JP2005314735A - Method for constructing blast furnace - Google Patents
Method for constructing blast furnace Download PDFInfo
- Publication number
- JP2005314735A JP2005314735A JP2004132633A JP2004132633A JP2005314735A JP 2005314735 A JP2005314735 A JP 2005314735A JP 2004132633 A JP2004132633 A JP 2004132633A JP 2004132633 A JP2004132633 A JP 2004132633A JP 2005314735 A JP2005314735 A JP 2005314735A
- Authority
- JP
- Japan
- Prior art keywords
- furnace
- ring block
- block
- blast furnace
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000010276 construction Methods 0.000 claims abstract description 70
- 239000011449 brick Substances 0.000 claims abstract description 62
- 238000001816 cooling Methods 0.000 claims abstract description 49
- 238000005304 joining Methods 0.000 claims description 7
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 60
- 229910052742 iron Inorganic materials 0.000 description 28
- 239000000725 suspension Substances 0.000 description 13
- 230000001788 irregular Effects 0.000 description 11
- 239000011819 refractory material Substances 0.000 description 8
- 238000009434 installation Methods 0.000 description 7
- 238000004519 manufacturing process Methods 0.000 description 5
- 238000012546 transfer Methods 0.000 description 5
- 238000009419 refurbishment Methods 0.000 description 4
- 230000001965 increasing effect Effects 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- 239000012779 reinforcing material Substances 0.000 description 3
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 229910052799 carbon Inorganic materials 0.000 description 2
- 238000005336 cracking Methods 0.000 description 2
- 230000006866 deterioration Effects 0.000 description 2
- 230000003028 elevating effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000012856 packing Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000000452 restraining effect Effects 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 230000036316 preload Effects 0.000 description 1
- 238000010626 work up procedure Methods 0.000 description 1
Images
Landscapes
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
Description
本発明は、高炉建設方法に関し、特に高炉の建設工事の工期短縮および安全性向上を可能ならしめたものである。 The present invention relates to a blast furnace construction method, and in particular, enables shortening the construction period and improving safety of blast furnace construction.
高炉の改修に伴う建設あるいは新たな高炉の建設を行う際には、建設現場となる高炉基礎とは異なる場所に炉体を構築する作業場(いわゆる地組み場と呼ばれるものであり、以下単に地組み場という)を設置し、その地組み場で、高炉を炉頂部から炉底部まで2個以上のリング状のブロックいわゆるリングブロックに分割して製作する。この時、地組み場で耐火レンガやステーブ等の付設装備の施工を完了する。このようにして地組み場で製作した各リングブロックを、順次、高炉基礎へ搬送して高炉を建設する。 When constructing a blast furnace, or when constructing a new blast furnace, a workshop that builds the furnace body in a location different from the blast furnace foundation, which is the construction site (this is called a so-called ground building, The blast furnace is divided into two or more ring-shaped blocks, so-called ring blocks, from the top of the furnace to the bottom of the furnace. At this time, construction of auxiliary equipment such as refractory bricks and staves is completed at the building site. In this way, each ring block manufactured in the groundwork site is sequentially transported to the blast furnace foundation to construct a blast furnace.
図1〜6は、高炉建設の手順の一例を示したものである。
まず、高炉の建設に当たっては、高炉炉体を複数個のリングブロックとして構築する。図1は、それらのリングブロックのうち、炉体の最上段に位置するリングブロックA(すなわち炉頂部リングブロック)を模式的に示したもので、地組み場1の置台2上でリングブロックAが構築された例である。
1-6 shows an example of the procedure of blast furnace construction.
First, in constructing a blast furnace, a blast furnace body is constructed as a plurality of ring blocks. FIG. 1 schematically shows a ring block A (that is, a furnace top ring block) located at the uppermost stage of the furnace body among the ring blocks. Is a built example.
完成後は、図2に示すように、吊換え装置3を地組み場に導入して、リングブロックA上に吊換え装置3を位置させる。3aは、吊換え装置3を地組み場1まで移動させる吊換え装置移動用搬送台車である。また、4は、リングブロックAを吊るリフトジャッキである。 After completion, as shown in FIG. 2, the suspending device 3 is introduced into the ground assembly site, and the suspending device 3 is positioned on the ring block A. 3a is a transporting carriage for moving the suspension device 3 that moves the suspension device 3 to the ground assembly 1. Reference numeral 4 denotes a lift jack that suspends the ring block A.
次に、図3に示すように、吊換え装置3のリフトジャッキ4により、リングブロックAをリフトアップし、リフトアップした空間に図中右方に示す炉体用輸送台車5を搬入する。この炉体用輸送台車5上には、積載レベル調整架構6が設けられており、7はレール、8は移動台である。なお、5aは、荷重を分散させるパッキングビームを示している。
Next, as shown in FIG. 3, the ring block A is lifted up by the lift jack 4 of the suspending device 3, and the
次に、図4に示すように、炉体用輸送台車5上にリングブロックAが積載される。積載されたリングブロックAは、図5に示すように、高炉基礎9に搬送され、高炉基礎9側のレール9aと炉体用輸送台車5上のレール7とが接続され、水平移動で高炉基礎上に誘導される。
図6は、高炉基礎上での高炉炉体建設を示すもので、高炉基礎上に誘導されたリングブロックAは、高炉炉体支持柱10に配設された昇降装置11aを用いて吊り上げる。
ついで、図1〜5に示したのと同じ手順で、リングブロックAの下段に位置することになる第2段リングブロックBを、高炉基礎上に搬送し、第2段リングブロックBを炉頂部リングブロックAの直下に誘導する。
Next, as shown in FIG. 4, the ring block A is loaded on the furnace
FIG. 6 shows the construction of a blast furnace body on the blast furnace foundation, and the ring block A guided on the blast furnace foundation is lifted by using an
Next, in the same procedure as shown in FIGS. 1 to 5, the second stage ring block B, which will be located at the lower stage of the ring block A, is transported onto the blast furnace foundation, and the second stage ring block B is moved to the top of the furnace. Guide directly under ring block A.
次に、リングブロックAを降下させて、リングブロックAと第2段リングブロックBとを接合する。
さらに、リングブロックAと第2段リングブロックBを接合したリングブロック接合体を昇降装置11aで吊り上げて、その下段に位置する第3段リングブロックCをその直下に誘導したのち、リングブロック接合体を降下させ、リングブロック接合体と第3段リングブロックCとを接合する。
Next, the ring block A is lowered and the ring block A and the second stage ring block B are joined.
Further, the ring block assembly obtained by joining the ring block A and the second stage ring block B is lifted by the lifting / lowering
上述のようにして、順次、上段に位置するリングブロック接合体を、昇降装置11aさらに必要に応じて昇降装置11b、11c・・(図示は11bまでで、他は省略)で吊り上げて、下段に位置するリングブロック(以下、下段リングブロックという)をリングブロック接合体の直下に誘導したのち、リングブロック接合体を降下させ、リングブロック接合体と下段リングブロックを接合し、最後の下段リングブロックである炉底部リングブロックが高炉基礎上に誘導されたのち、リングブロック接合体を炉底部リングブロック上に降下、接合して高炉を建設する(図7参照)。
As described above, the ring block assembly located in the upper stage is sequentially lifted by the lifting / lowering
その他、接合の順序を変更して高炉を建設する方法もある。
すなわち、まず、リングブロックAを炉体支持柱10に配設された昇降装置11aを用いて吊り上げる。ついで、リングブロックAの下段に位置する第2段リングブロックBを、リングブロックAの直下に誘導する。次に、第2段リングブロックBを昇降装置11bで吊り上げる。さらに、下段に位置することになる第3段リングブロックCをその直下に誘導したのち、第3段リングブロックCを昇降装置11cで吊り上げる。この手順を順次繰り返して、最後の炉底部リングブロックを高炉基礎上に誘導した後、その上に上段のリングブロックを降下させて接合し、次にその上段のリングブロックを降下させて接合し、最後に炉頂部リングブロックAを降下させて接合することにより高炉を建設する。
In addition, there is a method of constructing a blast furnace by changing the joining order.
That is, first, the ring block A is lifted by using the
なお、図7では、高炉を5個のリングブロックに分割して建設した例を示したが、通常、3〜4個のリングブロック化が作業能率の点で好ましいとされている。 FIG. 7 shows an example in which the blast furnace is divided into five ring blocks and constructed, but usually three to four ring blocks are preferable in terms of work efficiency.
上記のようにして高炉を建設するに際し、工期の短縮を図るために、種々の技術が提案されている。
例えば、特許文献1に開示された、高炉の短期改修・建設方法がそれである。この技術は、各リングブロックの真円度・剛性を高めて、運搬や吊り上げによる耐火レンガの割れや崩壊を抑止することによって、大リングブロック化を実現し、工期を短縮するものである。
実際、上記特許文献1に記載の高炉の短期改修・建設方法によれば、従来の改修・建設方法に比べて1/2〜2/3の工期で高炉の改修、建設が可能である。
なお、従来、炉底レンガ1500〜2500tは、炉体据え付け後、積んでおり、4〜6週間を要していた。炉体据え付けは、この炉底レンガ積み工程が最大の工程であった。
For example, this is the short-term blast furnace refurbishment / construction method disclosed in Patent Document 1. This technology increases the roundness and rigidity of each ring block to prevent cracking and collapse of the refractory bricks caused by transportation and lifting, thereby realizing a large ring block and shortening the construction period.
In fact, according to the short-term refurbishment / construction method for a blast furnace described in Patent Document 1, the blast furnace can be refurbished and constructed in a period of 1/2 to 2/3 as compared with the conventional refurbishment / construction method.
Conventionally, the furnace bottom bricks 1500 to 2500 t have been piled up after the furnace body has been installed, and it has taken 4 to 6 weeks. This furnace bottom brick stacking process was the biggest process for installing the furnace body.
さて、高炉建設に際し、最も効率的な建設を考えた場合、リングブロック単重を増加させること、すなわち高炉炉体をリングブロックに分割する分割数を減少させることが、より短期間での高炉建設につながる。
このように分割数を減少させてリングブロックを大型化した場合、特に高炉の最下段に位置する炉底部リングブロックは、通常、羽口部を含む部分の上方から、あるいは羽口部の下方から、炉底レンガを含みさらには炉底冷却用配管をも含む高炉最下部までの範囲にわたるため、最も重量のかさむリングブロックとなる。
When considering the most efficient construction for blast furnace construction, increasing the ring block unit weight, that is, reducing the number of divisions that divide the blast furnace body into ring blocks is a faster blast furnace construction. Leads to.
When the ring block is enlarged by reducing the number of divisions in this way, the furnace bottom ring block located at the lowest stage of the blast furnace is usually from above the portion including the tuyere or from below the tuyere. Since it extends to the bottom of the blast furnace including the bottom brick and further including the bottom cooling pipe, the ring block is the heaviest.
従来の工法では、ブロック単重は、通常1000〜2000t程度であり、この程度のブロック単量であれば、特許文献1で述べられているように、炉底部リングブロックは、その底部に炉底板が設置されていることもあって、反りや歪の発生さらには真円度の劣化などのおそれは小さかった。 In the conventional construction method, the block unit weight is usually about 1000 to 2000 t, and if it is this amount of block unit, as described in Patent Document 1, the furnace bottom ring block has a furnace bottom plate at its bottom. , The risk of warping, distortion, and deterioration of roundness was small.
しかしながら、特に炉底部リングブロックは、近年の大型高炉ではその高さが少なくとも10〜15mあるいはそれ以上となるため、炉底レンガ1500〜2500tを事前に積むレンガ構築部分を含んだ場合には、2500〜4500tあるいはそれ以上の重量となる。
そのため、特許文献1の工法を用いた場合では、炉底レンガを支持する強度は炉底板にはなく、反りや歪の発生さらには真円度の劣化などが懸念され、また施工の安全性にも問題を残していて、吊り上げることができなかった。
However, in particular, the bottom ring block of a furnace bottom has a height of at least 10 to 15 m or more in a large blast furnace in recent years. Therefore, when including a brick construction part that preloads a furnace bottom brick 1500 to 2500 t, 2500 It will be ~ 4500t or more.
Therefore, when the construction method of Patent Document 1 is used, the strength to support the furnace bottom brick is not in the furnace bottom plate, and there are concerns about the occurrence of warpage and distortion, and the deterioration of roundness, and the safety of construction. However, it was still a problem and could not be lifted.
本発明は、上記の問題を有利に解決するもので、高炉の改修・建設方法において、炉底部分に超重量となるリングブロックを採用した場合であっても、高炉の建設工事の工期短縮および安全性向上を可能ならしめ、特に炉底レンガ積み工程を大幅に短縮することができる新規な高炉建設方法を提案することを目的とする。 The present invention advantageously solves the above problems, and in the blast furnace refurbishment / construction method, even when a ring block that is extremely heavy is adopted for the bottom of the furnace, the construction period of the blast furnace construction work can be shortened. The purpose is to propose a new blast furnace construction method that can improve safety, and in particular, can significantly shorten the bottom brick building process.
すなわち、本発明の要旨構成は次のとおりである。
(1)高炉炉体を、炉頂部から炉底部まで2個以上のリングブロックに分割して地組み場で構築し、炉頂部リングブロックから順次、高炉基礎に搬送し、
高炉基礎上で、炉頂部リングブロックを吊り上げ、第2段リングブロックを炉頂部リングブロックの直下に誘導したのち、炉頂部リングブロックを降下させて両リングブロックを接合し、ついで接合したリングブロックを吊り上げたのち、次段のリングブロックを吊り上げたリングブロックの直下に誘導し、同様にして順次接合するか、あるいは、
高炉基礎に搬送した各リングブロックを、炉頂部リングブロックから順次吊り上げ、炉底部リングブロックを搬送後、すぐ上段のリングブロックを降下させて炉底部リングブロックと接合し、ついでその上段のリングブロックを順次降下させつつ接合する
ことにより高炉を建設する高炉建設方法において、
最後に高炉基礎に搬送される炉底部リングブロックを、炉体冷却用ステーブ、炉底レンガおよび炉底冷却用配管を含めて高炉基礎と同じレベルの架構上で構築して、高炉基礎に搬送し、高炉基礎上を水平方向にスライドさせて上段のリングブロックの直下に誘導することを特徴とする高炉建設方法。
That is, the gist configuration of the present invention is as follows.
(1) Divide the blast furnace body into two or more ring blocks from the top to the bottom of the furnace and build them at the earthwork site.
On the blast furnace foundation, lift the furnace top ring block, guide the second stage ring block directly below the furnace top ring block, lower the furnace top ring block, join both ring blocks, then join the ring blocks After lifting, guide the ring block of the next stage directly below the lifted ring block and join them in the same way, or
Each ring block transported to the blast furnace foundation is sequentially lifted from the furnace top ring block, and after transporting the furnace bottom ring block, the upper ring block is lowered and joined to the furnace bottom ring block, and then the upper ring block is connected. In the blast furnace construction method of constructing a blast furnace by joining while descending sequentially,
Finally, the bottom ring block transported to the blast furnace foundation is constructed on the same level as the blast furnace foundation, including the furnace body cooling stave, the bottom brick, and the bottom cooling piping, and then transported to the blast furnace foundation. A blast furnace construction method characterized by sliding horizontally on a blast furnace foundation and directly under an upper ring block.
これにより、超重量物となる炉底部リングブロックの吊換え作業を省略できるので、炉底部リングブロックに反りや歪、変形等を発生させることなく、リングブロック化による高炉建設が可能となる。 This eliminates the need to replace the furnace bottom ring block, which is a super-heavy object, so that it is possible to construct a blast furnace with a ring block without causing warp, distortion, deformation, or the like in the furnace bottom ring block.
(2)前記炉底部リングブロックの構築に際し、炉体鉄皮に、炉体冷却用ステーブおよび炉底冷却用配管を配置する段階までを高炉基礎より低いレベルで行い、ついで炉底部リングブロックを高炉基礎と同じレベルの架構上に上架したのち、炉底レンガを積み込んで炉底部リングブロックを完成させることを特徴とする上記(1)記載の高炉建設方法。 (2) When constructing the furnace bottom ring block, the stage up to the stage of placing the furnace cooling stave and the furnace bottom cooling pipe in the furnace core is performed at a level lower than the blast furnace base, and then the furnace bottom ring block is installed in the blast furnace The method for constructing a blast furnace according to (1) above, wherein the furnace bottom ring block is completed by loading the furnace bottom bricks after being overlaid on a frame of the same level as the foundation.
