 및 개방측 벽체교대가 만나는 우각부에 철근을 조립하고 콘크리트를 타설하는 단계와; 사면측 및 개방측 벽체교대의 연결브라켓을 제거한 후 사면측 벽체교대의 하부 내측으로 길이 방향을 따라 배수구를 시공하고 기초 되메우기를 실시하는 단계와; 사면측에서 사면측 벽체교대측으로 유입된 유입수의 배수를 위해 드레인보드를 사면측 벽체교대에 합성시키고, 사면과 벽체교대의 사이에 보강재 설치와 되메우기 다짐을 순차적으로 수회 반복하는 단계; 및 상부거더에 상부슬래브를 시공한 후 사면과 사면측 벽체교대의 사이에 상부로 접속슬래브를 시공하는 단계를 포함하여 시공되는 것을 특징으로 한다.The present invention provides a method of constructing a biotemp reinforced raymen bridge that is resistant to biased earth pressure and absorbs the displacement of the reinforced earth as much as possible and does not exert hydraulic pressure, thereby providing excellent safety and workability. According to a preferred embodiment of the present invention, there is provided a method of constructing a knee-joint reinforcing ramen bridge, the method comprising the steps of: disposing a base file at a predetermined interval on a slab-side slope side and a slice- ; Installing reinforcing concrete on top of both foundation files to construct an enlarged foundation and installing leveling pads on the upper surface of the reinforced foundation to provide a hinged ramen structure; Placing the mortar in the joint after temporarily fixing by placing the slope side wall alternation and the opening side wall alternation in the level holding pad respectively; Placing an upper girder on an upper surface of the slope side and the open side wall alternation; Assembling a reinforcing bar and pouring concrete into the right corner where the upper girder meets the oblique side and the open side wall alternation; Removing the connection brackets alternating between the oblique side and the open side wall, constructing the drainage along the longitudinal direction to the inside of the lower side of the slope side wall alternation and performing the base backflow; Synthesizing the drain board to the slope side wall alternation for drainage of inflow water flowing into the slope side wall alternating side from the slope side, repeating the step of installing the stiffener between the slope and the wall alternately, And installing the upper slab on the upper girder, and then installing the connecting slab on the upper side between the slope and the slope side wall alternation.

Description

편토압 보강 라멘교 및 이의 시공 방법{Biased soil pressure reinforcement rigid-frame bridge and construction method of the same}BACKGROUND OF THE INVENTION Field of the Invention [0001] The present invention relates to a bi-

본 발명은 라멘교의 시공 방법에 관한 것으로, 특히 편토압에 저항하고 보강토의 변위를 최대한 흡수하며 수압이 미치지 않도록 하여 안전성과 시공성이 우수한 편토압 보강 라멘교의 시공 방법에 관한 것이다.The present invention relates to a method of construction of a ramen bridge, and more particularly, to a construction method of a bilge-toe-reinforced ramen bridge which is excellent in safety and workability by absorbing the displacement of a reinforcing soil and absorbing the displacement of the reinforcing soil as much as possible.

라멘교(rigid-frame bridge)는 교량의 상부구조와 하부구조를 강철로 연결함으로써 전체 구조의 강성을 높임과 동시에 지간 내에 발생하는 휨모멘트의 크기를 줄이는 대신 이를 교대나 교각이 부담하게 하는 교량을 의미한다. 라멘교는 교각의 높이가 그리 높지 않고 주로 단경간의 교량에서 사용하는 것이 경제적이다. 이는, 단경간의 교량에서 신축이음(Expansion Joint)이나 교량받침이 없이 가설이 가능하고, 유지관리 측면에서 같은 지간의 단순교(조인트)에 비해 유리하고, 주형의 두께가 상대적으로 작게 설계될 수 있고 중앙부로부터 지간의 양단으로 헌치 형태를 이룬 경우 날렵한 모양을 이루어 교량의 미관이 수려한 장점을 갖는다. Rigid-frame bridges are designed to increase the stiffness of the entire structure by connecting the upper structure and the lower structure of the bridge with steel, and at the same time, reduce the size of the bending moment generated in the bridge, it means. It is economical to use the ramen bridge in the bridge between the main bridge and the bridge. This is because it is possible to construct a bridge between short bridges without expansion joints or bridges, and it is more advantageous than simple bridges in terms of maintenance, and the mold thickness can be designed to be relatively small When the hunting form is formed from the central part to both ends of the span, it has a sharp shape and the advantage of the beauty of the bridge is remarkable.

이러한 장점을 살려서 절토된 사면의 일측에 라멘교를 시공할 경우 편토압과 배수성 및 시야성 등을 고려하여 시공되어야 한다.When the ramen bridge is installed on one side of the cut slope by taking advantage of these advantages, it should be applied considering the soil pressure, drainage and visibility.

