KR100357828B1 - An Integrated Head Area Design of a Nuclear Reactor - Google Patents
An Integrated Head Area Design of a Nuclear Reactor Download PDFInfo
- Publication number
- KR100357828B1 KR100357828B1 KR1019990019245A KR19990019245A KR100357828B1 KR 100357828 B1 KR100357828 B1 KR 100357828B1 KR 1019990019245 A KR1019990019245 A KR 1019990019245A KR 19990019245 A KR19990019245 A KR 19990019245A KR 100357828 B1 KR100357828 B1 KR 100357828B1
- Authority
- KR
- South Korea
- Prior art keywords
- reactor
- cylinder
- cable
- support
- air
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C13/00—Pressure vessels; Containment vessels; Containment in general
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Plasma & Fusion (AREA)
- General Engineering & Computer Science (AREA)
- High Energy & Nuclear Physics (AREA)
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
본 발명은 가압 경수로형 원자로에서 원자로 상부 구조물을 일체에 가깝게 설계하여 핵연료 재장전시 원자로 용기덮개를 제거하는데 소요되는 시간을 단축시켜 발전소의 운전정지 기간을 단축시키고, 작업자의 방사선 피폭 량을 줄이도록 한 일체형 원자로 상부구조물에 관한 것이다.The present invention is designed to close the upper structure of the reactor in a pressurized water reactor reactor to reduce the time required to remove the reactor vessel cover when reloading the fuel to shorten the shutdown period of the power plant, reducing the radiation exposure of the operator A one-piece reactor superstructure.
종래의 원자로에서는 핵연료를 재장전하기 위하여 원자로 상부구조물을 제거하거나 설치하기 위하여는 다단계의 작업공정을 수행하여야 하므로 발전소의 운전정지기간이 매우 많이 소요되고 아울러 방사선에 피폭될 우려가 많았다.In the conventional nuclear reactors, a multi-stage work process must be performed to remove or install the reactor superstructure in order to reload the nuclear fuel, and thus, the operation shutdown period of the power plant is very long and there is a risk of being exposed to radiation.
본 발명에서는 가압 경수로형 원자로의 상부에 위치하며 내부에 다수의 제어봉 구동장치가 설치되고 핵연료 재장전시 분해하여 인양가능하도록 다수의 스터드볼트(111)에 의해 원자로 본체에 고정되는 원자로 용기덮개(110)을 포함하여 일체로 형성된 원자로 상부구조물(100)에 있어서, 상기 원자로 상부구조물(100)은 상기 원자로 덮개(110)의 위에 설치되는 환형 지지판(120)과; 상기 환형 지지판(120) 위에 설치되어 냉각공기 유동경로(133)를 형성하도록 외부격벽(131)과 내부격벽(132)으로 된 이중 원통 실린더형 구조물(130)과; 상기 이중 원통실린더형 구조물(130)을 형성하는 외부격벽(131)과 내부격벽(132)을 관통하여 실린더 외부의 찬 공기를 실린더 내부로 유입시키도록 하는 다수의 공기 흡입구(140) 및; 상기 실린더 내부로 유입된 공기가 상기 냉각공기 유동경로(133)로 유입되면서 제어봉구동장치(170)을 냉각하도록 하는 공기통로(134)와; 상기 이중 원통실린더형 구조물(130)의 상부에 설치되어 유사시 제어봉 구동장치(170)의 비산을 방지하도록 하는 비산물 방호판(150)과; 상기 비산물 방호판(150) 위에 설치되어 실린더 내부의 공기를 불어내도록 설치된 다수의 냉각팬(160)과; 상기 원자로 상부구조물(100)에 전력을 공급하며, 원자로 내에 설치된 계측기에서 나오는 신호전달 전선을 지지하도록 벽체(300)에 고정 설치되고, 필요시 벽체(300)쪽으로 인양되도록 설치된 케이블 설치부재(200)로 구성됨을 특징으로 하는 것임.In the present invention, located in the upper portion of the pressurized light-water reactor reactor, a plurality of control rod drive device is installed therein and the reactor vessel cover 110 is fixed to the reactor body by a plurality of stud bolts 111 to be disassembled and salvaged when the fuel is reloaded. A reactor upper structure (100) integrally formed, including, the reactor upper structure (100) includes an annular support plate (120) installed on the reactor cover (110); A double cylindrical cylindrical structure 130 installed on the annular support plate 120 and having an outer partition 131 and an inner partition 132 to form a cooling air flow path 133; A plurality of air inlets 140 penetrating the outer partition 131 and the inner partition 132 forming the double cylindrical cylinder-type structure 130 to allow cold air outside the cylinder to flow into the cylinder; An air passage 134 for cooling the control rod driving device 170 while the air introduced into the cylinder flows into the cooling air flow path 133; A scattering protection plate 150 installed above the double cylindrical cylinder-type structure 130 to prevent scattering of the control rod driving device 170 in case of emergency; A plurality of cooling fans installed on the fly protection plate 150 to blow air in the cylinder; The cable installation member 200 which supplies power to the reactor upper structure 100 and is fixedly installed on the wall 300 to support the signal transmission wires from the measuring instrument installed in the reactor, and, if necessary, is lifted toward the wall 300. It is characterized by consisting of.
Description
본 발명은 일반적인 가압 경수로형 원자로에 관련된 것으로 보다 자세하게는 가압 경수로형 원자로 상부 구조물을 일체로 설계하여 핵연료 재장전(교체 및 재배치)을 위해 제거 또는 분리해야 하는 구조물의 개수를 줄이기 위한 구조물의 재배치와 관련된 일체형 원자로 상부구조물에 관한 것이다.The present invention relates to a general pressurized PWR reactor, and more specifically, to restructure the structure to reduce the number of structures to be removed or separated for nuclear fuel reloading (replacement and relocation) by integrally designing the PWR reactor upper structure. Related integral reactor superstructures.
경수로형 원자력발전소의 경우 핵연료의 재장전을 위해서는 정기적으로 발전소의 운전을 정지시켜야 한다. 즉, 핵연료의 재장전을 위해서는 먼저 원자로용기 뚜껑을 열고 원자로 내부에 있는 오래된 핵연료 집합체를 새로운 핵연료 집합체로 교체하고, 나머지 핵연료들은 재배치시킨다.LWR nuclear power plants must be shut down on a regular basis to reload nuclear fuel. In other words, in order to reload the fuel, the lid of the reactor vessel is first opened, the old fuel assembly inside the reactor is replaced with a new fuel assembly, and the remaining fuel is rearranged.
이와 같은 작업을 위한 종래의 원자력발전소의 경우 원자로용기뚜껑을 열기 위해 다음과 같은 일련의 작업 단계를 거쳐야 하였다.In the case of the conventional nuclear power plant for such a task had to go through the following series of steps to open the reactor vessel lid.
① 중량 콘크리트로 된 비산물(missile) 방호벽 제거 공정① Removal process of missile barriers made of heavy concrete
② 제어봉 구동 장치 냉각을 위한 덕트(duct) 제거 공정② Duct removal process for cooling control rod drive device
③ 내진 지지봉 제거 공정③ Seismic support rod removal process
④ 제어봉 구동 장치 상단부의 동력선 및 신호선 분리 공정④ Power line and signal line separation process of upper part of control rod drive device
⑤ 원자로 상부 구조물 인양 삼각대 설치 공정⑤ Lifting tripod installation process of reactor upper structure
⑥ 원자로 상부에서 작업용 갑판(deck) 또는 벽체로 연결되는 케이블 설치대 및 케이블 제거 공정⑥ Cable installation and cable removal process connected to the work deck or wall at the top of the reactor
⑦ 원자로 용기 수위 측정 계측선 제거 공정⑦ Reactor vessel level measurement measurement line removal process
이상과 같은 일련의 작업공정이 완료된 후 원자로 용기 뚜껑 조임 볼트(stud bolt)를 제거한 다음 원자로 상부 구조물은 별도의 저장 공간으로 이송되어 저장된다. 핵연료의 교체 및 재장전이 끝나면 위에서 설명한 작업순서를 역순으로 하여 원자로 상부구조물의 조립 작업이 이루어진다.After the above-described series of work processes are completed, the reactor vessel lid tightening bolts are removed, and the upper structure of the reactor is transferred to a separate storage space and stored. After the fuel has been replaced and reloaded, the assembly of the reactor superstructure is carried out in reverse order of operation.
위에서 설명한 일련의 작업은 강한 방사선이 방출되는 지역에서 이루어지며, 이러한 작업에 소요되는 시간이 원자력 발전소의 정기 정비 기간에 영향을 주므로 핵연료 재장전에 소요되는 시간을 단축시키는 것은 원자력 발전소 설계자의 주요한과제가 되고 있다.The series of operations described above are performed in areas with strong radiation emissions, and the time spent on these operations affects the regular maintenance period of a nuclear power plant, so reducing the time spent reloading fuel is a major challenge for nuclear plant designers. It is becoming.
원자로 상부 구조물이 일체로 설계되면 앞에서 기술한 7 단계의 원자로 분해 작업공정은 다음과 같이 4 단계로 단축이 가능하다.If the reactor superstructure is designed integrally, the seven-step reactor decomposition process described above can be shortened to four steps as follows.
① 내진 지지봉 제거 공정① Seismic Support Rod Removal Process
② 제어봉 구동 장치 상단부의 동력선 및 신호선 분리 공정② Separation process of power line and signal line of upper part of control rod driving device
③ 원자로 상부에서 작업용 갑판(deck) 또는 벽체로 연결되는 케이블 설치대 및 케이블 제거 공정③ Cable installation process and cable removal process connected to the work deck or wall in the upper part of the reactor
④ 원자로 용기 수위 측정 계측선 제거 공정으로 작업을 단순화시킬 수 있다.(4) Reactor vessel water level measurement line removal process can simplify the operation.
이와 같이 원자로 상부 구조물을 일체로 설계할 경우 핵연료 재장전 공정을 단축시킬 수 있으므로 원자력 발전소 설계자들은 일체화에 관련된 여러 가지 기술이 개발되고 있다.As such, if the reactor superstructure is designed integrally, nuclear reactor designers are developing various technologies related to integration.
1995년에 Meuschke 등이 출원한 미국 특허 제5384812호에서는 원자로 상부 구조물로부터 작업용 갑판으로 케이블을 연결하기 위한 케이블설치대를 제안하였다. 이 설치대의 특징은 갑판 아래로 케이블 설치대가 들어가는 구조로 되어 있다.US Patent No. 5384812, filed in 1995 by Meuschke et al., Proposed a cable mount for connecting cables from the reactor superstructure to the work deck. The pedestal features a cable mount under the deck.
1998년에 Matteson이 출원한 미국 특허 제5715288호에서는 이전의 CE (Combustion Engineering)형 발전소의 설계 중 콘크리트 비산물 방호벽 등 기존 설계를 일부 개선한 상부 구조물을 제안하였다.US Patent No. 5715288, filed by Matteson in 1998, proposed an upper structure that partially improved the existing design, such as concrete fly-through barriers, of the previous CE (Combustion Engineering) power plant design.
그러나 이 두 가지 설계의 경우 원자로 용기 뚜껑 상부와 제어봉 구동 장치에서 발생하는 열을 제거하기 위한 적절한 방법이 제시되지 않았으며, 작업공정이 용이하지 못하였다.However, these two designs did not provide a suitable method for removing heat generated from the top of the reactor vessel lid and the control rod drive, and the process was not easy.
이와 같은 문제점을 개선하기 위하여 본 발명에서는 가압 경수로형 원자로에 있어서 앞에서 기술한 기존의 핵연료 재장전시 거쳐야 하는 원자로 상부 구조물 분해 단계를 줄여 발전소 정기 정비 기간을 단축시키고, 작업자의 방사선 피폭 선량을 줄이도록 하는 것을 목적으로 하는 것으로, 보다 자세하게는 원자로 상부 구조물을 가능한 한 단순화하여 일체로 설계함으로써 핵연료 재장전 기간 중 한 번의 인양 작업으로 원자로 상부 구조물을 들어올릴 수 있도록 설계한 일체형 원자로 상부구조물을 제공하는 것이 본 발명의 목적 중 하나이다.In order to improve such a problem, the present invention reduces the reactor superstructure disassembly step that is required to reload the existing nuclear fuel in the pressurized light-water reactor, thus reducing the regular maintenance period of the power plant and reducing the radiation exposure dose of the operator. It is an object of the present invention, more specifically, to provide an integral reactor superstructure designed to lift the reactor superstructure in one lifting operation during the fuel reload period by designing the reactor superstructure as simply and integrally as possible. One of the objects of the invention.
본 발명의 또 다른 목적은 기존의 보다 무겁고 부피를 많이 차지하였던 콘크리트 등으로 제작된 비산물 방호판을 철판으로 대체하고 원자로 상부 구조물과 일체화하여 보다 효과적으로 비산물을 방호하면서 핵연료 재 장전시 상부 구조물의 분리 착탈이 용이하도록 하는 것이다.Another object of the present invention is to replace the by-product protection plate made of concrete, such as the existing heavier and bulky with iron plate and integrated with the upper structure of the reactor to more effectively protect the by-products while reloading the nuclear fuel of the upper structure It is to facilitate separation and removal.
또 다른 목적은 케이블 설치대를 장착하여 원자로 상부 구조물과 증기발생기 사이의 벽체를 통해 인입되는 전원 케이블 및 신호 전달 전선을 원자로 상부 구조물과 쉽게 연결할 수 있도록 하고, 핵연료 재장전 시에는 케이블 설치대를 들어올릴 수 있는 구조로 하여 핵연료 재장전 기중기(도면에 없음)가 원자로에 접근할 수 있도록 하는 것이다.Another purpose is to equip the cable mounts so that the power cables and signal transmission wires that enter through the wall between the reactor upper structure and the steam generator can be easily connected to the upper structure of the reactor, and the cable mounts can be lifted when the fuel is reloaded. This allows the fuel reload crane (not shown) to access the reactor.
추가적인 또 하나의 목적은 원자로 용기 덮개 위에 외부격벽 및 내부격벽의 이중 구조로 된 공기 유동경로를 형성하여 원자로 용기 상부 및 제어봉 구동 장치에서 발생하는 열을 냉각팬을 사용하여 제거하도록 하여 제어봉 구동 장치의 전기 배선이 정해진 온도 이상으로 가열되지 않도록 하는 것이다.An additional object is to form a dual air flow path of the outer and inner bulkheads on the reactor vessel cover to remove heat generated from the upper part of the reactor vessel and the control rod drive unit by using a cooling fan. It is to prevent the electrical wiring from heating above the predetermined temperature.
도 1은 본 발명 일체형 원자로 상부 구조물의 설치상태를 보여주는 사시도.Figure 1 is a perspective view showing the installation state of the present invention integrated reactor upper structure.
도 2는 본 발명 일체형 원자로 상부 구조물의 설치상태를 보여주는 정면도.Figure 2 is a front view showing the installation state of the present invention integrated reactor upper structure.
도 3은 본 발명 일체형 원자로 상부 구조물 평면도.3 is a plan view of the present invention integrated reactor upper structure.
도 4는 본 발명 일체형 원자로 상부 구조물의 내부 구성상태를 보인 개략단면도.Figure 4 is a schematic cross-sectional view showing the internal configuration of the present invention, the integral reactor upper structure.
도 5는 본 발명 일체형 원자로 상부 구조물 케이블 설치부재의 작동상태도로서,5 is an operational state diagram of the integrated reactor upper structure cable installation member of the present invention,
(a)는 케이블 설치부재의 펼침상태이고, (b)는 인양 절첩상태임.(a) is the unfolded state of the cable installation member, (b) is the lifted folded state.
도 6은 본 발명 일체형 원자로 상부 구조물의 설치 가동상태 정면도 및 평면도.Figure 6 is a front view and a plan view of the installation operation state of the present invention integrated reactor superstructure.
〈도면의 주요부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>
100 : 원자로 상부 구조물 110 : 용기덮개100 reactor upper structure 110 container cover
111 : 스터드 볼트 120 : 환형 지지판111 stud bolt 120 annular support plate
130 : 이중원통 실린더형 구조물 131 : 외부격벽130: double cylinder cylindrical structure 131: outer partition
132 : 내부격벽 133 : 냉각공기 유동경로132: internal partition 133: cooling air flow path
140 : 공기흡입구 141 : 공기토출구140: air inlet 141: air outlet
150 : 비산물 방호판 160 : 냉각팬150: by-product protection plate 160: cooling fan
170 : 제어봉 구동장치 180 : 정비용 문170: control rod drive device 180: maintenance door
200 : 케이블 설치부재 201 : 케이블200: cable installation member 201: cable
210 : 케이블 설치대 220 : 케이블 설치대 경첩210: cable mounting bracket 220: cable mounting hinge
230 : 케이블 설치대 지지봉 240 : 하부지지대230: cable mounting support support 240: lower support
250 : 상부지지대 260 : 줄(string)250: upper support 260: string
270 : 인양철선 280 : 권선기270: lifting wire 280: winding machine
300 : 벽체 310 : 인양삼각대300: wall 310: lifting tripod
320 : 내진 지지봉320: seismic support rod
상기의 목적을 달성하기 위한 본 발명은 가압 경수로형 원자로의 상부에 위치하며 내부에 다수의 제어봉 구동장치가 설치되고 핵연료 재장전시 분해하여 인양가능하도록 다수의 스터드볼트(111)에 의해 원자로 본체에 고정되는 원자로 용기덮개(110)을 포함하여 일체로 형성된 원자로 상부구조물(100)에 있어서, 상기 원자로 상부구조물(100)은 상기 원자로 덮개(110)의 위에 설치되는 환형 지지판(120)과; 상기 환형 지지판(120) 위에 설치되어 냉각공기 유동경로(133)를 형성하도록 외부격벽(131)과 내부격벽(132)으로 된 이중 원통 실린더형 구조물(130)과; 상기 이중 원통실린더형 구조물(130)을 형성하는 외부격벽(131)과 내부격벽(132)을 관통하여 실린더 외부의 찬 공기를 실린더 내부로 유입시키도록 하는 다수의 공기 흡입구(140) 및; 상기 실린더 내부로 유입된 공기가 상기 냉각공기 유동경로(133)유입되면서 제어봉구동장치(170)을 냉각하도록 하는 공기통로(134)와; 상기 이중 원통실린더형 구조물(130)의 상부에 설치되어 유사시 제어봉 구동장치(170)의 비산을 방지하도록 하는 비산물 방호판(150)과; 상기 비산물 방호판(150) 위에 설치되어 실린더 내부의 공기를 불어내도록 설치된 다수의 냉각팬(160)과; 상기 원자로 상부구조물(100)에 전력을 공급하며, 원자로 내에 설치된 계측기에서 나오는 신호전달 전선을 지지하도록 벽체(300)에 고정 설치되고, 필요시 벽체(300)쪽으로 인양되도록 설치된 케이블 설치부재(200)로 구성됨을 특징으로 한다.The present invention for achieving the above object is located in the upper portion of the pressurized light-water reactor reactor, and a plurality of control rod drive device is installed therein and fixed to the reactor body by a plurality of stud bolts 111 to be disassembled and salvaged during nuclear reload. A reactor upper structure (100) integrally formed including a reactor vessel cover (110), wherein the reactor upper structure (100) includes an annular support plate (120) installed on the reactor cover (110); A double cylindrical cylindrical structure 130 installed on the annular support plate 120 and having an outer partition 131 and an inner partition 132 to form a cooling air flow path 133; A plurality of air inlets 140 penetrating the outer partition 131 and the inner partition 132 forming the double cylindrical cylinder-type structure 130 to allow cold air outside the cylinder to flow into the cylinder; An air passage 134 for cooling the control rod driving device 170 while the air introduced into the cylinder is introduced into the cooling air flow path 133; A scattering protection plate 150 installed above the double cylindrical cylinder-type structure 130 to prevent scattering of the control rod driving device 170 in case of emergency; A plurality of cooling fans installed on the fly protection plate 150 to blow air in the cylinder; The cable installation member 200 which supplies power to the reactor upper structure 100 and is fixedly installed on the wall 300 to support the signal transmission wires from the measuring instrument installed in the reactor, and, if necessary, is lifted toward the wall 300. Characterized in that consisting of.
또한 상기 케이블 설치부재(200)는 케이블 설치대 경첩(220)에 의해 벽체(300)에 설치되며, 상기 경첩(220)을 중심으로 원운동을 하는 케이블 설치대(210)와; 상기 케이블 설치대(210)를 지지하도록 일 측은 상기 케이블 설치대(210)의 하부에 결합되고, 타측은 벽체(300)의 하부지지대(240)에 결합된 케이블 설치대 지지봉(230)과; 상기 케이블 설치대 지지봉(230)의 하부 분리 후 케이블 설치대(210)의 인양시 상기 케이블 설치대 지지봉(230)이 소정의 범위 내에서만 움직일 수 있도록 상기 케이블 설치대(210)와 상기 지지봉(230) 사이를 연결하는 줄(string)(260)과; 상기 케이블 설치대(210)의 상부 선단부와 상부지지대(250) 사이에 설치되어 상기 케이블 설치대(210)를 필요시 인양하도록 하는 인양철선(270) 및 상기 인양철선(270)을 감거나 풀어서 케이블 설치대(210)의 자세를 변화시키는 권선기(280)를 구비하여 구성됨을 특징으로 한다.In addition, the cable installation member 200 is installed on the wall 300 by a cable mounting hinge 220, the cable mounting base 210 to the circular motion around the hinge 220; One side is coupled to the lower portion of the cable mount 210 to support the cable mount 210, the other side is a cable mount support rod 230 coupled to the lower support 240 of the wall (300); When the cable mounting bracket 210 is lifted after the lower part of the cable mounting support rod 230 is removed, the cable mounting support 210 is connected between the support rod 210 and the support rod 230 so as to move only within a predetermined range. A string 260; It is installed between the upper end portion of the cable mounting bracket 210 and the upper support 250 to lift or unwind the lifting wire 270 and the lifting wire 270 to lift the cable mounting stand 210, if necessary cable mounting stand ( It is characterized by comprising a winding machine 280 for changing the attitude of the 210.
이하 본 발명의 실시 예를 첨부된 도면에 의거하여 상세히 설명한다.Exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings.
도 1은 본 발명을 구성하는 주요 부품들을 보여주는 일체형 원자로 상부 구조물의 사시도이고, 도 2는 정면도로서 일체형 상부 구조물(100)을 구성하는 원자로 용기덮개(110), 환형 지지판(120), 외부 격벽(131), 내진 지지봉(320), 케이블 설치대(210), 냉각팬(160), 인양 삼각대(310)를 보여주고 있다.1 is a perspective view of a unitary reactor superstructure showing the main components of the present invention, and FIG. 2 is a front view of the reactor vessel cover 110, the annular support plate 120, and the outer partition wall constituting the unitary superstructure 100. 131, the seismic support rod 320, the cable mounting bracket 210, the cooling fan 160, the lifting tripod 310 is shown.
반구 형태의 원자로 용기 덮개(110)위에는 환형 지지판(120)이 설치되고, 상기 환형 지지판(120) 위에는 도 4와 같이 외부격벽(131)과 내부격벽(132)으로 이루어진 원형 실린더 형태의 이중 원통 실린더형 구조물(130)이 놓여진 형태로서 상기 외부격벽(131)과 내부격벽(132)의 사이에는 공기 유동경로(133)가 형성되도록 한 것이다. 상기 외부격벽(131)의 상부에는 비산물 방호판(150)이 설치되어 있으므로 제어봉 구동 장치(170)가 비산되어 주변의 구조물에 손상을 주는 것을 방지하도록 되어 있다. 또한 외부격벽(131)의 아래 부분에는 정비용 문(180)을 설치하여 운전 중 또는 정비 기간 중에 내부격벽(132) 안에 설치되어 있는 제어봉 구동 장치(180) 및 원자로 용기 덮개(110)에 설치되는 부품 및 신호 전달 계통을 점검할 수 있도록 한다.An annular support plate 120 is installed on the hemispherical reactor vessel cover 110, and a double cylindrical cylinder having a circular cylinder shape formed of an outer partition 131 and an inner partition 132 as shown in FIG. 4 on the annular support plate 120. As the structure 130 is placed, an air flow path 133 is formed between the outer partition 131 and the inner partition 132. Since the scattering protection plate 150 is installed above the outer partition 131, the control rod driving device 170 is scattered to prevent damage to the surrounding structure. In addition, a lower portion of the outer partition 131 is installed on the control rod driving device 180 and the reactor vessel cover 110 installed in the inner partition 132 during operation or maintenance period by installing the maintenance door 180. Allows you to check parts and signaling systems.
일체형 원자로 상부 구조물에는 지진 상태에서도 안전성을 확보하기 위하여 다수의 내진 지지봉(320)이 장착된다. 상기 내진 지지봉(320)들은 일체형 원자로 상부 구조물(100)과 벽체(300)를 연결하여 지진 등으로 인하여 원자로가 흔들려도 원자로 상부 구조물(320)이 자체 중량으로 인하여 옆으로 넘어지는 것을 방지한다.The integrated reactor upper structure is equipped with a plurality of seismic support rods 320 to ensure safety even in earthquake conditions. The seismic support rods 320 connect the unitary reactor upper structure 100 and the wall 300 to prevent the reactor upper structure 320 from falling sideways due to its own weight even if the reactor is shaken due to an earthquake or the like.
도 3은 일체형 원자로 상부 구조물(100)의 평면도로서 냉각팬(160) 및 인양 삼각대(310)의 배치를 보여주고 있다. 원자로 용기 덮개(110)에는 다수의 스터드 볼트(111)가 설치되어 있으며, 원자로 상부 구조물(100)을 들어올리기 전에 스터드 볼트(111)들, 내진 지지봉(320)들, 그리고 두 개의 케이블 설치대(210)를 일체형 원자로 상부 구조물(100)과 분리시켜야 한다. 여기서 케이블 설치대(210)는 원자로 상부 구조물에 전력을 공급하고, 원자로 내에 설치된 계측기에서 나오는 신호전달전선 케이블을 벽체(300) 쪽으로 잇는 다리 역할을 하는 구조물이다.3 is a plan view of the unitary reactor superstructure 100 and shows the placement of the cooling fan 160 and the lifting tripod 310. Nuclear reactor vessel cover 110 is provided with a plurality of stud bolts 111, the stud bolts 111, seismic support rods 320, and two cable mounts 210 before lifting the reactor upper structure 100 ) Must be separated from the unitary reactor superstructure 100. The cable installation unit 210 is a structure that serves as a bridge for supplying power to the upper structure of the reactor, and connecting the signal transmission line cable from the instrument installed in the reactor toward the wall (300).
도 5는 케이블 설치부재(200)의 자세한 구성상태를 보여주고 있다. 케이블 설치부재(200)는 케이블 설치대(210), 상부 지지대(250), 권선기(280), 인양 철선(270), 케이블 설치대 지지봉(230), 줄(260), 케이블 설치대 경첩(220), 그리고 하부 지지대(240)로 구성되며, 상부 지지대(250)와 케이블 설치대 경첩(220), 그리고 하부 지지대(240)는 벽체(300)에 고정되어 있다. 원자로에 핵연료를 재장전하기 위하여 원자로 용기 덮개(110)를 들어올릴 때 케이블 설치대(210)는 도 5의 (b)에서와 같이 들어올려진 상태로 둔다. 핵연료의 재장전이 끝난 후 다시 원자로 상부 구조물(100)을 도 5의 (a)와 같은 상태로 복귀시킨 상태에서 케이블 설치대(210)는 도시된 바와 같이 거의 수평한 상태가 된다. 케이블 설치대(210)의 자세는 상부지지대(250)에 설치되어 있는 권선기(280)를 이용하여 인양 철선(270)을 감거나 풀어주어 조절하는 구조이다. 케이블 설치대(210)가 수평 상태로 되면 케이블 설치대 지지봉(230) 하단부와 하부 지지대(240)는 핀 또는 볼트로 고정된다.5 shows a detailed configuration of the cable installation member 200. The cable mounting member 200 is a cable mounting bracket 210, the upper support 250, a winding machine 280, the lifting wire 270, cable mounting support rod 230, string 260, cable mounting hinge 220, and It is composed of a lower support 240, the upper support 250, the cable mounting hinge 220, and the lower support 240 is fixed to the wall (300). When lifting the reactor vessel cover 110 in order to reload the nuclear fuel in the reactor, the cable mounting base 210 is left in an elevated state as shown in FIG. After the reloading of the nuclear fuel is completed, the cable mounting stand 210 is almost horizontal as shown in the state where the upper reactor structure 100 is returned to the state as shown in FIG. The posture of the cable installation unit 210 is a structure for winding or releasing the lifting iron wire 270 by using the winding machine 280 installed on the upper support 250 to adjust. When the cable mounting bracket 210 is in a horizontal state, the lower end of the cable mounting support rod 230 and the lower supporter 240 are fixed with pins or bolts.
도 4는 일체형 상부 구조물 중 원자로 용기 덮개(110)의 윗부분 단면을 개략적으로 보여주고 있다. 상부 구조물의 내부에 있는 다수의 제어봉 구동 장치(170)와 원자로 용기 덮개(110) 중 외부 격벽(132)으로 감싼 부분에서는 많은 열이 발생하며, 이를 방출시켜야 제어봉 구동 장치(170)의 전기 장치가 제대로 작동할 수 있다.4 schematically illustrates a cross section of the upper portion of the reactor vessel cover 110 of the unitary superstructure. In the portion of the control rod drive device 170 and the reactor vessel cover 110 inside the upper structure wrapped around the outer partition 132, a lot of heat is generated, it must be released before the electrical device of the control rod drive device 170 Can work properly.
따라서 일체형 상부 구조물(100)의 내부는 냉각팬(160)에 의해 외부의 냉각 공기가 흡입되면서 제어봉 구동장치(170)가 설치된 내부격벽(132)의 중심부에 형성된 공기통로(142)를 통하여 냉각공기가 이동되면서 상기 제어봉 구동장치(170)에서 발생하는 열을 강제 냉각시키게 되며, 상기 냉각공기는 외부격벽(131)과 내부격벽(132)의 사이에 형성된 냉각공기 유동경로(133)를 통하여 공기토출구(141)로 배출된다.즉, 도 4에서 화살표는 냉각 공기의 유동 경로(133)를 보여주는 것으로, 냉각팬(160)의 작동에 의해 상부 구조물의 외부격벽(131)과 내부격벽(132) 사이에 있던 공기를 구조물의 외부로 화살표 방향으로 불어내도록 되어 있으며, 이로 인하여 공기 흡입구(140)를 통해 화살표 방향으로 찬 공기가 유입된다. 이렇게 유입된 찬 공기는 아래 방향으로 흘러서 제어봉 구동 장치(170)의 주변 공기통로(142)를 통해 흐르면서 제어봉 구동 장치(170)에서 발생한 열을 흡수한 다음 원자로 용기 덮개(110)에서 발생한 열을 흡수한 후 외부 격벽(131)과 내부격벽(132) 사이의 공간을 통해 위로 이동한다. 이렇게 이동한 공기는 냉각팬(160)에 의해 강제적으로 상부 구조물 밖으로 공기 토출구(141)를 통해 토출된다. 이렇게 강제적으로 찬 공기를 원자로 상부 구조물 내로 유동시킴으로써 온도에 민감한 제어봉 구동 장치(170)의 전기 코일 등이 정해진 온도 이하로 유지되도록 하는 것이다.Therefore, the interior of the integrated upper structure 100 is cooled air through the air passage 142 formed in the center of the inner partition 132, the control rod drive device 170 is installed while the external cooling air is sucked by the cooling fan 160. Is moved to forcibly cool the heat generated by the control rod drive device 170, the cooling air is an air discharge port through the cooling air flow path 133 formed between the outer partition 131 and the inner partition 132 That is, the arrow in FIG. 4 shows the flow path 133 of the cooling air, and is operated between the outer partition 131 and the inner partition 132 of the upper structure by the operation of the cooling fan 160. It is to blow the air in the direction of the arrow to the outside of the structure, due to which the cold air flows in the direction of the arrow through the air inlet 140. The cold air flows in the downward direction and flows through the surrounding air passage 142 of the control rod drive unit 170 to absorb heat generated by the control rod drive unit 170 and then absorbs heat generated from the reactor vessel cover 110. Afterwards, it moves upward through the space between the outer partition 131 and the inner partition 132. The air thus moved is forcibly discharged out of the upper structure through the air outlet 141 by the cooling fan 160. The forced cold air flows into the upper structure of the reactor so that the electric coil or the like of the temperature-sensitive control rod driving device 170 is maintained below a predetermined temperature.
도 6은 본 발명의 일체형 원자로 상부 구조물의 설치 가동상태 정면도 및 평면도로서 원자로 내에 설치된 계측기에서 나오는 신호전달전선인 케이블(201)이 가설된 상태를 도시한 것이다.FIG. 6 is a front view and a plan view of an installation operation state of the integrated reactor superstructure according to the present invention, showing a state in which a cable 201, which is a signal transmission line from a measuring instrument installed in the reactor, is hypothesized.
본 발명의 또 다른 특징은 원자로 상부 구조물(100)을 가능한 한 일체로 설계함으로써 핵연료 재정전을 위해 원자로 용기 덮개(110)를 제거할 때 이전의 복잡한 다단계 공정에 비해 비교적 단순한 몇 단계 공정으로 신속하게 작업이 이루어 질 수 있도록 한 것이다.Another feature of the present invention is to design the reactor superstructure 100 as integrally as possible so that the removal of the reactor vessel cover 110 for nuclear fuel reassembly can be accomplished in a few simple steps, relatively simple compared to previous complex multi-step processes. The work was done.
이상에서 상세히 살펴본 바와 같이 본 발명은 원자력 발전소 예방정비 기간 중 원자로 상부 구조물의 제거에 복잡한 다단계의 공정이 수반됨으로 인하여 작업자 방사선 피폭량 증가, 운전 정지로 인한 경제적인 손실 등의 피해를 입혀온 종래의 원자로 상부 구조물의 설계에 대하여,As described in detail above, the present invention is a conventional nuclear reactor which has suffered damages such as increased worker radiation exposure and economic loss due to shutdown due to the complicated multi-step process involved in the removal of the upper structure of the reactor during the maintenance period of the nuclear power plant. About the design of the superstructure,
원자로 상부 구조물을 단순한 몇 개의 부품으로 나누어 일체로 설계하여 단순한 몇 단계의 공정으로 원자로 상부 구조물의 제거가 신속하게 이루어 질 수 있게 하고, 원통형 이중 격벽 구조의 냉각 공기 유동 경로를 설치하여 냉각 공기를 강제로 순환시켜 중요 부품이 일정 온도 이하로 유지될 수 있게 함으로써, 불필요한 작업을 줄여 원자로의 운전 정지 기간을 단축하고, 작업자의 방사선 피폭량을 감소시키게 된다.The reactor superstructure is divided into several simple parts to design integrally, so that the reactor superstructure can be quickly removed in a few simple steps, and the cooling air flow path of the cylindrical double bulkhead structure is installed to force cooling air. By circulating furnaces, critical components can be kept below a certain temperature, reducing unnecessary work, reducing downtime and reducing radiation exposure for workers.
따라서 본 발명은 원자력 발전소의 경제적인 운전은 물론 세계적으로 그 규제가 강화되고 있는 작업자의 방사선 피폭 선량 저감을 위해서도 매우 유용한 기술이다.Therefore, the present invention is a very useful technique not only for the economical operation of nuclear power plants but also for reducing the radiation exposure dose of workers whose regulations are being strengthened worldwide.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019990019245A KR100357828B1 (en) | 1999-05-27 | 1999-05-27 | An Integrated Head Area Design of a Nuclear Reactor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019990019245A KR100357828B1 (en) | 1999-05-27 | 1999-05-27 | An Integrated Head Area Design of a Nuclear Reactor |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20000074957A KR20000074957A (en) | 2000-12-15 |
KR100357828B1 true KR100357828B1 (en) | 2002-10-25 |
Family
ID=19588144
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019990019245A KR100357828B1 (en) | 1999-05-27 | 1999-05-27 | An Integrated Head Area Design of a Nuclear Reactor |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100357828B1 (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100415487B1 (en) * | 2001-04-30 | 2004-01-24 | 한국수력원자력 주식회사 | Nuclear heating method for integral reactor |
KR100844439B1 (en) * | 2007-01-02 | 2008-07-07 | 한국전력기술 주식회사 | Modular reactor head area assembly |
JP2009198400A (en) * | 2008-02-22 | 2009-09-03 | Mitsubishi Heavy Ind Ltd | Cooling structure and method of control rod drive unit and nuclear reactor |
KR101102127B1 (en) * | 2010-06-16 | 2012-01-03 | 두산중공업 주식회사 | Performance Test Apparatus for Head assembly of Nuclear Reactor |
KR101438108B1 (en) | 2011-12-16 | 2014-09-12 | 두산중공업 주식회사 | Anti-seismic reinforcement assembly |
KR101551852B1 (en) | 2014-08-08 | 2015-09-08 | 한국전력기술 주식회사 | Anti-Seismic Appratus for Control Element Drive Mechanism |
KR20240013330A (en) | 2022-07-22 | 2024-01-30 | 한국수력원자력 주식회사 | Unpowered cooling system of a control element drive mechanism in a nuclear reactor |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4678623A (en) * | 1984-02-03 | 1987-07-07 | Westinghouse Electric Corp. | Modular head assembly and method of retrofitting existing nuclear reactor facilities |
US5774513A (en) * | 1997-01-14 | 1998-06-30 | Combustion Engineering, Inc. | Head area cable tray bridge |
-
1999
- 1999-05-27 KR KR1019990019245A patent/KR100357828B1/en not_active IP Right Cessation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4678623A (en) * | 1984-02-03 | 1987-07-07 | Westinghouse Electric Corp. | Modular head assembly and method of retrofitting existing nuclear reactor facilities |
US5774513A (en) * | 1997-01-14 | 1998-06-30 | Combustion Engineering, Inc. | Head area cable tray bridge |
Also Published As
Publication number | Publication date |
---|---|
KR20000074957A (en) | 2000-12-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100923047B1 (en) | Modular integrated head assembly | |
US4678623A (en) | Modular head assembly and method of retrofitting existing nuclear reactor facilities | |
KR100844439B1 (en) | Modular reactor head area assembly | |
US5715288A (en) | Integral head rig, head area cable tray and missile shield for pressurized water reactor | |
KR890002381B1 (en) | Standard integrated headpackage | |
US5930321A (en) | Head assembly | |
JP3126254B2 (en) | Reactor containment | |
US6546066B2 (en) | Integrated head assembly for a nuclear reactor | |
US7139359B2 (en) | Integrated head assembly for a nuclear reactor | |
KR100357828B1 (en) | An Integrated Head Area Design of a Nuclear Reactor | |
JPH0232598B2 (en) | ||
US3929568A (en) | Nuclear power plant containment construction | |
JP3343447B2 (en) | How to unload the reactor pressure vessel | |
CN109872827A (en) | A kind of barrel-type integration heap roof construction suitable for high temperature resistant driving mechanism | |
US9601220B2 (en) | Earthquake-resistant reinforcement assembly | |
US6639960B2 (en) | Method of retrofitting a reactor pressure vessel head assembly | |
JP3989246B2 (en) | How to install the reactor internals | |
US20030026377A1 (en) | Integrated head assembly for a nuclear reactor | |
US5631938A (en) | Reactor internal pump maintenance cover | |
US20040196947A1 (en) | Reactor cooling system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E902 | Notification of reason for refusal | ||
N231 | Notification of change of applicant | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20121005 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20131001 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20141001 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20151005 Year of fee payment: 14 |
|
LAPS | Lapse due to unpaid annual fee |