JP2000038727A - Foundation concrete and execution therefor - Google Patents
Foundation concrete and execution thereforInfo
- Publication number
- JP2000038727A JP2000038727A JP10205569A JP20556998A JP2000038727A JP 2000038727 A JP2000038727 A JP 2000038727A JP 10205569 A JP10205569 A JP 10205569A JP 20556998 A JP20556998 A JP 20556998A JP 2000038727 A JP2000038727 A JP 2000038727A
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- anchor
- bolt
- anchor plate
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Foundations (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、建築構造物の枠組
みを支持する布基礎等の基礎コンクリート及びその施工
方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation concrete such as a cloth foundation for supporting a framework of a building structure and a method of constructing the foundation concrete.
【0002】[0002]
【関連する背景技術】近年、スチールハウス(Steel-Fra
med Housing)が耐震性と耐久性に優れた安全で快適な住
まいとして脚光を浴びている。このスチールハウスと
は、木材と同外寸の厚さ1mm程度の亜鉛メッキ鋼板で造
られた軽量形鋼で形組みを作り、この形組みに合板など
をドリルネジで接合することにより建築された2×4工
法住宅をさす。骨組みとなる枠組みがスチール製である
ので、耐震性、耐久性に優れるとともに、不燃性であ
り、白蟻の被害もなく、材料の価格や品質も安定してい
るという特徴を有する。[Related Background Art] In recent years, steel houses (Steel-Fra
med Housing) has been spotlighted as a safe and comfortable home with excellent earthquake resistance and durability. This steel house is constructed by forming a shape from lightweight shaped steel made of galvanized steel sheet of the same outer dimensions as wood and having a thickness of about 1 mm, and joining plywood and the like to this shape with drill screws. × 4 house. Since the framework that forms the framework is made of steel, it has excellent features such as excellent earthquake resistance and durability, non-flammability, no damage to termites, and stable material price and quality.
【0003】このスチールハウスの枠組みを据え付ける
に当たり、先ず、図4の2点鎖線で示すコンクリート流
し込み用形枠2、3を地面の所定の場所に配置する。こ
の形枠内には鉄筋4が水平に配設されると共に複数のア
ンカーボルト6が図示しないクリップ等を用いて鉄筋4
の所定の場所で固定してある。そして、この形枠内にコ
ンクリートを所定量流し込み、コンクリートが硬化する
まで放置養生する。コンクリートが硬化した後、型枠
2、3を取り除き、コンクリート上面8(これを、以下
「天端」という)がほぼ平らになるようにならす(いわ
ゆる「天端ならし」)。この作業により、天端から所定
の間隔でアンカーボルト6が突出した布基礎が形成され
る。When installing the framework of this steel house, first, concrete pouring frames 2, 3 shown by two-dot chain lines in FIG. 4 are arranged at predetermined locations on the ground. In this form, a reinforcing bar 4 is horizontally disposed, and a plurality of anchor bolts 6 are attached to the reinforcing bar 4 using clips (not shown).
Is fixed at a predetermined location. Then, a predetermined amount of concrete is poured into the formwork and left to cure until the concrete hardens. After the concrete has hardened, the molds 2 and 3 are removed, and the concrete upper surface 8 (hereinafter, referred to as a “top end”) is leveled (so-called “top end leveling”). By this operation, a fabric base on which the anchor bolts 6 project at predetermined intervals from the top end is formed.
【0004】次に、上述の布基礎に、スチールハウス枠
組みの下枠チャンネル10が据え付けられる。尚、下枠
チャンネル10は、図5に示すように、U字型断面を有
する鋼板からなり、両側面には予め決められた間隔でア
ンカーボルト挿通用の孔10a、10bが開けられてい
る。そして、下枠チャンネル10の開口を水平方向に向
け、各アンカーボルトに対応してチャンネル補強用カラ
ー14をその内孔14aが下枠チャンネル10の孔10
a、10bに合致するように下枠チャンネル10に夫々
介装し、この状態を保持しながらアンカーボルト6を下
枠チャンネル10の孔10a、10bに挿通させ、下枠
チャンネル10の下面を天端8に当接させてこれに載置
する。[0004] Next, a lower frame channel 10 of a steel house frame is installed on the above-mentioned cloth foundation. As shown in FIG. 5, the lower frame channel 10 is formed of a steel plate having a U-shaped cross section, and holes 10a and 10b for inserting anchor bolts are formed on both sides at predetermined intervals. Then, the opening of the lower frame channel 10 is oriented in the horizontal direction, and the channel reinforcing collar 14 is formed in the hole 10a of the lower frame channel 10 in correspondence with each anchor bolt.
The lower frame channel 10 is inserted into the holes 10a and 10b of the lower frame channel 10 while maintaining this state, and the lower surface of the lower frame channel 10 is 8 and placed on it.
【0005】更に、下枠チャンネル10から上方に突出
したアンカーボルト6の夫々にナット18を螺合し、下
枠チャンネル10を天端8に固定する。このようにし
て、布基礎に枠組みの下枠チャンネル10を固定する。Further, a nut 18 is screwed into each of the anchor bolts 6 projecting upward from the lower frame channel 10, and the lower frame channel 10 is fixed to the top end 8. In this way, the lower frame channel 10 of the framework is fixed to the cloth foundation.
【0006】[0006]
【発明が解決しようとする課題】このように、従来の工
法では基礎となるコンクリートに植設するアンカーボル
ト6を鉄筋4の適当な場所にクリップ等で固定して位置
出しをする為、アンカーボルト6間の寸法を正確に管理
することが難しく、又、アンカーボルト6が鉄筋4に全
て鉛直に取り付けられるとは限らず、斜めに取り付けら
れてしまう場合もある。その結果、コンクリートを形枠
に流し込んで硬化させると、コンクリートの天端8から
不規則な間隔でかつ不規則な方向にボルト上部が突出し
た状態でアンカーボルト6が天端8に植設されてしまう
ことがある。コンクリートが一旦硬化してしまうと、こ
のようなアンカーボルト6を正規の位置・方向に植設し
直すことは容易なことではない。その為、天端8上に下
枠チャンネル10を載置する際、アンカーボルト挿通孔
10a、10bをアンカーボルト6の植設状態に合わせ
て開け直さなければならない場合がある。As described above, in the conventional construction method, the anchor bolt 6 to be planted in the foundation concrete is fixed to an appropriate place of the reinforcing bar 4 with a clip or the like, and the anchor bolt 6 is positioned. It is difficult to accurately manage the dimension between the anchor bolts 6, and the anchor bolts 6 are not necessarily all vertically attached to the reinforcing bar 4, but may be attached diagonally. As a result, when the concrete is poured into the formwork and hardened, the anchor bolts 6 are implanted into the top end 8 at irregular intervals and in irregular directions from the top end 8 of the concrete with the bolt tops protruding. Sometimes. Once the concrete has hardened, it is not easy to replant such anchor bolts 6 in the correct position and direction. For this reason, when placing the lower frame channel 10 on the top end 8, the anchor bolt insertion holes 10a and 10b may have to be reopened in accordance with the anchor bolt 6 installation state.
【0007】又、天端8にはアンカーボルト6の上部が
スタッド状に突出しているので、枠組みを布基礎上に仮
置きすることができない。つまり、下枠チャンネル10
の挿通孔10a、10bにカラー14の内孔14aが合
致するようにカラー14を下枠チャンネル10に介装
し、この状態を保ったまま枠組みを持ち上げ、アンカー
ボルト6がチャンネル10の夫々のボルト挿通孔10
b、カラー内孔14a、ボルト挿通孔10aを順次貫通
するように天端8上に下枠チャンネル10を載置する作
業を行うことが必要である。その為、一箇所でも下枠チ
ャンネル10のボルト挿通孔10a、10bとカラー内
孔14aとの相対的な位置がずれていると、下枠チャン
ネル10の孔10a、10bにアンカーボルト6を挿通
させることができなくなる。従って、カラー14の下枠
チャンネル10に対する位置合わせを行いながら、下枠
チャンネル10を天端8に載置する必要があり、この作
業は手間が掛かる。その結果、従来のアンカーボルト施
工方法は、スチールハウスの特徴である迅速かつ正確な
枠組みの据え付け作業に支障をきたしていた。Further, since the upper portion of the anchor bolt 6 projects from the top end 8 in a stud shape, the frame cannot be temporarily placed on the cloth foundation. That is, the lower frame channel 10
The collar 14 is interposed in the lower frame channel 10 so that the inner hole 14a of the collar 14 is aligned with the insertion holes 10a and 10b of the collar 14, and the frame is lifted while maintaining this state. Insertion hole 10
b, it is necessary to perform an operation of mounting the lower frame channel 10 on the top end 8 so as to sequentially pass through the collar inner hole 14a and the bolt insertion hole 10a. Therefore, if the relative positions of the bolt insertion holes 10a and 10b of the lower frame channel 10 and the collar inner hole 14a are displaced even at one position, the anchor bolt 6 is inserted into the holes 10a and 10b of the lower frame channel 10. You will not be able to do it. Therefore, it is necessary to place the lower frame channel 10 on the top end 8 while performing alignment with the lower frame channel 10 of the collar 14, and this operation is troublesome. As a result, the conventional anchor bolt construction method has hindered the quick and accurate framework installation work that is characteristic of a steel house.
【0008】本発明の目的は、スチールハウスの施工に
当たって、布基礎への枠組みの据え付け性を格段に向上
させる基礎コンクリート及びその施工方法を提供するこ
とにある。[0008] An object of the present invention is to provide a foundation concrete and a method for constructing a steel house, which greatly improve the ease of installation of a framework on a cloth foundation when constructing a steel house.
【0009】[0009]
【課題を解決するための手段】上述した目的を達成すべ
く本発明に係る基礎コンクリートは、建築構造物の型枠
又は木枠を支持するコンクリート部と、コンクリート部
の上端面に埋設されたアンカープレートと、コンクリー
ト部に埋設されたアンカーボルトと、アンカープレート
に所定間隔で配置固定され、上記型枠又は木枠を固定す
るための固定ボルトとアンカーボルトとを接続するため
の接続ナットとからなることを特徴とする。In order to achieve the above object, a foundation concrete according to the present invention comprises a concrete portion for supporting a formwork or a wooden frame of a building structure, and an anchor buried in the upper end surface of the concrete portion. A plate, an anchor bolt embedded in a concrete portion, and a connection nut fixed to the anchor plate at a predetermined interval and connected to a fixing bolt for fixing the formwork or the wooden frame and the anchor bolt. It is characterized by the following.
【0010】そして、本発明に係る基礎コンクリート
は、アンカープレートに所定間隔で配置固定された接続
ナットにアンカーボルトを取り付けた状態で、該アンカ
ープレートをコンクリート型枠間の所定位置に支持し、
コンクリートをアンカープレートと略面一になるまで型
枠間に流し込んでコンクリート部を形成し、コンクリー
ト部が硬化するまで放置養生した後、固定ボルトを接続
ナットに螺合させることによって、該コンクリート部に
建築構造物の型枠又は木枠を支持することで施工され
る。In the foundation concrete according to the present invention, the anchor plate is supported at a predetermined position between the concrete forms while anchor bolts are attached to connection nuts arranged and fixed to the anchor plate at predetermined intervals,
Pour concrete between molds until it is almost flush with the anchor plate to form a concrete part, leave it to cure until the concrete part hardens, and then screw the fixing bolts to the connection nuts. It is constructed by supporting a formwork or a wooden frame of a building structure.
【0011】好ましくは、本発明に係る基礎コンクリー
トは、調整プレートをコンクリート型枠上端に架け渡
し、該調整プレートに取り付けた吊下ボルトを前記接続
ボルトに螺合させることによりアンカープレートをコン
クリート型枠間の所定位置に支持することによって施工
される。Preferably, in the foundation concrete according to the present invention, the anchor plate is bridged over the upper end of the concrete formwork, and a suspension bolt attached to the adjustment plate is screwed into the connection bolt to connect the anchor plate to the concrete formwork. It is constructed by supporting it at a predetermined position in between.
【0012】従来の基礎コンクリートのように、アンカ
ーボルトの上部がコンクリートの天端から突出していな
いため、天端上に下枠チャンネルを載置し易くなる。
又、接続ナットのネジ孔がコンクリートの天端上に一定
間隔で正確に配置されるので、チャンネル固定ボルトを
用いた天端上への下枠チャンネルの据え付け作業が行い
易くなる。Since the upper portion of the anchor bolt does not protrude from the top end of the concrete unlike the conventional foundation concrete, the lower frame channel can be easily mounted on the top end.
In addition, since the screw holes of the connection nut are accurately arranged at regular intervals on the top of the concrete, the work of installing the lower frame channel on the top using the channel fixing bolts can be easily performed.
【0013】[0013]
【発明の実施の形態】以下、図面を参照して本発明の一
実施形態に係る基礎コンクリート及び基礎コンクリート
の施工方法について説明する。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a block diagram showing a basic concrete construction method according to an embodiment of the present invention.
【0014】図1及び図2に示すように、先ずアンカー
ボルト埋め込み装置30を組み立てる。このアンカーボ
ルト埋め込み装置30は、アンカーボルト32と下枠チ
ャンネル固定用ボルト(固定ボルト)58を取り付ける
ための接続ナット34を所定間隔で配置したアンカープ
レート38と、アンカープレート38から所定距離離間
し、両端部がコンクリート型枠2、3間に架け渡される
調整プレート42、この調整プレート42に高さ調整可
能に取付けられ、下端が上述の接続ナットのネジ孔34
aに螺合してアンカープレート38を所望の位置に吊下
させる吊具40等からなる。As shown in FIGS. 1 and 2, first, the anchor bolt embedding device 30 is assembled. This anchor bolt embedding device 30 is provided with an anchor plate 38 in which connection nuts 34 for attaching an anchor bolt 32 and a lower frame channel fixing bolt (fixing bolt) 58 are arranged at a predetermined interval, and is separated from the anchor plate 38 by a predetermined distance. An adjusting plate 42 whose both ends are bridged between the concrete forms 2 and 3 is attached to the adjusting plate 42 so that the height can be adjusted, and the lower end is a screw hole 34 of the connection nut.
and a hanging member 40 for screwing the anchor plate 38 to a desired position.
【0015】図1に示すアンカーボルト埋め込み装置3
0の接続ナット34は、図2に示すようにアンカープレ
ート38に所定の間隔で固定されている。接続ナット3
4は、図1に示すように上縁部にフランジ部34fが形
成されたフランジ付きナットであり、その本体部である
ナット部34nの下半部にはアンカーボルト32が螺合
され、且つ上半部には吊下ボルト40が螺合される。
尚、フランジ部34fの外周には高さがアンカープレー
ト38のフランジ部より高いコンクリート流入防止用の
樹脂製保護管46が嵌合されている。An anchor bolt embedding device 3 shown in FIG.
The zero connection nut 34 is fixed to the anchor plate 38 at predetermined intervals as shown in FIG. Connection nut 3
Numeral 4 denotes a flanged nut having a flange portion 34f formed on an upper edge portion as shown in FIG. 1. An anchor bolt 32 is screwed into a lower half portion of the nut portion 34n, which is a main body of the nut. A suspension bolt 40 is screwed into the half part.
A resin protection tube 46 for preventing concrete inflow, which is higher in height than the flange portion of the anchor plate 38, is fitted to the outer periphery of the flange portion 34f.
【0016】図2に示すように、アンカープレート38
は、両側部に剛性を維持するためのフランジ部を有し、
上方に開口した断面U字型の、布設する布基礎の長手方
向に沿って延びる長尺の鋼板である。又、アンカープレ
ート38には所定間隔で、即ち、固定する枠組みの下枠
チャンネル10に穿設されるチャンネル取付ボルト挿通
孔10a、10bのピッチに合わせて図1に示す接続ナ
ット取付け用の孔38aが穿設されており、孔38aに
は接続ナット34のナット部34nがプレート38の開
口側から挿通され、接続ナット34のフランジ部34f
が孔38aの周縁に当接している。そして、接続ナット
34はアンカープレート38に溶着されている。尚、溶
接による固定の代わりに接続ナット34のナット部34
nの外周にネジ部を形成し、このネジ部に別のナットを
螺合することにより、このナットとナット34のフラン
ジ部34fとでアンカープレート38を挟持してナット
34を固定するようにしても良い。As shown in FIG. 2, the anchor plate 38
Has flanges on both sides to maintain rigidity,
This is a long steel plate having a U-shaped cross section opened upward and extending along the longitudinal direction of the cloth foundation to be laid. The anchor plate 38 is provided at predetermined intervals, that is, in accordance with the pitch of the channel mounting bolt insertion holes 10a and 10b drilled in the lower frame channel 10 of the frame to be fixed. The nut portion 34n of the connection nut 34 is inserted through the hole 38a from the opening side of the plate 38, and the flange portion 34f of the connection nut 34 is formed.
Are in contact with the periphery of the hole 38a. The connection nut 34 is welded to the anchor plate 38. In addition, instead of fixing by welding, the nut portion 34 of the connection nut 34 is used.
By forming a screw portion on the outer periphery of n and screwing another nut to this screw portion, the nut 34 is fixed by clamping the anchor plate 38 between the nut and the flange portion 34f of the nut 34. Is also good.
【0017】調整プレート42は、図1及び図2に示す
ように、全長がコンクリート型枠2、3間の間隔より長
く、両側部に剛性を維持するためのフランジ部を有する
上方に開口した断面U字型の鋼板で形成されている。調
整プレート42は又、吊下ボルト40を挿通し且つボル
ト40の取付位置を調整プレート42の長手方向(従っ
て、布基礎の幅方向)に沿って調整できる長孔42aを
略中央部に備える。調整プレート42は更に、コンクリ
ート型枠2、3に対してプレート42の位置決めをする
ための切り起こし部42b、42cを両端部近傍の所定
位置に具備しており、この切り起こし部42b、42c
は、舌片状に切り取られ下方に折曲されて形成されてい
る。As shown in FIGS. 1 and 2, the adjustment plate 42 has an overall length longer than the interval between the concrete forms 2 and 3, and has an open upper section having flanges on both sides for maintaining rigidity. It is formed of a U-shaped steel plate. The adjusting plate 42 also has an elongated hole 42a at a substantially central portion through which the suspension bolt 40 can be inserted and the mounting position of the bolt 40 can be adjusted along the longitudinal direction of the adjusting plate 42 (therefore, in the width direction of the cloth foundation). The adjusting plate 42 further has cut-and-raised portions 42b and 42c for positioning the plate 42 with respect to the concrete forms 2 and 3 at predetermined positions near both ends, and the cut-and-raised portions 42b and 42c.
Is cut out like a tongue and bent downward.
【0018】吊下ボルト40と調整プレート42とは、
図1に示すように、ダブルナット54、55によって上
下位置調整可能に固定される。The suspension bolt 40 and the adjustment plate 42
As shown in FIG. 1, the upper and lower positions are fixed by double nuts 54 and 55 so as to be adjustable.
【0019】尚、吊下ボルト40、調整プレート42、
ダブルナット54、55等で吊下手段を構成している。The suspension bolt 40, the adjustment plate 42,
The suspension means is constituted by the double nuts 54, 55 and the like.
【0020】次に、以上のようなアンカーボルト埋め込
み装置30を用いた基礎コンクリートの施工方法につい
て説明する。Next, a method of constructing the foundation concrete using the anchor bolt embedding device 30 as described above will be described.
【0021】まず最初にアンカープレート38の接続ナ
ット34に必要な数だけのアンカーボルト32を取り付
ける。又、保護管46を接続ナット34のフランジ部3
4fに取り付ける。次に、吊下ボルト40にナット55
を螺合し、その後、吊下ボルト40を調整プレート42
に挿通する。ナット54を吊下ボルト40に螺合し、吊
下ボルト40をアンカープレート38の接続ナット34
に螺合する。そして、ナット54とナット55とを仮締
めすることで吊下ボルト40を調整プレート42に仮取
り付けする。First, the necessary number of anchor bolts 32 are attached to the connection nuts 34 of the anchor plate 38. The protection tube 46 is connected to the flange 3 of the connection nut 34.
Attach to 4f. Next, the nut 55 is attached to the suspension bolt 40.
After that, the suspension bolt 40 is connected to the adjustment plate 42
Through. The nut 54 is screwed into the suspension bolt 40, and the suspension bolt 40 is connected to the connection nut 34 of the anchor plate 38.
To screw. Then, the suspension bolt 40 is temporarily attached to the adjustment plate 42 by temporarily fastening the nut 54 and the nut 55.
【0022】次に、調整プレート42をコンクリート型
枠間に架け渡してアンカープレート38をコンクリート
型枠間に吊下する。そして、ナット55でアンカープレ
ート38の高さ調整、幅方向位置調整を行い、ナット5
4を締め付けることでアンカープレート38をコンクリ
ート型枠間の所定位置にしっかりと支持する。Next, the adjustment plate 42 is suspended between the concrete forms, and the anchor plate 38 is suspended between the concrete forms. The height of the anchor plate 38 and the position in the width direction are adjusted with the nut 55, and the nut 5 is adjusted.
By tightening 4, the anchor plate 38 is firmly supported at a predetermined position between the concrete forms.
【0023】次に、コンクリート型枠内に、コンクリー
トの高さがアンカープレート38のフランジの上端に達
するまで適量のコンクリートを流し込み、コンクリート
部1を形成する。尚、保護管46の高さは、フランジの
高さより高いため、保護管46の上端はコンクリート面
より上方に位置している。その為、コンクリートが保護
管46の内孔46a、即ち、接続ナット34と吊下ボル
ト40との螺合部近傍に流入しない。Next, an appropriate amount of concrete is poured into the concrete form until the height of the concrete reaches the upper end of the flange of the anchor plate 38 to form the concrete portion 1. Since the height of the protection tube 46 is higher than the height of the flange, the upper end of the protection tube 46 is located above the concrete surface. Therefore, the concrete does not flow into the inner hole 46 a of the protection tube 46, that is, the vicinity of the threaded portion between the connection nut 34 and the suspension bolt 40.
【0024】その後、コンクリートが硬化するまでその
まま放置する。コンクリートが硬化することにより、ア
ンカーボルト32、アンカープレート38、及び保護管
46の一部がコンクリート部1に埋設される。Thereafter, the concrete is left as it is until it hardens. As the concrete hardens, a part of the anchor bolt 32, the anchor plate 38, and the protection tube 46 are buried in the concrete part 1.
【0025】次に、調整プレート42と吊下ボルト40
との取り外し作業を行う。この作業は、以下の手順で行
う。Next, the adjusting plate 42 and the suspension bolt 40
And remove work. This operation is performed in the following procedure.
【0026】まず最初にナット54を十分に緩める。そ
して、吊下ボルト40をネジ緩み方向に回転させて接続
ナット34のネジ孔から取り外す。この作業を夫々の吊
下ボルト40について行った後、調整プレート42を吊
下ボルト40と共にコンクリート型枠2、3から取り外
す。これにより、コンクリートの天端43には保護管4
6の一部のみが突出し、かつ保護管46の内孔46aに
接続ナット34のフランジ部34fの上面及びナット3
4のネジ開口部が形成された状態になる。First, the nut 54 is loosened sufficiently. Then, the suspension bolt 40 is rotated in the screw loosening direction and removed from the screw hole of the connection nut 34. After this operation is performed for each of the suspension bolts 40, the adjustment plate 42 is removed from the concrete forms 2 and 3 together with the suspension bolts 40. Thereby, the protective tube 4 is attached to the top 43 of the concrete.
6 protrudes, and the upper surface of the flange 34f of the connection nut 34 and the nut 3 are inserted into the inner hole 46a of the protection tube 46.
4 is a state where the screw opening is formed.
【0027】そして、必要に応じて天端ならしを行い、
アンカープレート38が略コンクリートに埋没する程度
に天端を平らに仕上げる。尚、保護管46の一部がコン
クリートの天端43から突出しているので、この作業
中、微細なコンクリート片が接続ナット34のネジ開口
部に入り込まない。Then, if necessary, a top leveling is performed,
The top end is flattened to such an extent that the anchor plate 38 is substantially buried in concrete. In addition, since a part of the protective tube 46 protrudes from the top end 43 of the concrete, fine concrete pieces do not enter the screw opening of the connection nut 34 during this operation.
【0028】そして、上記の天端ならし作業が終了した
のち、各保護管46をプライヤー等で天端43から抜き
去る。保護管46は樹脂で形成されており変形し易いの
で、天端43から容易に抜くことができる。Then, after the above-described top-end trimming operation is completed, each protective tube 46 is pulled out from the top end 43 with pliers or the like. Since the protection tube 46 is formed of resin and is easily deformed, it can be easily removed from the top end 43.
【0029】以上の作業を行うことにより、アンカーボ
ルトの施工が完了する。By performing the above operations, the installation of the anchor bolt is completed.
【0030】続いて、このようにしてアンカーボルトが
埋設された布基礎への枠組みの固定方法について説明す
る。Next, a description will be given of a method of fixing the frame to the cloth foundation in which the anchor bolts are embedded as described above.
【0031】図3に示すように、断面U字型の下枠チャ
ンネル10をその開口を側方に向けて天端43上に仮置
きする。As shown in FIG. 3, the lower frame channel 10 having a U-shaped cross section is temporarily placed on the top end 43 with its opening directed sideways.
【0032】次に、下枠チャンネル10を天端43に取
り付けるための、下枠チャンネル10に形成された各ボ
ルト挿通孔10a、10bと天端43に配設された接続
ナット34のネジ孔とが夫々合致するように天端43上
での下枠チャンネル10の位置合わせを行う。尚、各接
続ナット34はアンカープレート38に予め溶接等によ
り固定されているので、各接続ナット34のネジ孔はチ
ャンネル10のボルト挿通孔10a、10bの穿設位置
に対応して所定間隔で埋設されている。従って、下枠チ
ャンネル10を天端43に載置したまま適当にずらすだ
けでボルト挿通孔52、53と接続ナット34のネジ孔
を全てぴったりと一致させることができる。即ち、下枠
チャンネル10の天端43への取付位置の位置決め作業
を極めて容易に行うことができる。Next, bolt mounting holes 10a and 10b formed in the lower frame channel 10 for attaching the lower frame channel 10 to the top end 43 and screw holes of connection nuts 34 provided in the top end 43 are provided. Are aligned on the top end 43 so that the two coincide with each other. Since the connection nuts 34 are fixed to the anchor plate 38 in advance by welding or the like, the screw holes of the connection nuts 34 are embedded at predetermined intervals corresponding to the drilling positions of the bolt insertion holes 10a and 10b of the channel 10. Have been. Accordingly, the bolt insertion holes 52 and 53 and the screw holes of the connection nut 34 can all be exactly aligned by simply shifting the lower frame channel 10 appropriately while being placed on the top end 43. That is, the work of positioning the mounting position of the lower frame channel 10 on the top end 43 can be performed extremely easily.
【0033】更に、カラー56を、各ボルト挿通孔10
a、10bの孔位置に合致させながら下枠チャンネル1
0に夫々介装する。この作業は、下枠チャンネル10を
天端43に載置した状態で行うことができ、従来のよう
にカラー56を介装した状態で下枠チャンネル10を天
端43に載せる必要がないので、介装後にカラー56が
ずれることがない。その為、従来の施工方法に較べてカ
ラー56の介装作業を迅速かつ確実に行うことができ
る。Further, the collar 56 is connected to each of the bolt insertion holes 10.
Lower frame channel 1 while matching the hole positions of a and 10b
0 each. This operation can be performed with the lower frame channel 10 mounted on the top end 43, and there is no need to mount the lower frame channel 10 on the top end 43 with the collar 56 interposed as in the related art. There is no displacement of the collar 56 after interposition. Therefore, the work of interposing the collar 56 can be performed quickly and reliably as compared with the conventional construction method.
【0034】カラー56の介装作業が終了したら、下枠
チャンネル10の天端43への固定作業を行う。When the work of installing the collar 56 is completed, the work of fixing the lower frame channel 10 to the top end 43 is performed.
【0035】固定ボルト58を上方から下枠チャンネル
10のボルト挿通孔10a、カラー56の内孔56a、
及びボルト挿通孔10bに挿通し、下枠チャンネル10
を天端43にしっかりと固定するまでボルト58を接続
ナット34にねじ込んでいく。The fixing bolt 58 is inserted from above into the bolt insertion hole 10a of the lower frame channel 10, the inner hole 56a of the collar 56,
And the lower frame channel 10
The bolt 58 is screwed into the connection nut 34 until is firmly fixed to the top end 43.
【0036】尚、上述の通り、コンクリート流し込み時
及び天端ならし時には、各接続ナット34のフランジ部
周囲は保護管46で覆われているので、接続ナット34
のネジ孔にはコンクリートが入り込んでおらず、固定ボ
ルト58を接続ナット34に容易且つ確実にねじ込むこ
とができる。As described above, when the concrete is poured and the top is leveled, the periphery of the flange portion of each connection nut 34 is covered with the protective tube 46.
Concrete does not enter into the screw hole of (1), and the fixing bolt 58 can be easily and reliably screwed into the connection nut 34.
【0037】上述の作業によって布基礎の所定位置に下
枠チャンネル10、即ち、型枠を迅速に固定することが
できる。The above operation makes it possible to quickly fix the lower frame channel 10, that is, the formwork, at a predetermined position on the cloth foundation.
【0038】以上のように、本発明の実施の形態では、
スチールハウスの枠組みの組み付けに際して、布基礎へ
の下枠チャンネル10の取り付けを迅速且つ正確に行う
ことのできる基礎コンクリート及びその施工方法につい
て説明したが、これを従来の木造住宅の建築において天
端43に枠組み用の木枠を取り付ける場合にも適用でき
ることは言うまでもない。As described above, in the embodiment of the present invention,
When assembling the framework of a steel house, a description has been given of the basic concrete and the method of constructing the basic concrete, which can quickly and accurately attach the lower frame channel 10 to the cloth foundation. Needless to say, the present invention can also be applied to a case where a wooden frame for a frame is attached to a vehicle.
【0039】尚、本発明の実施の形態では、コンクリー
ト流し込み時及び天端ならし時に各接続ナット34のフ
ランジ部周囲を保護管46で覆っているが、接続ナット
34のネジ孔にコンクリートが入り込まないようにコン
クリート流し込み作業、天端ならし作業を行うならば、
ナット34のフランジ部を保護管46で覆わなくても良
い。In the embodiment of the present invention, the periphery of the flange of each connection nut 34 is covered with the protective tube 46 at the time of pouring concrete and at the time of leveling the top, but concrete enters the screw hole of the connection nut 34. If you do concrete pouring work and top leveling work so that there is no
The flange portion of the nut 34 need not be covered with the protective tube 46.
【0040】又、接続ナット34の上部ネジ孔開口部が
天端43と略面一になるようにすれば、アンカープレー
ト38を上方に開口した状態でコンクリートに埋設する
代りにプレート38を下方に開口した状態でコンクリー
トに埋設しても良い。When the upper screw hole opening of the connection nut 34 is made substantially flush with the top end 43, the anchor plate 38 is opened downward and the plate 38 is lowered instead of being buried in concrete. It may be buried in concrete in an open state.
【0041】更に、アンカーボルト埋め込み装置30を
コンクリート型枠間に支持する際、アンカープレート3
8に固定された複数の接続ナット34の全てに吊下ボル
ト40を螺合して、夫々のボルト40を介して調整プレ
ート42を吊下させる必要はなく、例えば、アンカープ
レート38の両端部近傍の接続ナット34のみに吊下ボ
ルト40を螺合し、これらのボルト40を介して調整プ
レート42に固定して2ヶ所位置だけで支持するように
しても良い。Further, when supporting the anchor bolt embedding device 30 between the concrete forms, the anchor plate 3
It is not necessary to screw the suspension bolts 40 to all of the plurality of connection nuts 34 fixed to 8 and suspend the adjustment plate 42 via the respective bolts 40, for example, near both ends of the anchor plate 38. The suspension bolts 40 may be screwed into only the connection nuts 34 and fixed to the adjustment plate 42 via these bolts 40 to be supported only at two positions.
【0042】更に又、アンカーボルト32を接続ナット
34に螺合する代わりに圧入若しくは溶着しても良く、
又はこれらを一体に形成しても良い。アンカーボルト自
体もJ型形状でなく、棒状のいわゆる異形ボルトを用い
ても良い。Further, instead of screwing the anchor bolt 32 to the connection nut 34, the anchor bolt 32 may be press-fitted or welded.
Alternatively, these may be formed integrally. The anchor bolt itself does not have the J-shape but may be a rod-shaped so-called deformed bolt.
【0043】更に、吊下ボルト40と調整プレート42
とをダブルナット54、55で固定する代わりに、ボル
ト40の軸上に所定の間隔で貫通孔を設け、いずれかの
貫通孔にボルト40の軸径より大きい全長を有するピン
を挿通し、このピンの両端部を調整プレート42の長孔
42aの周囲に架け渡すことにより、アンカープレート
38を調整プレート42から吊下しても良い。Further, the suspension bolt 40 and the adjustment plate 42
Instead of fixing them with the double nuts 54 and 55, through holes are provided at predetermined intervals on the shaft of the bolt 40, and a pin having an overall length larger than the shaft diameter of the bolt 40 is inserted into one of the through holes. The anchor plate 38 may be hung from the adjustment plate 42 by bridging both ends of the pin around the long hole 42 a of the adjustment plate 42.
【0044】[0044]
【発明の効果】以上説明したように本発明に係る基礎コ
ンクリートは、建築構造物の型枠又は木枠を支持するコ
ンクリート部と、コンクリート部の上端面に埋設された
アンカープレートと、コンクリート部に埋設されたアン
カーボルトと、アンカープレートに所定間隔で配置固定
され、上記型枠又は木枠を固定するための固定ボルトと
アンカーボルトとを接続するための接続ナットとからな
ることを特徴とする。As described above, the basic concrete according to the present invention comprises a concrete part for supporting a formwork or a wooden frame of a building structure, an anchor plate embedded in the upper end face of the concrete part, and a concrete part. It is characterized by comprising a buried anchor bolt and a fixing nut arranged and fixed at a predetermined interval to the anchor plate, for connecting the anchor bolt with the fixing bolt for fixing the formwork or the wooden frame.
【0045】そして、本発明に係る基礎コンクリート
は、アンカープレートに所定間隔で配置固定された接続
ナットにアンカーボルトを取り付けた状態で、該アンカ
ープレートをコンクリート型枠間の所定位置に支持し、
コンクリートをアンカープレートと略面一になるまで型
枠間に流し込んでコンクリート部を形成し、コンクリー
ト部が硬化するまで放置養生した後、固定ボルトを接続
ナットに螺合させることによって、該コンクリート部に
建築構造物の型枠又は木枠を支持することで施工され
る。The foundation concrete according to the present invention supports the anchor plate at a predetermined position between the concrete forms with the anchor bolts attached to the connection nuts arranged and fixed at a predetermined interval on the anchor plate,
Pour concrete between molds until it is almost flush with the anchor plate to form a concrete part, leave it to cure until the concrete part hardens, and then screw the fixing bolts to the connection nuts. It is constructed by supporting a formwork or a wooden frame of a building structure.
【0046】好ましくは、本発明に係る基礎コンクリー
トは、調整プレートをコンクリート型枠上端に架け渡
し、該調整プレートに取り付けた吊下ボルトを前記接続
ボルトに螺合させることによりアンカープレートをコン
クリート型枠間の所定位置に支持することによって施工
される。Preferably, in the foundation concrete according to the present invention, the anchor plate is spanned over the upper end of the concrete formwork, and a suspension bolt attached to the adjustment plate is screwed to the connection bolt to connect the anchor plate to the concrete formwork. It is constructed by supporting it at a predetermined position in between.
【0047】従来の基礎コンクリートのように、アンカ
ーボルトの上部がコンクリートの天端から突出していな
いので、カラーを夫々下枠チャンネルに介装してから下
枠チャンネルを天端に載せる必要がなくなり、天端上に
下枠チャンネルを載置し易くなる。Since the upper portions of the anchor bolts do not protrude from the top end of the concrete unlike the conventional foundation concrete, it is not necessary to interpose the collars on the bottom frame channels and then mount the lower frame channels on the top ends, respectively. It becomes easy to place the lower frame channel on the top end.
【0048】又、接続ナットのネジ孔がコンクリートの
天端上に一定間隔で正確に配置されるので、下枠チャン
ネルを天端に載置したまま適当にずらすだけでボルト挿
通孔と接続ナットのネジ孔を全てぴったりと一致させる
ことができる。その結果、天端上への下枠チャンネルの
据え付け作業が行い易くなる。Further, since the screw holes of the connection nuts are accurately arranged at regular intervals on the top of the concrete, the bolt holes and the connection nuts of the connection nuts can be formed simply by appropriately displacing the lower frame channel while being placed on the top. All screw holes can be matched exactly. As a result, the work of installing the lower frame channel on the top end becomes easier.
【0049】このように、本発明に係る基礎コンクリー
ト及び基礎コンクリートの施工方法を実施すると、下枠
チャンネルの天端への取付作業性が格段に向上し、その
結果、スチールハウス等の枠組みの組み上げを従来に較
べて格段に迅速かつ正確に行うことができる。As described above, when the foundation concrete and the method for constructing the foundation concrete according to the present invention are implemented, the workability of attaching the lower frame channel to the top end is remarkably improved, and as a result, assembling a framework such as a steel house. Can be performed much faster and more accurately than in the past.
【図1】本発明の一実施形態に係るアンカーボルト埋め
込み装置30をコンクリート型枠2、3に取り付け、コ
ンクリートを流し込んだ状態を示す断面図である。FIG. 1 is a cross-sectional view showing a state in which an anchor bolt embedding device 30 according to an embodiment of the present invention is mounted on concrete forms 2 and 3 and concrete is poured.
【図2】本発明の一実施形態に係るアンカーボルト埋め
込み装置30を示す斜視図である。FIG. 2 is a perspective view showing an anchor bolt embedding device 30 according to one embodiment of the present invention.
【図3】本発明の一実施形態に係るアンカーボルト32
等を埋設したコンクリートの天端43に下枠チャンネル
10を固定する方法を示す図である。FIG. 3 is an anchor bolt 32 according to an embodiment of the present invention.
It is a figure which shows the method of fixing the lower frame channel 10 to the top end 43 of the concrete which embedded the etc.
【図4】アンカーボルト6等を従来の施工方法によりコ
ンクリートの天端8に埋設し、この天端8に下枠チャン
ネル10を固定した状態を示す断面図である。FIG. 4 is a sectional view showing a state in which anchor bolts 6 and the like are buried in a concrete top 8 by a conventional construction method and a lower frame channel 10 is fixed to the top 8;
【図5】従来の施工方法によりアンカーボルト6等を埋
設したコンクリートの天端8に下枠チャンネル10を固
定する方法示す斜視図である。FIG. 5 is a perspective view showing a method of fixing a lower frame channel 10 to a top end 8 of concrete in which anchor bolts 6 and the like are embedded by a conventional construction method.
1 コンクリート部 32 アンカーボルト 34 接続ナット 38 アンカープレート 40 吊下ボルト 42 調整プレート 46 保護管 58 固定ボルト DESCRIPTION OF SYMBOLS 1 Concrete part 32 Anchor bolt 34 Connection nut 38 Anchor plate 40 Hanging bolt 42 Adjustment plate 46 Protective tube 58 Fixing bolt
Claims (4)
ンクリート部と、上記コンクリート部の上端面に埋設さ
れたアンカープレートと、 上記コンクリート部に埋設されたアンカーボルトと、 上記アンカープレートに所定間隔で配置固定され、上記
型枠又は木枠を固定するための固定ボルトと上記アンカ
ーボルトとを接続するための接続ナットとからなること
を特徴とする基礎コンクリート。1. A concrete part supporting a formwork or a wooden frame of a building structure, an anchor plate embedded in an upper end face of the concrete part, an anchor bolt embedded in the concrete part, and A foundation concrete, which is arranged and fixed at a predetermined interval, and comprises a fixing bolt for fixing the formwork or the wooden frame and a connection nut for connecting the anchor bolt.
された接続ナットにアンカーボルトを取り付けた状態
で、該アンカープレートをコンクリート型枠間の所定位
置に支持し、 コンクリートを上記アンカープレートと略面一になるま
で上記型枠間に流し込んでコンクリート部を形成し、 上記コンクリート部が硬化するまで放置養生した後、固
定ボルトを上記接続ナットに螺合させることによって、
該コンクリート部に建築構造物の型枠又は木枠を支持す
ることを特徴とする基礎コンクリートの施工方法。2. An anchor plate is supported at a predetermined position between concrete forms while an anchor bolt is attached to a connection nut arranged and fixed to the anchor plate at a predetermined interval, and concrete is substantially flush with the anchor plate. To form a concrete part by pouring between the formwork until the concrete part hardens, and then screwed a fixing bolt to the connection nut.
A method for constructing basic concrete, comprising supporting a formwork or a wooden frame of a building structure on the concrete portion.
架け渡し、該調整プレートに取り付けた吊下ボルトを前
記接続ボルトに螺合させることにより上記アンカープレ
ートをコンクリート型枠間の所定位置に支持することを
特徴とする、請求項2記載の基礎コンクリートの施工方
法。3. An anchor plate is supported at a predetermined position between the concrete forms by spanning an adjusting plate over an upper end of the concrete form and screwing a suspension bolt attached to the adjust plate to the connection bolt. The method for constructing a foundation concrete according to claim 2, characterized in that:
めの固定ボルトと基礎コンクリートのコンクリート部に
埋設されるアンカーボルトとを接続するための接続ナッ
トを所定間隔で配置固定したアンカープレート。4. An anchor plate in which connection nuts for connecting fixing bolts for fixing a formwork or a wooden frame of a building structure and anchor bolts buried in a concrete part of foundation concrete are arranged and fixed at predetermined intervals. .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10205569A JP2000038727A (en) | 1998-07-21 | 1998-07-21 | Foundation concrete and execution therefor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10205569A JP2000038727A (en) | 1998-07-21 | 1998-07-21 | Foundation concrete and execution therefor |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2000038727A true JP2000038727A (en) | 2000-02-08 |
Family
ID=16509073
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10205569A Pending JP2000038727A (en) | 1998-07-21 | 1998-07-21 | Foundation concrete and execution therefor |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2000038727A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008255724A (en) * | 2007-04-06 | 2008-10-23 | Sekisui Chem Co Ltd | Jig for execution of work of foundation structure with anchor bolt |
JP2011144572A (en) * | 2010-01-15 | 2011-07-28 | Kajima Corp | Support structure of facility equipment on roof |
CN111778808A (en) * | 2020-07-31 | 2020-10-16 | 南通天承光电科技有限公司 | Pavement paving structure of intelligent light-emitting bricks and construction method thereof |
-
1998
- 1998-07-21 JP JP10205569A patent/JP2000038727A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008255724A (en) * | 2007-04-06 | 2008-10-23 | Sekisui Chem Co Ltd | Jig for execution of work of foundation structure with anchor bolt |
JP2011144572A (en) * | 2010-01-15 | 2011-07-28 | Kajima Corp | Support structure of facility equipment on roof |
CN111778808A (en) * | 2020-07-31 | 2020-10-16 | 南通天承光电科技有限公司 | Pavement paving structure of intelligent light-emitting bricks and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190010715A1 (en) | Formwork apparatus for forming a building support | |
JP2000038727A (en) | Foundation concrete and execution therefor | |
US11352802B1 (en) | Apparatus and method for supporting an elevated form panel | |
JP2630623B2 (en) | Anchor bolt installation method and anchor bolt support device used for it | |
JP3740232B2 (en) | Anchor bolt mounting bracket | |
JP3321670B2 (en) | Mold setting equipment for ready-mixed concrete | |
JP2010216196A (en) | Anchor bolt installation method for continuous footing, and anchor bolt-tool set | |
JP4650757B2 (en) | Steel frame mounting hardware, steel frame mounting structure and mounting method | |
JP3199417U (en) | Floor sleeve | |
JPH0138947B2 (en) | ||
JP2002356853A (en) | Anchor bolt location setting jig | |
JPH0572503B2 (en) | ||
JP2716357B2 (en) | Rising section formwork fixing jig | |
JP3640455B2 (en) | Anchor bolt temporary holder | |
JPH10184011A (en) | Metal tool set for installing anchor bolt | |
KR100451960B1 (en) | The method for set-up the guardrail and a set-up device for guardrail | |
KR200357073Y1 (en) | The Supporting device for a guardrail | |
KR200322141Y1 (en) | Temporary apparatus support structure for pier of bridge | |
JPH10299002A (en) | Form fixing structure for precast reinforced concrete footing | |
JPH093912A (en) | Plate anchor construction method | |
JPH08232471A (en) | Level difference forming method of slab | |
JP3027494B2 (en) | Independent installation method of PC foundation and connecting jig | |
JP3200322U (en) | Floor sleeve | |
JPS5942445Y2 (en) | Step temporary structure in concrete formwork | |
JPH04306365A (en) | Construction of concrete foundation and positioner therefor |