JP3225933U - Railing-mounted scaffolding and its scaffolding support - Google Patents
Railing-mounted scaffolding and its scaffolding support Download PDFInfo
- Publication number
- JP3225933U JP3225933U JP2020000394U JP2020000394U JP3225933U JP 3225933 U JP3225933 U JP 3225933U JP 2020000394 U JP2020000394 U JP 2020000394U JP 2020000394 U JP2020000394 U JP 2020000394U JP 3225933 U JP3225933 U JP 3225933U
- Authority
- JP
- Japan
- Prior art keywords
- wall
- balustrade
- plate member
- scaffold
- scaffolding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002184 metal Substances 0.000 claims abstract description 42
- 229910052751 metal Inorganic materials 0.000 claims abstract description 42
- 239000000725 suspension Substances 0.000 claims abstract description 22
- 238000003825 pressing Methods 0.000 claims description 9
- 238000010276 construction Methods 0.000 abstract description 6
- 238000010586 diagram Methods 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 18
- 239000010959 steel Substances 0.000 description 18
- 239000004567 concrete Substances 0.000 description 12
- 239000000463 material Substances 0.000 description 10
- 238000003466 welding Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 6
- 238000009434 installation Methods 0.000 description 5
- 229920001971 elastomer Polymers 0.000 description 4
- 239000005060 rubber Substances 0.000 description 4
- 230000002265 prevention Effects 0.000 description 3
- 230000001681 protective effect Effects 0.000 description 2
- 244000043261 Hevea brasiliensis Species 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Substances [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 229920003052 natural elastomer Polymers 0.000 description 1
- 229920001194 natural rubber Polymers 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 235000015067 sauces Nutrition 0.000 description 1
- 229920003051 synthetic elastomer Polymers 0.000 description 1
- 239000005061 synthetic rubber Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
【課題】自動車用高架道路の壁高欄に積上げる嵩上げ高欄の施工に適した高欄取付け式足場およびその足場保持金具を提供する。【解決手段】壁高欄20に取り付け且つ撤収可能な足場板40を搭載する足場保持金具1を、壁高欄20の内壁に押し当てる調整ボルト3を保持する背板5と、背板5に直角接合する頂板7と、頂板7に直角接合する吊板9と、吊板9に直角接合する足場支持板10と、足場支持板10に直角接合する側柱支持パイプ11で構成し、足場支持板10に搭載する足場板40とで高欄取付け式足場を架設して、嵩上げ高欄50を壁高欄20の頂部28に取り付けてから、嵩上げ高欄50の支柱と横柵体54と頂部28の成す隙間から足場保持金具1を撤去する。【選択図】図5PROBLEM TO BE SOLVED: To provide a balustrade-mounted scaffold suitable for construction of a raised balustrade which is piled up on a wall balustrade of an elevated road for automobiles, and a scaffold holding metal fitting. SOLUTION: A scaffold holding metal fitting 1 that mounts a scaffold plate 40 that can be attached to and removed from a wall balustrade 20 is joined at a right angle to a back plate 5 that holds an adjusting bolt 3 that is pressed against an inner wall of the wall balustrade 20. The scaffolding support plate 10 includes a top plate 7, a suspension plate 9 that is joined at a right angle to the top plate 7, a scaffolding support plate 10 that is joined at a right angle to the hanging plate 9, and a side pillar support pipe 11 that is joined at a right angle to the scaffolding support plate 10. A balustrade-mounting type scaffold is installed with the scaffolding board 40 to be mounted on, and the raised balustrade 50 is attached to the top 28 of the wall balustrade 20, and then the scaffold is formed from the gap between the pillars of the raised balustrade 50, the side fences 54 and the top 28. Remove the holding metal fitting 1. [Selection diagram] Fig. 5
Description
自動車用の高架道では、通行車両の転落防止を図るためにコンクリート等の側壁として壁高欄(鉄筋コンクリート壁式防護柵)を設けている。本考案は、この壁高欄設置箇所の修復・改良工事に必要な作業用足場として仮設する高欄取付け式足場として、特に、嵩上げ高欄取り付け作業に適する足場構造体に関する。 In elevated roads for automobiles, wall balustrades (reinforced concrete wall type protective fences) are provided as side walls of concrete to prevent falling of passing vehicles. The present invention relates to a scaffolding-type scaffold temporarily installed as a scaffolding for work required for the repair / improvement work of the wall balustrade installation site, and more particularly to a scaffolding structure suitable for a raised balustrade installation work.
従来、橋梁や高架道路に在る路肩壁部の工事には、地上面からの組み足場工法以外に、吊り足場工法が知られている。この吊り足場工法は河川や跨線箇所で有用であり、高架橋下での交通の妨げにならない有効な工法になっている。この吊り足場工法には各種の技術例があり、鉄橋のように形鋼の主桁や梁がある構築物ではチェーンの鋼材への取り付けが容易であり、鉄橋の一部にクランプした吊りチェーンと作業床および繋合わせ用パイプを用いて空中で組み立て作業を行なう。しかし、鉄骨の露出が少ないコンクリートスラブの高架道路ではこの工法が取りにくい。そのため、コンクリート構造の高架道路では、床版の路肩にある地覆あるいは壁高欄を利用した手段が採用されている。 Conventionally, for construction of a shoulder wall portion on a bridge or an elevated road, a suspension scaffolding method has been known in addition to a method for constructing scaffolding from the ground surface. This suspension scaffolding method is useful in rivers and overpasses, and is an effective construction method that does not interfere with traffic under the viaduct. There are various technical examples of this suspension scaffolding method, and it is easy to attach the chain to the steel material in the structure with the main girders and beams of shaped steel such as the iron bridge. Perform assembly work in the air using the floor and connecting pipes. However, this method is difficult to take on elevated roads with concrete slabs where the steel frame is barely exposed. Therefore, in the elevated road of concrete structure, the means using the ground cover or the wall balustrade on the shoulder of the floor slab is adopted.
例えば、特許文献1では橋梁の擁壁に触れないようにコの字状に垂下脚12を橋梁路盤の両サイドに懸下すると共に、橋梁の下側で両サイドの垂下脚12と吊り足場20とを接続する構造にすることで吊り足場を安定にする。この構造は橋の長手方向で安定足場の移動を可能にするが、橋梁の両サイドに設置する大がかりな構造になっており、橋の片側サイドのみでも安定した足場を構成できる簡易な構造も望まれている。その例として、特許文献2の手段では、ローラ25を外側に設けたコの字状の係止金具20を壁高欄の上面に被せておき、このローラを介して足場用フレーム34を吊下げてから、上向きの下部フレーム35を道路スラブ103の裏面(床版の下部に当たる床版裏)に押し当てるように組み立てる構造である。また、別の例として特許文献3は、路肩の地覆の上面に触らないようにコの字状の金具フレーム1を道路スラブの上側から、そして、足場板6を搭載したコの字状の吊り材13を道路スラブの下側から、この道路スラブの上側と下側を挟むようにボルトナットで絞め付けて組み立てる。この特許文献2、3の例では、コンクリートスラブの片側路肩のみで吊下げ足場を架設できるが、その吊下げ構造の複雑さから撤収作業に難しさを伴っている。 For example, in Patent Document 1, the hanging legs 12 are hung in a U shape on both sides of the bridge roadbed so as not to touch the retaining wall of the bridge, and the hanging legs 12 and the hanging scaffolding 20 on both sides of the bridge are provided under the bridge. Stabilize the suspension scaffold by making the structure to connect with. Although this structure enables stable movement of the scaffold in the longitudinal direction of the bridge, it is a large-scale structure that is installed on both sides of the bridge, and a simple structure that can form a stable scaffold on only one side of the bridge is also desired. It is rare. As an example thereof, in the means of Patent Document 2, the U-shaped locking metal fitting 20 provided with the roller 25 on the outside is covered on the upper surface of the wall balustrade, and the scaffolding frame 34 is hung through the roller. In this structure, the upward lower frame 35 is pressed against the back surface of the road slab 103 (the back of the floor slab, which is the lower portion of the floor slab). Further, as another example, in Patent Document 3, a U-shaped metal fitting frame 1 is provided from above the road slab so as not to touch the upper surface of the ground covering of the road shoulder, and a U-shaped metal frame 1 having a scaffolding plate 6 mounted thereon. The hanging material 13 is assembled from the lower side of the road slab by tightening it with bolts and nuts so as to sandwich the upper side and the lower side of the road slab. In the examples of Patent Documents 2 and 3, the suspension scaffold can be erected only by the shoulder on one side of the concrete slab, but due to the complexity of the suspension structure, removal work is difficult.
ところで、コンクリート製壁高欄の水平耐力や車両運転者の視線誘導の改善、あるいは、法令改正等に伴う防護柵高さの変更手段として、既存のコンクリート壁高欄の頂部に嵩上げ高欄を取り付けることがある。このような嵩上げ高欄の取り付けでは、簡易構造の足場を架設してこの高欄を取り付け後、足場撤去の容易な構造が望ましい。 By the way, a raised balustrade may be attached to the top of the existing concrete wall balustrade as a means to improve the horizontal bearing capacity of the concrete balustrade and the guidance of the driver of the vehicle, or as a means to change the height of the protective fence due to legal revisions. . In mounting such a raised balustrade, it is desirable that a scaffold having a simple structure is erected and the scaffold can be easily removed after the balustrade is mounted.
前述の従来の高欄足場架設具は、コンクリートスラブの上面と下面を接圧させる構造であり、接続および取付け金具等の締付け作業が要求される。このため、従来手段は複雑な取付けおよび撤去作業になり、結果、高コストで安全性の確保も容易でない。そこで、より望ましい高欄足場の架設用器具は一人の作業者が扱える軽量・小型で安全に組み付け可能な、新規な足場保持金具を用いた高欄取付け式足場を提供する必要がある。 The above-mentioned conventional balustrade scaffolding erection structure has a structure in which the upper surface and the lower surface of the concrete slab are brought into contact with each other, and it is required to perform a connection work and a tightening work for a mounting bracket or the like. For this reason, the conventional means requires complicated installation and removal work, resulting in high cost and difficulty in ensuring safety. Therefore, it is necessary to provide a balustrade-mounted scaffold that uses a new scaffold-holding metal fitting, which is more lightweight, compact, and can be safely assembled by a single operator as a more desirable device for constructing a balustrade scaffold.
第1の請求項に係る本考案は、車輛あるいは歩行者の通行する道路の側面を形成する壁高欄(20)に取り付け且つ撤収可能な高欄取付け式足場(1)において、
前記車輛あるいは歩行者の通行側に面した前記壁高欄(20)の内壁(26)に対して、この内壁(26)に押し当てるための調整ボルト(3)を保持し且つ下方向に延びる背板部材(5)と、
前記背板部材(5)に対して直角に接合し且つ前記壁高欄(20)の頂部(28)を圧接する頂板部材(7)と、
前記頂板部材(7)に対して直角に接合し且つ前記壁高欄(20)の外壁(34)に対して、この外壁(34)を押圧し且つ下方向に延びる吊板部材(9)と、
この吊板部材(9)に対して直角に接合し且つその接合が前記吊板部材(9)の長さの途中位置にある足場支持部材(10)と、
前記足場支持部材(10)の先端部に位置し且つ前記足場支持部材(10)と直角に接合する側柱支持パイプ(11)と、
を備え、
前記背板部材(5)と前記頂板部材(7)と前記吊板部材(9)と前記足場支持部材(10)と前記側柱支持パイプ(11)とを前記壁高欄(20)に固定して取り付けることを特徴とする高欄取付け式足場である。
The present invention according to the first claim is a balustrade-mounted scaffold (1) which can be attached to and removed from a wall balustrade (20) forming a side surface of a road on which a vehicle or a pedestrian passes.
A back that extends downwards while holding an adjusting bolt (3) for pressing against the inner wall (26) of the wall balustrade (20) facing the vehicle or pedestrian passage side. A plate member (5),
A top plate member (7) which is joined to the back plate member (5) at a right angle and press-contacts the top part (28) of the wall balustrade (20);
A suspension plate member (9) that is joined at a right angle to the top plate member (7) and presses the outer wall (34) against the outer wall (34) of the wall balustrade (20) and extends downward.
A scaffolding support member (10) which is joined at a right angle to the hanging plate member (9) and the joining is at an intermediate position in the length of the hanging plate member (9);
A side pillar support pipe (11) located at the tip of the scaffold support member (10) and joined at a right angle to the scaffold support member (10);
Equipped with
The back plate member (5), the top plate member (7), the suspension plate member (9), the scaffold support member (10), and the side column support pipe (11) are fixed to the wall balustrade (20). It is a balustrade-mounted scaffold, which is characterized by being attached.
第2の請求項に係る本考案は、車輛あるいは歩行者の通行する道路の側面を形成する壁高欄(20)に取り付け且つ撤収可能な高欄取付け式足場板(40)を搭載するために、前記壁高欄(20)に着脱可能な足場保持金具(1)において、
前記車輛あるいは歩行者の通行側に面した前記壁高欄(20)の内壁(26)に対して、この内壁(26)に押し当てるための調整ボルト(3)を保持し且つ下方向に延びる背板部材(5)と、
前記背板部材(5)に対して直角に接合し且つ前記壁高欄(20)の頂部(28)を圧接するための頂板部材(7)と、
前記頂板部材(7)に対して直角に接合し且つ前記壁高欄(20)の外壁(34)に対して、この外壁(34)に押し当てるための且つ下方向に延びる吊板部材(9)と、
この吊板部材(9)に対して直角に接合し且つその接合が前記吊板部材(9)の長さの途中位置にある足場支持部材(10)と、
前記足場支持部材(10)の先端部に位置し且つ前記足場支持部材(10)と直角に接合する側柱支持パイプ(11)と、
を備えたことを特徴とする足場保持金具(1)である。
The present invention according to the second claim is for mounting a balustrade-mounted scaffolding plate (40) that can be attached to and removed from a wall balustrade (20) forming a side surface of a road on which a vehicle or a pedestrian passes, In the scaffolding holding metal fitting (1) which is detachable from the wall balustrade (20),
A back that extends downwards while holding an adjusting bolt (3) for pressing against the inner wall (26) of the wall balustrade (20) facing the vehicle or pedestrian passage side. A plate member (5),
A top plate member (7) for joining at a right angle to the back plate member (5) and for pressing the top part (28) of the wall balustrade (20).
A hanging plate member (9) which is joined at a right angle to the top plate member (7) and is pressed against the outer wall (34) of the wall balustrade (20) against the outer wall (34). When,
A scaffolding support member (10) which is joined at a right angle to the hanging plate member (9) and the joining is at an intermediate position in the length of the hanging plate member (9);
A side pillar support pipe (11) located at the tip of the scaffold support member (10) and joined at a right angle to the scaffold support member (10);
The scaffolding holding metal fitting (1) is characterized by comprising:
第3の請求項に係る本考案は、車輛あるいは歩行者の通行する道路の側面を形成する壁高欄(20)の頂部(28)に積み上げて固定した嵩上げ高欄(50)は、前記頂部(28)の上面に固定した少なくとも2つの支柱(56)で支持される横柵体(54)が前記頂部(28)と並行に構成してあり、そして、前記横柵体(54)と前記2つの支柱(56)との成す空間(60)があって、
さらに、
前記車輛あるいは歩行者の通行側に面した前記壁高欄(20)の内壁(26)に対して、この内壁(26)に押し当てるための調整ボルト(3)を保持し且つ下方向に延びる背板部材(5)と、
前記背板部材(5)に対して直角に接合し且つ前記壁高欄(20)の頂部(28)を圧接する頂板部材(7)と、
前記頂板部材(7)に対して直角に接合し且つ前記壁高欄(20)の外壁(34)に対して、この外壁(34)を押圧し且つ下方向に延びる吊板部材(9)と、
この吊板部材(9)に対して直角に接合し且つその接合が前記吊板部材(9)の長さの途中位置にある足場支持部材(10)と、
前記足場支持部材(10)の先端部に位置し且つ前記足場支持部材(10)と直角に接合する側柱支持パイプ(11)と、
を備えた高欄取付け式足場用の足場保持金具(1)において、
前記足場保持金具(1)が、前記調整ボルト(3)の前記内壁(26)への押し当てを解除して前記空間(60)を通過した後においても、前記背板部材(5)と前記頂板部材(7)と前記吊板部材(9)と前記足場支持部材(10)と前記側柱支持パイプ(11)とを互いに接合した状態で維持されていることを特徴とする高欄取付け式足場用の足場保持金具(1)である。
In the invention according to the third claim, a raised rail (50) fixed on the top (28) of a wall rail (20) forming a side surface of a road on which a vehicle or a pedestrian passes is fixed to the top (28). ), Which is supported by at least two struts (56) fixed to the upper surface of the (), is configured in parallel with the top portion (28), and the horizontal fence body (54) and the two There is a space (60) made up of the columns (56),
further,
A back that extends downwards while holding an adjusting bolt (3) for pressing against the inner wall (26) of the wall balustrade (20) facing the vehicle or pedestrian passage side. A plate member (5),
A top plate member (7) which is joined to the back plate member (5) at a right angle and press-contacts the top part (28) of the wall balustrade (20);
A suspension plate member (9) that is joined at a right angle to the top plate member (7) and presses the outer wall (34) against the outer wall (34) of the wall balustrade (20) and extends downward.
A scaffolding support member (10) which is joined at a right angle to the hanging plate member (9) and the joining is at an intermediate position in the length of the hanging plate member (9);
A side pillar support pipe (11) located at the tip of the scaffold support member (10) and joined at a right angle to the scaffold support member (10);
In a scaffolding retainer (1) for a balustrade-mounted scaffold equipped with
Even after the scaffold holding metal fitting (1) releases the pressing of the adjusting bolt (3) against the inner wall (26) and passes through the space (60), the back plate member (5) and the A balustrade-mounted scaffold, characterized in that the top plate member (7), the suspension plate member (9), the scaffold support member (10), and the side column support pipe (11) are maintained in a state of being joined to each other. It is a scaffolding holding metal fitting (1) for.
第1の請求項に係る本考案は、道路の側面を形成する壁高欄に取り付けが容易であり、且つ作業者が一人であっても安全な足場を壁高欄の外壁に架設可能であり、そして、壁高欄の上側に嵩上げ高欄を設置後、一人の作業者でこの足場を撤収できる高欄取付け式足場を提供できる。 INDUSTRIAL APPLICABILITY The present invention according to the first claim is easy to install on a wall balustrade forming a side surface of a road, and a safe scaffold can be erected on an outer wall of the wall balustrade even if only one worker is present, and After installing the raised balustrade on the upper side of the wall balustrade, it is possible to provide the balustrade-mounted scaffolding in which one operator can withdraw this scaffold.
第2の請求項に係る本考案は、第1の請求項に係る本考案の足場を構成するための簡易構造であり且つ一人の作業者でも持ち運びが可能な軽量の足場保持金具を提供できる。 The present invention according to the second aspect can provide a lightweight scaffold holding metal fitting that has a simple structure for constructing the scaffold according to the first aspect and can be carried by one worker.
第3の請求項に係る本考案は、壁高欄に取り付ける嵩上げ高欄とその架設工事で用いる足場保持金具および作業者用足場を提供後に、この嵩上げ高欄から撤去可能な作業者用足場および足場保持金具を提供できる。 The present invention according to claim 3 provides a raised scaffold for mounting on a wall balustrade, a scaffold holding metal fitting used for the construction work thereof, and a scaffold for a worker, and then can be removed from the raised silt and a scaffold holding metal fitting for a worker. Can be provided.
以下、本考案の実施の形態を図に基づいて説明する。 Embodiments of the present invention will be described below with reference to the drawings.
図1は、本考案の足場保持金具1の全体を示す斜視図である。この足場保持金具1は鋼板を図示のように組み合わせて互いを接合している。それぞれの鋼板は約400mm〜600mm長さの等辺山形鋼板(Lアングル鋼)を用いる。この鋼板は材質SS400(一般構造用圧延鋼材)であり、JIS(日本産業規格)G3192で規定されたアングル鋼L6×50×50(厚さ6mm、等辺長さ50mm)である。図1の右側から順番に、調整ボルト3を取り付けるための背板5(長さ390mm)、後述する壁高欄に乗せるための頂板7(長さ400mm)、足場を吊るための吊板9(長さ550mm)、足場を搭載するための足場支持板10(長さ590mm)、そして、同図の左側に単管パイプを取り付けるための側柱支持パイプ11(長さ150mm、直径65mm)等の鋼材を設けてあり、それらは互いに直交する方向で接合している。この接合のために繋ぎ部分には、材質SS400で板厚6mmの背板用溶接板12、吊板用溶接板13、足場補強板15を用いて各鋼材を互いに90度角で溶接している。そこで、背板5と吊板9と側柱支持パイプ11は共に概ね鉛直方向に伸延し、頂板7と足場支持板10が概ね水平方向に伸延する接合構造である。 FIG. 1 is a perspective view showing the entire scaffold holding metal fitting 1 of the present invention. The scaffold holding metal fittings 1 are made by combining steel plates as shown in the figure and joining them to each other. As each steel plate, an equilateral angle steel plate (L angle steel) having a length of about 400 mm to 600 mm is used. This steel plate is made of SS400 (rolled steel for general structure) and is angle steel L6 × 50 × 50 (thickness 6 mm, equilateral length 50 mm) defined by JIS (Japanese Industrial Standard) G3192. In order from the right side of FIG. 1, a back plate 5 (length 390 mm) for attaching the adjustment bolt 3, a top plate 7 (length 400 mm) for putting on a wall balustrade described later, and a hanging plate 9 (long length) for hanging the scaffolding. Steel material such as a scaffolding support plate 10 (length 590 mm) for mounting a scaffold, and a side pillar support pipe 11 (length 150 mm, diameter 65 mm) for attaching a single pipe to the left side of FIG. Are provided, and they are joined in directions orthogonal to each other. For this joining, each steel material is welded at a 90-degree angle to each other using a back plate welding plate 12, a suspension plate welding plate 13, and a scaffolding reinforcing plate 15 having a material thickness of SS400 and a plate thickness of 6 mm for the joining portion. . Therefore, the back plate 5, the suspension plate 9 and the side pillar support pipe 11 are all extended substantially vertically, and the top plate 7 and the scaffold support plate 10 are extended substantially horizontally.
調整ボルト3は先端を受皿4にした呼び径M12で長さ100mmであり、背板5に対して概ね直交にしてナット(図省略)で固定する。また、側柱支持パイプ11は後述する側柱パイプを挿入固定するための側柱固定用ネジ部17を設ける。さらに、頂板7と吊板9とはそれぞれに弾力のあるゴム18、19(幅50mm、厚さ5mm)を貼り付け、滑り止めとして用いているので、このゴム18、19は天然ゴムあるいは合成ゴムのいずれでもよい。そこで、調整ボルト3、頂板7およびゴム18、および足場支持板10は天地方向から見ると直線状に並んでいることになる。以上の構成により、足場保持金具1は、鋼材の幅50mm、縦方向長さ約600mm、水平方向長さ約1m、重さ約100N(約10Kg)である。そこで、このサイズおよび重量から、この足場保持金具1は作業者1人で手持ち移動が可能である。 The adjusting bolt 3 has a nominal diameter M12 with the tip of the receiving tray 4 and a length of 100 mm, and is substantially orthogonal to the back plate 5 and is fixed with a nut (not shown). Further, the side pillar support pipe 11 is provided with a side pillar fixing screw portion 17 for inserting and fixing a side pillar pipe which will be described later. Further, since elastic rubbers 18 and 19 (width 50 mm, thickness 5 mm) are attached to the top plate 7 and the suspension plate 9 respectively, and used as slip stoppers, the rubbers 18 and 19 are natural rubber or synthetic rubber. Any of Therefore, the adjustment bolt 3, the top plate 7, the rubber 18, and the scaffold support plate 10 are arranged in a straight line when viewed from the top and bottom. With the above configuration, the scaffolding holding metal fitting 1 is made of steel having a width of 50 mm, a longitudinal length of about 600 mm, a horizontal length of about 1 m, and a weight of about 100 N (about 10 Kg). Therefore, because of this size and weight, this scaffolding holding metal fitting 1 can be carried by one operator by hand.
図1で示す足場保持金具1は図2に示すコンクリート防護柵に取り付ける。このコンクリート防護柵はいわゆる壁高欄20であり、この壁高欄20は基本形状の異なる数種類が存在するが概ね図2に示す形状である。この壁高欄20は、床版22から天端になる頂部28までの高さ、すなわち,壁高欄20の内壁26の高さ(H1)は凡そ900mmである。そして、頂部28の幅(W)は250mm、壁高欄20の低部29の幅(W0)は、例えばフロリダ型壁高欄で340mmである。また、コンクリートスラブ30の外側のコンクリートウェブ32に繋がる外壁34の高さ(H2)は、900mm以上になる。 The scaffold holding metal fitting 1 shown in FIG. 1 is attached to the concrete guard fence shown in FIG. This concrete guard fence is a so-called wall balustrade 20, and there are several types of wall balustrades having different basic shapes, but the shape is generally shown in FIG. The height of the wall balustrade 20 from the floor slab 22 to the top 28 at the top, that is, the height (H1) of the inner wall 26 of the wall balustrade 20 is about 900 mm. The width (W) of the top portion 28 is 250 mm, and the width (W0) of the lower portion 29 of the wall balustrade 20 is 340 mm in the Florida type wall balustrade. Further, the height (H2) of the outer wall 34 connected to the concrete web 32 on the outer side of the concrete slab 30 is 900 mm or more.
図3は図1に示した足場保持金具1を図2に示した壁高欄20に取り付けた状態を示している。この取り付けた足場保持金具1は、壁高欄20の頂部28に頂板7を搭載して、内壁26の側面に調整ボルト3の受皿4を押し当て圧接(図省略)している。図3では2つの足場保持金具1が描いてあるが、この間の長さは後述する足場板の長さ(2m)より少し短い距離(L=1.8m)で取り付ける。この図3では2つの足場保持金具1を並べた例を示したが、実際には後述の嵩上げ高欄取り付け作業区間(数百メートル)に亘り設置することが可能である。 FIG. 3 shows a state in which the scaffold holding metal fitting 1 shown in FIG. 1 is attached to the wall balustrade 20 shown in FIG. In the attached scaffold holding metal fitting 1, the top plate 7 is mounted on the top 28 of the wall balustrade 20, and the pan 4 of the adjusting bolt 3 is pressed against the side surface of the inner wall 26 for pressure welding (not shown). Although two scaffold holding metal fittings 1 are drawn in FIG. 3, the length between them is attached at a distance (L = 1.8 m) which is a little shorter than the length (2 m) of the scaffold plate described later. Although FIG. 3 shows an example in which two scaffolding holding fittings 1 are arranged side by side, it is possible to actually install the scaffold holding fittings 1 over a later-described raised rail mounting work section (several hundred meters).
図4は図3で示す足場保持金具1に作業者(図省略)が乗る足場板40を2つ並べて設置し、側柱支持パイプ11に単管パイプ製側柱パイプ42を差し込み側柱固定用ネジ部17で固定してある。さらに、2つの側柱パイプ42の間には、落下防止用の単管パイプ44を壁高欄20と凡そ平行に固定する。この固定は直行クランプ(図省略)で行うことができる。そしてさらに、単管パイプ44の取り付け後は、足場板40から落下物が下方の地上に落ちないように落下防止用メッシュシート46を単管パイプ44に固定する。これらの取り付け作業では、作業者が足場板40に乗ってパイプ42、44やシート46の取り付けを行うが、足場板40の足場保持金具1への搭載は、内壁26の車道側にいる作業者が手を伸ばせる範囲(H3=約300mm)に足場支持板10があるので、手作業で足場支持板10に設置可能である。 In FIG. 4, two scaffold plates 40 on which an operator (not shown) rides are installed side by side on the scaffold holding metal fitting 1 shown in FIG. 3, and a side pipe pipe 42 made of a single pipe is inserted into the side column support pipe 11 for fixing the side columns. It is fixed with a screw portion 17. Further, a single pipe pipe 44 for preventing fall is fixed between the two side pillar pipes 42 in parallel with the wall balustrade 20. This fixing can be performed by an orthogonal clamp (not shown). Further, after the single pipe pipe 44 is attached, the fall prevention mesh sheet 46 is fixed to the single pipe pipe 44 so that the falling objects do not drop from the scaffolding plate 40 to the ground below. In these mounting operations, the worker mounts the pipes 42, 44 and the seat 46 on the scaffolding plate 40, but the scaffolding plate 40 is mounted on the scaffolding holding fitting 1 by the worker who is on the road side of the inner wall 26. Since the scaffolding support plate 10 is within the reachable range (H3 = about 300 mm), the scaffolding support plate 10 can be manually installed.
図5は、壁高欄20に固定した足場保持金具1と、作業者が取り付け作業を行う嵩上げ高欄50との位置関係を示している。調整ボルト3を設ける背板5の長さA(360mm)、頂板7と吊板9の等辺幅B=50mm、嵩上げ高欄50に設けた上横柵体52の高さC(約300mm)、嵩上げ高欄50に設けた下横柵体54の高さD(約110mm)、足場板40までの高さE=約300mm、作業者の体重や足場保持金具1等の重量を支える外壁34の荷重支持長さF(235mm)、最先端モーメントとして作用する側柱パイプまでの距離G(約590mm)で構成してある。これらの構造寸法は、作業者の体重およびその他の構造物が吊板9に作用しても十分耐え得る強度を確保できる形状になっている。そして、作業者には、安全に且つ嵩上げ高欄の取り付け作業に適した作業可能な幅(2枚の足場板搭載幅:約500mm)と、作業上の安全を図る高さ(N:1m)と、作業が楽になる嵩上げ高欄の上端高さ(約600mm)が確保される。 FIG. 5 shows the positional relationship between the scaffolding holding metal fitting 1 fixed to the wall balustrade 20 and the raised balustrade 50 on which the worker performs the mounting work. The length A (360 mm) of the back plate 5 provided with the adjusting bolt 3, the equilateral width B of the top plate 7 and the hanging plate B = 50 mm, the height C (about 300 mm) of the upper horizontal fence body 52 provided in the raised height column 50, and the raised height The height D (about 110 mm) of the lower horizontal fence 54 provided on the balustrade 50, the height E to the scaffolding plate 40 = about 300 mm, the load support of the outer wall 34 that supports the weight of the worker and the weight of the scaffold holding metal fitting 1, etc. It is configured with a length F (235 mm) and a distance G (about 590 mm) to the side column pipe that acts as the most advanced moment. These structural dimensions are such that the weight of the operator and other structures can sufficiently withstand the suspension plate 9 even if it acts. For the worker, a workable width (two scaffolding board mounting width: about 500 mm) that is safe and suitable for mounting the raised balustrade, and a height (N: 1 m) for ensuring work safety , The upper end height (about 600 mm) of the raised balustrade that secures the work is secured.
図6は嵩上げ高欄50の壁高欄20への取り付け作業後に、側柱パイプ42や足場板40を撤去した途中工程を示している。この図ではすでに足場板40を撤去しているが、取り付け時に作業者が手作業で行ったと同じく、内壁26の車道側にいる作業者が手を伸ばしてこの撤収作業を行っている。側柱パイプ42や足場板40を撤去した足場保持金具1は、嵩上げ高欄50に妨害されて取り付け時と同じようには移動ができないが、嵩上げ高欄50の下横柵体54と2つの支柱56と壁高欄20の頂部28との成す空間60の隙間を通過させて撤去可能である。 FIG. 6 shows an intermediate step of removing the side pillar pipes 42 and the scaffolding plate 40 after the work of attaching the raised railing 50 to the wall railing 20. Although the scaffolding plate 40 has already been removed in this figure, the worker on the roadway side of the inner wall 26 reaches out to perform this withdrawal work, just as the worker did it manually at the time of installation. The scaffold holding metal fitting 1 from which the side pillar pipe 42 and the scaffold plate 40 have been removed cannot be moved in the same manner as when it is attached due to the obstruction by the raised rail 50, but the lower horizontal fence 54 and the two posts 56 of the raised rail 50. It can be removed by passing through a gap of a space 60 formed by the top 28 of the wall balustrade 20.
この撤去は足場保持金具1が嵩上げ高欄50の成す隙間60のサイズよりも小さい場合に可能である。この撤去の手順は、はじめに、頂板7の軸芯を中心に足場保持金具1を90度回転させる。この回転は嵩上げ高欄50の下横柵体54と壁高欄20の頂部28との間が頂板7の板幅50mmよりも広いので可能になる。次に、作業者は回転後ただちに足場保持金具1を内壁26側に移動させる。そこで、足場保持金具1の重心部分(凡そ、吊板9と足場支持板10との接合箇所付近)は、壁高欄20の頂部28に載ることになるので作業者に掛かる負担が軽い。さらに、作業者は足場支持板10部分を空間60の隙間から内壁26側に引き抜くので、足場保持金具1の回収作業は容易にできる。この引き抜きは足場保持金具1の吊板9の長さが、嵩上げ高欄50の支柱56の間(L2)よりも短い場合に可能になる。図6に示す実施例では支柱56の間隔距離が約2mであり、吊板9の長さK(約535mm)より十分に長いのでこの引き抜きが可能である。 This removal is possible when the scaffolding holding fixture 1 is smaller than the size of the gap 60 formed by the raised rail 50. In the removal procedure, first, the scaffold holding fixture 1 is rotated 90 degrees about the axis of the top plate 7. This rotation is possible because the space between the lower horizontal fence 54 of the raised rail 50 and the top 28 of the wall rail 20 is wider than the plate width 50 mm of the top plate 7. Next, the worker immediately moves the scaffold holding fixture 1 to the inner wall 26 side after the rotation. Therefore, the center of gravity of the scaffold holding metal fitting 1 (approximately in the vicinity of the joint between the suspension plate 9 and the scaffold support plate 10) is placed on the top 28 of the wall balustrade 20, so that the burden on the operator is light. Furthermore, since the worker pulls out the scaffolding support plate 10 portion from the gap of the space 60 toward the inner wall 26 side, the scaffold holding metal fitting 1 can be easily recovered. This withdrawal becomes possible when the length of the suspension plate 9 of the scaffolding holding metal fitting 1 is shorter than the space (L2) between the columns 56 of the raised rail 50. In the embodiment shown in FIG. 6, the distance between the pillars 56 is about 2 m, which is sufficiently longer than the length K (about 535 mm) of the suspension plate 9, so that this withdrawal is possible.
図7は足場保持金具1の撤去が完了した嵩上げ高欄50の完成状態を示すが、本考案の足場保持金具1を適用するためには、嵩上げ高欄50の下横柵体54と2つの支柱56と壁高欄20の頂部28との成す空間60が足場保持金具1のサイズよりも大きいことが必要になる。そして、この足場保持金具1の安定した使用箇所は、国土交通省が定める道路構造令に従った壁高欄の外壁を有する構造道路に適しており、例えば、外壁高さの少ない地覆のみの構造体に適用するものではない。 FIG. 7 shows a completed state of the raised height column 50 after the removal of the scaffold holding metal fitting 1 is completed. To apply the scaffold holding metal fitting 1 of the present invention, the lower horizontal fence body 54 and two columns 56 of the raised height rail 50 are applied. It is necessary that the space 60 formed by the above and the top 28 of the wall balustrade 20 is larger than the size of the scaffold holding metal fitting 1. The stable use location of the scaffolding holding metal fitting 1 is suitable for a structural road having an outer wall of a balustrade according to the Road Construction Ordinance of the Ministry of Land, Infrastructure, Transport and Tourism, for example, a structure with only an undercover with a small outer wall height. It does not apply to the body.
本考案の足場保持金具は等辺山形鋼板の片面を溶接した構造であるが、この等辺山形鋼板にこだわるものではない。例えば、リップ溝やコの字断面の軽量溝形鋼で厚さ2〜3mmを用いた場合には両面溶接の構造が可能になり、且つ一人の作業者でも持ち運びが可能な軽量の足場保持金具を提供できる。また、本考案で用いた鋼板材質はJISG3101で規定するSS400を用いたが、この材質にこだわるものではない。例えば、より溶接性のよい溶接構造用圧延鋼材(JISG3106:SM材)を利用して溶接信頼性を向上させた足場保持金具でも提供可能である。 The scaffold holding metal fitting of the present invention has a structure in which one side of an equilateral angle-shaped steel plate is welded, but the invention is not limited to this equilateral angle-shaped steel plate. For example, when a thickness of 2 to 3 mm is used for a lip groove or a light-weight channel steel having a U-shaped cross section, a double-sided welded structure is possible, and a lightweight scaffold holding metal fitting that can be carried by a single worker. Can be provided. Further, although the steel plate material used in the present invention is SS400 defined by JISG3101, the material is not limited to this material. For example, it is possible to provide a scaffold holding metal fitting having improved welding reliability by using a rolled steel material for welding structure (JIS G3106: SM material) having better weldability.
本考案は、自動車用の高架橋、高架道、高速道路や自動車専用道に設けた壁高欄の嵩上げ高欄を取り付ける工事で利用される。 INDUSTRIAL APPLICABILITY The present invention is used in the construction of mounting elevated railings for wall railings installed on viaducts, elevated roads, highways, and motorways for automobiles.
1 足場保持金具
3 調整ボルト
4 受皿
5 背板
7 頂板
9 吊板
10 足場支持板
11 側柱支持パイプ
12 背板用溶接板
13 吊板用溶接板
15 足場補強板
17 側柱固定用ネジ部
18、19 ゴム
20 壁高欄
22 床版
26 内壁
28 頂部
30 コンクリートスラブ
34 外壁
40 足場板
42 単管パイプ製側柱パイプ
44 落下防止用の単管パイプ
46 落下防止用メッシュシート
50 嵩上げ高欄
52 嵩上げ高欄の上横柵体
54 嵩上げ高欄の下横柵体
56 嵩上げ高欄の支柱
60 嵩上げ高欄の隙間の空間
1 Scaffolding retaining bracket 3 Adjustment bolt 4 Sauce 5 Back plate 7 Top plate 9 Hanging plate 10 Scaffolding support plate 11 Side pillar support pipe 12 Welding plate for back plate 13 Welding plate for hanging plate 15 Scaffolding reinforcement plate 17 Side pillar fixing screw part 18 , 19 Rubber 20 Wall balustrade 22 Floor slab 26 Inner wall 28 Top 30 Concrete slab 34 Outer wall 40 Scaffolding plate 42 Single pipe pipe side pillar pipe 44 Single pipe pipe 46 for fall prevention Mesh sheet 50 for fall prevention High rise column 52 Upper horizontal fence 54 Lower raised rail 56 Lower horizontal rail 60 Pillar 60 Raised space Space between raised rails
Claims (3)
前記車輛あるいは歩行者の通行側に面した前記壁高欄の内壁に対して、この内壁に押し当てるための調整ボルトを保持し且つ下方向に延びる背板部材と、
前記背板部材に対して直角に接合し且つ前記壁高欄の頂部を圧接する頂板部材と、
前記頂板部材に対して直角に接合し且つ前記壁高欄の外壁に対して、この外壁を押圧し且つ下方向に延びる吊板部材と、
この吊板部材に対して直角に接合し且つその接合が前記吊板部材の長さの途中位置にある足場支持部材と、
前記足場支持部材の先端部に位置し且つ前記足場支持部材と直角に接合する側柱支持パイプと、
を備え、
前記背板部材と前記頂板部材と前記吊板部材と前記足場支持部材と前記側柱支持パイプとを前記壁高欄に固定して取り付けることを特徴とする高欄取付け式足場。
In a balustrade-mounted scaffold that can be attached to and removed from the wall balustrade that forms the side of the road where vehicles or pedestrians pass,
With respect to the inner wall of the wall balustrade facing the side of the vehicle or pedestrians, a back plate member holding an adjusting bolt for pressing against the inner wall and extending downward,
A top plate member that is joined at a right angle to the back plate member and press-contacts the top part of the wall balustrade,
A suspension plate member that is joined at a right angle to the top plate member and that presses the outer wall and extends downward with respect to the outer wall of the wall balustrade;
A scaffolding support member that is joined at a right angle to the hanging plate member and the joining is at an intermediate position in the length of the hanging plate member;
A side pillar support pipe located at the tip of the scaffold support member and joined at a right angle to the scaffold support member;
Equipped with
A balustrade-attached scaffolding characterized in that the back plate member, the top plate member, the suspension plate member, the scaffold support member, and the side pillar support pipe are fixedly attached to the wall balustrade.
前記車輛あるいは歩行者の通行側に面した前記壁高欄の内壁に対して、この内壁に押し当てるための調整ボルトを保持し且つ下方向に延びる背板部材と、
前記背板部材に対して直角に接合し且つ前記壁高欄の頂部を圧接するための頂板部材と、
前記頂板部材に対して直角に接合し且つ前記壁高欄の外壁に対して、この外壁に押し当てるための且つ下方向に延びる吊板部材と、
この吊板部材に対して直角に接合し且つその接合が前記吊板部材の長さの途中位置にある足場支持部材と、
前記足場支持部材の先端部に位置し且つ前記足場支持部材と直角に接合する側柱支持パイプと、
を備えたことを特徴とする足場保持金具。
In order to mount a balustrade-mounting type scaffolding board that can be attached to and removed from a wall balustrade forming a side surface of a road through which vehicles or pedestrians pass, in a scaffolding holding metal fitting detachable to the wall balustrade,
With respect to the inner wall of the wall balustrade facing the side of the vehicle or pedestrians, a back plate member holding an adjusting bolt for pressing against the inner wall and extending downward,
A top plate member for joining at a right angle to the back plate member and for press-contacting the top part of the wall balustrade,
A hanging plate member that is joined to the top plate member at a right angle and that is pressed against the outer wall of the wall balustrade and that extends downwardly,
A scaffolding support member that is joined at a right angle to the hanging plate member and the joining is at an intermediate position in the length of the hanging plate member;
A side pillar support pipe located at the tip of the scaffold support member and joined at a right angle to the scaffold support member;
Scaffolding holding metal fittings characterized by having.
さらに、
前記車輛あるいは歩行者の通行側に面した前記壁高欄の内壁に対して、この内壁に押し当てるための調整ボルトを保持し且つ下方向に延びる背板部材と、
前記背板部材に対して直角に接合し且つ前記壁高欄の頂部を圧接する頂板部材と、
前記頂板部材に対して直角に接合し且つ前記壁高欄の外壁に対して、この外壁を押圧し且つ下方向に延びる吊板部材と、
この吊板部材に対して直角に接合し且つその接合が前記吊板部材の長さの途中位置にある足場支持部材と、
前記足場支持部材の先端部に位置し且つ前記足場支持部材と直角に接合する側柱支持パイプと、
を備えた高欄取付け式足場用の足場保持金具において、
前記足場保持金具が、前記調整ボルトの前記内壁への押し当てを解除して前記空間を通過した後においても、前記背板部材と前記頂板部材と前記吊板部材と前記足場支持部材と前記側柱支持パイプとを互いに接合した状態で維持されていることを特徴とする高欄取付け式足場用の足場保持金具。 The raised balustrade, which is stacked and fixed on the top of the wall balustrade that forms the side of the road through which vehicles or pedestrians pass, is a horizontal rail supported by at least two columns fixed on the upper surface of the top in parallel with the top. And there is a space formed by the side fence and the two columns,
further,
With respect to the inner wall of the wall balustrade facing the side of the vehicle or pedestrians, a back plate member holding an adjusting bolt for pressing against the inner wall and extending downward,
A top plate member that is joined at a right angle to the back plate member and press-contacts the top part of the wall balustrade,
A suspension plate member that is joined at a right angle to the top plate member and that presses the outer wall and extends downward with respect to the outer wall of the wall balustrade;
A scaffolding support member that is joined at a right angle to the hanging plate member and the joining is at an intermediate position in the length of the hanging plate member;
A side pillar support pipe located at the tip of the scaffold support member and joined at a right angle to the scaffold support member;
In a scaffolding retainer for a balustrade-mounted scaffold with
Even after the scaffolding retainer releases the pressing of the adjusting bolt against the inner wall and passes through the space, the back plate member, the top plate member, the suspension plate member, the scaffold support member, and the side. A scaffolding retainer for a balustrade-mounted scaffold, characterized in that it is maintained in a state of being joined to the pillar support pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020000394U JP3225933U (en) | 2020-02-07 | 2020-02-07 | Railing-mounted scaffolding and its scaffolding support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020000394U JP3225933U (en) | 2020-02-07 | 2020-02-07 | Railing-mounted scaffolding and its scaffolding support |
Publications (1)
Publication Number | Publication Date |
---|---|
JP3225933U true JP3225933U (en) | 2020-04-16 |
Family
ID=70166246
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2020000394U Active JP3225933U (en) | 2020-02-07 | 2020-02-07 | Railing-mounted scaffolding and its scaffolding support |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3225933U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113430895A (en) * | 2021-06-16 | 2021-09-24 | 重庆水利电力职业技术学院 | Automatic cleaning device of road surface for road and bridge |
-
2020
- 2020-02-07 JP JP2020000394U patent/JP3225933U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113430895A (en) * | 2021-06-16 | 2021-09-24 | 重庆水利电力职业技术学院 | Automatic cleaning device of road surface for road and bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4574705B2 (en) | Suspended scaffolding | |
JP5020163B2 (en) | Support for overhanging slab | |
KR101290296B1 (en) | Stairway structure for approaching bridge inspection passage and constructing method thereof | |
JP6180376B2 (en) | Main girder provision method in composite girder floor slab replacement method, composite girder floor slab replacement method, and main girder provision structure in composite girder floor slab replacement method | |
JP4310444B1 (en) | Width expansion material for road bridges | |
JP6673131B2 (en) | Floor slab replacement method | |
JP5020162B2 (en) | Support for overhanging slab | |
KR101406035B1 (en) | Pier for Bridge and Construction Method thereof | |
JP3225933U (en) | Railing-mounted scaffolding and its scaffolding support | |
JP3128947U (en) | Bridge inspection road structure | |
KR101618746B1 (en) | Prefabricated girder structure of a sidewalk enlargement installation | |
JP5484983B2 (en) | Method for assembling and dismantling bridge moving work device | |
JP3991067B1 (en) | Temporary bridge between railway platforms | |
JP3156486U (en) | Guard fence support structure | |
JP6873435B2 (en) | Suspended scaffolding and its erection method | |
KR102085928B1 (en) | Temporary bridge with end corner member and construction method therefor | |
JP4500462B2 (en) | Scaffolding equipment for viaduct installation and method for installation | |
JP6002013B2 (en) | Temporary material support device | |
JP4348158B2 (en) | Suspended scaffolding | |
JP3328626B2 (en) | Temporary guardrail parts | |
KR101428748B1 (en) | A Sidewalk Enlargement Installation | |
JP2010121434A (en) | Method for installing road-bridge-width expansion material | |
JP6368628B2 (en) | Mobile scaffold and inspection / repair method using the mobile scaffold | |
JP2005171703A (en) | Suspended scaffolding | |
KR101054741B1 (en) | Bikeway construction method using two point support by lateral support member and slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R150 | Certificate of patent or registration of utility model |
Ref document number: 3225933 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |