Nothing Special   »   [go: up one dir, main page]

JPH1136293A - Reinforcing device and method - Google Patents

Reinforcing device and method

Info

Publication number
JPH1136293A
JPH1136293A JP20727497A JP20727497A JPH1136293A JP H1136293 A JPH1136293 A JP H1136293A JP 20727497 A JP20727497 A JP 20727497A JP 20727497 A JP20727497 A JP 20727497A JP H1136293 A JPH1136293 A JP H1136293A
Authority
JP
Japan
Prior art keywords
spiral
rebar
flexible
reinforcing bar
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP20727497A
Other languages
Japanese (ja)
Other versions
JP3684540B2 (en
Inventor
Shinichiro Nozawa
伸一郎 野澤
Shoichi Furuyama
章一 古山
Hiroshi Hiraoka
寛 平岡
Masao Arai
政男 荒井
Motoshige Ariyama
元茂 有山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
East Japan Railway Co
Original Assignee
Taisei Corp
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp, East Japan Railway Co filed Critical Taisei Corp
Priority to JP20727497A priority Critical patent/JP3684540B2/en
Publication of JPH1136293A publication Critical patent/JPH1136293A/en
Application granted granted Critical
Publication of JP3684540B2 publication Critical patent/JP3684540B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

(57)【要約】 【課題】 簡単な構成で、効率よく、高品質の場所
打杭の施工ができる鉄筋の建込装置及び建込方法を提供
する。 【解決手段】 場所打杭に使用するフレキシブル鉄筋と
スパイラル筋の建込装置であって、建込架台、ドラム装
置を備えた、フレキシブル鉄筋建込装置と、ジャッキ、
スパイラル筋成形管、スパイラル筋送出し装置を備え
た、スパイラル筋建込装置とで構成されたことを特徴と
する、鉄筋の建込装置であり、また、場所打杭に使用す
るフレキシブル鉄筋とスパイラル筋の建込方法であっ
て、場所打杭の削孔上に設置された建込架台のガイドパ
イプに、フレキシブル鉄筋を挿通し、フレキシブル鉄筋
を施工基盤まで引き出し、フレキシブル鉄筋下端部に下
部フレームを取付け後、スパイラル筋送出し装置から送
り出されるスパイラル筋をフレキシブル鉄筋外周に巻き
付け、フレキシブル鉄筋の建込みと、スパイラル筋の巻
き付けを繰り返しながら、削孔内に建込んでいくことを
特徴とする、フレキシブル鉄筋とスパイラル筋の建込方
法である。
(57) [Summary] [PROBLEMS] To provide a rebar building apparatus and a building method capable of efficiently constructing a high-quality cast-in-place pile with a simple configuration. SOLUTION: This is a flexible rebar and spiral rebar construction device used for a cast-in-place pile, which comprises a mounting stand and a drum device, a flexible rebar construction device, a jack,
A rebar-building device characterized by comprising a spiral-rebar-forming tube, a spiral-rebar-equipped spiral-bar-reinforcing device, and a flexible rebar and a spiral for use in cast-in-place piles A method of laying bars, in which a flexible bar is inserted into the guide pipe of a gantry installed on a drilled hole in place, a flexible bar is pulled out to the construction base, and a lower frame is attached to the lower end of the flexible bar. After installation, the spiral rebar delivered from the spiral rebar delivery device is wrapped around the outer periphery of the flexible rebar, and the flexible rebar and the spiral rebar are wound repeatedly while being built into the drilled hole. This is the method of building the reinforcing bars and spiral bars.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、場所打杭を打設す
る際の鉄筋の建込装置及び建込方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus and a method for installing a reinforcing bar when driving a cast-in-place pile.

【0002】[0002]

【従来の技術】地上において、予め組立てられた鉄筋籠
を、場所打杭を打設する場所で吊り下げ、鉄筋籠をジョ
イントしながら削孔内に建込む方法が従来行われてい
る。しかしこれら従来の方法においては、以下の問題が
ある。 工事現場により、鉄筋籠を予め組立てるだけのスペー
スや、建込むための上部空間がない。 鉄筋籠をジョイントしながら削孔内に建込むため、施
工性が低下する。 作業に必要な上部空間を確保する分だけ、作業床を低
くしなければならず、地下水位を低下させるため、周辺
環境への悪影響を与える。これらの問題を解決するた
め、フレキシブル鉄筋を使用した方法があるが、この方
法においても、以下の問題がある。 主鉄筋のフレキシブル鉄筋に、フープ筋を取付ける
際、フープ筋のラップ部の溶接に時間がかかり、作業効
率が悪い。 フープ筋のラップ部の溶接作業により、主鉄筋は断面
欠損を生じる。
2. Description of the Related Art Conventionally, a method of suspending a pre-assembled reinforced cage at a place where a cast-in-place pile is to be placed on the ground and jointing the reinforced cage into a hole is conventionally performed. However, these conventional methods have the following problems. Depending on the construction site, there is no space for assembling the reinforced cage in advance, nor is there an upper space for installation. The workability is reduced because the steel cage is built in the borehole while jointing. The work floor must be lowered by the amount of space required for the work, and the groundwater level is lowered, which adversely affects the surrounding environment. In order to solve these problems, there is a method using a flexible reinforcing bar, but this method also has the following problems. When attaching the hoop to the flexible reinforcing bar of the main reinforcing bar, it takes a long time to weld the wrap portion of the hoop, resulting in poor work efficiency. Due to the welding operation of the wrap portion of the hoop rebar, the main rebar has a cross-sectional defect.

【0003】[0003]

【発明が解決しようとする課題】本発明は、上記従来の
問題点を解決するためになされたもので、簡単な方法に
より、作業性のよい、高品質の場所打杭を構築できる鉄
筋の建込装置及び建込方法を提供することを目的とす
る。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned conventional problems, and is intended to provide a workable and high-quality cast-in-place pile with a simple method. It is an object of the present invention to provide a mounting device and a mounting method.

【0004】[0004]

【課題を解決するための手段】本発明は、場所打杭に使
用するフレキシブル鉄筋とスパイラル筋の建込装置であ
って、建込架台、ドラム装置を備えた、フレキシブル鉄
筋建込装置と、ジャッキ、スパイラル筋成形管、スパイ
ラル筋送出し装置を備えた、スパイラル筋建込装置とで
構成されたことを特徴とする、鉄筋の建込装置であり、
また、建込架台上部にはガイドパイプを設け、建込架台
下部にはスパイラル筋建込装置、スパイラル筋送出し装
置を設けたことを特徴とする、鉄筋の建込装置であり、
また、スパイラル筋建込装置は、建込架台に固定したジ
ャッキにより懸架されていることを特徴とする、鉄筋の
建込装置であり、また、場所打杭に使用するフレキシブ
ル鉄筋とスパイラル筋の建込方法であって、場所打杭の
削孔上に設置された建込架台のガイドパイプに、フレキ
シブル鉄筋を挿通し、フレキシブル鉄筋を施工基盤まで
引き出し、フレキシブル鉄筋下端部に下部フレームを取
付け後、スパイラル筋送出し装置から送り出されるスパ
イラル筋をフレキシブル鉄筋外周に巻き付け、フレキシ
ブル鉄筋の建込みと、スパイラル筋の巻き付けを繰り返
しながら、削孔内に建込んでいくことを特徴とする、フ
レキシブル鉄筋とスパイラル筋の建込方法であり、ま
た、フレキシブル鉄筋の建込みは、建込架台に固定した
ジャッキにより懸架され、建込まれていくことを特徴と
する、フレキシブル鉄筋とスパイラル筋の建込方法であ
り、また、スパイラル筋の巻き付けは、スパイラル筋成
形管に複数回巻き付け、円形形状を成形し、円形形状を
記憶後、フレキシブル鉄筋に取り付けることを特徴とす
る、フレキシブル鉄筋とスパイラル筋の建込方法であ
り、さらにまた、場所打杭を形成するフレキシブル鉄筋
の中間部に中間フレームを取り付け、上端部に上部フレ
ームを取り付けたことを特徴とする、フレキシブル鉄筋
とスパイラル筋の建込方法である。
SUMMARY OF THE INVENTION The present invention relates to a flexible rebar and spiral rebar erection device used for a cast-in-place pile, comprising a erection stand and a drum device, a flexible rebar erection device, and a jack. , A spiral muscle forming pipe, equipped with a spiral muscle delivery device, a spiral muscle building device, characterized in that it is a reinforcing bar building device,
In addition, a guide pipe is provided in the upper part of the gantry, and a spiral ridge building device and a spiral ridge delivery device are provided in the lower portion of the gantry, which is a reinforced building device,
In addition, the spiral reinforcing bar mounting device is a reinforcing bar mounting device characterized by being suspended by a jack fixed to a mounting stand, and also includes a flexible reinforcing bar and a spiral reinforcing bar used for cast-in-place piles. After inserting the flexible rebar into the guide pipe of the gantry installed on the hole of the cast-in-place pile, pull out the flexible rebar to the construction base, and attach the lower frame to the lower end of the flexible rebar, Flexible rebar and spiral, characterized in that the spiral rebar sent from the spiral rebar delivery device is wound around the outer periphery of the flexible rebar, and the flexible rebar and spiral rebar are repeatedly built and drilled into the drilled hole while being repeatedly built. This is the method of laying bars, and the flexible bars are hanged by jacks fixed to the gantry. It is a method of building flexible rebars and spiral rebars, characterized by being built in.The spiral rebars are wound multiple times around a spiral rebar forming tube, and then a circular shape is formed. Is a method of erection of a flexible reinforcing bar and a spiral reinforcing bar, which is attached to a flexible reinforcing bar after storing the intermediate frame. A method for mounting a flexible rebar and a spiral rebar, comprising attaching a frame.

