JP2001164870A - Construction method for vertical shaft - Google Patents

Construction method for vertical shaft

Info

Publication number
JP2001164870A
JP2001164870A JP34889399A JP34889399A JP2001164870A JP 2001164870 A JP2001164870 A JP 2001164870A JP 34889399 A JP34889399 A JP 34889399A JP 34889399 A JP34889399 A JP 34889399A JP 2001164870 A JP2001164870 A JP 2001164870A
Authority
JP
Japan
Prior art keywords
liner
tubular liner
shaft
tubular
excavation hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP34889399A
Other languages
Japanese (ja)
Other versions
JP3427022B2 (en
Inventor
Eiji Onishi
英二 大西
Nobuo Sugita
信夫 杉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Raito Kogyo Co Ltd
Original Assignee
Raito Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Raito Kogyo Co Ltd filed Critical Raito Kogyo Co Ltd
Priority to JP34889399A priority Critical patent/JP3427022B2/en
Publication of JP2001164870A publication Critical patent/JP2001164870A/en
Application granted granted Critical
Publication of JP3427022B2 publication Critical patent/JP3427022B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PROBLEM TO BE SOLVED: To construct a vertical shaft safely and quickly. SOLUTION: A drilled hole D equal to the vertical shaft Y in full length is formed in the object ground by a slurry excavation, and a tubular liner 30 equal to the vertical shaft Y in full length is erected in the drilled hole D filled with the slurry B. The slurry B around the tubular liner 30 is solidified, and the tubular liner 30 is stuck to the wall of the drilled hole D via a solidified body to construct the vertical shaft Y.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、筒状ライナーを用
いる立坑の構築方法に関する。
The present invention relates to a method for constructing a shaft using a cylindrical liner.

【0002】[0002]

【従来の技術】周知のように、推進工法等の作業基地と
して構築される立坑においては、坑壁崩壊を防止して安
全に作業を行うことができるように土留めが施される。
従来は、親杭横矢板による土留め、鋼矢板による土留
め、地下連続壁による土留め等の方法が採用されていた
が、近年では、資材の保管場所や施工機械の保管・設置
場所の省スペース化の観点から、地盤に掘削形成した掘
削孔内において複数のライナープレートを筒状に連結し
て土留め壁とする立坑構築工法が頻繁に採用されるよう
になっている。
2. Description of the Related Art As is well known, in a shaft constructed as a working base for a propulsion method or the like, earth retaining is provided so that collapse of a pit wall can be prevented and work can be performed safely.
Conventionally, methods such as earth retaining with parent pile horizontal sheet pile, earth retaining with steel sheet pile, earth retaining with underground continuous wall, etc. have been adopted, but in recent years, saving of material storage place and construction machine storage and installation place has been reduced. From the viewpoint of space, a vertical shaft construction method in which a plurality of liner plates are connected in a tubular shape to form an earth retaining wall in an excavation hole excavated and formed in the ground has been frequently adopted.

【0003】かかるライナープレートを用いる立坑構築
工法について概説すると、先ず、計画した立坑の大きさ
よりやや大きめの、ライナープレート1リング分の深さ
の掘削孔を掘削した後、この掘削孔内において順次ライ
ナープレートをボルトとナットにより緊結して組み立て
て土留めを行う。ライナープレート1リング分の組み立
てを終えたならば、続いて更に1リング分の掘削を行
い、先行敷設したライナープレートリングの下に2段目
のライナープレートリングを組み立て連結する。以降順
次、1リング分の掘削およびリング組み立てを繰り返し
て、所定深度のライナープレート立坑を構築する。
[0003] An outline of a shaft construction method using such a liner plate is as follows. First, a drilling hole slightly larger than the planned shaft size and having a depth of one ring of the liner plate is excavated, and then the liner is sequentially inserted in the drilling hole. The plate is fastened with bolts and nuts to assemble and retain the soil. When the assembly for one ring of the liner plate is completed, one more ring is excavated, and the second-stage liner plate ring is assembled and connected below the previously laid liner plate ring. Thereafter, the excavation for one ring and the ring assembly are sequentially repeated to construct a liner plate shaft having a predetermined depth.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、従来方
法は、作業員が掘削孔内でリング組み立て及びリング相
互の接続を行う必要があり、少なからず危険を伴うもの
であった。
However, in the conventional method, it is necessary for an operator to assemble the ring and to connect the rings to each other in the borehole, which involves considerable danger.

【0005】また従来方法においては、作業員が掘削孔
内で作業を行う以上、孔壁の崩壊を確実に防がなければ
ならないため、一度に1リング分しか掘削および土留め
を行えず、迅速な施工は不可能であった。
In the conventional method, the collapse of the hole wall must be surely prevented as long as the worker works inside the excavation hole. Therefore, only one ring can be excavated and soil-retained at a time. Construction was not possible.

【0006】他方、一般的なライナープレートはその周
囲地盤等に対する食い付きを良くするために、表面が波
形をなしている。したがって、不用になったとしても地
上から引き抜くことができない。他の方法としては、作
業員が筒状ライナー内に入りライナー上端から順に分解
していくしかないが、孔壁崩壊のおそれがあり非常に危
険である。よって従来は、ライナーをそのまま埋め殺す
他なく、非常に不経済であった。
On the other hand, the surface of a general liner plate is corrugated in order to improve the bite against the surrounding ground and the like. Therefore, even if it becomes unnecessary, it cannot be pulled out from the ground. As another method, an operator only has to enter the cylindrical liner and disassemble in order from the upper end of the liner. However, there is a risk that the hole wall may collapse, which is extremely dangerous. Therefore, conventionally, the liner has to be buried and killed, which is very uneconomical.

【0007】したがって、本発明の主たる課題は、安全
かつ迅速な立坑の構築方法を提供することにある。ま
た、他の課題は、ライナーを容易に撤去回収できるよう
にすることにある。
[0007] Accordingly, a main object of the present invention is to provide a method for constructing a shaft that is safe and quick. Another object is to enable the liner to be easily removed and collected.

【0008】[0008]

【課題を解決するための手段】上記課題を解決した本発
明の立坑構築方法は、請求項1記載の発明は、安定液掘
削により対象地盤に立坑全長分の掘削孔を形成し、この
安定液で満たされた掘削孔内に立坑全長分の筒状ライナ
ーを建込み、しかる後、この筒状ライナーの周囲の安定
液を固化させて、筒状ライナーが固化体を介して掘削孔
壁に密着した立坑を構築することを特徴とする、立坑の
構築方法である。
According to a first aspect of the present invention, there is provided a method of constructing a shaft according to the first aspect of the present invention. A cylindrical liner for the entire length of the shaft is built in the borehole filled with, and after that, the stable liquid around the cylindrical liner is solidified, and the cylindrical liner adheres to the borehole wall via the solidified body This is a method for constructing a shaft, characterized by constructing a shaft.

【0009】請求項2記載の発明は、長手方向に接続す
ることによって立坑全長分となる複数の分割筒状ライナ
ーを用意し、先頭の分割筒状ライナーに対し順次後続の
分割筒状ライナーを接続して延長しながら、接続部分を
前記掘削孔内に順次落とし下げていくことによって、前
記立坑全長分の筒状ライナーの建込みを行う、請求項1
記載の立坑の構築方法である。
According to a second aspect of the present invention, a plurality of divided tubular liners are prepared by connecting them in the longitudinal direction so as to correspond to the entire length of the shaft, and successive divided tubular liners are sequentially connected to the first divided tubular liner. 2. A tubular liner for the entire length of the shaft is built by sequentially dropping a connection portion into the excavation hole while extending the pipe liner.
It is a construction method of the shaft described above.

【0010】請求項3記載の発明は、前記筒状ライナー
内を通り掘削孔下端部に臨む注入路を設け、この注入路
を介して筒状ライナーの周囲の安定液に固化材を注入し
固化を図る、請求項1または2記載の立坑の構築方法で
ある。
According to a third aspect of the present invention, there is provided an injection passage which passes through the inside of the cylindrical liner and faces the lower end portion of the drilling hole, and a solidifying material is injected into a stable liquid around the cylindrical liner through the injection passage to solidify. The method according to claim 1 or 2, wherein the shaft is constructed.

【0011】請求項4記載の発明は、前記掘削孔内への
建込みに先立って、前記筒状ライナーの底部開口となる
開口に、少なくとも一つの貫通孔を設けた底蓋を取り付
けるとともに、この貫通孔のライナー内側開口に可撓性
ホースの一端を着脱自在に接続し、可撓性ホースの他方
の自由端には線材を連結しておき、前記筒状ライナーの
掘削孔内への建込みに際し、前記可撓性ホースの自由端
に連結した線材の他端を地上部まで延在させた状態で、
前記可撓性ホースを介して筒状ライナー内に安定液を導
入しながら、前記筒状ライナーを掘削孔内の安定液中に
沈めていき、前記筒状ライナーの掘削孔内への建込み完
了後において、前記線材を介して前記可撓性ホースの自
由端を安定液面上に引き上げ、この可撓性ホースを前記
安定液の固化作業のための通路として利用する、請求項
1〜3のいずれか1項に記載の立坑の構築方法である。
According to a fourth aspect of the present invention, a bottom cover provided with at least one through hole is attached to an opening serving as a bottom opening of the tubular liner prior to installation into the excavation hole. One end of a flexible hose is detachably connected to the liner inner opening of the through hole, and a wire is connected to the other free end of the flexible hose so that the tubular liner is installed in the excavation hole. At this time, with the other end of the wire connected to the free end of the flexible hose extended to the ground,
While introducing the stabilizing liquid into the cylindrical liner through the flexible hose, the cylindrical liner is submerged in the stabilizing liquid in the drilling hole, and the installation of the cylindrical liner in the drilling hole is completed. Later, the free end of the flexible hose is pulled up above the stabilizing liquid level through the wire, and the flexible hose is used as a passage for solidifying the stabilizing liquid. A method for constructing a shaft according to any one of the preceding claims.

【0012】他方、請求項5記載の発明は、対象地盤に
掘削孔を形成するとともに、その掘削孔内に筒状ライナ
ーを建て込み、立坑を構築する方法において、少なくと
も前記筒状ライナー外周面と掘削孔内周面との隙間に袋
体を配するとともに、この袋体内に液体を充満させ、筒
状ライナーが前記液体が充満し膨張した袋体を介して掘
削孔壁に密着した立坑を構築することを特徴とする、立
坑の構築方法である。本方法により建て込んだ筒状ライ
ナーは、必要時に、袋体内から液体を抜き出してライナ
ーの周囲に隙間を生じさせるか、或いは袋体による充満
液体の拘束を解くことにより、筒状ライナーを掘削孔内
から吊り上げ撤去できるようになる。
[0012] On the other hand, according to a fifth aspect of the present invention, there is provided a method for forming an excavation hole in a target ground, setting a tubular liner in the excavation hole, and constructing a shaft. A bag is arranged in the gap with the inner peripheral surface of the drilling hole, and the bag is filled with liquid, and a tubular liner is constructed to fill the liquid and expand the bag, thereby forming a shaft in close contact with the wall of the drilling hole. And a method for constructing a shaft. When necessary, the tubular liner built by this method can be formed by removing liquid from the bag body to create a gap around the liner, or by releasing the restraint of the filled liquid by the bag body, thereby excavating the tubular liner. It can be lifted and removed from inside.

【0013】[0013]

【発明の実施の形態】以下、本発明の実施の形態につい
て工程順に詳説する。 <第1の実施形態;比較的に浅い立坑を構築する場合>
先ず図1に示すように、地盤の対象部位をベントナイト
泥水等の孔壁安定液Bを供給しながらエクステンション
ブーム付パワーショベル等により掘削し、所定断面形状
をなす立坑全長分の掘削孔Dを形成する。なお好適に
は、図2に示すように掘削対象部位の周囲に先ず環状の
打設溝を掘削しこれにコンクリートを打設する等して環
状のガイドウォール1を構築してから、そのガイドウォ
ール内部分を掘削して掘削孔Dを形成するようにする。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below in the order of steps. <First Embodiment: When Building a Relatively Shallow Shaft>
First, as shown in FIG. 1, a target site of the ground is excavated by a power shovel with an extension boom or the like while supplying a hole wall stabilizing liquid B such as bentonite muddy water to form a borehole D having a predetermined cross-sectional shape for the entire length of the shaft. I do. Preferably, as shown in FIG. 2, first, an annular driving groove is dug around the site to be excavated, concrete is poured into the groove, and the annular guide wall 1 is constructed. The inner part is excavated so as to form the excavation hole D.

【0014】一方、かかる掘削孔Dの形成と並行して又
はその先後に、地上部において筒状ライナーを準備す
る。例えば現場において、先ず図3および図4に示すよ
うに、地面上に溝形鋼材3,3…を格子状に配列すると
ともに、鋼材相互3,3を溶接やボルトナット連結等に
より連結し下部支持フレーム2を製作する。また、図4
に示すように下部支持フレーム2の四隅部に第1の貫通
孔4,4…をそれぞれ穿孔するとともに、それら第1の
貫通孔4,4…の裏側(下側)に下部ナット5,5…を
それぞれ同軸的に配し、フレーム2に対して溶接等によ
り固定する。
On the other hand, in parallel with or before the formation of the excavation hole D, a tubular liner is prepared in the above-ground portion. For example, at the site, first, as shown in FIGS. 3 and 4, channel steel members 3, 3... Are arranged in a grid on the ground, and the steel members 3, 3 are connected by welding, bolt and nut connection, etc. The frame 2 is manufactured. FIG.
As shown in FIG. 5, first through holes 4, 4... Are respectively formed at four corners of the lower support frame 2, and lower nuts 5, 5,. Are coaxially arranged, and are fixed to the frame 2 by welding or the like.

【0015】続いて図5に示すように、筒状ライナーの
底蓋にあたる鋼板6を下部支持フレーム2の上に載せ、
溶接等によりフレーム2に固定する。また、この鋼板6
における、下部支持フレーム2の四隅の第1の貫通孔
4,4…と対応する部位にそれぞれ第2の貫通孔7,7
…をそれぞれ穿孔形成する。
Subsequently, as shown in FIG. 5, a steel plate 6 corresponding to the bottom lid of the tubular liner is placed on the lower support frame 2, and
It is fixed to the frame 2 by welding or the like. In addition, this steel plate 6
At the four corners of the lower support frame 2 corresponding to the first through holes 4, 4,.
Are formed by piercing.

【0016】さらに図6〜図8にも示すように、かかる
鋼板6の上にライナープレート9a,9a…を筒状に配
列し、隣接プレート9a,9a相互はボルト等の連結手
段により連結して1リング分の筒状ライナー9Aを組み
立てるとともに、筒状ライナー9A下端と鋼板6とは溶
接等により連結する。
As shown in FIGS. 6 to 8, liner plates 9a, 9a... Are arranged in a tubular shape on the steel plate 6, and adjacent plates 9a, 9a are connected to each other by connecting means such as bolts. The cylindrical liner 9A for one ring is assembled, and the lower end of the cylindrical liner 9A and the steel plate 6 are connected by welding or the like.

【0017】次いで、第3の貫通孔8,8…(請求項4
記載の発明における貫通孔に相当)を、鋼板におけるフ
レーム部材3,3…と重ならない位置に必要数設ける。
本例のように横長の筒状ライナーを構築する場合には、
かかる第3の貫通孔8を長手方向に複数箇所(図示例で
は3箇所)設けるのが好ましい。また、この第3の貫通
孔8,8…は、図5に示すように前述第2の貫通孔7,
7…の穿孔時に設けることもできるが、後に鋼板6上で
作業員がライナー組立て作業を行うときに孔が開いてい
ると危険なので、本時点で設けるのが好ましい。
Next, the third through-holes 8, 8...
The necessary number is provided in a position not overlapping with the frame members 3, 3,... In the steel plate.
When constructing a horizontally long tubular liner as in this example,
It is preferable to provide a plurality of such third through holes 8 in the longitudinal direction (three in the illustrated example). Also, as shown in FIG. 5, the third through holes 8, 8...
7 can be provided at the time of drilling. However, it is dangerous if a hole is opened when an operator later performs a liner assembling operation on the steel plate 6, so it is preferable to provide the hole at this time.

