JP2002091927A - Device and method for managing schedule, computer readable recording medium with schedule management program stored therein and schedule management program - Google Patents

Device and method for managing schedule, computer readable recording medium with schedule management program stored therein and schedule management program

Info

Publication number
JP2002091927A
JP2002091927A JP2001191298A JP2001191298A JP2002091927A JP 2002091927 A JP2002091927 A JP 2002091927A JP 2001191298 A JP2001191298 A JP 2001191298A JP 2001191298 A JP2001191298 A JP 2001191298A JP 2002091927 A JP2002091927 A JP 2002091927A
Authority
JP
Japan
Prior art keywords
schedule
type
period
classifying
adjustment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001191298A
Other languages
Japanese (ja)
Inventor
Shinichiro Nishizawa
信一郎 西澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP2001191298A priority Critical patent/JP2002091927A/en
Publication of JP2002091927A publication Critical patent/JP2002091927A/en
Pending legal-status Critical Current

Links

Landscapes

  • Calculators And Similar Devices (AREA)

Abstract

PROBLEM TO BE SOLVED: To automatically perform adjustment between an inputted new schedule and the existing schedule by analyzing their contents. SOLUTION: A schedule classifying part 34 displays the inputted new schedule as a 'To do' list while classifying the new schedule either of a schedule format between a time limit type in which designated date and time have to be recognized as work time limit and a period type in which a certain designated period has to be secured for work. A schedule adjusting part 36 adjusts the schedule on the basis of the schedule formats which are the time limit type and the period time, when the inputted new schedule temporally overlaps on the existing schedule.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、ToDoリスト等
に入力されるスケジュール情報を管理するスケジュール
管理装置、方法、スケジュール管理プログラムを格納し
たコンピュータ可読の記録媒体及びスケジュール管理プ
ログラムに関し、特に新規スケジュールを入力した際の
既存スケジュールとの間の調整をスケジュールの内容を
解析して自動的に行うようにしたスケジュール管理装
置、方法、スケジュール管理プログラムを格納したコン
ピュータ可読の記録媒体及びスケジュール管理プログラ
ムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a schedule management apparatus and method for managing schedule information input to a ToDo list or the like, a computer-readable recording medium storing a schedule management program, and a schedule management program. The present invention relates to a schedule management apparatus, a method, a computer-readable recording medium storing a schedule management program, and a schedule management program which automatically adjusts an existing schedule when input by analyzing the contents of the schedule.

【0002】[0002]

【従来の技術】従来、携帯端末、パーソナルコンピュー
タ等の個人での使用を目的とした情報処理機器にあって
は、PIM(Personal Information Manager)やPDA(P
erso-nal Data Assistant )として知られた個人情報管
理システムを使用している。このような個人情報管理シ
ステムにあっては、月間予定表、週間予定表、1日の予
定表等のスケジュール表を作成して管理するスケジュー
ル管理、会議資料作成等のように何のために何をするか
の作業項目を設定して管理するToDo管理、住所録を
作成して管理する住所録管理等の個人情報の管理機能が
組み込まれている。 ここでToDoリストを管理する
アプリケーションを考えると、ToDoリストには他者
からの依頼や通知などにより自分が行わなければならな
い作業項目が入力される。入力される作業項目は「何時
までに何々を行う」「何日の何時に何処へ行く」などの
スケジュール情報となることが多い。
2. Description of the Related Art Conventionally, information processing devices for personal use, such as portable terminals and personal computers, include PIM (Personal Information Manager) and PDA (Personal Information Manager).
It uses a personal information management system known as erso-nal Data Assistant. In such a personal information management system, a schedule management system for creating and managing schedules such as a monthly schedule, a weekly schedule, and a daily schedule is required. A personal information management function, such as ToDo management for setting and managing work items to be performed or an address book management for creating and managing an address book, is incorporated. Here, considering an application that manages the ToDo list, work items that the user must perform are input to the ToDo list by a request or notification from another person. The input work item often becomes schedule information such as "what to do by what time", "what time and where to go".

【0003】その結果、管理アプリケーションはToD
oリストからスケジュール情報を入力し、月間予定表、
週間予定表、1日の予定表等のスケジュール表を作成し
て管理する機能が求められる。
As a result, the management application is a ToD
o Enter schedule information from the list,
A function for creating and managing a schedule table such as a weekly schedule table and a daily schedule table is required.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、従来の
スケジュール管理アプリケーションにあっては、ユーザ
が新たに作業項目をToDoリストに入力した場合、入
力した新規スケジュール情報に時間的に重複する既存の
スケジュール情報があっても、そのまま週間予定や月間
予定等のスケジュール表に組込んでおり、重複したスケ
ジュールの調整は、ユーザに依存している。
However, in the conventional schedule management application, when a user newly inputs a work item to the ToDo list, the existing schedule information that temporally overlaps with the new schedule information that is input. Even if there is a schedule, it is incorporated in a schedule table such as a weekly schedule or a monthly schedule, and the adjustment of the duplicate schedule depends on the user.

【0005】またスケジュールが重複した場合に警告表
示を行うものもあるが、基本的には重複した場合にはユ
ーザに調整を依存しており、ToDoリストでユーザが
新たな作業項目を設定してスケジュール情報が入力され
た場合に、既存スケジュールと新規に入力したスケジュ
ールとの間の調整操作が煩雑になる問題があった。
[0005] In some cases, a warning is displayed when the schedules overlap. Basically, when the schedules overlap, the user relies on the user to make adjustments. When the schedule information is input, there is a problem that the adjustment operation between the existing schedule and the newly input schedule becomes complicated.

【0006】本発明の目的は、入力した新規スケジュー
ルと既存スケジュールとの間の調整をそれらのスケジュ
ール情報に基づき自動的に行うようにしたスケジュール
管理装置、方法、スケジュール管理プログラムを格納し
たコンピュータ可読の記録媒体及びスケジュール管理プ
ログラムを提供することを目的とする。
SUMMARY OF THE INVENTION An object of the present invention is to provide a schedule management apparatus, a method, and a computer readable program storing a schedule management program for automatically adjusting an inputted new schedule and an existing schedule based on the schedule information. It is an object to provide a recording medium and a schedule management program.

【0007】[0007]

【課題を解決するための手段】図1は本発明の原理説明
図である。
FIG. 1 is a diagram illustrating the principle of the present invention.

【0008】本発明は、スケジュールを管理するスケジ
ュール管理装置であり、図1(A)のように、入力され
たスケジュールをその情報を基にいずれかの型式に分類
するスケジュール分類部34と、入力されたスケジュー
ルが既存のスケジュールに時間的に重複する場合、各ス
ケジュール型式に基づいてスケジュールを調整するスケ
ジュール調整部36とを備えたことを特徴とする。
The present invention relates to a schedule management device for managing a schedule, as shown in FIG. 1A, a schedule classifying section 34 for classifying an inputted schedule into any type based on its information, And a schedule adjusting unit that adjusts the schedule based on each schedule type when the set schedule temporally overlaps with the existing schedule.

【0009】ここでスケジュール分類部は、指定された
日時を作業の期限とする期限型スケジュールまたは指定
されたある期間を作業のために確保する期間型スケジュ
ールのいずれかの型式に分類する。
Here, the schedule classifying section classifies the data into either a term-type schedule in which a specified date and time is a work deadline or a period-type schedule in which a specified period is reserved for work.

【0010】入力された新規スケジュールを、指定され
た日時を作業の期限として意識する必要のある期限型ス
ケジュール又は指定されたある期間を作業のために確保
する必要のある期間型スケジュールのいずれかの型式に
分類して表示させるスケジュール分類部34と、入力さ
れた新規スケジュールが既存のスケジュールに時間的に
重複している場合、スケジュール分類部34で分類した
期限型と期間型のスケジュール型式に基づいてスケジュ
ールを調整するスケジュール調整部36とを備えたこと
を特徴とする。図1(B)(C)は、スケジュール表示
と分類の例である。
[0010] The input new schedule is either a term-type schedule in which it is necessary to consider a specified date and time as a work time limit or a period-type schedule in which a specified period must be secured for work. The schedule classifying unit 34 for classifying and displaying the schedule, and when the input new schedule temporally overlaps with the existing schedule, the schedule classifying unit 34 classifies the schedule based on the term type and the period type classified by the schedule classifying unit 34. A schedule adjusting unit for adjusting a schedule. FIGS. 1B and 1C are examples of schedule display and classification.

【0011】このように本発明は、スケジュールを期限
型と期間型の2つの型式に分類して月間予定や週間予定
等のスケジュール表に表示するため、利用者は表示され
たスケジュールに対し期限(締め切り)を意識すべき
か、ある期間の参加を意識すべきかを明確に把握でき
る。
As described above, according to the present invention, a schedule is classified into two types, a term type and a period type, and is displayed on a schedule table such as a monthly schedule or a weekly schedule. You can clearly understand whether you should be aware of the (deadline) or participation for a certain period.

【0012】ここでスケジュール分類部34は、ToD
oリストに入力されるスケジュール情報、例えば日時に
関する項目、場所に関する項目、関係者に関する項目、
内容に関する項目、優先度に関する項目、スケジュール
調整等のシステムに関する項目を含むスケジュール情報
に基づいて、期限型スケジュール又は期間型スケジュー
ルのスケジュール型式に分類する。
[0012] Here, the schedule classifying section 34 uses the ToD
o schedule information input to the list, for example, items related to date and time, items related to location, items related to related parties,
Based on schedule information including items related to contents, items related to priorities, and items related to the system such as schedule adjustment, the data is classified into a schedule type of a term-based schedule or a period-based schedule.

【0013】スケジュール調整部36は、入力された新
規スケジュールが既存のスケジュールに時間的に重複し
ている場合に、スケジュール分類部34で分類した期限
型と期間型のスケジュール型式に基づいてスケジュール
を調整するが、この調整対象とするスケジュールの重複
は次の3つに分けられる。
The schedule adjusting unit 36 adjusts the schedule based on the deadline type and the period type schedule types classified by the schedule classification unit 34 when the input new schedule temporally overlaps with the existing schedule. However, the overlap of the schedules to be adjusted is divided into the following three.

【0014】期限型と期限型の重複Deadline type and deadline type overlap

【0015】期間型と期間型の重複Period type overlaps with period type

【0016】期限型と期間型の重複[0016] Duplication of term type and period type

【0017】まず期限型と期限型のスケジュールが重複
した場合の調整を説明する。スケジュール調整部36
は、入力した新規スケジュールと既存スケジュールが共
に期限型スケジュールであり、両者の期限が重複する場
合、両者を調整することなく新規スケジュールをそのま
ま組込む。期限型の2つのスケジュールの期限が重複し
ても、スケジュールとしては問題ないことから、そのま
ま新規スケジュールを組込む。
First, the adjustment when the deadline type schedule and the deadline type schedule overlap will be described. Schedule adjustment unit 36
When both the input new schedule and the existing schedule are deadline-type schedules and the deadlines of the two overlap, the new schedule is incorporated as it is without adjusting the two. Even if the deadlines of two deadline-type schedules overlap, there is no problem as a schedule, so a new schedule is incorporated as it is.

【0018】次に期間型と期間型のスケジュールが重複
した場合の調整を説明する。スケジュール調整部36
は、入力した新規スケジュールと既存スケジュールが共
に期間型スケジュールであり、両者の期間が重複する場
合、優先度の高いスケジュールを残すように調整する。
Next, adjustment when the period type schedule and the period type schedule overlap will be described. Schedule adjustment unit 36
When both the new schedule and the existing schedule that are input are period-type schedules, and the two periods overlap, the schedule is adjusted so that the schedule with the higher priority is left.

【0019】またスケジュール調整部36は、入力した
新規スケジュールと既存スケジュールの優先度が同一の
場合、予め設定された条件に従って選択されたスケジュ
ールを残す。この優先度が同一の場合の条件として、ユ
ーザ選択、既存スケジュールの選択、又は新規スケジュ
ールのいずれかを選択して設定できる。
When the input new schedule and the existing schedule have the same priority, the schedule adjusting unit 36 leaves the schedule selected according to the preset conditions. As a condition when the priorities are the same, one of user selection, selection of an existing schedule, and new schedule can be selected and set.

【0020】次に期限型と期間型のスケジュールが重複
した場合の調整を説明する。スケジュール調整部36
は、入力した新規スケジュールと既存スケジュールのい
ずれか一方が期間型スケジュールで他方が期限型スケジ
ュールの場合、期限型スケジュールの優先度が高いとき
は、期間型スケジュールの期間開始位置に期限型スケジ
ュールを移動するように調整する。
Next, the adjustment in the case where the deadline type and the period type schedules overlap will be described. Schedule adjustment unit 36
Moves the deadline schedule to the period start position of the period schedule when the priority of the deadline schedule is high when one of the entered new schedule and existing schedule is the period schedule and the other is the period schedule Adjust to

【0021】またスケジュール調整部は、期限型スケジ
ュールの優先度が低いときは、例えば期間型スケジュー
ルの期間終了位置に期限型スケジュールを移動するよう
に調整する。
When the priority of the term schedule is low, the schedule adjustment unit adjusts the term schedule to move to the end position of the term of the term schedule, for example.

【0022】このようなToDoリストでユーザが新た
な作業項目を設定してスケジュール情報が入力された場
合に、既存スケジュールと新規に入力したスケジュール
との間のスケジュール調整が自動的に行われるため、利
用者のスケジュール調整作業の負担を大幅に軽減でき
る。
When the user sets a new work item in the ToDo list and inputs schedule information, the schedule between the existing schedule and the newly input schedule is automatically adjusted. The burden of the user's schedule adjustment work can be greatly reduced.

【0023】本発明のスケジュール管理装置は、更に、
スケジュール調整部36の調整により削除されたスケジ
ュールや調整により移動したスケジュールの調整前の位
置を保存するスケジュール履歴管理部38を設ける。こ
の場合、スケジュール調整部36は、既存のスケジュー
ルが削除された際に、スケジュール履歴管理部38によ
り保存されている履歴を参照し、スケジュール調整で削
除されたスケジュールの復活、又はスケジュール調整で
移動した初期位置へのスケジュールの戻しを行う。
The schedule management device according to the present invention further comprises:
A schedule history management unit 38 is provided for storing a position before adjustment of a schedule deleted by adjustment of the schedule adjustment unit 36 or a schedule moved by adjustment. In this case, when the existing schedule is deleted, the schedule adjustment unit 36 refers to the history stored by the schedule history management unit 38, and restores the schedule deleted by the schedule adjustment or moves by the schedule adjustment. Return the schedule to the initial position.

【0024】このようにスケジュール調整により削除さ
れたスケジュールや調整前の位置を履歴として保存して
おくことで、既存スケジュールを削除した際に、その存
在で調整対象となっていたスケジューを履歴から読み出
して復活したり、位置を元に戻すことで、スケジュール
を削除した際の調整を簡単にできる。
As described above, the schedule deleted by the schedule adjustment and the position before the adjustment are stored as a history, so that when the existing schedule is deleted, the schedule that has been adjusted due to its existence is read from the history. You can easily adjust the schedule when you delete it by restoring it or restoring its position.

【0025】また本発明は、スケジュールを管理するス
ケジュール管理方法を提供するものであり、入力された
スケジュールをその情報を基にいずれかの型式に分類す
るスケジュール分類ステップと;入力されたスケジュー
ルが既存のスケジュールに時間的に重複する場合、各ス
ケジュール型式に基づいてスケジュールを調整するスケ
ジュール調整ステップと;を備えたことを特徴とする。
Further, the present invention provides a schedule management method for managing a schedule, a schedule classification step of classifying an inputted schedule into any type based on the information; A schedule adjusting step of adjusting the schedule based on each schedule type when the schedule overlaps with the schedule in the above.

【0026】更に本発明は、コンピュータに、入力され
たスケジュールをその情報を基にいずれかの型式に分類
するスケジュール分類ステップと;入力されたスケジュ
ールが既存のスケジュールに時間的に重複する場合、各
スケジュール型式に基づいてスケジュールを調整するス
ケジュール調整ステップと;を実行させることを特徴と
するスケジュール管理プログラムを格納したコンピュー
タ可読の記録媒体を提供する。
Further, the present invention provides a computer with a schedule classifying step of classifying an inputted schedule into any type based on the information; if the inputted schedule temporally overlaps with an existing schedule, A schedule adjusting step of adjusting a schedule based on a schedule type; and a computer-readable recording medium storing a schedule management program.

【0027】更に本発明は、コンピュータに、入力され
たスケジュールをその情報を基にいずれかの型式に分類
するスケジュール分類ステップと;入力されたスケジュ
ールが既存のスケジュールに時間的に重複する場合、各
スケジュール型式に基づいてスケジュールを調整するス
ケジュール調整ステップと;を実行させることを特徴と
するスケジュール管理プログラムを提供する。
Further, the present invention provides a computer with a schedule classifying step of classifying an inputted schedule into any type based on the information; when the inputted schedule temporally overlaps with an existing schedule, A schedule adjusting step of adjusting a schedule based on a schedule type.

【0028】[0028]

【発明の実施の形態】図2は、本発明のスケジュール管
理装置が適用されるハードウェア構成の一例である。図
2において、スケジュール管理装置は、CPU10、R
OMを用いたプログラムメモリ12、TRAM等を用い
た主記憶14、ハードディスクドライブ(HDD)を用
いた2次記憶16、キーボード、マウス、タッチペンタ
ブレット等を用いた入力部18、CRTや液晶ディスプ
レイ等を用いた表示部20、更に電子メール等の外部と
の通信を行う通信部22を備える。
FIG. 2 shows an example of a hardware configuration to which a schedule management device according to the present invention is applied. In FIG. 2, the schedule management device includes a CPU 10 and an R
A program memory 12 using an OM, a main memory 14 using a TRAM or the like, a secondary memory 16 using a hard disk drive (HDD), an input unit 18 using a keyboard, a mouse, a touch pen tablet, and the like, a CRT, a liquid crystal display, and the like. The display unit 20 includes a display unit 20 used, and a communication unit 22 that communicates with the outside such as e-mail.

【0029】このような本発明が適用されるスケジュー
ル管理装置としては、携帯情報端末機器やパーソナルコ
ンピュータ等の適宜の情報機器が含まれる。
The schedule management apparatus to which the present invention is applied includes a suitable information device such as a portable information terminal device and a personal computer.

【0030】CPU10は、プログラム制御により実現
されるスケジュール管理モジュール26を備える。この
スケジュール管理モジュール26は、例えばPIMやP
DAとして提供されるアプリケーションプログラムの1
つの機能として実現される。このPIMやPDAとして
提供されるアプリケーションプログラムは、スケジュー
ル管理機能、ToDo管理機能、住所録管理機能、更に
はメール管理機能等をサポートしている。
The CPU 10 has a schedule management module 26 realized by program control. The schedule management module 26 includes, for example, PIM and P
One of application programs provided as DA
It is realized as one function. The application program provided as the PIM or PDA supports a schedule management function, a ToDo management function, an address book management function, a mail management function, and the like.

【0031】本発明のスケジュール管理処理にあって
は、スケジュール管理機能とToDo管理機能の2つを
適切に組み合わせてスケジュール管理を行うようにして
いる。
In the schedule management process of the present invention, the schedule management function and the ToDo management function are appropriately combined to perform the schedule management.

【0032】図3は、図2のCPU10に設けたスケジ
ュール管理モジュール26で実現される本発明の機能ブ
ロック図である。スケジュール管理モジュール26は、
スケジュール処理部28、ユーザ入力部30、記憶部3
2で構成され、ユーザに対する表示は表示部20により
実現している。
FIG. 3 is a functional block diagram of the present invention realized by the schedule management module 26 provided in the CPU 10 of FIG. The schedule management module 26
Schedule processing unit 28, user input unit 30, storage unit 3
The display to the user is realized by the display unit 20.

【0033】スケジュール処理部28には、スケジュー
ル分類部34、スケジュール調整部36及びスケジュー
ル履歴管理部38が設けられる。また記憶部32にはス
ケジュール保存領域40とスケジュール履歴保存領域4
2が設けられている。
The schedule processing section 28 includes a schedule classification section 34, a schedule adjustment section 36, and a schedule history management section 38. The storage unit 32 has a schedule storage area 40 and a schedule history storage area 4.
2 are provided.

【0034】スケジュール処理部28のスケジュール分
類部34は、ユーザ入力部30から入力された新規スケ
ジュールを期限型スケジュールまたは期間型スケジュー
ルのいずれかのスケジュール型式に分類する。
The schedule classifying unit 34 of the schedule processing unit 28 classifies the new schedule input from the user input unit 30 into a schedule type of a term type schedule or a period type schedule.

【0035】ここで、期限型スケジュールとは、指定さ
れた日時を作業の期限として意識する必要のあるタイプ
のスケジュールであり、完了期限指示型ということもで
きる。また期間型スケジュールとは、指定されたある期
間を作業のために確保する必要のあるタイプであり、参
加期限指示型スケジュールと言うこともできる。
Here, the term schedule is a type of schedule that requires the user to be aware of a designated date and time as a term of work, and can also be referred to as a completion term indication type. The term-type schedule is a type that requires a specified period to be reserved for work, and can also be referred to as a participation deadline-instruction-type schedule.

【0036】このようなスケジュール分類部34におけ
る新規に入力されたスケジュールを期限型か期間型に分
類するためのスケジュール入力情報として、ユーザ入力
部30からは日時、場所、内容等に関する項目が提供さ
れる。
As the schedule input information for classifying the newly inputted schedule in the schedule classifying section 34 into the expiration type or the period type, items relating to the date, time, place, contents, etc. are provided from the user input section 30. You.

【0037】本発明の実施形態にあっては、ユーザ入力
部30によるスケジュール情報の入力にToDoリスト
の作成画面を使用しており、このためスケジュール分類
部34に対する新規スケジュールのスケジュール情報と
しては、ToDoリストに入力される日時に関する項
目、場所に関する項目、関係者に関する項目、内容に関
する項目、優先度に関する項目、スケジュール調整等の
システムに関する項目が含まれ、これらの項目に基づい
て期間型スケジュールか期限型スケジュールかに分類す
るようになる。
In the embodiment of the present invention, a ToDo list creation screen is used for inputting schedule information by the user input unit 30. Therefore, the schedule information of the new schedule for the schedule classifying unit 34 is ToDo list. Items related to the date and time entered in the list, items related to places, items related to stakeholders, items related to contents, items related to priorities, items related to systems such as schedule adjustment, etc. are included. It will be classified as a schedule.

【0038】スケジュール処理部28は、ユーザ入力部
30から入力された新規スケジュールが、記憶部32の
スケジュール保存領域40のスケジュールリストに既に
登録されている既存のスケジュールに時間的に重複して
いる場合、スケジュール分類部34で分類したスケジュ
ールのタイプ、即ち期限型か期間型かに基づいてスケジ
ュールを調整する。
When the new schedule input from the user input unit 30 temporally overlaps with the existing schedule already registered in the schedule list in the schedule storage area 40 of the storage unit 32, the schedule processing unit 28 The schedule is adjusted based on the type of the schedule classified by the schedule classifying unit 34, that is, the term type or the period type.

【0039】スケジュール調整部36によるスケジュー
ル調整は、 (1)期限型と期限型の重複したスケジュールの調整 (2)期間型と期間型の重複したスケジュールの調整 (3)期間型と期限型の重複したスケジュールの調整 の3つの調整モードに分けることができる。
The schedule adjustment by the schedule adjustment unit 36 includes (1) adjustment of a schedule in which a term type and a term type overlap, (2) adjustment of a schedule in which a term type and a term type overlap, and (3) overlap of a term type and a term type. Schedule adjustment can be divided into three adjustment modes.

【0040】まず期限型と期限型の重複スケジュールに
ついては、新規スケジュールと既存スケジュールの両方
をスケジュールリストに登録しても問題がないことか
ら、期限型の新規スケジュールをそのままスケジュール
リストに組み入れる。 また期間型と期間型の重複スケ
ジュールについては、両者の優先度を比較し、優先度の
高いスケジュールを残し、優先度の低いスケジュールを
削除する。このスケジュール調整により削除されたスケ
ジュールは、記憶部32のスケジュール履歴保存領域4
2に登録される。
First, as for the deadline type and the overlapping schedule of the deadline type, since there is no problem even if both the new schedule and the existing schedule are registered in the schedule list, the new deadline type schedule is directly incorporated into the schedule list. In addition, for the period-type and period-type overlapping schedules, the priorities of the two are compared, and the schedule with the higher priority is left, and the schedule with the lower priority is deleted. The schedule deleted by this schedule adjustment is stored in the schedule history storage area 4 of the storage unit 32.
Registered in 2.

【0041】期間型と期間型の重複スケジュールの優先
度が同一の場合には、予め設定した条件に従っていずれ
か一方のスケジュールを残す。この優先度が同一の場合
のスケジュール調整の条件としては、 (1)ユーザ選択 (2)既存スケジュールの選択 (3)新規スケジュールの選択 のいずれかとすることができる。
When the priority of the period-type and the period-type overlap schedule are the same, one of the schedules is left according to a preset condition. When the priorities are the same, the conditions for schedule adjustment can be any of (1) user selection, (2) selection of existing schedule, and (3) selection of new schedule.

【0042】更に期間型と期限型の重複スケジュールの
調整については、期限型スケジュールの優先度が高い場
合と期限型スケジュールの優先度が低い場合に分けられ
る。期間型スケジュールに対し期限型スケジュールの優
先度が高い場合には、期限型スケジュールの期間開始位
置に期限型スケジュールを移動するように調整する。逆
に期限型スケジュールの優先度が低い場合には、期間型
スケジュールの期間終了位置に期限型スケジュールを移
動するように調整する。
Further, the adjustment of the overlapping schedule of the period type and the term type is divided into a case where the priority of the term type schedule is high and a case where the priority of the term type schedule is low. When the priority of the term schedule is higher than that of the term schedule, adjustment is made to move the term schedule to the period start position of the term schedule. Conversely, when the priority of the term-based schedule is low, adjustment is made so that the term-based schedule is moved to the period end position of the period-based schedule.

【0043】この期間型スケジュールとの調整のために
期限型スケジュールを移動した場合には、移動前の初期
位置をスケジュールレコードのシステム領域に保存し、
その後に調整対象となった期限型スケジュールの削除が
行われた場合に初期位置に戻すために利用する。
When the deadline schedule is moved for adjustment with the period schedule, the initial position before the movement is stored in the system area of the schedule record.
It is used to return to the initial position when the deadline schedule which has been adjusted is subsequently deleted.

【0044】スケジュール履歴管理部38は、スケジュ
ール保存領域40のスケジュールリストに登録されてい
る既存のスケジュールの削除処理が行われた場合に、削
除されたスケジュールを消去せずに記憶部32のスケジ
ュール履歴保存領域42に登録するようにしている。
The schedule history management unit 38 does not delete the deleted schedule but deletes the schedule history in the storage unit 32 when the existing schedule registered in the schedule list in the schedule storage area 40 is deleted. The information is registered in the storage area 42.

【0045】これによって、必要な場合にスケジュール
履歴保存領域42を検索することで、既にスケジュール
リストから削除したスケジュールを簡単にスケジュール
に戻すことができる。
Thus, by retrieving the schedule history storage area 42 when necessary, a schedule already deleted from the schedule list can be easily returned to the schedule.

【0046】更に本発明にあっては、単なる削除処理に
対するスケジュールの保存のみならず、スケジュール調
整部36による新規スケジュールと既存スケジュールの
調整で削除された場合の削除スケジュールをスケジュー
ル履歴保存領域42に保存しており、削除する原因とな
った既存スケジュールがその後に削除された場合、スケ
ジュール履歴保存領域42の検索で削除スケジュールと
重複している保存スケジュールを検索してスケジュール
リストに回復させるようにする。
Further, in the present invention, not only the schedule for the mere deletion processing but also the deletion schedule when deleted by the adjustment of the new schedule and the existing schedule by the schedule adjustment unit 36 is stored in the schedule history storage area 42. If the existing schedule that caused the deletion is subsequently deleted, the schedule history storage area 42 is searched for a storage schedule that overlaps with the deletion schedule, and is restored to the schedule list.

【0047】またスケジュール履歴管理部38は、スケ
ジュール削除の際にスケジュール保存領域40を検索
し、削除スケジュールとの間で以前にスケジュール調整
が行われて位置が移動している期限型スケジュールを検
索し、検索した期限型スケジュールをその初期位置に戻
す移動回復処理も同時に行わせることになる。
The schedule history management unit 38 searches the schedule storage area 40 when deleting a schedule, and searches for a deadline type schedule whose position has been moved due to a previous schedule adjustment with the deletion schedule. Then, the movement recovery process for returning the searched term-based schedule to its initial position is also performed at the same time.

【0048】図4は、図3の記憶部32のスケジュール
保存領域40に登録されているスケジュールリストの説
明図である。スケジュールリスト44は、例えばスケジ
ュールレコードR01,R02,R03,・・・R08
で構成される。 1つ1つのスケジュールレコードR0
1〜R08は、スケジュールレコードR01について右
側に取り出して示すように、図3のユーザ入力部30で
作成したToDoリストにより入力されたスケジュール
情報を持っている。
FIG. 4 is an explanatory diagram of a schedule list registered in the schedule storage area 40 of the storage unit 32 of FIG. The schedule list 44 includes, for example, schedule records R01, R02, R03,.
It consists of. Each schedule record R0
1 to R08 have schedule information input by the ToDo list created by the user input unit 30 in FIG. 3, as shown on the right side of the schedule record R01.

【0049】このToDoリストに従ったスケジュール
レコードの内容は、スケジュールの識別子となるスケジ
ュールIDに続いて、日付、内容、スケジュールのタイ
プ、優先度、場所、関係者、システム情報に関する各項
目が記述されている。
In the contents of the schedule record according to the ToDo list, items related to date, contents, schedule type, priority, location, related parties, and system information are described after the schedule ID serving as a schedule identifier. ing.

【0050】更に詳細に説明すると、日時に関する項目
としては、スケジュールの入力日時、指定期限または指
定期間、更に必要な日程等が含まれる。内容に関する項
目としては、会議の出席予定者や連絡を必要とするもの
等が記述される。内容に関する項目は「何をどうするの
か」という事柄が記述される。
More specifically, the items relating to the date and time include the date and time of inputting the schedule, the designated term or designated period, and the necessary schedule. As the items relating to the contents, those who are expected to attend the meeting, those requiring contact, and the like are described. In the item related to the content, a matter "what to do" is described.

【0051】タイプに関する項目は、図3のスケジュー
ル分類部34で分類されたスケジュールタイプとなる期
限型か期間型かのいずれかが記述される。優先度に関す
る項目は、スケジュールの優先度を何らかの型式で表現
しており、例えば最優先をA、続いて次の優先度をB、
更に3番目の優先度をC、優先度が特定しない場合をZ
のような型式で記述する。
In the item relating to the type, either the term type or the period type, which is the schedule type classified by the schedule classification unit 34 in FIG. 3, is described. The item relating to the priority expresses the priority of the schedule in some form, for example, A represents the highest priority, B represents the next priority, and B represents the next priority.
Further, the third priority is C, and the case where the priority is not specified is Z.
It is described in the format as follows.

【0052】場所に関する項目は、提出先、移動先、集
合場所、開催場所等を記述する。関係者に関する項目
は、出席予定者、連絡の必要なもの等を記述する。更に
システム情報に関する項目は、スケジュール調整によっ
て本来指定された期限や期間から移動したかどうかのス
ケジュール調整結果に関する情報を記述する。
The item relating to the location describes the destination, the destination, the meeting place, the venue, and the like. Items related to related parties include those who are expected to attend and those that need to be contacted. Further, the item relating to the system information describes information relating to the schedule adjustment result indicating whether or not the system has moved from the originally specified deadline or period due to the schedule adjustment.

【0053】図5は、図3のユーザ入力部30でスケジ
ュール情報の入力のために使用するToDoリスト作成
画面の説明図である。
FIG. 5 is an explanatory diagram of a ToDo list creation screen used for inputting schedule information in the user input section 30 of FIG.

【0054】図5において、ToDoリスト作成画面4
8は、図4のスケジュールレコードの項目に対応した入
力機能を持っている。即ちToDoリスト作成画面48
には、内容記述部50、日時記述部52、場所記述部5
4、関係者記述部56、優先度指定部58が設けられて
いる。
In FIG. 5, a ToDo list creation screen 4
8 has an input function corresponding to the items of the schedule record in FIG. That is, the ToDo list creation screen 48
Includes a content description section 50, a date / time description section 52, and a location description section 5.
4. A related person description unit 56 and a priority designation unit 58 are provided.

【0055】このうち日時記述部52にあっては、従来
のToDoリスト作成画面のように年、日、時間等を固
定的に定めている固定フォーマットではなく、日時に関
する情報を自由に記述することのできるフリーフォーマ
ットを適用している。このため利用者は、日時に関する
情報として、日、時間、期限等、必要に応じて自由な型
式で容易に記述することができる。
In the date / time description section 52, information on date / time is freely described, not in a fixed format in which year, day, time, etc. are fixedly set as in the conventional ToDo list creation screen. Applying a free format that allows For this reason, the user can easily describe the information on the date and time, such as the date, the time, the time limit, and the like in a free format as needed.

【0056】優先度指定部58は、上部の指定枠58−
1に現在の指定優先度が表示され、この指定優先度は下
側の選択領域の中からマウスクリックにより適宜に選択
することができる。
The priority designation section 58 includes an upper designation frame 58-
1 indicates the current designated priority, and the designated priority can be appropriately selected from the lower selection area by clicking the mouse.

【0057】更にToDoリスト作成画面48の下部に
は、登録ボタン60、キャンセルボタン62、入力クリ
アボタン64が設けられる。登録ボタン60は、ToD
oリスト作成画面48で必要な項目の入力が完了した際
に操作すると、図4に示した構造のスケジュールレコー
ドを生成して、図3のスケジュール処理部28にユーザ
入力部30から供給されるようになる。
Further, a registration button 60, a cancel button 62, and an input clear button 64 are provided below the ToDo list creation screen 48. The registration button 60 is a ToD
When the operation is performed when the necessary items are completed on the o-list creation screen 48, a schedule record having the structure shown in FIG. 4 is generated and supplied from the user input unit 30 to the schedule processing unit 28 in FIG. become.

【0058】キャンセルボタン62は、ToDoリスト
作成処理をキャンセルする際に使用する。入力クリアボ
タン64は、各記述部において記述を間違った際に初期
状態にクリアするために使用する。
The cancel button 62 is used to cancel the ToDo list creation processing. The input clear button 64 is used to clear the description to an initial state when the description is incorrect in each description section.

【0059】図6は、図3に示した本発明によるスケジ
ュール管理処理の全体的な手順を示したフローチャート
である。図6において、本発明のスケジュール管理モジ
ュールを起動すると、ステップS1でスケジュール管理
画面となるメニュー画面が表示される。
FIG. 6 is a flowchart showing the overall procedure of the schedule management process according to the present invention shown in FIG. In FIG. 6, when the schedule management module of the present invention is activated, a menu screen which is a schedule management screen is displayed in step S1.

【0060】続いてステップS2で終了の有無をチェッ
クしており、終了でなければステップS3に進み、メニ
ュー画面を使用して図5に示したToDoリスト作成画
面48によりToDoリストの新規作成の有無をチェッ
クしている。図5のToDoリスト作成画面48の作成
が行われて登録ボタン60が操作されると、ステップS
3でToDoリストの新規作成が判別され、ステップS
4に進み、図3のスケジュール分類部34によって、入
力した新規スケジュールの期間型または期限型への分類
処理が行われる。
Subsequently, it is checked in step S2 whether or not there is an end. If not, the flow advances to step S3 to check whether or not to newly create a ToDo list using the menu screen and the ToDo list creation screen 48 shown in FIG. Is checked. When the ToDo list creation screen 48 shown in FIG. 5 is created and the registration button 60 is operated, step S
In step S3, it is determined that a new ToDo list is to be created.
The process proceeds to step 4, where the schedule classifying unit 34 shown in FIG. 3 performs a process of classifying the input new schedule into a period type or a term type.

【0061】続いてステップS5に進み、図3のスケジ
ュール調整部36によって新規スケジュールに時間的に
重複する既存スケジュールを検索し、ステップS6で重
複を判別すると、ステップS7に進み、スケジュール調
整処理を行う。続いてステップS8で既存スケジュール
の削除の有無をチェックしており、スケジュール削除が
あるとステップS9に進み、図3のスケジュール履歴管
理部38によるスケジュール履歴管理処理を行う。
Subsequently, the process proceeds to step S5, in which the schedule adjusting unit 36 of FIG. 3 searches for an existing schedule that temporally overlaps with the new schedule, and if the overlap is determined in step S6, the process proceeds to step S7 to perform schedule adjustment processing. . Subsequently, in step S8, the presence or absence of the deletion of the existing schedule is checked. If the schedule is deleted, the process proceeds to step S9, and the schedule history management unit 38 of FIG. 3 performs the schedule history management process.

【0062】図7は、図6のステップS4における入力
した新規スケジュールの分類処理のフローチャートであ
る。このスケジュール分類処理は、ステップS1でTo
Doリスト作成画面から得られた入力スケジュール情報
より日時、場所、内容の各項目を取り出し、期限付き作
業か期限内作業かを判定する。
FIG. 7 is a flowchart of the classification process of the new schedule input in step S4 of FIG. This schedule classification processing is performed in Step S1 of To
The date, location, and contents are extracted from the input schedule information obtained from the Do list creation screen, and it is determined whether the operation is a work with a time limit or a work within the time limit.

【0063】ステップS2で期限付き作業であることが
判定されると、ステップS3でタイプを期限型スケジュ
ールに設定する。またステップS4で期間内作業が判別
されると、ステップS5で期間型スケジュールに設定す
る。
If it is determined in step S2 that the operation is a work with a time limit, the type is set to a time limit type schedule in step S3. If work within the period is determined in step S4, a period type schedule is set in step S5.

【0064】図8は、図7のスケジュール分類処理を通
じて保存されているスケジュールリストに基づくスケジ
ュール表の具体例である。図8(A)はスケジュール表
であり、図8(B)のスケジュールリストに基づいて表
示されている。
FIG. 8 is a specific example of a schedule table based on the schedule list stored through the schedule classification processing of FIG. FIG. 8A is a schedule table, which is displayed based on the schedule list in FIG. 8B.

【0065】図8(A)のスケジュール表70は、例え
ば週間スケジュール表の一部であり、5月15日、5月
16日、5月17日の3つの領域72−1,72−2,
72−3の3日間のスケジュール表示を例にとってい
る。このスケジュール表70に表示されたスケジュール
は図8(B)のスケジュールリスト44から作り出され
ている。
The schedule table 70 shown in FIG. 8A is, for example, a part of a weekly schedule table, and includes three areas 72-1, 72-2, May 15, May 16, and May 17.
The example shows a schedule display of 72-3 for three days. The schedule displayed in the schedule table 70 is created from the schedule list 44 in FIG. 8B.

【0066】スケジュールリスト44は、スケジュール
IDに相当する項目番号(1)〜(8)を持ち、それぞ
れ日時及び内容、タイプ、更に優先度を持っている。も
ちろん、それ以外の項目は説明を簡単にするため省略し
ている。
The schedule list 44 has item numbers (1) to (8) corresponding to schedule IDs, and has date and time, contents, type, and priority. Of course, other items are omitted for the sake of simplicity.

【0067】ここで項目番号(1)(4)(8)の3つ
が期限型であり、残りの項目番号(2)(3)(5)
(6)(7)が期間型となっている。また優先度は高い
順に、A,B,Cが指定されている。
Here, three of the item numbers (1), (4) and (8) are of the term type, and the remaining item numbers (2), (3) and (5)
(6) and (7) are of the period type. A, B, and C are specified in descending order of priority.

【0068】図8(A)のスケジュール表70における
期限型及び期間型スケジュールの表示を簡単に説明する
と次のようになる。まず項目番号(1)の期限型のスケ
ジュールにあっては、作業期限が「5/17 17:0
0」であって、入力時と期限との間にひらきがあること
から、これを明示する例として、この場合は入力日時が
「5/15 8:30」であることから、作業開始から
作業終了までを矢印で表わすようにしている。それ以外
の項目番号(4)(8)にあっては、期限、日時を三角
形のマーカで示している。
The display of the deadline type and the period type schedule in the schedule table 70 of FIG. 8A will be briefly described as follows. First, in the deadline type schedule of item number (1), the work deadline is “5/17 17: 0”.
0 ”and there is a gap between the input time and the deadline. As an example to clearly show this, since the input date and time is“ 5/15 8:30 ”in this case, The arrow until the end is indicated. For other item numbers (4) and (8), the expiration date and date are indicated by triangular markers.

【0069】また期間型にあっては項目番号(2)のよ
うに、5月15日の領域72−1に期間の開始時刻から
期間の終了時刻までを矢印で示し、更に項目番号、内
容、開始時刻、終了時刻を表示している。尚、期限型と
期間型を表示する際の区別は、表示色を異ならせてもよ
い。
In the case of the period type, as shown in item number (2), an arrow from the start time of the period to the end time of the period is indicated by an arrow in the area 72-1 on May 15, and the item number, contents, The start time and end time are displayed. It should be noted that the display color of the term type and that of the period type may be different from each other.

【0070】図9は、図6のステップS7に示すスケジ
ュール調整処理をサブルーチンとして示したフローチャ
ートである。
FIG. 9 is a flowchart showing, as a subroutine, the schedule adjustment processing shown in step S7 of FIG.

【0071】図9のスケジュール調整処理にあっては、
まずステップS1で時間的に重複が判断された新規スケ
ジュールと既存スケジュールの型式を取り出す。この2
つのスケジュールの間には、前述したように (1)期限型と期限型 (2)期間型と期間型 (3)期間型と期限型 のいずれかの組み合わせがある。
In the schedule adjustment processing of FIG.
First, in step S1, a model of a new schedule and a model of an existing schedule whose temporal overlap is determined are extracted. This 2
As described above, there are two types of schedules: (1) deadline type and deadline type, (2) period type and period type, and (3) period type and deadline type.

【0072】そこでステップS2,S4,S7の各々に
おいて、期限型と期限型、期間型と期間型、期間型と期
限型の判別を行う。ステップS2で新規スケジュールと
既存スケジュールが期限型と期限型の場合には、ステッ
プS3に進み、新規スケジュールをそのままスケジュー
ルリストに組み込む。
Therefore, in each of steps S2, S4, and S7, a term type and a term type, a term type and a term type, and a term type and a term type are determined. If the new schedule and the existing schedule are the deadline type and the deadline type in step S2, the process proceeds to step S3, and the new schedule is directly incorporated into the schedule list.

【0073】ステップS4で新規スケジュールと既存ス
ケジュールが期間型と期間型の場合には、ステップS5
に進み、優先度の高いスケジュールを残すように調整す
る。この場合、ステップS6で各スケジュールのシステ
ム項目に修正ありを記述し、更に削除した期間型スケジ
ュールは図3の記憶部32に設けているスケジュール履
歴保存領域42に保存する。
If the new schedule and the existing schedule are of the period type and the period type in step S4, step S5
And adjust so as to leave a schedule with a high priority. In this case, the system item of each schedule is described as modified in step S6, and the deleted period type schedule is stored in the schedule history storage area 42 provided in the storage unit 32 of FIG.

【0074】更にステップS7で新規スケジュールと既
存スケジュールが期間型と期限型であった場合には、ス
テップS8に進み、期限型の優先度と期間型の優先度を
比較し、期限型の優先度が期間型の優先度以上であった
場合には、ステップS9に進み、期間型の開始位置に期
限型を移動する。
If it is determined in step S7 that the new schedule and the existing schedule are of the period type and the term type, the process proceeds to step S8, where the priority of the term type and the priority of the term type are compared. If is greater than or equal to the priority of the period type, the process proceeds to step S9, and the term type is moved to the start position of the period type.

【0075】一方、期限型の優先度が期間型の優先度よ
り低かった場合には、ステップS10に進み、期間型の
終了位置に期限型を移動する。ステップS9またはステ
ップS10で期限型の位置を移動するスケジュール調整
を行った場合には、ステップS11で移動したスケジュ
ールのシステム領域に修正ありと修正前の位置を記述し
て、図6のルーチンにリターンする。
On the other hand, if the priority of the term type is lower than the priority of the term type, the process proceeds to step S10, and the term type is moved to the end position of the term type. If the schedule adjustment for moving the deadline type position is performed in step S9 or step S10, the corrected position is described in the system area of the moved schedule in step S11, and the process returns to the routine of FIG. I do.

【0076】図10は、図9のステップS3における新
規スケジュールと既存スケジュールが共に期限型の場合
のスケジュール調整の具体的な説明図である。図10
(A)は図8(A)と同じ内容のスケジュール表70で
あり、スケジュール調整前を示している。ここで図10
(B)の新規スケジュール入力があったとすると、新規
スケジュール74の日時は「5/17 12:00」で
あることから、図10(A)の既存のスケジュール表の
5月17日の領域72−3に設定している既存スケジュ
ール76と重複する。
FIG. 10 is a specific explanatory diagram of the schedule adjustment when both the new schedule and the existing schedule are of the term type in step S3 of FIG. FIG.
(A) is a schedule table 70 having the same contents as FIG. 8 (A), and shows before the schedule adjustment. Here, FIG.
If the new schedule input of (B) is made, since the date and time of the new schedule 74 is “5/17 12:00”, the area 72- of the existing schedule table of FIG. 3 overlaps with the existing schedule 76 set.

【0077】この既存スケジュール76は項目番号
(8)であることから、図8(B)より期限型となる。
したがって新規スケジュール74と既存スケジュール7
6は共に期限型として重複している。このように2つの
スケジュールが期限型で重複した場合には、両方の期限
を同時に設定してもスケジュールとしては特に問題はな
ことから、図10(C)のように新規スケジュール78
を項目番号(9)として既存スケジュール76に重複し
て組み入れる。
Since the existing schedule 76 has the item number (8), it is of a term type from FIG. 8B.
Therefore, the new schedule 74 and the existing schedule 7
6 overlaps as a deadline type. When the two schedules are of the deadline type and thus overlap each other, there is no particular problem with the schedule even if both deadlines are set at the same time. Therefore, as shown in FIG.
Is redundantly incorporated into the existing schedule 76 as the item number (9).

【0078】図11は、図9のステップS5における新
規スケジュールと既存スケジュールが共に期間型の場合
のスケジュール調整の具体例である。
FIG. 11 shows a specific example of schedule adjustment when both the new schedule and the existing schedule are of the period type in step S5 of FIG.

【0079】図11(A)は、図8(A)と同じスケジ
ュール調整前のスケジュール表70であり、この状態で
図11(B)の新規スケジュール80の入力があったと
する。新規スケジュール80の日時は「5/15 1
4:00〜16:00」であり、既存のスケジュール表
70における5月16日の領域72−2に設定している
既存スケジュール82と時間帯が重複している。
FIG. 11A shows the same schedule table 70 before schedule adjustment as in FIG. 8A, and it is assumed that a new schedule 80 shown in FIG. 11B is input in this state. The date and time of the new schedule 80 is “5/15 1
4:00 to 16:00 ”, and the time slot overlaps with the existing schedule 82 set in the area 72-2 on May 16 in the existing schedule table 70.

【0080】この新規スケジュール80に重複する既存
スケジュール82は、項目番号は(6)であり、図8
(B)のようにタイプが期間型であり、優先度は「B」
となっている。図11(A)の既存スケジュール82の
下側には、図11(B)の新規スケジュール84を仮に
設定した場合を破線で囲んで示している。このように既
存スケジュール82に対し新規スケジュール84をその
まま設定すると期間が重複しており、スケジュールとし
ては成立しない。
The existing schedule 82 overlapping the new schedule 80 has the item number (6),
The type is the period type as in (B), and the priority is “B”
It has become. A case where a new schedule 84 in FIG. 11B is temporarily set is shown below the existing schedule 82 in FIG. Thus, if the new schedule 84 is set as it is to the existing schedule 82, the periods overlap, and the schedule is not established.

【0081】そこで既存スケジュール82と新規スケジ
ュール84をスケジュール調整するため、まず優先度を
比較する。ここで優先度は新規スケジュール84が最優
先となる「A」であり、既存スケジュール82は図8
(B)から次に優先度が高い「B」である。
In order to adjust the schedule of the existing schedule 82 and the schedule of the new schedule 84, the priorities are compared first. Here, the priority is “A” in which the new schedule 84 has the highest priority.
“B” has the next highest priority from (B).

【0082】したがって期間型の2つのスケジュールが
重複した場合には、優先度の高い新規スケジュール84
を残し優先度の低い既存スケジュール82を削除するス
ケジュール調整を行う。その結果、図11(C)のよう
に優先度の高い新規スケジュール84がスケジュール表
70に残るようになる。
Therefore, when the two schedules of the period type overlap, the new schedule 84
, And delete the existing schedule 82 with a low priority. As a result, a new schedule 84 having a high priority as shown in FIG.

【0083】このとき調整前の既存のスケジュール表8
2は削除されるが、削除された既存スケジュール82の
スケジュールレコードは、図3の記憶部32に設けてい
るスケジュール履歴保存領域42に登録される。
At this time, the existing schedule table 8 before adjustment
2 is deleted, but the schedule record of the deleted existing schedule 82 is registered in the schedule history storage area 42 provided in the storage unit 32 of FIG.

【0084】図12は、図9のステップS7〜S11に
おいて、新規スケジュールと既存スケジュールが期限型
と期間型で重複した場合のスケジュール調整の具体例で
ある。図12(A)は図8(A)と同じ調整前のスケジ
ュール表70である。
FIG. 12 shows a specific example of schedule adjustment when the new schedule and the existing schedule overlap in the term type and the period type in steps S7 to S11 in FIG. FIG. 12A is the same schedule table 70 before adjustment as in FIG. 8A.

【0085】このスケジュール表に対し、図12(B)
に示す新規スケジュールレコード86が入力したとする
と、図12(A)の5月16日の既存スケジュール88
と新規スケジュール90が重複する。ここで新規スケジ
ュール90は期限型であり、期限が「5/16 10:
00」となっており、既存スケジュール88の期間「5
/16 8:30〜11:45」に重複している。
FIG. 12B shows the schedule table.
If a new schedule record 86 shown in FIG. 12 is input, the existing schedule 88 on May 16 in FIG.
And the new schedule 90 overlap. Here, the new schedule 90 is of a term type, and the term is “5/16 10:
00 ”and the period“ 5
/ 16 8:30 to 11:45 ".

【0086】このように期限型スケジュールと期間型ス
ケジュールが重複した場合には、両者の優先度を比較す
る。ここで新規スケジュール90の優先度は図12
(B)より最優先の「A」であり、これに対し既存スケ
ジュール88の優先度は項目番号が(5)であることか
ら、図8(B)より優先度は「B」となっている。
When the term schedule and the term schedule overlap in this way, the priorities of both are compared. Here, the priority of the new schedule 90 is shown in FIG.
The priority is “A”, which is the highest priority than (B), whereas the priority of the existing schedule 88 is item number (5), so the priority is “B” from FIG. 8B. .

【0087】したがって期限型スケジュール90の方が
優先度が高いことから、この場合には図12(C)のよ
うに重複する期間型の既存スケジュール88の期間開始
時刻「8:30」の位置に期限型のスケジュール92ト
して移動する。また逆に期限型スケジュール90の優先
度が期間型の既存スケジュール88より低かった場合に
は、既存スケジュール88の終了時刻「11:45」の
位置に期限型スケジュール92として移動する。
Therefore, since the term schedule 90 has a higher priority, in this case, as shown in FIG. 12C, the term schedule 90 is located at the position of the period start time “8:30” of the existing term schedule 88 which overlaps. The schedule is moved to a deadline schedule 92. Conversely, if the priority of the term schedule 90 is lower than that of the existing schedule 88 of the period type, the schedule 90 moves to the position of the end time “11:45” of the existing schedule 88 as the term schedule 92.

【0088】更に図12(C)のように、期限型スケジ
ュール92の位置を移動した場合には、その移動前の位
置「5/16 10:00」を新規スケジュールレコー
ドのシステム領域に保存する。
Further, as shown in FIG. 12C, when the position of the deadline schedule 92 is moved, the position “5/16 10:00” before the movement is stored in the system area of the new schedule record.

【0089】図13は、図6のステップS9におけるス
ケジュール履歴管理処理の詳細をサブルーチンとして示
したフローチャートである。このスケジュール履歴管理
処理にあっては、まずステップS1でスケジュール表の
表示画面上で削除する既存のスケジュールを指定する。
FIG. 13 is a flowchart showing details of the schedule history management processing in step S9 of FIG. 6 as a subroutine. In the schedule history management process, first, in step S1, an existing schedule to be deleted is specified on the display screen of the schedule table.

【0090】この削除スケジュールが指定されると、ス
テップS2で、指定したスケジュールをスケジュール保
存領域即ちスケジュールリストから取り除き、スケジュ
ール履歴保存領域に登録する。
When this deletion schedule is designated, in step S2, the designated schedule is removed from the schedule storage area, that is, the schedule list, and registered in the schedule history storage area.

【0091】このスケジュール削除とスケジュール履歴
保存領域の登録が済んだならば、ステップS3で削除ス
ケジュールの日時に重複するスケジュールをスケジュー
ル履歴保存領域から検索する。
After the schedule deletion and the registration of the schedule history storage area are completed, a schedule overlapping the date and time of the deletion schedule is searched from the schedule history storage area in step S3.

【0092】重複するスケジュールがスケジュール履歴
保存領域から検索できたならば、ステップS4で、検索
したスケジュールのシステム領域を参照して調整により
削除されたスケジュールか否かチェックする。もし調整
により削除されたスケジュールであればステップS5に
進み、調整前の位置にスケジュールを復活する。即ち、
スケジュール履歴保存領域の削除したスケジュール情報
の位置に入れ替える。
If an overlapping schedule has been retrieved from the schedule history storage area, it is checked in step S4 whether the retrieved schedule has been deleted by referring to the system area of the retrieved schedule. If the schedule has been deleted by the adjustment, the process proceeds to step S5, and the schedule is restored to the position before the adjustment. That is,
Replace with the position of the deleted schedule information in the schedule history storage area.

【0093】更にステップS6で、削除したスケジュー
ルの日時に重複するスケジュールをスケジュール保存領
域から検索する。この検索によって、以前のスケジュー
ル履歴調整によって位置が移動したスケジュールが検索
できる。
In step S6, a schedule overlapping the date and time of the deleted schedule is searched from the schedule storage area. By this search, the schedule whose position has been moved by the previous schedule history adjustment can be searched.

【0094】続いてステップS7で、検索されたスケジ
ュールが調整による移動スケジュールか否かチェックす
る。これは検索したスケジュールのシステム領域に調整
ありの記述があるか否かで判断できる。調整による移動
スケジュールであった場合にはステップS8に進み、調
整前の位置にスケジュールを移動させる。
Subsequently, in step S7, it is checked whether or not the searched schedule is a moving schedule by adjustment. This can be determined based on whether or not the system area of the searched schedule includes a description indicating that there is adjustment. If the movement schedule has been adjusted, the process proceeds to step S8, and the schedule is moved to the position before adjustment.

【0095】図14は、図13のスケジュール履歴管理
処理の具体例であり、既存のスケジュールを削除してス
ケジュール調整により位置が移動したスケジュールを初
期位置に戻す場合を例にとっている。
FIG. 14 shows a specific example of the schedule history management processing of FIG. 13, in which the existing schedule is deleted and the schedule whose position has been moved by the schedule adjustment is returned to the initial position.

【0096】図14(A)は図12(C)のスケジュー
ル調整済みのスケジュール表である。このスケジュール
表70について、例えば5月16日の項目番号(5)の
スケジュール94を削除したとする。このスケジュール
94の削除が行われるとスケジュール保存領域からスケ
ジュールリストが消去されて、新たにスケジュール保存
領域にスケジュールリストが登録される。
FIG. 14A is a schedule table after the schedule adjustment of FIG. 12C. For example, it is assumed that the schedule 94 of the item number (5) on May 16 is deleted from the schedule table 70. When the schedule 94 is deleted, the schedule list is deleted from the schedule storage area, and the schedule list is newly registered in the schedule storage area.

【0097】続いて削除スケジュール94と日時が重複
するスケジュールのスケジュール履歴保存領域の検索を
行うが、この場合には該当するスケジュールは検索され
ない。次に削除スケジュールと日時が重複するスケジュ
ール保存領域のスケジュールの検索を行う。
Subsequently, the schedule history storage area of the schedule whose date and time overlap with the deletion schedule 94 is searched. In this case, the corresponding schedule is not searched. Next, a search is made for a schedule in a schedule storage area whose date and time overlap with the deletion schedule.

【0098】この検索によって図14(A)の調整済み
スケジュール96が検索される。この調整済みスケジュ
ール96は、そのシステム情報として「調整あり」と調
整前の初期位置「5/16 10:00」を持っている
ことから、図14(B)のように初期位置に戻した回復
スケジュール98とする。
By this search, the adjusted schedule 96 shown in FIG. 14A is searched. Since the adjusted schedule 96 has “adjusted” as the system information and the initial position “5/16 10:00” before the adjustment, the restored schedule 96 is restored to the initial position as shown in FIG. Schedule 98.

【0099】また本発明は、図3のスケジュール管理モ
ジュールの機能ブロック図の処理機能を備えたスケジュ
ール管理プログラムを格納したコンピュータ読出し可能
な記録媒体を提供するものである。
The present invention also provides a computer-readable recording medium storing a schedule management program having the processing functions of the functional block diagram of the schedule management module shown in FIG.

【0100】この記録媒体の実施形態としては、CD−
ROMやフロッピディスク等のリムーバブルな可搬型の
記録媒体、回線によりプログラムを提供するプログラム
提供者の記憶装置、更にプログラムをインストールした
処理装置のRAMやハードディスク等のメモリがある。
また、記録媒体によって提供されたプログラムは処理装
置にローディングされ、その主メモリ上で実行される。
As an embodiment of this recording medium, a CD-
There are a removable portable recording medium such as a ROM and a floppy disk, a storage device of a program provider that provides a program via a line, and a memory such as a RAM or a hard disk of a processing device in which the program is installed.
Further, the program provided by the recording medium is loaded into the processing device and executed on the main memory.

【0101】尚、上記の実施形態は、図5のようにTo
Doリスト作成画面48を使用してスケジュール情報を
入力する場合を例にとるものであったが、作業項目を示
す内容、日時、場所、関係者、優先度の指定等の項目を
含むスケジュール情報の入力であれば、ToDoリスト
作成画面によらず適宜の入力画面を使用したスケジュー
ル情報の管理を含む。
In the above embodiment, as shown in FIG.
Although the case where the schedule information is input using the Do list creation screen 48 is described as an example, the schedule information including items such as the content indicating the work item, the date and time, the place, the person concerned, and the priority is designated. For input, the management of schedule information using an appropriate input screen regardless of the ToDo list creation screen is included.

【0102】また上記の実施形態にあっては、スケジュ
ール管理により作成表示されるスケジュール表として週
間スケジュール表を例にとるものであったが、これ以外
に月間スケジュール表や一日のスケジュール表について
も全く同様に、本発明によるスケジュール管理結果に基
づくスケジュール表示を行うことができる。
In the above-described embodiment, the weekly schedule table is taken as an example of the schedule table created and displayed by the schedule management. In exactly the same manner, a schedule display based on a schedule management result according to the present invention can be performed.

【0103】更にまた上記の実施形態に示したスケジュ
ール表の表示形態はこれに限定されず、適宜のフォーマ
ット構成のスケジュール表の表示であっても良い。
Furthermore, the display form of the schedule table shown in the above embodiment is not limited to this, and the display of the schedule table having an appropriate format may be used.

【0104】また本発明は上記の実施形態に限定され
ず、その目的と利点を損なわない適宜の変形を含み、更
に実施形態に示した数値による限定は受けない。
The present invention is not limited to the above-described embodiments, includes appropriate modifications that do not impair the objects and advantages thereof, and is not limited by the numerical values shown in the embodiments.

【0105】(付記) (付記1)スケジュールを管理するスケジュール管理装
置に於いて、入力されたスケジュールをその情報を基に
いずれかの型式に分類するスケジュール分類部と、入力
されたスケジュールが既存のスケジュールに時間的に重
複する場合、各スケジュール型式に基づいてスケジュー
ルを調整するスケジュール調整部と、を備えたことを特
徴とするスケジュール管理装置。
(Supplementary Note) (Supplementary Note 1) In a schedule management device for managing a schedule, a schedule classifying unit for classifying an inputted schedule into any one of the types based on the information, A schedule management device, comprising: a schedule adjustment unit that adjusts a schedule based on each schedule type when the schedule overlaps with time.

【0106】(付記2)付記1記載のスケジュール管理
装置に於いて、前記スケジュール分類部は、指定された
日時を作業の期限とする期限型スケジュールまたは指定
されたある期間を作業のために確保する期限型スケジュ
ールのいずれかの型式に分類することを特徴とするスケ
ジュール管理装置。
(Supplementary Note 2) In the schedule management device according to Supplementary Note 1, the schedule classification unit secures a deadline-type schedule in which a specified date and time is a work deadline or a specified period for work. A schedule management device, wherein the schedule management device is categorized into any of the expiration type schedules.

【0107】(付記3)付記2記載のスケジュール管理
装置に於いて、前記スケジュール分類部は、入力した新
規スケジュールに含まれる日時、場所、内容に関する項
目等に基づいて、前記期限型スケジュール又は期間型ス
ケジュールのスケジュール型式に分類することを特徴と
するスケジュール管理装置。
(Supplementary Note 3) In the schedule management device according to Supplementary Note 2, the schedule classifying unit may be configured to execute the term-based schedule or the period-based schedule based on items related to the date, time, place, and contents included in the input new schedule. A schedule management device characterized by classifying a schedule into a schedule type.

【0108】(付記4)付記2記載のスケジュール管理
装置に於いて、前記スケジュール分類部は、ToDoリ
ストに入力される日時に関する項目、場所に関する項
目、関係者に関する項目、内容に関する項目、優先度に
関する項目、スケジュール調整等のシステムに関する項
目を含むスケジュール情報に基づいて、前記期限型スケ
ジュール又は期間型スケジュールのスケジュール型式に
分類することを特徴とするスケジュール管理装置。
(Supplementary Note 4) In the schedule management device according to Supplementary Note 2, the schedule classification unit may include an item related to a date and time, an item related to a place, an item related to a related person, an item related to a content, and a priority related to a ToDo list. A schedule management device, wherein the schedule management device is categorized into the deadline type schedule or the period type schedule based on schedule information including items related to the system such as items and schedule adjustment.

【0109】(付記5)付記2記載のスケジュール管理
装置に於いて、前記スケジュール調整部は、入力した新
規スケジュールと既存スケジュールが共に期限型スケジ
ュールであり、両者の期限が重複する場合、両者を調整
することなく新規スケジュールをそのまま組込むことを
特徴とするスケジュール管理装置。
(Supplementary Note 5) In the schedule management device according to Supplementary Note 2, the schedule adjustment unit adjusts both the input new schedule and the existing schedule if they are deadline-type schedules and both deadlines overlap. A schedule management device characterized in that a new schedule is incorporated as it is without performing.

【0110】(付記6)付記2記載のスケジュール管理
装置に於いて、前記スケジュール調整部は、入力した新
規スケジュールと既存スケジュールが共に期間型スケジ
ュールであり、両者の期間が重複する場合、優先度の高
いスケジュールを残すように調整することを特徴とする
スケジュール管理装置。
(Supplementary Note 6) In the schedule management device according to Supplementary Note 2, the schedule adjustment unit may determine whether the input new schedule and the existing schedule are both period-type schedules and the two schedules overlap each other. A schedule management device characterized by adjusting so as to leave a high schedule.

【0111】(付記7)付記6記載のスケジュール管理
装置に於いて、前記スケジュール調整部は、入力した新
規スケジュールと既存スケジュールの優先度が同一の場
合、予め設定された条件に従って選択されたスケジュー
ルを残すことを特徴とするスケジュール管理装置。
(Supplementary note 7) In the schedule management device according to supplementary note 6, when the priority of the inputted new schedule is the same as the priority of the existing schedule, the schedule adjustment unit may execute the schedule selected according to the preset condition. Schedule management device characterized by leaving.

【0112】(付記8)付記7記載のスケジュール管理
装置に於いて、前記スケジュール調整部は、優先度が同
一の場合の条件として、ユーザ選択、既存スケジュール
の選択、又は新規スケジュールの選択を設定することを
特徴とするスケジュール管理装置。
(Supplementary note 8) In the schedule management device according to supplementary note 7, the schedule adjusting unit sets a user selection, an existing schedule selection, or a new schedule selection as a condition when the priorities are the same. A schedule management device, characterized in that:

【0113】(付記9)付記2記載のスケジュール管理
装置に於いて、前記スケジュール調整部は、入力した新
規スケジュールと既存スケジュールのいずれか一方が期
間型スケジュールで他方が期限型スケジュールの場合、
期限型スケジュールの優先度が高いときは、期間型スケ
ジュールの期間開始位置に期限型スケジュールを移動す
るように調整することを特徴とするスケジュール管理装
置。
(Supplementary note 9) In the schedule management device according to supplementary note 2, the schedule adjusting unit may determine whether the input new schedule or the existing schedule is a period type schedule and the other is a term type schedule.
When the priority of the term schedule is high, the schedule management device adjusts the term schedule to move to the period start position of the term schedule.

【0114】(付記10)付記9記載のスケジュール管
理装置に於いて、前記スケジュール調整部は、期限型ス
ケジュールの優先度が低いときは、期間型スケジュール
の期間終了位置に期限型スケジュールを移動するように
調整することを特徴とするスケジュール管理装置。
(Supplementary note 10) In the schedule management device according to supplementary note 9, when the priority of the deadline-type schedule is low, the schedule adjustment unit moves the deadline-type schedule to the period end position of the period-type schedule. A schedule management device, characterized in that the schedule is adjusted.

【0115】(付記11)付記9記載のスケジュール管
理装置に於いて、更に、前記スケジュール調整部の調整
により削除されたスケジュールや調整により移動したス
ケジュールの調整前の位置を保存するスケジュール履歴
管理部を設け、前記スケジュール調整部は、既存のスケ
ジュールが削除された際に、前記スケジュール履歴管理
部により保存されている履歴を参照し、スケジュール調
整で削除されたスケジュールの復活又はスケジュール調
整で移動した初期位置へのスケジュールの戻しを行うこ
とを特徴とするスケジュール管理装置。
(Supplementary Note 11) The schedule management device according to supplementary note 9, further comprising a schedule history management unit for storing a schedule deleted by the adjustment of the schedule adjustment unit and a position before the adjustment of the schedule moved by the adjustment. Wherein the schedule adjustment unit refers to the history stored by the schedule history management unit when the existing schedule is deleted, and restores the schedule deleted by the schedule adjustment or moves to the initial position moved by the schedule adjustment. A schedule management device for returning a schedule to a schedule management device.

【0116】(付記12)スケジュールを管理するスケ
ジュール管理方法に於いて、入力されたスケジュールを
その情報を基にいずれかの型式に分類するスケジュール
分類ステップと、入力されたスケジュールが既存のスケ
ジュールに時間的に重複する場合、各スケジュール型式
に基づいてスケジュールを調整するスケジュール調整ス
テップと、を備えたことを特徴とするスケジュール管理
方法。
(Supplementary Note 12) In a schedule management method for managing a schedule, a schedule classifying step of classifying an inputted schedule into any one of the types based on the information, And a schedule adjusting step of adjusting a schedule based on each schedule type when the schedules overlap.

【0117】(付記13)付記12記載のスケジュール
管理方法に於いて、前記スケジュール分類ステップは、
指定された日時を作業の期限とする期限型スケジュール
または指定されたある期間を作業のために確保する期間
型スケジュールのいずれかの型式に分類することを特徴
とするスケジュール管理方法。
(Supplementary Note 13) In the schedule management method according to supplementary note 12, the schedule classification step includes:
A schedule management method characterized by being classified into one of a term-type schedule in which a specified date and time is a work term and a term-type schedule in which a specified period is reserved for work.

【0118】(付記14)コンピュータに、入力された
スケジュールをその情報を基にいずれかの型式に分類す
るスケジュール分類ステップと、入力されたスケジュー
ルが既存のスケジュールに時間的に重複する場合、各ス
ケジュール型式に基づいてスケジュールを調整するスケ
ジュール調整ステップと、を実行させることを特徴とす
るスケジュール管理プログラムを格納したコンピュータ
可読の記録媒体。
(Supplementary Note 14) A schedule classifying step of classifying the inputted schedule into any one of the types based on the information, and a case where the inputted schedule temporally overlaps with the existing schedule. And a schedule adjusting step of adjusting a schedule based on a model. A computer-readable recording medium storing a schedule management program.

【0119】(付記15)コンピュータに、入力された
スケジュールをその情報を基にいずれかの型式に分類す
るスケジュール分類ステップと、入力されたスケジュー
ルが既存のスケジュールに時間的に重複する場合、各ス
ケジュール型式に基づいてスケジュールを調整するスケ
ジュール調整ステップと、を実行させることを特徴とす
るスケジュール管理プログラム。
(Supplementary Note 15) A schedule classifying step of classifying the inputted schedule into any one of the types based on the information, and a case where the inputted schedule temporally overlaps with the existing schedule. A schedule adjusting step of adjusting a schedule based on a model type.

【0120】[0120]

【発明の効果】以上説明してきたように本発明によれ
ば、利用者が入力した新規のスケジュールをその内容に
よって、指定された日時を作業の期限として意識する必
要のある期限型と、指定されたある期間を作業のために
確保する必要のある期間型に分類してスケジュール表に
表示するため、利用者は各スケジュールに対し期限(締
切)を意識すべきか、ある期間の参加を意識すべきかを
明確に把握したスケジュールの認識ができる。
As described above, according to the present invention, a new schedule input by a user is specified according to its contents as a deadline type for which it is necessary to consider a specified date and time as a work deadline. Should the user be aware of the deadline (deadline) for each schedule or be aware of participation in a certain period in order to classify certain periods into the period types that need to be reserved for work and display them in the schedule table? The schedule can be recognized by clearly grasping the schedule.

【0121】また新規スケジュールを入力して既存スケ
ジュールと重複する場合には、重複するスケジュールの
タイプ即ち期限型と期間型のタイプ、更に優先度によっ
てスケジュールの自動調整が行われ、利用者のスケジュ
ール調整の手間を大幅に削減することができる。更に、
入力した新規スケジュールと既存スケジュールの調整が
自動的に行われることで、更に細かな調整を利用者が行
う際の下地を自動調整機能によって得ることができる。
When a new schedule is input and an existing schedule is duplicated, the schedule is automatically adjusted according to the type of the overlapping schedule, that is, the type of the deadline type and the period type, and the priority, and the schedule adjustment of the user is performed. Labor can be greatly reduced. Furthermore,
By automatically adjusting the inputted new schedule and the existing schedule, it is possible to obtain a base when the user performs more detailed adjustment by the automatic adjustment function.

【0122】更にまた、スケジュールの履歴を保存管理
することで、削除した既存スケジュールがそのまま消去
されずに残っており、必要に応じてスケジュールに復活
させることができる。更に、スケジュール調整で削除さ
れたり位置が変更されたスケジュールにつき、既存のス
ケジュールの削除で元のスケジュールに復帰したり初期
位置に戻すことができ、この点においてもスケジュール
削除の際のスケジュール回復調整が不要となり、その
分、利用者の手間を削減し、更に細かい調整を行う場合
の下地をスケジュール削除に伴う復活や初期位置への移
動機能により簡単に実現することができる。
Furthermore, by storing and managing the schedule history, the deleted existing schedule remains without being deleted, and can be restored to the schedule if necessary. Furthermore, for a schedule that has been deleted or its position has been changed due to schedule adjustment, it is possible to return to the original schedule or return to the initial position by deleting the existing schedule. This is unnecessary, and the user's labor can be reduced accordingly, and the base for performing further fine adjustment can be easily realized by the resurrection function accompanying the schedule deletion and the function of moving to the initial position.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の原理説明図FIG. 1 is a diagram illustrating the principle of the present invention.

【図2】本発明のハードウェア構成の一例のブロック図FIG. 2 is a block diagram illustrating an example of a hardware configuration according to the present invention;

【図3】本発明によるスケジュール管理モジュールの一
実施形態となる機能ブロック図
FIG. 3 is a functional block diagram showing an embodiment of a schedule management module according to the present invention.

【図4】図3のスケジュール保存領域に格納されたスケ
ジュールリストとスケジュールレコードの説明図
FIG. 4 is an explanatory diagram of a schedule list and schedule records stored in a schedule storage area of FIG. 3;

【図5】本発明でスケジュール情報の入力に使用するT
oDo作成画面の説明図
FIG. 5 shows T used for inputting schedule information in the present invention.
Illustration of oDo creation screen

【図6】本発明によるスケジュール管理処理の全体的な
フローチャート
FIG. 6 is an overall flowchart of a schedule management process according to the present invention.

【図7】本発明によるスケジュール分類処理のフローチ
ャート
FIG. 7 is a flowchart of a schedule classification process according to the present invention.

【図8】本発明で作成されたスケジュール表とスケジュ
ールリストの具体例の説明図
FIG. 8 is an explanatory diagram of a specific example of a schedule table and a schedule list created by the present invention.

【図9】本発明によるスケジュール調整処理のフローチ
ャート
FIG. 9 is a flowchart of a schedule adjustment process according to the present invention.

【図10】期限型と期限型の間でスケジュールを調整す
る具体例の説明図
FIG. 10 is an explanatory diagram of a specific example of adjusting a schedule between expiration types.

【図11】期間型と期間型の間でスケジュールを調整す
る具体例の説明図
FIG. 11 is an explanatory diagram of a specific example of adjusting a schedule between a period type and a period type.

【図12】期限型と期間型の間でスケジュールを調整す
る具体例の説明図
FIG. 12 is an explanatory diagram of a specific example of adjusting a schedule between a term type and a period type.

【図13】本発明によるスケジュール履歴保存処理のフ
ローチャート
FIG. 13 is a flowchart of a schedule history storing process according to the present invention.

【図14】調整済みの期限型スケジュールを削除した際
に調整による移動したスケジュールを元の位置に戻す具
体例の説明図
FIG. 14 is an explanatory diagram of a specific example of returning a schedule moved by adjustment to an original position when an adjusted deadline schedule is deleted.

【符号の説明】[Explanation of symbols]

10:CPU 12:プログラムメモリ 14:主記憶 16:2次記憶 18:入力部 20:表示部 22:通信部 24:バス 26:スケジュール処理部 28:ユーザ入力部 32:記憶部 34:スケジュール分類部 36:スケジュール調整部 38:スケジュール履歴管理部 40:スケジュール保存領域 42:スケジュール履歴保存領域 44:スケジュールリスト 46:スケジュールレコード 48:ToDo作成画面(スケジュール情報入力画面) 50:内容記述枠 52:日時記述部 54:場所記述部 56:関係者記述部 58:優先度指定部 60:登録釦 62:キャンセル釦 64:入力クリア釦 70:スケジュール表 72−1〜72−3:表示領域(日単位) 76,82,88:期限型スケジュール(既存) 78,90:期限型スケジュール(新規) 84:期間型スケジュール(新規) 92:調整済み期限型スケジュール 94:削除スケジュール 96:回復スケジュール 10: CPU 12: Program memory 14: Main storage 16: Secondary storage 18: Input unit 20: Display unit 22: Communication unit 24: Bus 26: Schedule processing unit 28: User input unit 32: Storage unit 34: Schedule classification unit 36: schedule adjustment unit 38: schedule history management unit 40: schedule history storage area 42: schedule history storage area 44: schedule list 46: schedule record 48: ToDo creation screen (schedule information input screen) 50: content description frame 52: date and time description Part 54: Location description part 56: Related person description part 58: Priority designation part 60: Registration button 62: Cancel button 64: Input clear button 70: Schedule table 72-1 to 72-3: Display area (by day) 76 , 82, 88: Deadline schedule (existing) 78, 90: Deadline schedule Jules (new) 84: period type schedule (new) 92: adjusted period type schedule 94: Delete schedule 96: recovery schedule

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】スケジュールを管理するスケジュール管理
装置に於いて、 入力されたスケジュールをその情報を基にいずれかの型
式に分類するスケジュール分類部と、 入力されたスケジュールが既存のスケジュールに時間的
に重複する場合、各スケジュール型式に基づいてスケジ
ュールを調整するスケジュール調整部と、を備えたこと
を特徴とするスケジュール管理装置。
1. A schedule management device for managing a schedule, comprising: a schedule classifying unit for classifying an inputted schedule into any one of the types based on the information; A schedule management device, comprising: a schedule adjusting unit that adjusts a schedule based on each schedule type when overlapping.
【請求項2】請求項1記載のスケジュール管理装置に於
いて、前記スケジュール分類部は、指定された日時を作
業の期限とする期限型スケジュールまたは指定されたあ
る期間を作業のために確保する期間型スケジュールのい
ずれかの型式に分類することを特徴とするスケジュール
管理装置。
2. The schedule management device according to claim 1, wherein the schedule classifying unit has a deadline-type schedule in which a specified date and time is set as a work deadline, or a period for which a specified period is secured for the work. A schedule management device, wherein the device is classified into any one of a type schedule.
【請求項3】請求項2記載のスケジュール管理装置に於
いて、前記スケジュール分類部は、入力した新規スケジ
ュールに含まれる日時、場所、内容に関する項目等に基
づいて、前記期限型スケジュール又は期間型スケジュー
ルのスケジュール型式に分類することを特徴とするスケ
ジュール管理装置。
3. The schedule management device according to claim 2, wherein the schedule classifying unit is configured to execute the deadline type schedule or the period type schedule on the basis of items related to the date, time, place, and content included in the input new schedule. A schedule management device, wherein the schedule management device is classified into the following schedule types.
【請求項4】スケジュールを管理するスケジュール管理
方法に於いて、 入力されたスケジュールをその情報を基にいずれかの型
式に分類するスケジュール分類ステップと、 入力されたスケジュールが既存のスケジュールに時間的
に重複する場合、各スケジュール型式に基づいてスケジ
ュールを調整するスケジュール調整ステップと、を備え
たことを特徴とするスケジュール管理方法。
4. A schedule management method for managing a schedule, comprising: a schedule classification step of classifying an inputted schedule into any one of the types based on the information; A schedule adjusting step of adjusting a schedule based on each schedule type when the schedules overlap.
【請求項5】コンピュータに、 入力されたスケジュールをその情報を基にいずれかの型
式に分類するスケジュール分類ステップと、 入力されたスケジュールが既存のスケジュールに時間的
に重複する場合、各スケジュール型式に基づいてスケジ
ュールを調整するスケジュール調整ステップと、を実行
させるスケジュール管理プログラムを格納したコンピュ
ータ可読の記録媒体。
5. A schedule classifying step for classifying an inputted schedule into any one of the types based on the information, and when the inputted schedule temporally overlaps with an existing schedule, the computer comprises: A computer-readable recording medium storing a schedule management program for executing a schedule adjusting step of adjusting a schedule based on the schedule.
【請求項6】コンピュータに、 入力されたスケジュールをその情報を基にいずれかの型
式に分類するスケジュール分類ステップと、 入力されたスケジュールが既存のスケジュールに時間的
に重複する場合、各スケジュール型式に基づいてスケジ
ュールを調整するスケジュール調整ステップと、を実行
させることを特徴とするスケジュール管理プログラム。
6. A schedule classifying step for classifying an inputted schedule into any one of the types based on the information, and when the inputted schedule temporally overlaps with an existing schedule, a schedule classification step is performed for each schedule type. A schedule adjustment step of adjusting a schedule based on the schedule management program.
JP2001191298A 2000-07-10 2001-06-25 Device and method for managing schedule, computer readable recording medium with schedule management program stored therein and schedule management program Pending JP2002091927A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001191298A JP2002091927A (en) 2000-07-10 2001-06-25 Device and method for managing schedule, computer readable recording medium with schedule management program stored therein and schedule management program

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2000208298 2000-07-10
JP2000-208298 2000-07-10
JP2001191298A JP2002091927A (en) 2000-07-10 2001-06-25 Device and method for managing schedule, computer readable recording medium with schedule management program stored therein and schedule management program

Publications (1)

Publication Number Publication Date
JP2002091927A true JP2002091927A (en) 2002-03-29

Family

ID=26595700

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001191298A Pending JP2002091927A (en) 2000-07-10 2001-06-25 Device and method for managing schedule, computer readable recording medium with schedule management program stored therein and schedule management program

Country Status (1)

Country Link
JP (1) JP2002091927A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009518708A (en) * 2005-12-05 2009-05-07 コーニンクレッカ フィリップス エレクトロニクス エヌ ヴィ Flexible care plan method and apparatus
JP2019070913A (en) * 2017-10-06 2019-05-09 株式会社野村総合研究所 Schedule information analysis system and program

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009518708A (en) * 2005-12-05 2009-05-07 コーニンクレッカ フィリップス エレクトロニクス エヌ ヴィ Flexible care plan method and apparatus
JP2019070913A (en) * 2017-10-06 2019-05-09 株式会社野村総合研究所 Schedule information analysis system and program

Similar Documents

Publication Publication Date Title
US20020004734A1 (en) Schedule managing apparatus and method and computer-readable recording medium storing schedule managing program therein
US20150347987A1 (en) Integrated Daily Digital Planner
US8266520B2 (en) System and computer program product for efficiently processing comments to records in a database, while avoiding replication/save conflicts
US20110137929A1 (en) Computer implemented method for integrating services in a calendar application via web services
US5850219A (en) Method and system for electronic document approval with displayed imprint
US20150242091A1 (en) Unified Presentation Of Contextually Connected Information To Improve User Efficiency And Interaction Performance
JPH10214113A (en) Task processing system using notice board type data base, and method for processing the same
WO2017115158A1 (en) Native application collaboration
US11120200B1 (en) Capturing unstructured information in application pages
JP2008140089A (en) Information management device, conference system and program
US20240126975A1 (en) Method, apparatus, terminal and storage medium for data processing for an application
US20160062576A1 (en) Presentation apparatus and method providing composer content control and presenter selection flexibility for crafting presentations
JP2003337728A (en) Management method and device for data file history
WO2022242439A1 (en) Information processing method and apparatus, terminal, and storage medium
KR101109292B1 (en) Active agenda
US6671855B1 (en) Outline information generating apparatus and computer-readable recording medium recording thereon outline information generating program
JP5245143B2 (en) Document management system and method
JP2019102096A (en) Device and method for folder management
US11170311B2 (en) System and method for determining expense information based on inferred events
JPH0981636A (en) Project management assisting device
JP2002091927A (en) Device and method for managing schedule, computer readable recording medium with schedule management program stored therein and schedule management program
US10200496B2 (en) User interface configuration tool
JP2002312352A (en) Related document management system
JPH09244844A (en) Information presentation system and recording medium
JP2017102694A (en) Gantt chart generation program, gantt chart generation apparatus and gantt charge generation method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061218

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070810

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080304

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20080701