【0005】[0005]

【発明の実施の形態】以下図面を参照しながら本発明の
実施形態について説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0006】<イ>全体構成 図1は、本発明による鉄筋の建込装置の全体図であり、
図2はその平面図である。鉄筋の建込装置は、建込架台
1と、フレキシブル鉄筋2を収納したドラム装置3とか
らなるフレキシブル鉄筋建込装置と、ジャッキ4と、ス
パイラル筋成形管5と、スパイラル筋送出し装置6とか
らなるスパイラル筋建込装置により構成されている。
<A> Overall Configuration FIG. 1 is an overall view of a reinforcing-bar building apparatus according to the present invention.
FIG. 2 is a plan view thereof. The reinforcing-bar building apparatus includes a flexible truss-building apparatus including a gantry 1 and a drum device 3 containing a flexible reinforcing bar 2, a jack 4, a spiral-bar forming tube 5, and a spiral-bar delivering device 6. And a spiral muscle building device.

【0007】<ロ>建込架台 建込架台1は、場所打杭の施工基盤G上に設置され、削
孔Hの中心と一致するように配置される。建込架台1上
には、場所打杭の主鉄筋となるフレキシブル鉄筋2を、
削孔Hにガイドするガイドパイプ7が固定されており、
建込架台1下部には、建込架台1に固定されたジャッキ
4により懸架されたスパイラル筋成形管5が設けられて
いる。
<B> Mounting base The mounting base 1 is installed on the construction base G of the cast-in-place pile, and is arranged so as to coincide with the center of the drill hole H. A flexible reinforcing bar 2 serving as a main reinforcing bar of a cast-in-place pile is provided on a mounting stand 1,
A guide pipe 7 for guiding the hole H is fixed.
A spiral streak forming tube 5 suspended by a jack 4 fixed to the gantry 1 is provided below the gantry 1.

【0008】<ハ>ドラム装置 ドラム装置3は、各フレキシブル鉄筋2を、1本ずつカ
セット式に収納し,ドラムに装着したものである。各フ
レキシブル鉄筋2は、その先端を前記ガイドパイプ7に
挿通し、施工基盤Gまで引き出されるものである。
<C> Drum Device The drum device 3 is one in which each flexible reinforcing bar 2 is housed in a cassette type one by one and mounted on a drum. Each flexible reinforcing bar 2 has its tip inserted into the guide pipe 7 and is pulled out to the construction base G.

【0009】<ニ>ジャッキ 図3は、スパイラル筋建込装置の詳細を示す縦断面図で
ある。ジャッキ4は、建込架台1に固定されており、ロ
ッド41の上下移動操作により、スパイラル筋成形管5
を移動させる。
<D> Jack FIG. 3 is a longitudinal sectional view showing details of the spiral muscle building device. The jack 4 is fixed to the gantry 1 and the spiral streak forming tube 5 is
To move.

【0010】<ホ>スパイラル筋成形管 スパイラル筋成形管5は、建込架台1に固定したモータ
ー42の回転により回転され、スパイラル筋送出し装置
6から送り出されたスパイラル筋8を、外面に巻き、円
形形状に成形し、且つ、円形形状を記憶させるものであ
る。スパイラル筋成形管5の回転に際しては、建込架台
1に固定したモーター回転反力受43が、モーター回転
反力受用軸44とモーター42との回転力を受止め、回
転させる機構としている。
<E> Spiral streak forming tube The spiral streak forming tube 5 is rotated by the rotation of a motor 42 fixed to the gantry 1, and the spiral streaks 8 delivered from the spiral streak delivery device 6 are wound around the outer surface. , Into a circular shape and memorize the circular shape. When rotating the spiral streak forming tube 5, a motor rotation reaction force receiver 43 fixed to the gantry 1 receives the rotation force between the motor rotation reaction force receiving shaft 44 and the motor 42 and rotates the motor.

【0011】<ヘ>スパイラル筋送出し装置 図1〜図3に示すように、前記スパイラル筋成形管5の
側面に、スパイラル筋送出し装置6を設けている。後述
のスパイラル筋引出し架台9に載置されたスパイラル筋
8先端をスパイラル筋送出し装置6に挿入し、前記スパ
イラル筋成形管5の回転により、引き出せる機構として
いる。
<F> Spiral streak delivery device As shown in FIGS. 1 to 3, a spiral streak delivery device 6 is provided on the side surface of the spiral streak forming tube 5. The distal end of a spiral muscle 8 placed on a spiral muscle pull-out stand 9 described later is inserted into the spiral muscle sending-out device 6, and the spiral muscle forming tube 5 can be pulled out by rotation.

【0012】<ト>スパイラル筋引出し架台 スパイラル筋引出し架台9は、場所打杭の施工基盤G上
に設置され、円形状に格納されたスパイラル筋8を、回
転可能に載置している。
<G> Spiral muscle pull-out gantry The spiral muscle pull-out gantry 9 is installed on the construction base G of the cast-in-place pile, and rotatably mounts the spiral streaks 8 stored in a circular shape.

【0013】[0013]

【作用】以下に、鉄筋の建込方法を説明する。The following is a description of a method of building a reinforcing bar.

【0014】<イ>フレキシブル鉄筋の引出し 場所打杭の主鉄筋となるフレキシブル鉄筋2を、ガイド
パイプ7内に挿通し、ドラム装置3を回転させて、施工
基盤G近くまで引き出す。(図4)
<A> Pull-out of flexible reinforcing bar The flexible reinforcing bar 2 serving as the main reinforcing bar of the cast-in-place pile is inserted into the guide pipe 7, and the drum device 3 is rotated to pull it out near the construction base G. (FIG. 4)

【0015】<ロ>下部フレームの取付け 引き出されたフレキシブル鉄筋2の先端に、下部フレー
ム10を取付ける。(図5)下部フレーム10は、円環
状の鋼板10aの内周面に、凹部10bを設け、この凹
部10bにフレキシブル鉄筋2を取付ける。鋼板10a
は、上下一対とし、スペーサー10cで連結されてい
る。(図6)また、下部フレーム10の外側にフレキシ
ブル鉄筋2を取付けることもある。(図12、図13)
<B> Attaching the lower frame The lower frame 10 is attached to the tip of the pulled-out flexible reinforcing bar 2. (FIG. 5) The lower frame 10 is provided with a concave portion 10b on an inner peripheral surface of an annular steel plate 10a, and the flexible reinforcing bar 2 is attached to the concave portion 10b. Steel plate 10a
Are paired up and down and are connected by a spacer 10c. (FIG. 6) The flexible reinforcing bar 2 may be attached to the outside of the lower frame 10 in some cases. (FIGS. 12 and 13)

【0016】<ハ>スパイラル筋の巻付け コイル状に巻き取られたスパイラル筋8を、スパイラル
筋送出し装置6に挿入し、スパイラル筋成形管5を回転
させ、その外面に複数回巻付ける。(図7) スパイラル筋成形管5外面に巻付けられたスパイラル筋
8は、平面形状が円形に加工されたスパイラル筋成形管
5の円形形状を記憶される。(図3)
<C> Winding of spiral streaks The spiral streaks 8 wound in a coil shape are inserted into the spiral streak delivery device 6, and the spiral streak forming tube 5 is rotated to wind a plurality of times around the outer surface thereof. (FIG. 7) As the spiral streaks 8 wound around the outer surface of the spiral streak forming tube 5, the circular shape of the spiral streak forming tube 5 whose planar shape is processed into a circle is stored. (Fig. 3)

【0017】<ニ>スパイラル筋の取付け スパイラル筋成形管5内に複数回巻付けられたスパイラ
ル筋8を切断し、スパイラル筋成形管5下部から取外
し、フレキシブル鉄筋2に所定のピッチで取付ける。
(図8) スパイラル筋8の取付け速度に合わせて、ジャッキ4操
作により、スパイラル筋成形管5を順次上方へ引き上げ
ていく。
<D> Attaching the spiral streaks The spiral streaks 8 wound around the spiral streak forming tube 5 a plurality of times are cut off, removed from the lower part of the spiral streak forming tube 5, and attached to the flexible reinforcing bar 2 at a predetermined pitch.
(FIG. 8) In accordance with the mounting speed of the spiral streaks 8, the spiral streaks forming tube 5 is sequentially pulled up by operating the jack 4.

【0018】<ホ>フレキシブル鉄筋の建込み 図9に示すように、フレキシブル鉄筋2に取付けたスパ
イラル筋8が、施工基盤G近くになるまでフレキシブル
鉄筋2を、削孔H内に建込む。フレキシブル鉄筋2の建
込みと、スパイラル筋8の取付けを繰り返し行う。
<E> Installation of Flexible Reinforcing Bar As shown in FIG. 9, the flexible reinforcing bar 2 is installed in the hole H until the spiral reinforcing bar 8 attached to the flexible reinforcing bar 2 is close to the construction base G. The installation of the flexible rebar 2 and the attachment of the spiral rebar 8 are repeated.

【0019】<ヘ>中間フレームの取付け スパイラル筋8を取付けられたフレキシブル鉄筋2が、
削孔H内に建込まれ、所定深さに達した時、フレキシブ
ル鉄筋2に中間フレーム11の取付けを行う。中間フレ
ーム11の取付け後、再度フレキシブル鉄筋2の建込み
と、スパイラル筋8の取付けを繰り返し行う。(図1
0)
<F> Installation of the intermediate frame The flexible reinforcing bar 2 to which the spiral bar 8 is mounted is
When it is built in the drilled hole H and reaches a predetermined depth, the intermediate frame 11 is attached to the flexible reinforcing bar 2. After the installation of the intermediate frame 11, the installation of the flexible reinforcing bar 2 and the mounting of the spiral bar 8 are repeated. (Figure 1
0)

【0020】<ト>上部フレームの取付け スパイラル筋8を取付けられたフレキシブル鉄筋2の建
込みが、削孔H底面に達した時、図11に示すように上
部フレーム12の取付けを行う。上部フレーム12の取
付け完了後、フレキシブル鉄筋2の固定架台13を施工
基盤G上に設置し、フレキシブル鉄筋2を切断し、鉄筋
の建込み作業が完了する。
<G> Mounting of upper frame When the flexible reinforcing bar 2 to which the spiral bar 8 has been mounted reaches the bottom of the hole H, the upper frame 12 is mounted as shown in FIG. After the mounting of the upper frame 12 is completed, the fixing stand 13 of the flexible reinforcing bar 2 is installed on the construction base G, the flexible reinforcing bar 2 is cut, and the work of installing the reinforcing bar is completed.

【0021】[0021]

【発明の効果】本発明は以上説明したようになるから、
次のような効果を得ることができる。 <イ>場所打杭の上部空間が確保できない現場であって
も、簡単に施工できる。 <ロ>作業空間確保のための、掘削土量が少なくてす
み、経済的である。 <ハ>ジョイントなしで、連続して鉄筋の建込み作業が
行えるので、効率的な施工ができる。 <ニ>ジョイント部のない場所打杭となるので、構造的
に安定した場所打杭とすることができる。 <ホ>予め、鉄筋籠作製のための用地確保は不要であ
り、場所打杭施工の適用範囲が拡大する。 <ヘ>スパイラル筋取付けのための、溶接作業は不要で
あり、溶接による断面欠損は発生しない。 <ト>スパイラル筋を円形加工する必要がなく、効率的
な鉄筋の建込み作業が行える。 <チ>スパイラル筋成形管の設置により、コンパクトな
スパイラル筋巻付け装置となり、狭隘な場所での施工が
可能となる。 <リ>形状記憶したスパイラル筋とすることができるの
で、スパイラル筋巻付けのための張力による、フレキシ
ブル鉄筋の形状保持手段等が不要となる。
Since the present invention has been described above,
The following effects can be obtained. <B> Even in a site where the space above the cast-in-place pile cannot be secured, it can be easily constructed. <B> The amount of excavated soil to secure a work space is small and economical. <C> Since the rebar construction work can be performed continuously without a joint, efficient construction can be performed. <D> Since it is a cast-in-place pile without a joint, a cast-in-place pile that is structurally stable can be obtained. <E> It is not necessary to secure a site in advance for the production of steel cages, and the applicable range of cast-in-place pile construction is expanded. <F> No welding work is required for attaching the spiral streaks, and no cross-sectional loss due to welding occurs. <G> There is no need to circularly process the spiral rebar, and efficient rebar installation work can be performed. <H> By installing the spiral streak forming tube, it becomes a compact spiral streak winding device, and the construction in a narrow place becomes possible. <R> Since the spiral streaks having the shape memory can be used, it is not necessary to provide a means for retaining the shape of the flexible reinforcing bar by the tension for winding the spiral streaks.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による鉄筋建込装置の全体図を示す側断
面図。
FIG. 1 is a side sectional view showing an overall view of a reinforcing bar laying device according to the present invention.

【図2】同上平面図。FIG. 2 is a plan view of the same.

【図3】スパイラル筋建込装置の詳細を示す縦断面図。FIG. 3 is a longitudinal sectional view showing details of a spiral muscle building device.

【図4】フレキシブル鉄筋の引出し状況を示す側断面
図。
FIG. 4 is a side sectional view showing a state where a flexible reinforcing bar is pulled out.

【図5】下部フレームの取付けの引出し状況を示す側断
面図。
FIG. 5 is a side sectional view showing a situation where the lower frame is pulled out for attachment.

【図6】下部フレームの斜視図。FIG. 6 is a perspective view of a lower frame.

【図7】スパイラル筋の巻付け状況を示す側断面図。FIG. 7 is a side sectional view showing a winding state of a spiral streak.

【図8】スパイラル筋の取付け状況を示す側断面図。FIG. 8 is a side sectional view showing a state of attachment of a spiral muscle.

【図9】フレキシブル鉄筋の建込み状況を示す側断面
図。
FIG. 9 is a side sectional view showing the state of installation of a flexible reinforcing bar.

【図10】中間フレームの取付け状況を示す側断面図。FIG. 10 is a side sectional view showing a mounting state of the intermediate frame.

【図11】上部フレームの取付けが終了し、鉄筋の建込
みが完了した状況を示す側断面図。
FIG. 11 is a side sectional view showing a state in which the mounting of the upper frame has been completed and the rebar has been erected.

【図12】下部フレームのその他の形態を示す斜視図。FIG. 12 is a perspective view showing another embodiment of the lower frame.

【図13】同上平面図。FIG. 13 is a plan view of the same.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 平岡 寛 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 (72)発明者 荒井 政男 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 (72)発明者 有山 元茂 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Hiroshi Hiraoka 1-25-1, Nishishinjuku, Shinjuku-ku, Tokyo Taisei Construction Co., Ltd. (72) Inventor Masao Arai 1-25-1, Nishishinjuku, Shinjuku-ku, Tokyo Taisei Construction Co., Ltd. (72) Inventor Motomo Ariyama 1-25-1, Nishishinjuku, Shinjuku-ku, Tokyo Taisei Construction Co., Ltd.

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】場所打杭に使用するフレキシブル鉄筋とス
パイラル筋の建込装置であって、 建込架台、ドラム装置を備えた、フレキシブル鉄筋建込
装置と、 ジャッキ、スパイラル筋成形管、スパイラル筋送出し装
置を備えた、スパイラル筋建込装置とで構成されたこと
を特徴とする、 鉄筋の建込装置。
Claims: 1. An installation device for a flexible reinforcing bar and a spiral bar used for a cast-in-place pile, comprising: a mounting frame and a drum device; a flexible reinforcing bar mounting device; a jack, a spiral bar forming pipe, and a spiral bar. A reinforcing-bar building device, comprising a spiral-bar-building device provided with a delivery device.
【請求項2】請求項1に記載の鉄筋の建込装置におい
て、 建込架台上部にはガイドパイプを設け、建込架台下部に
はスパイラル筋建込装置、スパイラル筋送出し装置を設
けたことを特徴とする、 鉄筋の建込装置。
2. The reinforcing bar building device according to claim 1, wherein a guide pipe is provided at an upper portion of the gantry, and a spiral bar laying device and a spiral bar delivery device are provided at a lower portion of the gantry. A reinforced building device.
【請求項3】請求項1又は請求項2のいずれかに記載の
鉄筋の建込装置において、 スパイラル筋建込装置は、建込架台に固定したジャッキ
により懸架されていることを特徴とする、 鉄筋の建込装置。
3. The rebar-building device according to claim 1, wherein the spiral-bar-building device is suspended by a jack fixed to a building stand. Reinforcing equipment.
【請求項4】場所打杭に使用するフレキシブル鉄筋とス
パイラル筋の建込方法であって、 場所打杭の削孔上に設置された建込架台のガイドパイプ
に、フレキシブル鉄筋を挿通し、 フレキシブル鉄筋を施工基盤まで引き出し、 フレキシブル鉄筋下端部に下部フレームを取付け後、 スパイラル筋送出し装置から送り出されるスパイラル筋
をフレキシブル鉄筋外周に巻き付け、 フレキシブル鉄筋の建込みと、スパイラル筋の巻き付け
を繰り返しながら、削孔内に建込んでいくことを特徴と
する、フレキシブル鉄筋とスパイラル筋の建込方法。
4. A method for installing a flexible reinforcing bar and a spiral reinforcing bar for use in a cast-in-place pile, wherein the flexible reinforcing bar is inserted into a guide pipe of a gantry installed on a drilled hole in the cast-in-place pile. Pull out the rebar to the construction base, attach the lower frame to the lower end of the flexible rebar, wind the spiral rebar sent from the spiral rebar delivery device around the outer circumference of the rebar, repeat the installation of the flexible rebar and the winding of the spiral rebar, A method of building flexible reinforcing bars and spiral bars, characterized by being built in a borehole.
【請求項5】請求項4に記載の鉄筋の建込方法におい
て、 フレキシブル鉄筋の建込みは、建込架台に固定したジャ
ッキにより懸架され、建込まれていくことを特徴とす
る、 フレキシブル鉄筋とスパイラル筋の建込方法。
5. The method for mounting a reinforcing bar according to claim 4, wherein the mounting of the flexible reinforcing bar is suspended and built by a jack fixed to a mounting stand. How to build spiral muscle.
【請求項6】請求項4又は請求項5のいずれかに記載の
鉄筋の建込方法において、 スパイラル筋の巻き付けは、スパイラル筋成形管に複数
回巻き付け、円形形状を成形し、円形形状を記憶後、フ
レキシブル鉄筋に取り付けることを特徴とする、 フレ
キシブル鉄筋とスパイラル筋の建込方法。
6. The method for constructing a reinforcing bar according to claim 4, wherein the spiral streaks are wound a plurality of times around a spiral streaks forming tube, a circular shape is formed, and the circular shape is stored. A method of mounting a flexible rebar and a spiral rebar, wherein the method is attached to a flexible rebar.
【請求項7】請求項4乃至請求項6のいずれかに記載の
鉄筋の建込方法において、 場所打杭を形成するフレキシブル鉄筋の中間部に中間フ
レームを取り付け、上端部に上部フレームを取り付けた
ことを特徴とする、 フレキシブル鉄筋とスパイラル筋の建込方法。
7. The reinforcing bar according to claim 4, wherein an intermediate frame is attached to an intermediate portion of the flexible reinforcing bar forming the cast-in-place pile, and an upper frame is attached to an upper end portion. A method for mounting a flexible reinforcing bar and a spiral reinforcing bar.
JP20727497A 1997-07-16 1997-07-16 Reinforcing bar erection device and method Expired - Fee Related JP3684540B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20727497A JP3684540B2 (en) 1997-07-16 1997-07-16 Reinforcing bar erection device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20727497A JP3684540B2 (en) 1997-07-16 1997-07-16 Reinforcing bar erection device and method

Publications (2)

Publication Number Publication Date
JPH1136293A true JPH1136293A (en) 1999-02-09
JP3684540B2 JP3684540B2 (en) 2005-08-17

Family

ID=16537089

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20727497A Expired - Fee Related JP3684540B2 (en) 1997-07-16 1997-07-16 Reinforcing bar erection device and method

Country Status (1)

Country Link
JP (1) JP3684540B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018172868A (en) * 2017-03-31 2018-11-08 東日本旅客鉄道株式会社 Pile head fixing and holding structure of reinforcing bar cage

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018172868A (en) * 2017-03-31 2018-11-08 東日本旅客鉄道株式会社 Pile head fixing and holding structure of reinforcing bar cage

Also Published As

Publication number Publication date
JP3684540B2 (en) 2005-08-17

Similar Documents

Publication Publication Date Title
EP0758036B1 (en) A method for applying a ground anchor into the ground, and anchor to be used therewith
JP2002070048A (en) Construction method of trussed pillar and Yatco and steel pipe pile used for it
JPH1136293A (en) Reinforcing device and method
JP2010150810A (en) Implement and method for measuring inclination
JP3713678B2 (en) Cast-in-place pile, underground wall and its construction method
JP7007691B1 (en) Casting method for spring spacers, reinforcing bar cages and underground piles
JP3656225B2 (en) Spiral muscle winding device and spiral muscle winding method
JP3661165B2 (en) Pile construction method by spiral band reinforcing construction
JP3827309B2 (en) Auxiliary pile method and embedded pile method
JPH10317374A (en) Method for constructing underground column made of reinforced concrete
JP2001164570A (en) Centering jig for auger screw
JP3735825B2 (en) Reinforcing bar erection method and erection device
JP2009203690A (en) Earth anchor and method of removing the same
JP2002146780A (en) Steel pipe for concrete composite pile and method of building steel-pipe concrete composite pile
JPS6033183Y2 (en) excavator
JPS61250228A (en) Construction of head-reinforced pile
JP2792968B2 (en) Self-supporting soil cement retaining wall and its construction method
JP2773034B2 (en) Rotary press-fitting method for steel pipe piles
JP4919281B2 (en) Pillar assembly column tool and column method
JPH1136294A (en) Reinforcing device and construction method of cast-in-place pile
JP2751032B2 (en) Unbonded PC steel insertion device for cast-in-place prestressed reinforced concrete piles
JP2807692B2 (en) Crushing method for buried piles
JP3403674B2 (en) Method of maintaining the suspension support posture of the tube
JP3661166B2 (en) Reinforcing bar construction equipment for cast-in-place piles
JP2003013449A (en) Pile-driver and method for installing pile and method for burying pile

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041101

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050517

A61 First payment of annual fees (during grant procedure)

Effective date: 20050520

Free format text: JAPANESE INTERMEDIATE CODE: A61

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090610

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 5

Free format text: PAYMENT UNTIL: 20100610

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110610

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120610

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130610

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees