JPH11183448A - Method and system for monitoring of collapse of slope - Google Patents

Method and system for monitoring of collapse of slope

Info

Publication number
JPH11183448A
JPH11183448A JP9354250A JP35425097A JPH11183448A JP H11183448 A JPH11183448 A JP H11183448A JP 9354250 A JP9354250 A JP 9354250A JP 35425097 A JP35425097 A JP 35425097A JP H11183448 A JPH11183448 A JP H11183448A
Authority
JP
Japan
Prior art keywords
slope
slope failure
parameter
continuity
failure monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9354250A
Other languages
Japanese (ja)
Inventor
Akiyoshi Chichibu
顕美 秩父
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP9354250A priority Critical patent/JPH11183448A/en
Publication of JPH11183448A publication Critical patent/JPH11183448A/en
Pending legal-status Critical Current

Links

Landscapes

  • Emergency Alarm Devices (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)
  • Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)
  • Measurement Of Mechanical Vibrations Or Ultrasonic Waves (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

PROBLEM TO BE SOLVED: To obtain a method and a system in which the collapse of a slope as cut, filling or the like is judged with high accuracy without any malfunction. SOLUTION: An AE waveform which is detected by an AE sensor which is installed at a slope or the like is input to an AE parameter part 5 via an AE amplifier 4. The AE parameter part 5 computes the AE waveform so as to obtain a continuity degree parameter. The continuity degree parameter expresses a continuity degree in such a way that the input AE waveform is envelope-detected and that the time which exceeds a threshold value within a unit time is measured. A data analytical part 6 judges whether the continuity degree parameter which is continued for a prescribed time in the prescribed number of seconds contains the prescribed numbers of times or higher. When the number of continuity degrees in the continuity degree parameter is at a judgment reference or higher, the generation of the collapse of the slope is detected, and an emergency signal is output to a warning device together with slope position information which is set in an input data part 7.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、斜面崩壊監視方法
およびシステムに関し、特に、切土斜面、盛土斜面から
なる開放部における斜面崩壊発生の判定に適用して有効
な技術に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and system for monitoring a slope failure, and more particularly to a technique which is effective when applied to determination of occurrence of a slope failure in an open portion including a cut slope and an embankment slope.

【0002】[0002]

【従来の技術】本発明者が検討したところによれば、岩
盤斜面や切土斜面、盛土斜面からなる開放部などの斜面
崩壊を検知し、監視する方法として、AE(Acous
ticEmissin:音響波)計測による技術が利用
されつつある。
2. Description of the Related Art According to studies by the present inventor, an AE (Acous) is used as a method for detecting and monitoring a slope failure such as an open portion comprising a rock slope, a cut slope, and an embankment slope.
A technique using ticEmissin (acoustic wave) measurement is being used.

【0003】このAE計測は、斜面に、塑性変形や破壊
にともなって発生する音響波を検知するAEセンサを埋
設し、一定の時間に該AEセンサが検知したAEのリン
グダウンカウント数またはイベントカウント数を発生頻
度を表すパラメータとして斜面崩壊の判定を行ってい
る。
[0003] In this AE measurement, an AE sensor for detecting an acoustic wave generated by plastic deformation or destruction is embedded on a slope, and the number of ring-down counts or event counts of the AE detected by the AE sensor during a certain period of time is measured. Slope failure is determined using the number as a parameter representing the frequency of occurrence.

【0004】また、リングダウンカウント数、イベント
カウント数には、予めしきい値が設定されており、所定
の時間内に検知されたAE波形がそのしきい値よりも大
きい場合の計数値である。
A threshold value is set in advance for the ring-down count number and the event count number, and is a count value when the AE waveform detected within a predetermined time is larger than the threshold value. .

【0005】なお、この種のAE計測技術について詳し
く述べてある例としては、1990年5月1日、社団法
人 日本非破壊検査協会発行、社団法人 日本非破壊検
査協会(編)、「アコースティック・エミッション」が
あり、この文献には、AE法の特徴などが記載されてい
る。
[0005] Examples of this type of AE measurement technology are described in detail on May 1, 1990 by the Japan Non-Destructive Inspection Association, the Japan Non-Destructive Inspection Association (ed.), "Acoustic. This document describes the characteristics of the AE method and the like.

【0006】[0006]

【発明が解決しようとする課題】ところが、上記のよう
なAE計測技術では、次のような問題点があることが本
発明者により見い出された。
However, the present inventors have found that the AE measurement technique as described above has the following problems.

【0007】すなわち、斜面の崩壊時に発生するAEは
一様でなく、様々なパターンがあり、かつ土中を伝搬す
る際のAEの減衰が大きいためにAEカウント数をカウ
ントするしきい値の設定が困難である。
That is, the AE generated when the slope collapses is not uniform, has various patterns, and the attenuation of the AE during propagation in the soil is large. Is difficult.

【0008】また、AEカウント数の累積がどの程度の
計数値となれば、斜面が崩壊したことになるのかの見極
めが難しく、これらしきい値やリングダウンカウント数
の設定を誤れば、実際には斜面崩壊が発生しているにも
関わらず、斜面崩壊として判定されない恐れが生じてし
まう。
Further, it is difficult to determine what the accumulated value of the AE count is, which is the count value, at which the slope has collapsed. Although there is a slope failure, there is a possibility that the slope failure will not be determined.

【0009】本発明の目的は、斜面崩壊を誤動作なく高
精度に判定することのできる斜面崩壊判定方法およびシ
ステムを提供することにある。
An object of the present invention is to provide a method and a system for determining a slope failure which can determine a slope failure with high accuracy without malfunction.

【0010】本発明の前記ならびにその他の目的と新規
な特徴は、本明細書の記述および添付図面から明らかに
なるであろう。
The above and other objects and novel features of the present invention will become apparent from the description of the present specification and the accompanying drawings.

