Prior art keywords
production
product
production schedule
attribute
production line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP21814393A
Other languages
Japanese (ja)
Other versions
JP3391056B2 (en
Inventor
Takeshi Yoshioka
健 吉岡
Akira Kurosawa
明 黒澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujifilm Business Innovation Corp
Original Assignee
Fuji Xerox Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Xerox Co Ltd filed Critical Fuji Xerox Co Ltd
Priority to JP21814393A priority Critical patent/JP3391056B2/en
Publication of JPH0756994A publication Critical patent/JPH0756994A/en
Application granted granted Critical
Publication of JP3391056B2 publication Critical patent/JP3391056B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Multi-Process Working Machines And Systems (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE:To provide a production schedule planning generator capable of inputting relation among a production material, resources, storage, and a process in one drawing, and reducing erroneous description by easily recognizing the relation of production line element. CONSTITUTION:A user arranges by selecting the network drawing of a production line that becomes the target of a production schedule planning from four production line elements for the production material, the resources, the storage, and the process on a screen in a production line editor 1, and connects them with an arc, and generates and edits the network drawing by inputting attribute information. Also, the user generates an object from an inputted and edited network drawing, and sets the attribute of a generated object. A production line information managing part 2 preserves and manages the generated object. Also, the production schedule planning generator 3 generates the plan of production schedule based on the generated object.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、製造ラインの情報を入
力し生産日程計画を作成する生産日程計画作成装置に関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a production schedule planning device for inputting information on a manufacturing line and preparing a production schedule.

【0002】[0002]

【従来の技術】従来より、計算機を利用した生産日程計
画を作成するための生産日程計画作成装置が開発されて
いる。計算機を用いて生産日程計画を作成するには、対
象製造ライン内の製造ライン要素の情報を計算機上に表
現する必要がある。必要な製造ライン要素としては、ス
ケジューリング対象となる材料、部品、中間品、製品等
の生産物、生産物にサービスを与える製造設備、搬送設
備、作業者等のリソース、生産物を保管するための倉
庫、バッファ、タンク等のストレージ、生産物へのサー
ビスである加工/組立工程、検査工程、搬送工程等の工
程がある。このような生産日程計画の対象となる製造ラ
イン要素を計算機に入力し、生産日程計画を作成する。
2. Description of the Related Art Conventionally, a production schedule planning device for producing a production schedule plan using a computer has been developed. In order to create a production schedule using a computer, it is necessary to represent the information of the production line elements in the target production line on the computer. Necessary manufacturing line elements include materials such as materials, parts, intermediate products, and products to be scheduled, manufacturing equipment that provides services to products, transportation equipment, resources such as workers, and storage of products. There are processes such as storage such as warehouses, buffers, and tanks, processing / assembly processes that are services to products, inspection processes, and transportation processes. The production line elements that are the targets of such a production schedule plan are input into the computer to create a production schedule plan.

【0003】従来の生産日程計画作成装置としては、例
えば、電子情報通信学会論文誌D−I,Vol.J74
−D−I,No.8,pp.476−484に記載され
たものがある。この装置は、ISO:TC184/SC
5のモデルに準じた階層化参照モデルを利用して、生産
日程計画に必要な製造ラインの情報を設備モデル、工程
モデルなどに属するオブジェクトとして表現し、ユーザ
はスプレッドシートやダイアログを用いてこれらの情報
を記述する。ユーザが記述した製造ライン要素に関する
情報は、リソースおよびストレージを表現する設備モデ
ルと、工程を表現する工程モデルに分類してオブジェク
トとして表現される。しかし、生産物に関しては納期に
対するデータがあるだけであり、生産物と工程、生産物
とストレージの関係を理解することが困難である。ま
た、設備モデルと工程モデルが別々であるため、工程や
リソースの関係といった、異なる種類の要素間の関係を
理解することが困難であり、誤記述を招くおそれがあっ
た。
As a conventional production schedule planning device, for example, the IEICE Transactions DI, Vol. J74
-DI, No. 8, pp. 476-484. This device is ISO: TC184 / SC
Using the hierarchical reference model based on the model of 5, the information of the manufacturing line required for the production schedule is expressed as objects belonging to the equipment model, process model, etc. Describe the information. The information about the manufacturing line elements described by the user is classified into an equipment model that expresses resources and storage and a process model that expresses a process and expressed as an object. However, regarding products, there is only data on delivery dates, and it is difficult to understand the relationship between products and processes, and products and storage. Further, since the equipment model and the process model are separate, it is difficult to understand the relationship between different types of elements such as the relationship between the process and the resource, which may lead to erroneous description.

【0004】また、他の従来の技術として、千代田化工
建設(株)のFriendsというシステムがある。こ
のシステムでは、グラフィックエディタを用いて、生産
設備、バッファなどを表現する設備モデルおよび工程パ
ターンを2種類のネットワーク図として記述する。1つ
は、生産物とリソースとストレージの接続関係を記述
し、もう1つは、各工程の前後関係を記述している。従
来のシステムに比べ、視覚的に工程の前後関係および、
生産物とリソースとストレージの接続関係を把握できる
ため、誤記述を招く危険性が減少している。しかし、生
産物、リソース、ストレージと工程の関係は、別のネッ
トワーク図として記述するため、やはり、工程と、生産
物などの他の種類の製造ライン要素の関係の把握が難し
く、誤記述を招くおそれがあるという問題がある。
Another conventional technique is a system called Friends by Chiyoda Corporation. This system uses a graphic editor to describe equipment models and process patterns that represent production equipment, buffers, etc., as two types of network diagrams. One describes the connection relationship between products, resources, and storage, and the other describes the context of each process. Compared with the conventional system, the visual context of the process and
Since the connection relationship between products, resources, and storage can be grasped, the risk of causing erroneous description is reduced. However, since the relationship between products, resources, storage, and processes is described as a separate network diagram, it is still difficult to understand the relationship between processes and other types of manufacturing line elements such as products, resulting in erroneous description. There is a problem of fear.

【0005】[0005]

【発明が解決しようとする課題】本発明は、上述した事
情に鑑みてなされたもので、1つの図面に生産物、リソ
ース、ストレージ、工程の関係を入力でき、製造ライン
要素の関係を容易に把握できるようにして、誤記述を低
減させた生産日程計画作成装置を提供することを目的と
するものである。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned circumstances, and the relations of products, resources, storages, and processes can be entered in one drawing, and the relations of manufacturing line elements can be easily made. It is an object of the present invention to provide a production schedule planning device in which erroneous description can be reduced by making it possible to grasp.

【0006】[0006]

【課題を解決するための手段】本発明は、製造ラインの
情報を入力し生産日程計画を作成する生産日程計画作成
装置において、スケジューリング対象となる生産物を示
す要素と生産物にサービスを与えるリソースを示す要素
と生産物を保管するためのストレージを示す要素と生産
物へのサービスの工程を示す要素とを用いて製造ライン
を表現し用いた要素の属性情報を入力する入力手段と、
該入力手段により入力された要素と属性情報からオブジ
ェクトを生成するオブジェクト生成手段と、生成された
オブジェクトに基づき生産日程計画を作成する生産日程
計画作成手段を有することを特徴とするものである。
According to the present invention, in a production schedule planning apparatus for inputting information on a manufacturing line and preparing a production schedule, an element indicating a product to be scheduled and a resource for providing a service to the product. And an input means for inputting attribute information of an element used to represent a manufacturing line using an element indicating a storage element for storing a product and an element indicating a process of servicing a product,
It is characterized by including an object generating means for generating an object from the element and attribute information input by the input means, and a production schedule planning means for generating a production schedule plan based on the generated object.

【0007】また、前記入力手段は、前記各要素から選
択された要素を配置し、配置されている要素間の関係を
示す線分を配置し、さらに、配置されている要素に対し
て属性情報を入力し、前記オブジェクト生成手段は要素
が配置されたことによりオブジェクトを生成し、線分の
配置および属性情報の入力により対応するオブジェクト
の属性を設定することを特徴とするものである。
Further, the input means arranges an element selected from the respective elements, arranges a line segment indicating a relationship between the arranged elements, and further, attribute information for the arranged elements. The object generating means generates an object by arranging the elements, and sets the attribute of the corresponding object by arranging the line segment and inputting the attribute information.

【0008】[0008]

【作用】本発明によれば、生産物、リソース、ストレー
ジ、工程の4つの製造ライン要素をオブジェクト生成手
段によりオブジェクトという概念で統一して扱えるよう
に変換し、生産日程計画作成手段により生産日程計画を
作成している。そのため、入力手段においては、生産
物、リソース、ストレージ、工程の4つの製造ライン要
素を用いて製造ラインを表現することができ、これらの
製造ライン要素の関係を、従来のように複数の違った図
面に展開することなく、1つの図面上で視覚的に把握す
ることが可能となり、ユーザは工程と生産物とリソース
とストレージの関係を容易に理解することができ、誤記
述を招く可能性を減少させることができる。
According to the present invention, the four production line elements of product, resource, storage, and process are converted by the object generation means so that they can be handled in a unified manner based on the concept of an object, and the production schedule planning means makes the production schedule plan. Are being created. Therefore, in the input means, the manufacturing line can be expressed by using the four manufacturing line elements of the product, resource, storage, and process, and the relationship of these manufacturing line elements is different from that of the conventional one. It is possible to visually understand on one drawing without expanding it on the drawing, and the user can easily understand the relationship between the process, the product, the resource, and the storage, which may lead to an erroneous description. Can be reduced.

【0009】[0009]

【実施例】図1は、本発明の生産日程計画作成装置の一
実施例を示す概略構成図である。図中、1は製造ライン
エディタ、2は製造ライン情報管理部、3は生産日程計
画作成部である。製造ラインエディタ1は、ユーザが生
産日程計画の対象となる製造ラインの情報を入力し、編
集する。入力する製造ラインの情報としては、生産物、
リソース、ストレージ、工程の製造ライン要素、それら
の製造ライン要素の属性情報、および、製造ライン要素
間を接続するアーク等である。後述するように、ユーザ
は画面上に製造ライン要素を選択して配置し、アークで
結び、属性情報を入力する。入力した情報の削除、変更
も行なうことができる。入力編集された製造ラインの情
報から、オブジェクトを生成し、生成したオブジェクト
の属性を設定する。製造ライン情報管理部2は、製造ラ
インエディタ1により入力編集され、生成されたオブジ
ェクトを保存し、管理する。製造ラインエディタ1によ
り入力編集された製造ラインの情報を、オブジェクトに
変換する前のデータ形式で保存しておくこともできる。
生産日程計画作成部3は、製造ライン情報管理部2に格
納されている製造ラインの情報を参照して生産日程の計
画を作成する。もちろん、製造ラインエディタ1から直
接、製造ラインの情報を受け取って、計画を作成するこ
ともできる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a schematic block diagram showing an embodiment of a production schedule planning device of the present invention. In the figure, 1 is a production line editor, 2 is a production line information management unit, and 3 is a production schedule planning unit. The production line editor 1 allows a user to input and edit information on a production line that is a target of a production schedule plan. The information of the manufacturing line to be input is the product,
These are resources, storage, manufacturing line elements of processes, attribute information of these manufacturing line elements, and arcs that connect the manufacturing line elements. As will be described later, the user selects and arranges the production line elements on the screen, connects them with an arc, and inputs the attribute information. You can also delete or change the entered information. An object is generated from the input and edited information of the manufacturing line, and the attributes of the generated object are set. The production line information management unit 2 stores and manages the objects input and edited by the production line editor 1 and generated. The information on the production line input and edited by the production line editor 1 can be stored in a data format before being converted into an object.
The production schedule planning unit 3 refers to the information on the production line stored in the production line information management unit 2 to create a production schedule plan. Of course, it is also possible to directly receive information on the production line from the production line editor 1 and create a plan.

【0010】図2は、本発明の生産日程計画作成装置を
実現するためのワークステーションの全体構成図であ
る。図中、11は制御装置、12は主記憶装置、13は
表示画面、14はデータ入力装置、15はポインティン
グ入力装置、16は補助記憶装置である。図1に示した
生産日程計画作成装置を、例えば、ワークステーション
上に構築することができる。制御装置11および主記憶
装置12は、ワークステーション本体のCPU、メモリ
等で構成される。表示画面13は、例えば、ビットマッ
プディスプレイ等で構成される。データ入力装置14
は、例えば、キーボード等で構成される。ポインティン
グ入力装置は、例えば、マウスやデジタイザ等で構成さ
れる。補助記憶装置16は、例えば、磁気ディスクや光
ディスクなどで構成される。
FIG. 2 is an overall configuration diagram of a workstation for realizing the production schedule planning device of the present invention. In the figure, 11 is a control device, 12 is a main storage device, 13 is a display screen, 14 is a data input device, 15 is a pointing input device, and 16 is an auxiliary storage device. The production schedule planning device shown in FIG. 1 can be built on a workstation, for example. The control device 11 and the main storage device 12 are composed of a CPU, a memory and the like of the workstation body. The display screen 13 is composed of, for example, a bitmap display or the like. Data input device 14
Is composed of, for example, a keyboard. The pointing input device is composed of, for example, a mouse or a digitizer. The auxiliary storage device 16 is composed of, for example, a magnetic disk or an optical disk.

【0011】図1に示した製造ラインエディタ1は、制
御装置11および主記憶装置12、補助記憶装置16を
用い、データ入力装置14とポインティング入力装置1
5から入力される情報に従って、製造ライン要素やそれ
らを接続するアーク、属性情報等を表示画面13に表示
する。製造ライン情報管理部2は、主記憶装置12およ
び補助記憶装置16を用いて製造ラインの情報を保存す
る。生産日程計画装置3は、主記憶装置12および補助
記憶装置16を用いて制御装置11により生産日程の計
画を作成する。
The manufacturing line editor 1 shown in FIG. 1 uses a control device 11, a main storage device 12, and an auxiliary storage device 16, and uses a data input device 14 and a pointing input device 1.
The production line elements, arcs connecting them, attribute information, and the like are displayed on the display screen 13 according to the information input from 5. The production line information management unit 2 stores information on the production line using the main storage device 12 and the auxiliary storage device 16. The production schedule planning device 3 uses the main storage device 12 and the auxiliary storage device 16 to create a production schedule plan by the control device 11.

【0012】図3は、製造ラインエディタで用いられる
アイコンの説明図、図4は、ある製造ラインをネットワ
ーク図として記述した一例の説明図である。製造ライン
エディタでは、図3に示すような製造ライン要素を示す
アイコンを選択し、画面上に配置して行くことにより、
製造ラインをネットワーク図として記述することができ
る。図4に示した加工/組立工程、検査工程、搬送工
程、部品/材料、製品を表すアイコンは、IEのワーク
フローを表すのに利用する記号と同等なものを用いてい
る。作業者、ストレージ、設備を表すアイコンに関して
もユーザにとって分かりやすい単純な形状としている。
このため、製造部品のスタッフが本システムを用いて生
産日程計画を作成する場合、製造ライン情報である工
程、設備、生産物の関係を容易に理解可能である。
FIG. 3 is an explanatory diagram of icons used in the production line editor, and FIG. 4 is an explanatory diagram of an example in which a certain production line is described as a network diagram. In the production line editor, by selecting the icons showing the production line elements as shown in FIG. 3 and arranging them on the screen,
The production line can be described as a network diagram. The icons representing the processing / assembly process, the inspection process, the transfer process, the parts / materials, and the products shown in FIG. 4 are the same as the symbols used to represent the workflow of the IE. The icons representing workers, storage, and equipment are also simple shapes that are easy for users to understand.
Therefore, when the staff of manufacturing parts creates a production schedule using this system, it is possible to easily understand the relationship between the process, the equipment, and the product, which is the manufacturing line information.

【0013】図4は、図3に示したアイコンを用いて入
力した製造ラインの一例を示している。図4では、2つ
の加工/組立工程と1つの検査工程の計3工程からなる
製造ラインを表現している。部品“A”と部品“B”を
入力品とし、途中、各加工/組立工程では、作業者“M
r.Y”が作業を行ない、製造設備“YY”などのリソ
ースを使用し、最後に作業者“Mr.X”が検査を行な
い、製品“AB”が製造されることを表現している。
FIG. 4 shows an example of a manufacturing line input using the icon shown in FIG. In FIG. 4, a manufacturing line consisting of two processing / assembly processes and one inspection process is shown. The part “A” and the part “B” are input items, and the worker “M”
r. Y ”performs the work, uses resources such as the manufacturing equipment“ YY ”, and finally the worker“ Mr. X "represents that the inspection is performed and the product" AB "is manufactured.

【0014】部品/材料、中間品、製品と、加工/組
立、検査工程を接続するリンク上の数値は、その工程へ
の入出力品の数量を示している。例えば、第1工程の
“組立1”では、リソースとして作業者“Mr.Y”を
利用し、部品“A”を1個、部品“B”を2個使用し
て、中間品“C”を1個生成することを示している。ま
た、部品“A”は倉庫Aに、製品“AB”は倉庫Bに貯
蔵されることを表現している。このように、工程や設備
の関係ネットワーク図として視覚的に表現するため、誤
記述を招く可能性を減少できる。
The numbers on the links connecting the parts / materials, intermediate products, and products to the processing / assembly and inspection processes indicate the numbers of input / output products for the processes. For example, in the “assembly 1” of the first step, the worker “Mr.Y” is used as a resource, one part “A” and one part “B” are used, and the intermediate product “C” is used. It shows that one is generated. Further, the parts “A” are stored in the warehouse A, and the products “AB” are stored in the warehouse B. In this way, since it is visually expressed as a relational network diagram of processes and equipment, it is possible to reduce the possibility of erroneous description.

【0015】図5は、製造ラインエディタの画面表示の
一例の説明図である。図中、21はメニュー領域、22
はメニューカテゴリ、23はプルダウンメニュー、24
は属性プロパティである。図5では、図4に示した製造
ラインの一例の入力編集中の表示画面の例を示してい
る。表示画面の一部には、メニュー領域21が設けられ
ている。メニュー領域21には、いくつかのメニューカ
テゴリ22が表示されている。ユーザは、メニュー領域
21中のメニューカテゴリ22を、例えば、マウスでク
リックすることにより、プルダウンメニュー23を出現
させることができる。そして、プルダウンメニュー23
中から必要な処理を選択することができる。図5の例で
は、「ファイル」メニューカテゴリの中のセーブメニュ
ーをユーザが選択している例を示している。
FIG. 5 is an explanatory diagram of an example of a screen display of the production line editor. In the figure, 21 is a menu area, 22
Is a menu category, 23 is a pull-down menu, 24
Is an attribute property. FIG. 5 shows an example of a display screen during input editing of the example of the manufacturing line shown in FIG. A menu area 21 is provided in a part of the display screen. Several menu categories 22 are displayed in the menu area 21. The user can make the pull-down menu 23 appear by clicking the menu category 22 in the menu area 21 with a mouse, for example. And pull-down menu 23
You can select the required processing from among them. In the example of FIG. 5, the user has selected the save menu in the “File” menu category.

【0016】ファイルメニューカテゴリでは、セーブや
ロードなどのファイル操作を行なうことができる。編集
メニューカテゴリでは、製造ライン要素を表すアイコン
のコピー、削除、アイコン同士の接続など製造ラインの
編集作業ができる。要素メニューカテゴリ内のメニュー
では、必要な製造ライン要素であるアイコンを選択し、
エディタ上の任意の位置に配置することができる。ツー
ルメニューカテゴリ内のメニューでは、エディタ画面の
再表示やエディタ上のグリッドの表示を行なうことがで
きる。一覧表メニューカテゴリ内のメニューでは、生産
品一覧表や工程一覧表の表示などの操作を行なうことが
できる。図6に、各メニューカテゴリとそのカテゴリに
属するメニューの一覧を示す。
In the file menu category, file operations such as save and load can be performed. In the edit menu category, it is possible to edit the manufacturing line, such as copying and deleting icons representing manufacturing line elements and connecting the icons. In the menu in the Elements menu category, select the icon that is the required production line element,
It can be placed anywhere in the editor. The menu in the Tools menu category can redisplay the editor screen or display the grid on the editor. With the menus in the list menu category, operations such as displaying a product list and a process list can be performed. FIG. 6 shows a list of each menu category and menus belonging to that category.

【0017】製造システム要素を表すアイコンへの属性
設定は、例えば、アイコンをダブルクリックするなどの
手段を用いて、図5のように属性プロパティ24を表示
させ、その属性プロパティ24の必要な項目を、例え
ば、キーボードから入力することにより行なう。図5の
例では、加工アイコンに工程名と処理時間、歩留まりを
設定する属性プロパティ24が示してある。属性プロパ
ティ24の設定項目は、各アイコンの種類によってあら
かじめ決められている。もちろん、他の属性情報を付加
することが可能なように構成することもできる。
To set an attribute to an icon representing a manufacturing system element, for example, a means such as double-clicking the icon is used to display the attribute property 24 as shown in FIG. 5, and the necessary items of the attribute property 24 are displayed. , For example, by inputting from the keyboard. In the example of FIG. 5, the processing icon, the process name, the processing time, and the attribute property 24 for setting the yield are shown. The setting items of the attribute property 24 are predetermined depending on the type of each icon. Of course, it may be configured so that other attribute information can be added.

【0018】図7は、リソース一覧表の一例の説明図で
ある。図5のような属性プロパティ24による設定で
は、1つ1つのアイコンに対して、属性プロパティ24
を表示させて属性を設定する必要がある。図5の一覧表
メニューカテゴリ内の一覧表メニューを利用することに
より、スプレッドシート上で、各製造ライン要素の属性
を一度に表示したり、設定することができる。図7で
は、設備および作業者の一覧であるリソース一覧表の例
を示している。図7に示すような一覧表を表示させてお
き、マウスやキーボード等により入力編集したい欄を選
択して、情報の入力および編集を行なえばよい。
FIG. 7 is an explanatory diagram of an example of a resource list. In the setting by the attribute property 24 as shown in FIG. 5, the attribute property 24 is set for each icon.
Need to be displayed and the attribute must be set. By using the list menu in the list menu category of FIG. 5, the attributes of each manufacturing line element can be displayed or set at one time on the spreadsheet. FIG. 7 shows an example of a resource list that is a list of equipment and workers. It is sufficient to display a list as shown in FIG. 7, select a field to be input / edited with a mouse, a keyboard or the like to input and edit information.

【0019】以下、図4に示す製造ラインネットワーク
図を製造ラインエディタで作成する方法を図5の画面表
示例を用いて説明する。まず、必要となる製造ライン要
素のアイコンを要素メニューカテゴリの中から選択し、
表示画面上の任意の位置に、任意の順番で配置する。そ
して、工程の順序に合わせて、加工/組立工程、検査工
程アイコンをアークで接続する。また、各工程に入出力
される材料/部品、中間品、製品に対するアイコンをア
ークで接続する。さらに、各工程に必要となる設備、作
業者に対応するアイコンをアークで接続する。また、各
ストレージに対応するアイコンと、そのストレージに貯
蔵される生産物に対応するアイコンをアークで接続す
る。1つの生産物、リソース、ストレージが複数の工程
で必要となる場合には、1つの生産物、リソース、スト
レージのアイコンから、複数の工程とそれぞれアークで
接続すればよい。
A method of creating the manufacturing line network diagram shown in FIG. 4 with the manufacturing line editor will be described below with reference to the screen display example of FIG. First, select the required manufacturing line element icon from the element menu category,
Arrange them in any order on the display screen. Then, the machining / assembly process and inspection process icons are connected by arcs according to the order of the processes. In addition, icons for materials / parts, intermediate products, and products that are input / output in each process are connected by arcs. Furthermore, the icons corresponding to the equipment and workers required for each process are connected by arcs. Further, an icon corresponding to each storage and an icon corresponding to a product stored in the storage are connected by an arc. When one product, resource, and storage are required for a plurality of processes, one product, resource, and storage icons may be connected to the plurality of processes by arcs.

【0020】次に、各アイコンをダブルクリックして、
各アイコンおよびアークの属性をダイアログを用いて設
定する。もしくは、各一覧表メニューを用いて一覧表を
利用して属性設定を行なう。最後に、ファイルメニュー
カテゴリ内の登録メニューを選択し、後述するように、
アイコンに対応した各オブジェクトに変換する。
Next, double-click each icon,
Set the attributes of each icon and arc using the dialog. Alternatively, the attributes are set using the list using each list menu. Finally, select the registration menu in the File menu category and, as described below,
Convert to each object corresponding to the icon.

【0021】なお、アイコンの配置、アークによる接
続、属性の設定の操作を任意の順番で繰り返し、製造ラ
インに対応するネットワーク図を完成することが可能で
ある。もちろん、後からの追加や削除、変更などを行な
うこともできる。
It is possible to complete the network diagram corresponding to the manufacturing line by repeating the operations of arranging icons, connecting by arcs, and setting attributes in an arbitrary order. Of course, additions, deletions, and changes can be made later.

【0022】このように、製造ラインエディタは、生産
日程計画に必要な製造ライン要素の情報を、IEのワー
クフローで利用される記号に準じたアイコンとして表現
し、各情報間の関係をリンクで表現し、生産日程計画作
成に必要となる生産物、リソース、ストレージ、工程の
製造ライン要素など、製造ラインの情報を1つのネット
ワーク図として表現することができる。ユーザは、アイ
コンとリンクを1つのエディタ上で記述するため、各情
報の関係を視覚的に把握することが可能となり、誤記述
を招く可能性を減少できる。
As described above, the production line editor expresses the information of the production line elements necessary for the production schedule planning as icons according to the symbols used in the IE workflow, and expresses the relationship between the information by links. However, manufacturing line information such as products, resources, storage, and manufacturing line elements required for production schedule planning can be expressed as one network diagram. Since the user describes the icon and the link on one editor, it becomes possible to visually understand the relationship between the pieces of information and reduce the possibility of erroneous description.

【0023】図5では、ネットワーク図が画面内に収ま
っているが、複雑なネットワーク図では、画面内に収容
しきれない場合もある。そのような場合のために、上
下、左右にスクロールするようにしたり、拡大縮小の機
能を用いて全体と部分を切り換えて、あるいは、同じ表
示画面内に表示させることができる。また、複数の工程
をまとめて1つとし、階層的な入力編集、および、表示
が可能なように構成することもできる。
In FIG. 5, the network diagram is contained within the screen, but in a complicated network diagram, there are cases where it cannot be accommodated within the screen. For such a case, it is possible to scroll up and down, left and right, switch between the whole and the part by using the enlargement / reduction function, or display on the same display screen. Further, it is also possible to configure a plurality of processes into one so that hierarchical input editing and display can be performed.

【0024】図5のファイルカテゴリー内の登録メニュ
ーを選択すると、各製造ライン要素がオブジェクトに変
換される。製造ラインエディタは、入力された各アイコ
ンの種類から、オブジェクトを選択して生成し、属性プ
ロパティの内容とアイコンの種類、接続関係から、各オ
ブジェクトの属性を設定する。以下、オブジェクトにつ
いて説明する。
When the registration menu in the file category of FIG. 5 is selected, each production line element is converted into an object. The manufacturing line editor selects and generates an object from the input type of each icon, and sets the attribute of each object from the content of the attribute property, the type of icon, and the connection relationship. The objects will be described below.

【0025】図8は、各製造ライン要素に対応して生成
されるオブジェクトのデータ構造の一例の説明図、図9
は、図4に示したネットワーク図の一例をオブジェクト
に変換したデータの一例の説明図である。各オブジェク
トは独自の属性を持ち、それぞれ、その属性の設定およ
び問い合わせのための手続きを持っている。
FIG. 8 is an explanatory view of an example of a data structure of an object generated corresponding to each manufacturing line element, and FIG.
FIG. 5 is an explanatory diagram of an example of data obtained by converting the example of the network diagram shown in FIG. 4 into an object. Each object has its own attribute, and each has a procedure for setting and inquiring the attribute.

【0026】生産物を表すオブジェクト“Produc
e”は、名称、生産物タイプ(部品/材料、製品、中間
品)、納期、数量等を属性として持つ。また、手続きと
して、名称問い合わせ、生産物タイプ問い合わせ、納期
設定、納期問い合わせ等を持っている。
An object "Product" representing a product
"e" has the name, product type (parts / materials, products, intermediate products), delivery date, quantity, etc. as attributes. Also, as procedures, it has name inquiry, product type inquiry, delivery date setting, delivery date inquiry, etc. ing.

【0027】リソースを表すオブジェクト“Resou
rce”は、名称、リソースタイプ(製造設備、搬送設
備、作業者)、製造カレンダー等を属性として持つ。製
造カレンダーは、各リソースの稼働時間帯や休日を表す
もので、生産日程計画の対象となる期間の各日の稼働予
定をリストとして表したものである。手続きとしては、
名称問い合わせ、カレンダー問い合わせ、カレンダー設
定、その日時が稼動可能か否かの問い合わせ等を持って
いる。
An object "Resou" representing a resource
“Rce” has names, resource types (manufacturing equipment, transportation equipment, workers), manufacturing calendar, etc. as attributes. The manufacturing calendar represents the operating hours and holidays of each resource, and is the target of production schedule planning. It is a list showing the operation schedule of each day of the period.
It has name inquiries, calendar inquiries, calendar settings, inquiries as to whether or not the date and time is available.

【0028】ストレージを表すオブジェクト“Stor
age”は、名称、貯蔵容量(貯蔵可能な量)、貯蔵可
能生産物リスト等の属性を持つ。手続きとしては、名称
問い合わせ、貯蔵容量問い合わせ、貯蔵可能生産物リス
ト問い合わせ、その生産物が貯蔵可能か否かの問い合わ
せ等を持っている。
An object "Store" representing a storage
“age” has attributes such as name, storage capacity (storable amount), storable product list, etc. As a procedure, name inquiry, storage capacity inquiry, storable product list inquiry, and the product can be stored. I have inquiries about whether or not.

【0029】工程を表すオブジェクト“Proces
s”は、名称、プロセスタイプ(加工/組立、搬送、検
査)、入力生産物リスト、出力生産物リスト、使用リソ
ースリスト、処理時間、歩留まりもしくは変換効率等の
属性を持つ。入力生産物リストは、1バッチなどある単
位量生産される場合に、その工程に入力される生産物と
必要量を表すリストで構成される。手続きとしては、名
称問い合わせ、プライオリティ問い合わせ、リソースリ
スト問い合わせ、nバッチ処理した場合の処理時間問い
合わせ、出力生産物問い合わせ、入力生産物問い合わせ
等を持っている。
An object "Proces" representing a process
"s" has attributes such as name, process type (machining / assembly, transfer, inspection), input product list, output product list, used resource list, processing time, yield or conversion efficiency. The input product list is It is composed of a list that shows the products and the required amount that are input to the process when a certain unit quantity is produced, such as 1 batch.The procedure is: name inquiry, priority inquiry, resource list inquiry, n batch processing. It has a processing time inquiry, an output product inquiry, an input product inquiry, and the like.

【0030】図4に示したネットワーク図をもとに、オ
ブジェクトに変換すると、図9に示したような各オブジ
ェクトが生成される。図9には、設定される属性を示し
ている。図4に示した部品“A”、部品“B”、中間品
“C”、中間品“D”、製品“AB”から、図8の生産
物を表わすオブジェクト“Produce”を用い、そ
れぞれ、部品“A”オブジェクト“aProduce
1”、部品“B”オブジェクト“aProduce
2”、中間品“C”オブジェクト“aProduce
3”、中間品“D”オブジェクト“aProduce
4”、製品“AB”オブジェクト“aProduce
5”が生成される。その属性は、例えば、“aProd
uce1”オブジェクトでは、名称が“A”、生産品タ
イプが部品/材料、納期が93年5月1日、数量128
8であることを表している。他の生産物を表わすオブジ
ェクトについても同様である。なお、生産品タイプが、
部品/材料、中間品の”Produce”オブジェクト
の納期、数量は、生産品タイプが製品である”Prod
uce”オブジェクトの納期、数量より自動的に計算さ
れ、設定される。
When converted into objects based on the network diagram shown in FIG. 4, each object as shown in FIG. 9 is generated. FIG. 9 shows the set attributes. From the parts “A”, parts “B”, intermediate products “C”, intermediate products “D”, and products “AB” shown in FIG. 4, the objects “Product” representing the products of FIG. "A" object "aProduce"
1 ”, part“ B ”object“ aProduce ”
2 ”, intermediate product“ C ”object“ aProduce ”
3 ”, intermediate product“ D ”object“ aProduce ”
4 ”, product“ AB ”object“ aProduce ”
5 ”is generated. Its attribute is, for example,“ aProd
In the "use1" object, the name is "A", the product type is parts / materials, the delivery date is May 1, 1993, and the quantity is 128.
It means that it is 8. The same applies to objects representing other products. In addition, the product type is
The delivery date and quantity of "Product" objects for parts / materials and intermediate products are "Prod" when the product type is a product.
use ”object is calculated and set automatically from the delivery date and quantity.

【0031】図4に示した設備“YY”、作業者“M
r.X”、作業者“Mr.Y”から、図8のリソースを
表わすオブジェクト“Resource”を用い、それ
ぞれ、設備“YY”オブジェクト“aResource
1”、作業者“Mr.X”オブジェクト“aResou
rce2”、作業者“Mr.Y”オブジェクト“aRe
source3”が生成される。その属性は、例えば、
“aResource2”オブジェクトでは、名称が
“Mr.X”、リソースタイプが作業者、製造カレンダ
ーとして9:00から17:00まで稼働で、土曜日と
日曜日が休みの日勤カレンダーの属性を持っている。図
9では、5月1日、2日が休みであることのみを示して
いるが、他の日についても稼動時間、休み等が設定され
ている。図7に示したように、稼動形態と休日のデータ
から各日のカレンダーを設定することもできる。他のリ
ソースを表わすオブジェクトについても、同様に属性が
設定されている。
The equipment "YY" and the operator "M" shown in FIG.
r. X ", worker" Mr. From "Y", the object "Resource" representing the resource in FIG. 8 is used, and the equipment "YY" object "aResource"
1 ”, worker“ Mr. X "object" aResou
rce2 ”, worker“ Mr. Y ”object“ aRe
source3 "is generated. Its attribute is, for example,
In the “aResource2” object, the name is “Mr.X”, the resource type is worker, the manufacturing calendar operates from 9:00 to 17:00, and has attributes of a day shift calendar in which Saturday and Sunday are closed. Although FIG. 9 only shows that the holidays are May 1st and 2nd, the operating hours and holidays are set for other days as well. As shown in FIG. 7, it is also possible to set a calendar for each day based on the operating mode and holiday data. Attributes are similarly set for objects representing other resources.

【0032】図4に示したストレージ“倉庫A”、スト
レージ“倉庫B”から、図8に示したストレージを表わ
すオブジェクト“Strage”を用い、それぞれ、
“倉庫A”オブジェクト“aStrage”、“倉庫
B”オブジェクト“aStrage2”が生成される。
その属性は、例えば、“aStrage1”オブジェク
トでは、名称が“倉庫A”、貯蔵容量が1000、貯蔵
可能生産物が部品“A”であることを示している。
From the storage "warehouse A" and the storage "warehouse B" shown in FIG. 4, the object "Storage" representing the storage shown in FIG. 8 is used.
A "warehouse A" object "aStage" and a "warehouse B" object "aStorage2" are generated.
The attribute indicates that, for example, in the “aStorage1” object, the name is “warehouse A”, the storage capacity is 1000, and the storable product is the part “A”.

【0033】図4に示した加工/組立工程“組立1”、
加工/組立工程“組立2”、検査工程“検査1”から、
図8の工程を表わすオブジェクト“Process”を
用い、それぞれ、加工/組立工程“組立1”オブジェク
ト“aProcess1”、加工/組立工程“組立2”
オブジェクト“aProcess2”、検査工程“検査
1”オブジェクト“aProcess3”が生成され
る。その属性は、例えば、“aProcess1”オブ
ジェクトでは、名称が“組立1”、プロセスタイプが組
立、リソースリストが“Mr.Y”、入力生産物リスト
が(“A”1),(“B”2)、出力生産物リストが
(“C”1)、処理時間が3時間、歩留まりが90%で
あることを示している。すなわち、この“組立1”の工
程では“Mr.Y”という作業者を利用し、部品“A”
1個と、部品“B”2個から、3時間かけて1個の中間
品“C”を生産するということを示している。
The machining / assembly process "assembly 1" shown in FIG.
From the machining / assembly process "Assembly 2" and the inspection process "Inspection 1",
Using the object "Process" that represents the process of FIG. 8, the processing / assembly process "assembly 1" object "aProcess1" and the processing / assembly process "assembly 2" are used, respectively.
An object "aProcess2", an inspection process "inspection 1", and an object "aProcess3" are generated. The attributes are, for example, in the “aProcess1” object, the name is “assembly 1”, the process type is assembly, the resource list is “Mr.Y”, and the input product list is (“A” 1), (“B” 2 ), The output product list is (“C” 1), the processing time is 3 hours, and the yield is 90%. That is, in the process of "Assembly 1", the operator "Mr.Y" is used, and the part "A" is used.
It indicates that one intermediate product "C" is produced from one and two parts "B" in 3 hours.

【0034】上述の各オブジェクトは、アイコンの種類
に対応したオブジェクトが生成された後、図5に示した
属性プロパティ24や、図7に示したような一覧表によ
り入力された属性情報をもとに、オブジェクトの属性を
自動的に設定している。工程を表わすオブジェクト“P
rocess”では、入力された属性情報の他に、ネッ
トワーク図において接続されている他の製造ライン要素
を参照して、オブジェクトの属性が設定される。例え
ば、図4の“組立2”の工程を表す加工/組立工程アイ
コンをオブジェクトに変換する場合、“Proces
s”オブジェクトを生成し、入力された属性情報をもと
に、名称として「“組立2”」を、プロセスタイプとし
て「加工/組立」を、処理時間として「5時間」を、歩
留まりとして「96%」を属性として設定する。さら
に、この加工/組立工程アイコンにアークで接続されて
いる設備および作業者アイコンから、リソースリスト属
性を「(“Mr.Y”,“YY”)」に、また、加工/
組立工程アイコンに接続している中間品および製品アイ
コンと、それらのアイコンを接続するアークの属性か
ら、入力生産物リストとして「(“c”1)」、出力生
産物リストとして「(“d”1)」を属性として設定し
ている。
After the objects corresponding to the types of icons are generated, the above-mentioned objects are based on the attribute properties 24 shown in FIG. 5 and the attribute information input by the list as shown in FIG. Then, the attributes of the object are automatically set. Object "P" that represents a process
In “process”, the attribute of the object is set by referring to other manufacturing line elements connected in the network diagram in addition to the inputted attribute information. For example, the process of “assembly 2” in FIG. If you want to convert the processing / assembly process icon that you represent to an object, click "Proces".
An s "object is generated, and based on the input attribute information,""Assembly2""as the name," Machining / Assembly "as the process type," 5 hours "as the processing time, and" 96 "as the yield. % "As an attribute. Furthermore, the resource list attribute is changed to “(“ Mr.Y ”,“ YY ”)” from the equipment and worker icons connected to the machining / assembly process icon by an arc,
From the intermediate product and product icons connected to the assembly process icon, and the attributes of the arcs connecting these icons, "(" c "1)" as the input product list and "(" d "as the output product list. 1) ”is set as an attribute.

【0035】このようにして生成された各オブジェクト
は、図1の生産日程計画作成部3において用いられ、生
産日程計画が作成される。生産日程計画作成部3として
は、例えば、オブジェクト指向型の処理系を用い、生産
日程計画の推論を行なうように構成することができる。
The objects thus created are used in the production schedule planning section 3 of FIG. 1 to prepare a production schedule. As the production schedule planning unit 3, for example, an object-oriented processing system can be used and configured to infer the production schedule.

【0036】[0036]

【発明の効果】以上の説明から明らかなように、本発明
によれば、生産物、リソース、ストレージ、工程の4つ
の製造ライン要素を用いて製造ラインを表現するので、
これらの製造ライン要素の関係を1つの図面上で視覚的
に把握することが可能となり、ユーザは工程と生産物と
リソースとストレージの関係を容易に理解することがで
き、誤記述を招く可能性を減少させることができるとい
う効果がある。
As is apparent from the above description, according to the present invention, the manufacturing line is represented by using the four manufacturing line elements of product, resource, storage and process.
It is possible to visually understand the relationship between these manufacturing line elements on one drawing, and the user can easily understand the relationship between the process, product, resource, and storage, which may lead to erroneous description. There is an effect that can reduce.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の生産日程計画作成装置の一実施例を
示す概略構成図である。
FIG. 1 is a schematic configuration diagram showing an embodiment of a production schedule planning device of the present invention.

【図2】 本発明の生産日程計画作成装置を実現するた
めのワークステーションの全体構成図である。
FIG. 2 is an overall configuration diagram of a workstation for realizing the production schedule planning device of the present invention.

【図3】 製造ラインエディタで用いられるアイコンの
説明図である。
FIG. 3 is an explanatory diagram of icons used in a production line editor.

【図4】 ある製造ラインをネットワーク図として記述
した一例の説明図である。
FIG. 4 is an explanatory diagram of an example in which a certain manufacturing line is described as a network diagram.

【図5】 製造ラインエディタの画面表示の一例の説明
図である。
FIG. 5 is an explanatory diagram of an example of a screen display of a production line editor.

【図6】 各メニューカテゴリとそのカテゴリに属する
メニューの説明図である。
FIG. 6 is an explanatory diagram of each menu category and menus belonging to that category.

【図7】 リソース一覧表の一例の説明図である。FIG. 7 is an explanatory diagram of an example of a resource list.

【図8】 各製造ライン要素に対応して生成されるオブ
ジェクトのデータ構造の一例の説明図である。
FIG. 8 is an explanatory diagram of an example of a data structure of an object generated corresponding to each manufacturing line element.

【図9】 ネットワーク図の一例をオブジェクトに変換
したデータの一例の説明図である。
FIG. 9 is an explanatory diagram of an example of data obtained by converting an example of a network diagram into an object.

【符号の説明】[Explanation of symbols]

1 製造ラインエディタ、2 製造ライン情報管理部、
3 生産日程計画作成部、11 制御装置、12 主記
憶装置、13 表示画面、14 データ入力装置、15
ポインティング入力装置、16 補助記憶装置、21
メニュー領域、22 メニューカテゴリ、23 プル
ダウンメニュー、24 属性プロパティ。
1 production line editor, 2 production line information management unit,
3 production schedule planning unit, 11 control device, 12 main storage device, 13 display screen, 14 data input device, 15
Pointing input device, 16 auxiliary storage device, 21
Menu area, 22 menu category, 23 pull-down menu, 24 attribute properties.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 製造ラインの情報を入力し生産日程計画
を作成する生産日程計画作成装置において、スケジュー
リング対象となる生産物を示す要素と生産物にサービス
を与えるリソースを示す要素と生産物を保管するための
ストレージを示す要素と生産物へのサービスの工程を示
す要素とを用いて製造ラインを表現し用いた要素の属性
情報を入力する入力手段と、該入力手段により入力され
た要素と属性情報からオブジェクトを生成するオブジェ
クト生成手段と、生成されたオブジェクトに基づき生産
日程計画を作成する生産日程計画作成手段を有すること
を特徴とする生産日程計画作成装置。
1. A production schedule planning device for inputting information of a manufacturing line to create a production schedule, which stores an element indicating a product to be scheduled and an element indicating a resource for providing a service to the product and the product. Input means for expressing the production line by using an element indicating a storage for storing and an element indicating a process of servicing the product, and an element and an attribute input by the input means 1. A production schedule planning device, comprising: an object generating means for generating an object from information and a production schedule planning means for generating a production schedule based on the generated object.
【請求項2】 前記入力手段は、前記各要素から選択さ
れた要素を配置し、配置されている要素間の関係を示す
線分を配置し、さらに、配置されている要素に対して属
性情報を入力し、前記オブジェクト生成手段は要素が配
置されたことによりオブジェクトを生成し、線分の配置
および属性情報の入力により対応するオブジェクトの属
性を設定することを特徴とする請求項1に記載の生産日
程計画作成装置。
2. The input means arranges an element selected from the respective elements, arranges a line segment indicating a relationship between the arranged elements, and further sets attribute information for the arranged elements. 2. The object generation means generates an object by arranging elements, and sets an attribute of the corresponding object by arranging a line segment and inputting attribute information. Production schedule planning device.
JP21814393A 1993-08-09 1993-08-09 Production schedule planning device Expired - Fee Related JP3391056B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21814393A JP3391056B2 (en) 1993-08-09 1993-08-09 Production schedule planning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21814393A JP3391056B2 (en) 1993-08-09 1993-08-09 Production schedule planning device

Publications (2)

Publication Number Publication Date
JPH0756994A true JPH0756994A (en) 1995-03-03
JP3391056B2 JP3391056B2 (en) 2003-03-31

Family

ID=16715320

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21814393A Expired - Fee Related JP3391056B2 (en) 1993-08-09 1993-08-09 Production schedule planning device

Country Status (1)

Country Link
JP (1) JP3391056B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008018334A1 (en) * 2006-08-10 2008-02-14 Class Technology Co., Ltd. Production system creating system, production system creating method, and storage medium storing production system creating program for allowing computer to execute production system creating method
WO2008018333A1 (en) * 2006-08-10 2008-02-14 Class Technology Co., Ltd. Production system creating system, production system creating method, and storage medium storing production system creating program for allowing computer to execute production system creating method
JP2008284504A (en) * 2007-05-21 2008-11-27 Hitachi Constr Mach Co Ltd Tool for supporting construction of on-site system
JP2012008730A (en) * 2010-06-23 2012-01-12 Nets:Kk Production line simulation device and program
JP2012008729A (en) * 2010-06-23 2012-01-12 Nets:Kk Production line simulation device and program
JP2023032179A (en) * 2021-08-26 2023-03-09 株式会社三和住建 Information processing program and information processing device

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008018334A1 (en) * 2006-08-10 2008-02-14 Class Technology Co., Ltd. Production system creating system, production system creating method, and storage medium storing production system creating program for allowing computer to execute production system creating method
WO2008018333A1 (en) * 2006-08-10 2008-02-14 Class Technology Co., Ltd. Production system creating system, production system creating method, and storage medium storing production system creating program for allowing computer to execute production system creating method
JP2008041019A (en) * 2006-08-10 2008-02-21 Class Technology Co Ltd Production system creation system, production system creation method, and storage medium storing production system creating program for making computer execute production system creation method
JP2008041021A (en) * 2006-08-10 2008-02-21 Class Technology Co Ltd Production system creation system, production system creation method, and storage medium storing production system creating program for making computer execute production system creation method
JP2008284504A (en) * 2007-05-21 2008-11-27 Hitachi Constr Mach Co Ltd Tool for supporting construction of on-site system
WO2008142907A1 (en) * 2007-05-21 2008-11-27 Hitachi Construction Machinery Co., Ltd. On-site system construction assist tool
US8196054B2 (en) 2007-05-21 2012-06-05 Hitachi Construction Machinery Co., Ltd. On-site system building support tool
JP2012008730A (en) * 2010-06-23 2012-01-12 Nets:Kk Production line simulation device and program
JP2012008729A (en) * 2010-06-23 2012-01-12 Nets:Kk Production line simulation device and program
JP2023032179A (en) * 2021-08-26 2023-03-09 株式会社三和住建 Information processing program and information processing device

Also Published As

Publication number Publication date
JP3391056B2 (en) 2003-03-31

Similar Documents

Publication Publication Date Title
JP6388682B2 (en) Method and system for editing and reporting graphic programming language objects
US9070104B2 (en) Cross-context task management
US8302096B2 (en) Methods and systems to perform individual tasks as a composite task
US6418428B1 (en) Object oriented data access and analysis system
US6700590B1 (en) System and method for retrieving and presenting data using class-based component and view model
JP2923552B2 (en) Method of constructing organization activity database, input method of analysis sheet used for it, and organization activity management system
EP1586992A2 (en) Template for generating user interfaces
US20030212585A1 (en) Idea drawing support method and program product therefor
US20050235224A1 (en) User interface for an activity scout window
US20050235206A1 (en) User interface for a quick activity window
CN101084494B (en) Method and device for managing workflow in computer environment
US7836103B2 (en) Exchanging project-related data between software applications
EP0702292A2 (en) Graphical environment for constructing systems
US20050235208A1 (en) User interface for a guided activity window
US20050235223A1 (en) User interface adaptable by an end user
Bouchlaghem et al. Integrating product and process information in the construction sector
US8806368B2 (en) User interface having quick views and full views
US4926349A (en) Method for display panel processing
He et al. ISA-95 tool for enterprise modeling
JP3391056B2 (en) Production schedule planning device
US20050234939A1 (en) System and method for progressively disclosing information to a computer user
EP1367503A1 (en) Method for displaying and modifying a relational database schema
Bettig et al. An object-oriented program shell for integrating CAD software tools
JP2004178150A (en) Integrated production management method and system by production process management chart
Kim et al. Cost information model for managing multiple projects

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080124

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090124

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100124

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110124

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120124

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees