KR100887080B1 - Width variation compensation rolling method by coiling instantaneous tension of hot rolled steel sheet - Google Patents
Width variation compensation rolling method by coiling instantaneous tension of hot rolled steel sheet Download PDFInfo
- Publication number
- KR100887080B1 KR100887080B1 KR1020020053003A KR20020053003A KR100887080B1 KR 100887080 B1 KR100887080 B1 KR 100887080B1 KR 1020020053003 A KR1020020053003 A KR 1020020053003A KR 20020053003 A KR20020053003 A KR 20020053003A KR 100887080 B1 KR100887080 B1 KR 100887080B1
- Authority
- KR
- South Korea
- Prior art keywords
- rolling
- width
- steel sheet
- hot
- time
- Prior art date
Links
- 238000005096 rolling process Methods 0.000 title claims abstract description 117
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 66
- 239000010959 steel Substances 0.000 title claims abstract description 66
- 238000000034 method Methods 0.000 title claims abstract description 29
- 238000004804 winding Methods 0.000 claims abstract description 36
- 238000001816 cooling Methods 0.000 claims abstract description 18
- 238000005098 hot rolling Methods 0.000 claims abstract description 13
- 230000007812 deficiency Effects 0.000 claims abstract description 10
- 229910001209 Low-carbon steel Inorganic materials 0.000 claims abstract description 6
- 239000002360 explosive Substances 0.000 claims 1
- 238000005520 cutting process Methods 0.000 description 3
- 230000007423 decrease Effects 0.000 description 3
- 238000010438 heat treatment Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000002441 reversible effect Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/16—Control of thickness, width, diameter or other transverse dimensions
- B21B37/22—Lateral spread control; Width control, e.g. by edge rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2261/00—Product parameters
- B21B2261/02—Transverse dimensions
- B21B2261/04—Thickness, gauge
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2261/00—Product parameters
- B21B2261/20—Temperature
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control Of Metal Rolling (AREA)
Abstract
본 발명은 바의 폭압연시 폭부족부의 폭을 다른 부분의 폭보다 크게 제조하여 열간압연공정에서 권취공정에서 생기는 열연강판의 폭부족현상을 제거하는 열연 강판의 권취순간장력에 의한 폭변동량 보상압연방법에 관한 것으로, 바를 폭압연 및 두께압연하여 소정 두께(D) 및 폭(W)의 열연강판으로 만드는 열간압연공정에서 권취공정에서 권취가 완료된 강판의 과거 두께별 폭부족량 실적을 수집하여, 상기 폭부족분을 보상하는 폭 증가량(A)을 설정하고, 최종압연기 후면 목표온도에서 열간 평균변형저항이 가장 낮은 850℃까지 공냉되는데 걸리는 시간을 산출후, 상기 구간을 폭이 증가될 압연길이방향 위치로 설정하고, 증가부의 길이(L1)를 설정한 후, 상기 설정단계에서 설정된 값에 근거하여, 폭압연시 폭증가의 제어개시 시점(t1) 및 완료시점(t2)을 산출하여, 폭압연시 제어시점(t1)부터 완료시점(t2)까지의 범위에서 폭압연기의 폭을 상기 설정된 폭증가량(A)만큼 증가시켜 폭압연을 실시함으로서, 최종 생산된 코일에서 폭부족현상을 제거하는 것이다.The present invention provides a method for compensating the rolling fluctuation due to the instantaneous tension of the hot rolled steel sheet, which makes the width lacking part wider than the width of the other part during the rolling of the bar to remove the lack of width of the hot rolled steel sheet in the winding step in the hot rolling step In the hot rolling process of rolling and bar rolling the bar into a hot rolled steel sheet having a predetermined thickness (D) and width (W), collecting the width deficiency amount by the past thickness of the steel sheet is completed in the winding process, the width Set the width increase amount (A) to compensate for the deficiency, calculate the time taken for air cooling from the target temperature at the rear of the final mill to the lowest 850 ° C of the lowest average strain resistance, and then set the section to the rolling length direction position where the width will be increased. After setting the length L1 of the increasing part, the control start time t1 and the completion time t2 of the width increase at the time of the rolling rolling are determined based on the value set in the setting step. The width of the rolling mill is increased by the set width increasing amount (A) in the range from the control point (t1) to the completion point (t2) at the time of rolling. To remove it.
열간압연, 조압연, 다듬질 압연, 권취기, 변형저항, 극저탄소강Hot Rolled, Rough Rolled, Finish Rolled, Winding Machine, Strain Resistant, Ultra Low Carbon Steel
Description
도 1은 일반적인 열간압연공정의 전체 구성을 보인 공정도이다.1 is a process chart showing the overall configuration of a general hot rolling process.
도 2는 극저탄소강의 온도에 대한 변형저항 변화를 보인 그래프이다.2 is a graph showing a change in deformation resistance with respect to the temperature of the ultra low carbon steel.
도 3은 본 발명에 의한 폭 변동량 보상압연방법이 적용되는 조압연의 폭압연설비를 개략적으로 보인 블럭구성도이다.3 is a block diagram schematically showing a width rolling equipment of rough rolling to which the width variation compensation rolling method according to the present invention is applied.
도 4는 본 발명에 의한 열연 강판의 권취순간장력에 의한 폭변동량 보상압연방법을 보인 플로우챠트이다.Figure 4 is a flow chart showing a method for compensating rolling width fluctuation due to the instantaneous tension of the hot rolled steel sheet according to the present invention.
도 5는 과거실적데이타로부터 수집된 강판의 두께별 폭증가량을 보인 그래프이다.Figure 5 is a graph showing the increase in width by thickness of the steel sheet collected from the past performance data.
도 6은 강판(2.3mm 기준)이 목표온도에서 850℃까지 공냉되는데 걸리는 시간을 보인 그래프이다.6 is a graph showing the time it takes for the steel sheet (2.3 mm standard) to air-cool to 850 ° C from the target temperature.
도 7은 본 발명에 의하여 폭압연된 바의 상면도이다.
7 is a top view of the bar rolled according to the present invention.
본 발명은 바를 폭압연 및 두께압연하여 소정 두께(D) 및 폭(W)의 열연강판으로 만드는 열간압연공정에 관한 것으로, 보다 상세하게는 열권권취시 과장력에 의해 열연강판의 특정부분에 폭부족부가 발생하는 것을 보상하도록 폭압연시 폭부족분이 발생하는 부분의 폭을 증가시켜 권취시 해당 부분이 과장력에 의해 늘어나더라도 소정 폭을 유지하도록 하는 열연 강판의 권취순간장력에 의한 폭변동량 보상압연방법에 관한 것이다.The present invention relates to a hot rolling process in which a bar is rolled and rolled to make a hot rolled steel sheet having a predetermined thickness (D) and a width (W). Width compensating rolling method by rolling instantaneous tension of hot-rolled steel sheet which increases the width of the part where width shortage occurs during rolling in order to compensate for the shortage and maintains the predetermined width even if the corresponding part is increased by exaggerated force during winding It is about.
열간압연공정은 도 1에 도시된 바와 같이, 가열로(1)에서 슬라브(slab)를 소정 온도로 충분하게 균열시키고, 상기 가열로(1)에서 추출된 슬라브는 조압연기(2)로 이송되어, 소정의 두께 및 수요가의 요구하는 최종 폭을 갖는 바(bar)로 압연하고, 상기 조압연기(2)로부터 배출된 바는 다듬질압연기(3)로 치입되어, 수요가가 요구하는 최종 두께를 갖는 강판으로 압연된 후, 냉각설비(4)를 거쳐 권취기(5)에 코일로 권취하는 것이다.In the hot rolling process, as shown in FIG. 1, the slab is sufficiently cracked to a predetermined temperature in the
상기에서, 조압연공정(2)은 다듬질압연기(3)에서 압연하기 좋도록 가열로에서 충분히 균열된 슬라브를 소정의 바 두께(25~60mm) 및 수요가가 요구하는 최종폭을 갖도록 통상 3~9패스의 가역식 압연하는 공정으로서, 두께압연과정과 폭압연과정으로 나눌수있다.In the above, the rough rolling process (2) is usually 3 ~ to have a predetermined bar thickness (25 ~ 60mm) and the final width required by the slab sufficiently cracked in the heating furnace to roll in the finishing mill (3) 9 pass reversible rolling process, which can be divided into thickness rolling process and width rolling process.
상기 두께께압연은 수평압연기를 이용하여 실시하며 폭압연은 수직압연기를 이용하여 실시한다.The thickness rolling is performed using a horizontal rolling mill, and the width rolling is performed using a vertical rolling mill.
그리고, 다듬질압연공정(3)은 조압연기(2)에서 배출된 소정의 소재인 바를 수요가가 요구하는 최종적인 두께(1.0~25.4mm)로 압연하는 공정으로서, 통상 5~7개의 연속 압연기를 통해 고속(최대1500mpm)으로 이루어진다.In addition, the finishing
상기 다듬질압연공정(3)의 최종압연기를 통과한 열연강판은 냉각공정(4)을 거쳐 제품의 재질이 결정되고, 최종공정인 권취RL(5)에서 완제품인 열연코일이 만들어 진다.The hot rolled steel sheet that has passed through the final rolling mill of the finishing rolling process (3) is subjected to a cooling process (4) to determine the material of the product, and a final hot rolled coil is made in the winding RL (5).
그런데, 열간압연의 최종공정인 권취기(5)에서는 다듬질압연공정(3)의 최종압연기와 권취기의 사이에 적당한 장력을 부여하지 않으면 강판 톱부가 권취기에 진입시 생기는 순간적인 과장력에 의한 열연강판의 소정 부분에서 폭부족 현상이 발생하게 된다.By the way, in the
일반적으로, 열연강판의 평균변형저항은 온도가 낮아지면 낮아질수록 증가하는 현상을 나타내지만, 극저 탄소강의 경우는 온도가 낮아짐에도 불구하고 도 2에 도시한 바와 같이, 특정 온도구간(즉, 850℃부근)에서 열간 평균변형저항이 반대로 급격히 감소하는 현상이 나타난다. 보통 열간압연공정에서는 상기 온도구간(850℃부근)에서 권취가 이루어지기 때문에, 특히 극저탄소강의 경우, 열간 평균변형저항이 급격히 낮아지므로, 권취기에 진입시 생기는 순간적인 과장력에 의한 폭부족 현상이 더욱 크게 발생된다.In general, the average strain resistance of the hot-rolled steel sheet increases as the temperature decreases, but in the case of ultra-low carbon steel, the temperature decreases, as shown in FIG. In the near), the hot average strain resistance sharply decreases. In the hot rolling process, since the winding is performed in the above temperature range (near 850 ° C), especially in the case of the ultra low carbon steel, the average deformation resistance of the hot spring is drastically lowered. It is greatly generated.
그리고, 권취공정에서 열연강판의 선단부가 권취기(5)에 진입시 열연강판에 적당한 장력이 부여되지 않으면 열연코일의 권취형상이 나빠지므로, 반드시 일정 장력이 걸리도록 다듬질압연기중 최종압연기와 권취기의 속도를 조정하여 권취를 실시한다.
In addition, if the tip of the hot rolled steel sheet enters the
상기 권취기(5)의 속도는 다듬질압연기(3)의 최종압연기 속도보다 빠르게하여, 적당한 장력이 걸리도록 권취를 해야하나, 권취기의 속도가 너무 빠를 경우 과장력에 의한 폭부족 현상이 크게 나타나며 반면에 느릴 경우에는 느슨한 열연코일이 제조되므로 반드시 일정 장력이 걸리도록 권취해야 한다.The speed of the winder (5) is faster than the final mill speed of the finishing mill (3), the winding must be applied to take the appropriate tension, but if the speed of the winder is too fast, the shortage of the width due to the exaggeration appears large On the other hand, when it is slow, a loose hot rolled coil is manufactured so that it must be wound to take a certain tension.
따라서, 권취공정에서는 필연적으로 장력이 걸리므로, 강판의 선단부가 권취기(5)에 치입되면 권취기(5)와 최종압연기의 사이 강판에 갑작스럽게 장력이 걸리면서 해당 부분의 강판에 폭부족 현상이 발생된다. 이때문에, 종래 열연공정에서의 바의 전장에 걸쳐서 고객이 요구하는 폭보다 5~10mm 정도 증가한 폭으로 제조 하였기 때문에 고객이 강판을 재가공할시 증가한 폭만큼 전장에 걸쳐서 절단하여 사용할수 밖에 없었으며, 이로 인한 실수율 저하 및 절단시에 강판의 폭부족부분 절단불량으로 생산성이 떨어지는 등의 문제점을 초래하였다. Therefore, since the tension is inevitably applied in the winding process, when the tip of the steel sheet is inserted into the
본 발명은 상술한 종래의 문제점을 해결하기 위하여 제안된 것으로서, 그 목적은 바의 폭압연시 폭부족부의 폭을 다른 부분의 폭보다 크게 제조하여 열간압연공정에서 권취공정에서 생기는 열연강판의 폭부족현상을 제거하는 열연 강판의 권취순간장력에 의한 폭변동량 보상압연방법을 제공하는 것이다.
The present invention has been proposed in order to solve the above-mentioned problems, and an object thereof is to produce a width shortage portion at the time of the rolling of the bar larger than the width of other portions, thereby causing the shortage of the hot rolled steel sheet produced in the winding process in the hot rolling process. It is to provide a method for compensating rolling of the width fluctuation due to the instantaneous tension of the hot rolled steel sheet to remove the.
본 발명은 상술한 목적을 달성하기 위한 구성수단으로서, 바를 폭압연 및 두께압연하여 소정 두께(D) 및 폭(W)의 열연강판으로 만드는 열간압연공정에서 열연 강판의 권취 순간 장력에 의한 폭 변동량을 보상 압연하는 방법에 있어서,The present invention is a structural means for achieving the above object, the width fluctuation amount by the winding moment tension of the hot-rolled steel sheet in the hot rolling process of forming a hot rolled steel sheet of a predetermined thickness (D) and width (W) by rolling and thickness rolling the bar In the method of compensating rolling,
권취공정에서 권취가 완료된 강판의 과거 두께별 폭부족량 실적을 수집하여, 상기 폭부족분을 보상하는 폭 증가량(A)을 설정하는 단계;Collecting a width deficiency amount for each thickness of the steel sheet after winding in the winding process to set a width increase amount A to compensate for the deficiency;
최종압연기 후면 목표온도에서 열간 평균변형저항이 가장 낮은 850℃까지 공냉되는데 걸리는 시간을 산출후, 상기 공냉되는데 걸리는 시간, 다듬질 압연공정의 최종압연기 속도 및 다듬질압연공정의 최종압연기에서 권취기에 강판의 톱이 진입하기까지의 거리를 이용하여 폭이 증가될 압연길이방향 위치를 구하는 단계;After calculating the time taken for air cooling to 850 ° C, the lowest average strain resistance at the target temperature at the rear of the final rolling mill, the time taken for the air cooling, the final rolling speed of the finishing rolling process and the final rolling mill of the finishing rolling process. Obtaining a rolling length direction position in which the width is to be increased using the distance to the entry;
증가부의 길이(L1)를 설정하는 단계;Setting a length L1 of the increasing portion;
상기 압연길이방향 위치 설정단계 및 상기 증가부의 길이 설정단계에서 설정된 값에 근거하여, 폭압연시 폭증가의 제어개시 시점(t1) 및 완료시점(t2)을 산출하는 단계; 및Calculating a control start time t1 and a completion time t2 of the width increase at the time of rolling on the basis of the values set in the rolling length direction position setting step and the length setting step of the increasing part; And
폭압연시, 상기 산출단계에서 산출된 제어시점(t1)부터 완료시점(t2)까지 폭을 상기 설정된 폭증가량(A)만큼 증가시키는 단계;During width rolling, increasing the width from the control time t1 calculated in the calculating step to the completion time t2 by the set width increase amount A;
로 이루어지는 것을 특징으로 한다.Characterized in that consists of.
특히, 상기 폭 증가량 설정단계에서 폭증가량(A)은 (여기서, d는 최종압연후 귄취되는 강판의 최종두께이다)에 의하여 설정되고, 권취시 변동량을 보상하기 위해 폭을 증가시키는 부분의 압연길이방향 위치(P)는 In particular, the width increase amount (A) in the width increase amount setting step is (Where d is the final thickness of the steel sheet curled after the final rolling), and the rolling length direction position P of the portion increasing the width to compensate for the variation during winding is
(상기에서, L은 최종압연기에서 권취기까지의 거리, v는 최종압연기속도, β는 선진율, D는 강판최종두께, d는 바의 두께이고, T는 공냉시간이고, Tair는 공기온 도이고, Ttarget은 목표온도이고, α는 공냉계수이고, cp는 강판의 비열이고, γ는 강판의 밀도이다)에 의하여 설정되며, 제어시점(t1)은 에 의해 산출하고, 완료시점(t2)는 으로 산출하는 것을 특징으로 한다.
Where L is the distance from the final mill to the winding machine, v is the final rolling speed, β is the advance rate, D is the final thickness of the steel plate, d is the thickness of the bar, T is the air cooling time, and T air is the air temperature. T target is the target temperature, α is the air cooling coefficient, cp is the specific heat of the steel sheet, γ is the density of the steel sheet), and the control time point t1 is Calculated by, and the completion point t2 is It is characterized by calculating.
이하, 첨부한 도면을 참조하여 본 발명에 대해 구체적으로 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail the present invention.
도 3은 상기 도 1에 도시한 열간압연공정도에서, 본 발명과 관련된 조압연공정의 폭압연기를 개략적으로 보인 블럭도로서, 본 발명은 조압연기(10)의 전후면에 설치된 폭압연기(20)를 제어하여, 폭압연시 권취공정에서 발생하는 폭부족부의 폭을 증가시켜 도 7과 같은 형상의 바를 제조하도록 하는 것이다.FIG. 3 is a block diagram schematically showing the width rolling mill of the rough rolling process according to the present invention in the hot rolling process shown in FIG. 1, and the present invention provides a
즉, 바의 톱에서 테일까지의 전장부에서, 권취시 폭부족이 심하게 발생되는 부분을 추출하여, 해당 부분의 폭을 부족분만큼 증가시켜 폭압연한다.In other words, in the length portion of the bar from the top to the tail, the portion where the shortage of the width is severely generated at the time of winding is extracted, and the width of the corresponding portion is increased by the shortage to be rolled.
도 4는 본 발명에 의한 열연 강판의 권취순간장력에 의한 폭변동량 보상압연방법을 도시한 플로우챠트로서, 이를 참조하여 본 발명의 보상압연과정을 설명한다.4 is a flowchart illustrating a method for compensating for rolling width fluctuation due to the instantaneous tension of the hot rolled steel sheet according to the present invention, and the compensating rolling process of the present invention will be described with reference to the flowchart.
1)바의 폭 증가량 설정(단계401)1) Set the width increment of the bar (step 401)
조압연공정(2)에서 압연된 바의 폭의 증가량 설정은 후공정인 권취공정(5)에서 권취가 완료된 강판의 두께별 폭부족량 실적을 기준으로 설정한다. The increase amount of the width of the rolled bar in the rough rolling process (2) is set based on the result of the width deficiency amount for each thickness of the steel sheet wound up in the take-up step (5).
이 같은 폭 증가량 설정은 강판의 두께별로 행할수 있는데, 강판의 두께가 얇을수록 폭 증가량은 크고, 강판의 두께가 두꺼울수록 폭증가량은 작아지는 경향 을 나타낸다. 도 5는 과거 권취공정에서 수집된 폭부족부 실적에 근거하여 추출된 강판두께별 폭증가량을 그래프로 나타낸 것으로서, 이는 근사적으로 1차원의 X의 누승으로 표현될 수 있으며, 다음의 수학식 1과 같이 구해진다.The width increase amount can be set for each thickness of the steel sheet. The thinner the steel sheet, the larger the width increase, and the thicker the steel sheet, the smaller the width increase. FIG. 5 is a graph showing the amount of increase in steel sheet thickness extracted based on the performance of the lack of width collected in the past winding process, which may be expressed as a power of X in approximately one dimension, and is represented by
여기서, D는 최종압연후 귄취되는 강판의 최종두께이다)Where D is the final thickness of the steel sheet after the final rolling)
따라서, 상기 본 단계에서, 폭증가량 A는 최종압연기에서 출력되는 강판의 목표두께로부터 상기 수학식 1에 의해 설정된다.
Therefore, in the present step, the width increase amount A is set by the
2) 바의 폭증가부에 대한 압연 길이방향 위치 설정(단계402)2) Rolling longitudinal position setting for the width increasing part of the bar (step 402).
다음으로, 상기 설정된 폭증가분만큼 폭을 증가시킬 부분의 시작위치를 압연 길이방향을 기준으로 설정한다. 상기 압연길이방향 폭증가시작위치는 권취기(5) 진입시의 열간 평균변형저항이 가장 낮은 온도구간(850℃부근)의 압연 길이방향 위치로 설정한다. 이를 위해서, 강판이 진행하면서 공냉되는 공냉시간(T)을 먼저 산출한다.Next, the start position of the portion of which the width is to be increased by the set width increase is set based on the rolling length direction. The rolling length direction width increasing start position is set to the rolling longitudinal direction position of the temperature section (near 850 ° C.) where the hot average strain resistance at the time of entering the
상기 계산하는 공냉시간(T)은 다듬질압연공정(3)의 최종압연기 후면 목표온도에서 열간 평균변형저항이 가장 낮은 850℃까지 공냉되는데 걸리는 시간으로서, 예를 들어, 강판두께가 2.3mm의 경우 도 6에 도시한 바와 같은 1차원의 직선 그래프로 표현되고, 다음의 수학식 2와 같이 구해진다. The calculated air cooling time (T) is the time taken for air cooling from the target temperature of the final rolling mill rear surface of the finishing rolling process (3) to air cooling to 850 ° C. where the hot average strain resistance is the lowest. It is represented by the one-dimensional linear graph as shown in Fig. 6, and is obtained by the following expression (2).
(상기에서, T는 공냉시간이고, Tair는 공기온도이고, Ttarget은 목표온도이고, α는 공냉계수이고, cp는 강판의 비열이고, γ는 강판의 밀도이다)(In the above, T is the air cooling time, T air is the air temperature, T target is the target temperature, α is the air cooling coefficient, cp is the specific heat of the steel sheet, γ is the density of the steel sheet)
그 다음 폭증가부분의 압연길이방향 위치(P)를 상기에서 구해진 공냉시간(T)과 다듬질압연공정(3)의 최종압연기 속도(v) 및 다듬질압연공정(3)의 최종압연기에서 권취기(5)에 강판의 톱이 진입하기까지의 거리(L)를 이용하여 다음의 수학식 3과 같이 구한다.The rolling length direction position P of the width increasing portion is then obtained from the air cooling time T obtained above and the final rolling speed v of the finishing
상기에서, D는 강판의 두께, d는 바의 두께이고, L은 다듬질압연의 최종압연기에서 권취기에 강판의 선단부가 진입하기까지의 거리로, 통상 다듬질압연의 최종압연기에서 권취기까지의 거리에 권취기 진입후 초기장력이 걸리는 시점까지의 거리를 더한 값을 이용하는데, 본 발명에서는 다듬질압연의 최종압연기에서 권취기까지의 거리는 열연공장의 설비배치에 따라 결정되는 고정값이며, 권취기 진입후 초기장력이 걸리는 시점까지의 거리는 일반적으로 권취기 진입후 3~5바퀴 감기는 시점이므로 7~12m(권취기 초기경 0.762m ×π×3~5)를 사용하는 것이 바람직하며, β는 최종압연기의 압하율에 의해 결정되는 선진율로 통상 압하율의 25%를 사용하는 것이 바람직하다. In the above, D is the thickness of the steel sheet, d is the thickness of the bar, L is the distance from the final rolling mill of the finish rolling to the winding of the end of the steel sheet to the winder, usually the distance from the final rolling mill of the finishing rolling to the winder The distance from the initial tension to the time taken after the take-up is used. In the present invention, the distance from the final rolling mill to the take-up of the finishing rolling is a fixed value determined according to the arrangement of the hot rolling mill. Since the distance to the initial tension is generally 3 to 5 turns after entering the winder, it is preferable to use 7-12m (0.762m × pi × 3 ~ 5 initial winder diameter), and β is the final rolling mill. It is preferable to use 25% of the reduction ratio as the advance rate determined by the reduction ratio of.
3) 바의 폭 증가부 길이 설정(단계403)3) Setting the Width Increase Length of the Bar (Step 403)
증가부의 길이 설정은 상기 단계402에서 구해진 압연 길이방향 위치에서 최종압연이 완료된 열연강판의 길이기준으로 예를 들어 ±20m정도로 설정한다. 상기 ±20m는 경험치에 의해 임의로 산출된 값이다.
The length setting of the increasing part is set to, for example, about ± 20m based on the length of the hot rolled steel sheet in which the final rolling is completed at the rolling longitudinal position obtained in the
4) 제어개시 및 완료시점 산출(단계404)4) Control start and completion point calculation (step 404)
상기 설정된 압연 길이방향 위치와 증가부의 길이를 이용하여, 폭보상 제어개시 시점(t1)과 제어완료 시점(t2)을 다음의 수학식 4에 의해 구한다.The width compensation control start time t1 and the control completion time t2 are obtained by the following equation (4) using the set rolling longitudinal position and the length of the increase part.
상기에서, L1은 상기 단계403에서 설정된 증가부의 길이로 대략 ±20m이다.
In the above description, L1 is approximately ± 20 m in length of the increasing part set in
5) 폭보상 제어(단계405, 단계406)5) Width compensation control (
상기와 같이 제어데이타가 모두 구해지면, 상기 제어개시시점(t1)과 제어완료시점(t2)에 조압연공정의 폭압연기(20)의 폭을 설정치에서 상기 폭증가량(A)만큼 증가시켜, 폭압연을 실시한다. 즉, 폭압연시 상기 폭압연기(20)를 이용하여 바의 톱부로부터 거리 카운팅을 실시하여, 상기 설정된 제어개시시점(t1)에 도달하면, 폭압연기(20)의 폭을 설정치에서 상기 폭증가량(A)만큼 증가시키고 제어완료시점(t2)에 도달하면, 증가된 폭을 원래의 설정치로 감소시킨 후 바의 나 머지부분에 대해 폭압연을 실시한다.When all the control data is obtained as described above, the width of the
이에 의하여, 도 7에 도시한 바와 같이, 특정부분에서 폭이 큰 바가 제조된다.
As a result, as shown in FIG. 7, a large bar is manufactured at a specific portion.
다음은 상기 방법을 실제 적용한 실험예를 보인 것이다.The following shows an experimental example in which the above method is actually applied.
바의 폭압연시 폭의 증가량 및 압연 길이방향 위치와 증가부의 길이를 상기 수학식 1 내지 수학식 3을 이용하여 설정한다. 즉, 강판두께가 2.3mm인 경우, 바의 폭증가량은 상기 수학식 1에 의해, "19.083 x 2.3-1.3002 = 6.46mm" 이고, 최종압연기의 후단 목표온도가 910℃인 경우 공냉시간(T)이 수학식 2에 의해 "620 x 8000 x 2.3 / 1000 x ln((850 - 25) / (910 - 25)) / (-2.0 x 120) =3.337초"가 되고, 다듬질압연의 최종압연기에서 권취기까지의 거리가 120m, 권취기 진입후 초기장력이 걸리는 시점까지의 거리가 12m, 다듬질압연 최종압연기의 속도가 10m/초, 선진율이 4%, 바두께가 60mm 라고 하면, 압연 길이방향 위치는 수학식 3에 의해 "((120 + 12) - ((10 x (1.0 + 0.04)) x 3.337)) x (2.3 / 60.0)"로, 바 톱으로부터 3.73m 지점이 된다. 그리고, 증가부의 길이는 압연길이방향 위치에서 ±20m로 한다.The increase in width at the time of rolling the bar, the length in the rolling longitudinal direction, and the length of the increase part are set using the above equations (1) to (3). That is, when the steel plate thickness is 2.3mm, the width increase of the bar is "19.083 x 2.3 -1.3002 = 6.46mm" by
상기에서 구해진 압연 길이방향 위치와 증가부의 길이를 이용하여 제어개시 시점과 제어완료 시점을 구하면, 수학식 4에 의하여, 제어개시 시점은 "3.73 - (20 x (2.3 / 60.0))"로, 바의 톱으로부터 2.96m 경과한 시점이 되고, 제어완료 시점은 "[3.73 + (20 x (2.3 / 60.0))"로, 바 톱으로부터 4.50m 경과한 시점이 된다. When the control start time and the control completion time are obtained using the obtained rolling length position and the length of the increase part, the control start time is "3.73-(20 x (2.3 / 60.0))" 2.96m has elapsed from the top of the top, and the control completion point is "[3.73 + (20 x (2.3 / 60.0))", which is 4.50m after the bar top.
이에, 상기의 제어개시 시점(바 톱에서 2.96m 경과한 시점)에서 제어완료시점(바톱에서 4.50m 경과한 시점)까지 폭압연기를 제어하여 바의 폭을 6.46mm 만큼 증가시켜 폭압연을 실시하였다. 이렇게, 폭변동량을 보상한 바를 다듬질압연후 권취기에 권취한 결과, 코일의 폭부족 현상이 많이 개선되었다.
Therefore, the width of the bar was increased by 6.46mm by controlling the width rolling mill from the control start point (2.96m elapsed from the bar top) to the control completion point (4.50m elapsed from the bar top). . Thus, as a result of winding the winding machine after finishing rolling the compensation for the width variation, the shortage of the coil was much improved.
상술한 바와 같이, 본 발명은 조압연공정에서 소정 폭의 바를 제조할 때 권취시 과장력에 의한 열연강판의 폭부족량 및 폭부족부를 미리 예측하여 폭압연시 폭부족부에서 바의 폭을 폭부족량만큼 증가시켜, 강판의 폭부족부와 그 외 부분의 폭이 다른 바를 제조하여, 강판의 톱부가 권취기에 진입시 초기 과장력에 의한 폭부족 현상을 보상하며, 그에 따라 고객이 요구하는 목표 폭으로 정확하게 맞출 수 있어, 고객이 강판을 재가공할 시에 실수율 향상을 도모하고, 또한 절단시에 강판의 폭부족에 의한 절단불량을 최소화시켜 재가공 공정에서의 생산성을 향상시키는 효과가 있는 것이다.As described above, the present invention predicts the width deficiency and width deficiency of the hot rolled steel sheet due to the exaggeration force during winding when manufacturing the bar of the predetermined width in the rough rolling process, and the width of the bar in the width deficiency part during the width rolling by the width deflection amount. By increasing the width of the steel sheet and other portions of the bar, the width of the steel sheet is manufactured to compensate for the lack of width due to the initial exaggeration when the top portion of the steel sheet enters the winder, thereby accurately matching the target width required by the customer. It is possible to improve the error rate when the customer reprocesses the steel sheet, and to improve the productivity in the reworking process by minimizing the cutting defect due to the shortage of the steel sheet during the cutting.
특히, 본 발명은 열간 평균변형저항이 낮은 소재인 극저 탄소강의 경우 열연 강판의 폭부족 현상을 현저하게 줄이는 효과가 있다.In particular, the present invention has an effect of significantly reducing the shortage of the hot rolled steel sheet in the case of ultra-low carbon steel, which is a material having a low hot average strain resistance.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020020053003A KR100887080B1 (en) | 2002-09-03 | 2002-09-03 | Width variation compensation rolling method by coiling instantaneous tension of hot rolled steel sheet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020020053003A KR100887080B1 (en) | 2002-09-03 | 2002-09-03 | Width variation compensation rolling method by coiling instantaneous tension of hot rolled steel sheet |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20040020739A KR20040020739A (en) | 2004-03-09 |
KR100887080B1 true KR100887080B1 (en) | 2009-03-04 |
Family
ID=37325174
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020020053003A KR100887080B1 (en) | 2002-09-03 | 2002-09-03 | Width variation compensation rolling method by coiling instantaneous tension of hot rolled steel sheet |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100887080B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108421830B (en) * | 2018-02-27 | 2019-09-20 | 首钢京唐钢铁联合有限责任公司 | Self-adaptive control method and device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS629711A (en) * | 1985-07-09 | 1987-01-17 | Kawasaki Steel Corp | Controlling method for sheet width on hot rolling line of sheet |
KR100328930B1 (en) * | 1997-07-18 | 2002-11-13 | 포항종합제철 주식회사 | The hot rolling method for controlling the thickness and in the top end of strip |
-
2002
- 2002-09-03 KR KR1020020053003A patent/KR100887080B1/en active IP Right Grant
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS629711A (en) * | 1985-07-09 | 1987-01-17 | Kawasaki Steel Corp | Controlling method for sheet width on hot rolling line of sheet |
KR100328930B1 (en) * | 1997-07-18 | 2002-11-13 | 포항종합제철 주식회사 | The hot rolling method for controlling the thickness and in the top end of strip |
Also Published As
Publication number | Publication date |
---|---|
KR20040020739A (en) | 2004-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20130099091A (en) | Method for producing steel strips by continuous rolling or semi-continuous rolling | |
JP2010005655A (en) | Method and equipment for manufacturing hot-rolled steel plate | |
KR100887080B1 (en) | Width variation compensation rolling method by coiling instantaneous tension of hot rolled steel sheet | |
JP2002045908A (en) | Method and apparatus for controlling flatness of metal plate | |
JP4701762B2 (en) | Hot rolled steel sheet rolling method | |
US6237384B1 (en) | Method of and installation for shaping a metal strip | |
JP2005169454A (en) | Steel strip manufacturing equipment and method | |
JP6564209B2 (en) | Cold rolling equipment and manufacturing method for steel strip | |
JP4213434B2 (en) | Edge drop control device for rolling mill | |
JP6680284B2 (en) | Rolling mill leveling setting method, rolling mill leveling setting device, and steel plate manufacturing method | |
JP2005296973A (en) | Manufacturing method and apparatus for hot-rolled steel sheet | |
JP4055218B2 (en) | Stainless steel sheet manufacturing method | |
RU2768955C1 (en) | Method of producing strip metal and apparatus for implementing said method | |
JP2004261838A (en) | Manufacturing method of strip steel sheet in hot rolling line, strip steel sheet, apparatus, computer program, and computer-readable recording medium | |
JP2906988B2 (en) | Method of controlling width of steel sheet in hot rolling | |
JP2003025008A (en) | Control method for cooling metallic material to be rolled in hot rolling | |
JP2688390B2 (en) | Hot rolling method | |
JP4065251B2 (en) | Hot finish rolling method that prevents drawing wrinkles | |
KR100496824B1 (en) | Cooling control method of hot strip using intermediate pyrometer on run-out table | |
KR100990721B1 (en) | Cooling method of hot rolled material by continuous rolling and its device | |
JP3265972B2 (en) | Manufacturing method and equipment for thin hot rolled steel sheet | |
JP6152835B2 (en) | Steel strip temper rolling equipment and temper rolling method | |
KR100711386B1 (en) | Cooling Control Method Of Hot Rolled Steel Sheet | |
JP2002011502A (en) | Method and apparatus for manufacturing hot-rolled steel sheet | |
JPH07241612A (en) | Method for controlling width of steel sheet in hot rolling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20020903 |
|
PG1501 | Laying open of application | ||
A201 | Request for examination | ||
PA0201 | Request for examination |
Patent event code: PA02012R01D Patent event date: 20070831 Comment text: Request for Examination of Application Patent event code: PA02011R01I Patent event date: 20020903 Comment text: Patent Application |
|
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20080825 Patent event code: PE09021S01D |
|
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20090130 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20090226 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20090226 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
PR1001 | Payment of annual fee |
Payment date: 20120227 Start annual number: 4 End annual number: 4 |
|
FPAY | Annual fee payment |
Payment date: 20130204 Year of fee payment: 5 |
|
PR1001 | Payment of annual fee |
Payment date: 20130204 Start annual number: 5 End annual number: 5 |
|
FPAY | Annual fee payment |
Payment date: 20140227 Year of fee payment: 6 |
|
PR1001 | Payment of annual fee |
Payment date: 20140227 Start annual number: 6 End annual number: 6 |
|
FPAY | Annual fee payment |
Payment date: 20150225 Year of fee payment: 7 |
|
PR1001 | Payment of annual fee |
Payment date: 20150225 Start annual number: 7 End annual number: 7 |
|
FPAY | Annual fee payment |
Payment date: 20160226 Year of fee payment: 8 |
|
PR1001 | Payment of annual fee |
Payment date: 20160226 Start annual number: 8 End annual number: 8 |
|
FPAY | Annual fee payment |
Payment date: 20170224 Year of fee payment: 9 |
|
PR1001 | Payment of annual fee |
Payment date: 20170224 Start annual number: 9 End annual number: 9 |
|
FPAY | Annual fee payment |
Payment date: 20180226 Year of fee payment: 10 |
|
PR1001 | Payment of annual fee |
Payment date: 20180226 Start annual number: 10 End annual number: 10 |
|
FPAY | Annual fee payment |
Payment date: 20190226 Year of fee payment: 11 |
|
PR1001 | Payment of annual fee |
Payment date: 20190226 Start annual number: 11 End annual number: 11 |
|
FPAY | Annual fee payment |
Payment date: 20200225 Year of fee payment: 12 |
|
PR1001 | Payment of annual fee |
Payment date: 20200225 Start annual number: 12 End annual number: 12 |
|
PC1903 | Unpaid annual fee |
Termination category: Default of registration fee Termination date: 20211209 |