JP2851090B2 - How to lay an optical cable around an overhead line - Google Patents

How to lay an optical cable around an overhead line

Info

Publication number
JP2851090B2
JP2851090B2 JP33104589A JP33104589A JP2851090B2 JP 2851090 B2 JP2851090 B2 JP 2851090B2 JP 33104589 A JP33104589 A JP 33104589A JP 33104589 A JP33104589 A JP 33104589A JP 2851090 B2 JP2851090 B2 JP 2851090B2
Authority
JP
Japan
Prior art keywords
optical cable
winding
laying
winding machine
machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP33104589A
Other languages
Japanese (ja)
Other versions
JPH03192309A (en
Inventor
宣夫 勝岡
正美 小原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Furukawa Electric Co Ltd
Original Assignee
Furukawa Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Furukawa Electric Co Ltd filed Critical Furukawa Electric Co Ltd
Priority to JP33104589A priority Critical patent/JP2851090B2/en
Publication of JPH03192309A publication Critical patent/JPH03192309A/en
Application granted granted Critical
Publication of JP2851090B2 publication Critical patent/JP2851090B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/46Processes or apparatus adapted for installing or repairing optical fibres or optical cables
    • G02B6/48Overhead installation
    • G02B6/483Installation of aerial type
    • G02B6/486Installation of aerial type by helical wrapping

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Light Guides In General And Applications Therefor (AREA)
  • Electric Cable Installation (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、既設の架空地線、架空送電線あるいは架空
配電線などの架空線に、光ファイバを内蔵した光ケーブ
ルを巻付け布設する方法に関するものである。
Description: TECHNICAL FIELD The present invention relates to a method of winding and laying an optical cable having a built-in optical fiber around an overhead line such as an existing overhead ground line, overhead transmission line or overhead distribution line. Things.

〔従来技術〕(Prior art)

従来の光ケーブルの巻付け布設方法を図−5に示す。
符号11は鉄塔、12はその間に架設された架空地線であ
る。この方法は、架空地線12に牽引機13および巻付け機
14を取り付けると共に、その巻付け機14に光ケーブル15
を巻いたドラム16を搭載し、牽引機13で巻付け機14を牽
引しながら光ケーブル15の巻付け布設を行うものであ
る。巻付け機14は架空地線12を伝って走行すると、ドラ
ム16が架空地線12の周りに回転するようになっており、
これによって光ケーブル15が架空地線12にらせん状に巻
き付けられるものである。
FIG. 5 shows a conventional method of laying and winding an optical cable.
Reference numeral 11 denotes a steel tower, and reference numeral 12 denotes an overhead ground wire provided therebetween. This method uses a traction machine 13 and a winding machine
14 and an optical cable 15
The optical fiber 15 is wound and laid while the winding machine 14 is pulled by the pulling machine 13. When the winding machine 14 travels along the overhead ground wire 12, the drum 16 rotates around the overhead ground wire 12,
Thereby, the optical cable 15 is spirally wound around the overhead ground wire 12.

なお巻付け機の牽引は巻付け機につないだロープ等を
地上で引っ張ること等により行われる場合もある。
Note that the winding machine may be pulled by pulling a rope or the like connected to the winding machine on the ground.

このような布設方法では一つのスパンAの巻付け布設
を終えて次のスパンBの巻付け布設に移るときは、牽引
機13および巻付け機14を鉄塔11の片側の架空地線12から
反対側の架空地線12へ掛け換える必要がある。この掛け
換え作業は図−6のように行われる(巻付け機14のみを
示すが、牽引機も同様に行われる)。まず巻付け機14が
鉄塔11の近くに到着したら、鉄塔11の両側に作業梯子17
をかけ、巻付け機14からドラム16を取り外して作業に支
障のない所に固定する。その後、鉄塔11に固定した台棒
18およびチェーンブロック19を利用して巻付け機14を吊
り上げ、片側の架空地線12から外して反対側の架空地線
12に乗せる。
In such a laying method, when the winding and laying of one span A is completed and then the winding and laying of the next span B is to be performed, the traction machine 13 and the wrapping machine 14 are displaced from the overhead ground wire 12 on one side of the steel tower 11. It is necessary to change to the overhead ground line 12 on the side. This changeover operation is performed as shown in FIG. 6 (only the winding machine 14 is shown, but the towing machine is similarly performed). First, when the winder 14 arrives near the tower 11, work ladders 17 are placed on both sides of the tower 11.
, And remove the drum 16 from the winding machine 14 and fix it in a place where the work is not hindered. After that, a pole fixed to the tower 11
The winding machine 14 is lifted using the chain block 19 and the overhead ground wire 12 on one side and removed from the overhead ground wire 12 on the other side.
Put on 12.