【0018】続いて、必要に応じてライナー重量増を目
的として鋼板6上に若干厚のコンクリートを打設する。
このため先ず、各第2の貫通孔7,7…を囲む抜き型枠
10,10…をそれぞれ設置するとともに、各第3の貫
通孔8,8…内に打設コンクリート厚よりも長い管体1
1,11…をそれぞれ嵌め入れる。しかる後に、図9お
よび図10に示すように、先に組み立てた1リング分の
筒状ライナー9A内にコンクリートCを所定厚打設し鋼
板6全体を覆うようにする。かくしてライナー重量増が
図られるとともに、底蓋をなす鋼板6の周囲間隙等の止
水が図られる。
Subsequently, if necessary, a slightly thick concrete is cast on the steel plate 6 for the purpose of increasing the weight of the liner.
For this purpose, first, punching frames 10, 10 surrounding each of the second through holes 7, 7,... Are respectively installed, and a pipe body longer than the concrete thickness cast in each of the third through holes 8, 8,. 1
1, 11 ... are respectively fitted. Thereafter, as shown in FIGS. 9 and 10, concrete C is cast into the tubular liner 9A for one ring having a predetermined thickness to cover the entire steel plate 6 as previously assembled. Thus, the weight of the liner is increased, and the gap between the steel plate 6 forming the bottom lid and the like is prevented.

【0019】固化が完了したならば、図11に示すよう
に既設リング9A上にライナープレート9aを順次積み
上げ連結し、立坑全長分の筒状ライナー9を製作する。
またこの際、ライナープレート9a,9a間の隙間をコ
ーキングする。さらに図12および図13に示すよう
に、コンクリートC上面から突出する管体11に、可撓
性ホース12,12…をそれぞれ外嵌等により着脱自在
に接続するとともに、これら可撓性ホースの他方の自由
端には引上げロープ13,13…を連結し、これら引上
げロープ13,13…の他端を筒状ライナー9上端から
外部に引き出しておく。可撓性ホースの自由端はコンク
リートC上に載置しておく。
When the solidification is completed, the liner plates 9a are sequentially stacked and connected on the existing ring 9A as shown in FIG. 11 to manufacture the cylindrical liner 9 for the entire length of the shaft.
At this time, the gap between the liner plates 9a, 9a is coked. Further, as shown in FIGS. 12 and 13, flexible hoses 12, 12... Are detachably connected to a pipe 11 projecting from the upper surface of the concrete C by external fitting or the like, respectively. Are connected to the free ends thereof, and the other ends of the pulling ropes 13, 13 are drawn out from the upper end of the tubular liner 9 to the outside. The free end of the flexible hose rests on concrete C.

【0020】一方、図14に示すように、前述下部鋼板
6と略同じ外形を有するとともに中央部が矩形に切除さ
れた上部鋼板14を用意し、その上に、前述下部支持フ
レーム2と同形の上部支持フレーム15を載置し、相互
を溶接により固定して、上部支持材16を製作する。ま
た図15および図16に示すように、上部支持フレーム
15の四隅部に吊りフック17,17…を取付ける。
On the other hand, as shown in FIG. 14, an upper steel plate 14 having substantially the same outer shape as the above-mentioned lower steel plate 6 and having a central portion cut off in a rectangular shape is prepared. The upper support frame 15 is placed and fixed to each other by welding to produce the upper support member 16. As shown in FIGS. 15 and 16, hanging hooks 17, 17,... Are attached to the four corners of the upper support frame 15.

【0021】そして、かかる上部支持材16を、吊りフ
ック17,17…に連結したワイヤーを介してクレーン
により吊り上げ、筒状ライナー9の上に載せる。また図
15および図16に示すように、ネジ鋼棒18,18…
を、上部支持フレーム15の四隅に形成した第5の貫通
孔19,19…、これらに対応して上部鋼板14に形成
した第4の貫通孔20,20…、筒状ライナー9内、下
部鋼板6の第2の貫通孔7,7…および下部支持フレー
ムの第1の貫通孔4,4…を順にそれぞれ挿通させて、
それらの下端を下部支持フレーム3裏面に固定した下部
ナット5,5…に螺合させた後、上部支持フレーム15
の第5の貫通孔から上方に突出するネジ鋼棒の上端部に
上部ナット21,21…を螺合させる。かくして、筒状
ライナー9は上部支持材16および下部支持フレーム3
間に挟持され一体化されるとともに、当該一体化筒状ラ
イナー30は吊りフック17,17…を介して吊り上げ
及び吊り降ろしが可能となる。
Then, the upper supporting member 16 is lifted by a crane via a wire connected to the hanging hooks 17, 17,... And is placed on the tubular liner 9. As shown in FIG. 15 and FIG.
, Formed in the four corners of the upper support frame 15, fourth through holes 20, 20,... Formed in the upper steel plate 14 corresponding to these, the inside of the tubular liner 9, and the lower steel plate. 6 and the first through holes 4, 4,... Of the lower support frame, respectively.
After their lower ends are screwed into lower nuts 5, 5,... Fixed to the back surface of the lower support frame 3, the upper support frame 15
Are screwed into upper ends of threaded steel bars projecting upward from the fifth through holes. Thus, the tubular liner 9 comprises the upper support 16 and the lower support frame 3.
While being interposed and integrated, the integrated tubular liner 30 can be lifted and lowered via the hanging hooks 17, 17,....

【0022】かかる筒状ライナーの建て込み準備が完了
したならば、図17に示すように、一体化筒状ライナー
30を吊りフック17,17…に連結したワイヤー22
を介して図示しないクレーンにより吊り下げ、安定液B
で満たされた掘削孔D内に徐々に沈降させる。このと
き、矢印で示すように可撓性ホース12,12…を介し
て筒状ライナー9内に外部から安定液Bが流入し筒状ラ
イナー重量が増加するので、浮力の影響を受けずに円滑
な沈降が可能となる。筒状ライナー9の上端が安定液面
より若干上にある状態で沈降を完了する。
When the preparation for installing the cylindrical liner is completed, as shown in FIG. 17, a wire 22 connecting the integrated cylindrical liner 30 to the hanging hooks 17, 17,...
Via a crane (not shown)
Is gradually settled in the excavation hole D filled with. At this time, the stable liquid B flows into the tubular liner 9 from the outside via the flexible hoses 12, 12,... Through the flexible hoses 12, 12,. Sedimentation is possible. The sedimentation is completed when the upper end of the tubular liner 9 is slightly above the stable liquid level.

【0023】沈降が完了したならば、図18に示すよう
に、掘削孔Dを跨いで架設した架設部材40と一体化筒
状ライナー30に連結されているネジ鋼棒18,18と
を連結し、一体化筒状ライナー30を架設部材40によ
り吊り支持した後、クレーンによる吊り支持を解き、ワ
イヤー22を取り外す。図示例では架設部材40に上下
方向に貫通する貫通孔41,41が形成されており、架
設に際しそれら貫通孔41,41内にネジ鋼棒18,1
8を挿し通した後、架設部材上面から突出するネジ鋼棒
18,18の上端にナット42,42をそれぞれ螺合さ
せて、架設部材とネジ鋼棒とを連結している。
When the sedimentation is completed, as shown in FIG. 18, the erection member 40 erected over the excavation hole D is connected to the threaded steel rods 18, 18 connected to the integrated tubular liner 30. After the integrated tubular liner 30 is suspended and supported by the erection member 40, the suspended support by the crane is released, and the wire 22 is removed. In the illustrated example, through-holes 41, 41 penetrating in the up-down direction are formed in the erection member 40, and the threaded steel rods 18, 1 are provided in the through-holes 41, 41 during erection.
After inserting the nut 8, the nuts 42, 42 are screwed into the upper ends of the threaded steel bars 18, 18 projecting from the upper surface of the construction member, respectively, to connect the construction member and the screw steel bar.

【0024】そして、一体化筒状ライナー30が所定位
置(深さ方向および幅方向)に沈降されたことを確認
し、ズレている場合には適宜位置を調整する。
Then, it is confirmed that the integrated tubular liner 30 has settled at a predetermined position (depth direction and width direction), and if it is displaced, the position is adjusted appropriately.

【0025】しかる後、引上げロープ13を引上げて、
可撓性ホースの自由端の開口を安定液中から地上部に抜
き出す。抜き出し後の状態が図19に示されている。か
くして、筒状ライナー9外部と内部(可撓性ホース1
2,12…内は含まず)とが隔離された状態となる。
Thereafter, the pulling rope 13 is pulled up,
Withdraw the opening of the free end of the flexible hose from the stabilizing liquid to the above-ground part. The state after the extraction is shown in FIG. Thus, the outside and inside of the tubular liner 9 (the flexible hose 1
2, 12, ...) are isolated.

【0026】かかる状態で、図19に示すように、一体
化筒状ライナー30外面と掘削孔Dとの内面との隙間S
1を通して、好適には図示するように一体化ライナー3
0底面と掘削孔D底面との間まで注入ホース50を安定
液B中に挿入し、その先端から固化材を注入する。ま
た、注入ホース50先端近傍位置まで安定液B中に挿入
したエア吹込みホース51を介してエア51aを吹込み
供給し、安定液Bと注入固化材とをエア攪拌する(もち
ろん他の攪拌方法も採用できる。)
In this state, as shown in FIG. 19, a gap S between the outer surface of the integrated tubular liner 30 and the inner surface of the excavation hole D is formed.
1, preferably through an integrated liner 3 as shown.
The injection hose 50 is inserted into the stabilizing liquid B to a position between the bottom surface 0 and the bottom surface of the excavation hole D, and the solidified material is injected from the tip. In addition, air 51a is blown and supplied through an air blowing hose 51 inserted into the stable liquid B to a position near the tip of the injection hose 50, and the stable liquid B and the injected solidified material are air-stirred (of course, other stirring methods). Can also be adopted.)

【0027】この際、吹込みエア51aが一体化筒状ラ
イナー30の底面近傍に泡状になって滞留するおそれが
あるが、本例においてはそれら滞留エアは、一体化筒状
ライナー30の底面に開口する可撓性ホース12,12
…を介して地上に抜気されるので、緻密な固化体が形成
される。
At this time, there is a possibility that the blown air 51a may foam and stay in the vicinity of the bottom surface of the integrated tubular liner 30. In this example, the staying air is generated by the bottom surface of the integrated tubular liner 30. Flexible hoses 12, 12 open to
The air is evacuated to the ground via ... and a dense solidified body is formed.

【0028】可撓性ホース12,12…は、これ以外に
も、安定液の固化作業のための通路として利用できる。
例えば図20に示すように、可撓性ホース12内を介し
て注入ホース50やエア吹込みホース(図示せず)を一
体化筒状ライナー30の下側に挿入したりするために用
いることができる。また、図示しないが、同一の可撓性
ホース12内に注入ホース50およびエア吹込みホース
51の両方を挿入することもできるし、注入ホース50
を挿入する可撓性ホース12,12…を順次代えながら
注入することもできる。後者の場合に、一方の残りの可
撓性ホース12を介してエア吹込みホース51を挿入
し、他方を抜気路として用いることもできる。これらの
方法によれば、一体化筒状ライナー30側面と掘削孔D
側面との隙間S1が注入ホース類が入らない程度に狭く
ても注入工が可能となる。
The flexible hoses 12, 12,... Can also be used as passages for solidifying the stabilizing liquid.
For example, as shown in FIG. 20, an injection hose 50 or an air blowing hose (not shown) may be inserted under the integrated tubular liner 30 through the inside of the flexible hose 12. it can. Although not shown, both the injection hose 50 and the air blowing hose 51 can be inserted into the same flexible hose 12, and the injection hose 50
Can be injected while the flexible hoses 12, 12,... In the latter case, the air blowing hose 51 may be inserted through one of the remaining flexible hoses 12, and the other may be used as an air bleeding path. According to these methods, the side of the integrated tubular liner 30 and the borehole D
Even if the gap S1 with the side surface is so small that the injection hoses cannot enter, the injection can be performed.

【0029】固化が完了したならば、筒状ライナー9内
に固化されずに残留した安定液Bを、ライナー上端開口
を介して回収する。この回収安定液は、別スパン又は別
施工において使用するのが好ましい。かくして、図21
に示すように、筒状ライナーが固化体を介して掘削孔壁
に密着した立坑が構築される。
When the solidification is completed, the stable liquid B remaining without being solidified in the tubular liner 9 is recovered through the upper opening of the liner. This recovered stable liquid is preferably used in another span or in another construction. Thus, FIG.
As shown in (1), a shaft is constructed in which the tubular liner is in close contact with the wall of the borehole via the solidified body.

【0030】<第2の実施形態;比較的に深い立坑を構
築する場合>比較的に深い立坑を構築する場合には、前
述の第1の建込み方法と同様に立坑全長分の筒状ライナ
ーを地上部で組み立てこれを掘削孔内に建込むことも不
可能ではないが、より広い組立スペース及びより大きい
クレーン等の吊り降ろし装置が必要となり、吊り降ろし
作業も容易ではなくなる。また、立坑全長分のライナー
を一度に掘削孔内吊り降ろしできないような場合も想定
される。
<Second Embodiment: In the Case of Constructing a Deeper Shaft> In the case of constructing a relatively deep shaft, a cylindrical liner for the entire length of the shaft is used in the same manner as in the above-described first installation method. Although it is not impossible to assemble the above in the excavation hole, a larger assembling space and a larger lifting device such as a crane are required, and the lifting operation is not easy. In addition, there may be a case where the liner for the entire shaft cannot be suspended in the excavation hole at a time.

【0031】そこで、かかる場合には請求項2記載の発
明にしたがって、図22〜図33に示すように、長手方
向に接続することによって立坑全長分となる複数の分割
筒状ライナー9,39(図示例では6リング分)を用意
し、先頭の分割筒状ライナー9に対し順次後続の分割筒
状ライナー39を接続して延長しながら、その延長分に
応じて、接続部分を掘削孔内に順次落とし下げていくこ
とによって、立坑全長分の筒状ライナーの建込みを行う
ことを推奨する。
In such a case, according to the second aspect of the present invention, as shown in FIGS. 22 to 33, a plurality of divided tubular liners 9, 39 (39 In the illustrated example, 6 rings are prepared), while the subsequent divided tubular liner 39 is sequentially connected to the leading divided tubular liner 9 and extended, and according to the extension, the connection portion is inserted into the borehole. It is recommended to build a tubular liner for the entire length of the shaft by sequentially dropping it down.

【0032】具体例として、前述第1の実施形態の倍の
全長のライナーを建て込む形態について説明する。先
ず、先頭の分割筒状ライナー9を含む第1の一体化分割
筒状ライナー31を前述第1の実施形態における一体化
筒状ライナー30と略同様に組み立て、図25に示すよ
うに、クレーン等により掘削孔D内に吊り降ろすととも
にその上端が安定液面上に露出する高さ位置で、孔口縁
部のガイドウォールに対して仮支持する。
As a specific example, a form in which a liner having a total length twice that of the first embodiment is built will be described. First, the first integrated divided tubular liner 31 including the leading divided tubular liner 9 is assembled in substantially the same manner as the integrated tubular liner 30 in the first embodiment, and as shown in FIG. And suspended temporarily in the excavation hole D at the height position where the upper end is exposed above the stable liquid level, and is temporarily supported on the guide wall at the hole edge.

【0033】具体的には、例えば図22および図23に
示すように、第1の一体化分割筒状ライナー31の組立
て時において、筒状ライナー9側面に鋼板等のベース部
材60,60を溶接等により固設し、これに張出部材6
1,61…を着脱自在に取付けておく。また、ネジ鋼棒
118,118として、筒状ライナー2個分の長さのも
のを用いる。図示例では、筒状ライナー9の一方側およ
び他方側の各側面上部にベース部材60,60を固設
し、その長手方向に間隔をあけて2箇所(計4箇所)に
張出部材61,61…をそれぞれ取付けている。これら
張出部材61,61…の取付け方としては、図24に示
すようにベース部材60の所定位置にネジ孔60aを設
け、張出部材61の対応する部位に貫通孔61aを設
け、この貫通孔61aを通してネジ孔6aにボルト62
を螺合させることにより、ベース部材60に張出部材6
1を着脱自在に固定している。張出部材61は溶接等に
よりベース部材60に固定して取付けても良いが、後の
取り外し作業が煩雑となるので、前述のようにボルト固
定としておくのが好ましい。
Specifically, as shown in FIGS. 22 and 23, when assembling the first integrated divided tubular liner 31, a base member 60, such as a steel plate, is welded to the side of the tubular liner 9. Etc., and the overhanging member 6
Are detachably mounted. Further, as the screw steel rods 118, 118, those having a length of two cylindrical liners are used. In the illustrated example, the base members 60, 60 are fixedly provided on the upper side of each of the one side and the other side of the tubular liner 9, and the protruding members 61 are provided at two places (a total of four places) at intervals in the longitudinal direction. 61 are attached. As a method of attaching these overhanging members 61, 61, as shown in FIG. 24, a screw hole 60a is provided at a predetermined position of the base member 60, and a through hole 61a is provided at a corresponding portion of the overhanging member 61. The bolt 62 is inserted into the screw hole 6a through the hole 61a.
Is screwed into the base member 60 so that the overhang member 6
1 is detachably fixed. The overhanging member 61 may be fixed and attached to the base member 60 by welding or the like, but it is preferable that the overhanging member be fixed by bolts as described above because the subsequent removal work becomes complicated.

【0034】そして、かかる第1の一体化分割筒状ライ
ナー31を、図25に示すように掘削孔D内に徐々に吊
り降ろす。第1の一体化分割筒状ライナー31の側面に
は張出部材61,61が取付けられているので、図26
に示すように、それらが孔口縁部のガイドウォール1に
引っ掛かった時点で、第1の一体化分割筒状ライナー3
1は張出部材61,61を介してガイドウォール1間に
より仮支持されることになる。仮支持後は、上部支持材
16に連結したワイヤー22を取り外し、更に第1の分
割筒状ライナー31から上部支持材16を取り外して本
支持を解く。
Then, the first integrated divided tubular liner 31 is gradually lowered into the excavation hole D as shown in FIG. Since the overhang members 61, 61 are attached to the side surfaces of the first integrated divided tubular liner 31, FIG.
As shown in the figure, when they are caught on the guide wall 1 at the edge of the hole, the first integrated divided tubular liner 3
1 is temporarily supported between the guide walls 1 via the projecting members 61, 61. After the temporary support, the wire 22 connected to the upper support 16 is removed, and the upper support 16 is further removed from the first divided tubular liner 31 to release the full support.

【0035】かかる第1の分割筒状ライナー31の組立
ておよび沈降と並行して或いはその後に、後続の分割筒
状ライナーを含む第2の一体化分割筒状ライナー32を
製作する。第2の一体化分割筒状ライナー32は、図2
7および図28に示すように、第1の一体化分割筒状ラ
イナー31から、下部支持材(鋼板6および下部フレー
ム3)および可撓性ホース等を省略したものである。ま
た上部支持材16と筒状ライナ39とは、例えば図29
に示すように、上部支持材16の鋼板14にボルト挿通
孔14aを設けておき、これとライナープレート部分3
9上端のライナー相互連結用のボルト挿通孔39aとを
利用して、ボルト70およびナット71により連結す
る。
In parallel with or after the assembling and settling of the first divided tubular liner 31, a second integrated divided tubular liner 32 including a subsequent divided tubular liner is manufactured. The second integrated divided tubular liner 32 is shown in FIG.
As shown in FIG. 7 and FIG. 28, the lower support member (the steel plate 6 and the lower frame 3), the flexible hose and the like are omitted from the first integrated divided tubular liner 31. The upper support member 16 and the cylindrical liner 39 are, for example, as shown in FIG.
As shown in FIG. 3, a bolt insertion hole 14a is provided in the steel plate 14 of the upper support member 16, and the bolt insertion hole 14a and the liner plate portion 3 are formed.
The bolts 70 and the nuts 71 are used for connection with the bolt insertion holes 39a at the upper end of the liner 9 for interconnecting the liners.

【0036】しかる後、図30に示すように、かかる第
2の一体化分割筒状ライナー32を、掘削孔Dの口元に
仮支持されている第1の一体化分割筒状ライナー31の
上にクレーンにより吊り降ろし、図31に示すように積
み重ね分割筒状ライナー9,39相互を接続し、一体化
する。両ライナー31,32の接続後には接続部分のコ
ーキングを行う。
Thereafter, as shown in FIG. 30, the second integrated divided tubular liner 32 is placed on the first integrated divided tubular liner 31 temporarily supported at the mouth of the excavation hole D. The crane is lowered by a crane, and the stacked divided tubular liners 9 and 39 are connected and integrated as shown in FIG. After the connection of the two liners 31, 32, caulking of the connection portion is performed.

【0037】この接続にあたり、例えば図32に示すよ
うに、上側の後続分割筒状ライナー39の下端面および
下側の先頭分割筒状ライナー9の上端面に、予め側方に
張り出す接続板73,73をそれぞれ固定(図示例のよ
うにボルト73aおよびナット73bにより固定する
他、溶接により固定することもできる)しておき、これ
ら接続板73,73の側方張出部分にはボルト挿通孔7
3c,73cをそれぞれ対応して設けておき、両接続板
73,73の各ボルト挿通孔73c,73cにボルト7
4を通し、反対側からナット75を螺合させることによ
って、これら接続板73,73を介して上下ライナー
9,39相互を接続するようにすると外部からの接続作
業が可能となる。
In this connection, as shown in FIG. 32, for example, a connecting plate 73 which projects in advance to the lower end surface of the upper subsequent divided tubular liner 39 and the upper end surface of the lower leading divided cylindrical liner 9 is provided. , 73 are fixed respectively (in addition to the bolts 73a and the nuts 73b as in the illustrated example, and can also be fixed by welding), and bolt insertion holes are formed in the side projections of the connection plates 73, 73. 7
3c, 73c are provided correspondingly, and bolts 7 are inserted into the bolt insertion holes 73c, 73c of both connection plates 73, 73.
The upper and lower liners 9, 39 are connected to each other via the connection plates 73, 73 by screwing the nut 75 from the opposite side through the connector 4, so that an external connection work is possible.

【0038】また第2の一体化分割筒状ライナー32の
吊り降ろしに際し、図33に示すように、第1の筒状ラ
イナー31に取付けられているネジ鋼棒118を、第2
の一体化分割筒状ライナー32に取付けられている上部
支持材16の貫通孔19,20に挿し通し、上部支持材
16の上に突出する部分に上部ナット21を羅号させ
て、第1および第2の一体化分割筒状ライナー31,3
2を上部支持材16および下部支持材間で挟持し、一体
化筒状ライナー300とする。
When the second integrated divided tubular liner 32 is suspended, as shown in FIG. 33, the threaded steel rod 118 attached to the first tubular liner 31 is moved to the second cylindrical liner 32.
The upper nut 21 is inserted into the through holes 19 and 20 of the upper supporting member 16 attached to the integrated divided tubular liner 32, and the upper part of the upper supporting member 16 is marked with the upper nut 21. Second integrated divided tubular liners 31, 3
2 is sandwiched between the upper support member 16 and the lower support member to form an integrated tubular liner 300.

【0039】接続が完了したならば、そのままクレーン
によって一体化筒状ライナー300を若干持ち上げ、図
34に示すように張出部材61,61を取り外す。続い
て図35に示すように一体化筒状ライナー300を落と
し下げ、一体化筒状ライナー300の上端が安定液B面
より若干上にある状態で沈降を完了する。以降は、前述
の第1の実施形態と同様に、固化工を行う。
When the connection is completed, the integrated tubular liner 300 is slightly lifted by a crane as it is, and the projecting members 61 are removed as shown in FIG. Subsequently, as shown in FIG. 35, the integrated tubular liner 300 is dropped down, and the sedimentation is completed in a state where the upper end of the integrated tubular liner 300 is slightly above the surface of the stable liquid B. Thereafter, solidification is performed in the same manner as in the first embodiment.

【0040】他方、3分割以上の筒状ライナーを順次接
続しながら吊り降ろす場合には、最後尾以外の分割筒状
ライナーに張出部材を取付け、順次仮支持・接続・沈降
を繰り返し行うことで、掘削孔内への沈降を行う。
On the other hand, when three or more divided cylindrical liners are to be suspended while being sequentially connected, a projecting member is attached to the divided cylindrical liners other than the last, and temporary support, connection and settling are sequentially repeated. And settle into the borehole.

【0041】<第3の実施形態;請求項5記載の発明に
関する>次に、ライナーの撤去を可能とする本発明方法
について、前述第1の実施形態への適用例に基づいて詳
説する。先ず例えば図36および図37に示すような、
外周面部81、内周面部82、環状上底部83および環
状下底部84からなる筒体状の可撓性袋体80を準備
し、これを一体化筒状ライナー30の掘削孔D内への吊
り降ろしに先立って、図38に示すように少なくとも一
体化筒状ライナー30の安定液B中に没する部分の外周
面全体を取り囲むように取付けておく。85は、袋体側
面に設けられた液体注入路を示している。袋体80とし
ては、不透水性のビニール袋や、布に不透水処理を施し
たもの等で形成したものを用いることができる。
<Third Embodiment; Regarding the Invention According to Claim 5> Next, a method of the present invention which enables removal of a liner will be described in detail based on an example applied to the first embodiment. First, for example, as shown in FIGS.
A tubular flexible bag body 80 including an outer peripheral surface portion 81, an inner peripheral surface portion 82, an annular upper bottom portion 83, and an annular lower bottom portion 84 is prepared, and this is suspended in the excavation hole D of the integrated tubular liner 30. Prior to lowering, as shown in FIG. 38, it is attached so as to surround at least the entire outer peripheral surface of the portion of the integrated tubular liner 30 submerged in the stable liquid B. Reference numeral 85 denotes a liquid injection path provided on the side surface of the bag. As the bag body 80, a water-impermeable plastic bag, a cloth formed by applying a water-impermeable treatment to a cloth, or the like can be used.

【0042】次いで、この袋体80を取り付けた一体化
筒状ライナー30を、図38に示すように掘削孔D内へ
沈降し、図39に示すように液体注入路85を介して袋
体80内に水等の固化しない液体Wを充満させ、液体注
入路85に栓をする等により袋体を膨張させた状態で保
持しつつ、固化工を行う。他の点は第1の実施形態と同
様に行うことができる。ここに、液体Wが充満した袋体
80は、外周面部81と内周面部82とが充満液体Wに
よって離間した状態となる。また袋体80は筒状ライナ
ー30の表面形状に応じて変形し密着した状態となる。
かかる状態で安定液Bの固化が進行し、同図に示すよう
に、筒状ライナー30が液体充満袋体80および固化体
Gをこの順に介して掘削孔Dの側壁に密着した立坑Yが
構築される。
Next, the integrated tubular liner 30 to which the bag body 80 is attached is settled into the excavation hole D as shown in FIG. 38, and the bag body 80 is inserted through the liquid injection passage 85 as shown in FIG. The inside is filled with a liquid W that does not solidify, such as water, and solidification is performed while holding the bag body in an inflated state by plugging the liquid injection passage 85 or the like. Other points can be performed in the same manner as in the first embodiment. Here, the bag body 80 filled with the liquid W is in a state where the outer peripheral surface portion 81 and the inner peripheral surface portion 82 are separated by the filled liquid W. Further, the bag body 80 is deformed according to the surface shape of the cylindrical liner 30 and comes into close contact with the bag.
In this state, the solidification of the stabilizing liquid B progresses, and as shown in the figure, a shaft Y in which the cylindrical liner 30 is in close contact with the side wall of the excavation hole D through the liquid-filled bag body 80 and the solidified body G in this order is constructed. Is done.

【0043】建て込んだ筒状ライナー30が不用になる
等、必要に応じて、例えば図40に示すように袋体80
内から液体Wを抜き出し、袋体80を収縮させる。これ
によって、筒状ライナー30の外周面9Sと袋体内周面
部82との間に袋体収縮分の空隙S2が生じ、筒状ライ
ナー30の外周面9Sと固化体Gとが離間し、筒状ライ
ナー30の周囲拘束が解かれ、引き抜き撤去が可能とな
る。本例の場合、筒状ライナー30底面は固化体Gと強
固に接着しているので、図41に示すように、最下端の
リング9Aとその上部9Bとの接続(例えばボルト接
続)を解除するとともに、前述第2の実施形態において
第2の分割ライナープレートの吊り下げに用いた上部支
持材16と同様のものを、上部筒状ライナー9Bの上端
に載せ接続した後、上部支持材16を介して筒状ライナ
ー上側部分9Bをクレーン等により吊り上げることによ
って、地上に抜き出すことができる。この場合、最下端
のリング9A以下の下端部(鋼板6および下部支持フレ
ーム2等を含む)は埋め殺しになるが、大部分のライナ
ー9Bを回収することができる。
If necessary, for example, the built-in tubular liner 30 becomes unnecessary, for example, as shown in FIG.
The liquid W is extracted from the inside, and the bag 80 is contracted. As a result, a space S2 corresponding to the bag shrinkage is generated between the outer peripheral surface 9S of the cylindrical liner 30 and the inner peripheral surface portion 82 of the bag, and the outer peripheral surface 9S of the cylindrical liner 30 and the solidified body G are separated from each other. The constraint around the liner 30 is released, and the liner 30 can be pulled out and removed. In the case of this example, since the bottom surface of the cylindrical liner 30 is firmly adhered to the solidified body G, the connection (for example, bolt connection) between the lowermost ring 9A and its upper portion 9B is released as shown in FIG. At the same time, the same upper support member 16 used for suspending the second divided liner plate in the second embodiment described above is placed on the upper end of the upper cylindrical liner 9B and connected, and then the upper support member 16 is interposed. By lifting the cylindrical liner upper portion 9B with a crane or the like, it can be pulled out to the ground. In this case, the lower end (including the steel plate 6 and the lower support frame 2) below the lowermost ring 9A is buried, but most of the liner 9B can be collected.

【0044】なお図示しないが、筒状ライナー30の底
面に離型剤を塗布したり、底面全体を覆う底蓋材を設け
る(前述第1の実施形態等のようにライナー底部に管体
11を設ける等により、貫通孔を設けた場合には、底蓋
材の対応する部位に透孔を設けておく)等により、筒状
ライナー30全体を撤去することも可能となる。離型剤
は、筒状ライナー30の底面以外にも塗布することがで
きる。
Although not shown, a release agent is applied to the bottom surface of the cylindrical liner 30 or a bottom cover material is provided to cover the entire bottom surface (as in the first embodiment, the tube 11 is attached to the bottom of the liner). If a through-hole is provided by providing, for example, a through-hole is provided at a corresponding portion of the bottom cover material), the entire tubular liner 30 can be removed. The release agent can be applied to a portion other than the bottom surface of the cylindrical liner 30.

【0045】また、上記例では袋体80内の液体Wを積
極的に排出させたが、液体注入路85を開放したり、袋
体80の適宜の位置に透孔を形成したりして、袋体80
による内部液体の拘束を解き、袋体80が変形しうる状
態で、強引に筒状ライナーの上部9Bまたは全部を引き
抜くこともできる。
In the above example, the liquid W in the bag 80 is positively discharged. However, the liquid injection path 85 is opened, or a through hole is formed at an appropriate position in the bag 80, Bag 80
, The upper portion 9B or all of the cylindrical liner can be forcibly pulled out in a state where the bag body 80 can be deformed.

【0046】他方、本形態を前述第2の実施形態のよう
な分割建込みに適用する場合には、図42にも示すよう
に、各一体化分割ライナー31,32に取付ける袋体1
81,182として、上下隣接する袋体の一方181に
雄プラグ181aを設けるとともに他方182に雌プラ
グ182aを設け(図示例では上側の袋体181の下面
に雄プラグ181a、下側の袋体182の上面に雄プラ
グ182aをそれぞれ設けている)、これらをワンタッ
チで接続することにより上下の袋体181,182を連
通接続できるように構成することを推奨する。
On the other hand, when the present embodiment is applied to the split-building as in the second embodiment, as shown in FIG. 42, the bag 1 attached to each of the integrated split liners 31, 32 is used.
81 and 182, a male plug 181a is provided on one of the upper and lower adjacent bags 181 and a female plug 182a is provided on the other 182 (in the illustrated example, the male plug 181a is provided on the lower surface of the upper bag 181 and the lower bag 182 is provided). It is recommended that the upper and lower bags 181 and 182 be connected to each other by one-touch connection.

【0047】また、本袋体を用いる撤去方法は、本発明
以外の筒状ライナーを用いた立坑構築工法、例えば前述
従来例の欄で述べた工法にも適用できる。
The removal method using the bag body can also be applied to a shaft construction method using a cylindrical liner other than the present invention, for example, the method described in the section of the conventional example.

【0048】<その他> (イ)本発明においては、管体11および可撓性ホース
12を設けなくとも良いが、その場合には一体化筒状ラ
イナーの吊り降ろしにあたり、掘削孔内の安定液Bをポ
ンプにより汲み出し筒状ライナー内に供給するようにす
るのが好ましい。この場合において、吊り降ろしに先立
って筒状ライナー内全体に安定液を充満させることも不
可能ではないが、沈降レベルに応じて順次内外液位が同
じくなるように筒状ライナー内に安定液を供給するほう
が好ましい。
<Others> (A) In the present invention, it is not necessary to provide the tube 11 and the flexible hose 12, but in this case, when suspending and lowering the integrated tubular liner, the stable liquid in the borehole is required. Preferably, B is pumped out and supplied into the cylindrical liner. In this case, it is not impossible to fill the entire inside of the tubular liner with the stabilizing liquid before hanging down, but the stabilizing liquid is poured into the cylindrical liner so that the inner and outer liquid levels are sequentially the same according to the sedimentation level. It is preferable to supply.

【0049】(ロ)筒状ライナー内に安定液を導入する
場合、固化工程において筒状ライナー内の安定液が固化
しないように、筒状ライナー9外部と内部とを隔離する
必要があり、上記例では筒状ライナー9に底蓋(鋼板6
等)を設けているので、筒状ライナー9を掘削溝D内に
沈降するにあたって、その上端開口を安定液面Bより上
に残すようにしているが、例えば上端開口にも上蓋を着
脱自在に取付けておけば上端開口部位が安定液B中に多
少没する程度まで沈降させることもできる。この場合、
上蓋上に固化体が残ることになるが、後で取り除けばよ
い。また本発明においては、上記例のように筒状ライナ
ー9に対して鋼板6等による底蓋を設ける方が好ましい
が、設けない場合には図43に示すように、筒状ライナ
ー9の底端開口を掘削孔底D2に密着させるように掘削
孔D内に建込み、筒状ライナー9外部の安定液Bが底端
開口を介して内部へ浸入するのを防ぐようにすることで
も対応できる。この場合、前述第2の実施形態における
第2の一体化分割筒状ライナー32の沈降と同様の吊り
降ろし形態となり、同例の上部支持材16を用いること
ができる。
(B) When introducing the stable liquid into the cylindrical liner, it is necessary to isolate the outside and the inside of the cylindrical liner 9 so that the stable liquid in the cylindrical liner does not solidify in the solidification step. In the example, the bottom cover (steel plate 6)
Etc.), the upper end opening is left above the stable liquid level B when the cylindrical liner 9 is settled in the excavation groove D. For example, the upper lid is also detachably attached to the upper end opening. If it is attached, it can be settled to the extent that the upper end opening part is slightly immersed in the stabilizing liquid B. in this case,
The solidified body remains on the upper lid, but may be removed later. Further, in the present invention, it is preferable to provide a bottom cover made of a steel plate 6 or the like for the tubular liner 9 as in the above example, but when not provided, as shown in FIG. It is also possible to cope with this by setting up the opening in the drilling hole D such that the opening is in close contact with the drilling hole bottom D2 and preventing the stable liquid B outside the tubular liner 9 from entering the inside through the bottom end opening. In this case, the suspended form is the same as the settling of the second integrated divided tubular liner 32 in the second embodiment, and the upper support 16 of the same example can be used.

【0050】(ハ)本発明の筒状ライナーは、ライナー
プレートを組み立てて形成するものに限定されない。ま
た、ライナー形状は上記例のように断面小判形のほか、
断面矩形、断面円形のものでも良い。
(C) The tubular liner of the present invention is not limited to one formed by assembling a liner plate. In addition, the liner shape is an oval cross section as in the above example,
It may be rectangular or circular in cross section.

【0051】(ニ)本発明においては、図44に示すよ
うに、筒状ライナー90における発進坑口となる部位に
鋼管等の管体91を連通接続しておき、これを坑道入口
部とすることができる。なお、かかる坑道入口部管体9
1を接続した筒状ライナー90を建て込む場合には、例
えば管体91の先端に菅蓋92をして、後の固化工程に
おいて筒状ライナー90内の安定液B1が固化しないよ
うにするとともに、菅蓋92を掘削孔D側壁に密着させ
て掘削孔D内に建て込むようにする。その他は、上記例
と同様に行うことができる。
(D) In the present invention, as shown in FIG. 44, a pipe 91 such as a steel pipe is connected to a portion of the tubular liner 90 which is to be a starting wellhead, and this is used as a tunnel entrance. Can be. In addition, such a tunnel entrance part pipe 9
When the tubular liner 90 to which the tube 1 is connected is to be built, for example, a tube lid 92 is provided at the tip of the tubular body 91 to prevent the stable liquid B1 in the tubular liner 90 from being solidified in a subsequent solidifying step. Then, the tube lid 92 is brought into close contact with the side wall of the excavation hole D so as to be built into the excavation hole D. Others can be performed similarly to the above-mentioned example.

【0052】[0052]

【発明の効果】以上のとおり、本発明によれば安全かつ
迅速に立坑を構築できるようになる。また、ライナーを
容易に撤去回収できるようになる。
As described above, according to the present invention, a shaft can be constructed safely and quickly. Further, the liner can be easily removed and collected.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る掘削孔を示す縦断面図である。FIG. 1 is a longitudinal sectional view showing a borehole according to the present invention.

【図2】本発明に係る掘削孔を示す平面図である。FIG. 2 is a plan view showing an excavation hole according to the present invention.

【図3】下部支持材を示す斜視図である。FIG. 3 is a perspective view showing a lower support member.

【図4】下部支持材の裏面を示す斜視図である。FIG. 4 is a perspective view showing a back surface of a lower support member.

【図5】下部支持材上に鋼板を取り付けた状態を示す斜
視図である。
FIG. 5 is a perspective view showing a state where a steel plate is mounted on a lower support member.

【図6】1リング分のライナープレート等の取付け工程
を示す平面図である。
FIG. 6 is a plan view showing a step of attaching a liner plate or the like for one ring.

【図7】1リング分のライナープレート等の取付け工程
を示す正面図である。
FIG. 7 is a front view showing a step of attaching a liner plate or the like for one ring.

【図8】図6のVIII-VIII線断面図である。8 is a sectional view taken along line VIII-VIII in FIG.

【図9】コンクリート打設工程を示す縦断面図である。FIG. 9 is a longitudinal sectional view showing a concrete placing step.

【図10】コンクリート打設状態を示す平面図である。FIG. 10 is a plan view showing a concrete casting state.

【図11】筒状ライナー組立て完了状態を示す縦断面図
である。
FIG. 11 is a longitudinal sectional view showing a state where the cylindrical liner assembly is completed.

【図12】可撓性ホース取付け工程を示す、図13のXI
I-XII線断面図である。
FIG. 12 shows the flexible hose installation process, FIG.
It is an I-XII line sectional view.

【図13】可撓性ホース取付け工程を示す平面図であ
る。
FIG. 13 is a plan view showing a flexible hose attaching step.

【図14】上部支持材の分解組立図である。FIG. 14 is an exploded view of the upper support member.

【図15】上部支持材を取付けた状態の、図13のXIV-
XIV線断面図である。
FIG. 15 shows the XIV- of FIG. 13 with the upper support material attached.
FIG. 14 is a sectional view taken along line XIV.

【図16】上部支持材を取付けた状態を示す縦断面図で
ある。
FIG. 16 is a longitudinal sectional view showing a state where an upper supporting member is attached.

【図17】筒状ライナー沈降工程を示す縦断面図であ
る。
FIG. 17 is a longitudinal sectional view showing a cylindrical liner settling process.

【図18】吊り支持切り替え工程を示す縦断面図であ
る。
FIG. 18 is a vertical sectional view showing a suspension support switching step.

【図19】固化工を示す縦断面図である。FIG. 19 is a longitudinal sectional view showing a solidification process.

【図20】他の固化工を示す縦断面図である。FIG. 20 is a longitudinal sectional view showing another solidification process.

【図21】固化後の状態を示す縦断面図である。FIG. 21 is a longitudinal sectional view showing a state after solidification.

【図22】第2の実施形態における、第1の一体化分割
筒状ライナーを示す縦断面図である。
FIG. 22 is a longitudinal sectional view showing a first integrated divided tubular liner according to the second embodiment.

【図23】第1の一体化分割筒状ライナーを示す平面図
である。
FIG. 23 is a plan view showing a first integrated divided tubular liner.

【図24】第1の一体化分割筒状ライナーの要部拡大図
である。
FIG. 24 is an enlarged view of a main part of the first integrated divided tubular liner.

【図25】第1の一体化分割筒状ライナーの沈降工程を
示す縦断面図である。
FIG. 25 is a vertical cross-sectional view showing a settling process of the first integrated divided tubular liner.

【図26】第1の一体化分割筒状ライナーの仮支持状態
を示す縦断面図である。
FIG. 26 is a longitudinal sectional view showing a temporary support state of the first integrated divided tubular liner.

【図27】第2の一体化分割筒状ライナーを示す縦断面
図である。
FIG. 27 is a longitudinal sectional view showing a second integrated divided tubular liner.

【図28】第2の一体化分割筒状ライナーを示す縦断面
図である。
FIG. 28 is a longitudinal sectional view showing a second integrated divided tubular liner.

【図29】第2の一体化分割筒状ライナーの要部拡大図
である。
FIG. 29 is an enlarged view of a main part of a second integrated divided tubular liner.

【図30】第1および第2の分割筒状ライナーの積み重
ね工程を示す縦断面図である。
FIG. 30 is a longitudinal sectional view showing a step of stacking first and second divided tubular liners.

【図31】第1および第2の分割筒状ライナーの接続工
程を示す縦断面図である。
FIG. 31 is a longitudinal sectional view showing a connecting step of the first and second divided tubular liners.

【図32】接続例を示す要部拡大図である。FIG. 32 is an enlarged view of a main part showing a connection example.

【図33】図31の要部拡大図である。FIG. 33 is an enlarged view of a main part of FIG. 31.

【図34】仮支持解除状態を示す縦断面図である。FIG. 34 is a longitudinal sectional view showing a temporary support release state.

【図35】一体化筒状ライナーの沈降工程を示す縦断面
図である。
FIG. 35 is a longitudinal sectional view showing a step of settling the integrated tubular liner.

【図36】第3の実施形態で用いる袋体を示す斜視図で
ある。
FIG. 36 is a perspective view showing a bag used in the third embodiment.

【図37】袋体の縦断面図および要部拡大図である。FIG. 37 is a longitudinal sectional view and a main part enlarged view of the bag body.

【図38】袋体を取付けた一体化筒状ライナーの沈降工
程を示す縦断面図である。
FIG. 38 is a longitudinal sectional view showing a settling process of the integrated tubular liner to which the bag is attached.

【図39】固化後の状態を示す縦断面図である。FIG. 39 is a longitudinal sectional view showing a state after solidification.

【図40】袋体収縮状態を示す要部拡大縦断面図であ
る。
FIG. 40 is an enlarged longitudinal sectional view of a main part showing a bag body contracted state.

【図41】筒状ライナー上部撤去工程を示す縦断面図で
ある。
FIG. 41 is a longitudinal sectional view showing a tubular liner upper part removing step.

【図42】袋体の接続形態を示す縦断面図である。FIG. 42 is a longitudinal sectional view showing a connection form of the bag body.

【図43】底蓋を設けない形態を示す縦断面図である。FIG. 43 is a longitudinal sectional view showing a mode in which a bottom cover is not provided.

【図44】筒状ライナーに坑道入口部管体を取付ける形
態を示す縦断面図である。
FIG. 44 is a longitudinal sectional view showing a mode in which a tunnel entrance portion pipe is attached to a tubular liner.

【符号の説明】[Explanation of symbols]

1…ガイドウォール、2…下部支持材、6…鋼板、9…
筒状ライナー、9a…ライナープレート、12…可撓性
ホース、13…回収用ロープ、16…上部支持材、17
…吊りフック、18…ネジ鋼棒、B,B1…安定液、C
…コンクリート、D…掘削孔、G…固化体。
DESCRIPTION OF SYMBOLS 1 ... Guide wall, 2 ... Lower support material, 6 ... Steel plate, 9 ...
Tubular liner, 9a liner plate, 12 flexible hose, 13 recovery rope, 16 upper support, 17
... hanging hook, 18 ... threaded steel rod, B, B1 ... stabilizing solution, C
... concrete, D ... excavation hole, G ... solidified body.

【手続補正書】[Procedure amendment]

【提出日】平成12年12月21日(2000.12.
21)
[Submission date] December 21, 2000 (200.12.
21)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】全文[Correction target item name] Full text

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【書類名】明細書[Document Name] Statement

【発明の名称】立坑の構築方法Title of the invention Construction method of shaft

【特許請求の範囲】[Claims]

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、筒状ライナーを用
いる立坑の構築方法に関する。
The present invention relates to a method for constructing a shaft using a cylindrical liner.

【0002】[0002]

【従来の技術】周知のように、推進工法等の作業基地と
して構築される立坑においては、坑壁崩壊を防止して安
全に作業を行うことができるように土留めが施される。
従来は、親杭横矢板による土留め、鋼矢板による土留
め、地下連続壁による土留め等の方法が採用されていた
が、近年では、資材の保管場所や施工機械の保管・設置
場所の省スペース化の観点から、地盤に掘削形成した掘
削孔内において複数のライナープレートを筒状に連結し
て土留め壁とする立坑構築工法が頻繁に採用されるよう
になっている。
2. Description of the Related Art As is well known, in a shaft constructed as a working base for a propulsion method or the like, earth retaining is provided so that collapse of a pit wall can be prevented and work can be performed safely.
Conventionally, methods such as earth retaining with parent pile horizontal sheet pile, earth retaining with steel sheet pile, earth retaining with underground continuous wall, etc. have been adopted, but in recent years, saving of material storage place and construction machine storage and installation place has been reduced. From the viewpoint of space, a vertical shaft construction method in which a plurality of liner plates are connected in a tubular shape to form an earth retaining wall in an excavation hole excavated and formed in the ground has been frequently adopted.

【0003】かかるライナープレートを用いる立坑構築
工法について概説すると、先ず、計画した立坑の大きさ
よりやや大きめの、ライナープレート1リング分の深さ
の掘削孔を掘削した後、この掘削孔内において順次ライ
ナープレートをボルトとナットにより緊結して組み立て
て土留めを行う。ライナープレート1リング分の組み立
てを終えたならば、続いて更に1リング分の掘削を行
い、先行敷設したライナープレートリングの下に2段目
のライナープレートリングを組み立て連結する。以降順
次、1リング分の掘削およびリング組み立てを繰り返し
て、所定深度のライナープレート立坑を構築する。
[0003] An outline of a shaft construction method using such a liner plate is as follows. First, a drilling hole slightly larger than the planned shaft size and having a depth of one ring of the liner plate is excavated, and then the liner is sequentially inserted in the drilling hole. The plate is fastened with bolts and nuts to assemble and retain the soil. When the assembly for one ring of the liner plate is completed, one more ring is excavated, and the second-stage liner plate ring is assembled and connected below the previously laid liner plate ring. Thereafter, the excavation for one ring and the ring assembly are sequentially repeated to construct a liner plate shaft having a predetermined depth.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、従来方
法は、作業員が掘削孔内でリング組み立て及びリング相
互の接続を行う必要があり、少なからず危険を伴うもの
であった。
However, in the conventional method, it is necessary for an operator to assemble the ring and to connect the rings to each other in the borehole, which involves considerable danger.

【0005】また従来方法においては、作業員が掘削孔
内で作業を行う以上、孔壁の崩壊を確実に防がなければ
ならないため、一度に1リング分しか掘削および土留め
を行えず、迅速な施工は不可能であった。
In the conventional method, the collapse of the hole wall must be surely prevented as long as the worker works inside the excavation hole. Therefore, only one ring can be excavated and soil-retained at a time. Construction was not possible.

【0006】他方、一般的なライナープレートはその周
囲地盤等に対する食い付きを良くするために、表面が波
形をなしている。したがって、不用になったとしても地
上から引き抜くことができない。他の方法としては、作
業員が筒状ライナー内に入りライナー上端から順に分解
していくしかないが、孔壁崩壊のおそれがあり非常に危
険である。よって従来は、ライナーをそのまま埋め殺す
他なく、非常に不経済であった。
On the other hand, the surface of a general liner plate is corrugated in order to improve the bite against the surrounding ground and the like. Therefore, even if it becomes unnecessary, it cannot be pulled out from the ground. As another method, an operator only has to enter the cylindrical liner and disassemble in order from the upper end of the liner. However, there is a risk that the hole wall may collapse, which is extremely dangerous. Therefore, conventionally, the liner has to be buried and killed, which is very uneconomical.

【0007】したがって、本発明の主たる課題は、安全
かつ迅速な立坑の構築方法を提供することにある。ま
た、他の課題は、ライナーを容易に撤去回収できるよう
にすることにある。
[0007] Accordingly, a main object of the present invention is to provide a method for constructing a shaft that is safe and quick. Another object is to enable the liner to be easily removed and collected.

【0008】[0008]

【課題を解決するための手段】上記課題を解決した本発
明の立坑構築方法は、請求項1記載の発明は、安定液掘
削により対象地盤に立坑全長分の掘削孔を形成し、この
安定液で満たされた掘削孔内に立坑全長分の筒状ライナ
ーを建込み、しかる後、この筒状ライナーの周囲の安定
液を固化させて、筒状ライナーが固化体を介して掘削孔
壁に密着した立坑を構築することを特徴とする、立坑の
構築方法である。
According to a first aspect of the present invention, there is provided a method of constructing a shaft according to the first aspect of the present invention. A cylindrical liner for the entire length of the shaft is built in the borehole filled with, and after that, the stable liquid around the cylindrical liner is solidified, and the cylindrical liner adheres to the borehole wall via the solidified body This is a method for constructing a shaft, characterized by constructing a shaft.

【0009】請求項2記載の発明は、長手方向に接続す
ることによって立坑全長分となる複数の分割筒状ライナ
ーを用意し、先頭の分割筒状ライナーに対し順次後続の
分割筒状ライナーを接続して延長しながら、接続部分を
前記掘削孔内に順次落とし下げていくことによって、前
記立坑全長分の筒状ライナーの建込みを行う、請求項1
記載の立坑の構築方法である。
According to a second aspect of the present invention, a plurality of divided tubular liners are prepared by connecting them in the longitudinal direction so as to correspond to the entire length of the shaft, and successive divided tubular liners are sequentially connected to the first divided tubular liner. 2. A tubular liner for the entire length of the shaft is built by sequentially dropping a connection portion into the excavation hole while extending the pipe liner.
It is a construction method of the shaft described above.

【0010】請求項3記載の発明は、前記筒状ライナー
内を通り掘削孔下端部に臨む注入路を設け、この注入路
を介して筒状ライナーの周囲の安定液に固化材を注入し
固化を図る、請求項1または2記載の立坑の構築方法で
ある。
According to a third aspect of the present invention, there is provided an injection passage which passes through the inside of the cylindrical liner and faces the lower end portion of the drilling hole, and a solidifying material is injected into a stable liquid around the cylindrical liner through the injection passage to solidify. The method according to claim 1 or 2, wherein the shaft is constructed.

【0011】請求項4記載の発明は、前記掘削孔内への
建込みに先立って、前記筒状ライナーの底部開口に、少
なくとも一つの貫通孔を設けた底蓋を取り付けるととも
に、この貫通孔のライナー内側開口に可撓性ホースの一
端を着脱自在に接続し、可撓性ホースの他方の自由端に
は線材を連結しておき、前記筒状ライナーの掘削孔内へ
の建込みに際し、前記可撓性ホースの自由端に連結した
線材の他端を地上部まで延在させた状態で、前記可撓性
ホースを介して筒状ライナー内に安定液を導入しなが
ら、前記筒状ライナーを掘削孔内の安定液中に沈めてい
き、前記筒状ライナーの掘削孔内への建込み完了後にお
いて、前記線材を介して前記可撓性ホースの自由端を安
定液面上に引き上げ、この可撓性ホースを前記安定液の
固化作業のための通路として利用する、請求項1〜3の
いずれか1項に記載の立坑の構築方法である。
According to a fourth aspect of the present invention, a bottom cover having at least one through hole is attached to a bottom opening of the tubular liner prior to installation into the excavation hole. One end of a flexible hose is detachably connected to the liner inner opening, and a wire is connected to the other free end of the flexible hose. With the other end of the wire connected to the free end of the flexible hose extended to the ground portion, while introducing the stabilizing liquid into the tubular liner through the flexible hose, remove the tubular liner. Submerged in the stabilizing liquid in the drilling hole, and after the completion of the installation of the tubular liner in the drilling hole, the free end of the flexible hose is pulled up on the stabilizing liquid level via the wire, A flexible hose is passed through for solidifying the stabilizing solution. Utilized as a method for constructing a vertical shaft according to any one of claims 1 to 3.

【0012】他方、請求項5記載の発明は、対象地盤に
掘削孔を形成するとともに、その掘削孔内に筒状ライナ
ーを建て込み、立坑を構築する方法において、少なくと
も前記筒状ライナー外周面と掘削孔内周面との隙間に袋
体を配するとともに、この袋体内に液体を充満させ、筒
状ライナーが前記液体が充満し膨張した袋体を介して掘
削孔壁に密着した立坑を構築することを特徴とする、立
坑の構築方法である。本方法により建て込んだ筒状ライ
ナーは、必要時に、袋体内から液体を抜き出してライナ
ーの周囲に隙間を生じさせるか、或いは袋体による充満
液体の拘束を解くことにより、筒状ライナーを掘削孔内
から吊り上げ撤去できるようになる。
[0012] On the other hand, according to a fifth aspect of the present invention, there is provided a method for forming an excavation hole in a target ground, setting a tubular liner in the excavation hole, and constructing a shaft. A bag is arranged in the gap with the inner peripheral surface of the drilling hole, and the bag is filled with liquid, and a tubular liner is constructed to fill the liquid and expand the bag, thereby forming a shaft in close contact with the wall of the drilling hole. And a method for constructing a shaft. When necessary, the tubular liner built by this method can be formed by removing liquid from the bag body to create a gap around the liner, or by releasing the restraint of the filled liquid by the bag body, thereby excavating the tubular liner. It can be lifted and removed from inside.

【0013】[0013]

【発明の実施の形態】以下、本発明の実施の形態につい
て工程順に詳説する。 <第1の実施形態;比較的に浅い立坑を構築する場合>
先ず図1に示すように、地盤の対象部位をベントナイト
泥水等の孔壁安定液Bを供給しながらエクステンション
ブーム付パワーショベル等により掘削し、所定断面形状
をなす立坑全長分の掘削孔Dを形成する。なお好適に
は、図2に示すように掘削対象部位の周囲に先ず環状の
打設溝を掘削しこれにコンクリートを打設する等して環
状のガイドウォール1を構築してから、そのガイドウォ
ール内部分を掘削して掘削孔Dを形成するようにする。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below in the order of steps. <First Embodiment: When Building a Relatively Shallow Shaft>
First, as shown in FIG. 1, a target site of the ground is excavated by a power shovel with an extension boom or the like while supplying a hole wall stabilizing liquid B such as bentonite muddy water to form a borehole D having a predetermined cross-sectional shape for the entire length of the shaft. I do. Preferably, as shown in FIG. 2, first, an annular driving groove is dug around the site to be excavated, concrete is poured into the groove, and the annular guide wall 1 is constructed. The inner part is excavated so as to form the excavation hole D.

【0014】一方、かかる掘削孔Dの形成と並行して又
はその先後に、地上部において筒状ライナーを準備す
る。例えば現場において、先ず図3および図4に示すよ
うに、地面上に溝形鋼材3,3…を格子状に配列すると
ともに、鋼材相互3,3を溶接やボルトナット連結等に
より連結し下部支持フレーム2を製作する。また、図4
に示すように下部支持フレーム2の四隅部に第1の貫通
孔4,4…をそれぞれ穿孔するとともに、それら第1の
貫通孔4,4…の裏側(下側)に下部ナット5,5…を
それぞれ同軸的に配し、フレーム2に対して溶接等によ
り固定する。
On the other hand, in parallel with or before the formation of the excavation hole D, a tubular liner is prepared in the above-ground portion. For example, at the site, first, as shown in FIGS. 3 and 4, channel steel members 3, 3... Are arranged in a grid on the ground, and the steel members 3, 3 are connected by welding, bolt and nut connection, etc. The frame 2 is manufactured. FIG.
As shown in FIG. 5, first through holes 4, 4... Are respectively formed at four corners of the lower support frame 2, and lower nuts 5, 5,. Are coaxially arranged, and are fixed to the frame 2 by welding or the like.

【0015】続いて図5に示すように、筒状ライナーの
底蓋にあたる鋼板6を下部支持フレーム2の上に載せ、
溶接等によりフレーム2に固定する。また、この鋼板6
における、下部支持フレーム2の四隅の第1の貫通孔
4,4…と対応する部位にそれぞれ第2の貫通孔7,7
…をそれぞれ穿孔形成する。
Subsequently, as shown in FIG. 5, a steel plate 6 corresponding to the bottom lid of the tubular liner is placed on the lower support frame 2, and
It is fixed to the frame 2 by welding or the like. In addition, this steel plate 6
At the four corners of the lower support frame 2 corresponding to the first through holes 4, 4,.
Are formed by piercing.

【0016】さらに図6〜図8にも示すように、かかる
鋼板6の上にライナープレート9a,9a…を筒状に配
列し、隣接プレート9a,9a相互はボルト等の連結手
段により連結して1リング分の筒状ライナー9Aを組み
立てるとともに、筒状ライナー9A下端と鋼板6とは溶
接等により連結する。
As shown in FIGS. 6 to 8, liner plates 9a, 9a... Are arranged in a tubular shape on the steel plate 6, and adjacent plates 9a, 9a are connected to each other by connecting means such as bolts. The cylindrical liner 9A for one ring is assembled, and the lower end of the cylindrical liner 9A and the steel plate 6 are connected by welding or the like.

【0017】次いで、第3の貫通孔8,8…(請求項4
記載の発明における貫通孔に相当)を、鋼板におけるフ
レーム部材3,3…と重ならない位置に必要数設ける。
本例のように横長の筒状ライナーを構築する場合には、
かかる第3の貫通孔8を長手方向に複数箇所(図示例で
は3箇所)設けるのが好ましい。また、この第3の貫通
孔8,8…は、図5に示すように前述第2の貫通孔7,
7…の穿孔時に設けることもできるが、後に鋼板6上で
作業員がライナー組立て作業を行うときに孔が開いてい
ると危険なので、本時点で設けるのが好ましい。
Next, the third through-holes 8, 8...
The necessary number is provided in a position not overlapping with the frame members 3, 3,... In the steel plate.
When constructing a horizontally long tubular liner as in this example,
It is preferable to provide a plurality of such third through holes 8 in the longitudinal direction (three in the illustrated example). Also, as shown in FIG. 5, the third through holes 8, 8...
7 can be provided at the time of drilling. However, it is dangerous if a hole is opened when an operator later performs a liner assembling operation on the steel plate 6, so it is preferable to provide the hole at this time.

【0018】続いて、必要に応じてライナー重量増を目
的として鋼板6上に若干厚のコンクリートを打設する。
このため先ず、各第2の貫通孔7,7…を囲む抜き型枠
10,10…をそれぞれ設置するとともに、各第3の貫
通孔8,8…内に打設コンクリート厚よりも長い管体1
1,11…をそれぞれ嵌め入れる。しかる後に、図9お
よび図10に示すように、先に組み立てた1リング分の
筒状ライナー9A内にコンクリートCを所定厚打設し鋼
板6全体を覆うようにする。かくしてライナー重量増が
図られるとともに、底蓋をなす鋼板6の周囲間隙等の止
水が図られる。
Subsequently, if necessary, a slightly thick concrete is cast on the steel plate 6 for the purpose of increasing the weight of the liner.
For this purpose, first, punching frames 10, 10 surrounding each of the second through holes 7, 7,... Are respectively installed, and a pipe body longer than the concrete thickness cast in each of the third through holes 8, 8,. 1
1, 11 ... are respectively fitted. Thereafter, as shown in FIGS. 9 and 10, concrete C is cast into the tubular liner 9A for one ring having a predetermined thickness to cover the entire steel plate 6 as previously assembled. Thus, the weight of the liner is increased, and the gap between the steel plate 6 forming the bottom lid and the like is prevented.

【0019】固化が完了したならば、図11に示すよう
に既設リング9A上にライナープレート9aを順次積み
上げ連結し、立坑全長分の筒状ライナー9を製作する。
またこの際、ライナープレート9a,9a間の隙間をコ
ーキングする。さらに図12および図13に示すよう
に、コンクリートC上面から突出する管体11に、可撓
性ホース12,12…をそれぞれ外嵌等により着脱自在
に接続するとともに、これら可撓性ホースの他方の自由
端には引上げロープ13,13…を連結し、これら引上
げロープ13,13…の他端を筒状ライナー9上端から
外部に引き出しておく。可撓性ホースの自由端はコンク
リートC上に載置しておく。
When the solidification is completed, the liner plates 9a are sequentially stacked and connected on the existing ring 9A as shown in FIG. 11 to manufacture the cylindrical liner 9 for the entire length of the shaft.
At this time, the gap between the liner plates 9a, 9a is coked. Further, as shown in FIGS. 12 and 13, flexible hoses 12, 12... Are detachably connected to a pipe 11 projecting from the upper surface of the concrete C by external fitting or the like, respectively. Are connected to the free ends thereof, and the other ends of the pulling ropes 13, 13 are drawn out from the upper end of the tubular liner 9 to the outside. The free end of the flexible hose rests on concrete C.

【0020】一方、図14に示すように、前述下部鋼板
6と略同じ外形を有するとともに中央部が矩形に切除さ
れた上部鋼板14を用意し、その上に、前述下部支持フ
レーム2と同形の上部支持フレーム15を載置し、相互
を溶接により固定して、上部支持材16を製作する。ま
た図15および図16に示すように、上部支持フレーム
15の四隅部に吊りフック17,17…を取付ける。
On the other hand, as shown in FIG. 14, an upper steel plate 14 having substantially the same outer shape as the above-mentioned lower steel plate 6 and having a central portion cut off in a rectangular shape is prepared. The upper support frame 15 is placed and fixed to each other by welding to produce the upper support member 16. As shown in FIGS. 15 and 16, hanging hooks 17, 17,... Are attached to the four corners of the upper support frame 15.

【0021】そして、かかる上部支持材16を、吊りフ
ック17,17…に連結したワイヤーを介してクレーン
により吊り上げ、筒状ライナー9の上に載せる。また図
15および図16に示すように、ネジ鋼棒18,18…
を、上部支持フレーム15の四隅に形成した第5の貫通
孔19,19…、これらに対応して上部鋼板14に形成
した第4の貫通孔20,20…、筒状ライナー9内、下
部鋼板6の第2の貫通孔7,7…および下部支持フレー
ム2の第1の貫通孔4,4…を順にそれぞれ挿通させ
て、それらの下端を下部支持フレーム2裏面に固定した
下部ナット5,5…に螺合させた後、上部支持フレーム
15の第5の貫通孔19,19…から上方に突出するネ
ジ鋼棒18,18…の上端部に上部ナット21,21…
を螺合させる。かくして、筒状ライナー9は上部支持材
16および下部支持フレーム2間に挟持され一体化され
るとともに、当該一体化筒状ライナー30は吊りフック
17,17…を介して吊り上げ及び吊り降ろしが可能と
なる。
Then, the upper supporting member 16 is lifted by a crane via a wire connected to the hanging hooks 17, 17,... And is placed on the tubular liner 9. As shown in FIG. 15 and FIG.
, Formed in the four corners of the upper support frame 15, fourth through holes 20, 20,... Formed in the upper steel plate 14 corresponding to these, the inside of the tubular liner 9, and the lower steel plate. 6 and the first through holes 4, 4,... Of the lower support frame 2, respectively, and the lower nuts 5, 5 whose lower ends are fixed to the back surface of the lower support frame 2. Are screwed into the upper nuts 21, 21... At the upper ends of the threaded steel rods 18, 18 projecting upward from the fifth through holes 19, 19.
Screw. Thus, the tubular liner 9 is sandwiched and integrated between the upper support member 16 and the lower support frame 2, and the integrated tubular liner 30 can be lifted and lowered via the hanging hooks 17, 17,. Become.

【0022】かかる筒状ライナーの建て込み準備が完了
したならば、図17に示すように、一体化筒状ライナー
30を吊りフック17,17…に連結したワイヤー22
を介して図示しないクレーンにより吊り下げ、安定液B
で満たされた掘削孔D内に徐々に沈降させる。このと
き、矢印で示すように可撓性ホース12,12…を介し
て筒状ライナー9内に外部から安定液Bが流入し筒状ラ
イナー重量が増加するので、浮力の影響を受けずに円滑
な沈降が可能となる。筒状ライナー9の上端が安定液面
より若干上にある状態で沈降を完了する。
When the preparation for installing the cylindrical liner is completed, as shown in FIG. 17, a wire 22 connecting the integrated cylindrical liner 30 to the hanging hooks 17, 17,...
Via a crane (not shown)
Is gradually settled in the excavation hole D filled with. At this time, the stable liquid B flows into the tubular liner 9 from the outside via the flexible hoses 12, 12,... Through the flexible hoses 12, 12,. Sedimentation is possible. The sedimentation is completed when the upper end of the tubular liner 9 is slightly above the stable liquid level.

【0023】沈降が完了したならば、図18に示すよう
に、掘削孔Dを跨いで架設した架設部材40と一体化筒
状ライナー30に連結されているネジ鋼棒18,18と
を連結し、一体化筒状ライナー30を架設部材40によ
り吊り支持した後、クレーンによる吊り支持を解き、ワ
イヤー22を取り外す。図示例では架設部材40に上下
方向に貫通する貫通孔41,41が形成されており、架
設に際しそれら貫通孔41,41内にネジ鋼棒18,1
8を挿し通した後、架設部材上面から突出するネジ鋼棒
18,18の上端にナット42,42をそれぞれ螺合さ
せて、架設部材とネジ鋼棒とを連結している。
When the sedimentation is completed, as shown in FIG. 18, the erection member 40 erected over the excavation hole D is connected to the threaded steel rods 18, 18 connected to the integrated tubular liner 30. After the integrated tubular liner 30 is suspended and supported by the erection member 40, the suspended support by the crane is released, and the wire 22 is removed. In the illustrated example, through-holes 41, 41 penetrating in the up-down direction are formed in the erection member 40, and the threaded steel rods 18, 1 are provided in the through-holes 41, 41 during erection.
After inserting the nut 8, the nuts 42, 42 are screwed into the upper ends of the threaded steel bars 18, 18 projecting from the upper surface of the construction member, respectively, to connect the construction member and the screw steel bar.

【0024】そして、一体化筒状ライナー30が所定位
置(深さ方向および幅方向)に沈降されたことを確認
し、ズレている場合には適宜位置を調整する。
Then, it is confirmed that the integrated tubular liner 30 has settled at a predetermined position (depth direction and width direction), and if it is displaced, the position is adjusted appropriately.

【0025】しかる後、引上げロープ13を引上げて、
可撓性ホースの自由端の開口を安定液中から地上部に抜
き出す。抜き出し後の状態が図19に示されている。か
くして、筒状ライナー9外部と内部(可撓性ホース1
2,12…内は含まず)とが隔離された状態となる。
Thereafter, the pulling rope 13 is pulled up,
Withdraw the opening of the free end of the flexible hose from the stabilizing liquid to the above-ground part. The state after the extraction is shown in FIG. Thus, the outside and inside of the tubular liner 9 (the flexible hose 1
2, 12, ...) are isolated.

【0026】かかる状態で、図19に示すように、一体
化筒状ライナー30外面と掘削孔Dとの内面との隙間S
1を通して、好適には図示するように一体化ライナー3
0底面と掘削孔D底面との間まで注入ホース50を安定
液B中に挿入し、その先端から固化材を注入する。ま
た、注入ホース50先端近傍位置まで安定液B中に挿入
したエア吹込みホース51を介してエア51aを吹込み
供給し、安定液Bと注入固化材とをエア攪拌する(もち
ろん他の攪拌方法も採用できる。)。
In this state, as shown in FIG. 19, a gap S between the outer surface of the integrated tubular liner 30 and the inner surface of the excavation hole D is formed.
1, preferably through an integrated liner 3 as shown.
The injection hose 50 is inserted into the stabilizing liquid B to a position between the bottom surface 0 and the bottom surface of the excavation hole D, and the solidified material is injected from the tip. In addition, air 51a is blown and supplied through an air blowing hose 51 inserted into the stable liquid B to a position near the tip of the injection hose 50, and the stable liquid B and the injected solidified material are air-stirred (of course, other stirring methods). Can also be adopted.).

【0027】この際、吹込みエア51aが一体化筒状ラ
イナー30の底面近傍に泡状になって滞留するおそれが
あるが、本例においてはそれら滞留エアは、一体化筒状
ライナー30の底面に開口する可撓性ホース12,12
…を介して地上に抜気されるので、緻密な固化体が形成
される。
At this time, there is a possibility that the blown air 51a may foam and stay in the vicinity of the bottom surface of the integrated tubular liner 30. In this example, the staying air is generated by the bottom surface of the integrated tubular liner 30. Flexible hoses 12, 12 open to
The air is evacuated to the ground via ... and a dense solidified body is formed.

【0028】可撓性ホース12,12…は、これ以外に
も、安定液の固化作業のための通路として利用できる。
例えば図20に示すように、可撓性ホース12内を介し
て注入ホース50やエア吹込みホース(図示せず)を一
体化筒状ライナー30の下側に挿入したりするために用
いることができる。また、図示しないが、同一の可撓性
ホース12内に注入ホース50およびエア吹込みホース
51の両方を挿入することもできるし、注入ホース50
を挿入する可撓性ホース12,12…を順次代えながら
注入することもできる。後者の場合に、一方の残りの可
撓性ホース12を介してエア吹込みホース51を挿入
し、他方を抜気路として用いることもできる。これらの
方法によれば、一体化筒状ライナー30側面と掘削孔D
側面との隙間S1が注入ホース類が入らない程度に狭く
ても注入工が可能となる。
The flexible hoses 12, 12,... Can also be used as passages for solidifying the stabilizing liquid.
For example, as shown in FIG. 20, an injection hose 50 or an air blowing hose (not shown) may be inserted under the integrated tubular liner 30 through the inside of the flexible hose 12. it can. Although not shown, both the injection hose 50 and the air blowing hose 51 can be inserted into the same flexible hose 12, and the injection hose 50
Can be injected while the flexible hoses 12, 12,... In the latter case, the air blowing hose 51 may be inserted through one of the remaining flexible hoses 12, and the other may be used as an air bleeding path. According to these methods, the side of the integrated tubular liner 30 and the borehole D
Even if the gap S1 with the side surface is so small that the injection hoses cannot enter, the injection can be performed.

【0029】固化が完了したならば、筒状ライナー9内
に固化されずに残留した安定液B1を、ライナー上端開
口を介して回収する。この回収安定液は、別スパン又は
別施工において使用するのが好ましい。かくして、図2
1に示すように、筒状ライナーが固化体を介して掘削孔
壁に密着した立坑が構築される。
When the solidification is completed, the stable liquid B1 remaining without being solidified in the tubular liner 9 is recovered through the upper opening of the liner. This recovered stable liquid is preferably used in another span or in another construction. Thus, FIG.
As shown in FIG. 1, a shaft is constructed in which the tubular liner is in close contact with the wall of the borehole via the solidified body.

【0030】<第2の実施形態;比較的に深い立坑を構
築する場合>比較的に深い立坑を構築する場合には、前
述の第1の建込み方法と同様に立坑全長分の筒状ライナ
ーを地上部で組み立てこれを掘削孔内に建込むことも不
可能ではないが、より広い組立スペース及びより大きい
クレーン等の吊り降ろし装置が必要となり、吊り降ろし
作業も容易ではなくなる。また、立坑全長分のライナー
を一度に掘削孔内吊り降ろしできないような場合も想定
される。
<Second Embodiment: In the Case of Constructing a Deeper Shaft> In the case of constructing a relatively deep shaft, a cylindrical liner for the entire length of the shaft is used in the same manner as in the above-described first installation method. Although it is not impossible to assemble the above in the excavation hole, a larger assembling space and a larger lifting device such as a crane are required, and the lifting operation is not easy. In addition, there may be a case where the liner for the entire shaft cannot be suspended in the excavation hole at a time.

【0031】そこで、かかる場合には請求項2記載の発
明にしたがって、図22〜図33に示すように、長手方
向に接続することによって立坑全長分となる複数の分割
筒状ライナー9,39(図示例では6リング分)を用意
し、先頭の分割筒状ライナー9に対し順次後続の分割筒
状ライナー39を接続して延長しながら、その延長分に
応じて、接続部分を掘削孔内に順次落とし下げていくこ
とによって、立坑全長分の筒状ライナーの建込みを行う
ことを推奨する。
In such a case, according to the second aspect of the present invention, as shown in FIGS. 22 to 33, a plurality of divided tubular liners 9, 39 (39 In the illustrated example, 6 rings are prepared), while the subsequent divided tubular liner 39 is sequentially connected to the leading divided tubular liner 9 and extended, and according to the extension, the connection portion is inserted into the borehole. It is recommended to build a tubular liner for the entire length of the shaft by sequentially dropping it down.

【0032】具体例として、前述第1の実施形態の倍の
全長のライナーを建て込む形態について説明する。先
ず、先頭の分割筒状ライナー9を含む第1の一体化分割
筒状ライナー31を前述第1の実施形態における一体化
筒状ライナー30と略同様に組み立て、図25に示すよ
うに、クレーン等により掘削孔D内に吊り降ろすととも
にその上端が安定液面上に露出する高さ位置で、孔口縁
部のガイドウォールに対して仮支持する。
As a specific example, a form in which a liner having a total length twice that of the first embodiment is built will be described. First, the first integrated divided tubular liner 31 including the leading divided tubular liner 9 is assembled in substantially the same manner as the integrated tubular liner 30 in the first embodiment, and as shown in FIG. And suspended temporarily in the excavation hole D at the height position where the upper end is exposed above the stable liquid level, and is temporarily supported on the guide wall at the hole edge.

【0033】具体的には、例えば図22および図23に
示すように、第1の一体化分割筒状ライナー31の組立
て時において、筒状ライナー9側面に鋼板等のベース部
材60,60を溶接等により固設し、これに張出部材6
1,61…を着脱自在に取付けておく。また、ネジ鋼棒
118,118として、筒状ライナー2個分の長さのも
のを用いる。図示例では、筒状ライナー9の一方側およ
び他方側の各側面上部にベース部材60,60を固設
し、その長手方向に間隔をあけて2箇所(計4箇所)に
張出部材61,61…をそれぞれ取付けている。これら
張出部材61,61…の取付け方としては、図24に示
すようにベース部材60の所定位置にネジ孔60aを設
け、張出部材61の対応する部位に貫通孔61aを設
け、この貫通孔61aを通してネジ孔60aにボルト6
2を螺合させることにより、ベース部材60に張出部材
61を着脱自在に固定している。張出部材61は溶接等
によりベース部材60に固定して取付けても良いが、後
の取り外し作業が煩雑となるので、前述のようにボルト
固定としておくのが好ましい。
Specifically, as shown in FIGS. 22 and 23, when assembling the first integrated divided tubular liner 31, a base member 60, such as a steel plate, is welded to the side of the tubular liner 9. Etc., and the overhanging member 6
Are detachably mounted. Further, as the screw steel rods 118, 118, those having a length of two cylindrical liners are used. In the illustrated example, the base members 60, 60 are fixedly provided on the upper side of each of the one side and the other side of the tubular liner 9, and the protruding members 61 are provided at two places (a total of four places) at intervals in the longitudinal direction. 61 are attached. As a method of attaching these overhanging members 61, 61, as shown in FIG. 24, a screw hole 60a is provided at a predetermined position of the base member 60, and a through hole 61a is provided at a corresponding portion of the overhanging member 61. The bolt 6 is inserted into the screw hole 60a through the hole 61a.
The projecting member 61 is detachably fixed to the base member 60 by screwing the two. The overhanging member 61 may be fixed and attached to the base member 60 by welding or the like, but it is preferable that the overhanging member be fixed by bolts as described above because the subsequent removal work becomes complicated.

【0034】そして、かかる第1の一体化分割筒状ライ
ナー31を、図25に示すように掘削孔D内に徐々に吊
り降ろす。第1の一体化分割筒状ライナー31の側面に
は張出部材61,61が取付けられているので、図26
に示すように、それらが孔口縁部のガイドウォール1に
引っ掛かった時点で、第1の一体化分割筒状ライナー3
1は張出部材61,61を介してガイドウォール1間に
より仮支持されることになる。仮支持後は、上部支持材
16に連結したワイヤー22を取り外し、更に第1の分
割筒状ライナー31から上部支持材16を取り外して本
支持を解く。
Then, the first integrated divided tubular liner 31 is gradually lowered into the excavation hole D as shown in FIG. Since the overhang members 61, 61 are attached to the side surfaces of the first integrated divided tubular liner 31, FIG.
As shown in the figure, when they are caught on the guide wall 1 at the edge of the hole, the first integrated divided tubular liner 3
1 is temporarily supported between the guide walls 1 via the projecting members 61, 61. After the temporary support, the wire 22 connected to the upper support 16 is removed, and the upper support 16 is further removed from the first divided tubular liner 31 to release the full support.

【0035】かかる第1の分割筒状ライナー31の組立
ておよび沈降と並行して或いはその後に、後続の分割筒
状ライナーを含む第2の一体化分割筒状ライナー32を
製作する。第2の一体化分割筒状ライナー32は、図2
7および図28に示すように、第1の一体化分割筒状ラ
イナー31から、下部支持材(鋼板6および下部フレー
ム2)および可撓性ホース等を省略したものである。ま
た上部支持材16と筒状ライナー39とは、例えば図2
9に示すように、上部支持材16の鋼板14にボルト挿
通孔14aを設けておき、これとライナープレート部分
39上端のライナー相互連結用のボルト挿通孔39aと
を利用して、ボルト70およびナット71により連結す
る。
In parallel with or after the assembling and settling of the first divided tubular liner 31, a second integrated divided tubular liner 32 including a subsequent divided tubular liner is manufactured. The second integrated divided tubular liner 32 is shown in FIG.
As shown in FIG. 7 and FIG. 28, the lower support member (the steel plate 6 and the lower frame 2), the flexible hose, and the like are omitted from the first integrated divided tubular liner 31. The upper support 16 and the cylindrical liner 39 are, for example, as shown in FIG.
As shown in FIG. 9, a bolt insertion hole 14 a is provided in the steel plate 14 of the upper support member 16, and a bolt 70 and a nut are utilized by using the bolt insertion hole 39 a at the upper end of the liner plate portion 39 for interconnecting the liner. Connected by 71.

【0036】しかる後、図30に示すように、かかる第
2の一体化分割筒状ライナー32を、掘削孔Dの口元に
仮支持されている第1の一体化分割筒状ライナー31の
上にクレーンにより吊り降ろし、図31に示すように積
み重ね分割筒状ライナー9,39相互を接続し、一体化
する。両ライナー31,32の接続後には接続部分のコ
ーキングを行う。
Thereafter, as shown in FIG. 30, the second integrated divided tubular liner 32 is placed on the first integrated divided tubular liner 31 temporarily supported at the mouth of the excavation hole D. The crane is lowered by a crane, and the stacked divided tubular liners 9 and 39 are connected and integrated as shown in FIG. After the connection of the two liners 31, 32, caulking of the connection portion is performed.

【0037】この接続にあたり、例えば図32に示すよ
うに、上側の後続分割筒状ライナー39の下端面および
下側の先頭分割筒状ライナー9の上端面に、予め側方に
張り出す接続板73,73をそれぞれ固定(図示例のよ
うにボルト73aおよびナット73bにより固定する
他、溶接により固定することもできる)しておき、これ
ら接続板73,73の側方張出部分にはボルト挿通孔7
3c,73cをそれぞれ対応して設けておき、両接続板
73,73の各ボルト挿通孔73c,73cにボルト7
4を通し、反対側からナット75を螺合させることによ
って、これら接続板73,73を介して上下ライナー
9,39相互を接続するようにすると外部からの接続作
業が可能となる。
In this connection, as shown in FIG. 32, for example, a connecting plate 73 which projects in advance to the lower end surface of the upper subsequent divided tubular liner 39 and the upper end surface of the lower leading divided cylindrical liner 9 is provided. , 73 are fixed respectively (in addition to the bolts 73a and the nuts 73b as in the illustrated example, and can also be fixed by welding), and bolt insertion holes are formed in the side projections of the connection plates 73, 73. 7
3c, 73c are provided correspondingly, and bolts 7 are inserted into the bolt insertion holes 73c, 73c of both connection plates 73, 73.
The upper and lower liners 9, 39 are connected to each other via the connection plates 73, 73 by screwing the nut 75 from the opposite side through the connector 4, so that an external connection work is possible.

【0038】また第2の一体化分割筒状ライナー32の
吊り降ろしに際し、図33に示すように、第1の筒状ラ
イナー31に取付けられているネジ鋼棒118を、第2
の一体化分割筒状ライナー32に取付けられている上部
支持材16の貫通孔19,20に挿し通し、上部支持材
16の上に突出する部分に上部ナット21を羅号させ
て、第1および第2の一体化分割筒状ライナー31,3
2を上部支持材16および下部支持材間で挟持し、一体
化筒状ライナー300とする。
When the second integrated divided tubular liner 32 is suspended, as shown in FIG. 33, the threaded steel rod 118 attached to the first tubular liner 31 is moved to the second cylindrical liner 32.
The upper nut 21 is inserted into the through holes 19 and 20 of the upper supporting member 16 attached to the integrated divided tubular liner 32, and the upper part of the upper supporting member 16 is marked with the upper nut 21. Second integrated divided tubular liners 31, 3
2 is sandwiched between the upper support member 16 and the lower support member to form an integrated tubular liner 300.

【0039】接続が完了したならば、そのままクレーン
によって一体化筒状ライナー300を若干持ち上げ、図
34に示すように張出部材61,61を取り外す。続い
て図35に示すように一体化筒状ライナー300を落と
し下げ、一体化筒状ライナー300の上端が安定液B面
より若干上にある状態で沈降を完了する。以降は、前述
の第1の実施形態と同様に、固化工を行う。
When the connection is completed, the integrated tubular liner 300 is slightly lifted by a crane as it is, and the projecting members 61 are removed as shown in FIG. Subsequently, as shown in FIG. 35, the integrated tubular liner 300 is dropped down, and the sedimentation is completed in a state where the upper end of the integrated tubular liner 300 is slightly above the surface of the stable liquid B. Thereafter, solidification is performed in the same manner as in the first embodiment.

【0040】他方、3分割以上の筒状ライナーを順次接
続しながら吊り降ろす場合には、最後尾以外の分割筒状
ライナーに張出部材を取付け、順次仮支持・接続・沈降
を繰り返し行うことで、掘削孔内への沈降を行う。
On the other hand, when three or more divided cylindrical liners are to be suspended while being sequentially connected, a projecting member is attached to the divided cylindrical liners other than the last, and temporary support, connection and settling are sequentially repeated. And settle into the borehole.

【0041】<第3の実施形態;請求項5記載の発明に
関する>次に、ライナーの撤去を可能とする本発明方法
について、前述第1の実施形態への適用例に基づいて詳
説する。先ず例えば図36および図37に示すような、
外周面部81、内周面部82、環状上底部83および環
状下底部84からなる筒体状の可撓性袋体80を準備
し、これを一体化筒状ライナー30の掘削孔D内への吊
り降ろしに先立って、図38に示すように少なくとも一
体化筒状ライナー30の安定液B中に没する部分の外周
面全体を取り囲むように取付けておく。85は、袋体側
面に設けられた液体注入路を示している。袋体80とし
ては、不透水性のビニール袋や、布に不透水処理を施し
たもの等で形成したものを用いることができる。
<Third Embodiment; Regarding the Invention According to Claim 5> Next, a method of the present invention which enables removal of a liner will be described in detail based on an example applied to the first embodiment. First, for example, as shown in FIGS.
A tubular flexible bag body 80 including an outer peripheral surface portion 81, an inner peripheral surface portion 82, an annular upper bottom portion 83, and an annular lower bottom portion 84 is prepared, and this is suspended in the excavation hole D of the integrated tubular liner 30. Prior to lowering, as shown in FIG. 38, it is attached so as to surround at least the entire outer peripheral surface of the portion of the integrated tubular liner 30 submerged in the stable liquid B. Reference numeral 85 denotes a liquid injection path provided on the side surface of the bag. As the bag body 80, a water-impermeable plastic bag, a cloth formed by applying a water-impermeable treatment to a cloth, or the like can be used.

【0042】次いで、この袋体80を取り付けた一体化
筒状ライナー30を、図38に示すように掘削孔D内へ
沈降し、図39に示すように液体注入路85を介して袋
体80内に水等の固化しない液体Wを充満させ、液体注
入路85に栓をする等により袋体を膨張させた状態で保
持しつつ、固化工を行う。他の点は第1の実施形態と同
様に行うことができる。ここに、液体Wが充満した袋体
80は、外周面部81と内周面部82とが充満液体Wに
よって離間した状態となる。また袋体80は筒状ライナ
ー30の表面形状に応じて変形し密着した状態となる。
かかる状態で安定液Bの固化が進行し、同図に示すよう
に、筒状ライナー30が液体充満袋体80および固化体
Gをこの順に介して掘削孔Dの側壁に密着した立坑が構
築される。
Next, the integrated tubular liner 30 to which the bag body 80 is attached is settled into the excavation hole D as shown in FIG. 38, and the bag body 80 is inserted through the liquid injection passage 85 as shown in FIG. The inside is filled with a liquid W that does not solidify, such as water, and solidification is performed while holding the bag body in an inflated state by plugging the liquid injection passage 85 or the like. Other points can be performed in the same manner as in the first embodiment. Here, the bag body 80 filled with the liquid W is in a state where the outer peripheral surface portion 81 and the inner peripheral surface portion 82 are separated by the filled liquid W. Further, the bag body 80 is deformed according to the surface shape of the cylindrical liner 30 and comes into close contact with the bag.
In this state, the solidification of the stabilizing liquid B progresses, and as shown in the figure, a vertical shaft is constructed in which the cylindrical liner 30 is in close contact with the side wall of the excavation hole D via the liquid-filled bag 80 and the solidified body G in this order. You.

【0043】建て込んだ筒状ライナー30が不用になる
等、必要に応じて、例えば図40に示すように袋体80
内から液体Wを抜き出し、袋体80を収縮させる。これ
によって、筒状ライナー30の外周面9Sと袋体内周面
部82との間に袋体収縮分の空隙Sが生じ、筒状ライナ
ー30の外周面9Sと固化体Gとが離間し、筒状ライナ
ー30の周囲拘束が解かれ、引き抜き撤去が可能とな
る。本例の場合、筒状ライナー30底面は固化体Gと強
固に接着しているので、図41に示すように、最下端の
リング9Aとその上部9Bとの接続(例えばボルト接
続)を解除するとともに、前述第2の実施形態において
第2の分割ライナープレートの吊り下げに用いた上部支
持材16と同様のものを、上部筒状ライナー9Bの上端
に載せ接続した後、上部支持材16を介して筒状ライナ
ー上側部分9Bをクレーン等により吊り上げることによ
って、地上に抜き出すことができる。この場合、最下端
のリング9A以下の下端部(鋼板6および下部支持フレ
ーム2等を含む)は埋め殺しになるが、大部分のライナ
ー9Bを回収することができる。
If necessary, for example, the built-in tubular liner 30 becomes unnecessary, for example, as shown in FIG.
The liquid W is extracted from the inside, and the bag 80 is contracted. As a result, a gap S is formed between the outer peripheral surface 9S of the cylindrical liner 30 and the inner peripheral surface portion 82 of the bag, and the outer peripheral surface 9S of the cylindrical liner 30 and the solidified body G are separated from each other. The constraint around the liner 30 is released, and the liner 30 can be pulled out and removed. In the case of this example, since the bottom surface of the cylindrical liner 30 is firmly adhered to the solidified body G, the connection (for example, bolt connection) between the lowermost ring 9A and its upper portion 9B is released as shown in FIG. At the same time, the same upper support member 16 used for suspending the second divided liner plate in the second embodiment described above is placed on the upper end of the upper cylindrical liner 9B and connected, and then the upper support member 16 is interposed. By lifting the cylindrical liner upper portion 9B with a crane or the like, it can be pulled out to the ground. In this case, the lower end (including the steel plate 6 and the lower support frame 2) below the lowermost ring 9A is buried, but most of the liner 9B can be collected.

【0044】なお図示しないが、筒状ライナー30の底
面に離型剤を塗布したり、底面全体を覆う底蓋材を設け
る(前述第1の実施形態等のようにライナー底部に管体
11を設ける等により、貫通孔を設けた場合には、底蓋
材の対応する部位に透孔を設けておく)等により、筒状
ライナー30全体を撤去することも可能となる。離型剤
は、筒状ライナー30の底面以外にも塗布することがで
きる。
Although not shown, a release agent is applied to the bottom surface of the cylindrical liner 30 or a bottom cover material is provided to cover the entire bottom surface (as in the first embodiment, the tube 11 is attached to the bottom of the liner). If a through-hole is provided by providing, for example, a through-hole is provided at a corresponding portion of the bottom cover material), the entire tubular liner 30 can be removed. The release agent can be applied to a portion other than the bottom surface of the cylindrical liner 30.

【0045】また、上記例では袋体80内の液体Wを積
極的に排出させたが、液体注入路85を開放したり、袋
体80の適宜の位置に透孔を形成したりして、袋体80
による内部液体の拘束を解き、袋体80が変形しうる状
態で、強引に筒状ライナーの上部9Bまたは全部を引き
抜くこともできる。
In the above example, the liquid W in the bag 80 is positively discharged. However, the liquid injection path 85 is opened, or a through hole is formed at an appropriate position in the bag 80, Bag 80
, The upper portion 9B or all of the cylindrical liner can be forcibly pulled out in a state where the bag body 80 can be deformed.

【0046】他方、本形態を前述第2の実施形態のよう
な分割建込みに適用する場合には、図42にも示すよう
に、各一体化分割ライナー31,32に取付ける袋体1
81,182として、上下隣接する袋体の一方181に
雄プラグ181aを設けるとともに他方182に雌プラ
グ182aを設け(図示例では上側の袋体181の下面
に雄プラグ181a、下側の袋体182の上面に雄プラ
グ182aをそれぞれ設けている)、これらをワンタッ
チで接続することにより上下の袋体181,182を連
通接続できるように構成することを推奨する。
On the other hand, when the present embodiment is applied to the split-building as in the second embodiment, as shown in FIG. 42, the bag 1 attached to each of the integrated split liners 31, 32 is used.
81 and 182, a male plug 181a is provided on one of the upper and lower adjacent bags 181 and a female plug 182a is provided on the other 182 (in the illustrated example, the male plug 181a is provided on the lower surface of the upper bag 181 and the lower bag 182 is provided). It is recommended that the upper and lower bags 181 and 182 be connected to each other by one-touch connection.

【0047】また、本袋体を用いる撤去方法は、本発明
以外の筒状ライナーを用いた立坑構築工法、例えば前述
従来例の欄で述べた工法にも適用できる。
The removal method using the bag body can also be applied to a shaft construction method using a cylindrical liner other than the present invention, for example, the method described in the section of the conventional example.

【0048】<その他> (イ)本発明においては、管体11および可撓性ホース
12を設けなくとも良いが、その場合には一体化筒状ラ
イナーの吊り降ろしにあたり、掘削孔内の安定液Bをポ
ンプにより汲み出し筒状ライナー内に供給するようにす
るのが好ましい。この場合において、吊り降ろしに先立
って筒状ライナー内全体に安定液を充満させることも不
可能ではないが、沈降レベルに応じて順次内外液位が同
じくなるように筒状ライナー内に安定液を供給するほう
が好ましい。
<Others> (A) In the present invention, it is not necessary to provide the tube 11 and the flexible hose 12, but in this case, when suspending and lowering the integrated tubular liner, the stable liquid in the borehole is required. Preferably, B is pumped out and supplied into the cylindrical liner. In this case, it is not impossible to fill the entire inside of the tubular liner with the stabilizing liquid before hanging down, but the stabilizing liquid is poured into the cylindrical liner so that the inner and outer liquid levels are sequentially the same according to the sedimentation level. It is preferable to supply.

【0049】(ロ)筒状ライナー内に安定液を導入する
場合、固化工程において筒状ライナー内の安定液B1が
固化しないように、筒状ライナー9外部と内部とを隔離
する必要があり、上記例では筒状ライナー9に底蓋(鋼
板6等)を設けているので、筒状ライナー9を掘削溝D
内に沈降するにあたって、その上端開口を安定液面Bよ
り上に残すようにしているが、例えば上端開口にも上蓋
を着脱自在に取付けておけば上端開口部位が安定液B中
に多少没する程度まで沈降させることもできる。この場
合、上蓋上に固化体が残ることになるが、後で取り除け
ばよい。また本発明においては、上記例のように筒状ラ
イナー9に対して鋼板6等による底蓋を設ける方が好ま
しいが、設けない場合には図43に示すように、筒状ラ
イナー9の底端開口を掘削孔底D2に密着させるように
掘削孔D内に建込み、筒状ライナー9外部の安定液Bが
底端開口を介して内部へ浸入するのを防ぐようにするこ
とでも対応できる。この場合、前述第2の実施形態にお
ける第2の一体化分割筒状ライナー32の沈降と同様の
吊り降ろし形態となり、同例の上部支持材16を用いる
ことができる。
(B) When introducing the stable liquid into the cylindrical liner, it is necessary to isolate the outside and the inside of the cylindrical liner 9 so that the stable liquid B1 in the cylindrical liner does not solidify in the solidification step. In the above example, since the bottom cover (the steel plate 6 or the like) is provided on the tubular liner 9, the tubular liner 9 is
The upper end opening is left above the stabilizing liquid level B when it sinks into the inside, but if the upper lid is detachably attached to the upper end opening, for example, the upper end opening part is slightly submerged in the stabilizing liquid B. It can be settled to a degree. In this case, the solidified body remains on the upper lid, but may be removed later. Further, in the present invention, it is preferable to provide a bottom cover made of a steel plate 6 or the like for the tubular liner 9 as in the above example, but when not provided, as shown in FIG. It is also possible to cope with this by setting up the opening in the drilling hole D such that the opening is in close contact with the drilling hole bottom D2 and preventing the stable liquid B outside the tubular liner 9 from entering the inside through the bottom end opening. In this case, the suspended form is the same as the settling of the second integrated divided tubular liner 32 in the second embodiment, and the upper support 16 of the same example can be used.

【0050】(ハ)本発明の筒状ライナーは、ライナー
プレートを組み立てて形成するものに限定されない。ま
た、ライナー形状は上記例のように断面小判形のほか、
断面矩形、断面円形のものでも良い。
(C) The tubular liner of the present invention is not limited to one formed by assembling a liner plate. In addition, the liner shape is an oval cross section as in the above example,
It may be rectangular or circular in cross section.

【0051】(ニ)本発明においては、図44に示すよ
うに、筒状ライナー90における発進坑口となる部位に
鋼管等の管体91を連通接続しておき、これを坑道入口
部とすることができる。なお、かかる坑道入口部管体9
1を接続した筒状ライナー90を建て込む場合には、例
えば管体91の先端に菅蓋92をして、後の固化工程に
おいて筒状ライナー90内の安定液が固化しないように
するとともに、菅蓋92を掘削孔D側壁に密着させて掘
削孔D内に建て込むようにする。その他は、上記例と同
様に行うことができる。
(D) In the present invention, as shown in FIG. 44, a pipe 91 such as a steel pipe is connected to a portion of the tubular liner 90 which is to be a starting wellhead, and this is used as a tunnel entrance. Can be. In addition, such a tunnel entrance part pipe 9
When the tubular liner 90 to which the pipe 1 is connected is to be built, for example, a tube lid 92 is provided at the tip of the tubular body 91 so as to prevent the stable liquid in the tubular liner 90 from being solidified in a subsequent solidification step. The tube lid 92 is closely attached to the side wall of the borehole D and is built into the borehole D. Others can be performed similarly to the above-mentioned example.

【0052】[0052]

【発明の効果】以上のとおり、本発明によれば安全かつ
迅速に立坑を構築できるようになる。また、ライナーを
容易に撤去回収できるようになる。
As described above, according to the present invention, a shaft can be constructed safely and quickly. Further, the liner can be easily removed and collected.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る掘削孔を示す縦断面図である。FIG. 1 is a longitudinal sectional view showing a borehole according to the present invention.

【図2】本発明に係る掘削孔を示す平面図である。FIG. 2 is a plan view showing an excavation hole according to the present invention.

【図3】下部支持材を示す斜視図である。FIG. 3 is a perspective view showing a lower support member.

【図4】下部支持材の裏面を示す斜視図である。FIG. 4 is a perspective view showing a back surface of a lower support member.

【図5】下部支持材上に鋼板を取り付けた状態を示す斜
視図である。
FIG. 5 is a perspective view showing a state where a steel plate is mounted on a lower support member.

【図6】1リング分のライナープレート等の取付け工程
を示す平面図である。
FIG. 6 is a plan view showing a step of attaching a liner plate or the like for one ring.

【図7】1リング分のライナープレート等の取付け工程
を示す正面図である。
FIG. 7 is a front view showing a step of attaching a liner plate or the like for one ring.

【図8】図6のVIII-VIII線断面図である。8 is a sectional view taken along line VIII-VIII in FIG.

【図9】コンクリート打設工程を示す縦断面図である。FIG. 9 is a longitudinal sectional view showing a concrete placing step.

【図10】コンクリート打設状態を示す平面図である。FIG. 10 is a plan view showing a concrete casting state.

【図11】筒状ライナー組立て完了状態を示す縦断面図
である。
FIG. 11 is a longitudinal sectional view showing a state where the cylindrical liner assembly is completed.

【図12】可撓性ホース取付け工程を示す、図13のXI
I-XII線断面図である。
FIG. 12 shows the flexible hose installation process, FIG.
It is an I-XII line sectional view.

【図13】可撓性ホース取付け工程を示す平面図であ
る。
FIG. 13 is a plan view showing a flexible hose attaching step.

【図14】上部支持材の分解組立図である。FIG. 14 is an exploded view of the upper support member.

【図15】上部支持材を取付けた状態の、図13のXV-X
V線断面図である。
FIG. 15 shows the XV-X of FIG. 13 with the upper support attached.
FIG. 5 is a sectional view taken along line V.

【図16】上部支持材を取付けた状態を示す縦断面図で
ある。
FIG. 16 is a longitudinal sectional view showing a state where an upper supporting member is attached.

【図17】筒状ライナー沈降工程を示す縦断面図であ
る。
FIG. 17 is a longitudinal sectional view showing a cylindrical liner settling process.

【図18】吊り支持切り替え工程を示す縦断面図であ
る。
FIG. 18 is a vertical sectional view showing a suspension support switching step.

【図19】固化工を示す縦断面図である。FIG. 19 is a longitudinal sectional view showing a solidification process.

【図20】他の固化工を示す縦断面図である。FIG. 20 is a longitudinal sectional view showing another solidification process.

【図21】固化後の状態を示す縦断面図である。FIG. 21 is a longitudinal sectional view showing a state after solidification.

【図22】第2の実施形態における、第1の一体化分割
筒状ライナーを示す縦断面図である。
FIG. 22 is a longitudinal sectional view showing a first integrated divided tubular liner according to the second embodiment.

【図23】第1の一体化分割筒状ライナーを示す平面図
である。
FIG. 23 is a plan view showing a first integrated divided tubular liner.

【図24】第1の一体化分割筒状ライナーの要部拡大図
である。
FIG. 24 is an enlarged view of a main part of the first integrated divided tubular liner.

【図25】第1の一体化分割筒状ライナーの沈降工程を
示す縦断面図である。
FIG. 25 is a vertical cross-sectional view showing a settling process of the first integrated divided tubular liner.

【図26】第1の一体化分割筒状ライナーの仮支持状態
を示す縦断面図である。
FIG. 26 is a longitudinal sectional view showing a temporary support state of the first integrated divided tubular liner.

【図27】第2の一体化分割筒状ライナーを示す縦断面
図である。
FIG. 27 is a longitudinal sectional view showing a second integrated divided tubular liner.

【図28】第2の一体化分割筒状ライナーを示す縦断面
図である。
FIG. 28 is a longitudinal sectional view showing a second integrated divided tubular liner.

【図29】第2の一体化分割筒状ライナーの要部拡大図
である。
FIG. 29 is an enlarged view of a main part of a second integrated divided tubular liner.

【図30】第1および第2の分割筒状ライナーの積み重
ね工程を示す縦断面図である。
FIG. 30 is a longitudinal sectional view showing a step of stacking first and second divided tubular liners.

【図31】第1および第2の分割筒状ライナーの接続工
程を示す縦断面図である。
FIG. 31 is a longitudinal sectional view showing a connecting step of the first and second divided tubular liners.

【図32】接続例を示す要部拡大図である。FIG. 32 is an enlarged view of a main part showing a connection example.

【図33】図31の要部拡大図である。FIG. 33 is an enlarged view of a main part of FIG. 31.

【図34】仮支持解除状態を示す縦断面図である。FIG. 34 is a longitudinal sectional view showing a temporary support release state.

【図35】一体化筒状ライナーの沈降工程を示す縦断面
図である。
FIG. 35 is a longitudinal sectional view showing a step of settling the integrated tubular liner.

【図36】第3の実施形態で用いる袋体を示す斜視図で
ある。
FIG. 36 is a perspective view showing a bag used in the third embodiment.

【図37】袋体の縦断面図および要部拡大図である。FIG. 37 is a longitudinal sectional view and a main part enlarged view of the bag body.

【図38】袋体を取付けた一体化筒状ライナーの沈降工
程を示す縦断面図である。
FIG. 38 is a longitudinal sectional view showing a settling process of the integrated tubular liner to which the bag is attached.

【図39】固化後の状態を示す縦断面図である。FIG. 39 is a longitudinal sectional view showing a state after solidification.

【図40】袋体収縮状態を示す要部拡大縦断面図であ
る。
FIG. 40 is an enlarged longitudinal sectional view of a main part showing a bag body contracted state.

【図41】筒状ライナー上部撤去工程を示す縦断面図で
ある。
FIG. 41 is a longitudinal sectional view showing a tubular liner upper part removing step.

【図42】袋体の接続形態を示す縦断面図である。FIG. 42 is a longitudinal sectional view showing a connection form of the bag body.

【図43】底蓋を設けない形態を示す縦断面図である。FIG. 43 is a longitudinal sectional view showing a mode in which a bottom cover is not provided.

【図44】筒状ライナーに坑道入口部管体を取付ける形
態を示す縦断面図である。
FIG. 44 is a longitudinal sectional view showing a mode in which a tunnel entrance portion pipe is attached to a tubular liner.

【符号の説明】 1…ガイドウォール、2…下部支持フレーム、6…鋼
板、9…筒状ライナー、9a…ライナープレート、12
…可撓性ホース、13…引上げロープ、16…上部支持
材、17…吊りフック、18…ネジ鋼棒、B,B1…安
定液、C…コンクリート、D…掘削孔、G…固化体。
[Description of Signs] 1 ... guide wall, 2 ... lower support frame, 6 ... steel plate, 9 ... tubular liner, 9a ... liner plate, 12
... flexible hose, 13 ... pulling rope, 16 ... upper supporting material, 17 ... hanging hook, 18 ... threaded steel rod, B, B1 ... stabilizing liquid, C ... concrete, D ... drilling hole, G ... solidified body.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】安定液掘削により対象地盤に立坑全長分の
掘削孔を形成し、 この安定液で満たされた掘削孔内に立坑全長分の筒状ラ
イナーを建込み、 しかる後、この筒状ライナーの周囲の安定液を固化させ
て、筒状ライナーが固化体を介して掘削孔壁に密着した
立坑を構築することを特徴とする、立坑の構築方法。
An excavation hole for the entire length of the shaft is formed in the target ground by excavating the stable liquid, and a tubular liner for the entire length of the shaft is built in the excavation hole filled with the stable liquid. A method for constructing a shaft, comprising solidifying a stable liquid around a liner and constructing a shaft in which a cylindrical liner is in close contact with a wall of an excavation hole via a solidified body.
【請求項2】長手方向に接続することによって立坑全長
分となる複数の分割筒状ライナーを用意し、 先頭の分割筒状ライナーに対し順次後続の分割筒状ライ
ナーを接続して延長しながら、接続部分を前記掘削孔内
に順次落とし下げていくことによって、前記立坑全長分
の筒状ライナーの建込みを行う、請求項1記載の立坑の
構築方法。
2. A plurality of divided tubular liners each having a length corresponding to the total length of the shaft by connecting in the longitudinal direction are prepared. The method according to claim 1, wherein a tubular liner for the entire length of the shaft is built by sequentially dropping a connection portion into the excavation hole.
【請求項3】前記筒状ライナー内を通り掘削孔下端部に
臨む注入路を設け、この注入路を介して筒状ライナーの
周囲の安定液に固化材を注入し固化を図る、請求項1ま
たは2記載の立坑の構築方法。
3. An injection passage extending through the inside of the tubular liner and facing the lower end of the drilling hole, and a solidifying material is injected into a stable liquid around the cylindrical liner through the injection passage to achieve solidification. Or the method of constructing a shaft according to 2.
【請求項4】前記掘削孔内への建込みに先立って、前記
筒状ライナーの底部開口に、少なくとも一つの貫通孔を
設けた底蓋を取り付けるとともに、この貫通孔のライナ
ー内側開口に可撓性ホースの一端を着脱自在に接続し、
可撓性ホースの他方の自由端には線材を連結しておき、 前記筒状ライナーの掘削孔内への建込みに際し、前記可
撓性ホースの自由端に連結した線材の他端を地上部まで
延在させた状態で、前記可撓性ホースを介して筒状ライ
ナー内に安定液を導入しながら、前記筒状ライナーを掘
削孔内の安定液中に沈めていき、 前記筒状ライナーの掘削孔内への建込み完了後におい
て、前記線材を介して前記可撓性ホースの自由端を安定
液面上に引き上げ、この可撓性ホースを前記安定液の固
化作業のための通路として利用する、請求項1〜3のい
ずれか1項に記載の立坑の構築方法。
4. A bottom cover having at least one through hole is attached to a bottom opening of the tubular liner prior to installation in the excavation hole, and a flexible liner is provided in the liner inside opening of the through hole. One end of the hose is detachably connected,
A wire is connected to the other free end of the flexible hose, and the other end of the wire connected to the free end of the flexible hose is connected to the ground when the tubular liner is installed in the excavation hole. In a state where the cylindrical liner is extended into the cylindrical liner, the cylindrical liner is submerged in the stable liquid in the borehole while introducing the stable liquid into the cylindrical liner through the flexible hose. After the completion of the installation in the excavation hole, the free end of the flexible hose is pulled up to the stable liquid level via the wire, and the flexible hose is used as a passage for solidifying the stable liquid. The method according to any one of claims 1 to 3, wherein the shaft is constructed.
【請求項5】対象地盤に掘削孔を形成するとともに、そ
の掘削孔内に筒状ライナーを建て込み、立坑を構築する
方法において、 少なくとも前記筒状ライナー外周面と掘削孔内周面との
隙間に袋体を配するとともに、この袋体内に液体を充満
させ、筒状ライナーが前記液体が充満し膨張した袋体を
介して掘削孔壁に密着した立坑を構築することを特徴と
する、立坑の構築方法。
5. A method for forming an excavation hole in a target ground, setting a tubular liner in the excavation hole, and constructing a shaft, wherein at least a gap between an outer peripheral surface of the cylindrical liner and an inner peripheral surface of the excavation hole is provided. And the bag body is filled with a liquid, and a tubular liner is constructed to form a shaft that is in close contact with the wall of the borehole through the bag body filled with the liquid and expanded. How to build.
JP34889399A 1999-12-08 1999-12-08 Construction method of shaft Expired - Fee Related JP3427022B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34889399A JP3427022B2 (en) 1999-12-08 1999-12-08 Construction method of shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34889399A JP3427022B2 (en) 1999-12-08 1999-12-08 Construction method of shaft

Publications (2)

Publication Number Publication Date
JP2001164870A true JP2001164870A (en) 2001-06-19
JP3427022B2 JP3427022B2 (en) 2003-07-14

Family

ID=18400106

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34889399A Expired - Fee Related JP3427022B2 (en) 1999-12-08 1999-12-08 Construction method of shaft

Country Status (1)

Country Link
JP (1) JP3427022B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008082123A (en) * 2006-09-29 2008-04-10 Shimizu Corp Vertical shaft for waste underground burying disposal facility, and vertical shaft construction method of waste underground burying disposal facility
JP7093089B1 (en) 2022-02-21 2022-06-29 オリエンタル白石株式会社 Liner plate retaining wall root fixing member and liner plate retaining wall root fixing method
JP2023018682A (en) * 2022-09-30 2023-02-08 有限会社 伊藤 Liner plate and method for connecting liner plate

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008082123A (en) * 2006-09-29 2008-04-10 Shimizu Corp Vertical shaft for waste underground burying disposal facility, and vertical shaft construction method of waste underground burying disposal facility
JP7093089B1 (en) 2022-02-21 2022-06-29 オリエンタル白石株式会社 Liner plate retaining wall root fixing member and liner plate retaining wall root fixing method
JP2023121248A (en) * 2022-02-21 2023-08-31 オリエンタル白石株式会社 Well head foot protection member for liner plate earth-retaining wall, and well head foot protection method of liner plate earth-retaining wall
JP2023018682A (en) * 2022-09-30 2023-02-08 有限会社 伊藤 Liner plate and method for connecting liner plate
JP7309237B2 (en) 2022-09-30 2023-07-18 島工業Hd株式会社 Liner plate and method for connecting liner plate

Also Published As

Publication number Publication date
JP3427022B2 (en) 2003-07-14

Similar Documents

Publication Publication Date Title
JP5412501B2 (en) Reinforcement rod erection method, buoyancy imparting device used in the method, and buoyancy body detachment device
WO1996018001A1 (en) Pile head treating tool for cast-in-place pile, pile head treating method, and cast-in-place piling method
KR101840226B1 (en) The guide holes of the form for soil auger dredges
JP5351125B2 (en) Open shield machine start method of open shield method
JP3427022B2 (en) Construction method of shaft
US20060086011A1 (en) Method for making a channel in the ground, excavating device for making a channel in the ground, assembly comprising an excavating device and a construction element
JP6162356B1 (en) Method for excavating pile bottom sediment and stirring in hole and rotary table device used therefor
CN214832668U (en) Pile head integral breaking system for large-diameter bored pile
JP3827309B2 (en) Auxiliary pile method and embedded pile method
JP2001241287A (en) Construction method of shaft, assembly method of structural body used for construction method, and assembly device used for assembly method
JP4137173B1 (en) Reinforcing bar construction in cast-in-place pile
JP3418144B2 (en) Connection method between human hole and pipe
CN212223934U (en) Wall type foundation
JP7252608B2 (en) Shaft casing and earth retaining method
JP2592068B2 (en) Construction method of continuous underground wall
JPH0517958A (en) Execution method for steel pipe pile
JP4137172B1 (en) Reinforcing bar construction in cast-in-place pile
JPH07985B2 (en) Expandable and contractible liner form and its shaft excavation method
JP5940358B2 (en) How to install and remove Yamadome wall core
JP4049306B2 (en) Subsidence method of underground structure
CN113089671A (en) Pile head integral breaking system for large-diameter bored pile and construction method
JP3470954B2 (en) Method of laying interruption of manhole to existing buried pipe
CN118166788A (en) Accurate positioning reusable cleaning-free lattice column construction structure and construction method thereof
CN118187150A (en) Working well lining wall reverse construction method reinforcing steel bar installation method
JP2016113874A (en) Shield machine recovery method in open shield method

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
R150 Certificate of patent or registration of utility model

Ref document number: 3427022

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080509

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090509

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100509

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110509

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110509

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120509

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120509

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130509

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140509

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees