Method of constructing a tunnel

Info

Publication number
GB1318853A
GB1318853A GB1318853DA GB1318853A GB 1318853 A GB1318853 A GB 1318853A GB 1318853D A GB1318853D A GB 1318853DA GB 1318853 A GB1318853 A GB 1318853A
Authority
GB
United Kingdom
Prior art keywords
tunnel
heading
soil
galleries
gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Held & Francke Bau AG
Original Assignee
Held & Francke Bau AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Held & Francke Bau AG filed Critical Held & Francke Bau AG
Publication of GB1318853A publication Critical patent/GB1318853A/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

1318853 Tunnelling HELD & FRANCKE BAU AG 14 Jan 1971 1858/71 Heading E1F A method of constructing a tunnel involves driving auxiliary galleries 2 extending in the lengthwise direction of the tunnel to be formed, spaced apart from another in dependence of the width of the finished tunnel and disposed in the region of the roof of said tunnel; forming a row or rows of anchor piles 4 which extend downwardly into the soil from each gallery to provide on each side of the tunnel a pile wall; filling each auxiliary gallery with concrete 6; top-heading the tunnel by excavating soil from between the galleries; installing roof arches 7 as the excavation progresses and excavating the soil beneath the top heading to progressively form the floor and side walls of the tunnel by full face working.
GB1318853D 1971-01-14 1971-01-14 Method of constructing a tunnel Expired GB1318853A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB185871 1971-01-14

Publications (1)

Publication Number Publication Date
GB1318853A true GB1318853A (en) 1973-05-31

Family

ID=9729256

Family Applications (1)

Application Number Title Priority Date Filing Date
GB1318853D Expired GB1318853A (en) 1971-01-14 1971-01-14 Method of constructing a tunnel

Country Status (1)

Country Link
GB (1) GB1318853A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4365913A (en) * 1978-02-21 1982-12-28 Compagnie International des Pieux Armes Frankignoul Method and device for building in the ground vertical walled structures starting from a subterranean conduit
CN109751061A (en) * 2019-03-26 2019-05-14 西南交通大学 A road-rail combined construction of a single-tube double-layer shield tunnel
CN109915150A (en) * 2019-04-26 2019-06-21 重庆交通大学 A kind of pile foundation pre-reinforced supporting structure for controlling tunnel settlement and its construction method
CN115404883A (en) * 2022-09-13 2022-11-29 中国一冶集团有限公司 It meets laying of bridge pile subdivision piping lane and backfills structure to wear river reach

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4365913A (en) * 1978-02-21 1982-12-28 Compagnie International des Pieux Armes Frankignoul Method and device for building in the ground vertical walled structures starting from a subterranean conduit
CN109751061A (en) * 2019-03-26 2019-05-14 西南交通大学 A road-rail combined construction of a single-tube double-layer shield tunnel
CN109751061B (en) * 2019-03-26 2023-10-17 西南交通大学 A road-rail jointly built single-tube double-layer shield tunnel
CN109915150A (en) * 2019-04-26 2019-06-21 重庆交通大学 A kind of pile foundation pre-reinforced supporting structure for controlling tunnel settlement and its construction method
CN115404883A (en) * 2022-09-13 2022-11-29 中国一冶集团有限公司 It meets laying of bridge pile subdivision piping lane and backfills structure to wear river reach
CN115404883B (en) * 2022-09-13 2023-07-18 中国一冶集团有限公司 Laying backfill structure of bridge pile cabin pipe gallery for river reach

Similar Documents

Publication Publication Date Title
CN102758632A (en) Rock stratum double initial support layering method for establishing large-scale underground structure
GB1444068A (en) Method of blasting and reinforcing rock cavities
CN101781889A (en) H-shaped waterproof curtain construction process
CN207063982U (en) Mechanical assistance sealing Station structure in a kind of pilot tunnel
GB1309360A (en) Watertight wall
GB1318853A (en) Method of constructing a tunnel
CN109931063A (en) To substep alternating expression filling mining method in one kind
CN203499695U (en) Reinforcing structure for shallow-buried tunnel in bustling urban area
CN207177931U (en) Steppingly lower slider steel construction
EP0183233A3 (en) Construction method of underground structures by means of driving under a covering drift cap
GB2076449A (en) Process for the construction of an underground structure and a strucutre thus obtained
US2007498A (en) Method of erecting an iron frame building having deep underground floors
GB1363686A (en) Method for producing undercuttings for buildings
GB1154707A (en) A Method of providing or manufacturing a Tunnel or Culvert or a Lined Passage in a solid medium
SU998759A1 (en) Method of controlling rock pressure
DE882829C (en) Process for the creation of sealing walls in water-bearing layers
SU791976A1 (en) Method of plugging horizontal mine workings
CN219262410U (en) Island working face roadway coal pillar combined supporting system
SU881331A1 (en) Method of constructing shallow-depth tunnel in unsolid rock
CN204175307U (en) Large-inclination-angle coal bed working face is without coal pillar mining supporting facility
GB1403033A (en) Tunnelling method
JPS5664028A (en) Sheathing construction work by antecedent support framework
RU1802128C (en) Method for mining of thin manganese ore beds
CN209724335U (en) A kind of subway single layer Station structure
CN210031834U (en) Unilateral isolation foundation pit supporting structure

Legal Events

Date Code Title Description
PS Patent sealed
PLNP Patent lapsed through nonpayment of renewal fees