Nothing Special   »   [go: up one dir, main page]

KR101018903B1 - Stabilizing assembly for preventing soil-flow of slope and greening - Google Patents

Stabilizing assembly for preventing soil-flow of slope and greening Download PDF

Info

Publication number
KR101018903B1
KR101018903B1 KR1020100068849A KR20100068849A KR101018903B1 KR 101018903 B1 KR101018903 B1 KR 101018903B1 KR 1020100068849 A KR1020100068849 A KR 1020100068849A KR 20100068849 A KR20100068849 A KR 20100068849A KR 101018903 B1 KR101018903 B1 KR 101018903B1
Authority
KR
South Korea
Prior art keywords
slope
preventing
support plate
support
soil
Prior art date
Application number
KR1020100068849A
Other languages
Korean (ko)
Inventor
재 술 나
Original Assignee
재 술 나
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 재 술 나 filed Critical 재 술 나
Priority to KR1020100068849A priority Critical patent/KR101018903B1/en
Application granted granted Critical
Publication of KR101018903B1 publication Critical patent/KR101018903B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • A01G13/0256
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • E02B11/005Drainage conduits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Agronomy & Crop Science (AREA)
  • Mechanical Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PURPOSE: A stabilization assembly for greening and preventing a soil flow is provided to continuously maintain the stabilization of a slope by minimizing the inclination of the slope. CONSTITUTION: A stabilization assembly for greening and preventing a soil flow comprises support plates(120), cutoff screens(110), and support bars(130). The support plates are buried in the ground and have guide protrusion pieces(122) with support holes. The cutoff screens are placed on the top of the support plates and protrude the guide protrusion pieces to outside. The support bars are coupled to the support holes of the guide protrusion pieces and fix the cutoff screens to the top of the support plates.

Description

사면의 토사 흐름 방지 및 녹화를 위한 안정화 조립체{Stabilizing assembly for preventing soil-flow of slope and greening}Stabilizing assembly for preventing soil-flow of slope and greening

본 발명은 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체에 관한 것으로, 상세하게는 사면의 토사 흐름을 지속적으로 억제하고 시공이 간편하여 신속하게 설치할 수 있도록 하며 지속적으로 지지력을 유지하도록 하고 녹화가 편리하도록 하여 사면을 안전화를 유도하는 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체에 관한 것이다.
The present invention relates to a stabilization assembly for preventing and preventing soil flow of slopes, and more particularly, to continuously suppress the soil flow of slopes, to allow easy installation and to quickly install, and to maintain sustaining ability. The present invention relates to a stabilizing assembly for preventing and preventing soil flow on the slope to induce safety of the slope.

요즘 산업의 발달과 국가 기반시설에 대한 투자 확충으로 도로의 건설이 급격히 증가하고 있는데, 특히 산지에 도로를 건설함에는 절토사면의 발생이 필연적이다. Nowadays, the construction of roads is rapidly increasing due to the development of industry and expansion of investment in national infrastructure. Especially, the construction of roads in mountainous areas is inevitable.

이러한 절토사면은 게릴라성 집중호우, 태풍에 의한 집중강우 등에 의해 산사태, 사면 붕괴 우려가 있으므로 이에 대한 대비책이 마련되어야 한다.Such cut slopes may have landslides and slope collapses due to guerrilla heavy rains and heavy rainfalls caused by typhoons.

특히, 홍수 등의 천재지변에 의한 옹벽의 붕괴지역 및 토목공사 등으로 인하여 지형이 인위적으로 변하는 경사지역을 무단 방치하는 경우에는 경사면의 토양 등이 외부로 노출되어 있으므로 우천이나 풍수로 인하여 토사가 외부로 누출되거나 지반이 붕괴되어 산사태 및 붕괴가 자주 발생되어 많은 피해를 입게 되며 심지어는 인명피해도 발생될 뿐만 아니라 됨으로써, 이것을 예방하기 위해서는 경사면 및 옹벽부분에 소정의 방호벽 등을 형성시켜 토사의 유출을 방지시키거나 사면의 안정화 공사가 시행되어야 한다.In particular, in case of leaving the inclined area where the terrain changes artificially due to the collapse of the retaining wall due to natural disaster such as flooding or civil engineering work, the soil of the inclined surface is exposed to the outside, so the soil is not The landslides and ground collapses often cause landslides and collapses to cause a lot of damages, and even damage to humans. To prevent this, certain barriers are formed on slopes and retaining walls to prevent spills. Preventive or slope stabilization work should be implemented.

이러한 사면을 안정화시키는 종래의 방법은 크게 4가지로 나누어진다. The conventional method of stabilizing such a slope is largely divided into four.

첫째, 야자열매 등에서 추출된 천연섬유질로 짠 네트(coir net 등)를 경사면 및 옹벽부분에 설치하는 방법으로, 상기의 방법은 강풍이나, 강우시 망사이의 토층유실을 막지 못하고, 원자재의 수급 불안정 및 건습반복에 의해 네트의 수축발생으로 인하여 네트의 밀착성이 저하될 뿐만 아니라 천연섬유재의 사용으로 인하여 천연섬유재가 부식됨과 동시에 거름이 되어 식생의 생장은 촉진되나 네트의 기능을 상실하여 영구적으로 기능을 유지하지 못하는 문제점이 있었다.First, a method of installing a natural fiber woven net (coir net, etc.) extracted from coconut, etc. on the slope and the retaining wall part, the above method does not prevent the groundwater loss between the network during strong winds or rainfall, Due to the wet and dry repetition, the adhesion of the net not only decreases due to shrinkage of the net, but the natural fiber material is corroded and fertilized at the same time due to the use of natural fiber material, which promotes the growth of vegetation, but maintains the function permanently by losing the function of the net. There was a problem that can not.

둘째, 코탄 등으로 형성된 매트(coir mat)를 이용하는 방법으로 목질로 되어있는 코탄을 주재료로 하여 종자, 시멘트, 톱밥비료, 물 등을 혼합하여 뿜어 붙이기를 하여 유기질 매트를 조성시키는 방법이 있으나, 시공후 건조기에 돌출현상이 부분적으로 발생하여 발아 후 착근까지 살수가 필요하며 시공비가 고가이고 유실 및 활동에 대한 저항력이 약하다는 문제점이 있었다.Second, there is a method of forming an organic mat by mixing and spraying seed, cement, sawdust fertilizer, water, etc. by using cotan made of wood as a main material as a method of using a mat formed of cotan. There was a problem that the protrusion phenomenon occurred in the dryer after the germination and watering until the work after germination, the construction cost is high and the resistance to loss and activity is weak.

셋째, 천연섬유 또는 폴리섬유를 모래 등과 혼합시킨 매트형 텍솔녹화토 공법으로 암면 등에 망형상으로 얽어 묶은 매트형 텍솔녹화토를 강제 부착하여 녹화를 유도하는 공법으로, 토사의 유실 및 활동에 대한 저항력이 약하며 시간이 지날수록 원지반면과의 이질성에 대한 밀착성 감소로 기능이 저하되는 문제점이 있었다.Thirdly, it is a mat-type texol green soil method that mixes natural fiber or poly fiber with sand. It is a method that induces greening by forcibly attaching mat-type texol green soil that is entangled in the shape of rock on the rock surface. It is weak and there is a problem that the function is degraded by decreasing the adhesion to heterogeneity with the base surface over time.

넷째, 철망 및 인공토양층을 강제 부착시키는 녹생토 공법으로, 녹생토 공법은 인공토양층이 건조, 균열반복으로 원지반면과 분리, 이탈현상이 발생되고 우기시 갑작스런 함수량의 증가에 따른 단위중량 증가로 사면붕괴의 원인이 된다는 문제점이 있었다.
Fourth, the green soil method for forcibly attaching the wire mesh and artificial soil layer. The green soil method is the artificial soil layer which is separated and separated from the ground surface by drying and cracking repetition. There was a problem that was the cause.

따라서 본 발명의 주 목적은 사면의 안정화를 지속적으로 유지할 수 있도록 하는 사면의 토사 흐름방지 방지 및 녹화용 조립체를 제공하는 데 있다.Therefore, the main object of the present invention is to provide an assembly for preventing and preventing soil flow of the slope to maintain the stabilization of the slope continuously.

본 발명의 다른 목적은 신속하게 시공할 수 있도록 할 뿐만 아니라 시공에 따른 비용을 최소화 하도록 하는 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체를 제공하는 데 있다.It is another object of the present invention to provide a stabilizing assembly for preventing and preventing the flow of soil on the slope to minimize the cost of the construction as well as to allow for rapid construction.

본 발명의 다른 목적은 지지력을 견고하게 유지하여 절토사면의 기울기(각도)를 최소화하고 이로 이하여 사용가능한 면적을 최대화하는 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체를 제공하는 데 있다.It is another object of the present invention to provide a stabilization assembly for preventing and preventing soil flow of slopes, which minimizes the inclination (angle) of the cut slopes, thereby maximizing the usable area by maintaining the holding force firmly.

본 발명의 다른 목적은 사면 지표수의 원활한 배수를 유도함으로 지표수에 의한 세굴, 침식을 억제하여 사면의 안전성을 도모하도록 하는 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체를 제공하는 데 있다.Another object of the present invention is to provide a stabilization assembly for preventing and preventing the flow of slope of the slope to induce the safety of the slope by suppressing scour, erosion by the surface water by inducing smooth drainage of the slope surface water.

본 발명의 다른 목적은 사면을 안전하고 효과적으로 녹화할 수 있도록 하는 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체를 제공하는 데 있다.
It is another object of the present invention to provide a stabilizing assembly for preventing and preventing soil flow of the slope to record the slope safely and effectively.

이러한 목적을 달성하기 위하여 본 발명의 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체는 지면에 매설하되 상면에 지지공이 형성된 가이드돌출편을 형성한 지지플레이트와, 상기 지지플레이트의 상면에 안치시키되 가이드돌출편이 외부로 돌출되게 하는 차단망, 및 상기 지지플레이트에 돌출된 가이드돌출편의 지지공에 끼워 결합하여 지지플레이트의 상면에 차단망을 고정시키는 지지봉으로 구성함을 그 기술적 구성상의 기본 특징으로 한다.
In order to achieve the above object, the stabilizing assembly for preventing soil flow and greening of the slope of the present invention is buried in the ground, and a support plate formed with a guide protrusion formed with a support hole on the upper surface, and placed on the upper surface of the support plate It is characterized in that the basic configuration of the technical configuration of the barrier member to protrude to the outside, and the support rod for fixing the barrier net to the upper surface of the support plate by coupling to the support hole of the guide protrusion piece protruding to the support plate.

이러한 본 발명의 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체는 차단망의 이면에 지지봉으로 지지플레이트를 횡으로 결합하여 권회하고, 이러한 지지플레이트가 결합된 차단망을 시공하고자하는 장소로 이동하여 사면의 상부에서부터 순차적으로 차단망을 덮음과 동시에 지지플레이트를 사면의 지중으로 순차적으로 매설하여 시공하므로 사면을 신속하고 간편하게 안정화 할 수 있는 것으로, 특히 차단망이 사면을 견고하게 지지하여 녹화 작업 효율 및 녹화 효과를 향상시키고 사면의 안정화를 지속적으로 유지할 수 있도록 하며 시공에 따른 비용을 최소화 하고 사면의 지지력을 견고하게 유지하여 절토사면의 기울기를 최소화하므로 사용가능한 면적을 최대화하는 것일 뿐만 아니라 사면 지표수의 원활한 배수를 유도함으로 지표수에 의한 세굴, 침식을 억제하여 사면의 안전성을 도모하도록 하는 효과가 있는 것 입니다.
The stabilizing assembly for preventing the earth and sand flow of the slope of the present invention is coupled to the support plate on the back side of the screening network to the side by winding the support plate, and move to the place where you want to construct the screening network is combined such support plate Covering the screening net sequentially from the top of the slope and laying the supporting plate in the ground of the slope in order to stabilize the slope quickly and easily. Especially, the screening net supports the slope firmly so that the recording work efficiency and It improves the greening effect, maintains the stabilization of the slope continuously, minimizes the cost of construction, and maintains the slope's support to minimize the slope of the cut slope, thus maximizing the usable area and smoothing the surface water of the slope. Surface water by inducing drainage By scour, there is an effect of suppressing the erosion to promote the stability of the slope.

도 1 은 본 발명에 따른 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체의 분리상태를 나타낸 사시도.
도 2 는 본 발명에 따른 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체의 결합상태를 나타낸 사시도.
도 3 은 본 발명에 따른 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체의 결합상태를 나타낸 정면도.
도 4 는 본 발명에 따른 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체의 연접부분을 나타낸 사시도.
도 5 는 본 발명에 따른 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체의 연접부분을 나타낸 단면도.
도 6 은 본 발명에 따른 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체의 설치상태를 나타낸 사시도.
도 7 은 본 발명에 따른 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체의 설치상태를 나타낸 단면도.
도 8 은 본 발명에 따른 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체의 설치상태를 나타낸 확대단면도.
1 is a perspective view showing a separation state of the stabilization assembly for preventing and preventing the flow of soil on the slope according to the present invention.
Figure 2 is a perspective view showing a combined state of the stabilization assembly for preventing and preventing the soil flow of the slope according to the present invention.
Figure 3 is a front view showing a coupled state of the stabilizing assembly for preventing and preventing the flow of soil on the slope according to the present invention.
Figure 4 is a perspective view showing the joint portion of the stabilizing assembly for preventing and preventing soil flow of the slope according to the present invention.
Figure 5 is a cross-sectional view showing the joint portion of the stabilizing assembly for preventing and preventing soil flow of the slope according to the present invention.
Figure 6 is a perspective view showing the installation of the stabilization assembly for preventing and preventing the flow of soil on the slope according to the present invention.
Figure 7 is a cross-sectional view showing the installation of the stabilization assembly for preventing and preventing the flow of soil on the slope according to the present invention.
Figure 8 is an enlarged cross-sectional view showing the installation of the stabilizing assembly for preventing and preventing the flow of soil on the slope according to the present invention.

이하, 첨부된 도면을 참조하면서 본 발명의 실시 예를 설명하면 다음과 같다.Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.

도 1 내지 도 8 에 나타낸 바와 같이, 본 발명의 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체(100)는 지면에 매설하되 상면에 지지공(122a)이 형성된 가이드돌출편(122)을 형성한 지지플레이트(120)와, 상기 지지플레이트 (120)의 상면에 안치시키되 가이드돌출편(122)이 외부로 돌출되게 하는 차단망(110), 및 상기 가이드돌출편(122)의 지지공(122a)에 끼워 결합하여 지지플레이트(120)의 상면에 차단망(110)을 고정시키는 지지봉(130)으로 구성한다.As shown in Figures 1 to 8, the stabilizing assembly 100 for preventing the soil flow and greening of the slope of the present invention is buried in the ground, but the guide protrusion piece 122 is formed with a support hole (122a) formed on the upper surface One support plate 120, a blocking net 110 to be placed on the upper surface of the support plate 120, the guide projection piece 122 to protrude to the outside, and the support hole 122a of the guide projection piece 122 It is composed of a support rod 130 to be coupled to the coupling to secure the blocking net 110 on the upper surface of the support plate 120.

상기 지지플레이트(120)는 좌우측에 측판(121)을 형성하되, 일측 측판(121)에는 결합돌기(121a)를 형성하고 타측에는 결합돌기(121a)와 대응되는 체결공(121b)을 형성한다.The support plate 120 forms a side plate 121 on the left and right sides, one side plate 121 forms a coupling protrusion 121a and the other side forms a coupling hole 121b corresponding to the coupling protrusion 121a.

여기서 지지플레이트(120)의 상면 좌우측에는 상향으로 가이드돌출편(122)을 형성하고 가이드돌출편(122)에 지지공(122a)을 형성하되 좌우 가이드돌출편(122) 사이에는 한 개 이상의 가이드돌출편(122)을 더 형성할 수 도 있으며 지지공(122a)의 대용으로 지지홈을 형성할 수 도 있다.Here, the guide protrusions 122 are upwardly formed on the left and right sides of the upper surface of the support plate 120, and the support holes 122a are formed in the guide protrusions 122, but at least one guide protrusion is disposed between the left and right guide protrusions 122. The piece 122 may be further formed, and a support groove may be formed in place of the support hole 122a.

나아가 지지플레이트(120)는 하단을 톱니형상으로 형성하여 지중앰설이 용이하도록 함이 바람직하다.Furthermore, the support plate 120 is preferably formed in the sawtooth shape of the lower end to facilitate the underground amplification.

더불어 지지플레이트(120)의 정면에는 다수개의 배수공(123)을 천공하여 형성한다.In addition, the front of the support plate 120 is formed by drilling a plurality of drain holes (123).

상기 지지봉(130)은 좌우로 연접되는 지지플레이트(120)의 가이드돌출편(122)에 형성된 지지공(122a)에 관통시켜 연접되는 지지플레이트(110)와 차단망(110)을 상호 결합시키도록 한다.The support rod 130 is to penetrate through the support hole 122a formed in the guide protrusion piece 122 of the support plate 120 which is connected to the left and right to couple the support plate 110 and the blocking net 110 to be connected to each other. do.

따라서 지지플레이트(120)의 상면과 지지봉(130) 사이에 차단망(110)이 위치하여 결합상태를 유지한다.Therefore, the blocking network 110 is positioned between the upper surface of the support plate 120 and the support rod 130 to maintain a coupled state.

더불어, 지지봉(130)의 양단에는 체결수단(131)을 결합하여 고정한다.In addition, the fastening means 131 is coupled to both ends of the support bar 130 to be fixed.

나아가, 연접되어 결합된 지지플레이트(120)의 전체를 하나의 지지봉(130)으로 연결함이 바람직하다.Furthermore, it is preferable to connect the whole of the support plate 120 coupled to one support rod 130.

이러한 본 발명의 작용을 설명하면 다음과 같다.Referring to the operation of the present invention as follows.

먼저, 생산공장 등 제작소에서 적정한 폭의 차단망(110) 이면에 횡방향으로 지지플레이트(120)를 위치시켜 차단망(110)의 외향으로 가이드돌출편(122)이 돌출되게 한 다음 돌출된 가이드돌출편(122)의 지지공(122a)에 지지봉(130)을 끼워 체결수단(131)으로 결합하여 차단망(110)에 지지플레이트(120)를 결합한다.First, by placing the support plate 120 in the transverse direction on the back surface of the blocking network 110 of the appropriate width in the production plant, such as the production plant so that the guide protrusion piece 122 protrudes outward of the blocking network 110, and then the protruding guide The support rods 130 are inserted into the support holes 122a of the protruding pieces 122 to be coupled with the fastening means 131 to couple the support plates 120 to the blocking network 110.

이러한 지지플레이트(120)가 결합된 차단망(110)을 권회시켜 시공하고자하는 장소로 이동하여 사면(10)의 상부에서부터 순차적으로 차단망(110)을 덮음과 동시에 지지플레이트(120)를 사면(10)의 지중으로 박아 매설한다.The support plate 120 is wound around the blocking net 110 coupled to the construction site to be moved to cover the blocking net 110 sequentially from the top of the slope 10 and at the same time the slope of the support plate 120 ( We embed in the ground of 10) and bury.

이때 차단망(110)에 결합된 지지플레이트(120)는 차단망(110)의 이면에 위치하게 되고 이로 인하여 순차적으로 차단망(110)을 사면(10)에 안정적으로 설치한다.At this time, the support plate 120 coupled to the blocking network 110 is located on the rear surface of the blocking network 110, thereby sequentially installing the blocking network 110 to the slope 10 in a stable manner.

따라서 사면을 신속하고 간편하게 안정화 할 수 있을 뿐만 아니라 노화 작업도 원활하게 진행할 수 있는 것이다.Therefore, not only can the slope be stabilized quickly and easily, but also the aging work can proceed smoothly.

또한 지지플레이트(120)는 좌우 횡으로 연결하여 그 길이를 필요에 따랄 연장할 수 있는 것으로 이 경우에는 지지봉(130)의 길이도 연장하여 한 개의 지지봉(130)으로 결하할 수 있도록 함이 바람직하다.In addition, the support plate 120 may be connected to the left and right side to extend the length as necessary, in this case, it is preferable to extend the length of the support rod 130 to be connected to one support rod 130. .

나아가 지지플레이트(120)는 횡으로 결합함이 일반적이나 종으로 또는 대가선상으로 결합하여 사용할 수 도 있다.
Furthermore, the support plate 120 is generally coupled laterally, but may be used by being coupled longitudinally or at cost.

10 : 사면 100 : 조립체
110 : 차단망 120 : 지지플레이트
121 : 측판 121a : 결합돌기
121b : 체결공 122 : 가이드돌출편
122a : 지지공 123 : 배수공
130 : 지지봉 131 : 체결수단
10: slope 100: assembly
110: blocking network 120: support plate
121: side plate 121a: coupling protrusion
121b: Fastener 122: Guide protrusion
122a: support hole 123: drain hole
130: support rod 131: fastening means

Claims (3)

지면에 매설하되 상면 좌우에 지지공(122a)이 형성된 가이드돌출편(122)을 돌출시켜 형성한 지지플레이트(120)와,
상기 지지플레이트 (120)의 상면에 안치시키되 가이드돌출편(122)이 외부로 돌출되게 하는 차단망(110), 및
상기 지지플레이트(120)의 가이드돌출편(122)에 끼워 체결수단(131)으로 결합하여 지지플레이트(120)의 상면에 차단망(110)을 고정시키는 지지봉(130)으로 구성한 것을 특징으로 하는 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체.
A support plate 120 embedded in the ground and formed by protruding the guide protrusion pieces 122 having the support holes 122a formed on the upper and left sides thereof;
Blocking network 110 to be placed on the upper surface of the support plate 120 to guide protrusion 122 to the outside, and
Slope, characterized in that consisting of a support rod 130 for fixing to the upper surface of the support plate 120 is coupled to the guide protrusion piece 122 of the support plate 120 by fixing means 131 to the upper surface of the support plate 120 Stabilization assembly to prevent soil flow and greening of soil.
제 1 항에 있어서,
상기 지지플레이트(120)는 좌우측에 측판(121)을 형성하되, 일측 측판(121)에는 결합돌기(121a)를 형성하고 타측에는 결합돌기(121a)와 대응되는 체결공(121b)을 형성하여 구성한 것을 특징으로 하는 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체.
The method of claim 1,
The support plate 120 is formed by forming the side plate 121 on the left and right sides, one side plate 121 to form a coupling protrusion 121a and the other side to form a fastening hole 121b corresponding to the coupling protrusion 121a. Stabilizing assembly for preventing and preventing the soil flow of the slope, characterized in that.
제 1 항에 있어서,
상기 지지플레이트(120)는 하단을 톱니형상으로 형성하고 정면에 다수개의 배수공(123)을 천공하여 구성한 것을 특징으로 하는 사면의 토사 흐름방지 방지 및 녹화를 위한 안정화 조립체.
The method of claim 1,
The support plate 120 is formed in the sawtooth shape of the lower end and stabilizing assembly for preventing the soil flow prevention and greening of the slope, characterized in that configured by drilling a plurality of drain holes 123 in the front.
KR1020100068849A 2010-07-16 2010-07-16 Stabilizing assembly for preventing soil-flow of slope and greening KR101018903B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100068849A KR101018903B1 (en) 2010-07-16 2010-07-16 Stabilizing assembly for preventing soil-flow of slope and greening

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100068849A KR101018903B1 (en) 2010-07-16 2010-07-16 Stabilizing assembly for preventing soil-flow of slope and greening

Publications (1)

Publication Number Publication Date
KR101018903B1 true KR101018903B1 (en) 2011-03-02

Family

ID=43938310

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100068849A KR101018903B1 (en) 2010-07-16 2010-07-16 Stabilizing assembly for preventing soil-flow of slope and greening

Country Status (1)

Country Link
KR (1) KR101018903B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101519230B1 (en) * 2013-10-30 2015-05-12 강원대학교산학협력단 Steel Slope Protection Fence
KR102028855B1 (en) 2019-02-14 2019-10-04 윤석균 Construction method for plant soil composition
KR102052366B1 (en) * 2018-12-28 2020-01-08 (주)리버앤텍 Stair block assembly

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5492606U (en) 1977-12-14 1979-06-30
JPH0383236U (en) * 1989-12-13 1991-08-23
JPH068446U (en) * 1992-07-08 1994-02-04 山形工業株式会社 Spacer for slope construction
JPH11140828A (en) 1997-11-13 1999-05-25 Hitachi Cable Ltd Falling stone prevention method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5492606U (en) 1977-12-14 1979-06-30
JPH0383236U (en) * 1989-12-13 1991-08-23
JPH068446U (en) * 1992-07-08 1994-02-04 山形工業株式会社 Spacer for slope construction
JPH11140828A (en) 1997-11-13 1999-05-25 Hitachi Cable Ltd Falling stone prevention method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101519230B1 (en) * 2013-10-30 2015-05-12 강원대학교산학협력단 Steel Slope Protection Fence
KR102052366B1 (en) * 2018-12-28 2020-01-08 (주)리버앤텍 Stair block assembly
KR102028855B1 (en) 2019-02-14 2019-10-04 윤석균 Construction method for plant soil composition

Similar Documents

Publication Publication Date Title
KR100813236B1 (en) The structure for a slope reinforcement and eco slope reinforcement method
KR100920027B1 (en) Vegetation Method Reinforced Soil Slopes with Geotextile Curtain Wall combined with steel buckel and anchor Nails
KR100770162B1 (en) Planting block establish structure
KR100860748B1 (en) Honey cell greening works
KR101018903B1 (en) Stabilizing assembly for preventing soil-flow of slope and greening
KR101055635B1 (en) The bio-stone structure for protecting slope and the construction method thereof
RU2582814C1 (en) Method for construction of landslide protection structure of biopositive
KR100764019B1 (en) Vertational soil slope structure and method
KR100899037B1 (en) Block assembly
KR20100047485A (en) Slope reinforcement structure with reinforce frame of dividing
RU2582813C1 (en) Landslide protection structure of biopositive design
KR100514576B1 (en) Slope stable construction method
KR100349863B1 (en) Revetment Block and Construction Method of Revetment for using thereof
JP3067077B2 (en) Revegetation of flooded slopes such as dam lakes, lakes and ponds
KR101219217B1 (en) Construction method for stabilizing slope for soil-flow and greening
KR100523965B1 (en) Landscape block
KR101131814B1 (en) Rhombic dam using light weight steel and rock
JP5108744B2 (en) Greening road surface forming block and greening road surface on which the block is laid
KR101012655B1 (en) Block for a breast wall can live plant
KR101012653B1 (en) Retaining wall structure and construnction method of the retaining wall structure
CN220284869U (en) Ecological barricade is restoreed to mine trace land vegetation
JP4767116B2 (en) Revegetation structure of the constructed wall with the machin block
KR102544952B1 (en) Cascading slope greening method
KR20100001503U (en) Latticed block works for stabilizing slope
KR101138192B1 (en) Afforestation method of vertical wall and shelf assembly thereof

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140214

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20150213

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20160219

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170201

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20180312

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20200210

Year of fee payment: 10