본 발명의 배경이 되는 기술로는 한국 등록특허 등록번호 제10-0770574호(프리스트레스된 철골철근 콘크리트 합성형 라멘교 및 그 시공방법)로서, 경간 및 솟음에 맞게 분절된 형태로 강형을 제작하는 단계와; 분절된 각 강형의 하부플랜지에 콘크리트를 타설·양생하여 합성형을 제작하는 단계와; 합성형들을 용접 또는 고장력볼트로 연결하는 단계와; 쉬스관을 연결한 후 합성형들 사이의 연결홈을 그라우팅하는 단계와; 전경간에 걸쳐 긴장재를 삽입하고 프리스트레싱을 도입하는 단계와; 쉬스관을 그라우팅하는 단계와; 지반위에 설치된 벽체 위에 받침강형을 설치하는 단계와; 긴장력이 도입된 합성형을 상기 받침강형 위에 설치하는 단계와; 바닥판 콘크리트 및 잔여 벽체 콘크리트를 타설하는 단계와; 방호벽·포장등을 시공하는 단계를 포함하여서 됨을 특징으로 하는 프리스트레스된 철골철근 콘크리트 합성형 라멘교 제조방법이 제시되어 있다. 따라서 장경간 실현이 가능함과 아울러 형하공간을 충분히 확보함으로써 차량 및 유수의 원활한 소통을 얻을 수 있다.As a background of the present invention, Korean Patent Registration No. 10-0770574 (a pre-stressed steel-reinforced concrete composite type raymen bridge and its construction method) is used to manufacture a steel form in a shape that is segmented according to a span and a rise Wow; Placing the concrete on the lower flange of each segment of the segmented structure to produce a composite mold; Connecting the composite molds with welding or high tension bolts; Grouting the connection grooves between the composite molds after connecting the sheath pipes; Inserting a tension material across the foreground and introducing prestressing; Grouting the sheath tube; Installing a bearing steel on the wall provided on the ground; Installing a composite type in which a tensile force is introduced on the support stiffness; Casting the bottom plate concrete and the remaining wall concrete; Wherein the reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete. Therefore, it is possible to achieve a long span, and a sufficient space for a mold space can be ensured, so that smooth communication between the vehicle and the water flow can be obtained.

그러나 상기 배경기술은 한쪽의 절토면에 의해 편토압을 받는 곳에서의 저항 방법, 되메우기된 보강토 변위에서 발생된 측압의 제거 그리고 배수 시설에 대한 방안이 제시되어 있지 않다.However, the background art does not disclose a resistance method in a place subjected to a biased earth pressure by one cut surface, a removal of side pressure generated in a backed up earth displacement, and a method of a drainage facility.

한국 등록특허 등록번호 제10-0994432호(합성 라멘교의 시공에 사용되는 거푸집 구조 및 이를이용한 합성 라멘교의 시공방법)Korean Registered Patent Registration No. 10-0994432 (Formwork used in construction of synthetic ramen bridge and construction method of synthetic ramen bridge using the same) 한국 등록특허 등록번호 제10-1178876호(프리스트레스트 강합성 라멘교 시공방법)Korean Registered Patent No. 10-1178876 (Prestressed steel synthetic ramen bridge construction method) 한국 등록실용 등록번호 제20-0222512호(라멘교 벽체의 연결구조)Korean Registration No. 20-0222512 (connection structure of ramen bridge wall)

본 발명은 편토압에 저항하고 보강토의 변위를 최대한 흡수하며 수압이 미치지 않도록 하여 안전성과 시공성이 우수한 편토압 보강 라멘교의 시공 방법을 제공함에 그 목적이 있다.An object of the present invention is to provide a method of constructing a bi-omega-reinforced ramen bridge that is resistant to a biased earth pressure and absorbs the displacement of a reinforced earth to a maximum extent and has a low water pressure so that safety and workability are excellent.

본 발명의 적절한 실시 형태에 따른 편토압 보강 라멘교의 시공 방법은,According to a preferred embodiment of the present invention,

절토된 사면측과 이로부터 교폭만큼 떨어진 부분에 각기 터파기 한 후 터파기가 이루어진 지반에 기초파일을 일정 간격으로 근입하는 단계와;A step of removing the foundation slope from the cut slope side and a portion separated from the slope side by a predetermined distance in the ground where the slope is formed;

양쪽 기초파일의 상부에 철근 콘크리트를 타설하여 확대기초를 시공하고, 확대기초의 상면에 힌지형 라멘 구조가 되도록 각기 레벨유지용 패드를 설치하는 단계와;Installing reinforcing concrete on top of both foundation files to construct an enlarged foundation and installing leveling pads on the upper surface of the reinforced foundation to provide a hinged ramen structure;

상기 레벨유지용 패드에 사면측 벽체교대와 개방측 벽체교대를 각기 거치 입설하여 임시 고정 후 이음부에 몰탈을 타설하는 단계와;Placing the mortar in the joint after temporarily fixing by placing the slope side wall alternation and the opening side wall alternation in the level holding pad respectively;

상부거더를 상기 사면측 및 개방측 벽체교대의 상면에 거치시켜 놓는 단계와;Placing an upper girder on an upper surface of the slope side and the open side wall alternation;

상부거더와 상기 사면측 및 개방측 벽체교대가 만나는 우각부에 철근을 조립하고 콘크리트를 타설하는 단계와;Assembling a reinforcing bar and pouring concrete into the right corner where the upper girder meets the oblique side and the open side wall alternation;

사면측 및 개방측 벽체교대의 하부에 연결브라켓을 제거한 후 사면측 벽체교대의 하부 내측으로 길이 방향을 따라 배수구를 시공하고 기초 되메우기를 실시하는 단계와;Removing the connection brackets at the lower part of the slope side and open side wall alternation, constructing drainage along the longitudinal direction to the inside of the lower part of the slope side wall alternation and performing base backfilling;

사면측에서 사면측 벽체교대측으로 유입된 유입수의 배수를 위해 드레인보드를 사면측 벽체교대에 합성시키고, 사면과 벽체교대의 사이에 보강재 설치와 되메우기 다짐을 순차적으로 수회 반복하는 단계; 및Synthesizing the drain board to the slope side wall alternation for drainage of inflow water flowing into the slope side wall alternating side from the slope side, repeating the step of installing the stiffener between the slope and the wall alternately, And

상부거더에 상부슬래브를 시공한 후 사면과 사면측 벽체교대의 사이에 상부로 접속슬래브를 시공하는 단계를 포함하여 시공되는 것을 특징으로 한다.And installing the upper slab on the upper girder and then installing the connecting slab on the upper side between the slope and the slope side wall alternation.

또한, 사면측 벽체교대 외측면에 초기 보강토의 지반 안정화시까지 보강재의 변형에 따른 토압이 사면측 벽체교대에 미치지 않도록 토압흡수부재를 설치하고, 상기 드레인보드는 보강재가 연결되는 철망을 사이에 두고 토압흡수부재에 접합되어 있는 것을 특징으로 한다.The soil pressure absorbing member is installed on the alternating slope side wall so that the earth pressure corresponding to the deformation of the reinforcing material does not fall over the slope side wall alternation until the ground of the initial reinforcing soil is stabilized, And is joined to the earth pressure absorbing member.

또한, 개방측 벽체교대는 중앙에 시야 차폐를 제거하기 위해 두께 방향으로 개방된 교대 개구부가 형성되어 있는 것을 특징으로 한다.Further, the open side wall alternation is characterized in that an alternate opening portion opened in the thickness direction is formed at the center to remove the visual field shielding.

또한, 사면측 벽체교대는 자중을 감소시키고 되메우기 작업시 굵은 골재를 채울 수 있도록 외면에 일정 깊이로 함몰되어 있는 함몰홈이 형성되어 있는 것을 특징으로 한다.Further, the slope side wall alternation is characterized in that recessed grooves recessed at a predetermined depth on the outer surface are formed so as to reduce the self weight and fill the coarse aggregate in the backfilling operation.

또한, 사면에 천공하여 강봉을 삽입시킨 후 그라우팅을 실시하는 네일링 작업 또는 사면에 천공하여 어스 앵커를 설치한 후 강봉 또는 어스 앵커의 긴장재를 접속슬래브에 연결하는 단계가 더 포함되어 있는 것을 특징으로 한다.The method may further include the step of connecting the tension member of the steel bar or the earth anchor to the connecting slab after the grounding anchor is installed by perforating the slope by drilling the slope and then performing the grouting, do.

또한, 사면측 벽체교대에 강봉 또는 어스앵커의 긴장재를 연결하여 사면에 고정시켜 놓는 네일링 또는 앵커 시공으로 토압에 대해 추가 보강이 이루어지는 것을 특징으로 한다.Further, the reinforcing member is further reinforced with respect to the earth pressure by nailing or anchor construction in which the steel rods or earth anchors are fixed to the slopes by connecting tension members of the steel rods or earth anchors.

본 발명에 따른 편토압 보강 라멘교의 시공 방법은, 편토압을 받는 피암구조물이나 라멘 구조에 적용이 가능하며, 편토압을 보강재 보강토를 이용하여 저항할 수 있다. 또한 보강토의 변위를 토압흡수부재를 이용하여 최대한 흡수함으로써 라멘 벽체에 편토압에 의한 측압이 미치지 않으며, 드레인보드를 이용하여 배수함으로써 수압의 영향을 받지 않는 이점을 갖는다.The method of applying the soil pressure strengthening ramen bridge according to the present invention can be applied to the cargo structure or the raymen structure subjected to the biased earth pressure and the earth pressure can be resisted by using the reinforcing earth reinforcement soil. In addition, since the displacement of the reinforcing soil is absorbed to the maximum by using the earth pressure absorbing member, side pressure by the earth pressure is not applied to the wall of the raman, and drainage is performed by using the drain board.

본 명세서에서 첨부되는 다음의 도면들은 본 발명의 바람직한 실시 예를 예시하는 것이며, 발명의 상세한 설명과 함께 본 발명의 기술사상을 더욱 이해시키는 역할을 하는 것이므로, 본 발명은 첨부한 도면에 기재된 사항에만 한정되어서 해석되어서는 아니 된다.
도 1a 내지 도 1c는 본 발명에 따른 편토압 보강 라멘교의 시공 방법을 공정별로 나타낸 도면.
도 2는 본 발명에 적용되는 레벨유지용 패드가 확대기초에 설치되는 상태를 나타내는 도면.
도 3은 본 발명에 적용되는 상부거더의 사시도.
도 4a는 본 발명에 적용되는 사면측 벽체교대의 사시도.
도 4b는 본 발명에 적용되는 개방측 벽체교대의 사시도.
도 5는 본 발명에 적용되는 거더와 개방측 벽체교대의 접합부 사시도.
도 6a는 본 발명에 적용되는 드레인보드 및 보강재의 설치상태도.
도 6b는 본 발명에 적용되는 보강재와 철망의 연결상태도.
도 7은 본 발명의 시공 방법에 따른 편토압 보강 라멘교를 나타낸 사시도.
BRIEF DESCRIPTION OF THE DRAWINGS The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate exemplary embodiments of the invention and, together with the description, serve to explain the principles of the invention, Shall not be construed as limiting.
Figs. 1A to 1C are diagrams showing a construction method of a kneading soil reinforcement ramening bridge according to the present invention, by a process. Fig.
Fig. 2 is a view showing a state in which a level holding pad applied to the present invention is provided on an enlarged base; Fig.
3 is a perspective view of a top girder according to the present invention.
4A is a perspective view of a slope side wall alternation applied to the present invention.
4B is a perspective view of an open side wall alternation applied to the present invention.
5 is a perspective view of a girder and an open side wall alternating joint applied to the present invention.
FIG. 6A is a view showing an installation state of a drain board and a stiffener applied to the present invention. FIG.
6B is a connection state diagram of a reinforcing material and a wire net applied to the present invention.
FIG. 7 is a perspective view showing a semi-soil pressure reinforced raymen bridge according to a construction method of the present invention. FIG.

아래에서 본 발명은 첨부된 도면에 제시된 실시 예를 참조하여 상세하게 설명이 되지만 제시된 실시 예는 본 발명의 명확한 이해를 위한 예시적인 것으로 본 발명은 이에 제한되지 않는다. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to the embodiments shown in the accompanying drawings, but the present invention is not limited thereto.

터파기 및 기초파일 Terracotta and foundation files 근입Submission

먼저, 도 1(가)와 같이 절토된 사면(10)측과 이로부터 교폭(L) 만큼 떨어진 부분에 각기 터파기 한 후 터파기가 이루어진 지반에 기초파일(12,13)을 일정 간격으로 근입한다. 기초파일(12,13)은 특정되지 않으며 예로, 기성콘크리트 말뚝, 강재 말뚝, PC 말뚝 등등이 될 수 있다. 본 실시 예에서는 터파기 부분에 2열로 기초파일(12,13)이 각기 근입되어 있으나 이러한 배열에 본 발명이 한정되는 것은 아니다.First, as shown in Fig. 1 (a), the foundation piles 12 and 13 are inserted at regular intervals on the slope 10 side and the portion spaced apart from the slope 10 by the bridge width L, . The foundation files 12, 13 are not specified and can be, for example, ready-made concrete piles, steel piles, PC piles, and the like. In this embodiment, the base files 12 and 13 are respectively inserted in two rows in the ter- minal portion, but the present invention is not limited to this arrangement.

확대기초 및 레벨유지용 패드 설치Pads for enlarged foundation and level maintenance

다음, 도 1a(나) 및 도 2와 같이 양쪽 기초파일(12,13)의 상부에 철근 콘크리트를 타설하여 확대기초(14)(15)를 시공한 후, 확대기초(14)(15)의 상면에 힌지형 라멘 구조를 갖기 위해 각기 레벨유지용 패드(16)(16)를 설치한다. 이때 확대기초(14)(15)는 기초파일(12,13)의 두부에 주지의 두부보강장치를 통하여 연결될 수 있다. 레벨유지용 패드(16)(16)는 각기 확대기초(14,15)에 2열로 일정 간격을 두고 배치되어 있다. 레벨유지용 패드(16)(16)는 고강성 고무나 목판 그리고 케미칼 플라스틱 등의 합성수지 등등 다양한 재질로 제작된 것이 될 수 있다. 레벨유지용 패드(16)(16)는 앵커볼트로 확대기초(14,15)에 고정 설치된다.Next, as shown in Figs. 1A and 1B and Fig. 2, reinforced concrete is placed on top of the foundation piles 12 and 13 to construct the enlarged bases 14 and 15, And the level holding pads 16 and 16 are provided to have a hinge type ramen structure on the upper surface. At this time, the enlarged bases 14 and 15 can be connected to the head of the foundation piles 12 and 13 through a well-known head reinforcing apparatus. The level-retaining pads 16 and 16 are arranged on the enlarged bases 14 and 15 at regular intervals in two rows. The level-maintaining pads 16 and 16 may be made of various materials such as high-rigidity rubber, wood board, synthetic resin such as chemical plastic, and the like. The level-maintaining pads 16 and 16 are fixed to the expansion bases 14 and 15 with anchor bolts.

벽체교대 거치 및 이음 고정Fixing of walls and fixing joints

그 다음, 도1a(다)와 같이 레벨유지용 패드(16)(16)에 사면측 벽체교대(18)와 개방측 벽체교대(19)를 각기 거치 입설하여 임시 고정 후 이음부에 몰탈을 타설한다.Thereafter, the slope side wall alternation 18 and the opening side wall alternation 19 are alternately installed in the level maintaining pads 16 (16) as shown in Fig. 1A (C) do.

사면측 벽체교대(18)는 도 4a와 같이 자중을 감소시키기 위해 되메우기 작업시 가벼운 재질 예로 EPS 블록을 채울 수 있도록 외면에 일정 깊이로 함몰되어 있는 함몰홈(181)이 형성됨이 바람직하다. 또한 사면측 벽체교대(18)는 하부에 기울기를 갖는 배수통로(182)가 일정 간격마다 형성되어 있다. 개방측 벽체교대(19)는 도 4b와 같이 중앙에 측방으로의 시야 차폐를 해소하기 위해 두께 방향으로 개방된 교대 개구부(191)가 형성된 것이 바람직하다.As shown in FIG. 4A, the slope side wall alternation 18 is preferably formed with recesses 181 which are recessed at a predetermined depth on the outer surface so as to fill the EPS block. In addition, the slope side wall alternation 18 is formed with drainage passages 182 having slopes at lower portions at regular intervals. As shown in FIG. 4B, the open side wall alternation 19 is preferably formed with alternate openings 191 opened in the thickness direction in order to eliminate the lateral view shielding at the center.

이음 고정은 도 1a(다)와 같이 연결브라켓(17)을 사용하여 볼트로 사면측 벽체교대(18)와 개방측 벽체교대(19)를 각기 확대기초(14,15)에 연결시켜서 이루어질 수 있다.The joint fixing can be achieved by connecting the oblique side wall alternation 18 and the open side wall alternation 19 to the enlarged bases 14 and 15 with bolts using the connecting bracket 17 as shown in Fig. .

상부거더Upper girder 거치 Mount

그 다음, 도 1b(가)와 같이 상부거더(20)를 상기 사면측 및 개방측 벽체교대(18)(19)의 상면에 거치시켜 놓는다. 상부거더(20)는 예로 PSC 거더로 제작된 것이 될 수 있다. 상부거더(20)는 도 5와 같이 일정 간격을 두고 배치되어 일단이 사면측 벽체교대(18)의 상단에 타단이 개방측 벽체교대(19)의 상면에 지지되어 거치된다.Next, as shown in Fig. 1B (A), the upper girder 20 is mounted on the upper surfaces of the slope side and open side wall alternates 18 and 19. The upper girder 20 may be made of PSC girder, for example. As shown in Fig. 5, the upper girders 20 are arranged at regular intervals, one end of which is supported on the upper surface of the slope side wall alternation 18 and the other end is supported on the upper side of the opening side wall alternation 19.

우각부Right corner 철근 조립 및 콘크리트 타설 Reinforcement assembly and concrete pouring

그 다음, 도 1b(나) 및 도 5와 같이 상부거더(20)와 사면측 및 개방측 벽체교대(18)(19)가 만나는 우각부에 철근을 조립하고 콘크리트를 타설한다. 따라서 상부거더(20)의 양단부는 각기 철근과 콘크리트를 통해 사면측 및 개방측 벽체교대(18)(19)에 합성된다.Next, as shown in Figs. 1B and 5, reinforcing bars are assembled at the right corners where the upper girder 20 meets the oblique side and the open side wall alternates 18, 19, and the concrete is laid. Accordingly, both ends of the upper girder 20 are synthesized on the oblique side and the open side wall alternates 18 and 19 through reinforcing bars and concrete, respectively.

배수구 시공 및 기초 되메우기Drainage construction and foundation backfilling

그 다음, 도 1b(다)와 같이 임시 고정된 상기의 연결브라켓(17)을 제거한 후 사면측에서 사면측 벽체교대(18)로 유입되는 유입수의 배수 흐름을 만들어주기 위해 배수구(22)를 시공하고 기초 되메우기를 실시한다. Next, after removing the connection bracket 17 temporarily fixed as shown in FIG. 1B (C), the drain port 22 is installed to make a drainage flow of inflow water flowing into the slope side wall alternation 18 from the slope side And carry out backfilling.

배수구(22)는 사면측 벽체교대(18)의 하부측 안쪽에 라멘교의 길이 방향으로 설치된다. 따라서 사면측 벽체교대(18)의 하부측에 형성된 배수통로(182)와 배수구(22)가 연결된다. 배수구(22)는 개수로 형태이나 이러한 수로 형태에 한정되는 것은 아니다. 기초되메우기는 사면측 확대기초(14)의 배면측에서 이루어진다.The drain port (22) is provided in the longitudinal direction of the rammen bridge inside the lower side of the slope side wall alternation (18). Therefore, the drainage passage 182 formed on the lower side of the slope side wall alternation 18 is connected to the drainage hole 22. The drain port 22 is not limited to the open channel type and the water channel type. The base backing is made on the back side of the slope side expanding base 14.

드레인보드Drain board 합성 및 보강재 설치 후 되메우기 반복 Repeated backfilling after synthesis and reinforcement installation

그 다음, 도 1c(가) 및 도 6a와 같이 드레인보드(24)를 사면측 벽체교대(18)에 결합시키고 보강재(26) 설치와 되메우기 다짐을 순차적으로 수회 반복하여 보강토를 형성한다.Subsequently, the drain board 24 is coupled to the slope side wall alternation 18 as shown in Figs. 1C and 6A, and the reinforcing material is formed by repeating the installation of the stiffener 26 and the backing compaction successively several times.

이때 초기 보강토의 지반 안정화시까지 보강재(26)의 변형에 따른 토압이 사면측 벽체교대(18)에 미치지 않도록 토압흡수부재(25)가 설치됨이 바람직하다. 토압흡수부재(25)는 예로, EPS(Expandable PolyStrene) 블록(압축스티로폼), 우레탄폼 등이 될 수 있다.At this time, it is preferable that the earth pressure absorbing member 25 is installed so that the earth pressure corresponding to the deformation of the reinforcing member 26 does not reach the slope side wall alternation 18 until the ground stabilization of the initial reinforcing soil. The earth pressure absorbing member 25 may be, for example, an EPS (Expandable PolyStrene) block (compressed styrofoam), a urethane foam, or the like.

토압흡수부재(25)는 사면측 벽체교대(18) 외측면에 접합되어 설치되고, 드레인보드(24)는 보강재(26)가 연결되는 철망(27)을 사이에 두고 토압흡수부재(25)에 접합되게 시공된다. 보강재(26)는 도 6b와 같이 철망(27)에 연결핀(27a)을 매개로 연결된다. 보강재(26)는 시트형 보강재, 띠형 보강재, 그리드형 보강재 등이 적용될 수 있다.The earth pressure absorbing member 25 is attached to the outer surface of the slope side wall alternation 18 and the drain board 24 is connected to the earth pressure absorbing member 25 via the wire mesh 27 to which the reinforcing member 26 is connected It is constructed to be bonded. The reinforcing member 26 is connected to the wire net 27 through a connecting pin 27a as shown in FIG. 6B. The reinforcing member 26 may be a sheet-like stiffener, a stiffener, a grid-like stiffener, or the like.

네일링Nailing 또는 앵커 시공 Or anchor construction

그 다음, 도 1c(나)와 같이 사면(10)에 천공하여 강봉(28)을 삽입시킨 후 그라우팅을 실시하는 네일링 작업이 이루어질 수 있다. 이때 강봉(28)은 후술할 접속슬래브(32)와 연결되도록 설치됨이 바람직하다.Then, a nailing operation may be performed in which the steel rods 28 are inserted into the slope 10 as shown in FIG. 1C (B) and grouting is performed. At this time, it is preferable that the steel rods 28 are installed so as to be connected to the connection slab 32 to be described later.

네일링 시공에 대체하여 사면(10)에 천공하여 주지의 어스 앵커를 설치하여 긴장재가 접속슬래브(30)와 연결되도록 시공이 이루어질 수도 있다.Instead of the nailing installation, a well-known earth anchor may be installed in the slope 10 so as to connect the tension member to the connection slab 30.

또한, 필요시 네일링 또는 앵커를 사면측 벽체교대(18)에 연결 설치하여 토압에 추가 보강을 할 수 있다. 즉, 사면측 벽체교대(18)에 강봉(28) 또는 어스앵커의 긴장재를 연결하여 사면(10)에 고정시켜 놓는 네일링 또는 앵커 시공으로 토압에 대해 추가 보강이 이루어질 수 있다.Further, if necessary, the nailing or anchor can be connected to the slope side wall alternation 18 to further reinforce the earth pressure. In other words, additional reinforcement can be achieved with respect to the earth pressure by nailing or anchor construction in which the steel rods 28 or the anchors of the earth anchors are connected to the slope side wall alternation 18 and fixed to the slope 10.

접속슬래브 시공 및 포장Connection slab construction and packing

그 다음, 도 1c(다)와 같이 상부거더(20)에 상부슬래브(30)를 시공하고, 사면(10)과 사면측 벽체교대(18)의 사이에 상부로 접속슬래브(32)를 시공한 후 포장이 이루어져 편토압 보강 라멘교의 시공이 이루어진다. Subsequently, the upper slab 30 is installed on the upper girder 20 as shown in Fig. 1C (C), and the connecting slab 32 is installed on the upper side between the slope 10 and the slope side wall alternation 18 After packing is done, construction of reinforcement railway bridge is done.

이와 같은 편토압 보강 라멘교의 시공 방법은, 사면측의 되메우기층이 보강재(26)에 의해 저항력을 발휘하고, 보강토의 변위가 토압흡수부재(25)에 최대한 흡수됨으로써 라멘 벽체에 편토압에 의한 측압이 미치지 않토록 한다. 따라서 본 발명의 편토압 보강 라멘교는 편토압의 영향을 받지 않으므로 편토압을 받는 피암구조물이나 라멘 구조에 적용이 가능하다. 또한 드레인보드를 이용하여 배수함으로써 편토압 고강 라멘교는 수압의 영향을 받지 않는 안전한 교량 구조물이 된다.In the method of applying such a soil pressure strengthening ramen bridge, the back layer on the slope side exerts a resistive force by the reinforcing member 26 and the displacement of the reinforcing soil is absorbed by the earth pressure absorbing member 25 to the maximum, Let's not go crazy. Therefore, the present invention can be applied to a carcass structure or a ramen structure subjected to a biased earth pressure because it is not affected by a biomass pressure. Also, by draining by using drain board, it becomes a safe bridge structure that is not influenced by water pressure.

지금까지 본 발명은 제시된 실시 예를 참조하여 상세하게 설명이 되었지만 이 분야에서 통상의 지식을 가진 자는 제시된 실시 예를 참조하여 본 발명의 기술적 사상을 벗어나지 않는 범위에서 다양한 변형 및 수정 발명을 만들 수 있을 것이다. 본 발명은 이와 같은 변형 및 수정 발명에 의하여 제한되지 않으며 다만 아래에 첨부된 청구범위에 의하여 제한된다. While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is evident that many alternatives, modifications and variations will be apparent to those skilled in the art in light of the above teachings. will be. The invention is not limited by these variations and modifications, but is limited only by the claims appended hereto.

12,13: 기초파일
14,15: 확대기초
16: 레벨유지용 패드
18: 사면측 벽체교대
181: 함몰홈
19: 개방측 벽체교대
191: 교대개구부
20: 상부거더
24: 드레인보드
25: 토압흡수부재
26: 보강재
12,13: Foundation Files
14,15: Enlargement Foundation
16: Pad for level maintenance
18: Slope side wall shift
181: recessed groove
19: Open side wall shift
191: Alternating opening
20: Upper girder
24: drain board
25: earth pressure absorbing member
26: Stiffener

Claims (7)

(a) 절토된 사면(10)측과 이로부터 교폭(L)만큼 떨어진 부분에 각기 터파기 한 후 터파기가 이루어진 지반에 기초파일(12,13)을 일정 간격으로 근입하는 단계와;
(b) 양쪽 기초파일(12,13)의 상부에 철근 콘크리트를 타설하여 확대기초(14)(15)를 시공하고, 확대기초(14)(15)의 상면에 힌지형 라멘 구조가 되도록 각기 레벨유지용 패드(16)(16)를 설치하는 단계와;
(c) 상기 레벨유지용 패드(16)(16)에 사면측 벽체교대(18)와 개방측 벽체교대(19)를 각기 거치 입설하여 연결브라켓(17)으로 임시 고정 후 이음부에 몰탈을 타설하는 단계와;
(d) 상부거더(20)를 상기 사면측 및 개방측 벽체교대(18)(19)의 상면에 거치시켜 놓는 단계와;
(e) 상부거더(20)와 상기 사면측 및 개방측 벽체교대(18)(19)가 만나는 우각부에 철근을 조립하고 콘크리트를 타설하는 단계와;
(f) 사면측 및 개방측 벽체교대(18)(19)의 하부에 상기 (c)단계에서 설치된 연결브라켓(17)을 제거한 후 사면측 벽체교대(18)의 하부 내측으로 길이 방향을 따라 배수구(22)를 시공하고 기초 되메우기를 실시하는 단계와;
(g) 사면측에서 사면측 벽체교대(18)측으로 유입된 유입수의 배수를 위해 드레인보드(24)를 사면측 벽체교대(18)에 합성시키고, 사면(10)과 벽체교대(18)의 사이에 보강재(26) 설치와 되메우기 다짐을 순차적으로 수회 반복하는 단계와;
(h) 상부거더(20)에 상부슬래브(30)를 시공한 후 사면(10)과 사면측 벽체교대(18)의 사이에 상부로 접속슬래브(32)를 시공하는 단계; 및
(i) 상기 (h)단계 후 사면(10)에 천공하여 강봉(28)을 삽입시킨 후 그라우팅을 실시하는 네일링 작업 또는 사면(10)에 천공하여 어스 앵커를 설치한 후 강봉(28) 또는 어스 앵커의 긴장재를 접속슬래브(32)에 연결하는 단계;를 포함하여 시공되는 것을 특징으로 하는 편토압 보강 라멘교의 시공 방법.
(a) a step of disposing the foundation piles (12, 13) at a predetermined interval on the slope side (10) side and the part spaced apart from the slope side (10) by the pile width (L);
(b) Reinforcing concrete is placed on top of both foundation piles 12 and 13 to construct enlarged bases 14 and 15, and on the upper surfaces of the enlarged bases 14 and 15, Providing a holding pad (16) (16);
(c) The oblique side wall alternation 18 and the open side wall alternation 19 are mounted on the level maintaining pads 16 and 16, respectively, and temporarily fixed to the connection bracket 17, ;
(d) placing the upper girder (20) on the upper surface of the slope side and open side wall alternation (18) (19);
(e) assembling reinforcing bars and pouring concrete into the right corner where the upper girder (20) meets the oblique side and the open side wall alternation (18) (19);
(f) After removing the connection bracket 17 provided in the step (c) at the lower part of the oblique side and open side wall alternation 18 (19), the inside of the lower side of the oblique side wall alternation 18, (22) and performing a base backbone;
(g) Synthesizing the drain board 24 to the slope side wall alternation 18 for drainage of the influent water flowing into the slope side wall alternation 18 side from the slope side, and between the slope 10 and the wall alternation 18 A step of repeating the steps of installing the reinforcement member 26 and completing the backing step in sequence;
(h) installing an upper slab (32) on the upper side between the slope (10) and the slope side wall alternation (18) after installing the upper slab (30) on the upper girder (20); And
(i) After the step (h) is performed, a nailing work is performed to insert the steel rods 28 by inserting the steel rods 28 into the slope 10, or the steel rods 28 or And connecting the tension member of the earth anchor to the connecting slab (32).
제 1항에 있어서,
상기 (g)단계에서 사면측 벽체교대(18) 외측면에 초기 보강토의 지반 안정화시까지 보강재(26)의 변형에 따른 토압이 사면측 벽체교대(18)에 미치지 않도록 드레인보드(24)를 사면측 벽체(18)에 합성시킨 후 보강재(26)와의 사이에 토압흡수부재(25)를 설치하고, 상기 드레인보드(24)는 보강재(26)가 연결되는 철망(27)을 사이에 두고 토압흡수부재(25)에 접합되어 있는 것을 특징으로 하는 편토압 보강 라멘교의 시공 방법.
The method according to claim 1,
In step (g), on the outer surface of the slope side wall alternation 18, the drain board 24 is slung so that the earth pressure corresponding to the deformation of the stiffener 26 does not reach the slope side wall alternation 18 until the ground stabilization of the initial reinforcing soil Pressure absorbing member 25 is provided between the reinforcing member 26 and the reinforcing member 26 after the reinforcing member 26 is synthesized with the side wall member 18 and the drain board 24 absorbs the earth pressure through the reinforcing member 26, Is joined to the member (25).
제 1항에 있어서,
상기 (c)단계에서 개방측 벽체교대(19)는 중앙에 시야 차폐를 제거하기 위해 두께 방향으로 개방된 교대 개구부(191)가 형성되어 있는 것을 특징으로 하는 편토압 보강 라멘교의 시공 방법.
The method according to claim 1,
In the step (c), the open side wall alternation 19 is formed with an alternating opening 191 opened in the thickness direction to remove the visual field shield at the center.
제 1항에 있어서,
상기 (c)단계에서 사면측 벽체교대(18)는 자중을 감소시키고 되메우기 작업시 굵은 골재를 채울 수 있도록 외면에 일정 깊이로 함몰되어 있는 함몰홈(181)이 형성되어 있는 것을 특징으로 하는 편토압 보강 라멘교의 시공 방법.
The method according to claim 1,
In the step (c), the slope side wall alternation 18 is formed with a depression groove 181 recessed at a predetermined depth on the outer surface so as to reduce its own weight and to fill the coarse aggregate in the backfilling operation. Construction method of reinforced ramen bridge.
삭제delete 제 1항에 있어서,
상기 (i)단계 후 사면측 벽체교대(18)에 강봉(28) 또는 어스앵커의 긴장재를 연결하여 사면(10)에 고정시켜 놓는 네일링 또는 앵커 시공으로 토압에 대해 추가 보강이 이루어지는 것을 특징으로 하는 편토압 보강 라멘교의 시공 방법.
The method according to claim 1,
The reinforcing member is further reinforced with respect to the earth pressure by nailing or anchor construction in which the steel rods 28 or the anchors are connected to the slope side wall alternation 18 after the step (i) Construction method of earth pressure strengthening ramen bridge.
청구항 제 1항 내지 제 4항 및 제 6항 중 어느 하나의 시공 방법으로 시공된 것을 특징으로 하는 편토압 보강 라멘교.The method of any one of claims 1 to 4, further comprising the step of:
KR1020130122927A 2013-10-15 2013-10-15 Biased soil pressure reinforcement rigid-frame bridge and construction method of the same KR101627279B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130122927A KR101627279B1 (en) 2013-10-15 2013-10-15 Biased soil pressure reinforcement rigid-frame bridge and construction method of the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130122927A KR101627279B1 (en) 2013-10-15 2013-10-15 Biased soil pressure reinforcement rigid-frame bridge and construction method of the same

Publications (2)

Publication Number Publication Date
KR20150043913A KR20150043913A (en) 2015-04-23
KR101627279B1 true KR101627279B1 (en) 2016-06-03

Family

ID=53036318

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130122927A KR101627279B1 (en) 2013-10-15 2013-10-15 Biased soil pressure reinforcement rigid-frame bridge and construction method of the same

Country Status (1)

Country Link
KR (1) KR101627279B1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758867B (en) * 2017-01-18 2018-06-26 中电建路桥集团有限公司 A kind of Bridge Rotation Construction Technique control method for fully automatic
CN110468729B (en) * 2019-09-09 2021-08-17 中铁八局集团昆明铁路建设有限公司 Construction method of frame bridge
KR102118665B1 (en) * 2020-01-23 2020-06-03 주식회사 스팅이앤씨 Retaining wall and method for constructing the same
CN111380754A (en) * 2020-05-12 2020-07-07 广东工业大学 Slot type bias voltage experimental device
CN111910538A (en) * 2020-07-02 2020-11-10 中铁六局集团有限公司 Construction method for dismantling existing frame bridge by using rope saw reverse cutting method
KR20240147066A (en) 2023-03-31 2024-10-08 김갑부 Foundation structure for resisting uneven earth pressure, structure having the same and construction method of the same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200220890Y1 (en) 2000-10-19 2001-04-16 주식회사정도엔지니어링 Lateral Movement Prevention Structure of Bridge Abutment for using Sheet piles
KR200402401Y1 (en) 2005-08-30 2005-12-02 (주)한국해외기술공사 Prefabricated Breast Wall Structure for Roadway
KR100969586B1 (en) 2009-07-03 2010-07-12 주식회사 길교이앤씨 Rhamen bridge and construction method there of
KR101006900B1 (en) 2008-06-16 2011-01-14 한국철도기술연구원 Construction Method of Fill-Up Structure for Back-Area of Rigid Structure

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200222512Y1 (en) 2000-10-06 2001-05-02 주식회사경성엔지니어링 A jointing structure of a wall for Rahmen bridge's wall
KR100994432B1 (en) 2008-06-05 2010-11-15 (주)삼현피에프 Scaffolding system used for construction of composite rahmen bridge and its construction method using the same scaffolding system
KR101178876B1 (en) 2011-09-08 2012-09-03 (주)지아이건설 Prestressed composit rahmen bridge construdtion method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200220890Y1 (en) 2000-10-19 2001-04-16 주식회사정도엔지니어링 Lateral Movement Prevention Structure of Bridge Abutment for using Sheet piles
KR200402401Y1 (en) 2005-08-30 2005-12-02 (주)한국해외기술공사 Prefabricated Breast Wall Structure for Roadway
KR101006900B1 (en) 2008-06-16 2011-01-14 한국철도기술연구원 Construction Method of Fill-Up Structure for Back-Area of Rigid Structure
KR100969586B1 (en) 2009-07-03 2010-07-12 주식회사 길교이앤씨 Rhamen bridge and construction method there of

Also Published As

Publication number Publication date
KR20150043913A (en) 2015-04-23

Similar Documents

Publication Publication Date Title
KR101627279B1 (en) Biased soil pressure reinforcement rigid-frame bridge and construction method of the same
KR101613784B1 (en) Integral abutment bridge construction method of old joint butment bridge
KR101793037B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
KR101840226B1 (en) The guide holes of the form for soil auger dredges
KR101324231B1 (en) Soil cement wall structure and method for constructing thereof
KR101287739B1 (en) Sheet pile combined modular bridge abutment and construction method of the same
KR101181619B1 (en) Building method of high wall block for large scale underground structure using earth anchor represtressing
JP2004027609A (en) Construction method for subterranean structure and subterranean structure
KR20090043625A (en) Method for constructing underground slabs using asymmetric girder
KR20080025219A (en) Underground outer wall construction method using deck-plate and deck-plate for constructing underground outer wall
KR101763274B1 (en) Expanding construction method of concrete bridge and Expandable Concrete bridge
KR101808833B1 (en) Floor structure of underground floor with reduced floor height using shear reinforcement and the construction method thereof
JP7081744B2 (en) Foundation beam structure and foundation beam construction method
JP6031626B1 (en) Replacing the seismic isolation device in the pile head seismic isolation structure
KR101483865B1 (en) Construction Method of Underground Structure using Composite Wale
KR102098141B1 (en) A method of constructing an underground wall structure using an earth retaining wall and an underground wall structure
KR101545713B1 (en) Composite type cutoff wall of steel temporary facility and construction method of the same
JP6232190B2 (en) Joint components, concrete placement methods, concrete structures
KR101219451B1 (en) Concrete structure and construction method for the same, constructing method of underground wall as a retaining structural wall used in the same
KR100568904B1 (en) Structure, Method and Apparatus for Fiberglass Reinforced Plastics Deck-to-Girder Connections
KR100975847B1 (en) Retaining wall-block having guide cover for formation of strut block and method for constructing retaining wall using the same
KR101809554B1 (en) Structure using key-block and sheetfile
KR102547643B1 (en) Constructing Method for Concrete Construction using Lightweight Molding Panel
EP1258566A1 (en) Foundation method and foundation slab made by such a method
KR101645511B1 (en) Precast type integral imbutment bridge and construction methode thereof

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
FPAY Annual fee payment

Payment date: 20190703

Year of fee payment: 4