Nothing Special   »   [go: up one dir, main page]

JPH0551197A - Erected conveyor device for collected log - Google Patents

Erected conveyor device for collected log

Info

Publication number
JPH0551197A
JPH0551197A JP23885691A JP23885691A JPH0551197A JP H0551197 A JPH0551197 A JP H0551197A JP 23885691 A JP23885691 A JP 23885691A JP 23885691 A JP23885691 A JP 23885691A JP H0551197 A JPH0551197 A JP H0551197A
Authority
JP
Japan
Prior art keywords
rope
winch
wound around
carrier
braking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP23885691A
Other languages
Japanese (ja)
Other versions
JPH0657593B2 (en
Inventor
Yuichi Matsui
優一 松井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
C K S CHIYUUKI KK
Original Assignee
C K S CHIYUUKI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by C K S CHIYUUKI KK filed Critical C K S CHIYUUKI KK
Priority to JP23885691A priority Critical patent/JPH0657593B2/en
Publication of JPH0551197A publication Critical patent/JPH0551197A/en
Publication of JPH0657593B2 publication Critical patent/JPH0657593B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

PURPOSE:To simplify rope stretching work and impede the random movement of a carrier by winding the intermediate part of an elevating combined pull-up rope, wound around a second winch, several times around the first winding drum of the carrier so as to fit a hanging hook to the lower end of the pull-up rope suspended after winding, and winding a pull-back rope, wound around a second winding drum, onto a third winch. CONSTITUTION:A braking rope 7a such as a wire rope wound around a first winch 6a among three winches 6a, 6b, 6c adjacently fixed to a master column 1 is connected to the upper part of a tail column 2 through a fixed block P1 and a running block P. The intermediate part of an elevating combined pull-up rope 7b such as a wire rope wound around the second winch 6b is wound around the first winding drum d1 of a carrier 5 several times and then suspended, and a hanging hook 8 is fitted to the lower end of the suspended rope 7b. A pull-back rope 7c such as a wire rope wound around a second winding drum d2 is then pulled back onto the master column 1 side through the vertical fixed blocks P2, P2 of the tail column 2 and wound onto the third winch 6c.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は原木やビーム材などを
ワイヤーロープで空中搬送するに好適な架設集材搬送装
置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an erection and gathering and conveying apparatus suitable for conveying raw wood, beam materials and the like through wire rope in the air.

【0002】[0002]

【従来の技術】この種の架設集材搬送装置としては「労
働省安全衛生部安全課」監修、昭和61年9月10日
「林材業労災防止協会」発行の書籍「集材機運転者安全
必携」に記載のものが周知である。
2. Description of the Related Art This type of erection and collection transportation device is supervised by the Safety Division of the Ministry of Labor, Health and Safety Department, and published by the Forestry Workers' Accident Prevention Association on September 10, 1986. Those described in "Must Have" are well known.

【0003】これらの従来技術のうち同上書籍第23
頁、第24頁記載のように、ダブルエンドレスロープ式
架設集材機用の荷揚げロープ巻胴付設の特殊キャリッジ
も周知である。
Of these prior arts, the same as the above book No. 23.
Special carriages with an unloading rope winder for double endless rope erection rigs, as described on page 24, are also known.

【0004】[0004]

【発明が解決しようとする課題】前記した従来の技術は
キャリッジで荷揚げロープを巻取るもので、その手段と
しては元柱と先柱間に架設したエンドレスの専用ワイヤ
ーロープでキャリッジに設置した駆動プーリとギヤ組と
を介し荷揚げロープ巻胴を正逆に回転させることで、荷
の揚げ降しを実行するものであるから、上記専用のロー
プの索張り作業が必要で不経済であり、しかも吊下げ具
を降ろす際に元柱と搬器との間のロープがその自重でタ
ルんでしまい、吊下げ具が降りて来ないという問題点が
有る。
The above-mentioned prior art is to wind the unloading rope by the carriage, and as a means therefor, a drive pulley installed on the carriage by an endless exclusive wire rope laid between the original pillar and the leading pillar. Since the hoisting rope hoisting body is rotated forward and backward via the gears and the gear set, hoisting and unloading of the hoisting rope is performed. There is a problem that the rope between the main pillar and the carrier is talted by its own weight when lowering the hanging tool, and the hanging tool does not come down.

【0005】また上記従来技術では搬器を主索にクラン
プすることができないので、傾斜地では荷上げ時と荷降
ろし時に搬器が妄動してしまうことも有り、危険でもあ
るというような多くの問題点が有った。
Further, in the above-mentioned prior art, since the carrier cannot be clamped to the main ropes, there are many problems that the carrier may be deviated at the time of loading and unloading on a sloping ground, which is also dangerous. There was

【0006】この発明は前記した各問題点を除去するた
めに、荷揚げ降ろし用の昇降索を搬器の引寄せ索として
も兼用するとともに、上記昇降索の巻胴を駆動するため
のロープを搬器の引戻し索としても兼用することで索張
り作業を簡素化し、かつ荷揚げ・降ろし時に搬器を主索
にクランプできるようにして搬器の妄動を阻止すること
を目的とする。
According to the present invention, in order to eliminate the above-mentioned problems, the hoisting and lowering rope for unloading and loading is also used as the pulling rope of the carrier, and the rope for driving the winding drum of the hoisting rope is used for the carrier. By using it as a pull-back line, it aims to simplify the work of rigging and to prevent the carry-out device from moving by allowing it to be clamped to the main rope when unloading and unloading.

【0007】[0007]

【課題を解決させるための手段】上記したこの発明の目
的は、元柱と先柱との間に張設した主索に前後のプーリ
で搬器を吊下げ架設した集材搬送装置において、搬器の
側板の上部に固定した主索受板の下面に対向したクラン
パと下部に制動体とを有する昇降体を前記側板に対し昇
降可能にしかもスプリングの弾力で自己下降可能に配設
するとともに、この昇降体のほぼ中央に枢支した動滑車
の上部における側板に左右一対の定滑車を枢支し、また
前記側板の下部には前記制動体が摺接する制動円板と同
軸一体の二つの巻胴を枢支して備え、さらに前記元柱に
隣接固定した三基のウインチのうち第1のウインチに巻
付けた制動索を前記定滑車および動滑車を経て先柱の上
部に連結し、また第2のウインチに巻付けた昇降兼用引
寄せ索の中間部分を搬器の第1の巻胴に巻回垂下してそ
の下端に吊下げ具を取着し、さらに第2の巻胴に巻付け
た引戻し索を先柱の上下の定滑車により元柱側に引き返
して第3のウインチに巻装することで達成できる。
DISCLOSURE OF THE INVENTION The above-mentioned object of the present invention is to provide a collecting material conveying device in which a carrier is hung and suspended by front and rear pulleys on a main rope stretched between a main column and a front column. An elevating body having a clamper facing the lower surface of the main rope receiving plate fixed to the upper part of the side plate and a braking body in the lower part is arranged so as to be able to ascend and descend with respect to the side plate and to be able to self descend by the elastic force of the spring, and this ascending and descending. A pair of left and right constant pulleys are pivotally supported on the side plates in the upper part of the moving pulley pivotally supported at substantially the center of the body, and two winding drums coaxially integrated with the braking disc on which the braking body is slidably contacted are provided at the lower portions of the side plates. A braking line wound around a first winch of the three winches fixedly provided adjacent to the main column is connected to the upper part of the front column via the fixed pulley and the moving pulley, and the second winch is also provided. Middle part of the pulling rope for both lifting and lowering, which is wrapped around the winch The first winding drum of the carrier is wound around and the hanging tool is attached to the lower end thereof, and the pullback rope wound around the second winding drum is returned to the original pillar side by the fixed pulleys above and below the leading pillar. It can be achieved by winding it around a third winch.

【0008】[0008]

【作用】元柱側に存在する搬器を第3のウインチの回転
力で引戻し索を介して伐採現場の真上まで移動させるに
当っては、先ず第1のウインチを緩めると搬器のスプリ
ングの弾力で昇降体 5eが下降し主索クランプを解除す
ると同時に制動体を制動円板にキツク押し付けて第1お
よび第2の巻胴を制動する。
[Operation] When the carrier existing on the side of the original pillar is moved to the position just above the logging site through the pullback rope by the rotational force of the third winch, first, when the first winch is loosened, the spring force of the carrier is elastic. Then, the lifting body 5e descends to release the main rope clamp, and at the same time, the braking body is pressed against the braking disc to brake the first and second winding drums.

【0009】次いで第2のウインチに若干の制動を付与
しつつ第3のウインチに引戻し索を巻取り初めると、予
じめ制動状態に在る第2の巻胴が引戻し索で先柱の方向
に引かれるから搬器を伐採現場の直上迄主索に沿わせて
移動できる。
Then, when the retracting rope is started to be wound around the third winch while applying a slight braking to the second winch, the second winding cylinder in the pre-braking state is the retracting rope and the direction of the front pillar is reached. Since it is pulled by the truck, the transporter can be moved along the main rope to just above the logging site.

【0010】そして第1のウインチに制動索を強力に巻
取ると、その牽引力で動滑車を介し昇降体がスプリング
の弾力に抗してクランパ、制動体と共に上動して主索を
主索受板とクランパとできつく挟んで主索のクランプ状
態すなわち搬器自体の不動状態とすることができると同
時に制動円板から制動体が離れて制動を解き各巻胴が回
転可能となる。
When the braking rope is strongly wound around the first winch, the traction force causes the elevating body to move upward together with the clamper and the braking body against the elastic force of the spring through the moving pulley to receive the main rope. The main ropes can be clamped by tightly sandwiching the plate and the clamper, that is, the carrier itself can be made immobile, and at the same time, the braking body is separated from the braking disc to release the braking and each winding cylinder can be rotated.

【0011】その後第2のウインチに若干の制動を付与
しながら第3のウインチに引戻し索を巻込むと各巻胴は
回転フリー状態に在るので、先ず第2の巻胴の回転力で
第1の巻胴が吊下げ具を降ろす方向に回転し、荷扱い者
は、降りて来た吊下げ具に原木を玉掛けロープを介して
吊り下げ待機状態とすることができる。
After that, when the pull-back rope is wound around the third winch while applying a slight amount of braking to the second winch, each winding cylinder is in a rotation-free state. The winding cylinder rotates in the direction in which the suspending tool is lowered, and the loader can put the log into the suspending tool that has come down and put it in a standby state of suspending it through the sling rope.

【0012】次いで第3のウインチに若干の制動を与え
つつ第2のウインチに昇降兼用引寄せ索を巻取ると、こ
の索の下部は吊下げ具や原木と共に上昇し、原木を所定
の高さまで引上げることができる。
[0012] Next, when a lifting and lowering pulling rope is wound around the second winch while applying some braking to the third winch, the lower part of this rope is lifted together with the suspending tool and the log to bring the log to a predetermined height. Can be raised.

【0013】次に第1のウインチを緩めるとスプリング
の弾力で主索の前記クランプ状態を解くことができると
同時に制動体を制動円板にきつく圧接して各巻胴を制動
した後、第2のウインチに昇降兼用引寄せ索を巻取れ
ば、若干制動を受けている第3のウインチから引戻し索
を繰り出しつつ搬器を元柱の方向に主索を沿わせて原木
と共に引き寄せることができる。
Next, when the first winch is loosened, the elastic force of the spring can release the clamped state of the main rope, and at the same time, the braking body is pressed tightly against the braking disc to brake each winding cylinder, and then the second winch is released. By winding up and down the pulling rope around the winch, it is possible to pull the carrying rope along the main rope in the direction of the original pillar while pulling out the pulling rope from the third winch which is slightly braked, and pulling it together with the log.

【0014】引き寄せ終ったら第1のウインチに制動索
をきつく巻取って前記主索クランプ状態で巻胴フリー状
態とした後、第2のウインチに若干の制動を付与しつつ
引戻し索を第3のウインチに巻込むことで前記吊下げ具
の引き降ろし時と同様に吊下げ具と共に原木を元柱付近
に降ろすことができ、地上やトラック上で吊下げ具を玉
掛けロープから外して原木を集材できる。
After the pulling is completed, the braking line is tightly wound around the first winch to make the main drum clamp state in the winding drum free state, and then the pulling back line is moved to the third winch while applying some braking to the second winch. By winding it around the winch, you can lower the log together with the hanging tool to the vicinity of the main pillar, just like when pulling down the hanging tool, and remove the hanging tool from the sling rope on the ground or on the truck to collect the timber. ..

【0015】[0015]

【実施例】実施例について図面を参照して説明する。先
ずこの発明の基本構成は図1に示すように、地上などに
立設固定した元柱1と先柱2 との間に張設した鋼鉄製の
ワイヤーロープなどの主索3 に前後の溝付きプーリ4,4
で搬器5 を図3に示すように吊下げ架設した集材搬送器
を構成するに当り、図3および図4に示すように搬器5
の側板 5a,5aの上部に主索受板 5bを固定し、その下
面に対向しクランパ 5cとこのクランパの下部に制動体
5dを有する昇降体 5eを前記側板 5aに対し昇降可能
に、しかもスプリングSで自己下降するように配設す
る。
EXAMPLES Examples will be described with reference to the drawings. First of all, as shown in FIG. 1, the basic structure of the present invention is that a main rope 3 such as a steel wire rope stretched between a main pillar 1 and a front pillar 2 which are vertically erected on the ground is provided with front and rear grooves. Pulleys 4,4
As shown in FIGS. 3 and 4, when constructing a collecting and collecting carrier in which the carrier 5 is suspended and installed as shown in FIG.
The main rope receiving plate 5b is fixed to the upper portions of the side plates 5a, 5a of the vehicle, and the damper 5c is provided on the lower surface of the clamper 5c so as to face the lower surface thereof.
An elevating body 5e having 5d is arranged so as to be able to move up and down with respect to the side plate 5a, and further to be self-descended by a spring S.

【0016】そしてこの昇降体 5eのほぼ中央に枢支し
た動滑車Pの上部における側板 5aに左右一対の定滑車
P1,P1 を図3のように枢着する。
A pair of left and right fixed pulleys P1 and P1 are pivotally attached to the side plate 5a at the upper portion of the movable pulley P pivotally supported at substantially the center of the lift 5e as shown in FIG.

【0017】また前記側板 5aの下部には図3および図
4に示すように前記制動体 5d,5dが摺接する制動円板
d,dと同軸一体に二つの巻胴d1,d2 を枢支して備え
る。
As shown in FIGS. 3 and 4, two winding cylinders d1 and d2 are pivotally supported on the lower portion of the side plate 5a coaxially with the braking discs d and d on which the braking bodies 5d and 5d are in sliding contact. To prepare.

【0018】さらに図1に示すように前記元柱1 に隣接
固定した三基のウインチ 6a,6b,6cのうち第1のウイ
ンチ 6aに巻付けたワイヤーロープなどの制動索 7aを
前記定滑車P1 および動滑車Pを経て先柱2 の上部に連
結する。
Further, as shown in FIG. 1, of the three winches 6a, 6b, 6c fixed adjacent to the main column 1, a braking rope 7a such as a wire rope wound around the first winch 6a is attached to the constant pulley P1. And, it is connected to the upper part of the front pillar 2 via the movable pulley P.

【0019】さらにまた第2のウインチ 6bに巻付けた
ワイヤーロープなどの昇降兼用引寄せ索 7bの中間部分
を図1、図3および図4に示すように搬器5 の第1の巻
胴d1 に数回巻回垂下してその下端に吊下げ具8 を取着
する。
Further, as shown in FIGS. 1, 3 and 4, the intermediate portion of the lifting / lowering pulling rope 7b such as a wire rope wound around the second winch 6b is attached to the first winding cylinder d1 of the carrier 5. It hangs several times and attaches the suspending tool 8 to its lower end.

【0020】さらに第2の巻胴d2 に図3、図4に示す
ように巻付けたワイヤーロープなどの引戻し索 7cを図
1に示すように先柱2 の上下の定滑車P2,P2 を介して
元柱1 側に引き返して第3のウインチ 6cの巻装してこ
の発明による架設集材搬送装置の基本構成とする。
Further, as shown in FIG. 1, a pullback cable 7c such as a wire rope wound around the second winding drum d2 as shown in FIGS. 3 and 4 is provided with fixed pulleys P2 and P2 above and below the front pillar 2 as shown in FIG. And the third winch 6c is wound back to the side of the original column 1 to form the basic structure of the erection material gathering and conveying device according to the present invention.

【0021】なお前記各部材は鉄などの強靭材で作り、
また前記第1〜第3の各ウインチ 6a〜 6cには電動ま
たはオイルドライブ式のものを用い、これら各ウインチ
の駆動と制動とをそれぞれ一連のシーケンスに基づいて
コンピュータ等でプログラム制御するようにすれば、使
用に当り便利となるが、上記各ウインチ 6a〜 6cは人
手による手動スイッチ制御でも的確に操作可能である。
Each of the above members is made of a tough material such as iron,
Further, each of the first to third winches 6a to 6c is of an electric or oil drive type, and the driving and braking of these winches may be program-controlled by a computer or the like based on a series of sequences. If it is convenient to use, the winches 6a to 6c can be operated accurately even by manual switch control by human.

【0022】また元柱1 と先柱2 との距離や主索3 の傾
斜角度は伐採現場や集材現場の状況にもよるが、大略1
00〜500m程で、各柱の高さは10〜30m程度、
主索3 の傾斜角度は0°〜45°程度で設置し、各索条
は所定の弛度を保ち張設し、また使用し、さらに引戻し
索 7cは各柱の上部で引き返えして張設してもよく、さ
らにまた元柱1 や第1〜第3のウインチ 6a〜 6cなど
はトラック積載のものを採用すれば便利である。
The distance between the main pillar 1 and the front pillar 2 and the inclination angle of the main rope 3 depend on the conditions of the logging site and the logging site, but are roughly 1
The height of each pillar is about 10 to 30 m.
The main rope 3 is installed at an angle of inclination of 0 ° to 45 °, each rope is stretched while maintaining a certain degree of slackness, and is used again. Furthermore, the pullback rope 7c can be pulled back at the top of each pillar. It may be stretched, and it is convenient if the main column 1 and the first to third winches 6a to 6c are truck-mounted ones.

【0023】なお、図3から図6までの各図において符
号9 で示すものはすべて枢軸を示し、これら各枢軸はそ
れぞれ図3に示すように前后のプーリ4,4 と定滑車P1
を搬器5 の両側板 5a,5aに枢支したり、図3、図4に
示すように動滑車Pを昇降体5eに枢支したりする。
In FIGS. 3 to 6, all of the reference numerals 9 indicate pivots, and these pivots are, as shown in FIG. 3, front and rear pulleys 4 and 4 and a constant pulley P1.
Is pivotally supported on both side plates 5a, 5a of the carrier 5, or the movable pulley P is pivotally supported on the lift 5e as shown in FIGS.

【0024】また他の枢軸9 で図4に示すように左右2
枚の制動円板d,dおよびこれら円板の間に配置した第
1の巻胴d1 および第2の巻胴d2 をキーピン 9aを介
して同軸的に固定し、これらをまとめて側板5a,5aに
枢支する。
Another pivot 9 is provided on the left and right 2 as shown in FIG.
The braking discs d, d and the first winding drum d1 and the second winding drum d2 arranged between these discs are coaxially fixed via a key pin 9a, and they are collectively pivoted to the side plates 5a, 5a. Support.

【0025】さらに符号10aは図3、図4に示すように
側板 5a,5a同志を所定間隔を保ち固定し平行保持する
ための連結杆、また10b,10bはそれぞれ昇降体 5eを
側板5aに設けた上下の長孔10c,10cに沿って昇降ガ
イドするためのガイド軸、10d,10dはそれぞれ前記各
軸の抜け止め部を示す。
Further, reference numeral 10a is a connecting rod for fixing the side plates 5a and 5a in parallel with each other at a predetermined distance as shown in FIGS. 3 and 4, and 10b and 10b are provided with an elevating body 5e on the side plate 5a. Further, guide shafts for guiding up and down along the upper and lower elongated holes 10c, 10c, and 10d, 10d respectively denote retaining portions of the shafts.

【0026】さらに、またスプリングSは弾撥バネで図
4に示すように側板 5aに固定した2個のバネ受け座S
aと制動体 5dの両側上面との間に図4のように介在し
てある。
Further, the spring S is an elastic spring, and two spring receiving seats S fixed to the side plate 5a as shown in FIG.
It is interposed between a and the upper surfaces of both sides of the braking body 5d as shown in FIG.

【0027】なお図10で示すように第1の巻胴d1 に
巻装すべき昇降兼用引寄せ索 7bをサブプーリPaを経
て巻胴d1 に数回巻装すれば、昇降兼用引寄せ索 7bの
巻き重なりを防止できる。
As shown in FIG. 10, if the lifting / lowering pulling rope 7b to be wound around the first winding drum d1 is wound around the winding drum d1 several times via the sub-pulley Pa, the lifting / lowering pulling rope 7b It is possible to prevent wrapping.

【0028】この発明は以上のように構成してあり、次
にその動作を以下に説明する。
The present invention is configured as described above, and its operation will be described below.

【0029】元柱1 側に存在する搬器5 を第3のウイン
チ 6cの回転力で引戻し索 7cを介して伐採現場の真上
まで移動させるに当っては、先ず第1のウインチ 6aを
緩めると搬器5 のスプリングS,Sの弾力で昇降体 5e
が下降し、主索クランプを解除すると同時に制動体 5d
を図1、図3および図4に示すように制動円板dにキツ
ク押し付けて第1および第2の巻胴d1,d2 を制動す
る。
When the carrier 5 existing on the side of the main pillar 1 is moved to the position right above the logging site via the pullback rope 7c by the rotational force of the third winch 6c, first the first winch 6a is loosened. Lifting body 5e due to the elasticity of springs S and S of carrier 5.
Is lowered and the main rope clamp is released, and at the same time the braking body 5d
Is pressed against the braking disc d as shown in FIGS. 1, 3 and 4 to brake the first and second winding drums d1 and d2.

【0030】次いで第2のウインチ 6bに若干の制動を
付与しつつ第3のウインチ 6cに引戻し索 7cを巻取り
初めると、図1に示すように予じめ制動状態に在る第2
の巻胴d2 が引戻し索 7cで先柱2 の方向に引かれるか
ら図2に示すように搬器5 を伐採現場の直上迄主索3 に
沿わせて移動できる。
Then, when the retracting rope 7c is started to be wound around the third winch 6c while applying a slight amount of braking to the second winch 6b, as shown in FIG.
Since the winding drum d2 of 1 is pulled in the direction of the front pillar 2 by the pullback rope 7c, the carrier 5 can be moved along the main rope 3 to just above the logging site as shown in FIG.

【0031】そして第1のウインチ 6aに制動索 7aを
強力に巻取ると、その牽引力で動滑車Pを介し昇降体 5
eがスプリングSの弾力に抗してクランパ 5c、制動体
5dと共に図2、図5および図6に示すように上動して
主索3 を主索受板 5bとクランパ 5cとできつく挟んで
主索3 のクランプ状態すなわち搬器5 自体の不動状態と
することができると同時に制動円板dから制動体 5dが
離れて制動円板dに対する制動を解き各巻胴d1,d2 が
回転可能となる。
When the braking rope 7a is strongly wound around the first winch 6a, the pulling force of the braking rope 7a causes the lifting / lowering body 5 to move through the movable pulley P.
e resists the elasticity of the spring S, the clamper 5c, the braking body
As shown in FIGS. 2, 5 and 6 together with 5d, the main rope 3 is clamped tightly by the main rope receiving plate 5b and the clamper 5c so that the main rope 3 is clamped, that is, the carrier 5 itself is in an immobile state. At the same time, the braking body 5d is separated from the braking disc d to release the braking on the braking disc d, and the winding cylinders d1 and d2 can be rotated.

【0032】その後第2のウインチ 6bに若干の制動を
付与しながら第3のウインチ 6cに引戻し索 7cを巻込
むと各巻胴d1,d2は回転フリー状態に在るので、先ず
第2の巻胴d2 の回転力で第1の巻胴d1 が吊下げ具8
を図2に示すように降ろす方向に回転し、荷扱い者は降
りて来た吊下げ具8 に原木wを玉掛けロープlを介して
吊り下げ待機状態とすることができる。
After that, when the pullback rope 7c is wound around the third winch 6c while applying a slight amount of braking to the second winch 6b, the winding cylinders d1 and d2 are in a rotation-free state. The first winding cylinder d1 is suspended by the rotating force of d2.
As shown in FIG. 2, the cargo handling person can put the log wood w on the hanging tool 8 which has come down and put it on the slinging standby state by the sling rope l.

【0033】次いで第3のウインチ 6cに若干の制動を
与えつつ第2のウインチ 6bに昇降兼用引寄せ索 7bを
巻取ると、図7に示すようにこの昇降兼用引寄せ索 7b
の下部は吊下げ具8 および原木と共に上昇し、原木wを
所定の高さまで引上げることができる。
Next, when the lifting / lowering pulling rope 7b is wound around the second winch 6b while slightly braking the third winch 6c, as shown in FIG.
The lower part of the tree can be raised together with the suspending tool 8 and the log to pull the log w to a predetermined height.

【0034】次に第1のウインチ 6aを緩めると図8に
示すようにスプリングSの弾力で主索3 の前記クランプ
状態を解くことができると同時に制動体 5dを図3に示
すように制動円板dにきつく圧接して各巻胴d1,d2 を
制動した後、第2のウインチ6bに昇降兼用引寄せ索 7
bを巻取れば、若干制動を受けている第3のウインチ6
cから引戻し索7cを所定のバックテンションを与えつ
つ繰り出して図8の状態から図9に示すように搬器5 を
元柱1 の方向に主索3 を沿わせて原木wと共に引き寄せ
ることができる。
Next, when the first winch 6a is loosened, the elastic force of the spring S can release the clamped state of the main rope 3 as shown in FIG. After tightly pressure-contacting the plate d to brake each winding cylinder d1, d2, the pulling rope 7 for both lifting and lowering is attached to the second winch 6b.
If you wind up b, the third winch 6 which is slightly braked
By pulling out the pullback rope 7c from c while giving a predetermined back tension, the carrier 5 can be pulled together with the log w along the main rope 3 in the direction of the original pillar 1 from the state of FIG. 8 as shown in FIG.

【0035】引き寄せ終ったら図9に示すように第1の
ウインチ 6aに制動索 7aをきつく巻取って前記主索ク
ランプ状態で図5、図6に示すように巻胴フリー状態と
した後、第2のウインチ 6bに若干の制動を付与しつつ
引戻し索 7cを第3のウインチ 6cに巻込むことで図9
に示すように前記吊下げ具8 の引き降ろし時と同様に吊
下げ具8 と共に原木wを元柱1 付近に降ろすことがで
き、地上やトラック上で吊下げ具8 を玉掛けロープlか
ら外して原木wを集材できる。
After the pulling is completed, the braking rope 7a is tightly wound around the first winch 6a as shown in FIG. 9 and, in the main rope clamping state, as shown in FIG. 5 and FIG. By applying a slight amount of braking to the second winch 6b and winding the pull-back rope 7c around the third winch 6c, as shown in FIG.
As shown in Fig. 3, the log w can be lowered to the vicinity of the main pillar 1 together with the suspending tool 8 in the same manner as when the suspending tool 8 is pulled down, and the suspending tool 8 can be removed from the sling rope 1 on the ground or on a truck. You can collect w.

【0036】また吊下げ具8 を初めとする搬器5 に関す
る各部材を再び伐採現場まで引き戻すには、前記原木w
の引き上げ時と同様な操作で空の吊下げ具8 を引き上げ
た後、図1に示すように最初の操作に戻り、以下前記の
各操作の繰返しで多数の原木wを少人数で空中搬送して
集材することができる。
Further, in order to bring back each member related to the carrier 5 including the suspending tool 8 to the logging site again, the raw wood w
After pulling up the empty hanging tool 8 by the same operation as when pulling up, return to the first operation as shown in FIG. 1, and by repeating the above-mentioned operations, a large number of raw wood w are conveyed in the air by a small number of people. You can collect by collecting.

【0037】なお原木wに掛けた玉掛けロープlは周知
手段で外して再利用できると共に、玉掛けロープl自体
は絞り込みリング式の1本ロープのものでもよく、さら
に原木wの代りにビーム材などの建築資材やその他の資
材を空中搬送できる。
The sling rope l hung on the raw wood w can be removed and reused by well-known means, and the sling rope l itself may be a single narrowing ring type rope. Further, instead of the raw wood w, a beam material or the like can be used. It can transport building materials and other materials in the air.

【0038】[0038]

【発明の効果】この発明は以上説明したように構成した
ので、以下に記載の効果を奏する。元柱1 と先柱2 との
間に張設した主索3 に前後のプーリ4,4 で搬器5 を吊下
げ架設した集材搬送装置を構成するに当り、搬器5 に昇
降体 5eを昇降可能に配設するとともに、搬器5 の下部
には同軸一体の二つの巻胴d1,d2 を枢支して備え、前
記昇降体を制動索の第1のウインチによる操作により上
昇させたとき、主索クランプ・巻胴フリーとし、また下
降させたとき主索クランプを解除して前記各巻胴を制動
し、さらに第2のウインチ 6bに巻付けた昇降兼用引寄
せ索 7bの中間部分を搬器5 の第1の巻胴d1 に巻回垂
下してその下端に吊下げ具8 を取着し、また第2の巻胴
d2 に巻付けた引戻し索 7cを第3のウインチ 6cに巻
装したので、荷揚げ・荷降ろしに当り、主索に搬器をク
ランプして妄動阻止できるから、傾斜地でも安全に荷役
作業が実行できるという第1の効果が有る。
Since the present invention is configured as described above, it has the following effects. In constructing a material collecting and conveying device in which a carrier 5 is suspended by a front and rear pulleys 4 and 4 on a main rope 3 stretched between a main pillar 1 and a front pillar 2, an elevator 5e is moved up and down on the carrier 5. Two winding cylinders d1 and d2 coaxially integrated with each other are provided at the lower part of the carrying device 5 so that the lifting body is raised by the operation of the first winch of the braking rope. The rope is clamped / winding cylinder free, and when lowered, the main rope clamp is released to brake each winding cylinder, and the middle part of the lifting / lowering pulling rope 7b wound around the second winch 6b is attached to the carrier 5. Since the hanging member 8 is attached to the lower end of the first winding drum d1 and the pull-back rope 7c wound around the second winding drum d2 is wound around the third winch 6c, When unloading and unloading, derailment can be prevented by clamping a carrier on the main rope, so cargo handling can be performed safely even on sloping ground The first effect that kill there.

【0039】またこの発明では荷揚げ降ろし用の昇降索
を搬器の引寄せ索としても兼用するとともに、上記昇降
索の巻胴を駆動するためのロープを搬器の引戻し索とし
ても兼用することで索張り作業を簡素化でき、経済的に
実施できるという第2の効果も有る。
Further, in the present invention, the hoisting and lowering rope for unloading and loading is also used as the pulling rope of the carrier, and the rope for driving the winding cylinder of the hoisting rope is also used as the pulling back rope of the carrier. There is a second effect that the work can be simplified and can be carried out economically.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の実施例を示す一部省略の構成図FIG. 1 is a partially omitted configuration diagram showing an embodiment of the present invention.

【図2】図1と状態を異にした構成図FIG. 2 is a block diagram showing a state different from that of FIG.

【図3】搬器と各索条を示す一部切断立面図[Fig. 3] Partially cut-away elevation view showing the carrying device and each cord.

【図4】図3に示すものの中央部縦断立面図FIG. 4 is a vertical sectional elevation view of the central portion of the one shown in FIG.

【図5】図3と状態を異にした一部切断立面図FIG. 5 is a partially cutaway elevation view in a state different from that of FIG.

【図6】図4と状態を異にした中央部縦断側面図FIG. 6 is a vertical sectional side view of a central portion in a state different from that of FIG.

【図7】図2と状態を異にした構成図FIG. 7 is a block diagram showing a state different from that of FIG.

【図8】図7と状態を異にした構成図FIG. 8 is a block diagram showing a state different from that of FIG.

【図9】図8と状態を異にした構成図FIG. 9 is a block diagram showing a state different from that of FIG.

【図10】巻胴にロープを巻回する他の例を示す斜視図FIG. 10 is a perspective view showing another example of winding a rope around a winding drum.

【符号の説明】[Explanation of symbols]

1 元柱 2 先柱 3 主索 4 プーリ 5 搬器 5a 側板 5b 主索受板 5c クランパ 5d 制動体 5e 昇降体 6a,6b,6c ウインチ 7a 制動索 7b 昇降兼用引寄せ索 7c 引戻し索 8 吊下げ具 d1,d2 巻胴 d 制動円板 P 動滑車 p1,p2 定滑車 1 Main column 2 Front column 3 Main rope 4 Pulley 5 Carrier 5a Side plate 5b Main rope receiving plate 5c Clamper 5d Braking body 5e Lifting body 6a, 6b, 6c Winch 7a Braking rope 7b Lifting rope 7c Pullback rope 8 Suspension tool d1, d2 Winding drum d Braking disc P Moving pulley p1, p2 Constant pulley

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 元柱1 と先柱2 との間に張設した主索3
に前後のプーリ4,4で搬器5 を吊下げ架設した集材搬送
装置において、搬器5 の側板 5aの上部に固定した主索
受板 5bの下面に対向したクランパ 5cと下部に制動体
5dとを有する昇降体 5eを前記側板 5aに対し昇降可
能にしかもスプリングSの弾力で自己下降可能に配設す
るとともに、この昇降体 5eのほぼ中央に枢支した動滑
車Pの上部における側板 5aに左右一対の定滑車P1,P
1 を枢支し、また前記側板 5aの下部には前記制動体 5
dが摺接する制動円板dと同軸一体の二つの巻胴d1,d
2 を枢支して備え、さらに前記元柱1 に隣接固定した三
基のウインチのうち第1のウインチ 6aに巻付けた制動
索 7aを前記定滑車P1,P1 および動滑車Pを経て先柱
2 の上部に連結し、また第2のウインチ 6bに巻付けた
昇降兼用引寄せ索7bの中間部分を搬器5 の第1の巻胴
d1 に巻回垂下してその下端に吊下げ具8を取着し、さ
らに第2の巻胴d2 に巻付けた引戻し索 7cを先柱2 の
上下の定滑車P2,P2 により元柱1 側に引き返して第3
のウインチ 6cに巻装してなる架設集材搬送装置。
1. A main rope 3 stretched between a main pillar 1 and a front pillar 2.
In a collecting and conveying device in which a carrier 5 is suspended and erected by front and rear pulleys 4 and 4, a clamper 5c facing a lower surface of a main rope receiving plate 5b fixed to an upper part of a side plate 5a of the carrier 5 and a braking member at a lower part thereof.
An elevating body 5e having 5d is arranged so as to be able to move up and down with respect to the side plate 5a and also to be self-descended by the elastic force of the spring S, and the side plate 5a at the upper part of the movable pulley P pivotally supported at substantially the center of the elevating body 5e. A pair of left and right fixed pulleys P1, P
1 is pivotally supported, and the braking member 5 is provided at the lower part of the side plate 5a.
Two winding cylinders d1 and d coaxially integrated with the braking disc d on which d slides
2 is pivotally supported, and further, a braking rope 7a wound around a first winch 6a among the three winches fixedly fixed to the main pillar 1 is passed through the fixed pulleys P1 and P1 and the movable pulley P, and then the front pillar.
The middle part of the lifting / lowering pulling rope 7b connected to the upper part of 2 and wound around the second winch 6b is wound around the first winding drum d1 of the carrier 5 and the hanging tool 8 is attached to the lower end thereof. The pull-back rope 7c attached and further wound around the second winding drum d2 is returned to the original pillar 1 side by the fixed pulleys P2 and P2 above and below the leading pillar 2
A erection material gathering and conveying device wound around a winch 6c.
JP23885691A 1991-08-27 1991-08-27 Erection collecting and conveying device Expired - Lifetime JPH0657593B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23885691A JPH0657593B2 (en) 1991-08-27 1991-08-27 Erection collecting and conveying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23885691A JPH0657593B2 (en) 1991-08-27 1991-08-27 Erection collecting and conveying device

Publications (2)

Publication Number Publication Date
JPH0551197A true JPH0551197A (en) 1993-03-02
JPH0657593B2 JPH0657593B2 (en) 1994-08-03

Family

ID=17036281

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23885691A Expired - Lifetime JPH0657593B2 (en) 1991-08-27 1991-08-27 Erection collecting and conveying device

Country Status (1)

Country Link
JP (1) JPH0657593B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6481064B1 (en) * 2018-03-16 2019-03-13 森の機械株式会社 Overhead wire carrier
WO2021131801A1 (en) * 2019-12-23 2021-07-01 株式会社マルイチ Transport system
CN115246556A (en) * 2022-07-22 2022-10-28 浙江森林生物科技有限公司 Conveying system and method for cutting bamboos in mountainous areas
CN117904979A (en) * 2024-03-20 2024-04-19 四川公路桥梁建设集团有限公司 Cable-stayed bridge cable high-altitude suspension conveying device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105858469B (en) * 2016-06-08 2018-09-14 湖南省中南桥梁设备制造有限公司 A kind of axis hinge formula cable crane overhead traveling crane

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6481064B1 (en) * 2018-03-16 2019-03-13 森の機械株式会社 Overhead wire carrier
JP2019156612A (en) * 2018-03-16 2019-09-19 森の機械株式会社 Overhead power line style carrier
WO2019176456A1 (en) * 2018-03-16 2019-09-19 森の機械株式会社 Overhead-line-type carrier
CN111886196A (en) * 2018-03-16 2020-11-03 森之机械株式会社 Stringing type carrier
CN111886196B (en) * 2018-03-16 2022-08-12 森之机械株式会社 Stringing type carrier
WO2021131801A1 (en) * 2019-12-23 2021-07-01 株式会社マルイチ Transport system
JP2021098583A (en) * 2019-12-23 2021-07-01 株式会社マルイチ Carrying system
CN115246556A (en) * 2022-07-22 2022-10-28 浙江森林生物科技有限公司 Conveying system and method for cutting bamboos in mountainous areas
CN115246556B (en) * 2022-07-22 2023-09-19 浙江强村富民竹产业有限公司 Transportation system and method for bamboo harvesting in mountain area
CN117904979A (en) * 2024-03-20 2024-04-19 四川公路桥梁建设集团有限公司 Cable-stayed bridge cable high-altitude suspension conveying device
CN117904979B (en) * 2024-03-20 2024-06-11 四川公路桥梁建设集团有限公司 Cable-stayed bridge cable high-altitude suspension conveying device

Also Published As

Publication number Publication date
JPH0657593B2 (en) 1994-08-03

Similar Documents

Publication Publication Date Title
US4732234A (en) Perimeter safety net system for multi-story buildings under construction
US5101935A (en) Hoisting and rescue apparatus
JP2021001074A (en) Safety type position fixing facility of lift for building material
JPH08207750A (en) Ambulance for cableway
JPH0551197A (en) Erected conveyor device for collected log
CN109279499B (en) Special self-balancing hanging beam for long object lifting and crane
CN209322235U (en) A kind of anti-skidding clamping device of mine hoist
US2478513A (en) Loading device
JP3807775B2 (en) How to lift the construction elevator
JPH04292396A (en) Carrying device for material wood piece collected for erection
US3105597A (en) Skyline carriage
JP5841929B2 (en) How to change the main rope of the elevator
US2601228A (en) Hoist
US1502997A (en) Aerial transporter
CN219792170U (en) Anti-drop mechanism of portal frame crane
JPH04256690A (en) Transport device of gathered material for overhead installation
US20170174479A1 (en) Cable logging system
US3116838A (en) Cableway for bridge construction
CN217650696U (en) Hoisting equipment
US3202110A (en) Method and means for adjusting a tramway cable tensioning device
US1782348A (en) Pulley carrier for guy lines
SU1576381A1 (en) Air-logging unit
JPS6119522B2 (en)
SU1291470A2 (en) Rope arrangement for hauling timber
CN213974591U (en) Conveyer convenient to timber is tied up