【0011】[0011]

【課題を解決するための手段】本願において開示される
発明のうち、代表的なものの概要を簡単に説明すれば、
以下のとおりである。
SUMMARY OF THE INVENTION Among the inventions disclosed in the present application, the outline of a representative one will be briefly described.
It is as follows.

【0012】すなわち、本発明の斜面崩壊監視方法は、
土粒子や岩石などの変形および破壊によって発生するA
E波動をAE検知手段により検知し、検知されたAE波
形を単位時間内の連続度を表す連続度パラメータに計算
し、その連続度パラメータから連続度数を判定し、斜面
崩壊の検知を行うものである。
That is, the method for monitoring slope failure according to the present invention comprises:
A generated by deformation and destruction of soil particles and rocks
The E wave is detected by the AE detecting means, the detected AE waveform is calculated into a continuity parameter representing the continuity within a unit time, the continuity is determined from the continuity parameter, and the slope failure is detected. is there.

【0013】また、本発明の斜面崩壊監視方法は、前記
連続度パラメータが、AE波形を包絡線検波し、その包
絡線がしきい値を超えている時間を計測した結果よりな
るものである。
In the slope failure monitoring method of the present invention, the continuity parameter is obtained by detecting an envelope of an AE waveform and measuring a time during which the envelope exceeds a threshold value.

【0014】さらに、本発明の斜面崩壊監視方法は、前
記連続度パラメータが、AE波形におけるそれぞれの波
の最大値間を結んだピーク線を生成し、そのピーク線が
しきい値を超えている時間を計測した結果よりなるもの
である。
Further, in the slope failure monitoring method according to the present invention, the continuity parameter generates a peak line connecting the maximum values of the respective waves in the AE waveform, and the peak line exceeds a threshold value. It consists of the result of measuring time.

【0015】これらにより、降雨などによる斜面崩壊の
発生を短時間で高精度に検知することができる。
Thus, the occurrence of slope failure due to rainfall or the like can be detected in a short time and with high accuracy.

【0016】また、本発明の斜面崩監視システムは、土
粒子や岩石などの変形および破壊によって発生するAE
波動を検知するAE検知手段と、該AE検知手段により
検知されたAE波形を単位時間内の連続度を表す連続度
パラメータに計算するパラメータ演算部と、該パラメー
タ演算部の連続度パラメータに基づいて連続度数を判定
して斜面崩壊が発生したか否かの判断を行い、斜面崩壊
が発生した場合には緊急信号を出力するデータ分析部と
よりなものである。
Further, the slope failure monitoring system of the present invention provides an AE generated by deformation and destruction of soil particles and rocks.
AE detecting means for detecting a wave motion, a parameter calculating unit for calculating an AE waveform detected by the AE detecting means into a continuity parameter representing continuity within a unit time, and a continuity parameter of the parameter calculating unit. It is a data analyzer that determines whether or not a slope failure has occurred by determining the continuous frequency, and outputs an emergency signal when a slope failure has occurred.

【0017】これにより、降雨などによる斜面崩壊の発
生を簡単な回路構成によって高精度に検知することがで
きる。
Thus, the occurrence of slope failure due to rainfall or the like can be detected with high accuracy using a simple circuit configuration.

【0018】さらに、本発明の斜面崩壊監視システム
は、前記データ分析部の分析結果をメモリするデータ格
納部を設けたものである。
Further, the slope failure monitoring system of the present invention is provided with a data storage unit for storing the analysis result of the data analysis unit.

【0019】それにより、格納されたデータの検証を行
うことができるので、より高精度に斜面崩壊の発生を検
知することができる。
Thus, the stored data can be verified, so that the occurrence of slope failure can be detected with higher accuracy.

【0020】また、本発明の斜面崩壊監視システムは、
前記AE検知手段を設置した斜面の位置情報を任意に設
定できる位置情報入力部を設け、該位置情報入力部に設
定された位置情報をデータ分析部が緊急信号とともに出
力するものである。
Further, the slope failure monitoring system of the present invention comprises:
A position information input unit for arbitrarily setting the position information of the slope on which the AE detecting means is installed is provided, and the data analysis unit outputs the position information set in the position information input unit together with the emergency signal.

【0021】それにより、斜面崩壊が発生した位置を正
確に、かつ迅速に特定することができる。
Thus, the position where the slope collapse has occurred can be specified accurately and quickly.

【0022】以上のことにより、広範囲の斜面崩壊の発
生をリアルタイムに、かつ高精度に検知することができ
る。
As described above, the occurrence of a wide range of slope failure can be detected in real time and with high accuracy.

【0023】[0023]

【発明の実施の形態】以下、本発明の実施の形態を図面
に基づいて詳細に説明する。
Embodiments of the present invention will be described below in detail with reference to the drawings.

【0024】図1は、本発明の一実施の形態による斜面
崩壊監視システムの構成図、図2は、本発明の一実施の
形態による斜面崩壊監視システムに設けられたAE計測
装置のブロック図、図3は、盛土斜面に設置されたAE
センサの断面図、図4は、盛土斜面に設置されたAEセ
ンサの平面図、図5(a)〜(b)は、盛土斜面に設置
されるAEセンサの設置手順を示す説明図、図6は、切
土斜面に設置されたAEセンサの断面図、図7は、切土
斜面に設置されたAEセンサの平面図、図8(a)〜
(b)は、本発明の切土斜面に設置されるAEセンサの
設置手順を示す説明図、図9は、(a)は、本発明の一
実施の形態によるAE計測装置により処理される発生頻
度を表すリングダウンカウント数の説明図、(b)はA
E計測装置により処理される発生頻度を表すイベントカ
ウント数の説明図、図10は、本発明の一実施の形態に
よるAE計測装置により処理される信号の連続度を示す
パラメータの説明図、図11は、本発明の一実施の形態
による斜面崩壊監視システムにおける斜面崩壊の判定の
フローチャートである。
FIG. 1 is a configuration diagram of a slope failure monitoring system according to one embodiment of the present invention, FIG. 2 is a block diagram of an AE measuring device provided in the slope failure monitoring system according to one embodiment of the present invention, Figure 3 shows the AE installed on the embankment slope
FIG. 4 is a cross-sectional view of the sensor, FIG. 4 is a plan view of the AE sensor installed on the embankment slope, FIGS. 5A and 5B are explanatory diagrams showing the installation procedure of the AE sensor installed on the embankment slope, FIG. Is a sectional view of the AE sensor installed on the cut slope, FIG. 7 is a plan view of the AE sensor installed on the cut slope, FIGS.
(B) is an explanatory view showing an installation procedure of an AE sensor installed on a cut slope according to the present invention, and FIG. 9 (a) is a diagram illustrating a process performed by an AE measuring device according to an embodiment of the present invention. Explanatory drawing of the ring-down count number representing the frequency, (b) is A
FIG. 10 is an explanatory diagram of an event count number representing an occurrence frequency processed by the E measuring device. FIG. 10 is an explanatory diagram of a parameter indicating continuity of a signal processed by the AE measuring device according to the embodiment of the present invention. 5 is a flowchart of a slope failure determination in the slope failure monitoring system according to one embodiment of the present invention.

【0025】本実施の形態において、斜面崩壊監視シス
テム1は、切土斜面、盛土斜面からなる開放部におい
て、降雨などによる斜面崩壊をAE計測によって検知
し、警報などを発するものでる。
In the present embodiment, the slope failure monitoring system 1 detects a slope failure due to rainfall or the like by AE measurement and issues an alarm or the like in an open portion including a cut slope and an embankment slope.

【0026】この斜面崩壊監視システム1には、図1に
示すように、複数のAEセンサ(AE検知手段)2が設
けられており、該AEセンサ2を地中に埋設することに
よって土粒子間の摩擦によって発生するAE波動を検知
し、その検知したAE波形を計測する。
As shown in FIG. 1, the slope failure monitoring system 1 is provided with a plurality of AE sensors (AE detecting means) 2. AE wave generated by friction of the AE is detected, and the detected AE waveform is measured.

【0027】また、AEセンサ2は、AE計測装置3に
接続されている。このAE計測装置3は、該AEセンサ
2によって検知されたAE波形からAEパラメータの計
算を行い、斜面崩壊が発生したか否かの判定を行う。
The AE sensor 2 is connected to an AE measuring device 3. The AE measuring device 3 calculates AE parameters from the AE waveform detected by the AE sensor 2 and determines whether or not a slope failure has occurred.

【0028】AE計測装置3は、たとえば、警報などに
よって傾斜崩壊が発生したことを知らせる警報装置など
と接続されており、AE計測装置3から出力された緊急
信号などを接点出力などを用いて該警報装置などに外部
出力する。
The AE measuring device 3 is connected to, for example, an alarm device for notifying that the inclination collapse has occurred by an alarm or the like. The AE measuring device 3 receives an emergency signal or the like output from the AE measuring device 3 by using a contact output or the like. External output to alarm device.

【0029】次に、AE計測装置3の構成について、図
2を用いて説明する。
Next, the configuration of the AE measuring device 3 will be described with reference to FIG.

【0030】AE計測装置3には、AEアンプ4が設け
られている。このAEアンプ4は、AEセンサ2と接続
され、該AEセンサ2によって検知されたAE波形の増
幅を行う。AEアンプ4は、AEパラメータ(パラメー
タ演算部)5に接続されている。AEパラメータ5は、
AEの発生頻度を示すパラメータとしてイベントカウン
ト数、ダウンリングカウント数ならびに連続度パラメー
タの計算を行う。
The AE measuring device 3 is provided with an AE amplifier 4. The AE amplifier 4 is connected to the AE sensor 2 and amplifies the AE waveform detected by the AE sensor 2. The AE amplifier 4 is connected to an AE parameter (parameter operation unit) 5. The AE parameter 5 is
The event count number, the downlink count number, and the continuity parameter are calculated as parameters indicating the AE occurrence frequency.

【0031】また、AEパラメータ5は、データ分析部
6に接続されている。このデータ分析部6には、斜面位
置の情報をディップスイッチなどによって設定する入力
データ部(位置情報入力部)7が接続されている。
The AE parameter 5 is connected to a data analyzer 6. The data analysis unit 6 is connected to an input data unit (position information input unit) 7 for setting information on the slope position using a dip switch or the like.

【0032】データ分析部6は、AEパラメータ5によ
って計算されたパラメータに基づいて斜面崩壊が発生し
たか否かを判断し、斜面崩壊が発生した場合には、入力
データ部7に設定されたデータと斜面崩壊が発生したこ
とを判定した緊急信号とを前述した警報装置などに外部
出力する。
The data analysis unit 6 determines whether or not a slope failure has occurred based on the parameters calculated by the AE parameters 5. If a slope failure has occurred, the data set in the input data unit 7 is determined. And an emergency signal for judging that the slope collapse has occurred is output to the above-mentioned alarm device or the like.

【0033】次に、AEセンサの設置方法について説明
する。
Next, a method of installing the AE sensor will be described.

【0034】盛土斜面に設置する場合、図3に示すよう
に、導波棒、いわゆる、ウェーブガイド81の先端部に
AEセンサ2が取り付けられ、地中に埋設される。この
ウェーブガイド8は、信号の伝搬がよい、たとえば、ス
テンレスなどの金属製のからなり、長さは2m程度とな
っている。
When installing on an embankment slope, as shown in FIG. 3, the AE sensor 2 is attached to the tip of a waveguide rod, a so-called waveguide 81, and buried underground. The waveguide 8 is made of a metal such as stainless steel, which has good signal propagation, and has a length of about 2 m.

【0035】AEセンサ2は、斜面の中間付近で横一列
に設置を行う。また、盛土斜面は長くなることが予想さ
れるので、AEセンサ2の個数を少なくするために該A
Eセンサ2の間隔は、図4に示すように、たとえば、1
5m間隔で埋設する。AEセンサ2の埋設深さは、雨、
風などの影響を避けるために土被り50cm以上程度を
確保する。
The AE sensors 2 are installed in a horizontal line near the middle of the slope. Further, since the embankment slope is expected to be long, the A is used to reduce the number of AE sensors 2.
The interval between the E sensors 2 is, for example, 1 as shown in FIG.
It is buried at 5m intervals. The buried depth of the AE sensor 2 is rain,
In order to avoid the influence of wind, etc., secure about 50cm or more of earth covering.

【0036】さらに、AEセンサ2間のみで斜面崩壊が
発生した場合にAE波形が伝搬しない可能性があるの
で、それぞれのAEセンサ2間はチェーン9などによっ
て連結を行い、斜面崩壊時にウェーブガイド8を引き抜
くことにより強制的にAEを発生させる。
Further, if a slope failure occurs only between the AE sensors 2, there is a possibility that the AE waveform does not propagate. Therefore, the AE sensors 2 are connected to each other by a chain 9 or the like, and the waveguide 8 is connected when the slope collapses. AE is forcibly generated by extracting the AE.

【0037】AEセンサ2の埋設手順は、図5(a)に
示すように、斜面中間付近を60cm以上程度掘削し、
その掘削された穴に、図5(b)に示すように、先端部
にAEセンサ2が取り付けられたウェーブガイド8を埋
設する。また、それぞれのウェーブガイド8には、前述
したようにチェーン9が連結されている。そして、図5
(c)に示すように、掘削された穴を埋め戻ししてAE
センサ2の設置が完了する。
The procedure for embedding the AE sensor 2 is as follows: as shown in FIG.
As shown in FIG. 5 (b), a waveguide 8 having an AE sensor 2 attached at its tip is buried in the excavated hole. Further, the chains 9 are connected to the respective waveguides 8 as described above. And FIG.
As shown in (c), the excavated hole is backfilled and AE
The installation of the sensor 2 is completed.

【0038】前述したウェーブガイド8の長さ、埋設深
さ、埋設間隔などは、標準的なものであり、現場状況に
合わせて適宣調整を行うようにする。
The length, burying depth, burying interval, and the like of the above-described waveguide 8 are standard, and appropriate adjustments are made in accordance with site conditions.

【0039】また、切土斜面におけるAEセンサ2の設
置方法について説明する。
A method of installing the AE sensor 2 on a cut slope will be described.

【0040】切土斜面の場合においても、AEセンサ2
は、図6に示すように、斜面の中間付近に横方向に一列
になるように設置する。ウェーブガイド8の長さは1m
程度とし、間隔は、図7に示すように、10m程度とす
る。切土斜面では、原則としてチェーンなどによるウェ
ーブガイド8間の連結は行わない。
Even in the case of a cut slope, the AE sensor 2
As shown in FIG. 6, are installed in a row in the horizontal direction near the middle of the slope. Waveguide 8 is 1m long
And the interval is about 10 m as shown in FIG. On cut slopes, there is no connection between the waveguides 8 by a chain or the like in principle.

【0041】AEセンサ2の埋設手順は、図8(a)に
示すように、斜面中間付近を160cm程度削孔し、そ
の穴に、図8(b)に示すように、先端部にAEセンサ
2が取り付けられたウェーブガイド8を挿入する。そし
て、図5(c)に示すように、AEセンサ2が取り付け
られたウェーブガイド8が挿入された穴にモルタル10
を充填し、AEセンサ2の設置が完了する。
As shown in FIG. 8 (a), the AE sensor 2 is buried in the vicinity of the middle of the slope by about 160 cm, and the AE sensor 2 is provided at the tip of the hole as shown in FIG. 8 (b). Insert the waveguide 8 to which 2 is attached. Then, as shown in FIG. 5C, the mortar 10 is inserted into the hole into which the waveguide 8 to which the AE sensor 2 is attached is inserted.
And the installation of the AE sensor 2 is completed.

【0042】この場合も、前述したウェーブガイド8の
長さ、埋設深さ、埋設間隔ならびにチェーン連結の有無
などは標準的なものであり、現場状況に合わせて適宣調
整を行うようにする。
Also in this case, the length, burying depth, burying interval, presence / absence of chain connection, etc. of the above-mentioned waveguide 8 are standard, and appropriate adjustments are made according to the site conditions.

【0043】次に、本実施の形態の作用について説明す
る。
Next, the operation of the present embodiment will be described.

【0044】まず、AEセンサ2によって検知されたA
E波形は、AE計測装置3のAEアンプ4に入力され、
信号増幅が行われる。そして、増幅されたAE波形は、
AEパラメータ5に入力されて、パラメータとしてリン
グダウンカウント数、イベントカウント数ならびに連続
度パラメータの計算が行われる。
First, A detected by the AE sensor 2
The E waveform is input to the AE amplifier 4 of the AE measuring device 3,
Signal amplification is performed. And the amplified AE waveform is
The AE parameter 5 is input to the AE parameter 5 to calculate a ring-down count number, an event count number, and a continuity parameter as parameters.

【0045】リングダウンカウント数は、図9(a)に
示すように、所定のしきい値が設定されており、入力さ
れたAE波形の大きさが、そのしきい値以上となった回
数をカウントするものである。また、イベントカウント
数は、図9(b)に示すように、しきい値以上のAE波
形を有したAEのひとかたまりの波形数をカウントする
ものである。これらリングダウンカウント数、イベント
カウント数により、AEの発生頻度が表されることにな
る。
As shown in FIG. 9A, a predetermined threshold value is set for the ring-down count number, and the number of times that the magnitude of the input AE waveform becomes equal to or greater than the threshold value is set. It is to count. The event count counts, as shown in FIG. 9B, the number of AE waveforms having an AE waveform equal to or larger than a threshold value. The occurrence frequency of the AE is represented by the ring down count number and the event count number.

【0046】連続度パラメータは、図10に示すよう
に、連続するAEの発生を検知するものであり、たとえ
ば、入力されたAE波形の包絡線検波を行い、単位時間
内(この場合では1秒間)にしきい値を超えた時間を測
定し、これを信号の連続度を表す連続度パラメータとし
ている。
As shown in FIG. 10, the continuity parameter detects the occurrence of a continuous AE. For example, the continuity parameter detects the envelope of the input AE waveform, and within a unit time (one second in this case). ), The time over the threshold is measured, and this is used as a continuity parameter indicating the continuity of the signal.

【0047】また、連続度パラメータは、前述した包絡
線検波だけではなく、たとえば、AE波形のピーク値を
結んだピーク線のしきい値を超えた時間などのしきい値
を超えた時間を測定することのできるパラメータであれ
ばよい。
The continuity parameter measures not only the envelope detection described above but also a time exceeding a threshold such as a time exceeding a threshold of a peak line connecting the peak values of the AE waveform. Any parameters can be used.

【0048】そして、AEパラメータ5によって計算さ
れたリングダウンカウント数、イベントカウント数なら
びに連続度パラメータの計算結果は、データ分析部6に
入力され、斜面崩壊が発生したか否かの判定が行われ
る。
The calculation results of the ring-down count number, event count number, and continuity parameter calculated by the AE parameter 5 are input to the data analysis unit 6, and it is determined whether a slope failure has occurred. .

【0049】ここで、データ分析部6による斜面崩壊の
判定方法について、図1、図2および図11のフローチ
ャートを用いて説明する。
Here, a method of determining slope failure by the data analysis unit 6 will be described with reference to the flowcharts of FIGS. 1, 2 and 11.

【0050】まず、データ分析部6に、AEパラメータ
5により計算された30秒間のパラメータが入力される
(ステップS101)。よって、データ分析部6におい
ては、30秒単位に判定が行われることになる。
First, the parameters for 30 seconds calculated by the AE parameter 5 are input to the data analyzer 6 (step S101). Therefore, in the data analysis unit 6, the determination is made every 30 seconds.

【0051】入力されたパラメータのうち、イベントカ
ウント数が100以上であるか否かの判断を行い(ステ
ップS102)、99以下である場合にはステップS1
01の処理に戻り、100以上の場合には、リングダウ
ンカウント数が1000以上であるか否かの判断を行う
(ステップS103)。
It is determined whether or not the event count among the input parameters is 100 or more (step S102). If the event count is 99 or less, step S1 is performed.
Returning to the process of 01, if it is 100 or more, it is determined whether or not the ring down count is 1000 or more (step S103).

【0052】リングダウンカウント数が999以下の場
合には、ステップS101の処理に戻る。これらステッ
プS102、S103の処理は、AE発生程度の確認を
行うためのものである。
If the ring down count is less than 999, the process returns to step S101. The processing of steps S102 and S103 is for confirming the degree of occurrence of AE.

【0053】リングダウンカウント数が1000以上の
時は、30秒単位のAE波形を所定の秒数毎に区切り、
その秒数の中で、所定の秒数間に所定の時間連続する連
続度パラメータが所定の回数以上あるか否かの判断を行
う(ステップS104)。
When the ring-down count is 1000 or more, the AE waveform in units of 30 seconds is divided into predetermined seconds.
Among the seconds, it is determined whether or not the continuity parameter that continues for a predetermined time within a predetermined number of seconds is equal to or greater than a predetermined number (step S104).

【0054】このステップS104の処理における判定
基準としては、たとえば、30秒単位のAE波形を10
秒毎に区切り、その10秒間に連続する連続度パラメー
タが1回以上ある場合、30秒単位のAE波形を5秒毎
の区切り、それぞれの5秒間に4秒連続する連続度パラ
メータが3回以上ある場合、ならびに同じく5秒間に3
秒連続する連続度パラメータがある場合などが考えられ
る。
As a criterion for the processing in step S104, for example, an AE waveform in units of 30 seconds
If the AE waveform is divided every 30 seconds and the continuity parameter continuous for 10 seconds is one or more times, the AE waveform in units of 30 seconds is divided every 5 seconds, and the continuity parameter that is continuous for 4 seconds every 5 seconds is three or more times In some cases, as well as 3 in 5 seconds
There may be a case where there is a continuity parameter that continues for seconds.

【0055】そして、ステップS104の処理におい
て、連続度パラメータの連続度数が前述した判定基準以
上になった場合には、斜面崩壊が発生したと判定して入
力データ部7に設定された斜面位置を示す情報とともに
警報信号機器4、情報伝送機器5に斜面崩壊が発生した
ことを示す緊急信号を出力する(ステップS105)。
In the process of step S104, when the continuity of the continuity parameter is equal to or greater than the above-described criterion, it is determined that a slope collapse has occurred, and the slope position set in the input data unit 7 is determined. An emergency signal indicating that the slope collapse has occurred is output to the alarm signal device 4 and the information transmission device 5 together with the indicated information (step S105).

【0056】また、前述したステップS102〜S10
5の処理におけるイベントカウント数、リングダウンカ
ウント数ならびに、連続度数の判定基準は一例を示した
ものであり、現場の状況に合わせて適宣調整を行う。
Further, the above-mentioned steps S102 to S10
The criteria of the event count, the ring-down count, and the continuity count in the process No. 5 are merely examples, and appropriate adjustment is performed according to the situation at the site.

【0057】また、ステップS104の処理において、
連続度数が前述した判定基準以下の場合には、ステップ
S101の処理に戻ることになる。そして、AE計測装
置3から外部出力された緊急信号は、前述した警報装置
などに出力される。
Further, in the process of step S104,
If the continuation frequency is equal to or less than the aforementioned criterion, the process returns to step S101. The emergency signal externally output from the AE measuring device 3 is output to the above-described alarm device or the like.

【0058】それにより、本実施の形態によれば、AE
計測装置3が斜面崩壊の発生を連続度数のパラメータに
よって判断するとにより、短時間で、かつ高精度に斜面
崩壊の判定を行うことができる。
Thus, according to the present embodiment, AE
When the measurement device 3 determines the occurrence of the slope failure by using the parameter of the continuous frequency, the slope failure can be determined in a short time and with high accuracy.

【0059】また、本実施の形態においては、最初にA
E発生頻度を表すリングダウンカウント数、イベントカ
ウント数からAE発生の程度を確認した後に、連続度数
により斜面崩壊の発生を検知したが、リングダウンカウ
ント数ならびにイベントカウント数によるAE発生の程
度の確認を省いて、連続度数のみによって斜面崩壊の発
生を判断するようにしても、高精度に斜面崩壊の検知を
行うことができる。
In this embodiment, first, A
After confirming the degree of AE occurrence from the ring-down count number and event count number representing the frequency of E occurrence, the occurrence of slope failure was detected by the continuous frequency, but the degree of AE occurrence was confirmed by the ring-down count number and the event count number. , The slope failure can be detected with high accuracy even if the occurrence of the slope failure is determined based only on the continuous frequency.

【0060】以上、本発明者によってなされた発明を発
明の実施の形態に基づき具体的に説明したが、本発明は
前記実施の形態に限定されるものではなく、その要旨を
逸脱しない範囲で種々変更可能であることはいうまでも
ない。
Although the invention made by the inventor has been specifically described based on the embodiments of the present invention, the present invention is not limited to the above embodiments, and various modifications may be made without departing from the gist of the invention. Needless to say, it can be changed.

【0061】たとえば、図12に示すように、AE計測
装置3にデータ分析部6によって分析された様々なデー
タを格納する、たとえば、カードメモリなどのデータ格
納部11を設けるようにしてもよい。
For example, as shown in FIG. 12, the AE measuring device 3 may be provided with a data storage unit 11 such as a card memory for storing various data analyzed by the data analysis unit 6.

【0062】これにより、AEセンサ2を設置した現地
の分析データを蓄積して、斜面崩壊発生の妥当性などの
検証を行うことができるので、より高精度に斜面崩壊の
検知を行うことができる。
Thus, the analysis data of the site where the AE sensor 2 is installed can be accumulated and the validity of the occurrence of the slope failure can be verified, so that the slope failure can be detected with higher accuracy. .

【0063】また、それら分析データを蓄積することに
よって、AEカウント数、連続度数の基準値を、より合
理的なものに変更することができる。
Further, by accumulating the analysis data, the reference values of the AE count number and the continuous frequency can be changed to more reasonable values.

【0064】さらに、前記実施の形態においては、切
土、盛土における斜面崩壊監視について記載したが、こ
の斜面崩壊監視方法およびシステムは、たとえば、岩盤
斜面あるいは、地下空洞などにおけるさまざまな斜面崩
壊の監視に用いることができ、それによっても短時間
で、かつ高精度に斜面崩壊の判定を行うことができる。
Further, in the above-described embodiment, the description has been made of the monitoring of the slope failure in the cut and the embankment. However, the monitoring method and the system for the slope failure are, for example, monitoring of various slope failures in the rock slope or the underground cavity. This makes it possible to determine the slope failure in a short time and with high accuracy.

【0065】[0065]

【発明の効果】本願によって開示される発明のうち、代
表的なものによって得られる効果を簡単に説明すれば、
以下のとおりである。
Advantageous effects obtained by typical ones of the inventions disclosed by the present application will be briefly described as follows.
It is as follows.

【0066】(1)本発明によれば、AE波形を連続度
パラメータに計算し、その連続度に基づいて斜面崩壊の
検知を行うので、斜面崩壊の発生を高精度に行うことが
できる。
(1) According to the present invention, an AE waveform is calculated as a continuity parameter, and slope failure detection is performed based on the continuity, so that slope failure can be generated with high accuracy.

【0067】(2)また、本発明では、斜面崩壊が発生
した位置を正確に、かつ迅速に特定することができるの
で、広範囲の斜面崩壊の発生を精度よくリアルタイムに
検知することができる。
(2) Further, according to the present invention, since the position where the slope failure has occurred can be accurately and quickly specified, the occurrence of the slope failure in a wide range can be accurately detected in real time.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施の形態による斜面崩壊監視シス
テムの構成図である。
FIG. 1 is a configuration diagram of a slope failure monitoring system according to an embodiment of the present invention.

【図2】本発明の一実施の形態による斜面崩壊監視シス
テムに設けられたAE計測装置のブロック図である。
FIG. 2 is a block diagram of an AE measuring device provided in the slope failure monitoring system according to one embodiment of the present invention.

【図3】盛土斜面に設置されたAEセンサの断面図であ
る。
FIG. 3 is a cross-sectional view of an AE sensor installed on an embankment slope.

【図4】盛土斜面に設置されたAEセンサの平面図であ
る。
FIG. 4 is a plan view of an AE sensor installed on an embankment slope.

【図5】(a)〜(c)は、盛土斜面に設置されるAE
センサの設置手順を示す説明図である。
FIGS. 5A to 5C are AEs installed on an embankment slope;
It is explanatory drawing which shows the installation procedure of a sensor.

【図6】切土斜面に設置されたAEセンサの断面図であ
る。
FIG. 6 is a cross-sectional view of an AE sensor installed on a cut slope.

【図7】切土斜面に設置されたAEセンサの平面図であ
る。
FIG. 7 is a plan view of an AE sensor installed on a cut slope.

【図8】(a)〜(c)は、切土斜面に設置されるAE
センサの設置手順を示す説明図である。
FIGS. 8A to 8C are AEs installed on a cut slope.
It is explanatory drawing which shows the installation procedure of a sensor.

【図9】(a)は、本発明の一実施の形態によるAE計
測装置により処理される発生頻度を表すリングダウンカ
ウント数の説明図、(b)は、AE計測装置により処理
される発生頻度を表すイベントカウント数の説明図であ
る。
9A is an explanatory diagram of a ring-down count number representing an occurrence frequency processed by the AE measurement device according to one embodiment of the present invention, and FIG. 9B is an occurrence frequency processed by the AE measurement device; FIG. 9 is an explanatory diagram of an event count number indicating the event count.

【図10】本発明の一実施の形態によるAE計測装置に
より処理される信号の連続度を示すパラメータの説明図
である。
FIG. 10 is an explanatory diagram of a parameter indicating a continuity of a signal processed by the AE measuring device according to the embodiment of the present invention;

【図11】本発明の一実施の形態による斜面崩壊監視シ
ステムにおける斜面崩壊の判定のフローチャートであ
る。
FIG. 11 is a flowchart of determination of a slope failure in the slope failure monitoring system according to one embodiment of the present invention.

【図12】本発明の他の実施の形態による斜面崩壊監視
システムに設けられたAE計測装置のブロック図であ
る。
FIG. 12 is a block diagram of an AE measurement device provided in a slope failure monitoring system according to another embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 斜面崩壊監視システム 2 AEセンサ(AE検知手段) 3 AE計測装置 4 AEアンプ 5 AEパラメータ(パラメータ演算部) 6 データ分析部 7 入力データ部(位置情報入力部) 8 ウェーブガイド 9 チェーン 10 モルタル 11 データ格納部 Reference Signs List 1 slope failure monitoring system 2 AE sensor (AE detecting means) 3 AE measuring device 4 AE amplifier 5 AE parameter (parameter calculation unit) 6 data analysis unit 7 input data unit (position information input unit) 8 waveguide 9 chain 10 mortar 11 Data storage

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 土粒子や岩石などの変形および破壊によ
って発生するAE波動をAE検知手段により検知し、検
知されたAE波形を単位時間内の連続度を表す連続度パ
ラメータに計算し、その連続度パラメータから連続度数
を判定することにより斜面崩壊の検知を行うことを特徴
とする斜面崩壊監視方法。
An AE detection unit detects an AE wave generated by deformation and destruction of a soil particle or a rock, and calculates a detected AE waveform into a continuity parameter representing continuity within a unit time. A slope failure monitoring method, wherein a slope failure is detected by determining a continuous frequency from a degree parameter.
【請求項2】 請求項1記載の斜面崩壊監視方法におい
て、前記連続度パラメータが、前記AE波形を包絡線検
波し、前記包絡線がしきい値を超えている時間を計測し
た結果であることを特徴とする斜面崩壊監視方法。
2. The slope failure monitoring method according to claim 1, wherein the continuity parameter is a result of performing envelope detection on the AE waveform and measuring a time during which the envelope exceeds a threshold. A slope failure monitoring method, characterized in that:
【請求項3】 請求項1記載の斜面崩壊監視方法におい
て、前記連続度パラメータが、前記AE波形におけるそ
れぞれの波の最大値間を結んだピーク線を生成し、前記
ピーク線がしきい値を超えている時間を計測した結果で
あることを特徴とする斜面崩壊監視方法。
3. The slope failure monitoring method according to claim 1, wherein the continuity parameter generates a peak line connecting maximum values of respective waves in the AE waveform, and the peak line sets a threshold value. A slope failure monitoring method characterized in that it is a result of measuring a time exceeding the slope.
【請求項4】 土粒子や岩石などの変形および破壊によ
って発生するAE波動を検知するAE検知手段と、 前記AE検知手段により検知されたAE波形を単位時間
内の連続度を表す連続度パラメータに計算するパラメー
タ演算部と、 前記パラメータ演算部の連続度パラメータから連続度数
を判定して斜面崩壊が発生したか否かの判断を行い、斜
面崩壊が発生した場合には緊急信号を出力するデータ分
析部とよりなることを特徴とする斜面崩壊監視システ
ム。
4. An AE detecting means for detecting AE waves generated by deformation and destruction of soil particles and rocks, and an AE waveform detected by the AE detecting means is converted into a continuity parameter representing continuity within a unit time. A parameter calculation unit for calculating, a data analysis for determining whether a slope failure has occurred by determining a continuous frequency from the continuity parameter of the parameter calculation unit, and outputting an emergency signal when the slope failure has occurred; A slope failure monitoring system, comprising:
【請求項5】 請求項4記載の斜面崩壊監視システムに
おいて、前記データ分析部の分析結果をメモリするデー
タ格納部を設けたことを特徴とする斜面崩壊監視システ
ム。
5. The slope failure monitoring system according to claim 4, further comprising a data storage unit for storing an analysis result of the data analysis unit.
【請求項6】 請求項4または5記載の斜面崩壊監視シ
ステムにおいて、前記AE検知手段を設置した斜面の位
置情報を任意に設定できる位置情報入力部を設け、前記
位置情報入力部に設定された位置情報を前記データ分析
部が緊急信号とともに出力することを特徴とする斜面崩
壊監視システム。
6. The slope failure monitoring system according to claim 4, further comprising: a position information input unit that can arbitrarily set position information of the slope on which the AE detecting unit is installed, wherein the position information input unit is set to the position information input unit. A slope failure monitoring system, wherein the data analyzer outputs position information together with an emergency signal.
JP9354250A 1997-12-24 1997-12-24 Method and system for monitoring of collapse of slope Pending JPH11183448A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9354250A JPH11183448A (en) 1997-12-24 1997-12-24 Method and system for monitoring of collapse of slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9354250A JPH11183448A (en) 1997-12-24 1997-12-24 Method and system for monitoring of collapse of slope

Publications (1)

Publication Number Publication Date
JPH11183448A true JPH11183448A (en) 1999-07-09

Family

ID=18436287

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9354250A Pending JPH11183448A (en) 1997-12-24 1997-12-24 Method and system for monitoring of collapse of slope

Country Status (1)

Country Link
JP (1) JPH11183448A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100712475B1 (en) 2005-02-15 2007-05-02 (주)세기엔지니어링 Apparatus for mornitering a collapse of around the cutted ground
JP2008286619A (en) * 2007-05-17 2008-11-27 Tobishima Corp Property evaluation apparatus and method
KR100903949B1 (en) 2008-05-09 2009-06-25 한국지질자원연구원 Method for predicting failure of geotechnical structure
KR100921382B1 (en) * 2009-05-08 2009-10-14 한국지질자원연구원 Method for predicting failure of geotechnical structure
GB2467419A (en) * 2009-01-29 2010-08-04 Univ Loughborough Monitoring soil slope displacement rate by detecting acoustic emissions
CN101858987A (en) * 2010-06-10 2010-10-13 浙江工业大学 Collapse monitoring device based on omnibearing tilt sensor
CN112525327A (en) * 2020-11-30 2021-03-19 北京中关村智连安全科学研究院有限公司 Early warning method for rock mass collapse based on variation coefficient time domain dynamics index

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100712475B1 (en) 2005-02-15 2007-05-02 (주)세기엔지니어링 Apparatus for mornitering a collapse of around the cutted ground
JP2008286619A (en) * 2007-05-17 2008-11-27 Tobishima Corp Property evaluation apparatus and method
KR100903949B1 (en) 2008-05-09 2009-06-25 한국지질자원연구원 Method for predicting failure of geotechnical structure
GB2467419A (en) * 2009-01-29 2010-08-04 Univ Loughborough Monitoring soil slope displacement rate by detecting acoustic emissions
WO2010086584A2 (en) 2009-01-29 2010-08-05 Loughborough University Apparatus and method for monitoring soil slope displacement rate by detecting acoustic emissions
GB2467419B (en) * 2009-01-29 2011-05-18 Univ Loughborough Apparatus and method for monitoring soil slope displacement rate by detecting acoustic emissions
KR100921382B1 (en) * 2009-05-08 2009-10-14 한국지질자원연구원 Method for predicting failure of geotechnical structure
CN101858987A (en) * 2010-06-10 2010-10-13 浙江工业大学 Collapse monitoring device based on omnibearing tilt sensor
CN112525327A (en) * 2020-11-30 2021-03-19 北京中关村智连安全科学研究院有限公司 Early warning method for rock mass collapse based on variation coefficient time domain dynamics index

Similar Documents

Publication Publication Date Title
KR100903949B1 (en) Method for predicting failure of geotechnical structure
CN111042866B (en) Multi-physical-field cooperative water inrush monitoring method
JP4217728B2 (en) Lightning strike advanced evaluation apparatus and method, lightning charge evaluation apparatus and method, lightning charge advanced evaluation program
CN100416269C (en) Non destructive detection mothod used for anchor rod anchored system
JPH11183448A (en) Method and system for monitoring of collapse of slope
KR101989975B1 (en) Warning Method and Apparatus for Ground Subsidence using the Monitoring of Ground Water Level
JP2003232043A (en) Detector for abnormal soil, detection system for abnormal soil, and its detection method
JP5355344B2 (en) Lightning charge evaluation system, lightning determination method, lightning charge evaluation method
KR101872695B1 (en) Device and method for predicting location of structural damage
US11609148B2 (en) Method and apparatus for analysis and detection of encroachment and impact upon underground structures
KR100921382B1 (en) Method for predicting failure of geotechnical structure
KR20080090850A (en) System for determining and predicting rock failure using acoustic emission method
CN118188032A (en) Monitoring method, system, electronic equipment and medium for tunnel construction safety
JPH09274023A (en) Prediction system for landslide
JP5804025B2 (en) Soil monitoring device and soil monitoring method
US8050414B2 (en) Robust pipe-strike pulse detector
KR20110060632A (en) Acoustics and vibration complex sensing unit for defect of plant and defect diagnostics system for high pressure pipe
CN109919510A (en) A kind of method, apparatus, server and storage medium for predicting Earthquake risk
JP4583898B2 (en) Ultrasonic flaw detector
JPH10307128A (en) Method for predicting slope disaster by acoustic emission technology
CN112033980A (en) Device and method for monitoring damage of existing building pile foundation
EP4425169A1 (en) Third-party interference monitoring system and method
CN117589890B (en) Rock collapse early warning method and system based on acoustic emission characteristics
RU2263969C2 (en) Method and device for ultrasound control of objects in guarded zone
JPS62156496A (en) Falling-in detector for shielding excavator

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041202

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051128

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051206

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060404