JPH1121020A - Method and system for carrying roving bobbin - Google Patents
Method and system for carrying roving bobbinInfo
- Publication number
- JPH1121020A JPH1121020A JP18138797A JP18138797A JPH1121020A JP H1121020 A JPH1121020 A JP H1121020A JP 18138797 A JP18138797 A JP 18138797A JP 18138797 A JP18138797 A JP 18138797A JP H1121020 A JPH1121020 A JP H1121020A
- Authority
- JP
- Japan
- Prior art keywords
- bobbin
- roving
- rail
- suspended
- carrier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
- Spinning Or Twisting Of Yarns (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は上部支持式のフライ
ヤを2列に千鳥状に装備した粗紡機が配設された粗紡工
程と、粗糸巻を2列に吊下する搬送体を左右両側に配置
して構成されるクリールを備えた複数の精紡機が配設さ
れた精紡工程との間の粗糸ボビン搬送方法及び粗糸ボビ
ン搬送システムに関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a roving process in which roving machines equipped with staggered upper-supported flyers are arranged in two rows, and a carrier for hanging roving windings in two rows on both left and right sides. The present invention relates to a roving bobbin conveying method and a roving bobbin conveying system to and from a spinning step in which a plurality of spinning machines provided with creels arranged and arranged.
【0002】[0002]
【従来の技術】近年、紡績工場では省力化を図るため、
粗紡・精紡工程間の粗糸ボビンの搬送を、台車にボビン
を載せて搬送する代わりに、天井に架設されたレールに
沿って移動(走行)する搬送体に粗紡機で玉揚げされた
満ボビンや精紡機で粗糸が使用された後の空ボビンを吊
下して搬送する粗糸搬送システムが実施されている。2. Description of the Related Art In recent years, in order to save labor in spinning factories,
The roving bobbin is transported during the roving / spinning process, instead of being transported by placing the bobbin on a bogie, the roving bobbin is transported (running) along a rail erected on the ceiling by the roving machine. 2. Description of the Related Art A roving transport system for suspending and transporting an empty bobbin after roving has been used in a bobbin or a spinning machine has been implemented.
【0003】粗紡機及び精紡機では機台の小型化を図る
ため、フライヤやスピンドルの配置及びドラフトパート
へ粗糸を供給する粗糸ボビンの配置が適宜間隔を有して
設定されている。そして、粗紡機ではフライヤが千鳥状
に2列に配置され、ボビンホイールもそれに対応して千
鳥状に2列に配置されている。また、精紡機では一般に
予備粗糸替えが行われている。予備粗糸替えを行う精紡
機では機台の左右両側に設けた予備粗糸巻レールに予備
粗糸巻(予備粗糸ボビン)を1列に吊下しておき、クリ
ールに吊下されて粗糸供給中の粗糸ボビンが空に近づい
たときに、当該粗糸ボビンと予備粗糸巻とを交換する。
予備粗糸替えを行う精紡機と粗紡機との間で粗糸ボビン
の搬送を行う粗糸搬送システムでは、予備粗糸巻レール
に予備粗糸ボビンを1列に吊下した搬送体を搬入する。In the roving and spinning machines, in order to reduce the size of the frame, the arrangement of the flyer and the spindle and the arrangement of the roving bobbins for supplying the roving to the draft part are set at appropriate intervals. In the roving machine, the flyers are arranged in two rows in a staggered manner, and the bobbin wheels are also arranged in two rows in a staggered manner correspondingly. In addition, in a spinning machine, preliminary roving is generally performed. In a spinning machine that performs a preliminary roving change, a preliminary roving winding (preliminary roving bobbin) is suspended in a single row on preliminary roving winding rails provided on both the left and right sides of the machine stand, and suspended by a creel to supply roving. When the inner roving bobbin approaches empty, the roving bobbin is replaced with a spare roving.
In a roving yarn transport system that transports a roving bobbin between a spinning machine that performs preliminary roving change and a roving machine, a transport body in which a preliminary roving bobbin is suspended in a single row is loaded into a preliminary roving winding rail.
【0004】粗紡機のボビンホイールの配列ピッチと、
精紡機の予備粗糸巻レールに吊下される粗糸ボビンのピ
ッチとはそれぞれ異なる。そのため、粗紡機で生産され
たボビンホイール上の満ボビンを搬送体に吊下して精紡
機の予備粗糸巻レールに搬入するまでに、満ボビンのピ
ッチを予備粗糸巻レールでの所定ピッチに変更する必要
がある。また、予備粗糸巻レール上の搬送体に吊下され
た精紡機で使用された後の残粗糸ボビンのピッチを、残
粗糸処理後に粗紡機の前側上方に延設された粗紡機用レ
ールに搬入されるまでに粗紡機のボビンホイールの配列
ピッチに変更する必要がある。[0004] The arrangement pitch of the bobbin wheels of the roving machine,
The pitch of the roving bobbins suspended from the preliminary roving winding rail of the spinning machine is different from each other. Therefore, the full bobbin pitch is changed to the predetermined pitch on the spare roving winding rail before the full bobbin on the bobbin wheel produced by the roving machine is suspended on the carrier and carried into the spare roving winding rail of the spinning machine. There is a need to. In addition, the pitch of the remaining roving bobbin after being used by the spinning machine suspended on the carrier on the preliminary roving winding rail, the roving rail extending above the front side of the roving machine after the remaining roving process. It is necessary to change to the arrangement pitch of the bobbin wheels of the roving machine before being carried into the roving machine.
【0005】この粗糸ボビンのピッチ変更を、粗紡機に
沿って間欠的に移動して複数本ずつ管替作業を行う管替
装置により行う方法がある(例えば、特開昭61−17
4432号公報)。また、特開昭61−197376号
公報、特開昭61−102429号公報等には、予備粗
糸巻レールにおける粗糸ボビンのピッチで屈曲可能にリ
ンクを連結して構成した搬送体を使用する方法が開示さ
れている。この方法では、粗紡機用レールには搬送体を
ジグザグ状となるように搬入し、粗紡機で生産された満
ボビンを搬送体に千鳥状に吊下した状態で玉揚げし、搬
送体を予備粗糸巻レールに直線状となるように搬入して
ピッチ変更を行う。There is a method in which the pitch of the roving bobbin is changed by a pipe changing device which intermittently moves along a roving machine and performs a pipe changing operation for a plurality of bobbins (for example, JP-A-61-17).
No. 4432). Further, Japanese Patent Application Laid-Open Nos. 61-197376 and 61-102429 disclose a method of using a transport body constituted by connecting links that can be bent at the pitch of a roving bobbin in a preliminary roving winding rail. Is disclosed. In this method, the transport body is loaded in a zigzag shape on the roving rail, and the full bobbins produced by the roving machine are hung in a staggered manner on the transport body and doffed. The pitch is changed by loading the roving winding rail in a straight line.
【0006】ところが、特開昭61−174432号公
報に開示された方法では、管替装置の構造が複雑にな
る。また、千鳥状の配列を一直線状に変更して粗紡機用
レール上の搬送体に吊下するため、粗紡機用レールが粗
紡機より長くなるとともに、搬送体を管替作業に対応し
て移動させるための移動装置が必要になるという問題も
ある。However, the method disclosed in Japanese Patent Application Laid-Open No. 61-174432 complicates the structure of the switching device. In addition, since the staggered arrangement is changed to a straight line and suspended on the carrier on the roving rail, the roving rail is longer than the roving machine and the carrier is moved in accordance with the pipe change operation. There is also a problem that a moving device for causing the movement is required.
【0007】一方、特開昭61−197376号公報、
特開昭61−102429号公報等に開示された方法の
場合は、管替装置の構成は特開昭61−174432号
公報に開示されたものより簡単であるが、搬送体を構成
するローラやベアリングの数が多くなり、搬送体の構造
が複雑で製造コストが高くなる。On the other hand, Japanese Patent Application Laid-Open No. 61-197376 discloses
In the case of the method disclosed in Japanese Patent Application Laid-Open No. 61-102429 or the like, the configuration of the tube changing device is simpler than that disclosed in Japanese Patent Application Laid-Open No. 61-174432, The number of bearings increases, the structure of the carrier is complicated, and the manufacturing cost increases.
【0008】また、前記の従来方法では粗紡機と精紡機
とで搬送体が共用されるため、搬送体1台当たりのボビ
ンハンガの個数を粗紡機と精紡機とで共用できる数に設
定しなければならず、錘数の異なる粗紡機や精紡機を共
存させてボビン搬送システムを組むことが難しかった。Further, in the above-mentioned conventional method, since the carrier is shared by the roving frame and the spinning frame, the number of bobbin hangers per carrier must be set to a number that can be shared by the roving frame and the spinning frame. In addition, it was difficult to form a bobbin transport system in which roving and spinning machines having different numbers of spindles coexist.
【0009】これらの問題を解消する方法が特開平8−
157144号公報に提案されている。この方法では、
図14に示すように、粗紡工程でボビンの搬送を行う第
1の搬送体61と、精紡工程でボビンの搬送を行う第2
の搬送体62とは異なるピッチでボビンハンガ63を吊
下する構成となっている。そして、粗紡工程と精紡工程
とにそれぞれ独立の走行レール64,65が設けられる
とともに、各走行レール64,65が近接して配置され
た箇所に各搬送体61,62に吊下された満ボビンFと
空ボビンEとを交換するボビン交換装置66が設けられ
ている。そして、粗紡機のボビンホイールピッチで第1
の搬送体61に吊下された満ボビンFと、予備粗糸巻レ
ール上の所定ピッチで第2の搬送体62に吊下された空
ボビンEとが、ボビン交換装置66で交換されるように
なっている。A method for solving these problems is disclosed in Japanese Unexamined Patent Publication No.
No. 157,144. in this way,
As shown in FIG. 14, a first transporting body 61 for transporting the bobbin in the roving process and a second transporting body 61 for transporting the bobbin in the spinning process.
The bobbin hanger 63 is suspended at a pitch different from that of the carrier 62. In addition, independent traveling rails 64 and 65 are provided for the roving and spinning processes, respectively, and the full rails suspended by the transport bodies 61 and 62 are provided at positions where the traveling rails 64 and 65 are arranged close to each other. A bobbin exchanging device 66 for exchanging the bobbin F with the empty bobbin E is provided. And the first in the bobbin wheel pitch of the roving machine
And the empty bobbin E suspended from the second transport body 62 at a predetermined pitch on the preliminary roving winding rail is exchanged by the bobbin exchange device 66. Has become.
【0010】ボビン交換装置66はモータ67により駆
動されて、満ボビンF又は空ボビンEが挿着されたペッ
グ支持部材68をスライドさせる4台のスライド装置6
9と、4台のスライド装置69を同時に昇降させる昇降
手段(図示せず)とを備えている。そして、昇降手段及
び4台のスライド装置69を駆動制御することにより、
第1の搬送体61と第2の搬送体62との間で満ボビン
Fと空ボビンEとをそのピッチを変更しながら交換する
ようになっている。The bobbin exchanging device 66 is driven by a motor 67 to slide a peg support member 68 into which a full bobbin F or an empty bobbin E is inserted.
9 and lifting means (not shown) for raising and lowering the four slide devices 69 at the same time. Then, by driving and controlling the lifting / lowering means and the four slide devices 69,
The full bobbin F and the empty bobbin E are exchanged between the first transport body 61 and the second transport body 62 while changing the pitch.
【0011】[0011]
【発明が解決しようとする課題】ところが、前記従来装
置では第1の搬送体61と第2の搬送体62との間でボ
ビンの交換を行う際に、そのピッチを変更する必要があ
り、ピッチ変更のための機構が複雑になる。また、ボビ
ン交換装置66による交換作業時に、第1及び第2の搬
送体61,62を所定量移動させる動作も必要となり、
その制御が複雑になるという問題がある。However, in the conventional apparatus, when the bobbin is exchanged between the first carrier 61 and the second carrier 62, it is necessary to change the pitch. The mechanism for the change becomes complicated. Further, at the time of replacement work by the bobbin replacement device 66, an operation of moving the first and second transport bodies 61 and 62 by a predetermined amount is also required.
There is a problem that the control becomes complicated.
【0012】本発明は前記の問題点に鑑みてなされたも
のであって、その目的は互いに異なる走行レール上を移
動する搬送体に吊下された粗糸ボビンのピッチを変更す
ることなく、複数本ずつボビン交換を行うことができる
粗糸ボビン搬送方法及び粗糸ボビン搬送システムを提供
することにある。SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems, and has as its object to provide a plurality of roving bobbins suspended on a conveyor moving on different running rails without changing the pitch. It is an object of the present invention to provide a roving bobbin conveying method and a roving bobbin conveying system capable of performing bobbin replacement one by one.
【0013】[0013]
【課題を解決するための手段】前記の目的を達成するた
め請求項1に記載の発明では、上部支持式のフライヤを
2列に千鳥状に装備した粗紡機が配設された粗紡工程
と、粗糸ボビンを左右両側に2列ずつ配置して構成され
るクリールを備えた複数の精紡機が配設された精紡工程
との間の粗糸ボビン搬送方法であって、粗紡機の2列の
ボビンホイールの各列のボビンホイールピッチと、精紡
機のクリールにおける前記粗糸ボビンの2列の間隔とを
等しく設定し、粗紡機の上方に配設された粗紡機用レー
ル上に待機するとともに粗紡機のボビンホイールピッチ
でボビンハンガが吊下された第1の搬送体に粗紡機で生
産された満ボビンを吊下して粗紡機から交換位置まで搬
出し、精紡機のクリールを構成するため粗糸ボビンを2
列に吊下するボビンハンガを備えた第2の搬送体に空ボ
ビンを吊下した状態で交換位置まで搬送し、交換位置に
おいて第1の搬送体の満ボビンと第2の搬送体の空ボビ
ンとをボビンの間隔を保った状態で交換し、空ボビンが
吊下された第1の搬送体を前記粗紡機用レールに搬入
し、満ボビンが吊下された第2の搬送体を精紡機のクリ
ールに搬入するようにした。According to the first aspect of the present invention, there is provided a roving process in which a roving machine equipped with two staggered upper supporting flyers is provided. A roving bobbin conveying method between a spinning process and a spinning process in which a plurality of spinning machines provided with a creel configured by arranging roving bobbins in two rows on both the left and right sides are provided. The bobbin wheel pitch of each row of the bobbin wheel is set to be equal to the interval between the two rows of the roving bobbins in the creel of the spinning machine, and the robot stands by on a roving rail arranged above the roving machine. A full bobbin produced by a roving machine is hung on a first carrier on which a bobbin hanger is hung at the bobbin wheel pitch of the roving machine, carried out from the roving machine to an exchange position, and formed into a creel of a spinning machine. 2 thread bobbins
The empty bobbin is conveyed to the exchange position in a state where the empty bobbin is hung on the second conveyance body provided with the bobbin hanger suspended in the row. Are exchanged while maintaining the bobbin interval, the first transporter on which the empty bobbin is suspended is loaded into the rail for the roving machine, and the second transporter on which the full bobbin is suspended is transferred to the spinning machine. Carried in creel.
【0014】請求項2に記載の発明では、上部支持式の
フライヤを2列に千鳥状に装備した粗紡機が配設された
粗紡工程と、粗糸ボビンを左右両側に2列ずつ配置して
構成されるクリールを備えた複数の精紡機が配設された
精紡工程との間の粗糸ボビン搬送システムであって、粗
紡工程に設けられた第1の走行レールと、前記第1の走
行レールから分岐され、粗紡機の前側上方にその長手方
向に沿って延設された粗紡機用レールと、前記第1の走
行レール及び粗紡機用レール上を走行可能に設けられ、
粗紡機のボビンホイールピッチでボビンハンガが1列に
吊下された第1の搬送体と、前記第1の搬送体を移送す
る第1の移送手段と、精紡工程に設けられるとともに一
部が前記第1の走行レールと近接する位置に配置される
ように設けられた第2の走行レールと、前記第2の走行
レールから分岐され、各精紡機のクリールと対応する位
置に延設された2列の精紡機用レールと、前記第2の走
行レール及び精紡機用レール上を走行可能に設けられ、
ボビンハンガが2列で吊下されるとともに両列の間隔が
粗紡機のボビンホイールピッチと同じに設定された第2
の搬送体と、前記第2の搬送体を移送する第2の移送手
段と、前記第1の走行レールと第2の走行レールとが近
接する位置に設けられ、第1の搬送体上の満ボビンと第
2の搬送体上の空ボビンとの交換を2本ずつ行うボビン
交換装置とを備えた。According to the second aspect of the present invention, a roving process in which roving machines equipped with staggered upper-supported flyers in two rows are arranged, and roving bobbins are arranged in two rows on both left and right sides. A roving bobbin transport system between a spinning process in which a plurality of spinning machines provided with a creel are arranged, the first running rail provided in the roving process, and the first running A rail for a roving machine that is branched from a rail and extends along the longitudinal direction above the front side of the roving machine, and is provided so as to be able to run on the first travel rail and the roving rail.
A first transporter in which bobbin hangers are hung in a row at a bobbin wheel pitch of a roving machine, a first transporter for transporting the first transporter, and a part provided in a spinning process and partially provided in the spinning process. A second travel rail provided so as to be disposed close to the first travel rail; and a second travel rail branched from the second travel rail and extended to a position corresponding to the creel of each spinning machine. A row of spinning rails, and the second running rail and the spinning rail are provided so as to be able to run on the rails,
A second bobbin hanger is suspended in two rows and the interval between both rows is set to be equal to the bobbin wheel pitch of the roving machine.
, A second transfer means for transferring the second transfer body, and a position where the first travel rail and the second travel rail are close to each other, and A bobbin exchanging device for exchanging the bobbin with an empty bobbin on the second carrier two by two.
【0015】請求項3に記載の発明では、請求項2に記
載の発明において、前記ボビン交換装置は第1の搬送体
に吊下された満ボビンの下部に嵌合可能な一組の第1の
ペッグと、第2の搬送体に吊下された空ボビンの下部に
嵌合可能な一組の第2のペッグと、第1のペッグを第2
の搬送体に吊下されたボビンハンガと対向する位置に、
第2のペッグを第1の搬送体に吊下されたボビンハンガ
と対向する位置にそれぞれ回動配置する回動手段と、前
記第1及び第2のペッグを前記回動手段とともに第1の
搬送体に吊下された満ボビンの下部に嵌合可能な上昇位
置と、前記回動手段の回動時に前記ペッグ上の満ボビン
及び空ボビンと搬送体に吊下された満ボビン及び空ボビ
ンとが干渉しない下降位置とに移動させる昇降手段とを
備えている。According to a third aspect of the present invention, in the second aspect of the invention, the bobbin exchanging device is a set of first bobbin which can be fitted to a lower portion of a full bobbin suspended on a first carrier. , A pair of second pegs that can be fitted to the lower part of the empty bobbin suspended by the second carrier, and the first peg to the second
At a position facing the bobbin hanger suspended from the carrier
Rotating means for rotating and disposing the second peg at a position opposed to a bobbin hanger suspended on the first carrier, and the first carrier and the first and second pegs together with the rotating means; The raised position that can be fitted to the lower part of the full bobbin suspended on the peg, the full bobbin and the empty bobbin on the peg and the full bobbin and the empty bobbin suspended on the carrier when the rotating means rotates. Lifting means for moving to a lowering position that does not interfere.
【0016】請求項4に記載の発明では、請求項2又は
請求項3に記載の発明において、前記第1の走行レール
と第2の走行レールとは前記ボビン交換装置が配設され
る位置において互いに平行に延びるように配置されてい
る。According to a fourth aspect of the present invention, in the second or third aspect of the present invention, the first traveling rail and the second traveling rail are located at a position where the bobbin exchanging device is disposed. They are arranged to extend parallel to each other.
【0017】請求項5に記載の発明では、請求項4に記
載の発明において、前記ボビン交換装置は前記第1の走
行レール上の第1の搬送体から取り外した満ボビンと、
第2の走行レール上の第2の搬送体から取り外した空ボ
ビンとをそれぞれその配列方向を90°変更した状態で
交換する。According to a fifth aspect of the present invention, in the fourth aspect of the present invention, the bobbin exchanging device includes a full bobbin removed from a first carrier on the first traveling rail;
The empty bobbins removed from the second conveyor on the second traveling rail are exchanged while their arrangement directions are changed by 90 °.
【0018】請求項1に記載の発明では、粗紡機は上部
支持式のフライヤを2列に千鳥状に装備している。精紡
機のクリールは粗糸ボビンを2列に吊下する搬送体を左
右両側に配置して構成されている。粗紡機の2列のボビ
ンホイールの各列のボビンホイールピッチと、精紡機の
前記粗糸ボビンの2列の間隔とが等しく設定される。粗
紡機で生産された満ボビンは、粗紡機の上方に配設され
た粗紡機用レール上に待機するとともに粗紡機のボビン
ホイールピッチでボビンハンガが吊下された第1の搬送
体に吊下されて粗紡機から搬出される。精紡機のクリー
ルを構成する第2の搬送体は、粗糸が使用された後の2
列に吊下された残粗糸ボビンを搬出する。そして、第2
の搬送体は残粗糸処理が完了した空ボビンを吊下して交
換位置まで搬送する。交換位置において第1の搬送体の
満ボビンと第2の搬送体の空ボビンとがボビンの間隔を
保った状態で交換され、空ボビンが吊下された第1の搬
送体が粗紡機用レールに搬入され、満ボビンが吊下され
た第2の搬送体が精紡機のクリールに搬入される。According to the first aspect of the present invention, the roving machine is provided with the upper-supported flyers in two rows in a staggered manner. The creel of the spinning machine is configured by arranging transport bodies that suspend roving bobbins in two rows on both the left and right sides. The bobbin wheel pitch of each row of the two rows of bobbin wheels of the roving machine is set equal to the interval between the two rows of the roving bobbins of the spinning machine. The full bobbin produced by the roving machine stands by on a roving rail arranged above the roving machine and is suspended by a first carrier on which a bobbin hanger is suspended at the bobbin wheel pitch of the roving machine. Out of the roving machine. The second carrier constituting the creel of the spinning machine is the second carrier after the roving has been used.
The remaining roving bobbins suspended from the row are carried out. And the second
Transports the empty bobbin on which the remaining roving process has been completed to the replacement position. At the exchange position, the full bobbin of the first carrier and the empty bobbin of the second carrier are exchanged while maintaining the interval between the bobbins, and the first carrier on which the empty bobbin is suspended is connected to the roving frame rail. , And the second carrier, on which the full bobbin is suspended, is carried into the creel of the spinning machine.
【0019】請求項2に記載の発明では、請求項1に記
載の発明の方法を実施する場合、第1の搬送体は第1の
走行レール上と、第1の走行レールから分岐されて粗紡
機の前側上方にその長手方向に沿って延設された粗紡機
用レール上とを走行する。第1の搬送体は第1の移送手
段の作動に伴って第1の走行レール上を走行する。第2
の搬送体は第2の走行レール上と、第2の走行レールか
ら分岐されて各精紡機のクリールと対応する位置に延設
された2列の精紡機用レール上とを走行する。第2の搬
送体は第2の移送手段の作動に伴って第2の走行レール
上を走行する。第1及び第2の搬送体がボビン交換装置
と対応する位置を通過する間に、第1の搬送体上の満ボ
ビンと第2の搬送体上の空ボビンとがボビン交換装置の
作用により2本ずつ交換される。According to the second aspect of the present invention, when the method according to the first aspect of the present invention is carried out, the first transport body is provided on the first traveling rail and branched from the first traveling rail. It travels on a roving rail extending above the front side of the spinning machine along its longitudinal direction. The first transport body travels on the first travel rail with the operation of the first transfer means. Second
Transports on a second traveling rail and on two rows of spinning rails branched from the second traveling rail and extended to positions corresponding to the creels of the respective spinning machines. The second transporter travels on the second travel rail with the operation of the second transfer means. While the first and second carriers pass the positions corresponding to the bobbin changing device, two full bobbins on the first carrier and two empty bobbins on the second carrier are operated by the bobbin changing device. Be exchanged.
【0020】請求項3に記載の発明では、請求項2に記
載の発明において、ボビン交換装置の昇降手段の作動に
より、第1及び第2のペッグが昇降される。そして、第
1の搬送体に吊下された満ボビンが一組の第1のペッグ
に、第2の搬送体に吊下された空ボビンが一組の第2の
ペッグにそれぞれ嵌挿された状態でボビンハンガから取
り外される。満ボビン及び空ボビンが嵌挿された各ペッ
グが下降位置に配置された状態で回動手段が作動され、
第1のペッグが第2の搬送体に吊下されたボビンハンガ
と対向する位置に、第2のペッグが第1の搬送体に吊下
されたボビンハンガと対向する位置にそれぞれ配置され
る。その状態で昇降手段の作動により第1の搬送体に空
ボビンが、第2の搬送体に満ボビンがそれぞれ吊下され
る。According to a third aspect of the present invention, in the second aspect of the present invention, the first and second pegs are raised and lowered by the operation of the lifting and lowering means of the bobbin changing device. Then, the full bobbin suspended by the first transporter was fitted to a set of first pegs, and the empty bobbin suspended by the second transporter was fitted to a set of second pegs. Removed from bobbin hanger in state. The rotating means is operated in a state where each peg in which the full bobbin and the empty bobbin are inserted is arranged at the lower position,
The first peg is arranged at a position facing the bobbin hanger suspended on the second carrier, and the second peg is arranged at a position facing the bobbin hanger suspended on the first carrier. In this state, the empty bobbin is suspended on the first carrier and the full bobbin is suspended on the second carrier by the operation of the elevating means.
【0021】請求項4に記載の発明では、請求項2又は
請求項3に記載の発明において、第1の搬送体及び第2
の搬送体は、ボビン交換装置と対応する位置を移動する
際は互いに平行な状態で移動する。According to a fourth aspect of the present invention, in the second or third aspect of the present invention, the first carrier and the second
When moving at a position corresponding to the bobbin exchanging device, the carriers move in parallel with each other.
【0022】請求項5に記載の発明では、請求項4に記
載の発明において、第1の搬送体に吊下された満ボビン
と、第2の搬送体に吊下された空ボビンとは、ボビン交
換装置によりその配列方向が90°変更された状態で他
の搬送体に吊下される。According to a fifth aspect of the present invention, in the fourth aspect of the invention, the full bobbin suspended on the first carrier and the empty bobbin suspended on the second carrier are: The bobbin exchange device hangs it on another carrier with its arrangement direction changed by 90 °.
【0023】[0023]
(第1の実施の形態)以下、本発明を具体化した第1の
実施の形態を図1〜図8に従って説明する。図1に示す
ように、複数の粗紡機1が並設された粗紡工程と、複数
の精紡機2が並設された精紡工程とが隣接して配置され
ている。粗紡工程には第1の走行レール3が粗紡機群の
周囲に沿ってループ状に設けられている。各粗紡機1の
前側上方には2本の粗紡機用レール4a,4bが、第1
の走行レールから分岐した分岐レールとして平行に配設
されている。両粗紡機用レール4a,4bは、後記する
第1の搬送体5(図3及び図5に図示)が満ボビンを吊
下した状態で粗紡機用レール4a,4b上を移動する際
に、満ボビン同士が干渉しない間隔をおいて延設されて
いる。粗紡機用レール4a,4bと第1の走行レール3
との分岐部には走行路切換装置(図示せず)が配設され
ている。各粗紡機1の前側には一斉式の公知の構成(例
えば、特開平6−41827号公報)の管替装置(図示
せず)が配置されている。管替装置として特開昭61−
119730号公報に開示された装置と同様な間欠移動
型の装置を使用してもよい。(First Embodiment) A first embodiment of the present invention will be described below with reference to FIGS. As shown in FIG. 1, a roving process in which a plurality of roving machines 1 are arranged side by side and a spinning process in which a plurality of spinning machines 2 are arranged side by side are arranged adjacent to each other. In the roving process, a first traveling rail 3 is provided in a loop along the periphery of the roving machine group. Above the front side of each roving frame 1, two roving frame rails 4a and 4b are provided.
Are arranged in parallel as branch rails branched from the traveling rails. The two roving rails 4a, 4b are used when a first carrier 5 (shown in FIGS. 3 and 5) described later moves on the roving rails 4a, 4b in a state where a full bobbin is suspended. The bobbins extend at intervals so that they do not interfere with each other. Rover frame rails 4a, 4b and first running rail 3
A travel path switching device (not shown) is provided at the branching point. On the front side of each roving machine 1, a tube changing device (not shown) of a publicly known structure (for example, JP-A-6-41827) is arranged. JP-A-61-61
An intermittently moving device similar to the device disclosed in Japanese Patent No. 119730 may be used.
【0024】図5に示すように、第1の搬送体5を構成
する複数のリンク部材6は、走行ローラ7を介して前記
各レール3,4a,4bに対して吊下状態で装備される
とともに、連結部材8を介して屈曲可能に連結されてい
る。連結部材8はリンク部材6間の隙間に突出する凸部
8aを有する形状に形成され、第1の搬送体5はその全
長に亘ってリンク部材6の幅と同じ幅になるように形成
されている。第1の搬送体5は粗紡機1に千鳥状に配置
された2列のボビンホイール(図示せず)の1列分の粗
糸ボビンを吊下可能な長さに形成されている。各リンク
部材6にはボビンハンガ9が所定間隔毎に吊下されてい
る。ボビンハンガ9の間隔、即ちボビンハンガ9に吊下
された満ボビンFの間隔がボビンホイールの各列のピッ
チPに等しい値に設定されている。As shown in FIG. 5, a plurality of link members 6 constituting the first transporting body 5 are mounted on the rails 3, 4a, 4b via running rollers 7 in a suspended state. At the same time, they are connected to bendable via connecting members 8. The connecting member 8 is formed in a shape having a convex portion 8a protruding into a gap between the link members 6, and the first transport body 5 is formed so as to have the same width as the width of the link member 6 over its entire length. I have. The first conveyor 5 is formed to have a length capable of suspending one row of roving bobbins of two rows of bobbin wheels (not shown) arranged in a staggered manner on the roving machine 1. A bobbin hanger 9 is suspended from each link member 6 at predetermined intervals. The interval between the bobbin hangers 9, that is, the interval between the full bobbins F suspended from the bobbin hanger 9, is set to a value equal to the pitch P of each row of the bobbin wheels.
【0025】図4に示すように、精紡機2のクリール1
0は、クリールピラー11を中心として左右両側に配設
された精紡機用レールとしてのクリールレール12と、
クリールレール12に対して走行可能に装備された第2
の搬送体13とから構成されている。図1に示すよう
に、各クリールレール12は精紡機群の両端部において
精紡機2の長手方向と直交する方向に延びる部分を有す
る第2の走行レール14から分岐した分岐レールとして
平行に配設されている。第2の走行レール14の途中に
は残粗糸処理装置15が配設されている。第2の走行レ
ール14の途中には残粗糸ボビンを吊下した第2の搬送
体13を一時貯留する貯留部14aと、残粗糸処理が完
了した空ボビンEを吊下した第2の搬送体13を一時貯
留する貯留部14bとが分岐レールとして形成されてい
る。また、第2の走行レール14とクリールレール12
及び貯留部14a,14bとの分岐部には走行路切換装
置(図示せず)が配設されている。As shown in FIG. 4, the creel 1 of the spinning machine 2
0 is a creel rail 12 serving as a spinning frame rail disposed on the left and right sides of the creel pillar 11 as a center;
The second equipped to run on the creel rail 12
And the transporting body 13. As shown in FIG. 1, each creel rail 12 is disposed in parallel as a branch rail branched from a second running rail 14 having a portion extending in a direction orthogonal to the longitudinal direction of the spinning frame 2 at both ends of the spinning frame group. Have been. A remaining roving treatment device 15 is provided in the middle of the second running rail 14. In the middle of the second traveling rail 14, a storage section 14a for temporarily storing the second transporting body 13 suspended from the remaining roving bobbin, and a second storage section 14a suspended from the empty bobbin E having completed the remaining roving process. The storage section 14b for temporarily storing the transport body 13 is formed as a branch rail. Also, the second running rail 14 and the creel rail 12
A travel path switching device (not shown) is provided at a branch point between the storage sections 14a and 14b.
【0026】図6及び図7に示すように、第2の搬送体
13は複数(この実施の形態では12個)のボビンハン
ガ9を2列で吊下し、走行ローラ7を介してクリールレ
ール12及び第2の走行レール14に対して走行可能に
装備された搬送マガジン16を多数連結することにより
構成されている。2列のボビンハンガ9の列間隔は第1
の搬送体5のボビンハンガ9の間隔、即ちボビンホイー
ルピッチPと等しく設定されている。また、各列のボビ
ンハンガ9の間隔はボビンホイールピッチよりも小さい
スピンドルピッチに対応した所定間隔Qに設定されてい
る。搬送マガジン16はボビンハンガ9を支持する2本
のバー16aを4本の支持バー16b,16cで連結す
ることにより形成され、内側の支持バー16b上に走行
ローラ7の支柱17が立設されている。前後両側の支持
バー16cにはそれぞれ中央部に支持ブラケット18が
垂下され、両支持ブラケット18間にロービングガイド
ロッド19が水平状態に固定されている。また、前後両
側の支持バー16cにはバンパー20が固定されてい
る。As shown in FIGS. 6 and 7, the second carrier 13 suspends a plurality of (twelve in this embodiment) bobbin hangers 9 in two rows. And a plurality of transport magazines 16 movably mounted on the second travel rail 14. The row interval between the two rows of bobbin hangers 9 is the first.
Of the bobbin hanger 9 of the transfer body 5, that is, the bobbin wheel pitch P. The interval between the bobbin hangers 9 in each row is set to a predetermined interval Q corresponding to a spindle pitch smaller than the bobbin wheel pitch. The transport magazine 16 is formed by connecting two bars 16a supporting the bobbin hanger 9 with four support bars 16b and 16c, and a support 17 of the traveling roller 7 stands on the inner support bar 16b. . Support brackets 18 are respectively suspended at the center of the support bars 16c on both front and rear sides, and a roving guide rod 19 is fixed between the support brackets 18 in a horizontal state. The bumpers 20 are fixed to the support bars 16c on both front and rear sides.
【0027】搬送マガジン16の支柱17間には、後記
する移送装置と係合する係合バー21が水平に固定され
ている。また、隣接する搬送マガジン16は、連結リン
ク22を介して屈曲可能に連結されている。連結リンク
22は第2の搬送体13が第2の走行レール14のカー
ブ部分を走行する際に、隣接する搬送マガジン16の支
柱17の間隔が変化するのを許容するための長孔22a
を介して支柱17aに連結されている。また、連結リン
ク22は各搬送マガジン16が互いに当接する状態で直
線状に配置されたとき、係合バー21間の隙間に突出す
る凸部22bを有する形状に形成され、第2の搬送体1
3は係合バー21の配置高さにおいてその全長に亘って
一定の幅になるように形成されている。An engaging bar 21 that engages with a transfer device described later is horizontally fixed between the columns 17 of the transport magazine 16. The adjacent transport magazines 16 are connected via a connecting link 22 to bend. The connecting link 22 is a long hole 22a for allowing the interval between the columns 17 of the adjacent transport magazine 16 to change when the second transport body 13 travels on the curved portion of the second travel rail 14.
Is connected to the support 17a through the support. When the transport magazines 16 are arranged linearly in a state where the transport magazines 16 are in contact with each other, the connecting link 22 is formed in a shape having a convex portion 22 b projecting into a gap between the engaging bars 21.
Numeral 3 is formed to have a constant width over the entire length of the engaging bar 21 at the arrangement height thereof.
【0028】第1の走行レール3及び粗紡機用レール4
a,4b上には第1の搬送体5を移送する第1の移送手
段として移送装置23が所定間隔をおいて配設されてい
る。第2の走行レール14及びクリールレール12上に
は第2の搬送体5を移送する第2の移送手段として移送
装置24が所定間隔をおいて配設されている。First running rail 3 and roving rail 4
A transfer device 23 is provided on a and 4b at a predetermined interval as first transfer means for transferring the first transfer body 5. On the second running rail 14 and the creel rail 12, transfer devices 24 are provided at predetermined intervals as second transfer means for transferring the second transfer member 5.
【0029】移送装置23,24には公知の構成(例え
ば、特開平8−157144号公報)のものが使用され
ている。移送装置23は一対のプーリ間に巻き掛けられ
たベルトと、ベルトと対向して所定間隔をおいて配置さ
れたローラとを備えている。そして、リンク部材6又は
連結部材8を両側面においてベルト及びローラが挟む状
態でベルトが走行駆動されることにより、第1の搬送体
5を移送するようになっている。移送装置23は少なく
とも1台の移送装置23が第1の搬送体5と係合可能な
間隔で配設されている。移送装置24も移送装置23と
基本的に同様に構成され、係合バー21又は連結リンク
22を両側面においてベルト及びローラが挟む状態でベ
ルトが走行駆動されることにより、第2の搬送体13を
移送するようになっている。The transfer devices 23 and 24 have a known configuration (for example, Japanese Patent Application Laid-Open No. 8-157144). The transfer device 23 includes a belt wound around a pair of pulleys, and rollers arranged at a predetermined distance from the belt. Then, the belt is driven to run with the belt and the rollers sandwiching the link member 6 or the connecting member 8 on both side surfaces, so that the first transport body 5 is transferred. The transfer devices 23 are arranged at intervals such that at least one transfer device 23 can engage with the first transport body 5. The transfer device 24 is also basically configured in the same manner as the transfer device 23, and the belt is driven to run with the engagement bar 21 or the connection link 22 sandwiched between the belt and the roller on both side surfaces, so that the second transport member 13 is moved. Is to be transported.
【0030】そして、第1の搬送体5と係合状態にある
移送装置23が駆動されることにより、第1の搬送体5
はリンク部材6あるいは連結部材8を介して推進力を得
ることにより第1の走行レール3及び粗紡機用レール4
a,4b上を走行可能となっている。また、第2の搬送
体13と係合状態にある移送装置24が駆動されること
により、第2の搬送体13は係合バー21あるいは連結
リンク22を介して推進力を得ることにより第2の走行
レール14及びクリールレール12上を走行可能となっ
ている。When the transfer device 23 in the engaged state with the first transporter 5 is driven, the first transporter 5 is driven.
The first traveling rail 3 and the roving rail 4 are obtained by obtaining propulsion through the link member 6 or the connecting member 8.
a and 4b can be run. When the transfer device 24 engaged with the second transport body 13 is driven, the second transport body 13 obtains a propulsive force via the engagement bar 21 or the connection link 22 so as to obtain the second On the running rail 14 and the creel rail 12.
【0031】第1の走行レール3と第2の走行レール1
4とが近接して平行に延びる位置にはボビン交換装置2
5が配設されている。ボビン交換装置25は図2及び図
3に示すように、第1の走行レール3及び第2の走行レ
ール14の下方に配設されている。ボビン交換装置25
の昇降手段を構成するシリンダ26が上下方向に延びる
状態でベースプレート27上に固定されている。シリン
ダ26としてエアシリンダが使用されている。シリンダ
26の上方にはリニアガイド28が配設されている。リ
ニアガイド28は内部にボールスプラインを備え、ボー
ルスプライン軸29がピストンロッド26aと同軸上で
上下方向に延びるようにブラケット30を介してベース
プレート27に支持されている。ボールスプライン軸2
9は下端がピストンロッド26aの先端にカップリング
(図示せず)を介して連結されている。ボールスプライ
ン軸29の上端には支持プレート32が水平に固定され
ている。そして、エアシリンダ26の作動によりボール
スプライン軸29が上下方向に移動され、支持プレート
32が回動せずに昇降される。ピストンロッド26aの
ストロークは、満ボビンF及び空ボビンEの長さより大
きくなっている。First traveling rail 3 and second traveling rail 1
The bobbin changing device 2 is located at a position where the
5 are provided. The bobbin exchanging device 25 is disposed below the first traveling rail 3 and the second traveling rail 14, as shown in FIGS. Bobbin changing device 25
Is fixed on a base plate 27 in a state of extending vertically. An air cylinder is used as the cylinder 26. A linear guide 28 is provided above the cylinder 26. The linear guide 28 includes a ball spline therein, and is supported by a base plate 27 via a bracket 30 so that a ball spline shaft 29 extends vertically in the same direction as the piston rod 26a. Ball spline shaft 2
Reference numeral 9 denotes a lower end connected to the tip of the piston rod 26a via a coupling (not shown). A support plate 32 is horizontally fixed to the upper end of the ball spline shaft 29. Then, the operation of the air cylinder 26 moves the ball spline shaft 29 in the vertical direction, and the support plate 32 is moved up and down without rotating. The stroke of the piston rod 26a is larger than the lengths of the full bobbin F and the empty bobbin E.
【0032】支持プレート32の上面には支軸33が垂
直に固定され、支軸33の先端には固定歯車34が回転
不能に固定されている。支軸33は第1の走行レール3
と第2の走行レール14との間の中央と対向する位置に
設けられ、支軸33の中間部には回転ベース35が軸受
(図示せず)を介して回転可能に支持されている。回転
ベース35上には支軸33を挟んで対称位置に支軸3
6,37が立設されている。支軸36には遊星歯車とし
ての第1の被動歯車38が固定歯車34と噛合する状態
で回転可能に支持されている。支軸37には遊星歯車と
しての第2の被動歯車39が固定歯車34と噛合する状
態で回転可能に支持されている。両被動歯車38,39
はピッチ円半径及び歯数が同じに形成され、両被動歯車
38,39と固定歯車34とのピッチ円半径の比及び歯
数の比はそれぞれ2対1に設定されている。A support shaft 33 is vertically fixed to the upper surface of the support plate 32, and a fixed gear 34 is fixed to the tip of the support shaft 33 so as not to rotate. The support shaft 33 is the first traveling rail 3
The rotation base 35 is rotatably supported at an intermediate portion of the support shaft 33 via a bearing (not shown). On the rotation base 35, the support shaft 3 is positioned symmetrically with respect to the support shaft 33.
6, 37 are erected. A first driven gear 38 as a planetary gear is rotatably supported on the support shaft 36 in a state of meshing with the fixed gear 34. A second driven gear 39 as a planetary gear is rotatably supported on the support shaft 37 in a state of meshing with the fixed gear 34. Both driven gears 38, 39
Are formed with the same pitch circle radius and the same number of teeth, and the ratio of the pitch circle radius and the ratio of the number of teeth between the driven gears 38 and 39 and the fixed gear 34 are set to 2: 1.
【0033】第1の被動歯車38の上面には、1組の第
1のペッグ40a,40bが第1の搬送体5に吊下され
たボビンハンガ9のピッチPと同じ間隔で突設されてい
る。第1のペッグ40a,40bは回転ベース35が図
2及び図3に示す基準位置に配置された状態において、
第1の走行レール3と対向する位置、即ち第1の搬送体
5と対向可能な位置に設けられている。On the upper surface of the first driven gear 38, a pair of first pegs 40a, 40b is provided so as to project at the same interval as the pitch P of the bobbin hanger 9 suspended from the first carrier 5. . The first pegs 40a and 40b are in a state where the rotation base 35 is disposed at the reference position shown in FIGS. 2 and 3.
It is provided at a position facing the first traveling rail 3, that is, at a position capable of facing the first transport body 5.
【0034】第2の被動歯車39の上面には、1組の第
2のペッグ41a,41bが第2の搬送体13に吊下さ
れたボビンハンガ9の列間隔と同じ間隔で突設されてい
る。第2のペッグ41a,41bは回転ベース35が基
準位置に配置された状態において、第2の搬送体13に
吊下されたボビンハンガ9の列と対向可能な位置に設け
られている。On the upper surface of the second driven gear 39, a pair of second pegs 41a, 41b is provided so as to project at the same interval as the row interval of the bobbin hangers 9 suspended from the second carrier 13. . The second pegs 41a and 41b are provided at positions where they can face the rows of the bobbin hangers 9 suspended from the second carrier 13 in a state where the rotary base 35 is arranged at the reference position.
【0035】支持プレート32上にはモータ42がブラ
ケット31を介して固定されている。モータ42はその
出力軸42aが下方に延びるように固定され、出力軸4
2aにプーリ43が一体回転可能に固定されている。回
転ベース35のボス部にはプーリ44が一体回転可能に
固定され、両プーリ43,44間にベルト45が巻き掛
けられている。回転ベース35、固定歯車34,38,
39、モータ42、プーリ43,44及びベルト45に
より、第1及び第2のペッグ40a,40b,41a,
41bを第1の搬送体5及び第2の搬送体13に吊下さ
れたボビンハンガ9と対向する位置にそれぞれ回動配置
する回動手段が構成されている。A motor 42 is fixed on the support plate 32 via a bracket 31. The motor 42 is fixed so that its output shaft 42a extends downward.
A pulley 43 is fixed to 2a so as to be integrally rotatable. A pulley 44 is fixed to the boss portion of the rotation base 35 so as to be integrally rotatable, and a belt 45 is wound between the pulleys 43 and 44. Rotating base 35, fixed gears 34, 38,
39, the motor 42, the pulleys 43 and 44, and the belt 45, the first and second pegs 40a, 40b, 41a,
Rotating means for rotating and arranging 41b at positions opposing the bobbin hanger 9 suspended on the first transport body 5 and the second transport body 13 is configured.
【0036】次に前記のように構成された粗糸ボビン搬
送システムの作用を説明する。精紡機2のクリール10
を構成する第2の搬送体13は、隣接する搬送マガジン
16のバンパー20が互いに当接する状態でクリールレ
ール12上に保持される。そして、第2の搬送体13に
吊下された粗糸ボビンの粗糸が使用されて空又はほぼ空
になり、粗糸替え(篠替え)が必要になると、作業者に
より紡出中の粗糸が切断された後、当該精紡機2の第2
の搬送体13の搬出が行われる。第2の搬送体13は移
送装置24の作動によりクリールレール12から搬出さ
れるとともに、残粗糸処理装置15と対応する位置まで
移動され、残粗糸の処理が行われた後、貯留部14bに
搬入されて待機する。Next, the operation of the roving bobbin transport system configured as described above will be described. Creel 10 of spinning machine 2
Is held on the creel rail 12 in a state where the bumpers 20 of the adjacent transport magazines 16 are in contact with each other. Then, when the roving of the roving bobbin suspended on the second transport body 13 is used and becomes empty or almost empty, and the roving replacement (shino replacement) is required, the roving during spinning by the operator is performed. After the yarn is cut, the second spinning machine 2
Is carried out. The second transport body 13 is unloaded from the creel rail 12 by the operation of the transfer device 24, and is moved to a position corresponding to the remaining roving process device 15, and after the remaining roving is processed, the storage portion 14b It is carried in and stands by.
【0037】一方、粗紡機1が満管停止されると、管替
装置によりボビンレール上の満ボビンFと、粗紡機用レ
ール4a,4bに搬入された第1の搬送体5に吊下され
た空ボビンEとの交換作業が行われる。管替装置による
管替作業が完了して2列の第1の搬送体5に満ボビンが
吊下されると、移送装置23が順次作動されて2列の第
1の搬送体5が順次粗紡機用レール4a,4bから搬出
される。そして、第1の搬送体5はボビン交換装置25
に向かって第1の走行レール3上を移動して、前側の2
本の満ボビンFがボビン交換装置25の第1のペッグ4
0a,40bと対向する所定位置(交換位置)で停止す
る。移送装置23を制御する制御装置は、第1の搬送体
5がボビン交換装置25と対応する所定位置に到達した
ことを検知する検知手段(図示せず)からの信号に基づ
いて第1の搬送体5を所定位置で停止させるように移送
装置23を制御する。On the other hand, when the roving machine 1 is stopped from full filling, the refilling device suspends the full bobbin F on the bobbin rail and the first carrier 5 carried into the roving rails 4a and 4b. The replacement work with the empty bobbin E is performed. When the full bobbin is suspended on the two rows of the first transport bodies 5 after the refilling operation by the pipe replacement device is completed, the transfer devices 23 are sequentially operated to sequentially move the two rows of the first transport bodies 5 roughly. It is carried out from the spinning rails 4a and 4b. Then, the first transport body 5 is a bobbin exchange device 25.
On the first traveling rail 3 toward the front 2
The full bobbin F is the first peg 4 of the bobbin changing device 25.
It stops at a predetermined position (exchange position) opposite to 0a, 40b. The control device that controls the transfer device 23 performs the first transfer based on a signal from a detection unit (not shown) that detects that the first transfer body 5 has reached a predetermined position corresponding to the bobbin exchange device 25. The transfer device 23 is controlled so as to stop the body 5 at a predetermined position.
【0038】一方、満ボビンFを吊下した第1の搬送体
5がボビン交換装置25に向かって移動を開始すると、
貯留部14bに待機していた第2の搬送体13が空ボビ
ンEを吊下し状態でボビン交換装置25に向かって移動
を開始する。そして、前側の2本の満ボビンFがボビン
交換装置25の第2のペッグ41a,41bと対向する
所定位置(交換位置)で停止する。移送装置24を制御
する制御装置は、第2の搬送体13がボビン交換装置2
5と対応する所定位置に到達したことを検知する検知手
段(図示せず)からの信号に基づいて第2の搬送体13
を所定位置で停止させるように移送装置24を制御す
る。On the other hand, when the first transporting body 5 suspended with the full bobbin F starts moving toward the bobbin changing device 25,
The second carrier 13 that has been waiting in the storage unit 14b starts moving toward the bobbin changing device 25 with the empty bobbin E suspended. Then, the two full bobbins F on the front side stop at predetermined positions (exchange positions) facing the second pegs 41a and 41b of the bobbin exchange device 25. The control device for controlling the transfer device 24 is such that the second carrier 13 is
5 based on a signal from a detection means (not shown) for detecting that the second transport body 13 has reached the predetermined position corresponding to the second transport body 13.
Is stopped at a predetermined position.
【0039】両搬送体5,13がボビン交換装置25と
対向する所定位置に停止した状態で、先ずシリンダ26
が突出作動されて支持プレート32が上昇される。図8
に示すように、上昇途中で第1のペッグ40a,40b
が満ボビンFの底部に嵌挿され、第2のペッグ41a,
41bが空ボビンEの底部に嵌挿される。そして、ピス
トンロッド26aが最先端位置まで突出した後、シリン
ダ26が没入作動されて支持プレート32が下降され、
ボビンハンガ9から取り外された満ボビンFが第1のペ
ッグ40a,40bに嵌挿され、空ボビンEが第2のペ
ッグ41a,41bに嵌挿された状態で支持プレート3
2が待機位置に復帰する。この状態では各ペッグ40
a,40b,41a,41bに嵌挿された満ボビンF及
び空ボビンEの頂部は、各搬送体5,13に吊下された
満ボビンF及び空ボビンEの下端より低い位置となる。
従って、ペッグ40a,40b,41a,41bが搬送
体5,13の下方を通過してもペッグ40a,40b,
41a,41b上の満ボビンF及び空ボビンEと、各搬
送体5,13に吊下された満ボビンF及び空ボビンEと
が干渉しない状態となる。In a state in which the transport members 5 and 13 are stopped at predetermined positions facing the bobbin changing device 25, first, the cylinder 26
Is operated so that the support plate 32 is raised. FIG.
As shown in the figure, the first pegs 40a, 40b
Is inserted into the bottom of the full bobbin F, and the second pegs 41a,
41b is fitted into the bottom of the empty bobbin E. Then, after the piston rod 26a projects to the foremost position, the cylinder 26 is immersed and the support plate 32 is lowered,
The support plate 3 with the full bobbin F removed from the bobbin hanger 9 inserted into the first pegs 40a and 40b and the empty bobbin E inserted into the second pegs 41a and 41b.
2 returns to the standby position. In this state, each peg 40
The tops of the full bobbin F and the empty bobbin E fitted into the a, 40b, 41a, and 41b are lower than the lower ends of the full bobbin F and the empty bobbin E suspended on the transport bodies 5 and 13, respectively.
Therefore, even if the pegs 40a, 40b, 41a, 41b pass below the carriers 5, 13, the pegs 40a, 40b,
The full bobbin F and the empty bobbin E on the conveyors 5 and 13 do not interfere with each other.
【0040】次にモータ42が駆動され、プーリ43、
ベルト45及びプーリ44を介して回転ベース35が回
転される。モータ42は回転ベース35を図2の時計回
り方向に半回転、即ち180度回転させた後、停止され
る。回転ベース35が回転されると、第1及び第2の被
動歯車38,39は固定歯車34に噛合した状態で固定
歯車34の周囲を公転しつつ支軸36,37を中心に自
転する。そして、両被動歯車38,39と固定歯車34
とのピッチ円半径の比及び歯数の比はそれぞれ2対1に
設定されているため、回転ベース35が180度回転す
ると、両被動歯車38,39は回転ベース35に対して
90度回転する。その結果、第1のペッグ40a,40
bに嵌挿された2本の満ボビンFは第2の搬送体13の
ボビンハンガ9と対向する状態となり、第2のペッグ4
1a,41bに嵌挿された2本の空ボビンEは第1の搬
送体5のボビンハンガ9と対向する状態となる。Next, the motor 42 is driven, and the pulley 43
The rotation base 35 is rotated via the belt 45 and the pulley 44. The motor 42 is stopped after rotating the rotation base 35 half a clockwise direction in FIG. When the rotation base 35 is rotated, the first and second driven gears 38, 39 rotate around the support shafts 36, 37 while revolving around the fixed gear 34 while meshing with the fixed gear 34. Then, both driven gears 38 and 39 and fixed gear 34
Since the ratio of the pitch circle radius and the ratio of the number of teeth are set to 2: 1 respectively, when the rotation base 35 rotates 180 degrees, both driven gears 38 and 39 rotate 90 degrees with respect to the rotation base 35. . As a result, the first pegs 40a, 40
b, the two full bobbins F are in a state of facing the bobbin hanger 9 of the second carrier 13 and the second peg 4
The two empty bobbins E inserted into 1a and 41b are in a state of facing the bobbin hanger 9 of the first transport body 5.
【0041】次にシリンダ26が突出作動されて支持プ
レート32が上昇され、上昇途中で第1の搬送体5のボ
ビンハンガ9に空ボビンEの頂部が嵌合され、第2の搬
送体13のボビンハンガ9に満ボビンFの頂部が嵌合さ
れる。次にシリンダ26が没入作動されて支持プレート
32が下降され、支持プレート32が待機位置に復帰す
るとともに空ボビンEが第1の搬送体5に吊下され、満
ボビンFが第2の搬送体13に吊下された状態となって
1回のボビン交換サイクルが完了する。Next, the cylinder 26 is protruded to raise the support plate 32, and the top of the empty bobbin E is fitted into the bobbin hanger 9 of the first transport body 5 during the ascent, and the bobbin hanger of the second transport body 13 is raised. 9 is fitted with the top of the full bobbin F. Next, the cylinder 26 is immersed to lower the support plate 32, the support plate 32 returns to the standby position, the empty bobbin E is suspended by the first carrier 5, and the full bobbin F is moved to the second carrier. 13, and one bobbin exchange cycle is completed.
【0042】次に移送装置23が作動されて第1の搬送
体5がボビンハンガ9の吊下ピッチPの2倍移動され、
後続の満ボビンFが第1のペッグ40a,40bと対向
する位置に配置される。また、移送装置24が作動され
て第2の搬送体13がボビンハンガ9の吊下ピッチPb
に等しい距離移動され、後続の空ボビンEが第2のペッ
グ41a,41bと対向する位置に配置される。以下、
前記と同様にして第1の搬送体5に吊下された満ボビン
Fと、第2の搬送体13に吊下された空ボビンEとが2
本ずつ同時に順次交換される。Next, the transfer device 23 is operated to move the first transport body 5 twice the suspension pitch P of the bobbin hanger 9,
The succeeding full bobbin F is arranged at a position facing the first pegs 40a, 40b. Further, the transfer device 24 is operated, and the second transport body 13 is moved to the bobbin hanger 9 by the suspension pitch Pb.
And the subsequent empty bobbin E is disposed at a position facing the second pegs 41a and 41b. Less than,
In the same manner as described above, the full bobbin F suspended from the first carrier 5 and the empty bobbin E suspended from the second carrier 13 are 2
The books are exchanged simultaneously and sequentially.
【0043】ボビン交換装置25によるボビン交換作業
が完了すると、第1の搬送体5は移送装置23の作動に
より、空ボビンEを必要とする粗紡機1の粗紡機用レー
ル4a,4bに搬入される。また、第2の搬送体13は
移送装置24の作動により、満ボビンFを必要とする精
紡機2のクリールレール12に搬入される。When the bobbin exchanging operation by the bobbin exchanging device 25 is completed, the first carrier 5 is carried into the roving frame rails 4a and 4b of the roving machine 1 requiring the empty bobbin E by the operation of the transfer device 23. You. The second carrier 13 is carried into the creel rail 12 of the spinning machine 2 requiring the full bobbin F by the operation of the transfer device 24.
【0044】この実施の形態では以下の効果を有する。 (イ) 互いに異なる走行レール3,14上を移動する
搬送体5,13に吊下された粗糸ボビン(満ボビンF及
び空ボビンE)のピッチを変更することなく、複数本ず
つボビン交換を行うことができる。従って、ボビン交換
時にピッチの変更が必要な場合に比較して、装置の構成
が簡単になるとともに制御も簡単になる。また、メンテ
ナンスも簡単になる。This embodiment has the following effects. (B) A plurality of bobbins can be replaced one by one without changing the pitch of the roving bobbins (full bobbin F and empty bobbin E) suspended on the transport bodies 5 and 13 moving on different traveling rails 3 and 14. It can be carried out. Therefore, as compared with the case where the pitch needs to be changed at the time of bobbin replacement, the configuration of the device and the control are simplified. Maintenance is also simplified.
【0045】(ロ) 第1の走行レール3と第2の走行
レール14とは、ボビン交換装置25が配設される位置
において互いに平行に延びるように配置されているた
め、ボビン交換装置25付近における両走行レール3,
14のレイアウトがシンプルになる。(B) Since the first traveling rail 3 and the second traveling rail 14 are arranged so as to extend in parallel with each other at the position where the bobbin exchanging device 25 is provided, the vicinity of the bobbin exchanging device 25 is provided. Both running rails at 3,
14 becomes simple.
【0046】(ハ) 第1の搬送体5から取り外した満
ボビンFと、第2の搬送体13から取り外した空ボビン
Eとをそれぞれその配列方向を90°変更した状態で交
換するため、ボビン交換位置において第1及び第2の走
行レール3,14を比較的近接して配置でき、ボビン交
換装置25を小型化できる。(C) The bobbins F and B are exchanged with the full bobbin F removed from the first carrier 5 and the empty bobbin E removed from the second carrier 13 in a state where their arrangement directions are changed by 90 °. At the replacement position, the first and second traveling rails 3 and 14 can be arranged relatively close to each other, and the bobbin replacing device 25 can be downsized.
【0047】(ニ) 回転ベース35が半回転する間に
第1及び第2のペッグ40a,40b,41a,41b
の配列方向を90度変更する機構に遊星歯車機構を使用
しているため、簡単な構成で確実に所定角度変更でき
る。(D) The first and second pegs 40a, 40b, 41a, 41b while the rotation base 35 makes a half turn.
Since the planetary gear mechanism is used as the mechanism for changing the arrangement direction by 90 degrees, the predetermined angle can be reliably changed with a simple configuration.
【0048】(ホ) 昇降手段としてシリンダ26とリ
ニアガイド28とを組み合わせているため、回動手段を
支持する支持プレート32をその回動を防止した状態で
昇降させることができ、支持プレート32の昇降中に回
動手段の相対位置が変更する虞がない。(E) Since the cylinder 26 and the linear guide 28 are combined as the lifting / lowering means, the support plate 32 supporting the rotating means can be raised / lowered while preventing its rotation. There is no danger that the relative position of the rotating means changes during elevating.
【0049】(ヘ) 粗紡機用レール4a,4bをその
両端部で第1の走行レール3に対して接続可能な構成と
したので、一方からのみ第1の搬送体5の搬入及び搬出
を行う構成に比較して、粗紡機用レール4a,4bへの
搬入及び搬出作業の待ち時間が少なくなる。(F) The roving frame rails 4a and 4b are configured to be connectable to the first traveling rail 3 at both ends, so that the first carrier 5 can be loaded and unloaded only from one side. Compared with the configuration, the waiting time for carrying in and carrying out work to the roving rails 4a and 4b is reduced.
【0050】(ト) 粗紡機1と精紡機2とで別個の搬
送体が使用されるため、搬送体1台当たりのボビンハン
ガの個数を相互に無関係に設定でき、錘数の異なる粗紡
機や精紡機を共存させてボビン搬送システムを組むこと
が簡単になる。(G) Since separate transporters are used for the roving frame 1 and the spinning frame 2, the number of bobbin hangers per transporter can be set independently of each other. It is easy to set up a bobbin transport system in which the spinning machines coexist.
【0051】(チ) クリールレール12をその両端部
で第2の走行レール14に対して接続可能な構成とした
ので、一方からのみ第2の搬送体13の搬入及び搬出を
行う構成に比較して、クリールレール12への搬入及び
搬出作業の待ち時間が少なくなる。その結果、精紡機の
稼働率が向上する。(H) Since the creel rail 12 can be connected to the second traveling rail 14 at both ends thereof, it can be compared with a configuration in which the second transport body 13 is loaded and unloaded from only one side. Thus, the waiting time for carrying in and out the creel rail 12 is reduced. As a result, the operating rate of the spinning machine is improved.
【0052】(リ) 第1及び第2の搬送体5,13を
各レール3,4a,4b,12,14に設けられた移送
装置23,24により移動させる構成のため、第1及び
第2の搬送体5,13を牽引あるいは押して移動する搬
機を使用する構成に比較して走行レールとして強度の小
さなものを使用できる。(I) The first and second transport members 5, 13 are moved by the transfer devices 23, 24 provided on the rails 3, 4a, 4b, 12, 14, respectively. A traveling rail having a smaller strength can be used as compared with a configuration using a transporter that moves by pulling or pushing the transporting bodies 5 and 13.
【0053】(第2の実施の形態)次に第2の実施の形
態を図9及び図10に従って説明する。この実施の形態
ではボビン交換装置25の構成と、ボビン交換装置25
の近傍における第1及び第2の走行レール3,14の配
置とが前記実施の形態と異なっている。第1の実施の形
態と同一部分は同一符号を付して詳しい説明を省略す
る。(Second Embodiment) Next, a second embodiment will be described with reference to FIGS. In this embodiment, the configuration of the bobbin changing device 25 and the bobbin changing device 25
The arrangement of the first and second running rails 3 and 14 in the vicinity of is different from that of the above embodiment. The same parts as those in the first embodiment are denoted by the same reference numerals, and detailed description is omitted.
【0054】図9に示すように、第1の走行レール3と
第2の走行レール14とは少なくともボビン交換装置2
5の設置された箇所と対応する付近においては、第1の
走行レール3が第2の走行レール14の上方を直交する
状態で通過するように配設されている。ボビン交換装置
25は第1及び第2の搬送体5,13のボビン交換を行
う対象となる満ボビンF及び空ボビンEが両走行レール
3,14の交差部に差し掛かる手前の位置に配置された
状態で交換作業を行う構成となっている。As shown in FIG. 9, the first traveling rail 3 and the second traveling rail 14 are at least
In the vicinity corresponding to the place where 5 is installed, the first traveling rail 3 is disposed so as to pass above the second traveling rail 14 in an orthogonal state. The bobbin exchanging device 25 is disposed at a position just before the full bobbin F and the empty bobbin E to be subjected to the bobbin exchange of the first and second transport bodies 5 and 13 reach the intersection of the traveling rails 3 and 14. It is configured to perform the replacement work in the state where it is in a state of being replaced.
【0055】図10に示すように、上下方向に延びるよ
うに配設された一対のガイドレール46に沿って支持プ
レート47がローラ48を介して水平状態で昇降可能に
支持されている。支持プレート47は上下方向に延びる
ように立設されたシリンダ49のピストンロッド49a
に連結されている。支持プレート47上の中央にはモー
タ50が、その出力軸50aが垂直になるように固定さ
れている。出力軸50aには回転ベース51が一体回転
可能に固定されている。As shown in FIG. 10, a support plate 47 is supported by a pair of guide rails 46 extending vertically so as to be vertically movable via rollers 48. The support plate 47 is provided with a piston rod 49a of a cylinder 49 erected to extend in the vertical direction.
It is connected to. A motor 50 is fixed at the center on the support plate 47 so that its output shaft 50a is vertical. A rotation base 51 is fixed to the output shaft 50a so as to be integrally rotatable.
【0056】回転ベース51上には回転ベース51が図
9に示す基準位置に配置された状態において、第1の走
行レール3と対向する位置及び第2の走行レール14と
対応する位置にシリンダ52,53が上下方向に延びる
状態で固定されている。シリンダ52,53は回転ベー
ス51に形成された孔を貫通する状態で固定されてい
る。シリンダ52のピストンロッド52aには第1のペ
ッグ40a,40bが間隔Pで突設されたブロック54
が固定されている。シリンダ53のピストンロッド53
aには第2のペッグ41a,41bが間隔Pで突設され
たブロック55が固定されている。第1のペッグ40
a,40bと第2のペッグ41a,41bとは出力軸5
0aを中心として点対称の位置に設けられている。各シ
リンダ49,52,53はそのストロークが満ボビンF
及び空ボビンEの長さより大きくなっている。そして、
各シリンダ49,52,53は図示しない制御装置によ
り制御される制御弁を介して制御され、モータ50は該
制御装置により制御される。When the rotary base 51 is disposed on the rotary base 51 at the reference position shown in FIG. 9, the cylinder 52 is positioned at a position facing the first travel rail 3 and at a position corresponding to the second travel rail 14. , 53 are fixed so as to extend in the vertical direction. The cylinders 52 and 53 are fixed so as to pass through holes formed in the rotation base 51. A block 54 in which first pegs 40a and 40b are protruded at an interval P from the piston rod 52a of the cylinder 52.
Has been fixed. Piston rod 53 of cylinder 53
A block 55 in which second pegs 41a and 41b protrude at an interval P is fixed to a. First peg 40
a, 40b and the second pegs 41a, 41b are connected to the output shaft 5
It is provided at a point-symmetric position with respect to 0a. Each cylinder 49, 52, 53 has a full bobbin F stroke.
And longer than the length of the empty bobbin E. And
Each of the cylinders 49, 52, 53 is controlled via a control valve controlled by a control device (not shown), and the motor 50 is controlled by the control device.
【0057】この実施の形態では第1の搬送体5はボビ
ン交換装置25と対応する位置では第1の走行レール3
上を図9の左側から右側へ移動する。第2の搬送体13
はボビン交換装置25と対応する位置では第2の走行レ
ール14上を図9の上側から下側へ移動する。そして、
搬送体5,13がボビン交換装置25と対向する所定位
置に停止した状態で、先ずシリンダ49が突出作動され
て支持プレート47が上昇され、支持プレート47の上
昇途中で第2のペッグ41a,41bが空ボビンEの底
部に嵌挿される。また、支持プレート47の上昇途中で
シリンダ52が突出作動され、第1のペッグ40a,4
0bが満ボビンFの底部に嵌挿される。そして、ピスト
ンロッド49a,52aが最先端位置まで突出した後、
シリンダ49,52が没入作動され、ボビンハンガ9か
ら取り外された満ボビンFが第1のペッグ40a,40
bに嵌挿され、空ボビンEが第2のペッグ41a,41
bに嵌挿された状態で支持プレート47が待機位置に復
帰する。この状態では各ペッグ40a,40b,41
a,41bに嵌挿された満ボビンF及び空ボビンEの頂
部は、各搬送体5,13に吊下された満ボビンF及び空
ボビンEの下端より低い位置となる。次にモータ50が
駆動されて回転ベース51が180度回転される。そし
て、第1のペッグ40a,40bに嵌挿された2本の満
ボビンFは第2の搬送体13のボビンハンガ9と対向す
る状態となり、第2のペッグ41a,41bに嵌挿され
た2本の空ボビンEは第1の搬送体5のボビンハンガ9
と対向する状態となる。次にシリンダ49が突出作動さ
れて支持プレート47が上昇され、支持プレート47の
上昇途中で第2の搬送体13のボビンハンガ9に満ボビ
ンFの頂部が嵌合される。また、支持プレート47の上
昇途中でシリンダ53が突出作動されて第1の搬送体5
のボビンハンガ9に空ボビンEの頂部が嵌合される。次
にシリンダ49,53が没入作動されて支持プレート4
7が下降され、支持プレート47が待機位置に復帰する
とともに空ボビンEが第1の搬送体5に吊下され、満ボ
ビンFが第2の搬送体13に吊下された状態となって1
回のボビン交換サイクルが完了する。In this embodiment, the first transport body 5 is located at the position corresponding to the bobbin changing device 25 and the first traveling rail 3
The upper part is moved from the left side to the right side in FIG. Second carrier 13
Moves from the upper side to the lower side in FIG. 9 on the second traveling rail 14 at a position corresponding to the bobbin changing device 25. And
In a state where the carriers 5 and 13 are stopped at a predetermined position facing the bobbin changing device 25, first, the cylinder 49 is protruded and the support plate 47 is raised, and the second pegs 41a and 41b are raised while the support plate 47 is being raised. Is inserted into the bottom of the empty bobbin E. In addition, the cylinder 52 is protruded while the support plate 47 is being raised, and the first pegs 40a, 4
0b is inserted into the bottom of the full bobbin F. Then, after the piston rods 49a and 52a protrude to the foremost position,
The cylinders 49 and 52 are immersed, and the full bobbin F removed from the bobbin hanger 9 is moved to the first pegs 40a and 40.
b, and the empty bobbin E is inserted into the second pegs 41a and 41a.
The support plate 47 returns to the standby position in a state where the support plate 47 is inserted into the position b. In this state, each peg 40a, 40b, 41
The tops of the full bobbin F and the empty bobbin E fitted into the a and 41b are located at lower positions than the lower ends of the full bobbin F and the empty bobbin E suspended from the transport bodies 5 and 13, respectively. Next, the motor 50 is driven to rotate the rotation base 51 by 180 degrees. Then, the two full bobbins F inserted into the first pegs 40a and 40b face the bobbin hanger 9 of the second carrier 13, and the two full bobbins F inserted into the second pegs 41a and 41b. Empty bobbin E is the bobbin hanger 9 of the first carrier 5
And it is in a state of facing. Next, the cylinder 49 is protruded to raise the support plate 47, and the top of the full bobbin F is fitted to the bobbin hanger 9 of the second transport body 13 while the support plate 47 is being raised. Further, the cylinder 53 is protruded while the support plate 47 is being lifted, and the first transport body 5
The top of the empty bobbin E is fitted to the bobbin hanger 9. Next, the cylinders 49 and 53 are immersed and the support plate 4
7 is lowered, the support plate 47 returns to the standby position, the empty bobbin E is suspended by the first carrier 5, and the full bobbin F is suspended by the second carrier 13.
Bobbin exchange cycles are completed.
【0058】この実施の形態では前記第1の実施の形態
の(イ)、(ヘ)〜(チ)の効果の他に、次の効果を有
する。 (ヌ) ボビンの交換を両走行レール3,14が交差す
る位置で行うことができ、設置スペースの関係で走行レ
ール14の位置を高くできない場合でも、適用すること
ができる。This embodiment has the following effects in addition to the effects (a), (f) to (h) of the first embodiment. (V) The bobbin can be replaced at a position where the two traveling rails 3 and 14 intersect, and the present invention can be applied even when the position of the traveling rail 14 cannot be increased due to installation space.
【0059】なお、実施の形態は前記に限定されるもの
ではなく、例えば次のように具体化してもよい。 ○ 両搬送体5,13の走行位置の高さが同じ位置でボ
ビン交換を行う場合、第1の走行レール3又は第2の走
行レール14のカーブ部分にボビン交換装置25を設け
る。例えば、図11に示すように、第1の走行レール3
のカーブ部分と第2の走行レール14の直線部分が近接
する位置にボビン交換装置25を設ける。この場合両搬
送体5,13の高さが同じため、図12に示すように、
ボビン交換装置25は第2の実施の形態のボビン交換装
置25において、回転ベース51に第1及び第2のペッ
グ40a,40b,41a,41bをピッチPで直接突
設した構成でよくなる。従って、昇降手段も1本のシリ
ンダ49でよく、回転手段もモータ50だけでよくな
り、ボビン交換装置25の構造が簡単になるとともに制
御も簡単になる。The embodiment is not limited to the above, but may be embodied as follows, for example. In the case where the bobbin exchange is performed at the same height of the traveling positions of the two transport bodies 5 and 13, the bobbin exchanging device 25 is provided on a curved portion of the first traveling rail 3 or the second traveling rail 14. For example, as shown in FIG.
The bobbin exchange device 25 is provided at a position where the curved portion of the second traveling rail 14 and the straight portion of the second traveling rail 14 are close to each other. In this case, since the heights of the two carriers 5 and 13 are the same, as shown in FIG.
The bobbin exchanging device 25 has the same configuration as the bobbin exchanging device 25 of the second embodiment, except that the first and second pegs 40a, 40b, 41a, and 41b are directly protruded at a pitch P on the rotary base 51. Therefore, only one cylinder 49 is required for the lifting / lowering means, and only the motor 50 is required for the rotation means. This simplifies the structure of the bobbin exchanging device 25 and the control thereof.
【0060】○ カーブ部分にボビン交換装置25を配
置する構成において、回転ベース51を使用する構成に
代えて、図13に示すように、支持プレート47上にガ
イド溝56を形成し、ガイド溝56に沿って移動可能な
移動体57上に第1及び第2のペッグ40a,40b,
41a,41bをピッチPで突設する。また、移動体5
7をガイド溝56に沿って移動させる移動手段(図示せ
ず)を設ける。そして、支持プレート47を昇降手段で
昇降させるとともに、移動体57をガイド溝56に沿っ
て移動させ、第1の搬送体5上の満ボビンFと、第2の
搬送体13上の空ボビンEとを交換する。この構成で
は、ボビンハンガ9から取り外された満ボビンF及び空
ボビンEは移動体57とともに搬送体5,13に吊下さ
れた他の満ボビンF及び空ボビンEと干渉しないように
移動する。例えば、第1の搬送体5から取り外された満
ボビンが装着された移動体57は、図13に実線で示す
位置からガイド溝56に沿って図13における左回りと
なるように移動され、鎖線で示す中間位置を経て第2の
搬送体13のボビンハンガ9と対応する位置へ移動され
る。また、第2の搬送体13から取り外された空ボビン
が装着された移動体57は、図13に実線で示す位置か
らガイド溝56に沿って図13における左回りとなるよ
うに移動され、鎖線で示す中間位置を経て第1の搬送体
5のボビンハンガ9と対応する位置へ移動される。従っ
て、昇降手段の昇降距離は、満ボビンF及び空ボビンE
をボビンハンガ9から取り外すのに必要な距離でよくな
り、昇降手段としてシリンダを使用した場合そのストロ
ークが小さなものを使用できる。In the configuration in which the bobbin exchanging device 25 is disposed on the curved portion, a guide groove 56 is formed on the support plate 47 as shown in FIG. The first and second pegs 40a, 40b, on a moving body 57 movable along
41a and 41b are protruded at a pitch P. In addition, moving body 5
A moving means (not shown) for moving 7 along the guide groove 56 is provided. Then, the support plate 47 is moved up and down by the elevating means, and the moving body 57 is moved along the guide groove 56 so that the full bobbin F on the first carrier 5 and the empty bobbin E on the second carrier 13 are moved. Exchange. In this configuration, the full bobbin F and the empty bobbin E removed from the bobbin hanger 9 move together with the moving body 57 so as not to interfere with the other full bobbin F and the empty bobbin E suspended on the transporters 5 and 13. For example, the moving body 57 with the full bobbin removed from the first carrier 5 is moved from the position shown by the solid line in FIG. 13 along the guide groove 56 so as to turn counterclockwise in FIG. Is moved to a position corresponding to the bobbin hanger 9 of the second transport body 13 via the intermediate position indicated by. The moving body 57 to which the empty bobbin removed from the second transport body 13 is attached is moved along the guide groove 56 from the position shown by the solid line in FIG. Is moved to a position corresponding to the bobbin hanger 9 of the first transport body 5 via the intermediate position indicated by. Therefore, the ascent / descent distance of the elevating means is the full bobbin F and the empty bobbin E
Can be removed from the bobbin hanger 9, and a small stroke can be used when a cylinder is used as the elevating means.
【0061】○ 昇降手段のシリンダとしてエアシリン
ダに代えて油圧シリンダを使用したり、電動シリンダを
使用してもよい。 ○ 昇降手段として、支持プレート32,47にボール
ナットを設けボールナットと螺合するボールネジを上下
方向に配設し、ボールネジをモータで正逆回転駆動する
構成とする。この場合、エアシリンダや油圧シリンダを
使用する場合に比較して、支持プレート32,47の停
止位置の精度を高めることが容易になる。A hydraulic cylinder or an electric cylinder may be used instead of the air cylinder as the cylinder of the elevating means. As the elevating means, a ball nut is provided on the support plates 32 and 47, and a ball screw to be screwed with the ball nut is disposed in the up-down direction, and the ball screw is driven to rotate forward and reverse by a motor. In this case, it becomes easier to improve the accuracy of the stop position of the support plates 32 and 47 as compared with the case where an air cylinder or a hydraulic cylinder is used.
【0062】○ 第2の実施の形態において第1の走行
レール3を第2の走行レール14の下方を通過する状態
に配置してもよい。また、両走行レール3,14は必ず
しも直交する状態に限らず、斜めに交差する場合に適用
してもよい。In the second embodiment, the first traveling rail 3 may be arranged so as to pass below the second traveling rail 14. Further, the two traveling rails 3 and 14 are not necessarily in a state of being orthogonal to each other, but may be applied to a case where they cross diagonally.
【0063】○ 第1及び第2の搬送体5,13を各レ
ール3,4a,4b,12,14に設けられた移送装置
23,24により移動させる構成に代えて、第1及び第
2の搬送体5,13を牽引あるいは押して移動する搬機
を使用する構成にしてもよい。第1の搬送体5を牽引す
る搬機としては、例えば特開平1−213416号公報
に開示されたものが使用される。また、第2の搬送体1
3用の搬機としては搬送体を押して移動するタイプのバ
ッテリ車が使用される。Instead of moving the first and second transport members 5 and 13 by the transfer devices 23 and 24 provided on the rails 3, 4 a, 4 b, 12 and 14, the first and second transport members 5 and 13 are replaced with first and second transport members 5 and 13. A configuration in which a transporter that moves by pulling or pushing the transport bodies 5 and 13 may be used. As a transporter for pulling the first transport body 5, for example, a transporter disclosed in Japanese Patent Application Laid-Open No. Hei 1-213416 is used. Also, the second carrier 1
A battery car of a type that moves by pushing a carrier is used as the transporter for 3.
【0064】○ 両搬送体5,13を第1の走行レール
3及び第2の走行レール14上は搬機を利用して移動さ
せ、粗紡機用レール4a,4b及びクリールレール12
上は移送装置23,24により移動させる構成としても
よい。The transport members 5 and 13 are moved on the first travel rail 3 and the second travel rail 14 by using a transporter, and the roving rails 4 a and 4 b and the creel rail 12 are moved.
The upper part may be moved by the transfer devices 23 and 24.
【0065】○ 粗紡機用レール4a,4b及びクリー
ルレール12を第1の走行レール3及び第2の走行レー
ル14に対して片側だけで接続する構成としてもよい。 ○ 第2の搬送体13にロービングガイド19装備せず
に、精紡機2の機台側にロービングガイド19を設けて
もよい。The roving rails 4a, 4b and the creel rail 12 may be connected to the first running rail 3 and the second running rail 14 on only one side. The roving guide 19 may be provided on the machine side of the spinning machine 2 without providing the roving guide 19 on the second transport body 13.
【0066】なお、本明細書で言う「粗糸ボビン」と
は、粗紡機1で玉揚げされた満ボビンF、精紡機2で粗
糸が使用されるとともに粗糸の一部が残っている残粗糸
ボビン、残粗糸が処理された空ボビンの他、粗紡機1で
玉揚げされた満ボビン以外のボビンも含む。The "roving bobbin" referred to in the present specification is a full bobbin F doffed by the roving machine 1, a roving yarn used by the spinning machine 2, and a part of the roving remains. In addition to the remaining roving bobbins, the empty bobbins on which the remaining roving has been processed, bobbins other than the full bobbins doffed by the roving machine 1 are also included.
【0067】前記実施の形態から把握できる請求項記載
以外の技術思想(発明)について、以下にその効果とと
もに記載する。 (1) 請求項3に記載の発明において、回動手段は固
定歯車が設けられた支軸に回動可能に支持された回転ベ
ースに回動可能に支持された一対の遊星歯車を備え、第
1及び第2のペッグは固定歯車と噛合する前記遊星歯車
にそれぞれ突設され、固定歯車と各遊星歯車のピッチ円
半径が1対2に設定されている。この場合、満ボビンと
からボビンの配列方向を90度変更する機構が簡単にな
る。The technical ideas (inventions) other than those described in the claims which can be grasped from the embodiment will be described below together with their effects. (1) In the invention according to claim 3, the rotating means includes a pair of planetary gears rotatably supported by a rotating base rotatably supported by a support shaft provided with a fixed gear. The first and second pegs are respectively protruded from the planetary gear meshing with the fixed gear, and a pitch circle radius of the fixed gear and each planetary gear is set to 1: 2. In this case, the mechanism for changing the arrangement direction of the bobbins from the full bobbin by 90 degrees is simplified.
【0068】[0068]
【発明の効果】以上詳述したように請求項1〜請求項5
に記載の発明によれば、互いに異なる走行レール上を移
動する搬送体に吊下された粗糸ボビンのピッチを変更す
ることなく、複数本ずつボビン交換を行うことができ
る。As described in detail above, claims 1 to 5 are provided.
According to the invention described in (1), a plurality of bobbins can be replaced one by one without changing the pitch of the roving bobbins suspended on the conveyance body moving on different running rails.
【0069】請求項3に記載の発明では、回動手段によ
り二組のペッグの位置が同時に変更されるため、各組の
ペッグがそれぞれ独立して移動されるものに比較して構
成が簡単になる。According to the third aspect of the present invention, since the positions of the two sets of pegs are simultaneously changed by the rotating means, the structure is simpler than that in which each set of pegs is independently moved. Become.
【0070】請求項4に記載の発明では、第1の走行レ
ールと第2の走行レールとが、ボビン交換装置が配設さ
れる位置において互いに平行に延びるように配置されて
いるため、ボビン交換装置付近における両走行レールの
レイアウトがシンプルになる。According to the fourth aspect of the present invention, the first traveling rail and the second traveling rail are arranged so as to extend in parallel with each other at the position where the bobbin exchanging device is provided. The layout of both traveling rails near the device is simplified.
【0071】請求項5に記載の発明では、ボビン交換位
置と対応する位置において、第1及び第2の走行レール
を比較的近接して配置でき、ボビン交換装置を小型化で
きる。According to the fifth aspect of the present invention, the first and second traveling rails can be disposed relatively close to each other at a position corresponding to the bobbin replacing position, and the bobbin replacing apparatus can be downsized.
【図1】 第1の実施の形態の搬送システムの概略平面
図。FIG. 1 is a schematic plan view of a transport system according to a first embodiment.
【図2】 ボビン交換装置と走行レールの関係を示す模
式平面図。FIG. 2 is a schematic plan view showing a relationship between a bobbin changing device and a traveling rail.
【図3】 同じく正面図。FIG. 3 is a front view of the same.
【図4】 精紡機のクリールを示す概略正面図。FIG. 4 is a schematic front view showing a creel of the spinning machine.
【図5】 第1の搬送体の部分側面図。FIG. 5 is a partial side view of the first carrier.
【図6】 第2の搬送体の部分側面図。FIG. 6 is a partial side view of a second carrier.
【図7】 第2の搬送体の部分平面図。FIG. 7 is a partial plan view of a second carrier.
【図8】 ボビン交換装置の作用を説明する正面図。FIG. 8 is a front view illustrating the operation of the bobbin changing device.
【図9】 第2の実施の形態のボビン交換装置の模式平
面図。FIG. 9 is a schematic plan view of a bobbin changing device according to a second embodiment.
【図10】 同じく正面図。FIG. 10 is a front view of the same.
【図11】 別の実施の形態のボビン交換装置の模式平
面図。FIG. 11 is a schematic plan view of a bobbin changing device according to another embodiment.
【図12】 同じく正面図。FIG. 12 is a front view of the same.
【図13】 別の実施の形態のボビン交換装置の模式平
面図。FIG. 13 is a schematic plan view of a bobbin changing device according to another embodiment.
【図14】 従来のボビン交換装置の作用を示す概略平
面図。FIG. 14 is a schematic plan view showing the operation of a conventional bobbin changing device.
1…粗紡機、2…精紡機、3…第1の走行レール、4
a,4b…分岐レールとしての粗紡機用レール、5…第
1の搬送体、9…ボビンハンガ、10…クリール、12
…精紡機用レールとしてのクリールレール、13…第2
の搬送体、14…第2の走行レール、23…第1の移送
手段としての移送装置、24…第2の移送手段としての
移送装置、25…ボビン交換装置、26,49,52,
53…昇降手段を構成するシリンダ、32,47…同じ
く支持プレート、34…回動手段を構成する固定歯車、
35,51…同じく回転ベース、38,39…同じく被
動歯車、40a,40b…第1のペッグ、41a,41
b…第2のペッグ、42,50…回動手段を構成するモ
ータ、F…満ボビン、E…空ボビン。DESCRIPTION OF SYMBOLS 1 ... Roving machine, 2 ... spinning machine, 3 ... 1st running rail, 4
a, 4b: a rail for a roving machine as a branch rail, 5: a first carrier, 9: a bobbin hanger, 10: a creel, 12
... creel rail as spinning frame rail, 13 ... second
, A transfer device as a first transfer device, a transfer device as a second transfer device, a bobbin exchange device, 26, 49, 52,
53: a cylinder that constitutes elevating means; 32, 47: a support plate also; 34: a fixed gear that constitutes rotating means;
35, 51: Same rotation base, 38, 39: Same driven gear, 40a, 40b: First peg, 41a, 41
b: second peg, 42, 50: motor constituting a rotating means, F: full bobbin, E: empty bobbin.
Claims (5)
装備した粗紡機が配設された粗紡工程と、粗糸ボビンを
左右両側に2列ずつ配置して構成されるクリールを備え
た複数の精紡機が配設された精紡工程との間の粗糸ボビ
ン搬送方法であって、 粗紡機の2列のボビンホイールの各列のボビンホイール
ピッチと、精紡機のクリールにおける前記粗糸ボビンの
2列の間隔とを等しく設定し、粗紡機の上方に配設され
た粗紡機用レール上に待機するとともに粗紡機のボビン
ホイールピッチでボビンハンガが吊下された第1の搬送
体に粗紡機で生産された満ボビンを吊下して粗紡機から
交換位置まで搬出し、精紡機のクリールを構成するため
粗糸ボビンを2列に吊下するボビンハンガを備えた第2
の搬送体に空ボビンを吊下した状態で交換位置まで搬送
し、交換位置において第1の搬送体の満ボビンと第2の
搬送体の空ボビンとをボビンの間隔を保った状態で交換
し、空ボビンが吊下された第1の搬送体を前記粗紡機用
レールに搬入し、満ボビンが吊下された第2の搬送体を
精紡機のクリールに搬入する粗糸ボビン搬送方法。1. A roving process in which a roving machine equipped with staggered top-supported flyers in two rows is provided, and a creel configured by arranging two rows of roving bobbins on both the left and right sides. A roving bobbin conveying method between a spinning process in which a plurality of spinning machines are disposed, wherein the roving yarns in a bobbin wheel pitch of each of two rows of bobbin wheels of the roving frame and a creel of the spinning frame. The intervals between the two rows of bobbins are set to be equal to each other, and the bobbin hanger is suspended at the bobbin wheel pitch of the roving machine while standing by on the roving rail arranged above the roving machine. A second bobbin hanger equipped with a bobbin hanger for hanging a roving bobbin in two rows in order to form a creel of a spinning machine by suspending a full bobbin produced by the spinning machine and carrying the bobbin from the roving machine to an exchange position.
The empty bobbin is transported to the exchange position with the empty bobbin suspended, and the full bobbin of the first transport body and the empty bobbin of the second transport body are exchanged at the exchange position while maintaining the bobbin interval. A roving bobbin transporting method, wherein a first transporting body having an empty bobbin suspended is carried into the roving rail, and a second transporting body having a full bobbin suspended is transported into a creel of a spinning machine.
装備した粗紡機が配設された粗紡工程と、粗糸ボビンを
左右両側に2列ずつ配置して構成されるクリールを備え
た複数の精紡機が配設された精紡工程との間の粗糸ボビ
ン搬送システムであって、 粗紡工程に設けられた第1の走行レールと、 前記第1の走行レールから分岐され、粗紡機の前側上方
にその長手方向に沿って延設された粗紡機用レールと、 前記第1の走行レール及び粗紡機用レール上を走行可能
に設けられ、粗紡機のボビンホイールピッチでボビンハ
ンガが1列に吊下された第1の搬送体と、 前記第1の搬送体を移送する第1の移送手段と、 精紡工程に設けられるとともに一部が前記第1の走行レ
ールと近接する位置に配置されるように設けられた第2
の走行レールと、 前記第2の走行レールから分岐され、各精紡機のクリー
ルと対応する位置に延設された2列の精紡機用レール
と、 前記第2の走行レール及び精紡機用レール上を走行可能
に設けられ、ボビンハンガが2列で吊下されるとともに
両列の間隔が粗紡機のボビンホイールピッチと同じに設
定された第2の搬送体と、 前記第2の搬送体を移送する第2の移送手段と、 前記第1の走行レールと第2の走行レールとが近接する
位置に設けられ、第1の搬送体上の満ボビンと第2の搬
送体上の空ボビンとの交換を2本ずつ行うボビン交換装
置とを備えた粗糸ボビン搬送システム。2. A roving process in which a roving machine equipped with two staggered upper-supported flyers is provided, and a creel configured by arranging roving bobbins in two rows on both the left and right sides. A roving bobbin transport system between a spinning process in which a plurality of spinning machines are provided, a first running rail provided in the roving process, and a roving machine branched from the first running rail. A roving rail extending above the front side of the roving machine along the longitudinal direction thereof; and a row of bobbin hangers provided at a bobbin wheel pitch of the roving machine so as to be able to run on the first traveling rail and the roving rail. A first transporting body suspended in a first transporting body, a first transporting means for transporting the first transporting body, a part provided in a spinning process, and a part thereof is disposed at a position close to the first traveling rail. The second provided to be
And a two-row spinning rail branched from the second running rail and extended to a position corresponding to the creel of each spinning machine, and on the second running rail and the spinning rail. And a second transporter in which bobbin hangers are hung in two rows and the interval between the two rows is set to be equal to the bobbin wheel pitch of the roving machine; and the second transporter is transported. A second transfer unit, which is provided at a position where the first travel rail and the second travel rail are close to each other, and exchanges a full bobbin on the first carrier with an empty bobbin on the second carrier. A roving bobbin transport system including a bobbin exchanging device that performs a bobbin change.
下された満ボビンの下部に嵌合可能な一組の第1のペッ
グと、第2の搬送体に吊下された空ボビンの下部に嵌合
可能な一組の第2のペッグと、第1のペッグを第2の搬
送体に吊下されたボビンハンガと対向する位置に、第2
のペッグを第1の搬送体に吊下されたボビンハンガと対
向する位置にそれぞれ回動配置する回動手段と、前記第
1及び第2のペッグを前記回動手段とともに第1の搬送
体に吊下された満ボビンの下部に嵌合可能な上昇位置
と、前記回動手段の回動時に前記ペッグ上の満ボビン及
び空ボビンと搬送体に吊下された満ボビン及び空ボビン
とが干渉しない下降位置とに移動させる昇降手段とを備
えている請求項2に記載の粗糸ボビン搬送システム。3. The bobbin exchanging device includes a set of first pegs that can be fitted to a lower portion of a full bobbin suspended on a first carrier, and an empty bobbin suspended on a second carrier. A pair of second pegs that can be fitted to the lower part of the second carrier, and the second peg at a position facing the bobbin hanger suspended from the second carrier.
Rotating means for rotating and disposing the pegs at positions opposing the bobbin hanger suspended from the first carrier, and suspending the first and second pegs together with the rotating means on the first carrier. The raised position that can be fitted to the lower part of the lowered full bobbin, the full bobbin and the empty bobbin on the peg and the full bobbin and the empty bobbin suspended by the carrier do not interfere with each other when the rotating means rotates. 3. The roving bobbin transport system according to claim 2, further comprising a lifting unit for moving the bobbin to a lower position.
ルとは前記ボビン交換装置が配設される位置において互
いに平行に延びるように配置されている請求項2又は請
求項3に記載の粗糸ボビン搬送システム。4. The vehicle according to claim 2, wherein the first traveling rail and the second traveling rail are arranged so as to extend parallel to each other at a position where the bobbin changing device is provided. Roving bobbin transport system.
ール上の第1の搬送体から取り外した満ボビンと、第2
の走行レール上の第2の搬送体から取り外した空ボビン
とをそれぞれその配列方向を90°変更した状態で交換
する請求項4に記載の粗糸ボビン搬送システム。5. The bobbin changing device includes: a full bobbin removed from a first carrier on the first traveling rail;
The roving bobbin transport system according to claim 4, wherein the empty bobbin removed from the second transport body on the traveling rail is exchanged with the arrangement direction thereof being changed by 90 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP18138797A JPH1121020A (en) | 1997-07-07 | 1997-07-07 | Method and system for carrying roving bobbin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP18138797A JPH1121020A (en) | 1997-07-07 | 1997-07-07 | Method and system for carrying roving bobbin |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH1121020A true JPH1121020A (en) | 1999-01-26 |
Family
ID=16099856
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP18138797A Pending JPH1121020A (en) | 1997-07-07 | 1997-07-07 | Method and system for carrying roving bobbin |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH1121020A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107207180A (en) * | 2014-11-25 | 2017-09-26 | 马佐里机器纺织股份公司 | Integrating device and method for transmitting bobbin and pipe fitting between the fly frame and spinning frame of Spinning process line |
IT201700116280A1 (en) * | 2017-10-16 | 2019-04-16 | Marzoli Machines Textile Srl | DEVICE AND METHOD FOR THE EXCHANGE BETWEEN REELS AND TUBES IN A SPINNING LINE |
IT201700116289A1 (en) * | 2017-10-16 | 2019-04-16 | Marzoli Machines Textile Srl | EXCHANGE DEVICE BETWEEN REELS AND TUBES FOR A SPINNING LINE |
-
1997
- 1997-07-07 JP JP18138797A patent/JPH1121020A/en active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107207180A (en) * | 2014-11-25 | 2017-09-26 | 马佐里机器纺织股份公司 | Integrating device and method for transmitting bobbin and pipe fitting between the fly frame and spinning frame of Spinning process line |
CN111675042A (en) * | 2014-11-25 | 2020-09-18 | 马佐里机器纺织股份公司 | Integrated device, system, spinning line and method for operating a spinning line |
IT201700116280A1 (en) * | 2017-10-16 | 2019-04-16 | Marzoli Machines Textile Srl | DEVICE AND METHOD FOR THE EXCHANGE BETWEEN REELS AND TUBES IN A SPINNING LINE |
IT201700116289A1 (en) * | 2017-10-16 | 2019-04-16 | Marzoli Machines Textile Srl | EXCHANGE DEVICE BETWEEN REELS AND TUBES FOR A SPINNING LINE |
EP3470560A1 (en) * | 2017-10-16 | 2019-04-17 | MARZOLI MACHINES TEXTILE S.r.l. | Device and method for the exchange of bobbins and tubes in a spinning line |
EP3470561A1 (en) * | 2017-10-16 | 2019-04-17 | MARZOLI MACHINES TEXTILE S.r.l. | Device for the exchange of bobbins and tubes for a spinning line |
JP2019073843A (en) * | 2017-10-16 | 2019-05-16 | マルツォリ マシーンズ テクスタイル エス.アール.エル. | Device and method for exchanging bobbins and tubes in spinning line |
JP2019073842A (en) * | 2017-10-16 | 2019-05-16 | マルツォリ マシーンズ テクスタイル エス.アール.エル. | Device and method for exchanging bobbins and tubes in spinning line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2552260B2 (en) | Transfer method of roving bobbin | |
KR0184921B1 (en) | Bobbin carrying system in spinning machine | |
JPH1121020A (en) | Method and system for carrying roving bobbin | |
JP2906735B2 (en) | Doffing device in roving machine | |
EP0214837B1 (en) | Bobbin changing method in roving frame and apparatus for carrying out said method | |
JPH10331039A (en) | Method and apparatus for transferring full robing bobbin and empty robing tube | |
JPH0377291B2 (en) | ||
JPS6353300B2 (en) | ||
JP2684777B2 (en) | Coarse yarn end position alignment device | |
JP2002285435A (en) | Cop-changing apparatus in roving frame | |
JP2897559B2 (en) | Package transport system | |
JPH0653546B2 (en) | Transfer method of roving bobbin | |
JPH1121019A (en) | Roving conveying system | |
JPS61145082A (en) | Lap feeding apparatus | |
JPH04153330A (en) | Carrying method for roving in fine spinning frame | |
JP2000045137A (en) | Cop changing apparatus of roving frame and roving frame | |
JPS63101284A (en) | Conveyor for roving bobbin | |
JPH0740535Y2 (en) | Transfer device for roving bobbin | |
JPS61201029A (en) | Full bobbin doffer and conveyor | |
JP2897561B2 (en) | Package transport system | |
JPH08144138A (en) | Method for bobbin exchange for bobbin conveyer, bobbin exchange device and bobbin exchange system | |
JPS61102429A (en) | Bobbin changing in speed frame | |
JPS61201030A (en) | Full bobbin doffer and conveyor | |
JPH05195346A (en) | Sliver exchanger of fine spinning machine | |
JPS594575A (en) | Horizontal carrier for sliver bobbin |