Nothing Special   »   [go: up one dir, main page]

KR101027006B1 - Soak block structure - Google Patents

Soak block structure Download PDF

Info

Publication number
KR101027006B1
KR101027006B1 KR1020100036245A KR20100036245A KR101027006B1 KR 101027006 B1 KR101027006 B1 KR 101027006B1 KR 1020100036245 A KR1020100036245 A KR 1020100036245A KR 20100036245 A KR20100036245 A KR 20100036245A KR 101027006 B1 KR101027006 B1 KR 101027006B1
Authority
KR
South Korea
Prior art keywords
permeable
delete delete
block
fixed
fixed frame
Prior art date
Application number
KR1020100036245A
Other languages
Korean (ko)
Inventor
정영희
Original Assignee
정영희
주식회사 아트캠
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정영희, 주식회사 아트캠 filed Critical 정영희
Priority to KR1020100036245A priority Critical patent/KR101027006B1/en
Application granted granted Critical
Publication of KR101027006B1 publication Critical patent/KR101027006B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • E01C11/04Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
    • E01C11/06Methods of making joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/24Methods or arrangements for preventing slipperiness or protecting against influences of the weather
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C15/00Pavings specially adapted for footpaths, sidewalks or cycle tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/20Drainage details

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

PURPOSE: A permeable block structure is provided to ensure smooth water permeation and even top surface in spite of the subsidence or protrusion of a base layer. CONSTITUTION: A permeable block structure comprises a base layer, fixing frames(20), and permeable blocks(30). The base layer is built to a certain height on the surface of ground. The fixing frames are formed in a rectangular shape with a plurality of longitudinal grooves on top thereof and arranged at regular intervals on the base layer. The permeable blocks are inserted and fixed to the grooves of the fixing frames.

Description

투수블록 구조체{Soak Block Structure}Pitcher Block Structure

본 발명은 투수볼록 구조체에 관한 것으로, 더욱 상세하게는 인도나 보도의 표면에 시공되어 우수 등이 원활하게 배수되게 시공되는 투수블록 구조체에 관한 것이다.
The present invention relates to a permeable convex structure, and more particularly, to a permeable block structure is installed on the surface of the sidewalk or sidewalk to be drained smoothly.

일반적으로 일반 보도블록, 고강도 블록, 인터로킹 블록은 화강석, 대리석 등의 비투수 석재를 사용하는 경우 투수성이 미약하여 지하로의 우수침투가 적고, 이는 지하수의 고갈을 초래하면서 지반의 변형 및 지반약화를 야기시키며, 이외에도 우수가 하천으로만 유입되어 우기에는 하천유역에 범람이 빈번하게 발생되고, 토중생물 및 수목의 발육저하를 일으켜 생태계에도 많은 영향을 끼치게 되었다.In general, general sidewalk blocks, high strength blocks, and interlocking blocks have less permeability when using non-permeable stones such as granite and marble, so there is little penetration into the basement, which causes groundwater depletion and ground deformation and ground. In addition, rainwater flows into rivers only, causing frequent flooding in river basins during the rainy season and deterioration of native organisms and trees.

근래에는 이러한 문제를 해소하기 위하여 투수성을 갖춘 보도나 도로의 포장용 부재가 개발되고 있으며 실제로 도로상에 적용되어 어느 정도 효과를 보고 있는 실정이다.Recently, in order to solve such a problem, a pavement or a pavement member having a permeability has been developed, and it is actually applied to a road and has some effect.

이러한 투수성을 지닌 포장용 부재는 보도나 도로상에 타설한 후 양생시킴으로서 시공되는데, 이를 위해서는 지면을 편평하게 고르기 위해 이용되는 롤러차 및 각종 장비와 인력이 현장에 투입되어야 하며, 특히 보행자가 통행하는 보도에도 상기 포장용 부재를 적용하기 위해서는 다수의 장비와 인력이 투입되어야 한다.Such permeable pavement members are constructed by placing them on sidewalks or roads and curing them. To this end, roller cars, various equipment, and manpower used to level the ground must be put into the site. In order to apply the packaging member to the sidewalk, a large number of equipment and manpower must be put in.

이러한 문제는 보도에 시공되는 비투수 블록과 같이 투수성을 지닌 포장용 부재를 블록화시킴으로서, 현장에서 타설한 후, 양생시킬 필요없이 블록들을 상호 맞물리게 하나하나 배열시켜 보도나 도로의 포장작업을 용이하게 할 수 있으며, 향후 유지보수가 편리하며, 우천시 빗물을 지하에 투수시켜 수자원을 확보하거나 지하 상태계를 보존하는 것이 가능함은 물론 폭우시 하천 범람을 예방할 수 있어 수재에 의한 큰 피해를 방지할 수 있다.This problem is to block the permeable paving members such as non-permeable blocks installed on the sidewalk, and after paving in the field, the blocks are interlocked one by one to facilitate the paving of the sidewalk or road. In addition, it is convenient for future maintenance, and it is possible to secure rainwater during the rainy season and to secure water resources or to preserve the underground state system, and to prevent the flooding of the river during heavy rains, thereby preventing the great damage caused by the flood.

그러나 투수성을 지닌 도로포장용 부재는 내부에 일정한 공극이 형성되도록 하기 위해 입도가 큰 자갈 및 골재들이 포함되므로, 치밀하게 응집되는 종래 블록들에 비해 내구성 및 강도가 떨어지고, 이로 인해 블록의 운반 및 도로상에 설치작업 중 파손될 수 있으며, 통행하는 차량 및 보행자의 하중에 의해 지면에 조적된 블록의 모서리 부분이 쉽게 깨지거나 훼손되는 문제가 있었다.However, the permeable road pavement member includes gravel and aggregates having a large particle size so that a certain void is formed therein, so that durability and strength are inferior to those of the conventionally aggregated blocks, and thus the transport and road of the block It may be damaged during the installation work on the top, there was a problem that the edge portion of the block assembled on the ground is easily broken or damaged by the load of the passing vehicle and pedestrians.

한편 비투수 블록은 지표면을 평평하게 시공한 다음 일정 두께로 콘크리트를 시공하고, 콘크리트에 비투수블록인 석재타일, 화강석, 대리석 등의 석재를 시공하며, 블록 사이의 줄눈재 또한 비투수성을 갖는 시멘트가 사용된다.On the other hand, the non-permeable block is a flat surface, and then the concrete to a certain thickness, and the non-permeable blocks such as stone tiles, granite, marble, etc., and the joints between the blocks also have a non-permeable cement Is used.

이러한 비투수 블록은 배수가 이루어지도록 배수로를 형성해 주어야 하므로 블록 시공에 따른 공사 비용이 증가하게 되고, 공사 기간이 길어지게 되어 보행자의 통행에 불편을 주게 되며, 투수가 이루어지지 않아 장마철이나 폭우 등이 내리게 되면 보도에 물이 고이게 되어 신발이나 의류 등을 오염시키는 문제가 있었다.Since the non-permeable block has to form a drainage path for drainage, the construction cost increases due to the block construction, and the construction period becomes longer, causing inconvenience to pedestrians' traffic, and the rainy season or heavy rain due to no pitching. When it was lowered, water accumulated on the sidewalk, which contaminated shoes or clothing.

또한 블록은 지표면에 모래 또는 5㎜ 이하의 쇄석 등으로 된 지반층을 고르게 깔고서 시공하게 되는데, 지표면에 투수되는 물이나 지반 침하 등에 의해 고르게 깔려 있는 지반층의 표면이 불규칙하게 변하게 됨에 따라 블록의 높낮이가 달라지게 된다.In addition, the block is constructed by spreading the ground layer of sand or crushed stone less than 5mm on the ground surface.The height of the block is changed as the surface of the ground layer spread evenly due to water or ground subsidence. Will be different.

한편 블록의 저면에는 저수공간이 형성되어 있지 않아 투수가 원활하게 이루어지지 않게 되고, 블록 저면에 스며든 물에 의해 블록이 들뜨거나 침하 되는 현상이 발생된다.On the other hand, the bottom of the block is not formed with a reservoir, the pitcher is not made smoothly, the block is lifted or settled by the water soaked into the bottom of the block.

이렇게 블록의 높낮이가 달라지거나 들뜨게 됨에 따라 보도를 통행하는 보행자가 블록에 걸려 넘어지게 되는 안전사고가 발생하게 되고, 지반층의 표면 변화에 따라 블록이 일방향으로 밀리게 되어 최초 시공된 상태를 유지하지 못하게 되는 문제점이 있었다.As the height of the block is changed or lifted, a safety accident that causes the pedestrians who pass through the sidewalk to trip over the block occurs, and the block is pushed in one direction according to the surface change of the ground layer, so that it is not maintained in the initial construction state. There was a problem that prevented.

아울러 블록과 블록 사이에는 입경이 작은 쇄석이나 모래를 깔아놓게 되는데, 쇄석이나 모래가 움직이지 않도록 시멘트 등의 비투수성 줄눈재를 채우게 되면 비투수성의 시멘트에 의해 투수가 이루어지지 않게 되고, 시멘트와 같은 줄눈재를 채우지 않게 되면 쇄석이나 모래가 블록 위로 튕겨 올라오게 되어 보행자의 통행에 불편을 초래하게 되는 폐단이 있었다.
In addition, between the block and the block is placed a small particle size of crushed stone or sand, if the non-permeable joints such as cement so that the crushed stone or sand does not move, the permeability is not made by the impermeable cement, such as cement Failure to fill the joints resulted in pulverized rock or sand bounced over the block, causing inconvenience to pedestrians.

본 발명은 상기와 같은 문제점을 해결하기 위하여 안출된 것으로, 본 발명의 목적은 투수가 원활하게 이루어지고, 지표면이나 고르게 형성된 지반층의 침하 또는 돌출에 의한 변화에도 블록의 상면이 고르게 유지되는 투수블록 구조체를 제공하는 데 있다.The present invention has been made in order to solve the above problems, an object of the present invention is a permeable block is made smoothly, even if the surface of the ground or evenly formed by the change or settlement of the ground layer of the permeable block permeable block To provide a structure.

본 발명의 다른 목적은 블록 사이에 채워지는 잔골재, 규사 등의 줄눈재가 유동되지 않도록 고정된 상태에서 투수가 원활하게 이루어지는 투수블록 구조체를 제공하는 데 있다.
Another object of the present invention is to provide a permeable block structure made of a smoothly permeable in a fixed state so that the joint aggregate, such as fine aggregate, silica sand, which is filled between the blocks.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

본 발명의 투수블록 구조체는 지표면으로부터 일정 높이를 갖는 지반층, 상기 지반층에 일정 간격으로 배열되어 저수공간에 저수된 물이 유동되는 고정 프레임, 상기 고정 프레임에 끼워져 고정되는 투수블록을 포함하며,
상기 고정 프레임은 일정 길이를 가지는 장방형으로 형성되어 있고, 상면에는 길이방향으로 다수의 홈부가 형성되어 있으며, 상기 고정 프레임의 저면에는 상기 고정 프레임에 의해 형성되는 저수공간에 저장된 물이 유동되도록 상기 홈부와 직교되는 방향으로 하부홈이 형성되어 있는 것을 특징으로 한다.
The permeable block structure of the present invention includes a ground layer having a predetermined height from the ground surface, a fixed frame arranged at a predetermined interval on the ground layer and the water stored in the storage space flows, a permeable block fixed to the fixed frame,
The fixing frame is formed in a rectangular shape having a predetermined length, the upper surface is formed with a plurality of grooves in the longitudinal direction, the lower surface of the fixing frame so that the water stored in the storage space formed by the fixed frame flows It characterized in that the lower groove is formed in a direction perpendicular to the.

삭제delete

상기 홈부에는 일정 간격으로 투수블록이 끼워져 고정되는 끼움부가 형성되어 있고, 상기 투수블록에는 상기 고정 프레임에 일부가 끼워지는 돌출부가 형성되어 있는 것을 특징으로 한다.The groove portion is provided with a fitting portion to which the permeable block is fitted at fixed intervals, and the permeable block is characterized in that the protrusion portion is inserted into the fixing frame is formed.

상기 투수블록은 상기 고정 프레임에 일정 간격으로 배열되며, 이들 투수블록 사이에는 투수가 원활하게 이루어지도록 투수성 줄눈재가 충진되어 있는 것을 특징으로 한다.The permeable block is arranged in the fixed frame at regular intervals, characterized in that the permeable joint is filled between the permeable block so that the permeability is made smoothly.

또한 본 발명의 투수블록 구조체는 지표면으로부터 일정 높이를 갖는 지반층, 상기 지반층에 일정 간격으로 배열되는 고정 프레임, 상기 고정 프레임에 끼워져 고정되며 상기 고정 프레임 사이에 저수된 물이 유동되는 수로가 형성되는 투수블록을 포함하는 것을 특징으로 한다.In addition, the permeable block structure of the present invention is a ground layer having a predetermined height from the ground surface, a fixed frame arranged at a predetermined interval on the ground layer, is fixed to the fixed frame is formed in the water channel is formed between the fixed frame flows Characterized in that it comprises a pitcher block.

상기 고정 프레임은 일정 길이를 가지는 장방형으로 형성되어 있고, 상면에는 길이방향으로 다수의 홈부가 형성되어 있고, 상기 홈부에는 일정 간격으로 투수블록이 끼워져 고정되는 끼움부가 형성되어 있는 것을 특징으로 한다.The fixing frame is formed in a rectangular shape having a predetermined length, the upper surface is formed with a plurality of grooves in the longitudinal direction, the groove portion is characterized in that the fitting portion is formed by fixing the permeable block is fixed at a predetermined interval.

상기 투수블록에는 상기 고정 프레임의 홈부보다 더 높게 돌출부가 형성되어 있고, 상기 고정 프레임과 투수블록 사이에는 상기 고정 프레임 사이에 저수된 물이 유동되는 수로가 형성되는 것을 특징으로 한다.The permeation block is formed with a protrusion higher than the groove portion of the fixed frame, characterized in that the water flow channel is formed between the fixed frame and the permeation block flows the water stored between the fixed frame.

상기 투수블록은 상기 고정 프레임에 일정 간격으로 배열되며, 이들 투수블록 사이에는 투수가 원활하게 이루어지도록 투수성 줄눈재가 충진되어 있는 것을 특징으로 한다.The permeable block is arranged in the fixed frame at regular intervals, characterized in that the permeable joint is filled between the permeable block so that the permeability is made smoothly.

또 본 발명의 투수블록 구조체는 지표면으로부터 일정 높이를 갖는 지반층, 상기 지반층에 격자 형태로 배열되는 고정 프레임. 상기 고정 프레임에 끼워져 고정되는 투수블록을 포함하며,
상기 고정 프레임은 가로 방향으로 배열되는 가로 프레임과 세로 방향으로 배열되는 세로 프레임으로 이루어져 있고, 상기 가로 프레임에는 상기 투수블록이 끼워져 고정되는 홈부와 상기 세로 프레임이 끼워져 고정되는 상면홈이 형성되어 있으며, 상기 세로 프레임에는 상기 투수블록이 끼워져 고정되는 홈부와 상기 가로 프레임이 끼워져 고정되는 하면홈이 형성되어 있는 것을 특징으로 한다.
In addition, the permeable block structure of the present invention is a ground layer having a predetermined height from the ground surface, a fixed frame arranged in a grid form on the ground layer. It includes a pitcher block is fixed to the fixed frame,
The fixed frame includes a horizontal frame arranged in a horizontal direction and a vertical frame arranged in a vertical direction, wherein the horizontal frame is formed with a groove portion into which the permeable block is fixed and an upper surface groove into which the vertical frame is fixed. The vertical frame is characterized in that the groove portion to which the permeable block is inserted and fixed and the lower surface groove to which the horizontal frame is inserted and fixed are formed.

삭제delete

상기 투수블록에는 상기 홈부에 끼워져 고정되는 돌출부가 형성되어 있고, 상기 돌출부는 상기 수직 프레임의 홈부 또는 수평 프레임의 홈부에 끼워져 고정되어 있으며, 상기 홈부에는 일정 간격으로 투수블록이 끼워져 고정되는 끼움부가 형성되어 있는 것을 특징으로 한다.The permeation block is formed with a protrusion to be fitted into the groove portion, and the protrusion is fixed to the groove portion of the vertical frame or the groove portion of the horizontal frame, the groove portion is formed a fitting portion to be fitted and fixed at regular intervals. It is characterized by that.

상기 투수블록은 상기 고정 프레임에 일정 간격으로 배열되며, 이들 투수블록 사이에는 투수가 원활하게 이루어지도록 투수성 줄눈재가 충진되어 있는 것을 특징으로 한다.The permeable block is arranged in the fixed frame at regular intervals, characterized in that the permeable joint is filled between the permeable block so that the permeability is made smoothly.

삭제delete

또한 본 발명의 투수블록 구조체는 지표면으로부터 일정 높이를 갖는 지반층, 상기 지반층에 격자 형태로 배열되는 고정 프레임. 상기 고정 프레임 사이에 끼워져 고정되는 투수블록을 포함하며,
상기 고정 프레임은 일정 길이를 갖는 장방형으로 형성된 가로 프레임과 세로 프레임이 구비되어 있고, 상기 가로 프레임에는 길이 방향을 따라 상면 중앙에 상부로 돌출된 경계부가 형성되어 있고 일정 간격으로 상면홈이 형성되어 있으며, 상기 세로 프레임에는 길이 방향을 따라 상면 중앙에 상부로 돌출된 경계부가 형성되어 있고 일정 간격으로 하면홈이 형성되어 있는 것을 특징으로 한다.
In addition, the permeable block structure of the present invention is a ground layer having a predetermined height from the ground surface, the fixed frame is arranged in a grid form on the ground layer. It includes a pitcher block is fixed between the fixed frame,
The fixed frame has a horizontal frame and a vertical frame formed in a rectangular shape having a predetermined length, the horizontal frame is formed with a boundary protruding upward in the center of the upper surface in the longitudinal direction and the upper surface grooves are formed at regular intervals In the vertical frame, a boundary portion protruding upward is formed at the center of the upper surface along the longitudinal direction, and the groove is formed at a predetermined interval.

삭제delete

상기 투수블록은 상기 고정 프레임에 끼워지는 베이스와 그 상면에 베이스보다 작은 크기로 된 돌출면이 형성된 것을 특징으로 한다.
The permeable block is characterized in that the base is fitted to the fixed frame and a protruding surface having a smaller size than the base formed on the upper surface.

이와 같은 본 발명은 투수블록 저면에 일정 길이를 갖는 고정 프레임이 받쳐줌으로써 투수블록의 들뜨거나 침하를 방지하게 되고, 고정 프레임과 고정 프레임 사이에 형성된 저수공간이 형성됨으로써 장마철이나 폭우 등이 내리게 되더라도 보도블록의 상면으로 물이 올라오지 않게 되어 보행자가 미끄러지거나 넘어지게 되는 등의 안전사고를 방지하게 되는 유용한 효과가 있다.As described above, the present invention prevents the permeation block from being lifted or settled by being supported by a fixed frame having a predetermined length on the bottom of the pitcher block, and a water storage space formed between the fixed frame and the fixed frame is formed even when rainy season or heavy rain falls. Water does not rise to the upper surface of the block has a useful effect that prevents safety accidents such as pedestrians slip or fall.

또한 본 발명은 고정 프레임에 의해 형성된 저수공간을 통해 공기가 유동됨으로써 미생물, 지중생물 또는 식물의 생장에 필요한 공기를 충분히 공급해 주게 되고, 이로 인하여 지중생물 또는 식물의 생장을 촉진하게 되는 효과가 있다.In addition, the present invention is to supply the air necessary for the growth of microorganisms, land organisms or plants by the air flows through the storage space formed by the fixed frame, thereby promoting the growth of land organisms or plants.

또 본 발명은 투수블록뿐만 아니라 투수블록 사이에 투수성 줄눈재가 채워짐으로써 투수 효과가 극대화되며, 투수블록이 견고하게 고정되어 있어 밀림 등의 현상이 발생하지 않게 되는 효과가 있다.
In addition, the present invention is maximized permeability effect by filling the permeable joint between the permeable block as well as the permeable block, the permeability block is firmly fixed there is an effect that the phenomenon such as the jungle does not occur.

도 1은 본 발명의 제1실시예에 따른 투수블록 구조체를 도시한 분해 사시도이다.
도 2는 도 1의 단면도이다.
도 3은 도 1의 평면도이다.
도 4는 본 발명의 제2실시예에 따른 투수블록 구조체를 도시한 단면도이다.
도 5는 본 발명의 제3실시예에 따른 투수블록 구조체를 도시한 사시도이다.
도 6은 본 발명의 제4실시예에 따른 투수블록 구조체를 도시한 측단면도이다.
도 7은 본 발명의 제4실시예에 따른 투수블록 구조체를 도시한 단면도이다.
도 8은 본 발명의 제5실시예에 따른 투수블록 구조체를 도시한 분해 사시도이다.
도 9는 본 발명의 제6실시예에 따른 투수블록 구조체를 도시한 분해 사시도이다.
도 10은 본 발명의 제7실시예에 따른 투수블록 구조체를 도시한 사시도이다.
1 is an exploded perspective view showing a water permeable block structure according to a first embodiment of the present invention.
2 is a cross-sectional view of FIG. 1.
3 is a plan view of FIG. 1.
4 is a cross-sectional view showing a water permeable block structure according to a second embodiment of the present invention.
5 is a perspective view showing a water permeable block structure according to a third embodiment of the present invention.
Figure 6 is a side cross-sectional view showing a permeable block structure according to a fourth embodiment of the present invention.
7 is a cross-sectional view showing a permeable block structure according to a fourth embodiment of the present invention.
8 is an exploded perspective view illustrating a water permeable block structure according to a fifth embodiment of the present invention.
9 is an exploded perspective view illustrating a water permeable block structure according to a sixth embodiment of the present invention.
10 is a perspective view illustrating a water permeable block structure according to a seventh embodiment of the present invention.

이하 첨부된 도면을 참조하여 본 발명의 실시예를 설명한다.BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.

도 1은 본 발명의 제1실시예에 따른 투수블록 구조체를 도시한 분해 사시도이고, 도 2는 도 1의 단면도이며, 도 3은 도 1의 평면도이다.1 is an exploded perspective view illustrating a water permeable block structure according to a first embodiment of the present invention, FIG. 2 is a cross-sectional view of FIG. 1, and FIG. 3 is a plan view of FIG. 1.

도 1 내지 도 3에 도시된 바와 같이, 본 발명의 투수블록 구조체는 지표면에 일정 높이로 시공되는 지반층(10)과 상기 지반층(10)에 일정 간격으로 배열되는 고정 프레임(20)과 상기 고정 프레임(20)에 끼워져 고정되는 투수블록(30)을 포함한다.As shown in Figures 1 to 3, the permeable block structure of the present invention is the ground layer 10 is installed on the ground surface with a fixed height and the fixed frame 20 is arranged at a predetermined interval on the ground layer 10 and the It includes a water permeable block 30 is fixed to the fixed frame 20.

본 발명에서 지반층(10)은 투수가 원활하게 이루어지도록 모래 또는 쇄석으로 이루어져 있다.In the present invention, the ground layer 10 is made of sand or crushed stone so that the pitcher is made smoothly.

상기 고정 프레임(20)은 일정 길이를 갖는 장방형으로 형성되어 있고, 상면에는 홈부(21)가 형성되어 있으며, 상기 홈부(21)는 2개로 형성되어 있다.The fixing frame 20 is formed in a rectangular shape having a predetermined length, a groove portion 21 is formed on the upper surface, and the groove portion 21 is formed in two.

또 고정 프레임(20)에는 홈부(21)를 구분하는 경계부(22)가 형성되어 있고, 홈부(21)에는 일정 크기를 갖는 끼움부(23)가 형성되어 있다.Moreover, the boundary part 22 which divides the groove part 21 is formed in the fixed frame 20, and the fitting part 23 which has a fixed magnitude | size is formed in the groove part 21. As shown in FIG.

상기 투수블록(30)은 투수가 잘 이루어지도록 쇄석과 쇄석을 접착시키는 바인더로 이루어져 있고, 그 내부에 다수의 공극이 형성되어 있다.The permeable block 30 is composed of a binder for adhering the crushed stone and the crushed stone so that the permeability is well formed, a plurality of voids are formed therein.

또한 투수블록(30) 저면에는 홈부(21)에 끼워지는 돌출부(31)가 형성되어 있다.
In addition, the bottom of the permeation block 30 is formed with a protrusion 31 fitted into the groove portion 21.

이와 같은 구성으로 이루어진 본 발명의 제1실시예에 의한 투수블록 구조체는 지표면을 일정 깊이로 파서 고르게 시공한다.The permeable block structure according to the first embodiment of the present invention having such a configuration is to dig evenly the ground surface to a certain depth.

이렇게 시공된 지표면에 모래 또는 입경이 5㎜ 이하의 쇄석 등으로 일정 높이만큼 시공하고, 그 위에 고정 프레임(20)을 수평 상태로 시공한다.The ground surface thus constructed is constructed by a certain height with sand or a crushed stone having a particle diameter of 5 mm or less, and the fixed frame 20 is installed on it in a horizontal state.

이때 고정 프레임(20)은 도 1 및 도 2에 도시된 바와 같이, 일정 간격으로 떨어져 시공되며, 고정 프레임(20)의 간격은 투수블록(30)의 크기에 따라 달라지게 된다.In this case, as shown in FIGS. 1 and 2, the fixed frame 20 is constructed to be spaced apart at regular intervals, and the interval of the fixed frame 20 varies depending on the size of the pitcher block 30.

즉, 투수블록(30)의 크기가 크면 고정 프레임(20)의 간격이 멀어지게 되고, 투수블록(30)의 크기가 작으면 고정 프레임(20)의 간격은 좁아지게 된다.That is, when the size of the pitcher block 30 is large, the interval between the fixed frame 20 is far, and when the size of the pitcher block 30 is small, the interval between the fixed frame 20 is narrowed.

상기 지반층(10)에 시공된 고정 프레임(20)에는 투수블록(30)이 끼워져 고정되는데, 투수블록(30)의 돌출부(31)를 고정 프레임(20)의 홈부(21)에 끼워 고정하게 된다.The permeation block 30 is fitted into and fixed to the fixed frame 20 constructed on the ground layer 10. The protrusion 31 of the permeable block 30 is fitted into the groove 21 of the fixed frame 20 to be fixed. do.

이러한 투수블록(30)의 고정은 이격된 고정 프레임(20)의 홈부(21)에 돌출부(31)의 일측이 끼워지고, 인접한 고정 프레임(20)의 홈부(21)에 돌출부(31)의 타측이 끼워지게 된다.The fixing of the permeable block 30 is fitted with one side of the protrusion 31 in the groove 21 of the fixed frame 20 spaced apart, the other side of the protrusion 31 in the groove 21 of the adjacent fixing frame 20. Will be fitted.

또한 홈부(21)에는 끼움부(23)가 형성되어 있어 이들 홈부(21)에 투수블록(30)의 돌출부(31)를 끼워 고정시킴으로써 투수블록(30)의 고정을 보다 용이하게 하면서도 견고하게 고정시킬 수 있게 된다.In addition, the fitting portion 23 is formed in the groove portion 21, thereby fixing the protrusion 31 of the permeation block 30 to the groove portion 21 to fix the permeation block 30 more easily and firmly. You can do it.

상기 끼움부(23)는 선택적으로 형성되는 것으로, 끼움부(23)가 형성되어 있지 않더라도 홈부(21)에 투수블록(30)을 일정한 간격으로 배열시켜도 무방하다.The fitting portion 23 is selectively formed, and even if the fitting portion 23 is not formed, the permeation block 30 may be arranged in the groove portion 21 at regular intervals.

한편 고정 프레임(20)은 일정한 간격으로 이격되어 시공되므로 투수블록(30)을 통과한 우수(雨水) 등이 스며들어 저장되는 저수공간을 형성하게 되고, 이러한 저수공간은 장마철이나 폭우 등이 내리게 되더라도 투수블록(30) 상면으로 물이 고이지 않게 되어 보행자가 보도블록에 고인 물을 피하지 않고서 보행할 수 있는 편리성을 제공하게 된다.On the other hand, since the fixed frame 20 is spaced apart at regular intervals, it forms a storage space in which rainwater, which has passed through the pitcher block 30, is stored therein, and such storage spaces fall during rainy seasons or heavy rains. Water is not accumulated in the upper surface of the pitcher block 30 to provide convenience for pedestrians to walk without avoiding water accumulated on the sidewalk block.

또한 저수공간은 공기가 통하는 통로가 되어 지반층이나 지표면에 서식하는 지중생물이 생장하는데 필요한 공기를 충분히 제공하여 주게 되므로 지중생물의 생장을 촉진하게 된다.In addition, the reservoir is a passage through which the air flows to provide enough air for the growth of the land organisms in the ground layer or the ground surface, thereby promoting the growth of the land organisms.

이렇게 시공된 투수블록 구조체의 경계부(22)에는 투수성 줄눈재(35)가 채워지게 되는데, 경계부(22)의 간격과 경계부(22)의 상면에서부터 투수블록(30)의 높이까지 시공된다.The permeable joint 35 is filled in the boundary portion 22 of the permeable block structure thus constructed, and is constructed from the gap between the boundary portion 22 and the upper surface of the boundary portion 22 to the height of the permeable block 30.

이러한 투수성 줄눈재로는 잔골재, 규사, 고무칩, 폐유리 등과 수지, 시멘트 등의 바인더(접착제)를 혼합하여 사용하는 것이 바람직하며, 투수성 줄눈재(35)는 공극이 형성되어 있어 투수가 원활하게 이루어짐은 물론 줄눈재(35)가 보도 위로 튕겨 올라오거나 빗물 등에도 쏠리지 않게 되어 블록의 이탈이나 침하 등이 발생하지 않게 된다.Such a permeable joint material is preferably used by mixing a binder (adhesive) such as fine aggregate, silica sand, rubber chips, waste glass, resin, cement, etc., and the permeable joint material 35 has a void formed therein so that As well as being made smoothly, the joints 35 are bounced up on the sidewalks or are not swayed in rainwater, so that the blocks do not break out or settle down.

또한 투수블록(30)은 도 1에 도시된 바와 같이, 작은 크기의 투수블록(30)과 작은 크기의 투수블록 2개를 합친 것과 같은 크기의 투수블록(30) 등 다양한 형태로 제작하여 시공할 수 있는 것으로, 원형, 사각형, 다각형, 별 모양, 하트 모양 등으로 이루어져 일정 간격 즉, 투수성 줄눈재(35)가 채워지므로 투수블록(30)뿐만 아니라 줄눈재(35)에 의해서도 투수가 이루어져 보다 신속하게 투수가 이루어지게 된다.In addition, as shown in FIG. 1, the pitcher block 30 may be manufactured and manufactured in various forms such as a pitcher block 30 having the same size as a combination of the smaller pitcher block 30 and the smaller pitcher block 30. It can be, circular, square, polygonal, star-shaped, heart-shaped, etc. It is made of a certain interval, that is, because the permeable joint (35) is filled, not only the pitcher block 30 but also the perforated by the joint (35) The pitcher will be quickly.

또 투수블록(30)은 홈부(21)에 끼워져 고정되는 돌출부(31)가 형성되어 있으면 고정 프레임(20)에 고정되므로, 사각형 외에도 원형, 다각형, 별 모양, 하트 모양 등 다양한 형태로 시공될 수 있다.In addition, the pitcher block 30 is fixed to the fixing frame 20 if the protrusions 31 are inserted into the grooves 21 to be fixed, so that it can be constructed in various forms such as circular, polygonal, star, and heart shape in addition to the square. have.

한편 제1실시예에 의한 본 발명의 투수블록 구조체는 건물의 옥상 등에 시공함으로써 대기 중의 열원이 실내로 유입되는 열섬현상을 줄일 수 있게 된다.On the other hand, the permeable block structure of the present invention according to the first embodiment can reduce the heat island phenomenon that the heat source in the air flows into the room by installing on the roof of a building.

즉, 건물의 옥상은 콘크리트로 평평하게 시공되어 있으므로, 옥상 상면에 고정 프레임(20)을 일정 간격으로 배열 고정시키고, 고정 프레임(20)의 홈부(21)에 투수블록(30)을 고정시키며, 경계부(22)에 투수성 줄눈재(35)를 시공한다.That is, since the roof of the building is constructed flat with concrete, the fixing frame 20 is fixed to the rooftop at regular intervals, and the permeation block 30 is fixed to the groove 21 of the fixing frame 20. The permeable joint 35 is constructed at the boundary 22.

이와 같이 옥상에 설치되는 투수블록 구조체는 기온이 높은 여름철에 대기 중의 열원을 받게 되더라도 고정 프레임(20)에 의해 형성된 저수공간을 거쳐 열원이 전도(傳導)됨에 따라 건물 내부로 전달되는 열원을 줄어들어 실내온도 상승을 감소시키게 된다.In this way, the permeable block structure installed on the roof reduces the heat source transmitted to the interior of the building as the heat source is conducted through the reservoir space formed by the fixed frame 20 even when the heat source is received in the atmosphere during the summer when the temperature is high. It will reduce the temperature rise.

또한 옥상 표면에는 실내로 물이 스며들지 않도록 방수도료 등으로 방수층을 형성하게 되는데, 화학적, 물리적 풍화작용에 의해 방수층의 손상을 줄이게 되며, 햇빛에 의한 탈색이나 퇴색을 줄이게 된다.In addition, the roof surface is formed with a waterproof coating so that water does not penetrate into the room. The waterproof layer is reduced by chemical and physical weathering, and the discoloration or fading by sunlight is reduced.

한편 저장공간에는 투수성 블록(30)을 통해 투수된 물을 건물 지하에 설치되어 있는 집수조 등으로 보내 저장된 물을 재활용할 수 있게 된다.Meanwhile, in the storage space, the water that has been permeated through the water permeable block 30 can be sent to a water collecting tank installed in the basement of the building to recycle the stored water.

이와 같이 투수블록은 후술되는 실시예에도 적용가능한 것으로, 이하의 실시예에서는 중복되는 설명을 생략하기로 한다.
As described above, the pitcher block is also applicable to the following embodiments, and overlapping description will be omitted in the following embodiments.

도 4는 본 발명의 제2실시예에 따른 투수블록 구조체를 도시한 단면도이다.4 is a cross-sectional view showing a water permeable block structure according to a second embodiment of the present invention.

본 발명의 제2실시예에 의한 투수블록 구조체는 지반층(10)과 고정 프레임(20) 사이에 받침블록(40)을 시공하는 것으로, 전술한 제1실시예와 동일한 설명에 대하여 간략하게 설명하기로 한다.The permeable block structure according to the second embodiment of the present invention is to construct the support block 40 between the ground layer 10 and the fixed frame 20, the same description as the first embodiment described above will be briefly described. Let's do it.

본 발명의 제2실시예에 의한 투수블록 구조체는 제1실시예와 동일한 명칭에 대하여 동일한 부호를 사용하여 설명하기로 한다.The permeable block structure according to the second embodiment of the present invention will be described using the same reference numerals for the same names as the first embodiment.

제2실시예에 의한 투수블록 구조체(20)는 지표면에 일정 높이로 시공되는 지반층(10), 상기 지반층(10) 상면에 시공되는 받침블록(40), 상기 받침블록(40)에 끼워져 고정되는 고정 프레임(20)과 상기 고정 프레임(20)에 끼워져 고정되는 투수블록(30)을 포함한다.The permeable block structure 20 according to the second embodiment is inserted into the ground layer 10, the support block 40 is installed on the upper surface of the ground layer 10, the support block 40 is constructed at a predetermined height on the ground surface It includes a fixed frame 20 to be fixed and a pitcher block 30 is fitted to the fixed frame 20.

상기 지반층(10)은 투수가 원활하게 이루어지도록 모래 또는 쇄석 등으로 이루어져 있다.The ground layer 10 is made of sand or crushed stone such that the pitcher is smoothly made.

또 받침블록(40)은 일정한 두께와 높이를 갖는 정육면체, 원형, 다각형 등 다양한 형태로 이루어져 있고, 받침블록(40)은 다수의 공극을 갖는 쇄석과 바인더를 혼합하여 미리 성형한 것으로, 하부 금형에 쇄석과 바인더의 혼합물을 1차로 부은 후 각각의 받침블록(40)이 한 조로 이루어지도록 좌우 방향으로 와이어(41)를 배열한다.In addition, the support block 40 is made of various shapes such as a cube, a circle, a polygon having a predetermined thickness and height, and the support block 40 is formed by mixing a crushed stone and a binder having a plurality of voids in advance, to the lower mold After pouring the mixture of the crushed stone and the binder first, the wires 41 are arranged in the left and right directions so that each supporting block 40 is formed in a pair.

이렇게 와이어(41)가 배열된 하부 금형에 상기 쇄석과 바인더의 혼합물을 재차 부어 받침블록(40)과 와이어(41)를 일체로 성형한다.The mixture of the crushed stone and the binder is poured again into the lower mold in which the wires 41 are arranged to form the support block 40 and the wires 41 integrally.

이러한 받침블록(40)은 좌우로 여러개 배열된 프리캐스트(precast)로 제작한다.The support block 40 is made of precast (precast) arranged in the left and right.

상기 받침블록(40)은 블록과 블록 사이를 일정한 간격 즉, 바람직하게는 5~20㎜ 정도의 간격을 갖도록 한다.The support block 40 is to have a predetermined interval, that is, between 5 and 20mm interval between the block and the block.

상기 고정 프레임(20)은 일정 길이를 갖는 장방형으로 이루어져 있고, 그 상면에는 다수의 홈부(21)가 형성되어 있으며, 홈부(21) 사이에는 경계부(22)가 형성되어 있고, 홈부(21)에는 투수블록(30)이 끼워겨 고정되도록 끼움부(23)가 형성되어 있다.The fixed frame 20 has a rectangular shape having a predetermined length, and a plurality of groove portions 21 are formed on the upper surface thereof, boundary portions 22 are formed between the groove portions 21, and the groove portions 21 The fitting portion 23 is formed so that the permeable block 30 is fitted and fixed.

이러한 끼움부(23)는 투수블록(30)의 돌출부(31)와 동일한 크기로 이루어져 있어 투수블록(30)이 움직이지 않도록 하는 것으로, 끼움부(23)는 홈부(21)에 선택적으로 형성된다.The fitting portion 23 is made of the same size as the protrusion 31 of the pitcher block 30 so that the permeable block 30 does not move, the fitting portion 23 is selectively formed in the groove portion 21. .

또 고정 프레임(20) 저면에는 받침블록(40)의 이격된 간격과 동일한 돌기부(24)가 형성되어 있다.In addition, the bottom of the fixing frame 20 is formed with a protrusion 24 that is equal to the spaced apart interval of the support block 40.

또한 투수블록(30)은 투수가 원활하게 이루어지도록 공극을 갖는 쇄석과 쇄석을 접착시키는 바인더로 이루어져 있고, 투수블록(30)의 저면에는 고정 프레임(20)의 홈부(21)에 끼워져 고정되는 돌출부(31)가 형성되어 있다.
In addition, the permeation block 30 is made of a binder for adhering the crushed stone and the crushed stone so that the permeability is made smoothly, the bottom of the permeable block 30 is fitted into the groove portion 21 of the fixing frame 20, the protrusion is fixed 31 is formed.

이와 같은 구성으로 이루어진 본 발명의 투수블록 구조체는 지표면을 일정 깊이로 파내어 투수가 원활하게 이루어지도록 모래 또는 쇄석 등으로 지반층(10)을 일정 두께로 시공한다.The permeable block structure of the present invention having such a configuration is dug the ground surface to a certain depth to construct the ground layer 10 to a certain thickness with sand or crushed stone so that the permeability is made smoothly.

이렇게 시공된 지반층(10)에는 기 제작된 받침블록(40)을 배치하여 고정시키고, 받침블록(40) 상면에는 고정 프레임(20)을 고정한다. 이러한 고정 프레임(20)의 고정은 고정 프레임(20)의 저면에 돌출되어 있는 돌기부(24)를 받침블록(40) 사이에 끼워 고정시키게 된다.Thus constructed ground layer (10) is fixed by placing the pre-fabricated support block 40, the fixing frame 20 is fixed to the upper surface of the support block (40). The fixing of the fixing frame 20 is to fix the protrusions 24 protruding on the bottom of the fixing frame 20 between the support block 40.

즉, 받침블록(40)은 다수의 블록들이 좌우로 배열되어 있으므로 이들 사이에 고정 프레임(20)의 돌기부(24)를 끼워 고정시키게 되면 받침블록(40)과 고정 프레임(20)은 견고하게 고정된다.That is, the support block 40 is a plurality of blocks are arranged to the left and right when the projections 24 of the fixing frame 20 is sandwiched between them to fix the support block 40 and the fixing frame 20 is firmly fixed. do.

이렇게 시공된 고정 프레임(20)의 홈부(21)에는 투수블록(30)의 돌출부(31)를 끼워 고정하며, 투수블록(30)은 고정 프레임(20) 상에 다양한 형태로 배열된다.In this way, the groove 21 of the fixed frame 20 is fitted to fix the protrusion 31 of the permeable block 30, and the permeable block 30 is arranged in various forms on the fixed frame 20.

또한 투수블록(30)은 일정 간격으로 이격되어 배열되므로, 이들 투수블록(30) 사이에는 제1실시예와 같이 투수성 줄눈재(35)를 시공함으로써 투수블록(30)뿐만 아니라 투수성 줄눈재(35)를 통해서도 투수가 원활하게 이루어지도록 한다.In addition, since the permeable block 30 is arranged spaced at a predetermined interval, the permeable joint 30 as well as the permeable joint 30 by constructing the permeable joint material 35 as in the first embodiment between the permeable block 30 Also through (35) to make the pitcher smoothly.

이와 같이 시공된 투수블록 구조체는 투수블록(30)을 통과한 우수 등이 스며들어 저장되는 저수공간을 형성함은 물론 고정 프레임(20)에 의해서도 저수공간이 형성됨으로써 저수공간의 높이를 제1실시예에 비해 보다 높게 형성할 수 있게 된다.The permeable block structure constructed as described above forms a reservoir space through which the rainwater that has passed through the pitcher block 30 is stored, as well as the reservoir space is formed by the fixed frame 20, thereby increasing the height of the reservoir space. It can be formed higher than the example.

이러한 투수블록 구조체는 장마철이나 폭우 등에 의해 상습적으로 잠기는 상습 침수지역 등에 시공함으로써 보도블록이 물에 잠기는 것을 보다 줄일 수 있게 된다.Such a permeable block structure can be further reduced in the walkway block is submerged in the water by constructing a habitual submerged area that is habitually submerged by rainy season or heavy rain.

또 받침블록(40)과 고정 프레임(20)에 의해 형성된 저수공간은 물이 저장되는 공간의 확보는 물론 공기가 통하는 통로가 이루어짐으로써 지중에 서식하는 식물뿐만 아니라 생물의 생장(生長)에 필요한 공기를 충분히 공급할 수 있게 된다.
In addition, the water storage space formed by the support block 40 and the fixed frame 20 is not only secured a space for storing water but also a passage through which air flows, so that the air necessary for the growth of living organisms as well as plants inhabiting the ground It is possible to supply enough.

도 5는 본 발명의 제3실시예에 따른 투수블록 구조체를 도시한 사시도이다.5 is a perspective view showing a water permeable block structure according to a third embodiment of the present invention.

본 발명의 제3실시예에 따른 투수블록 구조체는 고정 프레임(20)의 저면에 다수의 하부홈(25)이 형성된 것으로, 저수된 물이 자유로이 유동되게 한다.In the water permeable block structure according to the third embodiment of the present invention, a plurality of lower grooves 25 are formed on the bottom of the fixed frame 20, and the stored water freely flows.

이러한 제3실시예의 투수블록 구조체에 대해서는 전술한 제1실시예 또는 제2실시예와 동일한 명칭에 대하여 동일한 부호를 사용하여 설명하기로 한다.The permeable block structure of this third embodiment will be described with the same reference numerals as in the first or second embodiment described above.

본 발명의 제3실시예에 의한 투수블록 구조체는 지표면으로부터 일정 높이를 갖는 지반층(10), 상기 지반층(10)에 일정 간격으로 배열되어 저수공간에 저수된 물이 유동되는 고정 프레임(20), 상기 고정 프레임(20)에 끼워져 고정되는 투수블록(30)을 포함한다.The permeable block structure according to the third embodiment of the present invention has a ground layer 10 having a predetermined height from the ground surface, the fixed frame 20 is arranged at a predetermined interval on the ground layer 10 to store the water stored in the reservoir space (20) ), The permeation block 30 is fitted to the fixed frame 20 is fixed.

상기 지반층(10)은 투수가 원활하게 이루어지도록 모래 또는 쇄석으로 이루어져 있다.The ground layer 10 is made of sand or crushed stone so that the pitcher is smoothly made.

이러한 지반층(10)은 지표면을 일정 깊이로 파내어 지면을 고르게 한 다음 적정 두께로 모래 또는 쇄석을 깔아 놓는다.The ground layer 10 is dug the ground surface to a certain depth to even the ground and then lay the sand or crushed stone to the appropriate thickness.

또 고정 프레임(20)은 일정 길이를 갖는 장방형으로 이루어져 있고, 그 상면에는 투수블록(30)이 끼워져 고정되는 홈부(21)가 형성되어 있으며, 홈부(21) 사이에는 경계부(22)가 형성되어 있다.In addition, the fixing frame 20 is formed in a rectangular shape having a predetermined length, and the upper surface is formed with a groove portion 21 into which the permeation block 30 is fitted and fixed, and the boundary portion 22 is formed between the groove portions 21. have.

또한 고정 프레임(20) 저면에는 상면의 홈부(21)와 직교되는 방향으로 하부홈(25)이 형성되어 있다. 이러한 하부홈(25)은 고정 프레임(20) 사이에 형성되는 저수공간의 물이 유동되는 통로를 형성하게 된다.In addition, the lower groove 25 is formed on the bottom of the fixed frame 20 in a direction orthogonal to the groove portion 21 on the upper surface. The lower groove 25 forms a passage through which water in the storage space formed between the fixed frames 20 flows.

즉, 고정 프레임(20)은 제1실시예 또는 제2실시예에서 일직선상으로 형성되어 있어 고정 프레임(20) 사이에 저수된 물이 제한된 공간 내에서 유동하게 되는데, 하부홈(25)이 형성되어 있어 길이 방향뿐만 아니라 직교되는 방향으로도 유동이 가능하게 된다.That is, the fixed frame 20 is formed in a straight line in the first embodiment or the second embodiment so that the water stored between the fixed frame 20 flows in the limited space, the lower groove 25 is formed This allows flow not only in the longitudinal direction but also in the perpendicular direction.

상기 투수블록(40)은 투수가 원활하게 이루어지는 재질로 이루어져 있고, 그 저면에는 고정 프레임(20)의 홈부(21)에 끼워져 고정되는 돌출부(31)가 형성되어 있다.
The permeation block 40 is made of a material that is smoothly pitched, the bottom is formed with a protrusion 31 is fitted into the groove 21 of the fixing frame 20 to be fixed.

이와 같은 구성으로 이루어진 본 발명의 제3실시예에 의한 투수블록 구조체는 지표면을 일정 깊이로 파내고, 파여진 지표면에 모래 또는 쇄석 등의 투수가 용이하게 이루어지는 재질을 적정 두께로 시공한다.The permeable block structure according to the third embodiment of the present invention having such a configuration digs the ground surface to a certain depth, and constructs a material having an easy thickness of permeability such as sand or crushed stone on the excavated ground surface.

한편 이러한 지반층(10) 상면에는 전술한 제2실시예에서와 같이 받침블록(40)을 선택적으로 시공할 수 있으며, 받침블록(40)의 시공은 지반이나 지질의 종류, 지표의 높이 등에 따라 선택적으로 시공한다.On the other hand, on the upper surface of the ground layer 10, as in the above-described second embodiment, the support block 40 may be selectively installed, and the construction of the support block 40 may be performed depending on the type of ground or geology, the height of the surface, etc. Selective construction

즉, 받침블록(40)은 연약한 지반이나 지질인 경우 받침블록(40)을 시공함으로써 지반이 침하되더라도 프리캐스트 성형된 받침블록(40) 전체가 침하되지 않아 투수블록(30)이 침하되지 않게 된다.That is, when the supporting block 40 is soft ground or geological construction, the supporting block 40 does not settle the whole precast molded supporting block 40 even if the ground is settled so that the permeable block 30 does not settle. .

또한 받침블록(40)이 시공되는 경우 고정 프레임(20) 저면에는 전술한 제2실시예에서와 같이, 하부홈(25)을 제외한 부분에 돌기부(24)를 형성하여 받침블록(40) 사이에 끼워 고정되도록 한다.In addition, when the support block 40 is constructed, as shown in the above-described second embodiment, the bottom of the fixing frame 20 forms a protrusion 24 on the portion except the lower groove 25 to form a space between the support blocks 40. To be fixed.

상기 고정 프레임(20)에는 홈부(21)에 끼움부(23)를 선택적으로 형성하여 투수블록(30)의 고정을 보다 용이하게 한다.The fixing frame 20 selectively forms the fitting portion 23 in the groove 21 to more easily fix the permeable block 30.

또 투수블록(30)은 저면에 형성된 돌출부(31)를 고정 프레임(20)의 홈부(21)에 끼워 고정하며, 투수블록(30) 사이에는 투수성 줄눈재(35)를 채워 줌으로써 투수블록(30) 및 투수성 줄눈재(35)를 통해 저수가 원활하게 이루어지게 된다.In addition, the permeable block 30 is fixed to the projection (31) formed on the bottom surface to the groove portion 21 of the fixing frame 20, the permeable block (30) by filling the permeable joint (35) between the permeable block (30) 30) and the water through the permeable joint 35 is made smoothly.

이와 같이 시공된 투수블록 구조체는 고정 프레임(20) 사이에 형성된 저수공간에 우수 등의 물이 장기간 저장되고, 저수공간에 저장된 물이 하부홈(25)을 통해 자유로이 유동된다.In the construction of the permeable block structure, water such as rainwater is stored for a long time in a storage space formed between the fixed frames 20, and the water stored in the storage space flows freely through the lower groove 25.

또한 저수공간에는 공기가 자유로이 통하게 됨으로써 지중에 서식하는 식물뿐만 아니라 지중생물이 서식하는데 필요한 공기를 충분히 공급해 줄 수 있게 된다.
In addition, the free passage of air into the reservoir can provide enough air for the inhabitants as well as the inhabitants of the land.

도 6은 본 발명의 제4실시예에 따른 투수블록 구조체를 도시한 측단면도이고, 도 7은 본 발명의 제4실시예에 따른 투수블록 구조체를 도시한 단면도이며, 전술한 제1실시예 내지 제3실시예와 동일한 명칭에 대하여 동일한 부호를 사용하여 설명하기로 하고, 중복된 설명은 생략하기로 한다.6 is a side cross-sectional view illustrating a permeable block structure according to a fourth embodiment of the present invention, and FIG. 7 is a cross-sectional view illustrating the permeable block structure according to the fourth embodiment of the present invention. The same names as those in the third embodiment will be described with the same reference numerals, and redundant descriptions will be omitted.

도 6 및 도 7에 도시된 바와 같이, 본 발명의 제4실시예에 의한 투수블록 구조체는 지표면으로부터 일정 높이를 갖는 지반층(10), 상기 지반층(10)에 일정 간격으로 배열되는 고정 프레임(20), 상기 고정 프레임(20)에 끼워져 고정되며 상기 고정 프레임(20) 사이에 저수된 물이 유동되는 수로가 형성되는 투수블록(30)을 포함한다.As shown in Figure 6 and 7, the permeable block structure according to the fourth embodiment of the present invention is a ground layer 10 having a predetermined height from the ground surface, a fixed frame arranged at a predetermined interval on the ground layer 10 20, a permeation block 30 inserted into and fixed to the fixed frame 20 and having a water channel through which water stored between the fixed frame 20 flows.

도 6 및 도 7에 도시된 바와 같이, 본 발명의 제4실시예에 의한 투수블록 구조체는 전술한 제1실시예 내지 제3실시예에서와 같이, 지반층(10) 및 고정 프레임(20)은 동일하므로 이에 대한 설명은 생략하기로 하며, 동일한 명칭에 대하여 동일한 부호를 사용하여 설명하기로 한다.6 and 7, the permeable block structure according to the fourth embodiment of the present invention, as in the first to third embodiments described above, the ground layer 10 and the fixed frame 20 Since the same is a description thereof will be omitted, and the same reference numerals will be used for the same name.

상기 투수블록(30)은 그 저면에 돌출부(31)가 형성되는데, 돌출부(31)의 높이가 고정 프레임(20)의 홈부(21) 높이보다 더 높게 형성된다.The permeation block 30 has a protrusion 31 formed on the bottom thereof, and the height of the protrusion 31 is formed higher than the height of the groove portion 21 of the fixing frame 20.

즉, 도 6 및 도 7에 도시된 바와 같이, 돌출부(31)가 홈부(21)보다 높게 형성되어 있으므로 투수블록(30)이 홈부(21)에 끼워져 고정되면 투수블록(30)의 저면이 홈부(21)보다 위에 위치하게 된다.
That is, as shown in FIGS. 6 and 7, since the protrusion part 31 is formed higher than the groove part 21, when the permeation block 30 is fitted into the groove part 21 and fixed, the bottom surface of the permeation block 30 is the groove part. It is located above 21.

이와 같은 구성으로 이루어진 본 발명의 제4실시예에 의한 투수블록 구조체는 일정 높이의 지반층(10)에 고정 프레임(20)이 고정되고, 고정 프레임(20)의 홈부(21)에는 투수블록(30)이 끼워져 고정된다.In the permeable block structure according to the fourth embodiment of the present invention having such a configuration, the fixing frame 20 is fixed to the ground layer 10 having a predetermined height, and the permeable block 20 is formed in the groove 21 of the fixing frame 20. 30) is fitted and fixed.

이때 투수블록(30)의 저면은 고정 프레임(20)의 상면보다 높게 위치하게 되므로 고정 프레임(20)에 의해 형성된 수로를 통해 저수공간의 물이 유동하게 된다.At this time, the bottom surface of the pitcher block 30 is positioned higher than the top surface of the fixed frame 20, so that the water in the storage space flows through the channel formed by the fixed frame 20.

전술한 제3실시예에서는 고정 프레임(20)의 저면에 형성된 하부홈(25)을 통해 저수공간의 물이 유동되도록 하였으나, 제4실시예에서는 고정 프레임(20)의 상면을 통해 저수공간의 물이 유동되게 한 것이다.In the above-described third embodiment, the water in the reservoir space flows through the lower groove 25 formed in the bottom of the fixed frame 20. However, in the fourth embodiment, the water in the reservoir space is passed through the upper surface of the fixed frame 20. This is the fluid.

한편 지반층(10)과 고정 프레임(20) 사이에는 받침블록(40)이 선택적으로 시공될 수 있음은 물론이다.Meanwhile, the supporting block 40 may be selectively installed between the ground layer 10 and the fixed frame 20.

상기 고정 프레임(20)의 경계부(22) 상면에는 투수성 줄눈재(35)이 채워지므로, 저수공간의 물이 고정 프레임(20)보다 높게 채워지게 되면 고정 프레임(20)과 투수블록(30) 사이의 수로를 통해 물이 유동하게 된다.Since the permeable joint material 35 is filled on the upper surface of the boundary portion 22 of the fixed frame 20, when the water in the storage space is filled higher than the fixed frame 20, the fixed frame 20 and the permeable block 30 are filled. Water flows through the channels in between.

즉, 수로가 투수성 줄눈재(35)에 의해 차단되어 있더라도 투수성 줄눈재(35)는 투수가 원활하게 이루어지는 재질로 이루어져 있어 물이 유동될 수 있게 된다.
That is, even if the water channel is blocked by the water permeable joint 35, the water permeable joint 35 is made of a material that is smoothly pitched so that water can flow.

도 8은 본 발명의 제5실시예에 따른 투수블록 구조체를 도시한 분해 사시도이다.8 is an exploded perspective view illustrating a water permeable block structure according to a fifth embodiment of the present invention.

본 발명의 제5실시예에 의한 투수블록 구조체는 고정 프레임(20)이 격자 형태로 배열되는 것으로, 전술한 지반층(10) 및 투수블록(30)에 대한 중복 설명을 생략하기로 하고, 동일한 명칭에 대하여 동일한 부호를 사용하여 설명하기로 한다.In the permeable block structure according to the fifth embodiment of the present invention, the fixed frame 20 is arranged in a lattice form, and thus the overlapping description of the ground layer 10 and the permeable block 30 will be omitted. The same reference numerals are used for the names.

제5실시예에 의한 본 발명의 투수블록 구조체는 지표면으로부터 일정 높이를 갖는 지반층(10), 상기 지반층(10)에 격자 형태로 배열되는 고정 프레임(20). 상기 고정 프레임(20)에 끼워져 고정되는 투수블록(30)을 포함한다.The permeable block structure of the present invention according to the fifth embodiment is a ground layer (10) having a predetermined height from the ground surface, a fixed frame (20) arranged in a grid form on the ground layer (10). It includes a water permeable block 30 is fixed to the fixed frame 20.

상기 고정 프레임(20)은 가로 방향으로 배열되는 가로 프레임(26)과 세로 방향으로 배열되는 세로 프레임(27)으로 이루어져 있다.The fixed frame 20 includes a horizontal frame 26 arranged in a horizontal direction and a vertical frame 27 arranged in a vertical direction.

상기 가로 프레임(26)과 세로 프레임(27)에는 상측에 투수블록(30)이 끼워져 고정되는 홈부(21)가 형성되어 있고, 이들 홈부(21) 사이에는 경계부(22)가 형성되어 있다.The horizontal frame 26 and the vertical frame 27 are formed with a groove portion 21 into which the permeable block 30 is fitted and fixed to the upper side, and a boundary portion 22 is formed between these groove portions 21.

또 가로 프레임(26)에는 길이 방향을 따라 일정한 간격으로 상면홈(28)이 형성되어 있고, 세로 프레임(27)에는 가로 프레임(26)의 상면홈(28)에 대응되는 하면홈(29)이 형성되어 있다.In addition, the horizontal frame 26 has upper surface grooves 28 formed at regular intervals along the longitudinal direction, and the vertical frame 27 has a lower surface groove 29 corresponding to the upper surface groove 28 of the horizontal frame 26. Formed.

이들 가로 프레임(26)과 세로 프레임(27)은 동일한 높이로 시공되어야 하므로, 상면홈(28)은 가로 프레임(26)의 상면으로부터 저면에 근접하게 형성되고, 세로 프레임(27)의 하면홈(29)은 가로 프레임(26)의 저면에서부터 상면홈(28)까지의 높이만큼 형성된다.Since the horizontal frame 26 and the vertical frame 27 should be constructed at the same height, the upper groove 28 is formed close to the bottom surface from the upper surface of the horizontal frame 26, and the lower groove ( 29 is formed by the height from the bottom of the horizontal frame 26 to the top groove 28.

즉, 하면홈(29)은 가로 프레임(26)의 저면에서부터 상면홈(28)까지의 높이와 동일하게 형성되어 이들 가로 프레임(26)과 세로 프레임(27)을 서로 교차되게 결합시키면 가로 프레임(26)과 세로 프레임(27)이 동일한 수평면을 갖도록 형성된다.
That is, the lower groove 29 is formed to have the same height from the bottom of the horizontal frame 26 to the upper groove 28 so that when the horizontal frame 26 and the vertical frame 27 are intersected with each other, the horizontal frame ( 26 and the vertical frame 27 are formed to have the same horizontal plane.

이와 같은 구성으로 이루어진 본 발명의 투수블록 구조체는 지표면에 지반층(10)을 형성하고, 지반층(10)에는 필요에 따라 받침블록(40)을 시공한다.The permeable block structure of the present invention having such a configuration forms a ground layer 10 on the ground surface, and the support layer 40 is constructed on the ground layer 10 as necessary.

상기 지반층(10) 또는 받침블록(40)에는 고정 프레임(20)을 시공하게 되는데, 가로 프레임(26)을 일정한 간격으로 배열하고, 상기 가로 프레임(26)의 상면홈(28)에 세로 프레임(27)의 하면홈(29)을 끼우게 된다.The ground layer 10 or the support block 40 is constructed with a fixed frame 20, the horizontal frame 26 is arranged at regular intervals, the vertical frame in the upper groove 28 of the horizontal frame 26 The lower surface groove 29 of the 27 is fitted.

이렇게 시공된 고정 프레임(20)에는 투수블록(30)을 고정하게 되며, 투수블록(30)은 돌출부(31)를 고정 프레임(20)의 홈부(21)에 끼워 고정하게 된다.The permeable block 30 is fixed to the fixed frame 20 constructed as described above, and the permeable block 30 fixes the protrusion 31 to the groove 21 of the fixed frame 20.

이러한 돌출부(31)는 도 8에 도시된 바와 같이, 세로 프레임(27)의 홈부(21)에 끼워 고정시킬 수 있고, 4개의 돌출부(31) 중 2개의 돌출부(31)는 가로 프레임(26)의 홈부(21)에 고정시키고, 2개의 돌출부(31)는 세로 프레임(27)의 홈부(21)에 고정시켜도 무방하다.As shown in FIG. 8, the protrusions 31 may be fixed to the grooves 21 of the vertical frame 27, and two protrusions 31 of the four protrusions 31 may be horizontal frames 26. The two projections 31 may be fixed to the groove portion 21 of the vertical frame 27.

상기 돌출부(31)가 각각 가로 프레임(26)과 세로 프레임(27)에 끼워져 고정되면, 투수블록(30)은 별도로 고정시키지 않아도 좌우로 움직이지 않게 고정된다.When the protrusions 31 are fixed to the horizontal frame 26 and the vertical frame 27, respectively, the permeation block 30 is fixed so as not to move from side to side without being fixed separately.

한편 고정 프레임(20)에는 제3실시예에서와 같이, 고정 프레임(20) 측면에 다수의 하부홈(25)을 형성하여 고정 프레임(20) 사이에 형성된 저수공간의 물이 유동되게 한다.Meanwhile, as in the third embodiment, the fixing frame 20 forms a plurality of lower grooves 25 on the side of the fixing frame 20 so that water in the storage space formed between the fixing frames 20 flows.

이렇게 결합된 고정 프레임(20)에는 투수블록(30)의 돌출부(31)를 끼워 고정하며, 투수블록(30)의 돌출부(31)는 가로 프레임(26)과 세로 프레임(27)에 서로 끼워져 고정함으로써 좌우로 움직이지 않도록 고정한다.The protrusions 31 of the pitcher block 30 are fixed to the fixed frame 20 coupled as described above, and the protrusions 31 of the pitcher block 30 are fitted to each other in the horizontal frame 26 and the vertical frame 27. So that it does not move from side to side.

또한 투수블록(30) 사이에는 투수성 줄눈재(35)를 채워주어 투수블록(30)과 투수성 줄눈재(35)를 통해 우수 등이 원활하게 투수된다.
In addition, by filling the permeable joint material 35 between the permeable block 30, the rainwater is smoothly transmitted through the permeable block 30 and the permeable joint material 35.

도 9는 본 발명의 제6실시예에 따른 투수블록 구조체를 도시한 분해 사시도이다.9 is an exploded perspective view illustrating a water permeable block structure according to a sixth embodiment of the present invention.

본 발명의 제6실시예에 의한 투수블록 구조체는 지반층(10)은 중복 설명을 생략하기로 하고, 동일한 명칭에 대하여 동일한 부호를 사용하여 설명하기로 한다.In the permeable block structure according to the sixth embodiment of the present invention, the ground layer 10 will not be redundantly described, and the same names will be described with the same reference numerals.

본 발명의 제6실시예에 의한 투수블록 구조체는 지표면으로부터 일정 높이를 갖는 지반층(10), 상기 지반층(10)에 격자 형태로 배열되는 고정 프레임(20a). 상기 고정 프레임(20a) 사이에 끼워져 고정되는 투수블록(30)을 포함한다.The permeable block structure according to the sixth embodiment of the present invention is a ground layer (10) having a predetermined height from the ground surface, a fixed frame (20a) arranged in a grid form on the ground layer (10). It includes a pitcher block 30 is sandwiched between the fixing frame (20a) is fixed.

제6실시예에 의한 고정 프레임(20a)은 전술한 제5실시예에서와 같이, 가로 프레임(26a)과 세로 프레임(27a)으로 이루어져 있으며, 고정 프레임(20a)은 홈부(21)가 형성되어 있지 않고 경계부(22)를 중심으로 양측면이 개방된 형태로 이루어져 있다.The fixed frame 20a according to the sixth embodiment includes a horizontal frame 26a and a vertical frame 27a as in the fifth embodiment, and the fixing frame 20a has a groove 21 formed therein. Rather, it is formed in a form in which both sides are opened about the boundary part 22. As shown in FIG.

또 가로 프레임(26a)과 세로 프레임(27a)은 일정 길이를 갖는 장방형으로 이루어져 있고, 가로 프레임(26a)에는 길이 방향을 따라 일정한 간격으로 상면홈(28a)이 형성되어 있으며, 세로 프레임(27a)에는 길이 방향을 따라 일정한 간격으로 하면홈(28a)이 형성되어 있다.In addition, the horizontal frame 26a and the vertical frame 27a have a rectangular shape having a predetermined length, and the horizontal frame 26a has upper surface grooves 28a formed at regular intervals along the longitudinal direction, and the vertical frame 27a. The grooves 28a are formed at regular intervals along the longitudinal direction.

상기 투수블록(30)은 전술한 제1실시예 내지 제5실시예와 달리 저면에 돌출부(31)가 형성되지 않고서 격자로 배열되는 고정 프레임(20a)에 끼워져 고정된다.
Unlike the first to fifth embodiments described above, the permeable block 30 is fitted into and fixed to a fixed frame 20a arranged in a grid without a protrusion 31 formed on a bottom surface thereof.

이와 같은 구성으로 이루어진 본 발명의 투수블록 구조체는 지표면에 지반층(10)을 시공하고, 지반층(10)에 전술한 제2실시예에서와 같이 받침블록(40)을 필요에 따라 선택적으로 시공한다.The permeable block structure of the present invention having such a configuration is to construct the ground layer 10 on the ground surface, and selectively install the support block 40 on the ground layer 10 as necessary as in the second embodiment described above. do.

또 지반층(10)에는 고정 프레임(20a)을 시공하게 되는데, 가로 프레임(26a)을 일정한 간격으로 배열하고, 가로 프레임(26a)의 상면홈(28a)에는 세로 프레임(27a)의 하면홈(29a)을 끼워 결합한다.In addition, the ground layer 10 is provided with a fixed frame 20a. The horizontal frames 26a are arranged at regular intervals, and the lower surface grooves of the vertical frames 27a are arranged in the upper grooves 28a of the horizontal frames 26a. And insert 29a).

이렇게 시공된 고정 프레임(20a)은 가로 프레임(26a)과 세로 프레임(27a)에 의해 평면에서 보았을 때 사각형의 모양이 형성되며, 상기 고정 프레임(20a)에 의해 형성된 사각형 내부에 투수블록(30)을 끼워 고정하게 된다.The fixed frame 20a thus constructed has a rectangular shape when viewed in plan by the horizontal frame 26a and the vertical frame 27a, and the pitcher block 30 is formed inside the square formed by the fixed frame 20a. To fix it.

또한 고정 프레임(20a)에는 전술한 제3실시예에서와 같이, 하부홈(25)을 형성함으로써 고정 프레임(20a)에 의해 형성된 저수공간의 물이 자유로이 유동되게 할 수 있음은 물론이다.
In addition, as in the above-described third embodiment, the fixed frame 20a may form a lower groove 25 so that water in the storage space formed by the fixed frame 20a may freely flow.

도 10은 본 발명의 제7실시예에 따른 투수블록 구조체를 도시한 사시도이다.10 is a perspective view illustrating a water permeable block structure according to a seventh embodiment of the present invention.

본 발명의 제7실시예에 의한 투수블록 구조체는 투수블록에 관한 것으로, 지반층(10), 고정 프레임(20a)은 전술한 실시예와 동일하므로 중복 설명을 생략하기로 한다.The permeable block structure according to the seventh embodiment of the present invention relates to a permeable block, and the ground layer 10 and the fixed frame 20a are the same as the above-described embodiments, and thus redundant description thereof will be omitted.

상기 투수블록(30)은 두께를 갖는 사각 형상으로 이루어진 베이스(32)와 베이스(32) 상면에 베이스(32)보다 작은 크기로 된 돌출면(33)이 일체로 이루어져 있다.The permeable block 30 has a base 32 having a thickness having a thickness and a protruding surface 33 having a size smaller than that of the base 32 on the base 32.

이러한 투수블록(30)은 전술한 제6실시예에서와 같이, 격자로 배열되는 고정 프레임(20a) 사이에 끼워져 고정되는데, 베이스(32)는 고정 프레임(20a) 사이에 끼워져 고정되고, 돌출면(33)은 고정 프레임(20a)의 경계부(22)와 일정 간격 떨어져 공간부를 형성하게 된다.
The permeable block 30 is sandwiched and fixed between the fixed frames 20a arranged in a grid as in the sixth embodiment described above, and the base 32 is sandwiched and fixed between the fixed frames 20a and the protruding surface. Reference numeral 33 forms a space portion spaced apart from the boundary portion 22 of the fixed frame 20a.

이와 같은 구성으로 이루어진 본 발명의 투수블록 구조체는 지반층(10)을 시공한 다음 전술한 실시예에서와 같이, 받침블록(40)을 필요에 따라 선택적으로 시공하며, 지반층(10) 또는 받침블록(40) 상면에 고정 프레임(20a)을 일정한 간격을 갖는 격자 형태로 배열한다.The permeable block structure of the present invention having such a configuration is to construct the ground layer 10, and then, as in the above-described embodiment, selectively supports the support block 40 as needed, the ground layer 10 or the support The fixed frame 20a is arranged in a lattice shape at regular intervals on the upper surface of the block 40.

이렇게 배열된 고정 프레임(20a)에는 사각형으로 된 투수블록(30)을 끼워 고정되며, 고정 프레임(20a)의 경계부(22)와 돌출면(33)에 의해 형성된 공간에 투수성 줄눈재(35)를 채우게 된다.
The fixing frame 20a arranged as described above is fitted with a rectangular permeable block 30 to be fixed, and a permeable joint 35 in a space formed by the boundary 22 and the protruding surface 33 of the fixing frame 20a. Will be filled.

한편 본 발명은 다수의 실시예에 따라 각각 설명되었으나, 고정 프레임(20,20a)에 형성되는 홈부(21), 끼움부(23), 돌기부(24) 및 하부홈(25)을 필요에 따라 형성할 수 있는 것으로, 각각의 실시예에 한정되지 않고, 투수블록(30) 및 받침블록, 투수성 줄눈재 또한 각각의 실시예에 한정되지 않고서 다른 실시예에 공히 적용될 수 있음은 물론이다.
On the other hand, the present invention has been described in accordance with a number of embodiments, but the groove 21, the fitting portion 23, the protrusions 24 and the lower groove 25 formed in the fixed frame (20, 20a) as needed As can be, it is not limited to each embodiment, and the permeable block 30 and the support block, the permeable joint material can also be applied to other embodiments without being limited to each embodiment, of course.

10: 지반층 20,20a: 고정 프레임
21: 홈부 22: 경계부
23: 끼움부 24: 돌기부
25: 하부홈 26,26a: 가로 프레임
27,27a: 세로 프레임 28,28a: 상면홈
29,29a: 하면홈 30: 투수블록
31: 돌출부 32: 베이스
33: 돌출면 35: 투수성 줄눈재
40: 받침블록 41: 와이어
10: ground layer 20,20a: fixed frame
21: groove portion 22: boundary portion
23: fitting portion 24: protrusion
25: lower groove 26, 26a: horizontal frame
27,27a: vertical frame 28,28a: top groove
29,29a: Bottom groove 30: Pitcher block
31: protrusion 32: base
33: protrusion 35: permeable joint
40: support block 41: wire

Claims (30)

삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 지표면으로부터 일정 높이를 갖는 지반층,
상기 지반층에 일정 간격으로 배열되어 저수공간에 저수된 물이 유동되는 고정 프레임,
상기 고정 프레임에 끼워져 고정되는 투수블록을 포함하며,
상기 고정 프레임은 일정 길이를 가지는 장방형으로 형성되어 있고, 상면에는 길이방향으로 다수의 홈부가 형성되어 있으며,
상기 고정 프레임의 저면에는 상기 고정 프레임에 의해 형성되는 저수공간에 저장된 물이 유동되도록 상기 홈부와 직교되는 방향으로 하부홈이 형성되어 있는 것을 특징으로 하는 투수블록 구조체.
Ground layer having a certain height from the earth's surface,
A fixed frame in which water stored in the storage space is arranged at regular intervals in the ground layer,
It includes a pitcher block is fixed to the fixed frame,
The fixed frame is formed in a rectangular shape having a predetermined length, the upper surface is formed with a plurality of grooves in the longitudinal direction,
And a lower groove formed on a bottom surface of the fixed frame in a direction orthogonal to the groove so that water stored in the storage space formed by the fixed frame flows.
삭제delete 제12항에 있어서,
상기 홈부에는 일정 간격으로 투수블록이 끼워져 고정되는 끼움부가 형성되어 있는 것을 특징으로 하는 투수블록 구조체.
The method of claim 12,
Permeable block structure, characterized in that the groove is formed with a fitting portion is fixed to the permeable block is fixed at intervals.
제12항에 있어서,
상기 투수블록에는 상기 고정 프레임에 일부가 끼워지는 돌출부가 형성되어 있는 것을 특징으로 하는 투수블록 구조체.
The method of claim 12,
The permeable block structure, characterized in that the projecting portion is formed in which part of the fixing frame is fitted.
제12항에 있어서,
상기 투수블록은 상기 고정 프레임에 일정 간격으로 배열되며, 이들 투수블록 사이에는 투수가 원활하게 이루어지도록 투수성 줄눈재가 충진되어 있고,
상기 투수성 줄눈재는 잔골재, 규사, 폐유리, 폐벽돌, 고무칩 중 어느 하나 이상과 수지 또는 시멘트가 혼합된 것을 특징으로 하는 투수블록 구조체.
The method of claim 12,
The permeable blocks are arranged at regular intervals in the fixed frame, the permeable joint is filled between the permeable blocks so that the permeability is made smoothly,
The permeable joint is a permeable block structure, characterized in that any one or more of the fine aggregate, silica sand, waste glass, waste brick, rubber chips and resin or cement are mixed.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020100036245A 2010-04-20 2010-04-20 Soak block structure KR101027006B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100036245A KR101027006B1 (en) 2010-04-20 2010-04-20 Soak block structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100036245A KR101027006B1 (en) 2010-04-20 2010-04-20 Soak block structure

Publications (1)

Publication Number Publication Date
KR101027006B1 true KR101027006B1 (en) 2011-04-11

Family

ID=44049608

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100036245A KR101027006B1 (en) 2010-04-20 2010-04-20 Soak block structure

Country Status (1)

Country Link
KR (1) KR101027006B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101250001B1 (en) * 2011-08-31 2013-04-03 (주)삼이블록 Tree guard
KR101718921B1 (en) 2016-08-08 2017-03-24 주식회사 클레이맥스 the hybrid block unit and the hybrid panel unit combined with base for preventing weeds
CN110409243A (en) * 2019-08-15 2019-11-05 苏州金螳螂园林绿化景观有限公司 A kind of open air stone material surface layer permeable pavement structure
KR102147934B1 (en) 2020-03-11 2020-08-25 주식회사 대영테크 Drainage and water storaged infiltration block
KR102201399B1 (en) * 2020-09-03 2021-01-11 김광일 Air Purification and Water Storage Function Sidewalk Blocks
KR102505041B1 (en) 2022-10-18 2023-02-28 남옥랑 Ground surface water permeability structure with improved water permeation efficiency
KR102667815B1 (en) * 2023-12-22 2024-05-21 (주)휴먼텍코리아엔지니어링건축사사무소 Multifunctional sidewalk block

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200403790Y1 (en) * 2005-09-16 2005-12-14 김도환 Multilayer type water sink into a block
KR200440180Y1 (en) * 2007-10-31 2008-05-28 김재욱 sound type side-walk block
KR200442828Y1 (en) * 2007-06-26 2008-12-17 임선명 Impact Relief Grass Vegetation Blocks
KR100934561B1 (en) * 2008-01-28 2009-12-29 주식회사 쌍 곰 Epoxy joints for tiles with excellent stain resistance

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200403790Y1 (en) * 2005-09-16 2005-12-14 김도환 Multilayer type water sink into a block
KR200442828Y1 (en) * 2007-06-26 2008-12-17 임선명 Impact Relief Grass Vegetation Blocks
KR200440180Y1 (en) * 2007-10-31 2008-05-28 김재욱 sound type side-walk block
KR100934561B1 (en) * 2008-01-28 2009-12-29 주식회사 쌍 곰 Epoxy joints for tiles with excellent stain resistance

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101250001B1 (en) * 2011-08-31 2013-04-03 (주)삼이블록 Tree guard
KR101718921B1 (en) 2016-08-08 2017-03-24 주식회사 클레이맥스 the hybrid block unit and the hybrid panel unit combined with base for preventing weeds
CN110409243A (en) * 2019-08-15 2019-11-05 苏州金螳螂园林绿化景观有限公司 A kind of open air stone material surface layer permeable pavement structure
KR102147934B1 (en) 2020-03-11 2020-08-25 주식회사 대영테크 Drainage and water storaged infiltration block
KR102201399B1 (en) * 2020-09-03 2021-01-11 김광일 Air Purification and Water Storage Function Sidewalk Blocks
KR102505041B1 (en) 2022-10-18 2023-02-28 남옥랑 Ground surface water permeability structure with improved water permeation efficiency
KR102667815B1 (en) * 2023-12-22 2024-05-21 (주)휴먼텍코리아엔지니어링건축사사무소 Multifunctional sidewalk block

Similar Documents

Publication Publication Date Title
KR101027006B1 (en) Soak block structure
US10233595B2 (en) Hard pavement construction method for natural groundwater recharge
KR101020718B1 (en) Seepaging structure using absorbent pavement geo-cell for material and rainforced of ground
KR101435373B1 (en) Permeatable rain storage block
CN210262555U (en) Light soil road structure
CN108239905A (en) A kind of anti-ponding road and its construction method
CN105484132B (en) A kind of construction method that novel water permeable pavement is mated formation
CN104695298A (en) Complete permeable compound type road surface structure
CN207244389U (en) A kind of shallow-layer water storage road surface water-permeable brick
CN104594155A (en) Permeable pavement laying method
KR101959680B1 (en) Paving block structures for preventing weed growth construction method thereof
CN207793792U (en) A kind of road surface permeable pavement structure
KR101733481B1 (en) Pavement structure using assembly type under stream block having rainwater storage function
CN211340276U (en) Semi-permeable brick for sponge city laying
CN210395013U (en) Light type road structure of permeating water
CN107268368A (en) Latch gap water-permeable brick
CN211079810U (en) Avoid pitch highway of ponding
CN106996063A (en) A kind of pavement structure of permeable road
KR100926539B1 (en) Temperature and humidity control apparatus of stone block sidewalk by geothermy and rainwater circulation, using the same Eco-friendly stone block sidewalk constructing
CN208486142U (en) A kind of novel porous runoff porous pavement
CN205329670U (en) Short system of oozing of rainwater of soft soil foundation
CN210368501U (en) Water permeable brick
CN214301079U (en) Outdoor water-permeable ground structure
CN216275075U (en) Archaize broken stone road
CN111593628B (en) Multifunctional self-fastening permeable environment-friendly greening brick

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
X091 Application refused [patent]
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140122

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20150224

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20160127

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170111

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20180205

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20200212

Year of fee payment: 10