Foundation pile constructing method

Info

Publication number
JPS563714A
JPS563714A JP8034979A JP8034979A JPS563714A JP S563714 A JPS563714 A JP S563714A JP 8034979 A JP8034979 A JP 8034979A JP 8034979 A JP8034979 A JP 8034979A JP S563714 A JPS563714 A JP S563714A
Authority
JP
Japan
Prior art keywords
concrete
rotary shaft
hole
cast
expanded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8034979A
Other languages
Japanese (ja)
Other versions
JPS6128770B2 (en
Inventor
Taro Ikeda
Minoru Saito
Akiyoshi Nojiri
Masaaki Fujitani
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP8034979A priority Critical patent/JPS563714A/en
Publication of JPS563714A publication Critical patent/JPS563714A/en
Publication of JPS6128770B2 publication Critical patent/JPS6128770B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE: To enable the construction of a concrete pile with larger strength than a mortar pile by giving combined roles of a concrete-striking pipe and a tremie pipe to a rotary shaft in a foundation pile constructing method by using the cast-in-place concrete to large diameter.
CONSTITUTION: An excavator A is equipped with a digging bit 2 and a hole- expanding bit 3 which can be expanded at the bottom of a dug hole at the tip part of a rotary shaft 1 used for both a earth discharge pipe and a concrete-striking pipe. By emploing this excavator A, the hole is dug, while the excavated earth and sand being sucked and discharged by the rotary shaft 1. When the digging reaches a give depth, the hole-expanding bit 3 is expanded to broaden the bottom. When the expansion being ended, the discharge of earth is discontinued immediately, and the concrete is cast through the rotary shaft 1 to build a bulb at the bottom expanded. Then, the rotary shaft being pulled up gradually, the concrete 4 is cast. In the middle of this process of working, the hole is expanded by expanding the bit 3 and the concrete is cast to form a knot 5.
COPYRIGHT: (C)1981,JPO&Japio
JP8034979A 1979-06-26 1979-06-26 Foundation pile constructing method Granted JPS563714A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8034979A JPS563714A (en) 1979-06-26 1979-06-26 Foundation pile constructing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8034979A JPS563714A (en) 1979-06-26 1979-06-26 Foundation pile constructing method

Publications (2)

Publication Number Publication Date
JPS563714A true JPS563714A (en) 1981-01-16
JPS6128770B2 JPS6128770B2 (en) 1986-07-02

Family

ID=13715774

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8034979A Granted JPS563714A (en) 1979-06-26 1979-06-26 Foundation pile constructing method

Country Status (1)

Country Link
JP (1) JPS563714A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994002687A1 (en) * 1992-07-24 1994-02-03 Wagstaff Piling Pty. Ltd. Apparatus and method for forming piles
WO2004053237A3 (en) * 2002-12-06 2005-04-14 Geotechnical Reinforcement Inc Method for construction of piers in soil and a pier construction
WO2010014668A3 (en) * 2008-07-29 2010-05-06 Geopier Foundation Company, Inc. Shielded tamper and method of use for making aggregate columns
KR101027963B1 (en) 2010-12-29 2011-04-13 (주)삼일이엔씨 Construction method for concreting enlarged drill hole for piles and tention members
US8562258B2 (en) 2008-07-29 2013-10-22 Geopier Foundation Company, Inc. Shielded tamper and method of use for making aggregate columns

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994002687A1 (en) * 1992-07-24 1994-02-03 Wagstaff Piling Pty. Ltd. Apparatus and method for forming piles
WO2004053237A3 (en) * 2002-12-06 2005-04-14 Geotechnical Reinforcement Inc Method for construction of piers in soil and a pier construction
US7004684B2 (en) 2002-12-06 2006-02-28 Geotechnical Reinforcement, Inc. Method for construction of piers in soil and a pier construction
WO2010014668A3 (en) * 2008-07-29 2010-05-06 Geopier Foundation Company, Inc. Shielded tamper and method of use for making aggregate columns
US8128319B2 (en) 2008-07-29 2012-03-06 Geopier Foundation Company, Inc. Shielded tamper and method of use for making aggregate columns
US8562258B2 (en) 2008-07-29 2013-10-22 Geopier Foundation Company, Inc. Shielded tamper and method of use for making aggregate columns
KR101027963B1 (en) 2010-12-29 2011-04-13 (주)삼일이엔씨 Construction method for concreting enlarged drill hole for piles and tention members

Also Published As

Publication number Publication date
JPS6128770B2 (en) 1986-07-02

Similar Documents

Publication Publication Date Title
CN104563104A (en) Linkage type wall protecting device for pile driving drilling machine and construction method for using linkage type wall protecting device for pile driving drilling machine
CN204608773U (en) Pile work drilling machine coordinated type breast wall apparatus
JPS563714A (en) Foundation pile constructing method
CN106567382B (en) A kind of pit curtain construction method in metalling
CN208294522U (en) Waterproof of man in a kind of pilot tunnel of rich water sand-pebble layer
JPS566822A (en) Base pile making method
JPS60119816A (en) Formation of continuous pile
JPS61109822A (en) Construction work of pile
JPS60126423A (en) Pile driving method
JPH0280710A (en) Preparing cast-in-place concrete pile
JPS6088720A (en) Piling work
JPS63289114A (en) Head for drill casing
CN108019211A (en) Waterproof of man and its construction method in a kind of pilot tunnel of rich water sand-pebble layer
JP3118536B2 (en) Offshore intake outlet construction method
JPS57108328A (en) Formation of basement
JPS57112513A (en) Construction of foundation pile for ground improvement
JPH0240151Y2 (en)
JPS5819836B2 (en) Large-diameter vertical hole drilling method
JPH0325121A (en) Sinking of pile in inner drilling pile method
JPH0627405B2 (en) Ready-made pile burying method
JPS62178620A (en) Formation of improved angular ground
JPH0442493B2 (en)
JPS60230423A (en) Ground improving method
JPH0384115A (en) Excavated casing
JPS5545902A (en) Method of working hole for cast-in-place concrete pile