これにより、炉底部リングブロックの構築の際、施工上重量物となる炉体冷却用ステーブの設置、熟練作業を必要とする炉体冷却用ステーブと鉄皮間の不定形耐火物の充填作業、炉底冷却用配管施工、炉底冷却用配管回りの耐火物スタンプおよび不定形耐火物の充填作業などを、作業性が良く、また安全性の高い低いレベルの地組み場で実施することが可能となる。 In this way, when constructing the furnace bottom ring block, installation of the furnace cooling stave, which is heavy in construction, filling work of the amorphous refractory between the furnace cooling stave and the iron skin, which requires skilled work, It is possible to carry out piping work for furnace bottom cooling, filling refractory stamps around pipes for cooling the furnace bottom, and irregular refractories, etc. at a low-level building site with good workability and high safety. It becomes.
(3)前記炉底部リングブロックの構築に際し、炉底冷却用配管部分を含む下部炉底部リングブロックとその上の上部炉底部リングブロックとに少なくとも2分割して、高炉基礎より低いレベルの地組み場で構築し、炉体冷却用ステーブおよび炉底冷却用配管を配設したのち、分割した各炉底部リングブロックを接合し、ついで接合した炉底部リングブロックを高炉基礎と同じレベルの架構上に上架したのち、炉底レンガを積み込んで炉底部リングブロックを完成させることを特徴とする上記(1)または(2)記載の高炉建設方法。
これにより、炉底部リングブロックの構築作業を、分割した各分割炉底部リングブロック毎に行うことができるので、作業性がよく、しかも安全な作業が可能となる。
(3) When constructing the furnace bottom ring block, it is divided into at least two parts, a lower furnace bottom ring block including a furnace bottom cooling pipe part and an upper furnace bottom ring block above it, and the ground structure at a level lower than that of the blast furnace base Constructed in the field, and after placing the furnace body cooling stave and the furnace bottom cooling pipe, each of the divided furnace bottom ring blocks is joined, and then the joined furnace bottom ring block is placed on the same level as the blast furnace foundation. The method for constructing a blast furnace according to (1) or (2) above, wherein after being overlaid, a furnace bottom brick is loaded to complete a furnace bottom ring block.
Thereby, the construction work of the furnace bottom ring block can be performed for each of the divided furnace bottom ring blocks, so that workability is good and safe work is possible.
(4)前記炉底部リングブロックの単重が、2500t以上であることを特徴とする上記(1)〜(3)のいずれかに記載の高炉建設方法。
本発明では、上記のように炉底部リングブロックの単重が2500t以上もの超重量の場合であっても、炉底部リングブロックに反りや歪、変形等を発生させることなく、リングブロック化による高炉建設が可能となる。
(4) The blast furnace construction method according to any one of (1) to (3) above, wherein the unit weight of the furnace bottom ring block is 2500 t or more.
In the present invention, even when the unit weight of the furnace bottom ring block is more than 2500 tons as described above, the blast furnace by the ring block without causing warp, distortion, deformation or the like in the furnace bottom ring block. Construction becomes possible.
(5)前記炉底部リングブロックを上架する架構が、炉底部リングブロック構築の際、たわみ量が15mm以下の剛性を有する構造物で構成されていることを特徴とする上記(1)〜(4)のいずれかに記載の高炉建設方法。
これにより、炉底部ブロックの製作時や搬送時におけるレンガたわみに起因したレンガ亀裂発生を効果的に抑止することができる。
(5) The above-described (1) to (4), wherein the frame overlying the furnace bottom ring block is configured by a structure having a rigidity of a deflection of 15 mm or less when the furnace bottom ring block is constructed. ) A blast furnace construction method according to any one of the above.
Thereby, the brick crack generation resulting from the bending of the brick at the time of manufacture of a furnace bottom part block or conveyance can be suppressed effectively.
本発明によれば、高炉炉体を、炉頂部から炉底部まで2個以上のリングブロックに分割して地組み場で構築し、ついで高炉基礎上で炉頂部リングブロックから吊り上げ、順次に次段のリングブロックを前段のリングブロックの直下に誘導し、各リングブロックを相互に接合させて高炉を建設する高炉の短期建設方法において、最終段となる炉底部リングブロックが超大型化した場合であっても、問題のない高炉建設が可能になる。 According to the present invention, the blast furnace furnace body is divided into two or more ring blocks from the top to the bottom of the furnace and built at the ground assembly site, and then lifted from the top ring block on the blast furnace foundation, and the next stage in sequence. In the blast furnace short-term construction method in which the blast furnace is constructed by guiding the ring block directly below the previous stage ring block and joining the ring blocks to each other, the final ring block at the bottom of the furnace is very large. However, it will be possible to construct a blast furnace without any problems.
また、本発明によれば、従来、高炉炉内で昼夜兼行して行っていた炉底レンガ積み作業を、炉底部リングブロック側で予め実施できるため、事前の昼間作業にすることができ、安全性が向上するだけでなく、作業負荷が軽減される。そして、炉底部リングブロックをほぼ完成した構造に予め構築しておく場合には、2500〜4500tを超える超重量となるが、かような超重量化炉底部リングブロックであっても、施工した不定形耐火物、炉底れんが、内張りレンガに亀裂を発生させずに高炉建設を実現することができる。 In addition, according to the present invention, since the furnace bottom brick stacking work that has been conventionally performed day and night in the blast furnace can be performed in advance on the furnace bottom ring block side, it can be made a daytime work in advance, Not only improves performance, but also reduces the workload. And if the furnace bottom ring block is built in a nearly completed structure in advance, it will be over 2500 to 4500t, but even such a super-weight furnace bottom ring block will not be constructed. Blast-furnace construction can be realized without causing cracks in the lining bricks.
かくして、本発明によれば、高炉の建設工事の工期短縮と共に、特に炉底部リングブロックの構築に際し、作業性および安全性の向上を図ることができる。 Thus, according to the present invention, it is possible to shorten the work period of the blast furnace construction and improve the workability and safety particularly when constructing the furnace bottom ring block.
以下、本発明を具体的に説明する。
高炉炉体をリングブロック(以下単にブロックという)化して炉体構築を行う際の制約は、高炉基礎上でのブロック吊り上げ能力と、地組み場で構築されたブロックを炉体ブロック用輸送台車に乗せる際の吊換え装置の能力ならびに炉体ブロック用輸送台車によるブロック運搬時の歪・変形抑止技術である。
Hereinafter, the present invention will be specifically described.
The restrictions when constructing a furnace body by making the blast furnace body into a ring block (hereinafter simply referred to as a block) are the ability to lift the block on the foundation of the blast furnace, and the block constructed at the ground assembly site to be a transportation cart for the furnace body block. This is the technology of restraining distortion and deformation when transporting the block by the transporting bogie for the furnace block and the capacity of the switching device when placing it.
炉底部ブロック以外の炉体ブロックは、移動および高炉基礎上の吊り上げが必要であるため、各吊下装置(吊換え装置を含む)はその吊り上げ能力をブロック重量に応じて備える必要がある。
しかしながら、最終段となる炉底部ブロックは、最下段に位置するため、高炉基礎上での吊り上げは不要であり、このことを考慮した時、前記したような超重量に至る(超重量化したブロックとしたい)炉底部ブロックのブロック重量制約が吊換え装置能力にかかる場合、この吊換え装置能力を超重量に対応する能力とすることは不経済である。
Since the furnace body blocks other than the furnace bottom block need to be moved and lifted on the blast furnace foundation, each suspension device (including the suspension changing device) needs to have the lifting ability according to the block weight.
However, the furnace bottom block, which is the final stage, is located at the lowest stage, so it is not necessary to lift it on the blast furnace foundation. If the block weight constraint of the bottom block of the furnace is related to the suspension device capacity, it is uneconomical to make this suspension device capacity capable of dealing with the super weight.
また、一方で、炉底部ブロックを吊り上げる場合、従来、炉底部ブロックを除くブロックには変形防止のための補強処理を施し、炉底部ブロックについてはその底板が変形抑止の補強材となって歪や変形の発生を防止していた。 On the other hand, when lifting the furnace bottom block, conventionally, the block excluding the furnace bottom block is subjected to a reinforcing treatment for preventing deformation, and the bottom plate of the furnace bottom block serves as a deformation restraining reinforcing material to prevent distortion. The occurrence of deformation was prevented.
しかしながら、前述したように、2500tを超える大型、超重量化に至った場合、かかる超大型ブロックの吊換えを行うと、この吊換え装置に超重量に対応する能力を持たせ、吊換え時に吊点を複数点として荷重分散を図ったとしても、吊換え時にブロックを構成する鉄皮の反りや歪の発生が避けられず、その内部に予め施工している炉休冷却用ステーブや炉底レンガ、炉底冷却用配管、なかでも炉体鉄皮とステーブ間に充填施工されている不定形耐火物および炉底レンガの亀裂発生が懸念される。 However, as described above, when a large-sized and super-heavy weight exceeding 2500 t is reached, if the super-large block is resuspended, this re-shaking device has the ability to cope with the super-weight, and is suspended during re-hanging. Even if load distribution is attempted with multiple points, warping and distortion of the iron skin that constitutes the block is unavoidable during suspension, and the reactor cooling cooling stave and the bottom brick that have been pre-installed in the interior are unavoidable. In addition, there are concerns about cracks in the furnace bottom cooling pipes, in particular, the irregular refractories filled between the furnace shell and the stave and the furnace bottom bricks.
なお、この部分に亀裂が発生した場合、高熱伝導性の炉底レンガやステーブと炉底冷却配管との間に断熱層が発生して、炉底レンガの冷却性能が低下し、高炉の寿命に最も重要な炉底寿命が損なわれるため、炉底部ブロック内に予め施工していた不定形耐火物、内張りレンガおよび炉底レンガの再施工が必要となり、かえって高炉建設日数が延長することになる。 In addition, if a crack occurs in this part, a heat insulation layer is generated between the furnace bottom brick or stave and the furnace bottom cooling pipe with high thermal conductivity, the cooling performance of the furnace bottom brick is lowered, and the life of the blast furnace is shortened. Since the most important furnace bottom life is lost, it is necessary to reconstruct the irregular refractories, lining bricks and furnace bottom bricks previously constructed in the furnace bottom block, and the blast furnace construction days will be extended.
この点、本発明では、炉底部ブロックは、高炉基礎と同じレベルの架橋上で構築され、炉底部ブロック完成後、炉底部ブロックを積載している架構ごと炉体ブロック用輸送台車で高炉基礎まで搬送し、高炉基礎上を水平方向にスライドさせて前段ブロックの直下に誘導する。
このように、本発明では、炉底部ブロックは、炉体冷却用ステーブ、炉底レンガおよび炉底冷却用配管を含めて高炉基礎と同レベルの架構上で構築する、換言すると、底面をいわゆる面支持された状態で構築するため、ブロック単重が2500tを超える超重量物に至る炉底部ブロックとなっても、反り、歪の発生は極小に抑止することができる。従って、炉底部ブロックには、炉底レンガの施工に加え、内張りレンガの施工を加えても構わない。
In this regard, in the present invention, the furnace bottom block is constructed on the same level of bridge as the blast furnace foundation, and after the completion of the furnace bottom block, the whole frame loaded with the furnace bottom block is transported to the blast furnace foundation with the transport block for the furnace body block. Carry it and slide it horizontally on the blast furnace foundation to guide it directly under the front block.
As described above, in the present invention, the furnace bottom block is constructed on a frame of the same level as the blast furnace foundation including the furnace body cooling stave, the furnace bottom brick, and the furnace bottom cooling pipe. Since it is constructed in a supported state, even if it becomes a furnace bottom block that reaches a super-heavy object with a block unit weight exceeding 2500 t, warpage and distortion can be suppressed to a minimum. Therefore, in addition to the construction of the furnace bottom brick, the construction of the lining brick may be added to the furnace bottom block.
また、本発明では、炉底部ブロックが超重量物になっても輸送上の問題は発生しない。
すなわち、公知文献(特開2000−282116号公報)に記載されているように、炉体ブロック用輸送台車は、上面が平坦な長方形の台車本体を備え、台車本体の下部には空気を充填したタイヤ式の車輪が多数配列されており、地面上を走行する。車軸上には油圧式の昇降シリンダが配設してあって台車本体が昇降自在であり、また各車輪は旋回レバーを調整することにより車輪の水平旋回が可能となるため走行方向の調整も制御自在である。このため、炉体用輸送台車には、前進後退移動を可能とする走行用駆動装置を備えた自走式のものと、駆動装置のない従動式のものを長手方向に連結して使用される。かような輪送台車は、ユニットドーリー等と呼称される台車であり、連結台数の選択により長さが調節できるだけでなく、並列して使用することにより幅の広いものにも対応可能であり、使用台数を増加させることによって輸送可能重量は自在に調整できる。
Further, in the present invention, even if the furnace bottom block becomes a super-heavy object, no transportation problem occurs.
That is, as described in a publicly known document (Japanese Patent Laid-Open No. 2000-282116), the furnace block transport cart includes a rectangular cart body having a flat upper surface, and the lower portion of the cart body is filled with air. Many tire-type wheels are arranged and run on the ground. There is a hydraulic lifting cylinder on the axle so that the main body of the carriage can be raised and lowered, and each wheel can be turned horizontally by adjusting the turning lever, so the adjustment of the traveling direction is also controlled. It is free. For this reason, a self-propelled type equipped with a driving device for traveling that allows forward and backward movement and a driven type without a driving device are used by connecting in the longitudinal direction to the transporting carriage for the furnace body. . Such a wheeled carriage is a truck called a unit dolly, etc., and not only can the length be adjusted by selecting the number of connected units, but it can also be used for a wide range by using in parallel. The transportable weight can be adjusted freely by increasing the number of units used.
従って、超重量の炉底部ブロックとなっても、その輸送は、炉体ブロック用輸送台車の使用台数の調整で十分に可能であり、支障にならない。この高炉基礎とレベルを同じくする架構上で炉底部ブロックを構築し、炉底部ブロック完成後、炉底部ブロックを積載している架構ごと炉体ブロック用輸送台車にて高炉基礎まで搬送する。ついで、炉底部ブロックを、高炉基礎上を水平方向にスライドさせて前段ブロックの直下に誘導したのち、前段ブロックを降下させて接合する。
このように、本発明では、輸送台車による移動と、高炉基礎上でのスライド式移動によって建設が可能であるため、炉底部ブロックの吊り上げ作業を省略することができ、炉底部ブロックに反りや歪、変形などが発生するおそれがなくなる。
Therefore, even if it becomes an ultra-heavy furnace bottom block, its transportation can be sufficiently performed by adjusting the number of transporting carriages for the furnace block, which does not hinder. A furnace bottom block is constructed on a frame having the same level as that of the blast furnace foundation, and after completion of the furnace bottom block, the entire frame on which the furnace bottom block is loaded is transported to the blast furnace foundation by a transport block for the furnace block. Next, the furnace bottom block is slid horizontally on the blast furnace foundation and guided directly below the previous block, and then the previous block is lowered and joined.
In this way, in the present invention, since construction is possible by movement by a transport carriage and sliding movement on the blast furnace foundation, the lifting operation of the furnace bottom block can be omitted, and the furnace bottom block is warped or distorted. , There is no risk of deformation.
なお、炉底部ブロックを、高炉基礎上を水平方向にスライドさせて、前段ブロックの真下に誘導する方法は、他のブロックを誘導する場合と同様であり、図5に示したように、高炉基礎9の近傍まで輪送し、積荷レベル調整架構6の上面に設けたレール7と高炉基礎9上のレール9aとを接続する。移動台8上に積載された炉体ブロックは、駆動シリンダ20の駆動により、矢印方向へレール7,9a上を水平に摺動移動する。この駆動シリンダ20は、例えば公知文献(特開2000−319709号公報)に開示されているように、取り付け位置が変更可能になっていて、炉体ブロック(この例では炉頂部ブロックA)の移動に追従して設置位置を少しずつ前進させつつ、炉頂部ブロックAを押し進める。これにより、炉頂部ブロックAがレール7上からレール9a上に徐々に移動し、最終的に高炉基礎9の中心部に誘導される。
その他、移動台およびレールに替えて、炉体ブロックと積載レベル調整架構との間に介在させたエアーキャスターを用い、積載レベル調整架構上および高炉基礎上に配置したエアーキャスター通路上を、水平方何にスライドさせる方法で炉体ブロックを移動させることもでき、いずれの手段をも採用することができる。
In addition, the method of sliding the furnace bottom block horizontally on the blast furnace foundation and guiding it directly below the previous block is the same as that for guiding the other blocks. As shown in FIG. The
In addition, in place of the moving platform and rail, an air caster interposed between the furnace block and the loading level adjustment frame is used. The furnace block can be moved by any sliding method, and any means can be adopted.
また、本発明では、炉底部ブロックの構築に際し、炉体鉄皮に、炉体冷却用ステーブや炉底冷却用配管を配置する段階までは高炉基礎よりも低いレベルで行い、その後、高炉基礎と同じレベルに炉底部ブロックを上架し、高炉基礎と同じレベルの架橋上にて、炉底部ブロックに炉底レンガを積み込むようにしても良い。 Further, in the present invention, when constructing the furnace bottom block, it is performed at a level lower than the blast furnace foundation until the stage of placing the furnace cooling stave and the furnace bottom cooling pipe on the furnace core, The furnace bottom block may be overlaid at the same level, and the bottom brick may be loaded on the furnace bottom block on the same level of bridge as the blast furnace foundation.
この方法は、炉底部ブロックの構築作業を、前半は、作業性、安全性を考慮して、高炉基礎よりも低いレベルで行う方法である。ここに、前半とは、単品でかなりの重量となる炉体冷却用ステーブや炉底冷却用配管の設置作業、炉底板の施工作業ならびに不定形耐火物の充填作業などをさす。そして、これら鋼構造物の施工および緻密な不定形耐火物の充填作業を完了させたのち、高炉基礎と積載レベルを同じにする架構上に炉底部ブロックを乗せ換え、その後構築重量がかさむ炉底レンガさらには内張りレンガを積み付ける。 This method is a method in which the construction work of the furnace bottom block is performed at a level lower than that of the blast furnace foundation in the first half in consideration of workability and safety. Here, the first half refers to the installation work of the furnace body cooling stave and the furnace bottom cooling pipe, the construction work of the furnace bottom plate, and the filling work of the irregular refractory, which are considerably heavy. After completing the construction of these steel structures and the filling work of dense irregular refractories, the bottom block was placed on the same blast furnace foundation and the same level of loading as the blast furnace foundation, and then the bottom of the furnace where the construction weight increased. Lay bricks and lining bricks.
上記した低いレベルでの作業として、一部炉底レンガの積み付けを含めてもかまわないが、この場合には、高炉基礎と積載レベルを同じにする架構上に炉底部ブロックを乗せ換える際に、鉄皮と炉体冷却用ステーブ間の間隙に充填施工された不定形耐火物、あるいは炉底冷却用配管回りに充填施工された不定形耐火物に亀裂が生じない限度内にブロック重量をおさめる必要がある。 As a work at the low level mentioned above, it may be possible to include the stacking of some bottom bricks, but in this case, when replacing the bottom block on the frame with the same loading level as the blast furnace foundation The weight of the block is kept within the limit that does not cause cracks in the irregular refractory filled in the gap between the iron shell and the furnace cooling stave, or the irregular refractory filled around the furnace bottom cooling pipe. There is a need.
また、作業性、安全性を考慮して、高炉基礎よりも低いレベルで作業を行う場合、炉底部ブロックを少なくとも2分割して、作業性および安全性の一層の向上を図ることもできる。
なお、この場合、上記したような鋼構造物の施工および不定形耐火物の充填作業が完了したのちは、架構への乗せ換えに先立ち、分割した各ブロックを接合する。
Further, in consideration of workability and safety, when work is performed at a level lower than that of the blast furnace foundation, the workability and safety can be further improved by dividing the furnace bottom block into at least two parts.
In this case, after the construction of the steel structure and the filling operation of the irregular refractory as described above are completed, the divided blocks are joined prior to the transfer to the frame.
そして、高炉基礎と積載レベルを同じにする架構上への炉底部ブロックの乗せ換えは、地組み場の炉底部ブロックを、吊換え装置を移動させてリフトアップし、リプトアップした空間に高炉基礎と同じレベルの架構を差し込み、その上に上架することにより行う。また、吊換え装置が固定式の場合には、炉底部ブロックを炉体用輸送台車により吊換え装置まで移動させて、吊り上げ、高炉基礎と同じレベルとした架橋を差し込み、その上に上架することにより行う。 And, the transfer of the bottom block to the frame with the same loading level as the blast furnace foundation is done by lifting up the bottom floor block of the ground assembly site by moving the suspension device, and the blast furnace foundation in the lit-up space. This is done by inserting a frame of the same level as and placing it on it. If the suspension device is fixed, move the furnace bottom block to the suspension device by means of a transport truck for the furnace body, lift it up, insert a bridge at the same level as the blast furnace foundation, and place it on top of it. To do.
炉底部ブロックに対する炉底レンガ施工は、上架した場所で、またレンガ積みなど最終作業を実施する場所へ架構を移動させたのち、該架構上で行えばよい。
また、炉底部部ブロックの鉄皮完成後、高炉基礎と積載レベルを同じにする架構上に炉底部鉄皮ブロックを上架して、該架構上でステーブの配設、不定形耐火物の充填施工、炉底レンガ施工を行って、炉底部ブロックを完成させるようにしてもかまわない。
The furnace bottom brick construction for the furnace bottom block may be performed on the frame after moving the frame to a place where the final work such as brick stacking is performed.
In addition, after completion of the iron core of the furnace bottom block, the furnace bottom iron block is overlaid on a frame that has the same loading level as the blast furnace foundation, and a stave is placed on the frame, and an irregular refractory is filled. Alternatively, the furnace bottom brick construction may be performed to complete the furnace bottom block.
なお、炉底部の直径を20mとして、炉底レンガとして使用されるカーボンレンガをその両端(20m間隙)で支持する実験では、約81〜82mmのたわみが発生した。実際の高炉では、カーボンレンガ間に目地が存在するため、たわみは大きくなり、亀裂発生の可能性が大である。従って、架構上でかようなたわみが生じないように、炉底部ブロックの炉底板や炉底部ブロックを上架している架構で炉底レンガを支持できるようにする。具体的には、架構上で炉底部ブロックが完成した際、炉底部のたわみ量が15mm以下となる剛性を付与する必要がある。
というのは、たわみ量が15mmを超えると亀裂が生じる可能性があり、亀裂が生じた場合には、前記したように、高熱伝導性の炉底レンガやステーブと炉底冷却配管との間に断熱層が発生して、炉底レンガの冷却性能が低下し、高炉の寿命に最も重要な炉底寿命が損なわれるため、炉底部ブロック内に予め施工していた不定形耐火物や炉底レンガの再施工が必要となり、かえって高炉建設日数が延長することになるからである。より好ましくは、たわみ量は10mm以下とする。これにより、炉底部ブロックの製作、搬送時におけるレンガたわみに起因したレンガ亀裂発生を効果的に抑止することができる。
In an experiment in which the diameter of the bottom of the furnace was 20 m and the carbon brick used as the bottom brick was supported at both ends (20 m gap), a deflection of about 81 to 82 mm occurred. In an actual blast furnace, joints exist between the carbon bricks, so the deflection becomes large and the possibility of cracking is great. Therefore, the bottom bricks can be supported on the bottom plate of the bottom block and the frame overlying the bottom block so that such deflection does not occur on the frame. Specifically, when the furnace bottom block is completed on the frame, it is necessary to impart rigidity so that the deflection of the furnace bottom is 15 mm or less.
This is because if the amount of deflection exceeds 15 mm, cracks may occur, and when cracks occur, as described above, between the bottom bricks and staves with high thermal conductivity and the bottom cooling piping. Because the heat insulation layer is generated, the cooling performance of the bottom brick is lowered, and the bottom bottom life, which is the most important for the life of the blast furnace, is impaired. This is because the number of days required for the blast furnace construction will be extended. More preferably, the amount of deflection is 10 mm or less. Thereby, the brick crack generation resulting from the bending of the brick at the time of manufacture of a furnace bottom part block and conveyance can be suppressed effectively.
実施例1
本発明に従う炉底部ブロックの構築および高炉基礎への搬送の手順の一例を示す。
まず、図8に示すように、地組み場1の置台2上にて炉底部ブロックの鉄皮30を組み立てる。地組み場1では、鉄皮30の内面61および底部62にそれぞれステーブ、炉底冷却配管の施工(図8(a)参照)および変形防止のための炉底補強用の補強材33を施工した後、吊換え装置3によりリフトアップ(吊り上げ)を行う(図8(b)参照)。ついで、リフトアップした空間に、図8(c)に示すように、炉底部ブロック用のドーリ架構、すなわち高炉基礎と同じレベルとした架構35を、ドーリと呼称される炉体用輸送台車5で搬送し、この架構35上に炉底部ブロックを上架する。この上架した状態で、あるいは上架した炉底部ブロックを所定の場所まで搬送し、架構35を着地させたのち、架構35上で炉底レンガの積み込みなど炉底部ブロックの完成に至る残りの作業を行う(図13(d)参照)。炉底部ブロック完成後、架構35を一旦着地させた場合は架構35の下部に炉体用輸送台車5を侵入させて架構35を持ち上げ(図8(e)参照)、高炉基礎と同じレベルとしてのち、高炉基礎9まで搬送する。ついで、高炉基礎レベルと高さを同じにする架構35から高炉基礎上に炉底部ブロックは水平方向に移動され、高炉基礎上の高炉設置位置に搬送し、位置決めがなされる(図8(f)参照)。
Example 1
An example of the procedure of construction | assembly of the furnace bottom part block according to this invention and conveyance to a blast furnace foundation is shown.
First, as shown in FIG. 8, the
なお、炉底部ブロックは、完成すると2500〜4500tあるいはそれ以上の重量になるため、架構載置場所地盤は支持面の補強などを行う他、図9に示すように地盤沈下対策として、架構35の脚部35aにジャッキ36等を介在させておき、定期的に架構35の水平レベルを測定し、沈下が生じた際には、ジャッキ36にて架構35の脚部高さを調整し水平レベルを維持する修正を行うことが好ましい。
When the furnace bottom block is completed, it will be 2500 to 4500 tons or more in weight. Therefore, the ground where the frame is placed will reinforce the support surface, and as shown in FIG. A
また、炉底部ブロックに炉底レンガ施工を行うに当たり、炉底レンガが許容たわみ内に収まるように、炉底部ブロック完成時の変形を5mm以下とする強度の架構を設計し使用した。その結果、施工済みレンガに亀裂の発生などは生じなかった。そして、この場合には、炉底部ブロックに炉底レンガ施工を行わない場合に比べた、高炉改修の工期を10〜15日短縮することができた。 In addition, when constructing the bottom brick in the bottom block, a frame was designed and used so that the deformation at the completion of the bottom block was 5 mm or less so that the bottom brick was within the allowable deflection. As a result, there was no occurrence of cracks in the installed brick. And in this case, compared with the case where a furnace bottom brick construction is not performed to a furnace bottom part block, the construction period of blast furnace repair was able to be shortened by 10 to 15 days.
実施例2
この例は、炉底部ブロックの構築手順の一例を示すものである。
まず、図10(a)に示すように、地組み場にて炉底部ブロックの鉄皮30を組み立てる。この図において、炉底部ブロックの鉄皮30の側壁に設けられた31a,31b,31c,31dはそれぞれ作業用足場であり、32は炉底板、33は鉄皮30の変形防止のために設けられた補強材である。なお、鉄皮30の下段にも変形防止のために補強材34が組み込まれている。
そして、
(1)組み場で炉底部鉄皮を組み立て、炉底板施工により鉄皮30を完成させる。
ついで、作業用足場31a,31b,31c,31dを利用して、鉄皮30内で以下の作業を行う。
(2)炉底・炉側壁ステーブ設置・炉底冷却用配管配設。
(3)不定形耐火物充填・圧入作業(図10(b)参照)。
Example 2
This example shows an example of the construction procedure of the furnace bottom block.
First, as shown in FIG. 10 (a), the
And
(1) Assemble the furnace bottom iron skin at the assembly site and complete the
Next, the following work is performed in the
(2) Installation of furnace bottom / furnace side wall stave / furnace bottom cooling piping.
(3) Filling and press-fitting an irregular refractory (see Fig. 10 (b)).
ついで、図2と同様に、吊換え装置3を導入し、図3に示したように、炉底部ブロックの鉄皮30を吊り上げ、炉体用輸送台車5を進入させ、この炉体用輸送台車5上に鉄皮30を積載する。この炉体用輸送台車5上には、予め図11に番号35で示す高炉基礎と高さを同じにする架構が搭載されており、この架構35上に炉底部ブロックの鉄皮30を積載する。
具体的な手順は、以下のとおりである。
(4)炉底部ブロック吊換え装置の移動、吊換え用架構の移動。
(5)炉底部ブロックを吊換え装置によりリフトアップし、架構上に炉底部ブロックを載積する(必要に応じて、架構を高炉基礎に接近させた位置に移動させる。あるいは、地組み場を高炉基礎に接近させておく)。
ついで、高炉基礎近傍の所定位置に、炉体用輸送台車5にて移動させ、炉体用輸送台車5の下降操作で架橋35を着地させ、以降この着地した架構35上に積載した状態で炉底部ブロックの鉄皮30に必要な内装を施す。
Next, as shown in FIG. 2, the suspension changing device 3 is introduced, and as shown in FIG. 3, the
The specific procedure is as follows.
(4) The movement of the furnace bottom block changing device and the moving frame.
(5) The furnace bottom block is lifted up by the suspension device and the furnace bottom block is loaded on the frame (if necessary, the frame is moved to a position close to the blast furnace foundation. Keep close to the blast furnace foundation).
Next, the furnace
まず、図12に示すように、
(6)架構上の炉底部ブロックに天井37を施工する。また、この天井37には工事用クレーン38などを設置する。この処置は、作業を迅速化、安全化するためであり、必要に応じて各種機器の導入も可能である。
ついで、
(7)炉底れんが積み、内張りレンガ積みなど重量のかさむ工事を実施する。
(8)炉底部ブロックの完成後、天井を解体し撤去する。この天井の解体撤去は、高炉基礎部への搬送後でもかまわないが、炉体部ブロックの変形防止のため、鉄皮30の補強材33は施工したままとする。
First, as shown in FIG.
(6) The
Next,
(7) Carry out heavy construction such as stacking furnace bottom bricks and lining bricks.
(8) After completion of the furnace bottom block, dismantle the ceiling and remove it. This dismantling / removal of the ceiling may be performed even after transport to the blast furnace base, but the reinforcing
ついで、
(9)高炉基礎に搬送する(架構の下に炉体用輸送台車を進入させその昇降操作により、架構底と地面の地切りを行い、架構のレベルを高炉基礎と同じレベルに調整したのち、移動させる)。
(10)高炉基礎上をスライドさせて設置位置に誘導する。
(11)炉底部ブロックの上位になる前段ブロックを降下させ、炉底部ブロック上に載置、接合する。
(12)他のブロックも順次降下させ、下段のブロック上に載置、接合する。
この例では、(1)〜(3)までの作業を低いレベルの地組み場で行うことができるため、作業の安全性を図ることができる。
Next,
(9) Transport to the blast furnace foundation (After the furnace carriage is entered under the frame, and by raising and lowering it, the frame bottom and ground are grounded, and the frame level is adjusted to the same level as the blast furnace foundation. Move).
(10) Slide the blast furnace foundation to the installation position.
(11) Lower the upper block above the furnace bottom block, and place and join it on the furnace bottom block.
(12) Lower the other blocks in sequence, and place and join them on the lower block.
In this example, since the operations (1) to (3) can be performed at a low-level building site, the safety of the operation can be achieved.
また、炉底部ブロックが、超重量に至る工事は、(5)の架構上で行い、高炉基礎への移送は、この状態で搬送後、高炉基礎上をスライドさせることにより行うため、炉底部ブロックに歪や変形などの発生がなく、また予め施工した不定形耐火物、内張りレンガ、炉底レンガなどに亀裂が発生することもない。 In addition, the construction that the furnace bottom block is super heavy is performed on the frame of (5), and the transfer to the blast furnace foundation is carried out by sliding on the blast furnace foundation in this state. There is no occurrence of distortion, deformation, etc., and cracks do not occur in the preliminarily constructed refractory material, lining brick, furnace bottom brick and the like.
実施例3
この例は、炉底部ブロックを炉底下層ブロックと炉底上層ブロックとに2分割し、それぞれ個別に地組み場で製作し、両者を接合して所定の炉底部ブロックとして組み上げる例である。
図13(a)は、炉底下層ブロックの模式断面図、また同図(b)は、炉底下層ブロックと炉底上層ブロックを接合した場合の模式断面図である。
図中、Eで炉底部ブロック全体を、E1で最下層に位置する炉底下層ブロックを、E2で上位の炉底部ブロックである炉底上層ブロックを示す。
炉底下層ブロックE1 には、上底板45および下底板46を炉底板として設け、上底板45の上方に僅かに 300〜1500mm程度突出する鉄皮44aと上底板45と下底板46との間に冷却配管47や耐火物48等を配設する。なお、49は高炉炉体を支持するアンカーボルトである。
Example 3
In this example, the furnace bottom block is divided into a furnace bottom lower block and a furnace bottom upper block, each is individually manufactured at a ground assembly site, and both are joined to form a predetermined furnace bottom block.
FIG. 13A is a schematic cross-sectional view of the furnace bottom lower block, and FIG. 13B is a schematic cross-sectional view when the furnace bottom lower block and the furnace bottom upper block are joined.
In the figure, E represents the entire furnace bottom block, E 1 represents the bottom bottom block located at the lowermost layer, and E 2 represents the furnace bottom upper block, which is the upper furnace bottom block.
The bottom bottom block E 1 is provided with a
この炉底部ブロックEの炉底最下層ブロックE1 の高さhは、1〜1.5m程度であるため、作業者は地組み場で容易かつ安全に炉底下層ブロックE1 内に入ることができる。
従って、作業効率の向上および安全性の向上を達成できる。また、作業に用いる装置、工具および各種材料の搬入も容易に行えるので、作業負荷の大きい炉底下層ブロックE1 の作製期間を大幅に短縮することができる。
Since the height h of the bottom floor block E 1 of the bottom block E is about 1 to 1.5 m, an operator can easily and safely enter the bottom bottom block E 1 at the assembly site. it can.
Therefore, improvement in work efficiency and improvement in safety can be achieved. Moreover, since the apparatus, tools, and various materials used for the work can be easily carried in, the production period of the furnace bottom lower block E 1 having a large work load can be greatly shortened.
一方、図13(b)に示す炉底部ブロックEのうち、炉底上層ブロックE2 部分は、他の地組み場で製作する。なお、この炉底上層ブロックE2 には、炉体冷却用ステーブなど予め炉内に取り込めるものを装備する。鉄皮44b内には、炉体冷却用ステーブ41が予め施工され、また鉄皮44bと炉体冷却用ステーブ41との間には不定形耐火物42が予め充填施工される。なお、43は炉体冷却用ステーブ41の冷却配管である。
このように、炉底下層ブロックE1 と炉底上層ブロックE2 とを個別に製作したのち、図13(b)に示すように、炉底下層ブロックE1 上に炉底上層ブロックE2 を組み合わせ、鉄皮44aと鉄皮44bを接合して炉底部ブロックEとする。
On the other hand, among the furnace bottom block E shown in FIG. 13 (b), the furnace bottom upper block E 2 is manufactured at another assembly site. Note that this hearth upper block E 2, equipped with what capture the furnace body cooling stave like in advance furnace. A furnace body cooling stave 41 is preliminarily applied in the
Thus, after individually manufacturing the furnace bottom lower block E 1 and the furnace bottom upper block E 2 , the furnace bottom upper block E 2 is placed on the furnace bottom lower block E 1 as shown in FIG. In combination, the
ついで、接合した炉底部ブロックEを、実施例2で説明したように、図11に示すような架構35上に積載し、図12に示すように、炉底レンガ積みなどの内部施工を施す。
なお、炉底部ブロックが大型化し、分割ブロックの接合の際に十分な精度が出ないと予想される場合には、接合を行った後に、炉体冷却用ステーブの組み込みや不定形耐火物の充填施工を行っても構わない。
Next, as described in the second embodiment, the joined furnace bottom block E is loaded on a
If the furnace bottom block becomes larger and it is expected that sufficient accuracy will not be obtained when joining the divided blocks, after joining, the furnace cooling stave is built in or the amorphous refractory is filled. You may perform construction.
この例では、炉底部ブロックEを分割して製作するため、作業負荷の大きい炉底部ブロックEの製作に要する時間を効果的に短縮できるので、建設工事の工期短縮と同時に、建設費用の削減を達成できる。しかも、分割してそれぞれ製作するため、ブロック高さが低く、その結果、安全性の向上も達成できる。 In this example, since the furnace bottom block E is divided and manufactured, the time required to manufacture the furnace bottom block E with a large work load can be effectively shortened, so the construction period can be shortened and the construction cost can be reduced. Can be achieved. Moreover, since the blocks are manufactured separately, the block height is low, and as a result, safety can be improved.
実施例4
この例は、炉体部ブロックを分割する点では、実施例3と技術思想を同じくする。
この例では、図14(a)に示すように、炉底下層ブロックE1 に、地組み場で予め炉底レンガ50の一部を積み付けておく。上底板45および下底板46を炉底板として設け、上底板45の上方に僅かに300〜1500mm程度突出する鉄皮44aと上底板45と下底板46との間に冷却配管47や耐火物48等を配設するのは、実施例3の場合と同様である。
但し、この例においては、炉底レンガの一部を積み付け等の施工範囲を、地組み場から架構35に乗せ換えを行うときに許容される重量範囲内におさめることが重要である。なお、この施工範囲は、強度計算によって許容できる反り、歪の値をもとに算出することができる。
Example 4
This example has the same technical idea as the third embodiment in that the furnace body block is divided.
In this example, as shown in FIG. 14 (a), the furnace bottom subblock E 1, previously stowed part of previously furnace
However, in this example, it is important that the construction range such as stacking a part of the furnace bottom brick is within the weight range permitted when transferring from the building site to the
そして、この炉底下層ブロックE1を、別の地組み場で製作された炉底上層ブロックE2と図14(b)に示すように組み合わせ、鉄皮44aと鉄皮44bを接合して一体物の炉底部ブロックEとする。なお、鉄皮44bと炉底レンガ50との間隙51には、鉄皮44aと44bを接合した後、不定形耐火物が充填施工する。
その後、架構築35上に乗せ換えを行い、残る工事範囲の作業を架構35上で行い、炉底部ブロックEを完成させる。なお、鉄皮44bと炉底レンガ50との間隙51への不定形耐火物の充填施工は、炉底部ブロックEを架橋35上に積載した後に行っても構わない。
Then, the bottom floor block E 1 is combined with the bottom floor block E 2 manufactured at a different assembly site as shown in FIG. 14 (b), and the
Thereafter, the work is transferred onto the
この例によれば、予め炉底レンガの一部を積み付けておけるため、この分の炉底レンガの積み付けに相当する期間だけ、高炉建設期間の短縮を図ることができる。 According to this example, since a part of the bottom brick can be stacked in advance, the blast furnace construction period can be shortened only during the period corresponding to the stacking of the bottom brick.
なお、これまで主に、炉体ブロックを5個のブロックに分割して高炉を建設する場合、また炉底部ブロックを2分割とした場合について説明したが、本発明は、これらの例に限られるものではなく、高炉炉体については2個以上のブロックに分割して建設する場合に適用でき、また炉底部ブロックについては分割数を3個以上としても構わず、炉体ブロックの個数および炉底部ブロックの分割数は必要に応じて適宜定めることができる。 Although the case where the furnace block is divided into five blocks to construct a blast furnace and the case where the furnace bottom block is divided into two has been described so far, the present invention is limited to these examples. However, the blast furnace furnace body can be applied when divided into two or more blocks, and the furnace bottom block may be divided into three or more. The number of block divisions can be determined as needed.
1 地組み場
2 置台
3 吊換え装置 3a 吊換え装置移動用搬送台車
4 リフトジャッキ
5 炉体用輸送台車 5a パッキングビーム
6 積載レベル調整架構
7 レール
8 移動台
9 高炉基礎 9a レール
10 高炉炉体支持柱
11a,11b 昇降装置
20 駆動シリンダ
30 鉄皮
31a,31b,31c,31d 作業用足場
32 炉底板
33,34 補強材
35 架構 35a 架構の脚部
36 ジャッキ
37 天井
38 工事用クレーン
41 炉体冷却用ステーブ
42 不定形耐火物
43 冷却配管
44a,44b 鉄皮
45 上底板
46 下底板
47 冷却配管
48 耐火物
49 アンカーボルト
50 炉底レンガ
51 鉄皮と炉底レンガとの間隙
61 鉄皮の内面
62 鉄皮の底部
DESCRIPTION OF SYMBOLS 1
10 Blast furnace body support pillar
11a, 11b Lifting device
20 Drive cylinder
30 Iron skin
31a, 31b, 31c, 31d Working scaffold
32 Furnace bottom plate
33, 34 Reinforcement
35
36 Jack
37 Ceiling
38 Construction crane
41 Furnace cooling stave
42 Indefinite refractories
43 Cooling piping
44a, 44b Iron skin
45 Upper bottom plate
46 Bottom plate
47 Cooling piping
48 Refractories
49 Anchor bolt
50 hearth brick
51 Gap between the iron skin and the bottom brick
61 Inside of the iron skin
62 Bottom of the iron skin
Claims (5)
高炉基礎上で、炉頂部リングブロックを吊り上げ、第2段リングブロックを炉頂部リングブロックの直下に誘導したのち、炉頂部リングブロックを降下させて両リングブロックを接合し、ついで接合したリングブロックを吊り上げたのち、次段のリングブロックを吊り上げたリングブロックの直下に誘導し、同様にして順次接合するか、あるいは、
高炉基礎に搬送した各リングブロックを、炉頂部リングブロックから順次吊り上げ、炉底部リングブロックを搬送後、すぐ上段のリングブロックを降下させて炉底部リングブロックと接合し、ついでその上段のリングブロックを順次降下させつつ接合する
ことにより高炉を建設する高炉建設方法において、
最後に高炉基礎に搬送される炉底部リングブロックを、炉体冷却用ステーブ、炉底レンガおよび炉底冷却用配管を含めて高炉基礎と同じレベルの架構上で構築して、高炉基礎に搬送し、高炉基礎上を水平方向にスライドさせて上段のリングブロックの直下に誘導することを特徴とする高炉建設方法。 The blast furnace furnace body is divided into two or more ring blocks from the top to the bottom of the furnace and built at the earthwork site.
On the blast furnace foundation, the furnace top ring block is lifted and the second stage ring block is guided directly below the furnace top ring block, then the furnace top ring block is lowered to join both ring blocks, and then the joined ring block is After lifting, guide the ring block of the next stage directly below the lifted ring block and join them in the same way, or
Each ring block transported to the blast furnace foundation is sequentially lifted from the furnace top ring block, and after transporting the furnace bottom ring block, the upper ring block is lowered and joined to the furnace bottom ring block, and then the upper ring block is connected. In the blast furnace construction method of constructing a blast furnace by joining while dropping sequentially
Finally, the bottom ring block transported to the blast furnace foundation is constructed on the same level as the blast furnace foundation, including the furnace body cooling stave, the bottom brick, and the bottom cooling piping, and then transported to the blast furnace foundation. A blast furnace construction method characterized by sliding horizontally on a blast furnace foundation and directly under an upper ring block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004132633A JP4841809B2 (en) | 2004-04-28 | 2004-04-28 | Blast furnace construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004132633A JP4841809B2 (en) | 2004-04-28 | 2004-04-28 | Blast furnace construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2005314735A true JP2005314735A (en) | 2005-11-10 |
JP4841809B2 JP4841809B2 (en) | 2011-12-21 |
Family
ID=35442464
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2004132633A Expired - Lifetime JP4841809B2 (en) | 2004-04-28 | 2004-04-28 | Blast furnace construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4841809B2 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006104229A1 (en) * | 2005-03-29 | 2006-10-05 | Nippon Steel Engineering Co., Ltd. | Method of carrying bottom mantel for blast furnace |
JP2009209427A (en) * | 2008-03-05 | 2009-09-17 | Nippon Steel Engineering Co Ltd | Structure for fitting iron-shell reinforcing member |
JP2010215985A (en) * | 2009-03-18 | 2010-09-30 | Nippon Steel Engineering Co Ltd | Method for replacing furnace bottom block of blast furnace |
CN109457073A (en) * | 2018-11-16 | 2019-03-12 | 中冶天工集团有限公司 | A kind of big volume blast furnace assembles passage method offline |
CN113832281A (en) * | 2021-09-15 | 2021-12-24 | 中国二十二冶集团有限公司 | Method for industrially manufacturing and installing smelting reduction furnace |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113860205B (en) * | 2021-08-25 | 2023-02-03 | 中冶南方工程技术有限公司 | Furnace top scale auxiliary leveling device and furnace top scale leveling method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5243709A (en) * | 1975-10-02 | 1977-04-06 | Sankiyuu Kk | Building method of blast furnace |
JPH05222420A (en) * | 1991-02-27 | 1993-08-31 | Kawasaki Steel Corp | Method for intermediate reconstruction of blast furnace |
JP2001002400A (en) * | 1999-06-21 | 2001-01-09 | Nippon Steel Corp | Fluid-floating transportation method for large structure having bottom plate |
JP2001131617A (en) * | 1999-10-29 | 2001-05-15 | Sumitomo Metal Ind Ltd | Method for repairing blast furnace |
-
2004
- 2004-04-28 JP JP2004132633A patent/JP4841809B2/en not_active Expired - Lifetime
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5243709A (en) * | 1975-10-02 | 1977-04-06 | Sankiyuu Kk | Building method of blast furnace |
JPH05222420A (en) * | 1991-02-27 | 1993-08-31 | Kawasaki Steel Corp | Method for intermediate reconstruction of blast furnace |
JP2001002400A (en) * | 1999-06-21 | 2001-01-09 | Nippon Steel Corp | Fluid-floating transportation method for large structure having bottom plate |
JP2001131617A (en) * | 1999-10-29 | 2001-05-15 | Sumitomo Metal Ind Ltd | Method for repairing blast furnace |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006104229A1 (en) * | 2005-03-29 | 2006-10-05 | Nippon Steel Engineering Co., Ltd. | Method of carrying bottom mantel for blast furnace |
JP2006307319A (en) * | 2005-03-29 | 2006-11-09 | Nippon Steel Engineering Co Ltd | Method for transporting mantel of furnace bottom for blast furnace |
JP2009209427A (en) * | 2008-03-05 | 2009-09-17 | Nippon Steel Engineering Co Ltd | Structure for fitting iron-shell reinforcing member |
JP2010215985A (en) * | 2009-03-18 | 2010-09-30 | Nippon Steel Engineering Co Ltd | Method for replacing furnace bottom block of blast furnace |
CN109457073A (en) * | 2018-11-16 | 2019-03-12 | 中冶天工集团有限公司 | A kind of big volume blast furnace assembles passage method offline |
CN113832281A (en) * | 2021-09-15 | 2021-12-24 | 中国二十二冶集团有限公司 | Method for industrially manufacturing and installing smelting reduction furnace |
Also Published As
Publication number | Publication date |
---|---|
JP4841809B2 (en) | 2011-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100468106B1 (en) | Method and apparatus for short-term relining or construction of blast furnace | |
JP4841809B2 (en) | Blast furnace construction method | |
JP3165362B2 (en) | Short-term repair and construction of blast furnace | |
JP3539885B2 (en) | Mobile suspension apparatus for furnace body ring block, blast furnace body dismantling method, and blast furnace body construction method | |
JP6789753B2 (en) | Coke furnace and its repair method | |
JPH05222420A (en) | Method for intermediate reconstruction of blast furnace | |
JP4472115B2 (en) | Blast furnace assembly method | |
JP4802457B2 (en) | Method of dismantling the bottom of the blast furnace furnace | |
CN101215616A (en) | Upper repairing method for mammoth converter lining | |
JP4592860B2 (en) | Blast furnace component installation method | |
JP5336893B2 (en) | How to replace the bottom block of a blast furnace | |
JP3046552B2 (en) | Blast furnace furnace construction method | |
JP2005139482A (en) | Method for reconstructing hot blast stove | |
JP4085293B2 (en) | Blast furnace assembly / disassembly apparatus and assembly / disassembly method | |
JP3873549B2 (en) | Blast furnace repair method | |
JP3565123B2 (en) | Foundation reinforcement method and foundation reinforcement structure for blast furnace ring block suspension device in blast furnace furnace ring block method | |
JP2002020812A (en) | Device for changing hanging of furnace body ring block for reconstructing blast furnace | |
JP4737405B2 (en) | Foundation construction method and foundation structure of lifting device | |
JP2004225161A (en) | Shiftable type hang-changing device, unit and method for constructing, demolishing and assembling furnace body in blast furnace | |
JP2007126708A (en) | Method for overhauling and constructing blast furnace | |
JP4583536B2 (en) | Ring mantel centering method | |
JP5193535B2 (en) | Method of dismantling the bottom of the blast furnace furnace | |
JP2000144220A (en) | Method for building, dismantling and repairing blast furnace | |
JP4505355B2 (en) | Blast furnace repair method | |
JP2001003110A (en) | Method for dismantling furnace body mantel in blast furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070316 |
|
RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20070316 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20090724 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090811 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20091009 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20100112 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100412 |
|
A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20100507 |
|
A912 | Re-examination (zenchi) completed and case transferred to appeal board |
Free format text: JAPANESE INTERMEDIATE CODE: A912 Effective date: 20100611 |
|
RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20110726 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110906 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20111005 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4841809 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20141014 Year of fee payment: 3 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |