KR100397522B1 - a scaffolding - Google Patents
a scaffolding Download PDFInfo
- Publication number
- KR100397522B1 KR100397522B1 KR10-2000-0003317A KR20000003317A KR100397522B1 KR 100397522 B1 KR100397522 B1 KR 100397522B1 KR 20000003317 A KR20000003317 A KR 20000003317A KR 100397522 B1 KR100397522 B1 KR 100397522B1
- Authority
- KR
- South Korea
- Prior art keywords
- pipe
- scaffold
- building
- scaffolding
- coupled
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G2001/157—Extensible platforms, e.g. telescopic platforms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ladders (AREA)
- Movable Scaffolding (AREA)
Abstract
본 발명은 건축물의 외부 마감작업을 위해 건축물 둘레에 설치된 비계파이프에 장착되어 작업자가 딛고 활동할 수 있도록 받쳐주는 건축물 시공용 작업대를 개시한다. 본 발명은 서로 결합될 수 있는 플랜지와 채널을 대응하는 양쪽 단부에 각각 가지며 다수의 관통구멍이 형성된 판상의 내식성 금속제 발판과, 플랜지와 채널 사이의 발판 하면에 고정되며 일단부에 비계파이프의 한쪽 수평파이프에 걸리는 고정훅을 갖는 가이드와, 가이드에 이동 가능하게 결합되어 안쪽으로 탄성바이어스 되며, 비계파이프의 다른쪽 수평파이프에 탄성적으로 걸리는 가동훅을 구비한다. 발판의 한쪽 단부에 체결되는 나사부를 하단부에 가지며 상단부에 핸드레일용 체인 등이 결합될 수 있는 고리를 갖는 레일 서포트를 더 구비한다. 본 발명은 비계파이프에 대해 매우 간편하게 설치 및 해체할 수 있어 작업대의 설치/해체에 소요되는 인원과 시간을 크게 줄일 수 있으며, 작업대가 매우 견고하게 고정됨은 물론 안전용 난간에 의해 작업자의 추락위험을 효과적으로 억제할 수 있게되므로 건축물의 시공의 안정성과 편의성 향상 등에 기여하게 된다.The present invention discloses a workbench for building construction that is mounted on a scaffolding pipe installed around a building for external finishing work of a building to support an operator to step on it. The present invention is a plate of a corrosion-resistant metal scaffold having a plurality of through holes and a flange and a channel that can be joined to each other, respectively, and fixed to the lower surface of the scaffold between the flange and the channel, one end of the scaffold pipe at one end A guide having a fixed hook to the pipe and a movable hook coupled to the guide to be elastically biased inwardly and elastically hooked to the other horizontal pipe of the scaffolding pipe. It further includes a rail support having a screw portion coupled to one end of the foot plate and having a ring to which a chain for a handrail or the like can be coupled to the upper end. The present invention can be installed and dismantled very easily for the scaffolding pipe can greatly reduce the number of people and time required for installation / disassembly of the workbench, the workbench is very firmly fixed as well as the risk of falling of the operator by the safety railings. Since it can be effectively suppressed, it contributes to improving the stability and convenience of the construction of the building.
Description
본 발명은 각종 건축물의 시공시에 작업자가 안전하게 딛고 작업할 수 있도록 받쳐주기 위한 작업대에 관한 것으로서, 보다 상세하게는 2층 이상의 건축물의 외부 마감작업 등을 위해 건축물 둘레에 설치되어 일정한 활동공간을 형성하는 비계파이프에 설치되어 외부자재의 운반과 작업자의 시공을 가능하게 해주는 건축물 시공용 작업대에 관한 것이다.일반적으로 2층 이상의 일반 건축물이나 고층빌딩 및 탑 등의 높이의 구조물을 시공할 시 건축물의 외부 마감작업, 예컨대 시멘트 처리나 벽돌, 대리석 및 각종 패널부착 또는 페인트 등의 외부공사를 위해서는 그에 필요한 자재 및 공구의 운반과 함께 작업자가 소요의 작업을 안전하게 수행할 수 있도록 건축물의 외부에도 적절한 활동공간이 필요하게 된다. 이를 위해 통상 도 1에 도시한 바와 같이, 시공중인 건축물(B)의 둘레에는 다수의 파이프들이 소정형태로 결속된 비계파이프(1)를 설치하고, 이 비계파이프(1)의 수평파이프(2)들 사이에 다수의 각목(3)들을 적정간격으로 결속한 뒤, 각목(3)들 위에 합판(4)을 얹어 줌으로써 건축물(B)의 외부에 시공에 필요한 활동공간을 형성하고 있다.그런데, 이러한 종래의 작업대 구조물은 비계파이프(1)에 단순히 목재로 이루어진 각목(3)과 합판(4)을 설치한 것인 바, 다음과 같은 여러 가지 문제점이 있었다.첫째, 합판(4)과 이의 고임목으로 사용되는 각목(3)은 일반적으로 건설현장에서 노상 방치되고 있어 눈, 비에 노출될 뿐만 아니라 시멘트 등의 부석물들에 의해 오염되기 쉽고, 이로 인해 각목(3)과 합판(4)의 중량이 순수상태의 것보다 크게 증대되어 그 운반과 설치 및 해체 작업이 상당히 불편하였다. 또한, 합판(4)의 경우 부피도 상당하여 고층빌딩에의 운반설치시 바람 등의 외부요인에 큰 영향을 받을 수 있어 안전상의 문제도 있었다.둘째, 다수의 각목(3)을 비계파이프(1)에 철사 등의 와이어로 일일이 묶어주어야 하기 때문에 설치와 해체작업이 대단히 번잡하고 많은 인력과 시간이 소비되었다. 이로 인해 각목(3)을 단단히 고정하지 않을 우려가 있으며, 특히 각목(3)은 고정한다 하더라도 합판(4)의 경우 대개는 단순히 각목(3)위에 얹어놓은 상태에서 공사를 진행하고 있어 합판(4)의 낙하와 작업자의 추락사고를 비롯한 갖가지 안전사고가 빈발하는 문제도 있었다. 특히, 작업자의 추락을 억제할 어떠한 안전수단도 구비되어 있지 않아 작업자의 안전이 매우 취약하다.셋째, 각목(3)과 합판(4)은 목재로 이루어져 있으므로 설치와 해체시의 부주의 및 자재의 무게 등으로 인하여 파손되기 쉽고, 이 경우 폐기처분해야 되기 때문에 고비용임에도 불구하고 수명이 매우 짧아 비교적 큰 비용손실을 야기하였다.The present invention relates to a workbench for supporting a worker to safely work on the construction of various buildings, and more specifically, is installed around the building for the external finishing work of two or more buildings to form a constant activity space It is related to the workbench for building construction, which is installed in the scaffolding pipe to allow the transportation of external materials and the construction of workers.In general, when building a structure of two or more floors or a height such as a high-rise building and a tower, the exterior of the building For finishing works such as cement processing, brick, marble and various panel attachments or paints, there is a suitable activity space on the outside of the building to transport the necessary materials and tools, as well as to allow the worker to safely perform the required work. It is necessary. For this purpose, as shown in FIG. 1, a scaffold pipe 1 in which a plurality of pipes are bound in a predetermined form is installed around the building B under construction, and the horizontal pipe 2 of the scaffold pipe 1 is installed. After joining a plurality of pieces of wood (3) at appropriate intervals between the two, the plywood (4) is placed on the wood (3) to form an active space for construction outside the building (B). Conventional workbench structure is simply installed in the scaffolding pipe (1) of the wood lumber (3) and plywood (4), there were a number of problems as follows: First, the plywood (4) and its solid wood The lumber used 3 is generally left on the road in construction sites and is not only exposed to snow and rain, but also easily contaminated by pumices such as cement, so that the weight of the lumber 3 and plywood 4 is pure. It is greatly increased than in state and carries and installs it The demolition work was very uncomfortable. In addition, in the case of the plywood (4) is also large in volume, it can be greatly affected by external factors such as wind during transportation installation in high-rise buildings, there was also a safety problem. ), The installation and dismantling work was very complicated and a lot of manpower and time was consumed. For this reason, there is a possibility that the lumber 3 is not firmly fixed. Especially, even if the lumber 3 is fixed, in the case of the plywood 4, the construction is usually carried out simply by placing it on the lumber 3 so that the plywood 4 There were also frequent problems of various safety accidents, including the fall of) and the fall of the worker. In particular, the safety of the worker is very vulnerable because no safety measures are provided to suppress the fall of the worker. Third, the lumber 3 and plywood 4 are made of wood. It is easy to be damaged due to, for example, and in this case, it has to be disposed of, but despite the high cost, its life is very short, causing a relatively large cost loss.
본 발명은 상술한 종래의 문제점을 감안하여 안출된 것으로서, 눈, 비 등에 의한 상태변화가 거의 없으며 가볍고 튼튼하여 운반 등의 취급이 용이하면서도 쉽게 파손되지 않는 건축물 시공용 작업대를 제공함에 그 목적이 있다.본 발명의 다른 목적은, 비계파이프에 대해 매우 간편하게 설치 및 해체할 수 있음은 물론 견고한 고정상태를 유지할 수 있는 건축물 시공용 작업대를 제공하는 것이다.본 발명의 또 다른 목적은, 건축물 외부에 작업자의 안전한 활동공간을 구현하여 작업자의 추락사고를 최대한 억제할 수 있는 건축물 시공용 작업대를 제공하는 것이다.The present invention has been made in view of the above-mentioned conventional problems, and has an object of providing a workbench for building construction that is hardly damaged while being easily handled and transported because it is light and durable due to almost no state change due to snow or rain. Another object of the present invention is to provide a workbench for building construction that can be installed and dismantled very easily on a scaffolding pipe as well as being able to maintain a firm fixed state. It is to provide a workbench for building construction that can restrain worker's accident as much as possible by implementing a safe activity space.
도 1은 종래의 건축물 시공용 작업대를 나타낸 사시도,1 is a perspective view showing a workbench for a conventional building construction,
도 2는 본 발명에 의한 건축물 시공용 작업대를 나타낸 분해 사시도,2 is an exploded perspective view showing a workbench for building construction according to the present invention;
도 3은 도 2의 결합상태 단면도,3 is a cross-sectional view of the coupled state of FIG.
도 4a 내지 도 4d는 본 발명에 의한 건축물 시공용 작업대의 설치과정을 순차적으로 나타낸 발췌도들,도 5는 본 발명의 건축물 시공용 작업대가 설치 완료된 상태를 나타낸 사시도이다.4A to 4D are excerpts sequentially illustrating the installation process of the building construction work platform according to the present invention, and FIG. 5 is a perspective view showing a state in which the building work bench of the present invention is installed.
〈도면의 주요 부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>
11: 발판 12: (발판의) 플랜지13: (발판의) 채널 14: 가이드15 : (가이드의) 안내구멍 16: (가이드의) 고정훅18: 코일스프링 19: 가동훅20: 레일 서포트 21: (레일서포트의) 나사부22: (레일서포트의) 고리 24: 보조발판25: (보조발판의) 플랜지 26: 체인B: 건축물 P: 비계파이프P1: (비계파이프의) 수평파이프 P2: (비계파이프의) 수직파이프DESCRIPTION OF SYMBOLS 12 Scaffolding 12 Flange 13 Scaffolding Channel 14 Guide 15 Guide hole 16 Guiding hole Fixing hook 18 Coil spring 19 Moving hook 20 Rail support 21 Thread part 22 (rail support) Hook 24 (Rail support) 24: Auxiliary scaffold 25: (Auxiliary scaffold) Flange 26: Chain B: Building P: Scaffolding pipe P1: (Scaffolding pipe) Horizontal pipe P2: (Scaffolding pipe) Vertical pipe
이와 같은 목적들을 달성하기 위해 본 발명에 의한 건축물 시공용 작업대는, 건축물의 외부시공을 위해 그 둘레에 설치된 비계파이프에 장착되어 작업자가 딛고 활동할 수 있도록 받쳐주는 발판 작업대로서, 서로 결합될 수 있는 플랜지(flange)와 채널(channel)을 대응하는 양쪽 단부에 각각 가지며, 다수의 관통구멍이 형성된 판상의 내식성 금속제 발판; 플랜지와 채널 사이의 발판 하면에 고정되며, 일단부에 비계파이프의 한쪽 수평파이프에 걸리는 고정훅(hook)을 갖는 가이드(guide); 이 가이드에 이동 가능하게 결합되어 안쪽으로 탄성바이어스(elastic bias) 되며, 비계파이프의 다른쪽 수평파이프에 탄성적으로 걸리는 가동훅;을 구비하는 것을 특징으로 한다.이러한 본 발명의 한 바람직한 특징에 의하면, 발판의 한쪽 단부에 체결되는 나사부를 하단부에 가지며 상단부에 핸드레일(hand rail)용 체인등이 결합될 수 있는 고리를 갖는 레일 서포트(rail support)를 더 구비한다.이에 따라 본 발명은, 비계파이프에 대해 매우 간편하게 설치및 해체할 수 있어 작업대의 설치/해체에 소요되는 인원과 시간을 크게 줄일 수 있으며, 작업대가 매우 견고하게 고정됨은 물론 안전용 난간에 의해 작업자의 추락위험을 효과적으로 억제할 수 있게 되므로 건축물의 시공의 안정성과 편의성 향상 등에 효과가 있다.이와 같은 본 발명의 구체적 특징과 다른 이점들은 첨부된 도면을 참조한 이하의 바람직한 실시예의 설명으로 더욱 명확해질 것이다.도 2 내지 도 5에서, 본 발명에 의한 건축물 시공용 작업대(10)는, 건출물(B)의 외부 마감시공 등을 위해 건축물(B)의 둘레에 설치된 비계파이프(P)에 장착되어 작업자가 딛고 활동할 수 있도록 받쳐주는 것으로, 판상의 발판(11) 및 이 발판(11)에 설치되어 비계파이프(P)의 나란한 두 수평파이프(P1)에 탄성적으로 결합되는 훅(16)(19)으로 구성된다.발판(11)은 내식성이 우수한 금속으로 구성되거나, 또는 표면을 고내식성을 갖는 아연 등으로 도금 처리한 철제 강판으로 구성된다. 이러한 발판(11)은 장방형의 직사각형 형태로 구성되어 두 단변쪽이 비계파이프(P)의 나란한 수평파이프(P1)들에 각각 고정된다. 발판(11)의 장변쪽 한쪽 단부에는 플랜지(12)가 하방으로 절곡되어 형성되고, 다른쪽 단부에는 발판(11)의 가장자리가 하방으로 대략 U자형으로 절곡되어 채널(13)이 형성된다. 이같은 플랜지(12)와 채널(13)은 인접하는 다른 발판(11)의 채널(13) 및 플랜지(12)와 서로 중첩되도록 결합된다. 바람직하기로, 이와 같은 발판(11)에는 다수의 관통구멍(11a)들이 형성되는데, 이 관통구멍(11a)은 발판(11)의 무게를 경감시킴과 함께 작업자의 미끄럼짐을 억제하게 된다.한편, 발판(11)의 하면, 바람직하기로 그 플랜지(12)와 채널(13)의 중간에는 가이드(14)가 발판(11)의 길이방향을 따라 배치되어 용접 등으로 접합된다. 가이드(14)는 내부에 작동공간(14a)을 가지며, 그 하면에는 길이방향을 따라 안내구멍(15)이 적정길이로 형성된다. 이러한 가이드(14)의 한쪽 단부 하면에는 비계파이프(P)의 바깥쪽 수평파이프(P1)를 걸어주는 고정훅(16)이 용접 등으로 접합된다.그리고, 가이드(14)의 작동공간(14a)에는 피스톤(17)이 설치되어 코일스프링(18)에 의해 중앙쪽으로 탄성바이어스 되며, 이 피스톤(17)에는 비계파이프(P)의 안쪽 수평파이프(P1)를 탄성적으로 걸어주는 가동훅(19)이 가이드(14)의 안내구멍(15)을 통해 연결 고정된다. 이 때, 피스톤(17)과 가동훅(19)의 고정은 볼트로 체결할 수도 있고, 용접 등으로 접합할 수도 있다.여기서, 고정훅(16)과 가동훅(19)간의 간격은 비계파이프(P)의 두 수평파이프(P1)의 간격보다 작게 설정된다.한편, 바람직하기로 발판(11)의 단변쪽 일단, 즉 건축물(B)에 대해 바깥쪽에 위치하는 단부에는 예를 들어 체인(26) 등으로 이루어진 핸드레일을 지지해주기 위한 레일 서포트(20)가 더 설치된다. 이러한 레일 서프트(20)는 여러 가지 방법으로 발판(11)에 구비될 수 있는데, 도시된 바와 같이 발판(11)과 나사결합으로 체결됨으로써 필요에 따라 간편하게 분해 및 조립할 수 있도록 구성되는 것이 바람직하다. 이를 위해 발판(11)의 외측단부에는 가이드(14)를 관통하도록 체결구멍(11b)이 형성되어 가이드(14)의 하면에 너트(23)가 용접되고, 레일 서포트(20)의 하단부에는 발판(11)의 체결구멍(11b)를 통해 가이드(14)의 너트(23)에 나사결합되는 나사부(21)가 형성된다. 그리고, 레이 서포트(20)의 상단부에는 체인(26)을 걸어주기 위한 고리(22)가 구비된다.한편, 본 발명은 이와 같은 구성만으로도 작업자의 시공에 필요한 활동공간을 안전하게 구현할 수 있으나, 보다 바람직하기로는 도 5에 도시된 바와 같은 판상의 보조발판(24)을 더 구비할 수 있다. 이러한 보조발판(24)은 비계파이프(P)의 수직파이프(P2)에 의한 두 발판(11)간의 틈새를 막아주기 위한 것으로, 다수의 관통구멍(24a)이 형성되고, 그 장변쪽 한쪽 단부에는 발판(11)의 채널(13)에 결합되는 플랜지(25)가 하방으로 절곡되어 형성된다. 이 같은 보조발판(24) 역시 발판(11)과 마찬가지로 내식성의 금속이나 내식성 금속이 도금처리된 철제 강판으로 구성된다.다음, 이와 같이 구성된 본 발명에 의한 건축물 시공용 작업대(10)를 비계파이프(P)에 설치하는 방법을 도 4를 참조하여 설명하기로 한다.먼저, 도 4a에 도시한 바와 같이 가동훅(19)을 비계파이프(P)의 안쪽 수평파이프(P1)에 걸어준 뒤, 발판(11)을 바깥쪽으로 당긴다. 그러면, 피스톤(17)이 코일스프링(18)을 압축하면서 후퇴하게 되고, 이에 따라 발판(11)이 상대적으로 바깥쪽으로 전진하여 고정 및 가동훅(16)(19)간의 간격이 비계파이프(P)의 두 수평파이프(P1)의 간격보다 넓어지게 된다.이 상태에서, 도 4b에 도시한 바와 같이 가동훅(19)이 결합된 비계파이프(P)의 안쪽 수평파이프(P1)를 중심으로 하여 발판(11)의 외측 단부를 하방으로 회전시켜 가이드(14)이 고정훅(16)을 바깥쪽 수평파이프(P1)에 걸어준다. 그러면, 두 훅(16)(19)이 압축스프링(18)의 복원탄성에 의해 비계파이프(P)의 두 수평파이프(P1)에 탄성적으로 걸리게 됨으로써 발판(11)이 비계파이프(P)에 간단하면서도 안정되게 장착된다.이와 같은 방법으로 도 5에 도시한 바와 같이, 다수의 발판(11)을 비계파이프(P)의 수평파이프(P1)에 연속적으로 설치함으로써 작업자의 시공에 필요한 활동공간을 건축물(B)의 외부에 형성하게 되는데, 이 때 인접하는 두 발판(11)의 플랜지(12)와 채널(13)은 서로 중첩되도록 결합됨으로써 각 발판(11)은 일체적으로 연결 지지된다.다음, 이와 같이 발판(11)이 비계파이프(P)에 장착되고 나면, 도 4c에 도시한 바와 같이 발판(11)의 체결구멍(11b)에 레일 서포트(20)의 나사부(21)를 관통시켜 가이드(14)의 너트(23)에 체결함으로써 레일 서포트(20)를 각 발판(11)에 설치한다.이어서, 도 4d에 도시한 바와 같이 발판(11)에 설치된 각 레일 서포트(20)의 고리(22)에 체인(26)을 걸어 핸드레일을 구성해줌으로써 작업자의 추락위험을 억제하여 안전을 도모하게 된다.그리고, 비계파이프(P)의 수직파이프(P2)에 의해 벌어진 두 발판(11) 사이의 틈새는 도 5에 도시한 바와 같이, 보조발판(24)으로 막아준다. 이 때 보조발판(24)은 그 플랜지(25)가 어느 한 발판(11)의 채널(13)에 결합되므로 쉽게 이탈되지 않는다.한편, 작업대(10)의 해체는 전술한 장착의 역순으로 진행된다.In order to achieve the above objects, the building construction work platform according to the present invention is a scaffold work platform mounted on a scaffolding pipe installed around the building for external construction of the building to support an operator to step on, a flange that can be coupled to each other. a plate-shaped, corrosion-resistant metal scaffold having a flange and a channel at both ends thereof, each of which has a plurality of through holes; A guide fixed to the bottom surface of the scaffold between the flange and the channel, and having a fixed hook hooked to one horizontal pipe of the scaffold pipe at one end thereof; And a movable hook which is movably coupled to the guide and is elastically biased inwardly and elastically hooked to the other horizontal pipe of the scaffolding pipe. According to one preferred feature of the present invention, And a rail support having a threaded portion fastened to one end of the scaffold and having a ring to which a chain for a hand rail or the like can be coupled to the upper end thereof. Very easy installation and dismantling of pipes can greatly reduce the number of people and time required for installation and disassembly of the workbench. The workbench is very firmly fixed and the safety railing can effectively suppress the fall of the worker. Therefore, it is effective in improving the stability and convenience of construction of the building. The points will become more apparent from the following description of the preferred embodiment with reference to the accompanying drawings. In Figures 2 to 5, the building construction work platform 10 according to the present invention, for the external finishing of the building (B), etc. Mounted on the scaffolding pipe (P) installed around the building (B) to support the operator to step on, the plate-shaped scaffold (11) and the scaffold pipe (P) installed side by side two horizontal It is composed of hooks 16 and 19 that are elastically coupled to the pipe P1. The scaffold 11 is made of a metal having excellent corrosion resistance, or is made of an iron steel plate whose surface is plated with zinc or the like having high corrosion resistance. It is composed. The scaffold 11 is configured in a rectangular rectangular shape and two short sides thereof are respectively fixed to side-by-side horizontal pipes P1 of the scaffolding pipe P. The flange 12 is bent downward at one end of the long side of the foot plate 11, and the edge of the foot plate 11 is bent substantially U-shaped downward at the other end to form a channel 13. Such a flange 12 and a channel 13 are coupled to overlap each other with the channel 13 and the flange 12 of another adjacent footrest 11. Preferably, a plurality of through holes 11a are formed in the footrest 11, which reduces the weight of the footrest 11 and suppresses the sliding of the worker. The lower surface of the scaffold 11, preferably between the flange 12 and the channel 13, the guide 14 is disposed along the longitudinal direction of the scaffold 11 is joined by welding or the like. The guide 14 has an operating space 14a therein, and the lower surface of the guide 14 has a proper length along the longitudinal direction. A fixed hook 16 for hanging the outer horizontal pipe P1 of the scaffolding pipe P is joined to the lower surface of one end of the guide 14 by welding or the like. Then, the operating space 14a of the guide 14 is joined. The piston 17 is installed in the center is elastically biased toward the center by the coil spring (18), the movable hook (19) for elastically hanging the inner horizontal pipe (P1) of the scaffold pipe (P) to the piston (17) The guide hole 15 of the guide 14 is connected and fixed. At this time, the piston 17 and the movable hook 19 may be fastened by bolts, or may be joined by welding or the like. Here, the interval between the fixed hook 16 and the movable hook 19 may be a scaffolding pipe ( It is set smaller than the distance between the two horizontal pipes P1 of P). On the other hand, the chain 26 is preferably provided at one end of the short side of the scaffold 11, that is, at the end located outside the building B. Rail support 20 for supporting the handrail made of a back is further installed. The rail support 20 may be provided in the footrest 11 in various ways, and is preferably configured to be easily disassembled and assembled as necessary by being fastened to the footrest 11 by screwing as shown. . To this end, a fastening hole 11b is formed at the outer end of the foot plate 11 to penetrate the guide 14 so that the nut 23 is welded to the lower surface of the guide 14, and the foot plate ( A threaded portion 21 screwed into the nut 23 of the guide 14 is formed through the fastening hole 11b of the 11. In addition, the upper end of the ray support 20 is provided with a hook 22 for hanging the chain 26. On the other hand, the present invention can implement the activity space required for the construction of the worker with only such a configuration, but more preferably Below may further include a plate-shaped auxiliary scaffold 24 as shown in FIG. The auxiliary scaffold 24 is to prevent the gap between the two scaffold 11 by the vertical pipe (P2) of the scaffold pipe (P), a plurality of through holes (24a) is formed, one end of the long side The flange 25 coupled to the channel 13 of the scaffold 11 is bent downward. Like the scaffold 11, the auxiliary scaffold 24 is made of a steel plate coated with a corrosion-resistant metal or a corrosion-resistant metal. Next, the work bench 10 for building construction according to the present invention configured as described above has a scaffolding pipe ( The method of mounting on P) will be described with reference to Fig. 4. First, as shown in Fig. 4A, the movable hook 19 is hung on the inner horizontal pipe P1 of the scaffolding pipe P, and then the scaffolding is performed. Pull out (11). Then, the piston 17 is retracted while compressing the coil spring 18, so that the footrest 11 is moved outward relative to the gap between the fixed and movable hooks (16) and (19) scaffolding pipe (P). In this state, the scaffolding centers around the inner horizontal pipe P1 of the scaffolding pipe P to which the movable hook 19 is coupled, as shown in FIG. 4B. The outer end of the (11) is rotated downward so that the guide 14 hooks the fixing hook 16 to the outer horizontal pipe P1. Then, the two hooks 16 and 19 are elastically caught by the two horizontal pipes P1 of the scaffolding pipe P by the restoring elasticity of the compression spring 18, so that the scaffold 11 is connected to the scaffolding pipe P. In this way, as shown in FIG. 5, a plurality of scaffolds 11 are continuously installed in the horizontal pipe P1 of the scaffolding pipe P to provide an active space for the construction of the worker. It is formed on the outside of the building (B), the flange 12 and the channel 13 of the two adjacent scaffold 11 is coupled to overlap each other so that each scaffold 11 is integrally connected and supported. After the footrest 11 is mounted on the scaffolding pipe P as described above, the threaded portion 21 of the rail support 20 passes through the fastening hole 11b of the footrest 11 as illustrated in FIG. 4C. The rail support 20 is attached to each scaffold 11 by fastening to the nut 23 of 14. Next, FIG. 4D As shown in the figure, the chain 26 is hooked to the hooks 22 of the rail supports 20 installed on the footrest 11 to form a handrail, thereby reducing the risk of falling of the operator and promoting safety. The gap between the two scaffolds 11 opened by the vertical pipe P2 of the pipe P is blocked by the auxiliary scaffold 24, as shown in FIG. At this time, the auxiliary scaffold 24 is not easily detached because the flange 25 is coupled to the channel 13 of any one scaffold 11. Meanwhile, the disassembly of the work table 10 proceeds in the reverse order of the above-described mounting. .
이상에서 설명한 바와 같이 본 발명에 의하면, 작업대가 내식 처리된 다공성 금속판으로 구성되므로 눈이나 비에 영향받지 않음은 물론 가벼우면서도 매우 튼튼하여 운반시 등에 취급이 간편할 뿐만 아니라 목재인 종래에 비해 수명이 획기적으로 연장된다.특히, 비계파이프에 대해 매우 간편하게 설치 및 해체할 수 있어 작업대의 설치/해체에 소요되는 인원과 시간을 크게 줄일 수 있고, 작업대가 비계파이프에 매우 견고하게 고정됨은 물론 안전용 핸드레일이 구비되므로 작업자의 추락위험을 효과적으로 억제할 수 있게 된다.그러므로 본 발명은, 건축물의 시공의 안정성과 편의성 등은 향상시키고 비용을 절감할 수 있는 매우 우수한 효과가 있다.As described above, according to the present invention, since the work table is composed of a corrosion-resistant porous metal plate, it is not affected by snow or rain, and is light and very strong, so that it is easy to handle during transportation and has a long service life compared to the conventional wood. In particular, the installation and dismantling of scaffolding pipes can be done very easily, greatly reducing the number of people and time required for installation and disassembly of the workbench, and the workbench is very firmly fixed to the scaffolding pipes as well as the safety hand. Since the rail is provided, the fall risk of the worker can be effectively suppressed. Therefore, the present invention has a very excellent effect of improving the stability and convenience of construction of the building and reducing the cost.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2000-0003317A KR100397522B1 (en) | 2000-01-20 | 2000-01-20 | a scaffolding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2000-0003317A KR100397522B1 (en) | 2000-01-20 | 2000-01-20 | a scaffolding |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020000025167U Division KR200226552Y1 (en) | 2000-08-29 | 2000-08-29 | a scaffolding |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20000024129A KR20000024129A (en) | 2000-05-06 |
KR100397522B1 true KR100397522B1 (en) | 2003-09-13 |
Family
ID=19641044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2000-0003317A KR100397522B1 (en) | 2000-01-20 | 2000-01-20 | a scaffolding |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100397522B1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101588984B1 (en) | 2014-12-29 | 2016-01-28 | 김현식 | Fixing apparatus of scaffold and structure body |
KR101588978B1 (en) | 2014-11-24 | 2016-01-28 | 김현식 | Fixing apparatus of scaffold and structure body |
KR101588868B1 (en) | 2014-11-24 | 2016-02-12 | 김현식 | Fixing apparatus of scaffold and structure body |
KR20160061924A (en) | 2016-01-05 | 2016-06-01 | 김현식 | Clamp device for fixing device of scaffold |
KR20160061922A (en) | 2016-01-05 | 2016-06-01 | 김현식 | Connection device for fixing device of scaffold and fixing device of scaffold |
KR20160061923A (en) | 2016-01-05 | 2016-06-01 | 김현식 | Suspension device for fixing device of scaffold |
KR20180026208A (en) | 2016-09-02 | 2018-03-12 | 삼성중공업 주식회사 | Scaffolding |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0893215A (en) * | 1994-09-26 | 1996-04-09 | Tatsuo Ono | Scaffolding board |
KR960038017A (en) * | 1995-04-14 | 1996-11-19 | 다츠오 오노 | Scaffolding |
JPH09151599A (en) * | 1996-06-26 | 1997-06-10 | Nikko Co Ltd | Plinth for scaffolding |
JPH10266556A (en) * | 1997-03-25 | 1998-10-06 | Chuo Build Ind Co Ltd | Scaffolding board |
JPH11343732A (en) * | 1998-06-01 | 1999-12-14 | Nitto Kogyo:Kk | Toe plate for scaffold board of temporary scaffold |
-
2000
- 2000-01-20 KR KR10-2000-0003317A patent/KR100397522B1/en not_active IP Right Cessation
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0893215A (en) * | 1994-09-26 | 1996-04-09 | Tatsuo Ono | Scaffolding board |
KR960038017A (en) * | 1995-04-14 | 1996-11-19 | 다츠오 오노 | Scaffolding |
JPH09151599A (en) * | 1996-06-26 | 1997-06-10 | Nikko Co Ltd | Plinth for scaffolding |
JPH10266556A (en) * | 1997-03-25 | 1998-10-06 | Chuo Build Ind Co Ltd | Scaffolding board |
JPH11343732A (en) * | 1998-06-01 | 1999-12-14 | Nitto Kogyo:Kk | Toe plate for scaffold board of temporary scaffold |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101588978B1 (en) | 2014-11-24 | 2016-01-28 | 김현식 | Fixing apparatus of scaffold and structure body |
KR101588868B1 (en) | 2014-11-24 | 2016-02-12 | 김현식 | Fixing apparatus of scaffold and structure body |
KR101588984B1 (en) | 2014-12-29 | 2016-01-28 | 김현식 | Fixing apparatus of scaffold and structure body |
KR20160061924A (en) | 2016-01-05 | 2016-06-01 | 김현식 | Clamp device for fixing device of scaffold |
KR20160061922A (en) | 2016-01-05 | 2016-06-01 | 김현식 | Connection device for fixing device of scaffold and fixing device of scaffold |
KR20160061923A (en) | 2016-01-05 | 2016-06-01 | 김현식 | Suspension device for fixing device of scaffold |
KR20180026208A (en) | 2016-09-02 | 2018-03-12 | 삼성중공업 주식회사 | Scaffolding |
Also Published As
Publication number | Publication date |
---|---|
KR20000024129A (en) | 2000-05-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP7547047B2 (en) | Safety Rail System | |
US6666298B2 (en) | Hanging scaffold support | |
US20210238872A1 (en) | Temporary safety railing system and method | |
US6722468B2 (en) | Suspended scaffolding system | |
KR100397522B1 (en) | a scaffolding | |
CN211775640U (en) | Modular staircase regularization steel protection passageway | |
US20110278526A1 (en) | Reusable temporary safety rail post and extension kit | |
KR20090025737A (en) | A prefabricated foothold | |
KR200226552Y1 (en) | a scaffolding | |
CN217323154U (en) | Pedestrian passageway for climbing lower structure of frame to tower crane | |
KR200428125Y1 (en) | Scaffolding structure | |
EP1647512B1 (en) | Working scaffold system of elevator | |
CN115726558A (en) | Assembled construction platform | |
JP3950800B2 (en) | Suspension scaffold | |
KR101103293B1 (en) | Falling thing prevention apparatus for gang form | |
US20040020713A1 (en) | Building-mountable construction safety platform apparatus and method | |
KR100901016B1 (en) | Safety bracket to external wall scaffolding for a structure | |
KR200213539Y1 (en) | Frame of safety workbench | |
EP1854940A1 (en) | Scaffolding | |
CA2704888A1 (en) | Reusable temporary safety rail post and extension kit | |
CN216109850U (en) | Practical special guardrail for high-altitude edge-facing protection | |
JPH0874361A (en) | Fixture for mounting external wall material and method of laminating high-and-medium-rise building by using the same | |
CN217352125U (en) | Bailey bridge builds with channel-section steel assembled steel landing stage railing | |
KR102355983B1 (en) | apparatus | |
CN210420883U (en) | Bridge construction crossbeam construction operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
N231 | Notification of change of applicant | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20070228 Year of fee payment: 4 |
|
LAPS | Lapse due to unpaid annual fee |