ついでドラム16を巻付け機14に搭載した後、鉄塔11部
における光ケーブル15の固定作業を行う。この固定作業
は図−7のように行われる。すなわち光ケーブル15に保
護チューブ21および補強線入り保護管22を被せた後、巻
付け終了部(図の右方)から順に、把持金具23A、固定
金具24A、中間支持金具25、固定金具24B、把持金具23B
を取り付けて、光ケーブル15を架空地線12および鉄塔11
に固定していく。この固定作業が終了したならば、再び
巻付け機14をスタートさせ、次のスパンの巻付け作業を
行う。以上のような手順を踏むのは鉄塔部で光ケーブル
に長さの過不足が生じないようにするためである。
Next, after the drum 16 is mounted on the winding machine 14, the optical cable 15 is fixed to the steel tower 11 in a fixed manner. This fixing operation is performed as shown in FIG. That is, after covering the optical cable 15 with the protective tube 21 and the protective tube 22 containing the reinforcing wire, the holding metal 23A, the fixing metal 24A, the intermediate supporting metal 25, the fixing metal 24B, Bracket 23B
And attach the optical cable 15 to the overhead ground wire 12 and tower 11
Fixed to. When the fixing operation is completed, the winding machine 14 is started again, and the winding operation for the next span is performed. The procedure described above is performed in order to prevent the optical cable from being excessively short or short at the steel tower.

〔課題〕〔Task〕

従来の巻付け布設方法では、巻付け機が鉄塔等の支持
体を通過する度に、比較的時間のかかる光ケーブルの固
定作業を行っており、この間、巻付け機は停止したまま
であるため、全長を布設し終えるまでに極めて長い時間
がかかるという問題があり、布設工事のスピードアップ
が望まれていた。
In the conventional winding and laying method, every time the winding machine passes through a support such as a steel tower, a relatively time-consuming fixing work of the optical cable is performed, and during this time, the winding machine remains stopped. There is a problem that it takes an extremely long time to finish laying the entire length, and it has been desired to speed up the laying work.

〔課題の解決手段とその作用〕[Means for solving the problem and its operation]

本発明は、上記のような課題を解決するため、光ケー
ブルを巻いたドラムを搭載した巻付け機を架空線伝いに
走行させて、光ケーブルを架空線に巻付け布設する方法
において、上記巻付け機が一つのスパンの巻付け布設を
終えて次のスパンの巻付け布設に移るときに、光ケーブ
ルを鉄塔等の支持体の通過に必要な長さより余分に引き
出しておき、次のスパンの巻付け布設を開始した後に、
その光ケーブルの余長部分を上記支持体またはその付近
に取り付けた余長収納ケースに収納する作業を行うこと
を特徴とするものである。
In order to solve the above-described problems, the present invention provides a method of running a winding machine equipped with a drum around which an optical cable is wound along an overhead line and winding and laying the optical cable around the overhead line. After completing the laying of one span and moving to the laying of the next span, pull out the optical cable extra than the length necessary to pass through a support such as a steel tower, and lay the wrap of the next span. After starting,
The operation of storing the extra length portion of the optical cable in the extra length storage case attached to the support or the vicinity thereof is performed.

このようにすると、巻付け機による巻付け布設と、支
持体部における光ケーブルの固定作業を、並行して行え
るようになり、布設工事の大幅な時間短縮が可能とな
る。
With this configuration, the winding installation by the winding machine and the operation of fixing the optical cable in the support portion can be performed in parallel, and the time required for the installation work can be greatly reduced.

〔実施例〕〔Example〕

以下、本発明の実施例を図面を参照して詳細に説明す
る。
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

図−1および図−2は本発明の一実施例を示す。この
巻付け布設方法は、まず図−1に示すように牽引機13お
よび巻付け機14が鉄塔11の近くに到着したならば、鉄塔
11の両側に作業梯子17をかけ、巻付け機14からドラム16
を取り外して作業に支障のない所に固定する。このとき
ドラム16から光ケーブル15を鉄塔部の通過に必要な長さ
より余分に引き出しておく。その後、台棒18およびチェ
ーンブロック19を利用して牽引機13および巻付け機14を
鉄塔11の片側の架空地線12から反対側の架空地線12に掛
け換える。
1 and 2 show an embodiment of the present invention. This winding laying method is performed as follows. First, when the towing machine 13 and the wrapping machine 14 arrive near the tower 11, as shown in FIG.
A work ladder 17 is placed on both sides of 11 and the winding machine 14
And secure it in a place where it will not interfere with work. At this time, the optical cable 15 is pulled out from the drum 16 more than the length required for passing through the steel tower. Thereafter, the pulling machine 13 and the winding machine 14 are changed from the overhead ground wire 12 on one side of the steel tower 11 to the overhead ground wire 12 on the opposite side using the bar 18 and the chain block 19.

ついでドラム16を巻付け機14に搭載した後、光ケーブ
ル15の余長部分をそのままにして、牽引機13および巻付
け機14を次のスパンの架空地線12上でスタートさせて巻
付け布設を開始する。そして巻付け機14が巻付け布設を
行っている間に、鉄塔11上で光ケーブル15の固定作業を
行うのである。この固定作業は図−2に示すように、光
ケーブル11に保護チューブ21を被せ、固定金具24A・24B
で巻付け終了部と巻付け開始部を架空地線12に固定した
後、余長収納ケース26を鉄塔11に固定し、この余長収納
ケース26に光ケーブル15の余長部分を適当な大きさに丸
めて収納することにより行う。余長収納ケース26として
は例えば蓋付きの円盤状のケースを用いるとよい。
Then, after the drum 16 is mounted on the winding machine 14, the extra length of the optical cable 15 is left as it is, and the traction machine 13 and the winding machine 14 are started on the overhead ground wire 12 of the next span to complete the winding installation. Start. Then, while the winding machine 14 is performing the winding installation, the fixing work of the optical cable 15 on the steel tower 11 is performed. As shown in FIG. 2, the fixing work is performed by covering the optical cable 11 with the protective tube 21 and fixing the metal fittings 24A and 24B.
After fixing the winding end portion and the winding start portion to the overhead ground wire 12, the extra length storage case 26 is fixed to the steel tower 11, and the extra length portion of the optical cable 15 is appropriately sized in the extra length storage case 26. It is performed by storing it in a roll. As the extra storage case 26, for example, a disc-shaped case with a lid may be used.

なお上記実施例では余長収納ケース26を鉄塔11に取り
付ける場合を説明したが、余長収納ケース26は例えば図
−3に示すように鉄塔11付近の架空地線12に取り付ける
こともできる。
In the above embodiment, the case where the extra length storage case 26 is attached to the steel tower 11 has been described. However, the extra length storage case 26 can be attached to the overhead ground wire 12 near the iron tower 11, for example, as shown in FIG.

また図−4に示すように光ケーブル15を架空送電線27
に巻付け布設する場合は、余長収納ケース26をジャンパ
ー線28の中間部に取り付けることもできる。なお図−4
において、11は鉄塔、28は耐張碍子、29は吊下げ碍子、
30は引留クランプである。
In addition, as shown in FIG.
When wrapping and wrapping around, the extra length storage case 26 can also be attached to the middle part of the jumper wire 28. Figure-4
, 11 is a steel tower, 28 is a tension insulator, 29 is a hanging insulator,
Numeral 30 denotes a retaining clamp.

〔発明の効果〕〔The invention's effect〕

以上説明したように本発明によれば、巻付け機が一つ
のスパンの巻付け布設を終えて次のスパンの巻付け布設
に移るときに、光ケーブルを鉄塔等の支持体の通過に必
要な長さより余分に引き出しておき、次のスパンの巻付
け布設を開始した後で、その光ケーブルの余長部分を、
上記支持体等に取り付けた余長収納ケースに収納するよ
うにしたので、巻付け機による巻付け布設と、支持体部
における光ケーブルの固定作業を、並行して行うことが
でき、布設工事に要する時間を大幅に短縮できる利点が
ある。
As described above, according to the present invention, when the winding machine finishes the laying of the winding of one span and moves to the laying of the next span, the optical cable has a length necessary to pass through a support such as a steel tower. After pulling out the extra length and starting to lay the next span, remove the extra length of the optical cable,
Since it is stored in the extra length storage case attached to the support or the like, the winding installation by the winding machine and the optical cable fixing work on the support can be performed in parallel, which is necessary for the installation work. There is an advantage that the time can be significantly reduced.

【図面の簡単な説明】[Brief description of the drawings]

図−1および図−2は本発明に係る巻付け布設方法の一
実施例を示すもので、図−1は鉄塔部で牽引機および巻
付け機を掛け換えるときの状態を示す側面図、図−2は
布設後の状態を示す側面図、図−3および図−4はそれ
ぞれ本発明の他の実施例による布設後の状態を示す側面
図、図−5は従来の巻付け布設方法を示す側面図、図−
6は従来の方法における巻付け機を掛け換えるときの状
態を示す側面図、図−7は従来の方法による布設後の状
態を示す側面図である。 11:鉄塔、12:架空地線、13:牽引機 14:巻付け機、15:光ケーブル、16:ドラム 21:保護チューブ、24A・24B:固定金具 26:余長収納ケース
1 and 2 show an embodiment of a winding and laying method according to the present invention, and FIG. 1 is a side view and a view showing a state in which a traction machine and a winding machine are replaced at a steel tower portion. 2 is a side view showing a state after installation, FIGS. 3 and 4 are side views each showing a state after installation according to another embodiment of the present invention, and FIG. 5 shows a conventional winding installation method. Side view, Figure-
FIG. 6 is a side view showing a state when the winding machine is replaced by a conventional method, and FIG. 7 is a side view showing a state after installation by the conventional method. 11: Steel tower, 12: Overhead ground wire, 13: Towing machine 14: Winding machine, 15: Optical cable, 16: Drum 21: Protection tube, 24A / 24B: Fixture 26: Extra length storage case

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】光ケーブルを巻いたドラムを搭載した巻付
け機を架空線伝いに走行させて、光ケーブルを架空線に
巻付け布設する方法において、上記巻付け機が一つのス
パンの巻付け布設を終えて次のスパンの巻付け布設に移
るときに、光ケーブルを鉄塔等の支持体の通過に必要な
長さより余分に引き出しておき、次のスパンの巻付け布
設を開始した後に、その光ケーブルの余長部分を上記支
持体またはその付近に取り付けた余長収納ケースに収納
する作業を行うことを特徴とする架空線への光ケーブル
巻付け布設方法。
1. A method of running a winding machine equipped with a drum around which an optical cable is wound along an overhead wire and winding and laying the optical cable around the overhead wire, wherein the winding machine performs winding and laying of one span. At the end, when moving to the next span of laying, pull out the optical cable more than necessary to pass through a support such as a tower, and after starting the next span of wrapping, A method of wrapping and wrapping an optical cable around an overhead wire, wherein the operation of storing the long portion in the extra length storage case attached to or near the support is performed.
JP33104589A 1989-12-22 1989-12-22 How to lay an optical cable around an overhead line Expired - Lifetime JP2851090B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33104589A JP2851090B2 (en) 1989-12-22 1989-12-22 How to lay an optical cable around an overhead line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33104589A JP2851090B2 (en) 1989-12-22 1989-12-22 How to lay an optical cable around an overhead line

Publications (2)

Publication Number Publication Date
JPH03192309A JPH03192309A (en) 1991-08-22
JP2851090B2 true JP2851090B2 (en) 1999-01-27

Family

ID=18239224

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33104589A Expired - Lifetime JP2851090B2 (en) 1989-12-22 1989-12-22 How to lay an optical cable around an overhead line

Country Status (1)

Country Link
JP (1) JP2851090B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103048759A (en) * 2012-12-17 2013-04-17 福建省电力有限公司 Paying-off robot and application thereof on erecting optical cables on 110kV circuit
CN107907956A (en) * 2017-04-19 2018-04-13 国网浙江省电力公司湖州供电公司 A kind of ADSS optical cables and steel tower attachment device

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104730640A (en) * 2015-02-10 2015-06-24 中国电信集团工会上海市莘闵电信局委员会 Butt joint device and method for self-support skin optical fibers
CN107196237A (en) * 2017-04-29 2017-09-22 中国能源建设集团安徽电力建设第工程有限公司 A kind of laying method of current collection line cord
CN107248711A (en) * 2017-04-29 2017-10-13 中国能源建设集团安徽电力建设第工程有限公司 One kind collection electric line ground wire erection method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103048759A (en) * 2012-12-17 2013-04-17 福建省电力有限公司 Paying-off robot and application thereof on erecting optical cables on 110kV circuit
CN103048759B (en) * 2012-12-17 2014-12-31 福建省电力有限公司 Paying-off robot and application thereof on erecting optical cables on 110kV circuit
CN107907956A (en) * 2017-04-19 2018-04-13 国网浙江省电力公司湖州供电公司 A kind of ADSS optical cables and steel tower attachment device
CN107907956B (en) * 2017-04-19 2019-10-25 国网浙江省电力公司湖州供电公司 A kind of ADSS optical cable and steel tower attachment device

Also Published As

Publication number Publication date
JPH03192309A (en) 1991-08-22

Similar Documents

Publication Publication Date Title
WO1999005555A1 (en) Method and apparatus for storing surplus adss cable
JP2851090B2 (en) How to lay an optical cable around an overhead line
US5217207A (en) Apparatus for aerial installation of cable in interduct
US3814383A (en) Method of stringing aerial cable
US20070009215A1 (en) Optical aerial line and method of installation thereof
CN112290457A (en) Construction method of carbon fiber composite core wire
JP3505416B2 (en) Optical cable winding and laying method on overhead line
JPH03289308A (en) Vehicle for laying cable
JP7488530B2 (en) Cable installation method
JP2002017011A (en) Aerial line stringing method
JP2003128367A (en) Rope extension method at climbing of lifting device and its auxiliary device
JPH03103016A (en) Moving drum type manipulator cable stringing vehicle
JPH07189213A (en) Suspension method of diagonal cable
JP2000295727A (en) Overhead cable installation method
JP3155724B2 (en) Winding method of wound optical fiber cable
JP3581854B2 (en) Corner guide for cable overhead line
JP2001327016A (en) Stringing construction method for cable and corner guide for cable stringing
JPH1189032A (en) Method for stringing cable and equipment used therein
JPH0424728Y2 (en)
JP2774674B2 (en) Balanced stretcher
JPH0112488Y2 (en)
JPS6250801B2 (en)
JPS6295910A (en) Systematically mechanized method of stretching and hanging coaxial cable
JPS6057809A (en) Tensionless wire drawing method of optical fiber cable
JPH03103015A (en) Head traction type manipulator cable stringing vehicle

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071113

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081113

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081113

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091113

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101113

Year of fee payment: 12

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101113

Year of fee payment: 12