JPS5526378A - Method of foundation construction of soft ground - Google Patents
Method of foundation construction of soft groundInfo
- Publication number
- JPS5526378A JPS5526378A JP9937578A JP9937578A JPS5526378A JP S5526378 A JPS5526378 A JP S5526378A JP 9937578 A JP9937578 A JP 9937578A JP 9937578 A JP9937578 A JP 9937578A JP S5526378 A JPS5526378 A JP S5526378A
- Authority
- JP
- Japan
- Prior art keywords
- piles
- water
- placing
- ground
- water permeable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Foundations (AREA)
Abstract
PURPOSE: To shorten a term of works, and to reduce cost, by placing foundation piles while improving the ground by increasing the strength of the ground by placing hollow piles, to which circumferential flanks a large number of water permeable holes are drilled and which are coated with water permeable coating materials, to the soft ground, by permeating underground water into the piles and by discharging water by means of a pump.
CONSTITUTION: Underground water flows into piles 1 from water permeable holes 3 through water permeable coating materials 4 with the placing of the piles 1. Underground water flowing into the piles 1 is pumped up by means of a pump 6, a water-level is lowered, the gush-out of void water is promoted, water is continuously discharged even after the placing of the piles 1 is completed, and these piles are used as permanent foundation piles after confirming that the strength of the peripheral ground increases to normal consolidation viscous soil.
COPYRIGHT: (C)1980,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP9937578A JPS5526378A (en) | 1978-08-15 | 1978-08-15 | Method of foundation construction of soft ground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP9937578A JPS5526378A (en) | 1978-08-15 | 1978-08-15 | Method of foundation construction of soft ground |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS5526378A true JPS5526378A (en) | 1980-02-25 |
Family
ID=14245776
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP9937578A Pending JPS5526378A (en) | 1978-08-15 | 1978-08-15 | Method of foundation construction of soft ground |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5526378A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS57202547U (en) * | 1981-06-19 | 1982-12-23 | ||
CN102444125A (en) * | 2011-10-21 | 2012-05-09 | 中铁十七局集团第六工程有限公司 | Construction method for improving penetration speed and bearing capacity of prestressed pipe pile |
CN103850260A (en) * | 2014-03-24 | 2014-06-11 | 北京城建勘测设计研究院有限责任公司 | Pile-well integration dewatering well |
CN104775398A (en) * | 2015-04-13 | 2015-07-15 | 天津大学 | Box tube type basic siphon corridor water taking structure and application thereof |
CN106337427A (en) * | 2016-09-26 | 2017-01-18 | 湖南科技大学 | Deformation control method applied to foundation pit pre-dewatering construction |
CN113338299A (en) * | 2021-06-21 | 2021-09-03 | 中铁十二局集团有限公司 | Pile well composite foundation pit supporting construction method |
CN113818303A (en) * | 2021-08-23 | 2021-12-21 | 中国一冶集团有限公司 | Anti-floating drainage system under high-water-level lane and construction method thereof |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4727766U (en) * | 1971-04-19 | 1972-11-29 | ||
JPS4839521U (en) * | 1971-09-13 | 1973-05-17 |
-
1978
- 1978-08-15 JP JP9937578A patent/JPS5526378A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4727766U (en) * | 1971-04-19 | 1972-11-29 | ||
JPS4839521U (en) * | 1971-09-13 | 1973-05-17 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS57202547U (en) * | 1981-06-19 | 1982-12-23 | ||
JPS6339329Y2 (en) * | 1981-06-19 | 1988-10-17 | ||
CN102444125A (en) * | 2011-10-21 | 2012-05-09 | 中铁十七局集团第六工程有限公司 | Construction method for improving penetration speed and bearing capacity of prestressed pipe pile |
CN103850260A (en) * | 2014-03-24 | 2014-06-11 | 北京城建勘测设计研究院有限责任公司 | Pile-well integration dewatering well |
CN103850260B (en) * | 2014-03-24 | 2015-10-28 | 北京城建勘测设计研究院有限责任公司 | A kind of stake well integration dewatering well |
CN104775398A (en) * | 2015-04-13 | 2015-07-15 | 天津大学 | Box tube type basic siphon corridor water taking structure and application thereof |
CN106337427A (en) * | 2016-09-26 | 2017-01-18 | 湖南科技大学 | Deformation control method applied to foundation pit pre-dewatering construction |
CN113338299A (en) * | 2021-06-21 | 2021-09-03 | 中铁十二局集团有限公司 | Pile well composite foundation pit supporting construction method |
CN113818303A (en) * | 2021-08-23 | 2021-12-21 | 中国一冶集团有限公司 | Anti-floating drainage system under high-water-level lane and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS5526378A (en) | Method of foundation construction of soft ground | |
JPS5598520A (en) | Composite grouting method | |
JPS56142923A (en) | Construction of foundation pile and case auger used therefor | |
JPS5631928A (en) | Constructing method for soil pile | |
CN206667238U (en) | A kind of high-pressure rotary-spray pilework | |
SU639993A1 (en) | Casing pile | |
JPS57112513A (en) | Construction of foundation pile for ground improvement | |
JPS573915A (en) | Method and apparatus for construction of reaction resistor body underground | |
RU2087617C1 (en) | Method for construction of cast-in-place pile | |
JPS57108321A (en) | Construction of foundation for building and structure | |
JPS5664018A (en) | Concrete pile | |
JPS5592425A (en) | Method and device for pile being driven into predigged hole | |
JPS56153016A (en) | Application of reinforced foundation pile | |
JPS5719422A (en) | Fixing method of net in process covering slope with net | |
JPS56150222A (en) | Construction of marine structure | |
JPS5733614A (en) | Method for sinking installed pile through internal excavation | |
JPS57174527A (en) | Construction of underground pile | |
JPS55161118A (en) | Pile driving method and pile | |
JPS5545910A (en) | Pile pulling method | |
JPS5721622A (en) | Construction of large-diameter pile in site | |
JPS55105021A (en) | High pressure chemichal liquid grouting method utilizing high frequency vibration pressure | |
JPS5781525A (en) | Construction of underground continuous wall | |
JPS57108329A (en) | Formation of basement | |
JPS57140421A (en) | Construction of large-diameter in-situ cast pile | |
JPS5796137A (en) | Construction of footing of pier, etc. |