Tubular wheel for watch and manufacture thereof

Info

Publication number
JPH0894769A
JPH0894769A JP22521194A JP22521194A JPH0894769A JP H0894769 A JPH0894769 A JP H0894769A JP 22521194 A JP22521194 A JP 22521194A JP 22521194 A JP22521194 A JP 22521194A JP H0894769 A JPH0894769 A JP H0894769A
Authority
JP
Japan
Prior art keywords
tubular
wheel
protrusion
gear
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP22521194A
Other languages
Japanese (ja)
Other versions
JP3052748B2 (en
Inventor
Kenichi Michihashi
賢一 道端
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seiko Epson Corp
Original Assignee
Seiko Epson Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seiko Epson Corp filed Critical Seiko Epson Corp
Priority to JP6225211A priority Critical patent/JP3052748B2/en
Publication of JPH0894769A publication Critical patent/JPH0894769A/en
Application granted granted Critical
Publication of JP3052748B2 publication Critical patent/JP3052748B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Gears, Cams (AREA)

Abstract

PURPOSE: To manufacture a tubular wheel for a watch quickly at low cost by subjecting a planar body repeatedly to drawing to form a tubular covered protrusion and then punching through the covered part to form a tubular part. CONSTITUTION: A planar body 1 of metal (e.g. phosphor bronze) is pressed repeatedly to form a tubular bottomed protrusion 2. The protrusion 2 is then press formed to match the shape at the tubular part of tubular wheel of a watch. Subsequently, the cover part 2a of the protrusion 2 is punched through by press to make an opening 3a thus completing a tubular part 3. The planar body 1 around the tubular part 3 is then 'drawn in' by press to form a disc gear part 4 having teeth 4a. Finally, the tubular part 3 and the gear part 4 are 'drawn out' from the peripheral planar body 1 to complete a tubular wheel for the watch. Since the gear part 4 is temporarily 'drawn in' before being 'drawn out', durability of die is enhanced and the accuracy at the gear part 4 is also enhanced.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は時計用筒車とその製造方
法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a timepiece wheel and its manufacturing method.

【0002】[0002]

【従来の技術】従来、時計用筒車を製造する場合は、切
削加工により、その筒状部と歯車部とをそれぞれ形成し
ていた。
2. Description of the Related Art Conventionally, when manufacturing a hour wheel and a wheel, the cylindrical portion and the gear portion have been formed by cutting.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上記従
来の製造方法では、切削加工用材料を用いて筒車の形状
と歯形を切削により形成する必要があり、これらの切削
加工工程には時間がかかり、製造コストが高くなるとい
う問題があった。
However, in the above-described conventional manufacturing method, it is necessary to form the shape of the hour wheel and the tooth profile by cutting using the cutting material, and these cutting steps take time. However, there is a problem that the manufacturing cost becomes high.

【0004】そこで本発明は上記問題点を解決するもの
であり、その課題は、時計用筒車を迅速かつ低コストで
製造することのできる製造方法を得ることにある。
Therefore, the present invention is to solve the above-mentioned problems, and an object thereof is to obtain a manufacturing method capable of manufacturing a timepiece hour wheel quickly and at low cost.

【0005】[0005]

【課題を解決するための手段】本発明の時計用筒車は、
板状体に絞り加工を繰り返し施して有蓋円筒状の突出部
を形成し、該突出部を成形した後に、前記突出部の蓋部
分を抜いて筒状部を形成して成ることを特徴とする。
The timepiece hour wheel of the present invention comprises:
It is characterized in that a plate-shaped body is repeatedly drawn to form a cylindrical protruding portion with a lid, the protruding portion is molded, and then the lid portion of the protruding portion is removed to form a tubular portion. .

【0006】ここで、前記板状体における前記筒状部の
周囲を歯車状に抜き落として歯車部を形成することが好
ましい。
[0006] Here, it is preferable that the periphery of the tubular portion of the plate-like body is pulled out in a gear shape to form the gear portion.

【0007】つぎに、本発明の時計用筒車の製造方法
は、板状体に絞り加工を繰り返して有蓋円筒状の突出部
を形成する絞り加工工程と、該突出部を成形して時計用
筒車の筒部形状を形成する成形工程と、前記突出部の蓋
部分を抜き落として時計用筒車の筒状部を形成する蓋抜
き工程とを有するものである。
The timepiece wheel manufacturing method of the present invention comprises a drawing step in which a plate-shaped body is repeatedly drawn to form a cylindrical protrusion with a lid, and the timepiece is formed by molding the protrusion. The method includes a forming step of forming a tubular portion of the hour wheel, and a lid removing step of removing the lid portion of the protruding portion to form a tubular portion of the hour wheel and pinion.

【0008】この場合において、前記成形工程において
は、前記筒状部の蓋部分に、前記蓋抜き工程における抜
き落とし部分に含まれる領域に成形時の逃げ形状を形成
することが好ましい。
In this case, it is preferable that, in the molding step, a relief shape at the time of molding is formed in a region included in the removal portion in the lid removal step in the lid portion of the tubular portion.

【0009】また、前記抜き工程の後に、前記板状体に
おける前記突出部の周囲部分を歯車状に抜き落として歯
車部を形成する歯形抜き工程を設けることが好ましい。
Further, it is preferable to provide a tooth profile removing step of forming a gear portion by removing the peripheral portion of the projecting portion of the plate-like body into a gear shape after the extracting step.

【0010】このとき、前記歯形抜き工程は、前記板状
体に対して前記歯車部を抜き付ける抜き付け段階と、前
記歯車部の抜き付けられた前記板状部から前記歯車部を
抜き外す抜き外し段階とから構成することが望ましい。
At this time, the tooth profile removing step includes a step of removing the gear portion from the plate-shaped body and a step of removing the gear portion from the plate-shaped portion of the gear portion. It is desirable to configure it with the removal step.

【0011】[0011]

【作用】請求項1又は請求項3によれば、従来の切削加
工に代えて、絞り加工、成形、抜き落としの工程を備え
たプレス加工により製造することができるので、迅速か
つ低コストに製造できる。
According to the first or third aspect of the present invention, instead of the conventional cutting process, it can be manufactured by a press process including a drawing process, a forming process, and a removing process. Therefore, the manufacturing process is rapid and low cost. it can.

【0012】請求項2又は請求項5によれば、歯車部の
形成も打ち抜きにより形成できるので、さらに迅速な加
工ができる。
According to the second aspect or the fifth aspect, the gear portion can be formed by punching as well, so that it is possible to perform more rapid processing.

【0013】請求項4によれば、成形時に余分な肉を逃
がすことができるので高精度に成形できるとともに、こ
の逃げ形状の部分が蓋抜き工程において除去されるよう
に構成したので、前後の工程に影響を与えることなく効
率良く筒車を製造することができる。
According to the fourth aspect, since the excess meat can be released at the time of molding, the molding can be performed with high accuracy, and the relief-shaped portion is removed in the lid removing step. It is possible to efficiently manufacture the hour wheel without affecting the above.

【0014】請求項5によれば、抜き付けと抜き外しの
2段階で歯車部を形成することにより、型の負担が低減
されて耐久性が向上するとともに、高精度に歯車部を形
成することができる。
According to the fifth aspect, the gear portion is formed in two steps, that is, the removal and the removal, so that the load on the mold is reduced, the durability is improved, and the gear portion is formed with high accuracy. You can

【0015】[0015]

【実施例】次に、図面を参照して本発明に係る時計用筒
車及びその製造方法の実施例を説明する。図1は、本実
施例における時計用筒車を製造する全体工程を示す工程
断面図である。本実施例の概略は、(a)に示す金属
(例えばリン青銅等)製の板状体1に、(b)、(c)
に示すようにプレス加工により絞り加工を繰り返し施
し、(d)に示すように有蓋筒状の突出部2を形成す
る。次に、この突出部2を加圧成形して、(e)に示す
ように時計用筒車の筒状部の形状に合致した形状に成形
する。さらに、この突出部の蓋部分2aをプレスにより
打ち抜いて、(f)に示すように開口3aを形成し、筒
状部3を完成させる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, embodiments of a timepiece wheel and wheel manufacturing method according to the present invention will be described with reference to the drawings. FIG. 1 is a process cross-sectional view showing the overall process of manufacturing the hour wheel and pinion according to this embodiment. The outline of the present embodiment is as follows: (b), (c) for the plate-shaped body 1 made of metal (for example, phosphor bronze) shown in (a).
As shown in (d), the drawing process is repeatedly performed by press working to form the cylindrical protruding portion 2 with a cover as shown in (d). Next, the protrusion 2 is pressure-molded to have a shape that matches the shape of the tubular portion of the hour wheel and pinion as shown in (e). Further, the lid portion 2a of the protruding portion is punched out by a press to form an opening 3a as shown in (f), and the tubular portion 3 is completed.

【0016】次に、筒状部3の周囲の板状体1に歯形状
にプレスで抜き付けを行うことにより、(g)に示すよ
うに歯形4aを備えた円板状の歯車部4を形成する。最
後に(h)に示すように、この筒状部3及び歯車部4を
周囲の板状体1から抜き外すことにより時計用筒車が完
成する。
Next, by pressing the plate-shaped body 1 around the cylindrical portion 3 into a tooth shape by pressing, a disc-shaped gear portion 4 having a tooth profile 4a is formed as shown in (g). Form. Finally, as shown in (h), the timepiece hour wheel is completed by removing the tubular portion 3 and the gear portion 4 from the surrounding plate-shaped body 1.

【0017】上記加工工程は、図2に示す帯状(リボン
状)の板状体1に対して施される。この板状体1には、
幅方向の両縁部に沿って2列で等間隔に穿設された複数
のパイロット孔11と、該パイロット孔11の列の間に
等間隔に穿設された打ち抜き孔12,13,14,15
の組とがそれぞれプレス加工により形成されている。こ
の打ち抜き孔12,13,14,15によって、板状体
1の中央部には、支持橋部16,19と支持腕部17,
18,20,21とにより支持された円板形の島状部2
2が構成される。
The above-mentioned processing steps are applied to the strip-shaped (ribbon-shaped) plate-shaped body 1 shown in FIG. In this plate-shaped body 1,
A plurality of pilot holes 11 formed in two rows at equal intervals along both edges in the width direction, and punched holes 12, 13, 14, formed at equal intervals between the rows of pilot holes 11. 15
Are formed by press working. Due to the punched holes 12, 13, 14, 15, the support bridge portions 16, 19 and the support arm portions 17, 19 are formed in the central portion of the plate-shaped body 1.
Disk-shaped island portion 2 supported by 18, 20, 21
2 is configured.

【0018】上記製造工程中における島状部22の近傍
を拡大して示したものが図3(a)と(b)である。図
3(a)は、図1(a)乃至図1(d)に示すように、
プレスによる絞り加工により島状部22の中央に突出部
2に対応した窪み30が形成された状態を示す。この窪
み30は、絞り加工により次第に有蓋(若しくは有底)
円筒状に成形されていく突出部2に対応して、グラス
(コップ)状に変形していく。本実施例においては、1
0回の絞り加工により図1(d)に示す形状まで加工さ
れる。この絞り加工は、図4に詳細に示されている。こ
こで、2−1、2−4、2−6はそれぞれ1回目、4回
目、6回目の絞り加工後の形状である。当初は大きく碗
状に窪ませ、次第に少しずつ立ち上がり部分を垂直な壁
面に仕上げていく。
FIG. 3A and FIG. 3B are enlarged views of the vicinity of the island-like portion 22 during the manufacturing process. As shown in FIGS. 1A to 1D, FIG.
A state in which a depression 30 corresponding to the projecting portion 2 is formed in the center of the island-shaped portion 22 by drawing processing by a press is shown. The recess 30 is gradually covered by a drawing (or has a bottom).
Corresponding to the protruding portion 2 that is formed into a cylindrical shape, it is transformed into a glass (cup) shape. In this embodiment, 1
By drawing 0 times, the shape shown in FIG. This drawing is shown in detail in FIG. Here, 2-1, 2-4, and 2-6 are the shapes after the first, fourth, and sixth drawing processes, respectively. Initially, make a large bowl-shaped depression, and gradually finish the rising part to a vertical wall.

【0019】図3(b)は、図1(g)に示すプレス加
工による「抜き付け」によって、島状部22において窪
み30を中心とした円板形に歯車部4の歯車面40が形
成された状態を示す。この「抜き付け」加工は、歯車部
4の歯形4aを形成するための歯形状の開口を備えたダ
イと、このダイの開口形状に対応した断面形状を備えた
パンチとにより、島状部22を上下から挟み付けること
で施される。ここで、パンチをダイの開口内へ完全に挿
入すると、歯車部4は島状部22から「抜き落とし」さ
れるが、歯車部4を島状部22から抜くことなく、歯形
4aの部分が破断により周囲の島状部22から分断され
るだけで、島状部22の面内に歯車部4が保持されるよ
うにすることにより、歯車部4が「抜き付け」られる。
In FIG. 3B, the gear surface 40 of the gear portion 4 is formed in a disk shape centering on the depression 30 in the island-shaped portion 22 by "extraction" by the press working shown in FIG. 1 (g). The state is shown. This "extraction" process is performed by using a die having a tooth-shaped opening for forming the tooth profile 4a of the gear portion 4 and a punch having a cross-sectional shape corresponding to the opening shape of the die to form the island-shaped portion 22. It is applied by sandwiching from above and below. Here, when the punch is completely inserted into the opening of the die, the gear portion 4 is “pulled out” from the island portion 22, but without removing the gear portion 4 from the island portion 22, the portion of the tooth profile 4a is removed. The gear portion 4 is “pulled out” by allowing the gear portion 4 to be held in the plane of the island portion 22 only by being separated from the surrounding island portion 22 by the breakage.

【0020】図3(b)に示すように「抜き付け」られ
た筒状部3及び歯車部4は、歯車部4の外周径に合致し
た径の開口を備えたダイと、このダイに対応したパンチ
とによって「抜き外し」され、時計用筒車が完成する。
このように、歯車部を一旦「抜き付け」てから「抜き外
し」することにより、金型の耐久性が向上するととも
に、精度の良い歯車部を形成することができる。
As shown in FIG. 3B, the cylindrical portion 3 and the gear portion 4 which are “extracted” are provided with a die having an opening having a diameter matching the outer diameter of the gear portion 4 and the die. It is "pulled out" by the punches that have been made, and the hour wheel is completed.
As described above, by temporarily "pulling" the gear portion and then "pulling it out", the durability of the mold is improved and the gear portion with high accuracy can be formed.

【0021】図5は、図1(d)に示す突出部2を成形
して、図1(e)に示すように時計用筒車の筒状部3の
外形を成形する工程を示すものである。突出部2は、図
示の一点鎖線で示すパンチAとダイBとによって加圧成
形される。なお、図中Cはストリッパの当接面を示す。
ここで、実線は成形前の突出部2の断面形状、破線Xは
成形後の突出部2の断面形状である。突出部2の外面側
には時針の圧入面2bと、テーパ面2cと、端面2dと
が、ダイBの形状に従って成形される。ここで、ダイB
には図1(f)に示す開口3aの形成時に除去される蓋
部分2a内に、成形された余分の肉が寄せられる逃げ部
Baが形成されており、成形によりこの逃げ部Baによ
り形成された部分が厚肉になる。この厚肉部分は、後に
開口3aを形成することにより除去されるので、いかな
る形状に成形されようとも筒状部3の形状には影響しな
い。
FIG. 5 shows a step of forming the protrusion 2 shown in FIG. 1D to form the outer shape of the cylindrical portion 3 of the hour wheel and pinion as shown in FIG. 1E. is there. The protrusion 2 is pressure-molded by the punch A and the die B shown by the chain line in the figure. In the figure, C indicates the contact surface of the stripper.
Here, the solid line is the cross-sectional shape of the protrusion 2 before molding, and the broken line X is the cross-sectional shape of the protrusion 2 after molding. A press-fitting surface 2b of the hour hand, a tapered surface 2c, and an end surface 2d are formed on the outer surface side of the protrusion 2 in accordance with the shape of the die B. Where die B
1 (f), there is formed a relief portion Ba into which the molded extra meat is gathered in the lid portion 2a which is removed when the opening 3a shown in FIG. 1 (f) is formed. The thickened part becomes thick. Since this thick portion is removed later by forming the opening 3a, the shape of the tubular portion 3 is not affected by any shape.

【0022】突出部2の壁面上部には、絞り加工特有の
凹部2eが形成されるが、この凹部2eは、上記成形工
程において完全に消失する。この成形工程では、凹部2
eのような前工程の形成不良が除去される他、筒車とし
て必要な形状精度が確保される。例えば、時針の圧入面
2bは、時針の位置決めを行う。また、突出部2の内周
面は、指針を回転駆動する場合の回転中心を決めるもの
であるため、やはり高精度に成形する必要がある。
A concave portion 2e peculiar to the drawing process is formed on the upper portion of the wall surface of the protruding portion 2, but this concave portion 2e disappears completely in the molding step. In this molding process, the recess 2
In addition to eliminating formation defects in the previous process such as e, the shape accuracy required for the hour wheel is secured. For example, the press-fitting surface 2b of the hour hand positions the hour hand. Further, since the inner peripheral surface of the protruding portion 2 determines the center of rotation when the pointer is rotationally driven, it must be molded with high accuracy.

【0023】以上説明したように本実施例では、絞り加
工により突出部を形成し、この突出部を成形した後に、
穿孔することにより筒状部を形成するようにしたので、
従来のように切削加工を施すことなく、短時間にかつ低
コストで時計用筒車を製造できる。
As described above, in this embodiment, the protrusion is formed by drawing, and after the protrusion is molded,
Since the cylindrical part is formed by drilling,
It is possible to manufacture a timepiece hour wheel in a short time and at low cost without performing cutting work as in the past.

【0024】また、成形工程においては、突出部2の蓋
部分2aに成形時の余分な肉が逃げるように型に逃げ部
を形成したので、前後の工程に影響を及ぼすことなく高
精度に成形を行うことができる。
Further, in the molding step, since the relief portion is formed in the mold in the lid portion 2a of the protruding portion 2 so that the excess meat at the time of molding escapes, the molding can be performed with high accuracy without affecting the front and rear steps. It can be performed.

【0025】さらに、歯車部の形成に当たっては、「抜
き付け」と「抜き外し」を行うことにより、一時に「抜
き落し」を行う場合よりも、型の耐久性を高めることが
できるとともに、抜きの精度を高めることができる。
Further, in forming the gear portion, by performing "extracting" and "extracting", it is possible to enhance the durability of the mold as compared with the case where "extracting" is performed at a time, and The accuracy of can be improved.

【0026】本実施例では、帯状の板状体1を搬送手段
により順次移動させていくことにより、板状体1の上に
配列形成された複数の島状部を順送り加工するようにし
ているので、従来の切削加工による製造工程よりも大幅
に生産性を向上させることができ、さらに労力も低減さ
れるなどきわめて顕著な効果を奏するものである。
In the present embodiment, the belt-shaped plate-shaped body 1 is sequentially moved by the conveying means, so that a plurality of island-shaped portions arranged and formed on the plate-shaped body 1 are sequentially fed. Therefore, the productivity can be greatly improved as compared with the conventional manufacturing process by cutting work, and the labor is also reduced, which is a very remarkable effect.

【0027】[0027]

【発明の効果】以上説明したように、本発明によれば以
下の効果を奏する。
As described above, the present invention has the following effects.

【0028】請求項1又は請求項3によれば、従来の切
削加工に代えて、絞り加工、成形、抜き落としの工程を
備えたプレス加工により製造することができるので、迅
速かつ低コストに製造できる。
According to the first or third aspect of the present invention, instead of the conventional cutting process, it can be manufactured by a press process including a drawing process, a forming process, and a removing process. Therefore, the manufacturing process is quick and low cost. it can.

【0029】請求項2又は請求項5によれば、歯車部の
形成も打ち抜きにより形成できるので、さらに迅速な加
工ができる。
According to the second aspect or the fifth aspect, the gear portion can be formed by punching as well, so that it is possible to perform more rapid processing.

【0030】請求項4によれば、成形時に余分な肉を逃
がすことができるので高精度に成形できるとともに、こ
の逃げ形状の部分が蓋抜き工程において除去されるよう
に構成したので、前後の工程に影響を与えることなく効
率良く筒車を製造することができる。
According to the fourth aspect, since the excess meat can be released at the time of molding, the molding can be performed with high accuracy, and the relief-shaped portion is removed in the lid removing step. It is possible to efficiently manufacture the hour wheel without affecting the above.

【0031】請求項5によれば、抜き付けと抜き外しの
2段階で歯車部を形成することにより、型の負担が低減
されて耐久性が向上するとともに、高精度に歯車部を形
成することができる。
According to the fifth aspect, the gear portion is formed in two steps, that is, the extraction and the removal, so that the load on the mold is reduced, the durability is improved, and the gear portion is formed with high accuracy. You can

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る時計用筒車及びその製造方法の実
施例を示す概略工程図(a)〜(h)である。
FIG. 1 is schematic process diagrams (a) to (h) showing an embodiment of a timepiece wheel and wheel manufacturing method according to the invention.

【図2】同実施例における板状体の一部平面図である。FIG. 2 is a partial plan view of a plate-shaped body in the same example.

【図3】同実施例における製造工程中の板状体の平面形
状を示す部分平面図(a)及び(b)である。
FIG. 3 is partial plan views (a) and (b) showing the planar shape of the plate-like body during the manufacturing process in the example.

【図4】同実施例における絞り加工時の形状を示す断面
図である。
FIG. 4 is a cross-sectional view showing a shape at the time of drawing in the same embodiment.

【図5】同実施例における成形工程前後の形状を示す拡
大断面図である。
FIG. 5 is an enlarged cross-sectional view showing a shape before and after a molding step in the example.

【符号の説明】[Explanation of symbols]

1 板状体 2 突出部 3 筒状部 3a 開口 4 歯車部 4a 歯形 22 島状部 DESCRIPTION OF SYMBOLS 1 Plate-like body 2 Projection part 3 Cylindrical part 3a Opening 4 Gear part 4a Tooth profile 22 Island part

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 板状体に絞り加工を繰り返し施して有蓋
円筒状の突出部を形成し、該突出部を成形した後に、前
記突出部の蓋部分を抜いて筒状部を形成して成ることを
特徴とする時計用筒車。
1. A plate-shaped body is repeatedly drawn to form a cylindrical protrusion with a lid, the protrusion is formed, and then the lid of the protrusion is removed to form a tubular portion. A clock wheel that is characterized by that.
【請求項2】 請求項1において、前記板状体における
前記筒状部の周囲を歯車状に抜き落として歯車部を形成
して成ることを特徴とする時計用筒車。
2. The timepiece wheel and wheel according to claim 1, wherein the periphery of the tubular portion of the plate-shaped body is pulled out in a gear shape to form a gear portion.
【請求項3】 板状体に絞り加工を繰り返して有蓋円筒
状の突出部を形成する絞り加工工程と、該突出部を成形
して時計用筒車の筒部形状を形成する成形工程と、前記
突出部の蓋部分を抜き落として時計用筒車の筒状部を形
成する蓋抜き工程とを有することを特徴とする時計用筒
車の製造方法。
3. A drawing process in which a plate-shaped body is repeatedly drawn to form a covered cylindrical protrusion, and a forming process in which the protrusion is formed to form the shape of a cylinder of a timepiece wheel. And a lid removing step of forming a tubular portion of the timepiece wheel by removing the lid portion of the protruding portion.
【請求項4】 請求項3において、前記成形工程におい
ては、前記筒状部の蓋部分に、前記蓋抜き工程における
抜き落とし部分に含まれる領域に成形時の逃げ形状を形
成することを特徴とする時計用筒車の製造方法。
4. The molding process according to claim 3, wherein, in the molding step, a relief shape at the time of molding is formed in a region included in the removal portion in the lid removal process in the lid portion of the tubular portion. Manufacturing method for timepiece wheel.
【請求項5】 請求項3において、前記抜き工程の後
に、前記板状体における前記突出部の周囲部分を歯車状
に抜き落として歯車部を形成する歯形抜き工程を有する
ことを特徴とする時計用筒車の製造方法。
5. The timepiece according to claim 3, further comprising, after the extracting step, a tooth profile removing step of forming a gear portion by removing a peripheral portion of the projecting portion of the plate-like body into a gear shape. Method for manufacturing wheel carriers.
【請求項6】 請求項5において、前記歯形抜き工程
は、前記板状体に対して前記歯車部を抜き付ける抜き付
け段階と、前記歯車部の抜き付けられた前記板状部から
前記歯車部を抜き外す抜き外し段階とを有することを特
徴とする時計用筒車の製造方法。
6. The tooth profile removing step according to claim 5, wherein the step of removing the gear part from the plate-like body is performed, and the step of removing the plate-like part from the gear part is performed. And a removing step for removing the timepiece.
JP6225211A 1994-09-20 1994-09-20 Hourglass hourpiece and its manufacturing method Expired - Lifetime JP3052748B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6225211A JP3052748B2 (en) 1994-09-20 1994-09-20 Hourglass hourpiece and its manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6225211A JP3052748B2 (en) 1994-09-20 1994-09-20 Hourglass hourpiece and its manufacturing method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP10028808A Division JP3065014B2 (en) 1998-02-10 1998-02-10 Method of manufacturing tubular parts for watches

Publications (2)

Publication Number Publication Date
JPH0894769A true JPH0894769A (en) 1996-04-12
JP3052748B2 JP3052748B2 (en) 2000-06-19

Family

ID=16825733

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6225211A Expired - Lifetime JP3052748B2 (en) 1994-09-20 1994-09-20 Hourglass hourpiece and its manufacturing method

Country Status (1)

Country Link
JP (1) JP3052748B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130157525A1 (en) * 2011-12-20 2013-06-20 GIFU HIGHTECH Co., Ltd. Method for manufacturing contact terminal, contact terminal manufacturing apparatus, and contact terminal

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130157525A1 (en) * 2011-12-20 2013-06-20 GIFU HIGHTECH Co., Ltd. Method for manufacturing contact terminal, contact terminal manufacturing apparatus, and contact terminal
CN103171519A (en) * 2011-12-20 2013-06-26 阿斯莫有限公司 Method for manufacturing contact terminal, contact terminal manufacturing apparatus, and contact terminal
JP2013128942A (en) * 2011-12-20 2013-07-04 Asmo Co Ltd Method and apparatus for manufacturing contact terminal, and the contact terminal
US9391419B2 (en) 2011-12-20 2016-07-12 Asmo Co., Ltd. Method for manufacturing contact terminal, contact terminal manufacturing apparatus, and contact terminal
CN103171519B (en) * 2011-12-20 2016-12-28 阿斯莫有限公司 For manufacturing the method for contact terminal, contact terminal manufactures device and contact terminal

Also Published As

Publication number Publication date
JP3052748B2 (en) 2000-06-19

Similar Documents

Publication Publication Date Title
JP4472797B2 (en) Metal product pressing and progressive processing
JPH0894769A (en) Tubular wheel for watch and manufacture thereof
JP3065014B2 (en) Method of manufacturing tubular parts for watches
JPS63154216A (en) Manufacture of long flange product
JPH057944A (en) Drawing method
JPH0339768B2 (en)
JPH06182472A (en) Production method of rack bar
JPS5923894B2 (en) How to manufacture gears from flat plate materials
JP2002143934A (en) Die
JP3577878B2 (en) Pressed part manufacturing method and watch
JPH09304554A (en) Production of one piece timepiece case
JP2000176557A (en) Method for deep draw forming and device therefor
JPH01143732A (en) Pressing method
JPH01306028A (en) Manufacture of metallic material with hole
JPH01306030A (en) Punching punch
SU804131A1 (en) Method of producing bevelled annular parts
JPS5835779B2 (en) Manufacturing method for watch cases
JP2001286971A (en) Forging apparatus and manufacturing method of cylindrical body using it
JP2558550B2 (en) Eyebolt finishing method
JPH04322018A (en) Manufacture of button contact
JP3377854B2 (en) Manufacturing method of watch truth
FR2556249A1 (en) Bush producing punch with die
JPH0862355A (en) Manufacture of gear, and manufacture of gear member using the gear
JPH04253526A (en) Method for splitting scrap
JPH09276964A (en) Production of inner fastening device of armlet

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080407

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090407

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090407

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100407

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110407

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110407

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120407

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130407

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130407

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140407

Year of fee payment: 14

EXPY Cancellation because of completion of term