Nothing Special   »   [go: up one dir, main page]

JP5038681B2 - Building reinforcement structure - Google Patents

Building reinforcement structure Download PDF

Info

Publication number
JP5038681B2
JP5038681B2 JP2006290188A JP2006290188A JP5038681B2 JP 5038681 B2 JP5038681 B2 JP 5038681B2 JP 2006290188 A JP2006290188 A JP 2006290188A JP 2006290188 A JP2006290188 A JP 2006290188A JP 5038681 B2 JP5038681 B2 JP 5038681B2
Authority
JP
Japan
Prior art keywords
insertion hole
bolt insertion
floor
bolt
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2006290188A
Other languages
Japanese (ja)
Other versions
JP2008106511A (en
Inventor
行宏 中尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP2006290188A priority Critical patent/JP5038681B2/en
Publication of JP2008106511A publication Critical patent/JP2008106511A/en
Application granted granted Critical
Publication of JP5038681B2 publication Critical patent/JP5038681B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

本発明は、基礎上に敷設された床上に、縦横の芯材を矩形枠状に組み立ててなる矩形枠と、この矩形枠の両面に取り付けられた面材とを備えた壁が立設された建物の補強構造に関する。   In the present invention, on a floor laid on a foundation, a wall provided with a rectangular frame formed by assembling vertical and horizontal core members into a rectangular frame shape, and a face member attached to both sides of the rectangular frame is erected. It relates to the reinforcement structure of buildings.

木製の柱を基礎に固定する際、従来は、まず土台となる木材をアンカーボルトで固定し、この土台を介して基礎に柱を固定することが多い。
このような基礎に柱を固定する技術については種々のものが提案されており、例えば、柱の側面に固定したホールダウン金物とアンカーボルトとを連結することによって、柱と基礎とを結合する技術が知られている(例えば、特許文献1参照)。
特開2001−214914号公報
When fixing a wooden column to a foundation, conventionally, the base wood is first fixed with anchor bolts, and the column is often fixed to the foundation via this foundation.
Various techniques have been proposed for fixing the pillar to such a foundation, for example, a technique for joining the pillar and the foundation by connecting a hole-down hardware fixed to the side of the pillar and an anchor bolt. Is known (see, for example, Patent Document 1).
JP 2001-214914 A

ところで、地震や台風等によって建物が倒壊する際は、建物の柱、土台等の引き抜きや横ずれ等が原因の一つとなる場合があった。このため、近年では、上記特許文献1に記載されたような技術よりも、さらに柱の固定強度を高めたり、柱を固定する金物の剛性を高めたりする建物の補強技術の改良が成されている。そして、このような建物の補強技術を、パネル工法やツーバイフォー工法等の建物にも取り入れたいという要望があった。   By the way, when a building collapses due to an earthquake, a typhoon, or the like, there are cases where pulling out or lateral displacement of the pillars or foundations of the building is one of the causes. For this reason, in recent years, improvements have been made to the building reinforcement technology that further increases the fixing strength of the columns and the rigidity of the hardware for fixing the columns, as compared with the technology described in Patent Document 1 above. Yes. There has been a demand to incorporate such building reinforcement technology into buildings such as the panel method and the two-by-four method.

本発明の課題は、建物の基礎上に壁を強固に固定することができ、延いては建物全体の補強を行うことが可能な建物の補強構造を提供することを目的とする。   An object of the present invention is to provide a reinforcing structure of a building that can firmly fix a wall on the foundation of the building, and can thereby reinforce the entire building.

請求項1に記載の発明は、例えば図1〜図4に示すように、建物の補強構造であり、基礎1上に敷設された床2上に、縦材30aおよび横材30bを矩形枠状に組み立ててなる矩形枠30と、この矩形枠30の両面に取り付けられた面材31とを備えた壁3が立設されており、
前記床2と、この床2の上面に接する壁3の横材30bには、これら床2と横材30bとを貫通し、前記基礎1から突出するアンカーボルト1aが挿通されたボルト挿通孔4が形成されており、
前記ボルト挿通孔4の孔底41近傍にバッカー材6が嵌め込まれ、前記ボルト挿通孔4には、前記バッカー材6の上から接着剤5が充填されており、
前記バッカー材6は円形に形成されており、前記アンカーボルト1aの外周面に当接する中央孔6aと前記ボルト挿通孔4の孔壁40に当接する外周部6bとを備えることを特徴とする。
The invention according to claim 1 is a reinforcing structure of a building, for example, as shown in FIGS. 1 to 4, and a vertical member 30 a and a horizontal member 30 b are formed in a rectangular frame shape on a floor 2 laid on the foundation 1. A wall 3 having a rectangular frame 30 assembled to each other and a face material 31 attached to both sides of the rectangular frame 30 is erected,
Bolt insertion holes 4 through which the anchor bolts 1a that penetrate the floor 2 and the transverse member 30b and protrude from the foundation 1 are inserted into the transverse member 30b of the wall 3 in contact with the floor 2 and the upper surface of the floor 2. Is formed ,
Backer material 6 is fitted in the vicinity of the hole bottom 41 of the bolt insertion hole 4, and the bolt insertion hole 4 is filled with the adhesive 5 from above the backer material 6 ,
The backer material 6 is formed in a circular shape, and includes a central hole 6 a that contacts the outer peripheral surface of the anchor bolt 1 a and an outer peripheral portion 6 b that contacts the hole wall 40 of the bolt insertion hole 4 .

請求項1に記載の発明によれば、前記床2と横材30bとを貫通し、前記基礎1から突出するアンカーボルト1aが挿通されたボルト挿通孔4に接着剤5が充填されていることから、この接着剤5によって前記アンカーボルト1aとボルト挿通孔4とを接着して、前記床2と横材30bとを一体化することができるので、前記横材30bを前記床2上に強固に固定することができる。これによって、前記横材30bを含んで構成される前記壁3を床2上に、延いては前記基礎1に対して強固に固定することができるので、例えば地震や台風等の際における壁3の引き抜きや横ずれを確実に防ぐことが可能となり、延いては建物全体の補強を行うことができる。
また、前記ボルト挿通孔4の孔底41近傍にバッカー材6が嵌め込まれ、その上から前記接着剤5が充填されているので、このバッカー材6によって前記ボルト挿通孔4の孔底41近傍から接着剤5が漏れ出すことを確実に防ぐことができる。
According to the first aspect of the present invention, the adhesive 5 is filled in the bolt insertion hole 4 through which the anchor bolt 1a protruding through the floor 2 and the cross member 30b and protruding from the foundation 1 is inserted. Thus, the anchor bolt 1a and the bolt insertion hole 4 can be bonded by the adhesive 5 so that the floor 2 and the cross member 30b can be integrated, so that the cross member 30b is firmly fixed on the floor 2. Can be fixed to. Accordingly, the wall 3 including the cross member 30b can be firmly fixed on the floor 2 and, consequently, the foundation 1, so that the wall 3 in the event of an earthquake or a typhoon, for example. It is possible to reliably prevent the pulling out and lateral displacement of the building, and thus the entire building can be reinforced.
In addition, since the backer material 6 is fitted in the vicinity of the hole bottom 41 of the bolt insertion hole 4 and the adhesive 5 is filled from above, the backer material 6 allows the back of the bolt insertion hole 4 from the vicinity of the hole bottom 41. It is possible to reliably prevent the adhesive 5 from leaking out.

請求項2に記載の発明は、例えば図1〜図4に示すように、請求項1に記載の建物の補強構造において、
前記ボルト挿通孔4をアンカーボルト1aよりも大径に形成することによって、前記ボルト挿通孔4の孔壁40と、このボルト挿通孔4に挿通されたアンカーボルト1aとの間に、前記接着剤5を充填するための隙間Sが形成されていることを特徴とする。
The invention according to claim 2 is a reinforcing structure of a building according to claim 1, for example, as shown in FIGS.
By forming the bolt insertion hole 4 with a diameter larger than that of the anchor bolt 1a, the adhesive is provided between the hole wall 40 of the bolt insertion hole 4 and the anchor bolt 1a inserted through the bolt insertion hole 4. A gap S for filling 5 is formed.

請求項2に記載の発明によれば、前記ボルト挿通孔4をアンカーボルト1aよりも大径に形成することによって、前記ボルト挿通孔4の孔壁40と、このボルト挿通孔4に挿通されたアンカーボルト1aとの間に、前記接着剤5を充填するための隙間Sが形成されているので、前記アンカーボルト1aとボルト挿通孔4とを容易に接着することができる。
すなわち、このように前記ボルト挿通孔4をアンカーボルト1aよりも意図的に大径に形成しておくことによって、前記アンカーボルト1aとボルト挿通孔4との間に接着剤5を充填するための隙間Sを容易かつ確実に形成することができるので、この隙間Sに対して接着剤5を充填するだけで、前記アンカーボルト1aとボルト挿通孔4とを容易に接着することができる。
According to the invention described in claim 2, the bolt insertion hole 4 is formed to have a larger diameter than the anchor bolt 1 a, thereby being inserted into the hole wall 40 of the bolt insertion hole 4 and the bolt insertion hole 4. Since the gap S for filling the adhesive 5 is formed between the anchor bolt 1a, the anchor bolt 1a and the bolt insertion hole 4 can be easily bonded.
That is, by forming the bolt insertion hole 4 intentionally larger in diameter than the anchor bolt 1a in this way, the adhesive 5 is filled between the anchor bolt 1a and the bolt insertion hole 4. Since the gap S can be easily and reliably formed, the anchor bolt 1a and the bolt insertion hole 4 can be easily bonded by simply filling the gap S with the adhesive 5.

請求項3に記載の発明は、例えば図1〜図4に示すように、請求項1または2に記載の建物の補強構造において、
前記ボルト挿通孔4は、前記床2を貫通する第1挿通孔4aと前記横材30bを貫通する第2挿通孔4bとからなり、前記接着剤5は、前記第1挿通孔4aと第2挿通孔4bにわたって充填されていることを特徴とする。
The invention according to claim 3 is a reinforcing structure for a building according to claim 1 or 2, as shown in FIGS.
The bolt insertion hole 4 includes a first insertion hole 4a penetrating the floor 2 and a second insertion hole 4b penetrating the cross member 30b. The adhesive 5 includes the first insertion hole 4a and the second insertion hole 4b. It is characterized by being filled over the insertion hole 4b.

請求項3に記載の発明によれば、前記接着剤5は、前記第1挿通孔4aと第2挿通孔4bにわたって充填されていることから、前記床2と横材30bとが互いに水平方向に移動することによってアンカーボルト1aに作用する剪断力に対して剛性を得ることができるので、例えば地震や台風等の際における壁3の引き抜きや横ずれをより確実に防ぐことが可能となる。   According to invention of Claim 3, since the said adhesive agent 5 is filled over the said 1st penetration hole 4a and the 2nd penetration hole 4b, the said floor 2 and the cross member 30b are mutually horizontal. Since the rigidity can be obtained with respect to the shearing force acting on the anchor bolt 1a by moving, it is possible to more reliably prevent the wall 3 from being pulled out or laterally displaced in the event of an earthquake or typhoon, for example.

請求項に記載の発明は、例えば図4に示すように、請求項1〜のいずれか一項に記載の建物の補強構造において、
前記アンカーボルト1aの上端に、前記ボルト挿通孔4の開口上面を覆うシール材7を介してナット8が螺合されていることを特徴とする。
The invention according to claim 4 is the reinforcing structure for a building according to any one of claims 1 to 3 , for example, as shown in FIG.
A nut 8 is screwed to the upper end of the anchor bolt 1a through a sealing material 7 that covers the upper surface of the opening of the bolt insertion hole 4.

請求項に記載の発明によれば、前記アンカーボルト1aの上端に、前記ボルト挿通孔4の開口上面を覆うシール材7を介してナット8が螺合されているので、前記シール材7によってボルト挿通孔4の開口上面を閉塞して、その上からナット8によって、さらに締め付けることとなるので、前記ボルト挿通孔4の開口上面から接着剤5が溢れ出すことを確実に防ぐことができる。 According to the invention described in claim 4 , the nut 8 is screwed to the upper end of the anchor bolt 1 a via the sealing material 7 that covers the upper surface of the bolt insertion hole 4. Since the upper surface of the bolt insertion hole 4 is closed and further tightened by the nut 8 from above, it is possible to reliably prevent the adhesive 5 from overflowing from the upper surface of the bolt insertion hole 4.

本発明によれば、基礎上に敷設された床と、この床上に立設される壁を構成する横材とを貫通し、基礎から突出するアンカーボルトが挿通されたボルト挿通孔に接着剤が充填されていることから、この接着剤によってアンカーボルトとボルト挿通孔とを接着して、床と横材とを一体化することができるので、この横材を床上に強固に固定することができる。これによって、横材を含んで構成される壁を床上に、延いては基礎に対して強固に固定することができるので、例えば地震や台風等の際における壁の引き抜きや横ずれを確実に防ぐことが可能となり、延いては建物全体の補強を行うことができる。   According to the present invention, the adhesive is inserted into the bolt insertion hole through which the anchor bolt that penetrates the floor laid on the foundation and the cross member constituting the wall erected on the floor and protrudes from the foundation is inserted. Since it is filled, the anchor bolt and the bolt insertion hole can be bonded by this adhesive, and the floor and the cross member can be integrated, so that the cross member can be firmly fixed on the floor. . This makes it possible to securely fix the wall composed of cross members on the floor and eventually to the foundation, so that, for example, during the earthquake or typhoon, the wall can be prevented from being pulled out or laterally displaced. It is possible to reinforce the entire building.

以下、図面を参照して本発明の実施の形態について説明する。
なお、本実施の形態における建物は、壁や床、屋根といった建物の構成要素を予め工場にてパネル化しておき、施工現場でこれらのパネルを組み立てて構築するパネル工法で構築されるが、その他にも、2×4インチの断面を有する木材、または2インチはそのままで4インチの整数倍の断面長さを有する木材を、主として釘打ち工法によって建て、壁全体で支える壁式工法等の建物にも適用することができる。
Embodiments of the present invention will be described below with reference to the drawings.
The building in this embodiment is constructed by a panel method in which building components such as walls, floors, and roofs are panelized in advance in the factory, and these panels are assembled and constructed at the construction site. In addition, a building with a 2 × 4 inch cross-section, or a wall-type construction method that supports a whole wall by building a wood having a cross-sectional length that is an integral multiple of 4 inches without changing 2 inches, mainly by a nailing method. It can also be applied to.

本実施の形態の建物の補強構造は、図1〜図4に示すように、基礎1上に敷設された床2上に、縦材30aおよび横材30bを矩形枠状に組み立ててなる矩形枠30と、この矩形枠30の両面に取り付けられた面材31とを備えた壁3が立設されており、前記床2と、この床2の上面に接する壁3の横材30bには、これら床2と横材30bとを貫通し、前記基礎1から突出するアンカーボルト1aが挿通されたボルト挿通孔4が形成され、このボルト挿通孔4には接着剤5が充填されている。   As shown in FIGS. 1 to 4, the building reinforcing structure of the present embodiment is a rectangular frame formed by assembling vertical members 30 a and horizontal members 30 b into a rectangular frame shape on a floor 2 laid on a foundation 1. 30 and a wall 3 provided with face members 31 attached to both sides of the rectangular frame 30, and the floor 2 and the cross member 30b of the wall 3 in contact with the upper surface of the floor 2, A bolt insertion hole 4 is formed through the floor 2 and the cross member 30b and through which the anchor bolt 1a protruding from the foundation 1 is inserted. The bolt insertion hole 4 is filled with an adhesive 5.

ここで、前記基礎1は布基礎1であり、この基礎1には、アンカーボルト1aが上方に向かって突出するようにして埋め込まれており、図示はしないが、前記アンカーボルト1aは、基礎1に沿って複数埋め込まれており、このアンカーボルト1aを基礎1と建物の躯体との連結に用いることができるようになっている。   Here, the foundation 1 is a cloth foundation 1, and an anchor bolt 1a is embedded in the foundation 1 so as to protrude upward. Although not shown, the anchor bolt 1a is a foundation 1. The anchor bolts 1a can be used for connecting the foundation 1 and the building frame.

また、前記床2は床パネル2であり、複数の框材20を矩形枠状に組み立ててなる矩形枠と、この矩形枠の上面に取り付けられた面材21とを備えており、前記框材20を基礎1上に載置するようにして、対向する基礎1,1どうしに床パネル2を架設することによって、床パネル2を敷設することができるようになっている。   The floor 2 is a floor panel 2, and includes a rectangular frame formed by assembling a plurality of frame materials 20 into a rectangular frame shape, and a surface material 21 attached to the upper surface of the rectangular frame. The floor panel 2 can be laid by laying the floor panel 2 between the opposing foundations 1 and 1 so that 20 is placed on the foundation 1.

なお、前記基礎1と床パネル2との間には、基礎1の上端の平坦面の確保や、基礎1の上端の透水防止を目的とする台輪9が前記基礎1の上端に敷き込まれている。また、図示はしないが、この台輪9は、所定間隔をおいて複数形成されたアンカーボルト挿通用の矩形の貫通穴を有する梯子状の形状をしている。   In addition, between the foundation 1 and the floor panel 2, a pedestal 9 for securing a flat surface at the upper end of the foundation 1 and preventing water permeation at the upper end of the foundation 1 is laid on the upper end of the foundation 1. ing. Moreover, although not shown in figure, this base wheel 9 has a ladder-like shape having a plurality of anchor bolt insertion rectangular through holes formed at predetermined intervals.

前記壁3は壁パネル3であり、上述したように、縦材30aおよび横材30bを矩形枠状に組み立ててなる矩形枠30と、この矩形枠30の両面に取り付けられた面材31とを備えている。そして、この壁3は、図1に示すように、横材30bを前記床2の上面に接するように配置し、この横材30bの端部において縦材30aが上方に立ち上がるようにして前記床2上に立設されている。   The wall 3 is the wall panel 3, and as described above, the rectangular frame 30 formed by assembling the vertical members 30a and the horizontal members 30b into a rectangular frame shape, and the face material 31 attached to both surfaces of the rectangular frame 30. I have. As shown in FIG. 1, the wall 3 is arranged such that the cross member 30b is in contact with the upper surface of the floor 2, and the vertical member 30a rises upward at the end of the cross member 30b. 2 upright.

そして、前記ボルト挿通孔4は、前記床2と横材30bとを貫通するようにして形成されており、このボルト挿通孔4には、図3に示すように、接着剤5が充填されている。
これによって、前記接着剤5によって前記アンカーボルト1aとボルト挿通孔4とを接着して、前記床2と横材30bとを一体化することができるので、前記横材30bを前記床2上に強固に固定することができるようになっている。
The bolt insertion hole 4 is formed so as to penetrate the floor 2 and the cross member 30b, and the bolt insertion hole 4 is filled with an adhesive 5 as shown in FIG. Yes.
Accordingly, the anchor bolt 1a and the bolt insertion hole 4 can be bonded by the adhesive 5, and the floor 2 and the cross member 30b can be integrated, so that the cross member 30b is placed on the floor 2. It can be fixed firmly.

また、本実施の形態の接着剤5は、種々のものが挙げられるが、例えばアンカーボルト1a等の金属と床パネル2および壁パネル3等の木材との接着に適すとともに、接着剤自体の経年変化も効果的に防ぐことができるもの等、本発明の趣旨を逸脱せず、しかも、より高い効果を得ることができるような接着剤を用いるようにする。   Various adhesives may be used as the adhesive 5 according to the present embodiment. For example, the adhesive 5 is suitable for bonding metal such as the anchor bolt 1a and wood such as the floor panel 2 and the wall panel 3, and the adhesive itself is aged. Adhesives that do not depart from the spirit of the present invention, such as those that can effectively prevent changes, and that can obtain higher effects are used.

続いて、前記ボルト挿通孔4について、さらに詳細に説明する。   Next, the bolt insertion hole 4 will be described in more detail.

前記ボルト挿通孔4は、図1に示すように、このボルト挿通孔4に挿通される前記アンカーボルト1aよりも大径に形成されている。なお、これらアンカーボルト1aおよびボルト挿通孔4の径は本発明の趣旨を逸脱しない範囲で、適宜変更可能とする。   As shown in FIG. 1, the bolt insertion hole 4 has a larger diameter than the anchor bolt 1 a inserted through the bolt insertion hole 4. The diameters of the anchor bolt 1a and the bolt insertion hole 4 can be appropriately changed without departing from the spirit of the present invention.

すなわち、このように前記ボルト挿通孔4をアンカーボルト1aよりも意図的に大径に形成しておくことによって、前記アンカーボルト1aとボルト挿通孔4との間に接着剤5を充填するための隙間Sを容易かつ確実に形成することができるので、この隙間Sに対して接着剤5を充填するだけで、前記アンカーボルト1aとボルト挿通孔4とを容易に接着することができる。   That is, by forming the bolt insertion hole 4 intentionally larger in diameter than the anchor bolt 1a in this way, the adhesive 5 is filled between the anchor bolt 1a and the bolt insertion hole 4. Since the gap S can be easily and reliably formed, the anchor bolt 1a and the bolt insertion hole 4 can be easily bonded by simply filling the gap S with the adhesive 5.

また、前記ボルト挿通孔4は、前記床2を貫通する第1挿通孔4aと前記横材30bを貫通する第2挿通孔4bとからなり、前記接着剤5は、前記第1挿通孔4aと第2挿通孔4bにわたって充填されている。   The bolt insertion hole 4 includes a first insertion hole 4a penetrating the floor 2 and a second insertion hole 4b penetrating the cross member 30b. The adhesive 5 includes the first insertion hole 4a and the first insertion hole 4a. The second insertion hole 4b is filled.

つまり、前記接着剤5が、前記第1挿通孔4aと第2挿通孔4bにわたって充填されていることにより、前記床2と横材30bとが互いに水平方向に移動することによってアンカーボルト1aに作用する剪断力に対して剛性を得ることができるので、例えば地震や台風等の際における壁3の引き抜きや横ずれを確実に防ぐことが可能となる。   That is, when the adhesive 5 is filled over the first insertion hole 4a and the second insertion hole 4b, the floor 2 and the cross member 30b move in the horizontal direction to act on the anchor bolt 1a. Since rigidity can be obtained with respect to the shearing force, for example, it becomes possible to reliably prevent the wall 3 from being pulled out or laterally displaced during an earthquake or typhoon.

さらに、前記ボルト挿通孔4の孔底41近傍には、図2に示すように、バッカー材6が嵌め込まれ、その上から前記接着剤5が充填されている。したがって、このバッカー材6によって前記ボルト挿通孔4の孔底41近傍から接着剤5が漏れ出すことを確実に防ぐことができるようになっている。   Further, as shown in FIG. 2, a backer material 6 is fitted in the vicinity of the hole bottom 41 of the bolt insertion hole 4, and the adhesive 5 is filled from above. Therefore, the backer material 6 can surely prevent the adhesive 5 from leaking from the vicinity of the hole bottom 41 of the bolt insertion hole 4.

なお、このバッカー材6とは、例えば外壁3材と外壁3材との間の隙間Sに嵌め込まれて、その上から充填されたコーキング材を後方から支持するためのものであり、本実施の形態においては、前記アンカーボルト1aとボルト挿通孔4との間の隙間Sに嵌め込まれ、さらにその上から充填された前記接着剤5を下方から支持するものである。   The backer material 6 is, for example, for supporting the caulking material that is fitted into the gap S between the outer wall 3 material and the outer wall 3 material and filled from above, from the back. In the embodiment, the adhesive 5 that is fitted into the gap S between the anchor bolt 1a and the bolt insertion hole 4 and further filled from above is supported from below.

このバッカー材6としては、種々のものが挙げられ、任意であるが、本実施の形態においてはスポンジ状の素材を円形に形成し、アンカーボルト1aの外周面に当接する中央孔6aとボルト挿通孔4の孔壁40に当接する外周部6bとを備えた構成のものが用いられている。   The backer material 6 includes various materials and is optional, but in the present embodiment, a sponge-like material is formed in a circular shape, and a central hole 6a that contacts the outer peripheral surface of the anchor bolt 1a and a bolt insertion The thing of the structure provided with the outer peripheral part 6b contact | abutted to the hole wall 40 of the hole 4 is used.

一方、前記アンカーボルト1aの上端には、図4に示すように、前記ボルト挿通孔4の開口上面を覆うシール材7を介してナット8が螺合されている。
すなわち、前記シール材7によってボルト挿通孔4の開口上面を閉塞して、その上からナット8によって、さらに締め付けることとなるので、前記ボルト挿通孔4の開口上面から接着剤5が溢れ出すことを確実に防ぐことができるようになっている。
On the other hand, as shown in FIG. 4, a nut 8 is screwed onto the upper end of the anchor bolt 1a through a sealing material 7 covering the upper surface of the bolt insertion hole 4.
That is, the upper surface of the bolt insertion hole 4 is closed by the sealing material 7 and further tightened by the nut 8 from above, so that the adhesive 5 overflows from the upper surface of the opening of the bolt insertion hole 4. It can be surely prevented.

なお、本実施の形態のシール材7としては、ゴムパッキン等の樹脂からなり、ボルト挿通孔4の開口上面を密閉できるようになっている。また、このシール材7の上面には座金部材8aが設けられており、この座金部材8aによって、ナット8の緩み止め等の本来の役割を果たすことができるだけでなく、ボルト挿通孔4の開口上面を閉塞する際の補助を行うことができるようになっている。   In addition, as the sealing material 7 of this Embodiment, it consists of resin, such as rubber packing, and the opening upper surface of the bolt penetration hole 4 can be sealed now. Further, a washer member 8a is provided on the upper surface of the sealing material 7, and the washer member 8a can not only play an original role such as loosening prevention of the nut 8, but also the upper surface of the bolt insertion hole 4. It is possible to provide assistance when closing the door.

次に、建物の補強方法について説明する。   Next, a method for reinforcing a building will be described.

まず、基礎1上に敷設する床パネル2と、この床パネル2上に立設される壁パネル3の所定の箇所にボルト挿通孔4を形成する。ここで、所定の箇所とは、前記床パネル2に形成される第1挿通孔4aと、壁パネル3に形成される第2挿通孔4bとの位置が対応し合っている所定の箇所を意味しているとともに、壁パネル3の安定した立設状態を確保することが可能な所定の箇所を意味している。   First, bolt insertion holes 4 are formed at predetermined positions of a floor panel 2 laid on the foundation 1 and a wall panel 3 erected on the floor panel 2. Here, the predetermined location means a predetermined location where the positions of the first insertion hole 4a formed in the floor panel 2 and the second insertion hole 4b formed in the wall panel 3 correspond to each other. In addition, it means a predetermined location where a stable standing state of the wall panel 3 can be secured.

次に、図1に示すように、基礎1上に台輪9を敷き込んだ後、基礎1から突出するアンカーボルト1aの位置と第1挿通孔4aの位置とを合わせるようにして床パネル2を敷設する。
そして、この床パネル2の上面に、前記アンカーボルト1aの位置と第2挿通孔4bの位置とを合わせるようにして壁パネル3を立設する。
Next, as shown in FIG. 1, after laying the base 9 on the foundation 1, the position of the anchor bolt 1a protruding from the foundation 1 and the position of the first insertion hole 4a are matched so that the floor panel 2 Laying.
The wall panel 3 is erected on the upper surface of the floor panel 2 so as to match the position of the anchor bolt 1a and the position of the second insertion hole 4b.

次に、図2に示すように、前記第1挿通孔4aの孔底41近傍にバッカー材6を嵌め込むようにする。その後、図3に示すように、前記第1挿通孔4aと第2挿通孔4bにわたって接着剤5を充填する。   Next, as shown in FIG. 2, the backer material 6 is fitted in the vicinity of the hole bottom 41 of the first insertion hole 4a. Then, as shown in FIG. 3, the adhesive 5 is filled over the first insertion hole 4a and the second insertion hole 4b.

そして、このようにボルト挿通孔4に接着剤5を充填し終えた後は、図4に示すように、このボルト挿通孔4の開口上面にシール材7を設けるとともに、その上から座金部材8aを設け、さらにアンカーボルト1aにナット8を螺合して締め付けるようにする。以上のようにして、建物の補強が行われる。   Then, after filling the bolt insertion hole 4 with the adhesive 5 in this way, as shown in FIG. 4, a sealing material 7 is provided on the upper surface of the opening of the bolt insertion hole 4, and a washer member 8a is formed thereon. Further, the nut 8 is screwed onto the anchor bolt 1a and tightened. The building is reinforced as described above.

本実施の形態によれば、前記床2と横材30bとを貫通し、前記基礎1から突出するアンカーボルト1aが挿通されたボルト挿通孔4に接着剤5が充填されていることから、この接着剤5によって前記アンカーボルト1aとボルト挿通孔4とを接着して、前記床2と横材30bとを一体化することができるので、前記横材30bを前記床2上に強固に固定することができる。これによって、前記横材30bを含んで構成される前記壁3を床2上に、延いては前記基礎1に対して強固に固定することができるので、例えば地震や台風等の際における壁3の引き抜きや横ずれを確実に防ぐことが可能となり、延いては建物全体の補強を行うことができる。   According to the present embodiment, the adhesive 5 is filled in the bolt insertion hole 4 through which the anchor bolt 1a protruding through the floor 2 and the cross member 30b and protruding from the foundation 1 is inserted. Since the anchor bolt 1a and the bolt insertion hole 4 can be bonded by the adhesive 5 to integrate the floor 2 and the cross member 30b, the cross member 30b is firmly fixed on the floor 2. be able to. Accordingly, the wall 3 including the cross member 30b can be firmly fixed on the floor 2 and, consequently, the foundation 1, so that the wall 3 in the event of an earthquake or a typhoon, for example. It is possible to reliably prevent the pulling out and lateral displacement of the building, and thus the entire building can be reinforced.

基礎上に敷設された床上に壁が立設された状態を示す断面図である。It is sectional drawing which shows the state by which the wall was erected on the floor laid on the foundation. ボルト挿通孔にバッカー材が嵌め込まれた状態を示す断面図である。It is sectional drawing which shows the state by which the backer material was engage | inserted by the bolt insertion hole. ボルト挿通孔に接着剤が充填された状態を示す断面図である。It is sectional drawing which shows the state with which the bolt insertion hole was filled with the adhesive agent. 壁を床に固定した状態を示す断面図である。It is sectional drawing which shows the state which fixed the wall to the floor.

符号の説明Explanation of symbols

1 基礎
1a アンカーボルト
2 床
3 壁
4 ボルト挿通孔
5 接着剤
30b 横材
S 隙間
1 Foundation 1a Anchor bolt 2 Floor 3 Wall 4 Bolt insertion hole 5 Adhesive 30b Cross member S Gap

Claims (4)

基礎上に敷設された床上に、縦材および横材を矩形枠状に組み立ててなる矩形枠と、この矩形枠の両面に取り付けられた面材とを備えた壁が立設されており、
前記床と、この床の上面に接する壁の横材には、これら床と横材とを貫通し、前記基礎から突出するアンカーボルトが挿通されたボルト挿通孔が形成されており、
前記ボルト挿通孔の孔底近傍にバッカー材が嵌め込まれ、前記ボルト挿通孔には、前記バッカー材の上から接着剤が充填されており、
前記バッカー材は円形に形成されており、前記アンカーボルトの外周面に当接する中央孔と前記ボルト挿通孔の孔壁に当接する外周部とを備えることを特徴とする建物の補強構造。
On the floor laid on the foundation, a wall having a rectangular frame formed by assembling vertical members and cross members into a rectangular frame shape, and a face member attached to both sides of the rectangular frame is erected,
The floor and the cross member of the wall in contact with the upper surface of the floor are formed with bolt insertion holes through which the anchor bolts that penetrate the floor and the cross member and protrude from the foundation are inserted ,
A backer material is fitted near the bottom of the bolt insertion hole, and the bolt insertion hole is filled with an adhesive from above the backer material ,
The backer material is formed in a circular shape, and includes a central hole that contacts the outer peripheral surface of the anchor bolt and an outer peripheral portion that contacts a hole wall of the bolt insertion hole .
請求項1に記載の建物の補強構造において、
前記ボルト挿通孔をアンカーボルトよりも大径に形成することによって、前記ボルト挿通孔の孔壁と、このボルト挿通孔に挿通されたアンカーボルトとの間に、前記接着剤を充填するための隙間が形成されていることを特徴とする建物の補強構造。
In the building reinforcement structure according to claim 1,
A gap for filling the adhesive between the hole wall of the bolt insertion hole and the anchor bolt inserted into the bolt insertion hole by forming the bolt insertion hole larger in diameter than the anchor bolt. Reinforcement structure of building characterized by being formed.
請求項1または2に記載の建物の補強構造において、
前記ボルト挿通孔は、前記床を貫通する第1挿通孔と前記横材を貫通する第2挿通孔とからなり、前記接着剤は、前記第1挿通孔と第2挿通孔にわたって充填されていることを特徴とする建物の補強構造。
In the reinforcement structure of the building of Claim 1 or 2,
The bolt insertion hole includes a first insertion hole penetrating the floor and a second insertion hole penetrating the cross member, and the adhesive is filled across the first insertion hole and the second insertion hole. Reinforcement structure of the building characterized by that.
請求項1〜のいずれか一項に記載の建物の補強構造において、
前記アンカーボルトの上端に、前記ボルト挿通孔の開口上面を覆うシール材を介してナットが螺合されていることを特徴とする建物の補強構造。
In the reinforcement structure of the building as described in any one of Claims 1-3 ,
A reinforcing structure for a building, wherein a nut is screwed to an upper end of the anchor bolt via a sealing material that covers an upper surface of the opening of the bolt insertion hole.
JP2006290188A 2006-10-25 2006-10-25 Building reinforcement structure Expired - Fee Related JP5038681B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006290188A JP5038681B2 (en) 2006-10-25 2006-10-25 Building reinforcement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006290188A JP5038681B2 (en) 2006-10-25 2006-10-25 Building reinforcement structure

Publications (2)

Publication Number Publication Date
JP2008106511A JP2008106511A (en) 2008-05-08
JP5038681B2 true JP5038681B2 (en) 2012-10-03

Family

ID=39440107

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006290188A Expired - Fee Related JP5038681B2 (en) 2006-10-25 2006-10-25 Building reinforcement structure

Country Status (1)

Country Link
JP (1) JP5038681B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6543010B1 (en) * 2019-04-01 2019-07-10 株式会社中東 Bonding structure of wooden members

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4456207B2 (en) * 1999-02-25 2010-04-28 積水化学工業株式会社 Bonding structure of wall panel and upper floor panel and unit building
JP2000303551A (en) * 1999-04-23 2000-10-31 Misawa Homes Co Ltd Panel jointing fitting and floor structure using it

Also Published As

Publication number Publication date
JP2008106511A (en) 2008-05-08

Similar Documents

Publication Publication Date Title
JP6550319B2 (en) Column with braces
JP2018096071A (en) Composite building
JP5142656B2 (en) Seismic reinforcement frame of cloth foundation opening
JP6965663B2 (en) Building foundation repair method and building foundation structure
JP2009174249A (en) Reinforcing structure and reinforcing method
JP5038681B2 (en) Building reinforcement structure
JP4902251B2 (en) Building reinforcement structure
JP5442365B2 (en) Reinforced beam joint hardware
JP4855795B2 (en) Seismic reinforcement structure for existing structures
JP4688012B2 (en) Middle and high-rise buildings using HFC pillars and beams
JP4672459B2 (en) Building reinforcement method
JP2013083063A (en) Method for reinforcing existing mullion wall of reinforcement concrete structure
JP5358203B2 (en) Building unit fixed structure and unit building
JP2011032862A (en) Method of constructing exterior wall using horizontal slit member and exterior wall structure
JP2010236180A (en) Earthquake-resistant structure
JP5356010B2 (en) Foundation reinforcement structure
JP2010242392A (en) Seismic strengthening structure
JP4904383B2 (en) Seismic reinforcement method and structure for existing buildings
JP2004218236A (en) Earthquake-resistant repair method for existing wooden building
JP3708712B2 (en) Slab panel construction method
JP5091580B2 (en) Balcony floor support structure
JP4634702B2 (en) Seismic reinforcement structure for buildings, seismic reinforcement method for buildings
JP3825771B2 (en) Wall structure
JP4098334B2 (en) Seismic reinforcement method and seismic reinforcement structure for buildings
JP2012017633A (en) Earthquake-resistant structure and reinforcement method for wooden column

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20080220

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090918

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120131

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120402

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120703

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120706

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150713

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5038681

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees