Nothing Special   »   [go: up one dir, main page]

EP3209551B1 - Rigging to simplify jibing/tacking manoeuvres - Google Patents

Rigging to simplify jibing/tacking manoeuvres Download PDF

Info

Publication number
EP3209551B1
EP3209551B1 EP15786893.6A EP15786893A EP3209551B1 EP 3209551 B1 EP3209551 B1 EP 3209551B1 EP 15786893 A EP15786893 A EP 15786893A EP 3209551 B1 EP3209551 B1 EP 3209551B1
Authority
EP
European Patent Office
Prior art keywords
sail
boom
rigging
masts
plane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP15786893.6A
Other languages
German (de)
French (fr)
Other versions
EP3209551A1 (en
Inventor
Fabrice BARONNET
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP3209551A1 publication Critical patent/EP3209551A1/en
Application granted granted Critical
Publication of EP3209551B1 publication Critical patent/EP3209551B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B32/00Water sports boards; Accessories therefor
    • B63B32/40Twintip boards; Wakeboards; Surfboards; Windsurfing boards; Paddle boards, e.g. SUP boards; Accessories specially adapted therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B32/00Water sports boards; Accessories therefor
    • B63B32/60Board appendages, e.g. fins, hydrofoils or centre boards
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H8/00Sail or rigging arrangements specially adapted for water sports boards, e.g. for windsurfing or kitesurfing
    • B63H8/20Rigging arrangements involving masts, e.g. for windsurfing
    • B63H8/21Wishbones
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H8/00Sail or rigging arrangements specially adapted for water sports boards, e.g. for windsurfing or kitesurfing
    • B63H8/40Arrangements for improving or maintaining the aerodynamic profile of sails, e.g. cambers, battens or foil profiles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H9/00Marine propulsion provided directly by wind power
    • B63H9/04Marine propulsion provided directly by wind power using sails or like wind-catching surfaces
    • B63H9/06Types of sail; Constructional features of sails; Arrangements thereof on vessels
    • B63H9/061Rigid sails; Aerofoil sails
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H9/00Marine propulsion provided directly by wind power
    • B63H9/04Marine propulsion provided directly by wind power using sails or like wind-catching surfaces
    • B63H9/06Types of sail; Constructional features of sails; Arrangements thereof on vessels
    • B63H9/061Rigid sails; Aerofoil sails
    • B63H9/0615Inflatable aerofoil sails

Definitions

  • the present invention relates to a rig according to the preamble of claim 1 and to a floating or rolling apparatus according to the preamble of claim 12.
  • the invention relates to a floating machine of the windsurfing type or to a rolling machine of the windsurfing type with wheels, designated “speed sail” or “windskate” in English.
  • a windsurf board consists of a float and a rig mounted on the float and to ensure the propulsion of windsurfing by the force of the wind.
  • the rigging of the prior art comprise a mast articulated on the float, a triangular sail mounted on the mast and a double boom, commonly called "boom", to maintain and orient the rigging.
  • the wishbone consists of two curved tubes arranged on both sides of the sail and joining at their ends, on the one hand to the mast, and on the other hand to the point of flow of the sail in order to stretch it.
  • This configuration of the rig requires a particular type of navigation, requiring particularly delicate maneuvers.
  • a tack that is to say a change of tack against the wind
  • a jibe that is to say a change of tack in the wind
  • the windsurfer must rotate the rigging and seize the opposite part of the boom, that is to say the part of the boom arranged on the other side of the sail, so as to pass the trailing edge of the sail from one edge to the other. the other of the board.
  • the windsurfer must tilt the rigging to the rear, release a portion of the boom, and change tack in passing the rigging, in order to grasp the other part of the boom and rotate the boom. sail.
  • the hands of the windsurfer pass from one part to the other of the boom in order to be able to rotate the sail by 180 °.
  • a first example of rigging and / or floating gear is known from the document DE 30 17 362 A1 .
  • the term "semi-rigid” qualifies an at least partially rigid surface having a predetermined shape and being provided with a shape memory by which this surface tends, following a mechanical deformation, to resume its original form.
  • a sail made up of such a surface therefore has at least one stable camber, the hollow value of which is measured locally along the normal to the rope plane of the sail, defined by the two masts alternately serving as the edge of the sail. attack and trailing edge. Under the action of the wind, the force or thrust is substantially perpendicular to this plane of rope and is concentrated at the maximum hollow of the sail.
  • boom refers to a horizontal bar connecting the two masts and extending transversely to the rigging on one side or the other of the chord plane.
  • Such a boom is also called a simple boom, as opposed to a double boom resulting from the assembly of two simple booms extending on either side of the chord plane.
  • the "theoretical plane of the boom” designates the plane defined by the boom which is substantially perpendicular to the plane of rope.
  • the sail is then divided into two parts or portions, the first, located above the boom, extending between the intersection of the sail with the boom plane and the top, the second, located below the boom, extending between the intersection of the sail with the boom plane and the foot box. Note that this division of the sail by the boom plane is only for illustrative purposes, the sail forming a united surface joining the localized portions above and below the boom.
  • the invention is thus based on the novel and inventive concept of providing a rig whose handling is substantially improved, and which allows to go upwind.
  • Such rigging also allows the windsurfer to go upwind.
  • the arched shape of the sail whose hollow is advantageously low, allows the windsurfer to work in finesse, that is to say by orienting the sail so that the rope forms a low angle of incidence with the direction of the wind.
  • the flow of the wind on the intrados and the extrados of the sail is then laminar, and allows to create a significant lift while limiting the generation of turbulence, so as to allow upwind.
  • the semi-rigid nature of the sail allows it to maintain a predefined profile, allowing to optimize the ability of the sail to go upwind, while fixing the position of its maximum hollow. Positioning the maximum hollow of the sail below the at least one boom improves its maneuverability.
  • the passage of the sail from one arched shape to another or in other words, the passage of the hollow of the sail from one side to the other of the rope plane can be realized following the implementation on the upper surface of the sail of a pushing thrust force exceeding a predefined threshold.
  • said surface of said sail extending towards said foot box is larger than said surface of said sail extending towards said crown.
  • the average value of the hollow of said sail is between 2.5% and 7.5% of the average value of the rope of said sail.
  • the average values of trough and chord are measured at the level of the plane of boom. Maintaining an average trough value in such an interval improves the fineness of the sail, and therefore its ability to go upwind. For a value less than this interval, there is a drop in lift. For a higher value, the sail enters turbulent regime unacceptable to go upwind.
  • the ratio of the longitudinal length of said sail to the maximum rope of said sail is greater than 1.5.
  • the two masts have in the vicinity of said boom an arcuate shape whose convexity is oriented towards the outside of the rigging.
  • the two masts have near said vertex and / or near said foot box an arcuate shape whose convexity is oriented towards the inside of said rig.
  • the masts are profiled tubular elements having an ovoid section whose largest dimension is oriented in the transverse direction.
  • the sail comprises at least one stiffening element.
  • the section of the sail makes it possible to preform a hollow.
  • said stiffening element is a transverse lath inserted into a gusset carried by said sail.
  • said masts and / or said stiffening element and / or said sail are inflatable.
  • said boom has an adjustable length to allow a voltage adjustment of said sail.
  • At least one of said booms comprises a cam pivoting around said boom and being adapted to come into contact with said sail.
  • a sailboard 1 equipped with a rigging 2 according to the invention is represented on the figure 1 .
  • the windsurfing board 1 comprises a float 3 and a rigging 2 mounted articulated on the float 3.
  • the float 3 comprises a thin rigid hull and a steering fin 4, disposed in the rear portion of the float 3, to stabilize the trajectory 1.
  • the float 3 may also include a fin, disposed in the central portion, and to prevent the board from deviating from its path under the action of the wind.
  • the rigging 2 comprises two masts (6, 7), a double boom 8 connecting the two masts (6, 7) and a sail 9 stretched between the two masts (6, 7) to ensure the propulsion of the windsurf board by the force of the wind.
  • the double boom 8 results from the assembly of two simple booms (8a, 8b) extending on either side of the chord plane.
  • the double boom 8 defines a plane P substantially perpendicular to the chord plane.
  • the sail 9 is then divided into two parts or portions (9a, 9b), the first portion 9b, located above the double boom 8, extending between the intersection of the sail 9 with the boom plane P and the top 18, the second portion 9a, located below the double boom 8, extending between the intersection of the sail 9 with the boom plane P and the foot case 5.
  • the two masts (6, 7), represented on the figure 2 have an arcuate shape whose convexity is directed towards the outside of the rigging 2. Thus, the two masts (6, 7) approach each other at their ends and move away at their level. middle part.
  • the lower ends of the poles (6, 7) are fixed on a foot box 5.
  • the upper ends of the poles (6, 7) are fixed on a head housing 11.
  • the foot box 5 is mounted on a mast base 10 having a hinge 13, not shown in detail, for orienting the rigging 2 in all directions.
  • the foot casing 5 is advantageously adapted to be mounted on a standard mast base.
  • the mast foot 10 is adapted to be removably attached to the float 4.
  • the hinge 13 can be made by any suitable means, such as a cardan type connection or a diabolo type connection, for example.
  • the masts (6, 7) are symmetrical with respect to the vertical axis X extending between the foot box 5 and the head box 11, that is between the foot box 5 and the top 18 of the sail 9.
  • each of the masts (6, 7) is adapted to alternately form a leading edge or a trailing edge depending on the tack and the rigging 2 is thus able to be used unilaterally, without the need to return it.
  • the masts (6, 7) are formed of tubular elements having a shaped section of ovoid shape, the largest dimension is oriented in the transverse direction to facilitate the flow of air.
  • the masts (6, 7) also have flexibility, especially at their upper portion, adapted to relieve the sail 9 in strong winds.
  • each mast (6, 7) consists of an upper tube 6a, 7a and a lower tube 6b, 7b nestable one inside the other.
  • the tubes, upper 6a, 7a and lower 6b, 7b, of each mast (6, 7) are secured to each other by fixing means.
  • each end of the poles (6, 7) is nested in complementary shaped tubular housings formed in the foot boxes 5 and head 11 and fixed therein by fixing means.
  • the double boom 8 is equipped at each of its ends with a half-sleeve 12 which fits on the masts (6, 7) and ensuring the attachment of the double boom 8 on the masts 6, 7.
  • the half Sleeves 12 are also equipped with fastening means.
  • the aforementioned fixing means may in particular be snap fastening means.
  • any other type of attachment may also be used. It is thus understood that the structure of the rig can be easily assembled and dismantled and stored in a transport bag of modest dimensions.
  • the sail 9, shown on the figure 1 has a general ovoid shape whose outer contours follow the shape of the masts (6, 7).
  • the sail 9 is composed of transparent surfaces of polyethylene terephthalate (Mylar TM).
  • the sail 9 has two sleeves (14, 15) arranged along its two side edges and in which the masts (6, 7) can be threaded to mount the sail 9 on the masts 6, 7.
  • the sleeves 14, 15 are each interrupted on a median portion 16 to allow the attachment of the double boom 8 to the masts 6, 7.
  • the sail 9 is equipped with stiffening elements arranged to give the sail 9 a camber.
  • the sail 9 is mounted on the masts (6, 7) so that the concavity of the sail 9 is oriented vis-à-vis the double boom 8.
  • the stiffening elements are transverse slats 17 inserted into gussets worn by the sail 9.
  • the double boom 8 has an adjustable length allowing a distance or approximation of the median portions of the masts (6, 7) so as to allow a tension adjustment of the sail 9.
  • the maximum hollow 9 'of the sail 9, that is to say the center of thrust of the sail 9, is placed below the axis of the double boom 8 to facilitate navigation and including maneuvers.
  • the rigging 2 as described above makes it possible to simplify the navigation maneuvers while allowing upwelling. Indeed, to perform the change of tack maneuvers, the windsurfer rotates in the same direction as the rigging 2 and can permanently keep both hands in position on the boom 8, without having to let go of his rear hand.
  • the rig 2 can be moved by rotating in one direction or the other, the choice of the windsurfer. The navigation can then be resumed on the other side.
  • the rigging 2 can be moved by simply rocking one side or the other of the float 3, to change tack by completing the turn.
  • the windsurfer can at any time play on an opening or closing of the sail 9, coordinated with an action of the feet to initiate transitions.
  • rigging according to the invention has been described above in relation to a windsurf board, it can also be mounted on a rolling machine comprising a board equipped with wheels.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Jib Cranes (AREA)
  • Wind Motors (AREA)

Description

Domaine techniqueTechnical area

La présente invention se rapporte à un gréement selon le préambule de la revendication 1 et à un engin flottant ou roulant selon le préambule de la revendication 12.The present invention relates to a rig according to the preamble of claim 1 and to a floating or rolling apparatus according to the preamble of claim 12.

L'invention vise notamment un engin flottant du type planche à voile ou un engin roulant du type planche à voile à roulettes, désigné par « speed sail » ou « windskate » en langue anglaise.In particular, the invention relates to a floating machine of the windsurfing type or to a rolling machine of the windsurfing type with wheels, designated "speed sail" or "windskate" in English.

Arrière-plan technologiqueTechnological background

Une planche à voile est constituée d'un flotteur et d'un gréement monté sur le flotteur et permettant d'assurer la propulsion de la planche à voile par la force du vent.A windsurf board consists of a float and a rig mounted on the float and to ensure the propulsion of windsurfing by the force of the wind.

Les gréements de l'art antérieur comportent un mât articulé sur le flotteur, une voile de forme triangulaire montée sur le mât et une bôme double, communément appelée « wishbone », permettant de maintenir et d'orienter le gréement. Le wishbone est constitué de deux tubes courbes disposés de part et d'autre de la voile et se rejoignant en leurs extrémités, d'une part au mât, et d'autre part au point d'écoule de la voile afin de la tendre.The rigging of the prior art comprise a mast articulated on the float, a triangular sail mounted on the mast and a double boom, commonly called "boom", to maintain and orient the rigging. The wishbone consists of two curved tubes arranged on both sides of the sail and joining at their ends, on the one hand to the mast, and on the other hand to the point of flow of the sail in order to stretch it.

Cette configuration du gréement impose un type de navigation particulier, nécessitant des manoeuvres particulièrement délicates. Lors d'un virement de bord, c'est-à-dire un changement d'amure face au vent, ou lors d'un empannage, c'est-à-dire un changement d'amure dos au vent, le véliplanchiste doit faire pivoter le gréement et saisir la partie opposée du wishbone, c'est-à-dire la partie du wishbone disposée de l'autre côté de la voile, de sorte à faire passer le bord de fuite de la voile d'un bord à l'autre de la planche.This configuration of the rig requires a particular type of navigation, requiring particularly delicate maneuvers. During a tack, that is to say a change of tack against the wind, or during a jibe, that is to say a change of tack in the wind, the windsurfer must rotate the rigging and seize the opposite part of the boom, that is to say the part of the boom arranged on the other side of the sail, so as to pass the trailing edge of the sail from one edge to the other. the other of the board.

Pour ce faire, à chaque virement de bord, le véliplanchiste doit incliner le gréement vers l'arrière, lâcher une partie du wishbone, et changer de bord en passant devant le gréement, afin de saisir l'autre partie du wishbone et faire pivoter la voile. Pour ce qui est de l'empannage, les mains du véliplanchiste passent d'une partie à l'autre du wishbone afin de pouvoir faire pivoter la voile de 180°.To do this, at each tack, the windsurfer must tilt the rigging to the rear, release a portion of the boom, and change tack in passing the rigging, in order to grasp the other part of the boom and rotate the boom. sail. As for the jibe, the hands of the windsurfer pass from one part to the other of the boom in order to be able to rotate the sail by 180 °.

Or, de tels manoeuvres entraînent une série de déséquilibres qui amène bien souvent une chute du véliplanchiste, même aguerri.However, such maneuvers lead to a series of imbalances that often leads to a fall of the windsurfer, even seasoned.

Un premier exemple de gréement et/ou d'engin flottant est connu du document DE 30 17 362 A1 .A first example of rigging and / or floating gear is known from the document DE 30 17 362 A1 .

Un autre exemple est connu du document WO 85/00336 qui est considéré comme l'art antérieur le plus proche et qui décrit toutes les caractéristiques du préambule de la revendication 1 et du préambule de la revendication 12.Another example is known from the document WO 85/00336 which is considered the closest prior art and which describes all the features of the preamble of claim 1 and the preamble of claim 12.

Objet de l'inventionObject of the invention

L'invention vise à remédier aux problèmes mentionnés ci-dessus en proposant, dans au moins de réalisation, un gréement pour engin flottant ou roulant comprenant :

  • un boîtier de pied destiné à être monté articulé sur ledit engin;
  • deux mâts comportant chacun une extrémité inférieure solidarisée audit boîtier de pied ;
  • une voile, s'étendant entre lesdits deux mâts et présentant un sommet ;
  • au moins une bôme reliant transversalement lesdits deux mâts le plan théorique de ladite bôme divisant ladite voile en deux parties: une surface de ladite voile partant dudit plan et s'étendant vers ledit boîtier du pied et une surface de ladite voile partant dudit plan et s'étendant vers le sommet, ladite bôme permettant de maintenir et/ou d'orienter ledit gréement.
The invention aims to remedy the problems mentioned above by proposing, in at least one embodiment, a rig for a floating or rolling vehicle comprising:
  • a foot box for hinged mounting on said machine;
  • two masts each having a lower end secured to said foot housing;
  • a sail extending between said two masts and having a top;
  • at least one boom connecting said two masts transversely to the theoretical plane of said boom dividing said sail into two parts: a surface of said sail starting from said plane and extending towards said foot box and a surface of said sail starting from said plane and extending to the top, said boom for maintaining and / or orienting said rig.

Un tel gréement est caractérisé en ce que :

  • ladite voile est semi-rigide et prend au repos au moins deux formes stables,
  • lesdits deux mâts sont symétriques par rapport à un axe longitudinal (X) dudit gréement, s'étendant entre ledit sommet de ladite voile et ledit boîtier de pied, de telle sorte que chaque mât est apte à servir alternativement de bord d'attaque et de bord de fuite,
  • le gréement comprend une deuxième bôme, ladite bôme et ladite deuxième bôme étant disposées dans le plan, de part et d'autre de ladite voile,
  • lesdites deux formes stables de ladite voile présentent chacune au repos une cambrure dont la concavité est dirigée soit vers ladite bôme, soit vers ladite deuxième bôme, chacun des deux creux maximum étant localisé au niveau de la surface de ladite voile partant dudit plan et s'étendant vers ledit boîtier du pied,
  • une desdites bômes comprend une came formant pivot autour de ladite bôme et est adaptée pour venir au contact de ladite voile.
Such rigging is characterized in that:
  • said sail is semi-rigid and resting at least two stable forms,
  • said two masts are symmetrical with respect to a longitudinal axis (X) of said rig, extending between said top of said sail and said foot box, so that each mast is able to serve alternately as leading edge and trailing edge,
  • the rig includes a second boom, said boom and said second boom being arranged in the plane, on either side of said sail,
  • said two stable forms of said sail each have at rest a camber whose concavity is directed either towards said boom or towards said second boom, each of the two maximum hollows being located at the surface of said sail starting from said plane and extending to said foot housing,
  • one of said booms comprises a pivot cam about said boom and is adapted to come into contact with said sail.

Dans la présente description, l'expression « semi-rigide» qualifie une surface au moins en partie rigide présentant une forme prédéterminée et étant dotée d'une mémoire de forme par laquelle cette surface tend, à la suite d'une déformation mécanique, à reprendre sa forme initiale. Au repos, une voile constituée d'une telle surface présente donc au moins une cambrure stable, dont la valeur de creux est mesurée localement le long de la normale au plan de corde de la voile, défini par les deux mâts servant alternativement de bord d'attaque et de bord de fuite. Sous l'action du vent, l'effort ou poussée vélique est sensiblement perpendiculaire à ce plan de corde et est concentré au niveau du creux maximum de la voile. Le terme « bôme » désigne une barre horizontale reliant les deux mâts et s'étendant transversalement au gréement d'un côté ou de l'autre du plan de corde. Une telle bôme est également nommée bôme simple, en opposition à une bôme double résultant de l'assemblage de deux bômes simples s'étendant de part et d'autre du plan de corde. Le « plan théorique de la bôme » désigne le plan défini par la bôme qui est sensiblement perpendiculaire au plan de corde. La voile est alors divisée en deux parties ou portions, la première, localisée au dessus de la bôme, s'étendant entre l'intersection de la voile avec le plan de bôme et le sommet, la deuxième, localisée en dessous de la bôme, s'étendant entre l'intersection de la voile avec le plan de bôme et le boîtier de pied. A noter que cette division de la voile par le plan de bôme n'est réalisée qu'à simple titre illustratif, la voile formant une surface unie réunissant les portions localisées au dessus et en dessous de la bôme.In the present description, the term "semi-rigid" qualifies an at least partially rigid surface having a predetermined shape and being provided with a shape memory by which this surface tends, following a mechanical deformation, to resume its original form. At rest, a sail made up of such a surface therefore has at least one stable camber, the hollow value of which is measured locally along the normal to the rope plane of the sail, defined by the two masts alternately serving as the edge of the sail. attack and trailing edge. Under the action of the wind, the force or thrust is substantially perpendicular to this plane of rope and is concentrated at the maximum hollow of the sail. The term "boom" refers to a horizontal bar connecting the two masts and extending transversely to the rigging on one side or the other of the chord plane. Such a boom is also called a simple boom, as opposed to a double boom resulting from the assembly of two simple booms extending on either side of the chord plane. The "theoretical plane of the boom" designates the plane defined by the boom which is substantially perpendicular to the plane of rope. The sail is then divided into two parts or portions, the first, located above the boom, extending between the intersection of the sail with the boom plane and the top, the second, located below the boom, extending between the intersection of the sail with the boom plane and the foot box. Note that this division of the sail by the boom plane is only for illustrative purposes, the sail forming a united surface joining the localized portions above and below the boom.

L'invention repose ainsi sur le concept nouveau et inventif consistant à fournir un gréement dont la maniabilité est substantiellement améliorée, et qui permet de remonter au vent.The invention is thus based on the novel and inventive concept of providing a rig whose handling is substantially improved, and which allows to go upwind.

Ainsi, un tel gréement permet au véliplanchiste de naviguer dans toutes les directions sans avoir à retourner le gréement comme dans les gréements de l'art antérieur, et par conséquent, sans qu'il soit nécessaire de lâcher le gréement des mains. En effet, chacun des deux mâts étant apte à servir alternativement de bord d'attaque et de bord de fuite, il n'est plus nécessaire de retourner la voile lorsqu'on change d'amure.Thus, such a rig allows the windsurfer to navigate in all directions without having to return the rigging as in the rigs of the prior art, and therefore, without the need to release the rigging hands. Indeed, each of the two masts being able to serve alternately leading edge and trailing edge, it is no longer necessary to return the sail when changing tack.

Un tel gréement permet également au véliplanchiste de remonter au vent. En effet, la forme cambrée de la voile, dont le creux est avantageusement faible, permet au véliplanchiste de travailler en finesse, c'est-à-dire en orientant la voile de manière à ce que la corde forme un angle de faible incidence avec la direction du vent. L'écoulement du vent sur l'intrados et l'extrados de la voile est alors laminaire, et permet de créer une portance importante tout en limitant la génération de turbulence, de manière à permettre une remontée au vent. Le caractère semi-rigide de la voile permet à cette dernière de conserver un profil prédéfini, permettant d'optimiser la capacité de la voile à remonter au vent, tout en fixant la position de son creux maximum. Le positionnement du creux maximum de la voile en dessous de l'au moins une bôme permet d'améliorer sa maniabilité. En effet, l'effort de poussée vélique étant exercé entre l'au moins une bôme et le boîtier de pied, les efforts à fournir par le véliplanchiste pour manoeuvrer le gréement sont par effet de levier moindres que dans l'hypothèse où le creux maximum serait localisé au dessus de la bôme. Ce gain de manoeuvrabilité lié au positionnement du creux maximum en dessous de la bôme vient ainsi s'ajouter au gain de manoeuvrabilité lié à la mise en oeuvre de mâts symétriques.Such rigging also allows the windsurfer to go upwind. Indeed, the arched shape of the sail, whose hollow is advantageously low, allows the windsurfer to work in finesse, that is to say by orienting the sail so that the rope forms a low angle of incidence with the direction of the wind. The flow of the wind on the intrados and the extrados of the sail is then laminar, and allows to create a significant lift while limiting the generation of turbulence, so as to allow upwind. The semi-rigid nature of the sail allows it to maintain a predefined profile, allowing to optimize the ability of the sail to go upwind, while fixing the position of its maximum hollow. Positioning the maximum hollow of the sail below the at least one boom improves its maneuverability. Indeed, the vee force force being exerted between the at least one boom and the foot case, the efforts to be provided by the windsurfer to maneuver the rig are less leverage effect than in the case where the maximum trough would be located above the boom. This gain in maneuverability related to the positioning of the maximum hollow below the boom is thus added to the maneuverability gain associated with the implementation of symmetrical masts.

Selon un mode de réalisation particulier, le passage de la voile d'une forme cambrée à une autre ou en d'autres termes, le passage du creux de la voile d'un côté à l'autre du plan de corde, peut être réalisé suite à la mise en oeuvre sur l'extrados de la voile d'un effort de poussée vélique dépassant un seuil prédéfini.According to a particular embodiment, the passage of the sail from one arched shape to another or in other words, the passage of the hollow of the sail from one side to the other of the rope plane, can be realized following the implementation on the upper surface of the sail of a pushing thrust force exceeding a predefined threshold.

Selon un mode de réalisation particulier, ladite surface de ladite voile s'étendant vers ledit boîtier du pied est plus grande que ladite surface de ladite voile s'étendant vers ledit sommet.According to a particular embodiment, said surface of said sail extending towards said foot box is larger than said surface of said sail extending towards said crown.

Par effet de levier, les efforts à fournir par le véliplanchiste pour manoeuvrer le gréement sont ainsi réduits.By leverage, the efforts to be provided by the windsurfer to maneuver the rig are reduced.

Selon un mode de réalisation particulier, la valeur moyenne du creux de ladite voile est comprise entre 2,5% et 7,5% de la valeur moyenne de la corde de ladite voile.According to a particular embodiment, the average value of the hollow of said sail is between 2.5% and 7.5% of the average value of the rope of said sail.

Les valeurs moyennes de creux et de corde sont mesurées au niveau du plan de bôme. Le maintien d'une valeur moyenne de creux dans un tel intervalle permet d'améliorer la finesse de la voile, et donc sa capacité à remonter au vent. Pour une valeur inférieure à cet intervalle, on constate une chute de la portance. Pour une valeur supérieure, la voile entre dans en régime turbulent rédhibitoire pour remonter au vent.The average values of trough and chord are measured at the level of the plane of boom. Maintaining an average trough value in such an interval improves the fineness of the sail, and therefore its ability to go upwind. For a value less than this interval, there is a drop in lift. For a higher value, the sail enters turbulent regime unacceptable to go upwind.

Selon un mode de réalisation particulier, le rapport de la longueur longitudinale de ladite voile sur la corde maximum de ladite voile est supérieur à 1,5.According to a particular embodiment, the ratio of the longitudinal length of said sail to the maximum rope of said sail is greater than 1.5.

Une telle caractéristique permet ainsi d'améliorer la finesse de la voile.Such a characteristic thus makes it possible to improve the fineness of the sail.

Selon un mode de réalisation particulier, les deux mâts présentent à proximité de ladite bôme une forme arquée dont la convexité est orientée vers l'extérieur du gréement.According to a particular embodiment, the two masts have in the vicinity of said boom an arcuate shape whose convexity is oriented towards the outside of the rigging.

La mise en oeuvre d'une telle forme permet de concentrer la prise au vent de la voile au niveau de la bôme, d'où une finesse et une maniabilité améliorées.The implementation of such a shape makes it possible to concentrate the wind taking of the sail at the level of the boom, resulting in improved fineness and maneuverability.

Selon un mode de réalisation particulier, les deux mâts présentent à proximité dudit sommet et/ou à proximité dudit boîtier de pied une forme arquée dont la convexité est orientée vers l'intérieur dudit gréement.According to a particular embodiment, the two masts have near said vertex and / or near said foot box an arcuate shape whose convexity is oriented towards the inside of said rig.

La mise en oeuvre d'une telle forme permet de réduire la prise au vent au niveau des extrémités supérieures et/ou inférieures de la voile, d'où une finesse et une maniabilité améliorées.The implementation of such a shape reduces the wind resistance at the upper and / or lower ends of the sail, resulting in improved fineness and maneuverability.

Selon un mode de réalisation particulier, les mâts sont des éléments tubulaires profilés présentant une section ovoïde dont la plus grande dimension est orientée selon la direction transversale.According to a particular embodiment, the masts are profiled tubular elements having an ovoid section whose largest dimension is oriented in the transverse direction.

Selon un mode de réalisation particulier, la voile comporte au moins un élément de rigidification.According to a particular embodiment, the sail comprises at least one stiffening element.

Selon un mode de réalisation particulier, la coupe de la voile permet de préformer un creux.According to a particular embodiment, the section of the sail makes it possible to preform a hollow.

Selon un mode de réalisation particulier, ledit élément de rigidification est une latte transversale insérée dans un gousset porté par ladite voile.According to a particular embodiment, said stiffening element is a transverse lath inserted into a gusset carried by said sail.

Selon un mode de réalisation particulier, lesdits mâts et/ou ledit élément de rigidification et/ou ladite voile sont gonflables.According to a particular embodiment, said masts and / or said stiffening element and / or said sail are inflatable.

Selon un mode de réalisation particulier, ladite bôme présente une longueur réglable afin de permettre un réglage en tension de ladite voile.According to a particular embodiment, said boom has an adjustable length to allow a voltage adjustment of said sail.

Selon l'invention, au moins une desdites bômes comprend une came formant pivot autour de ladite bôme et étant adaptée pour venir au contact de ladite voile.According to the invention, at least one of said booms comprises a cam pivoting around said boom and being adapted to come into contact with said sail.

Il est ainsi possible pour un véliplanchiste de modifier la forme de la voile, et notamment de déplacer son creux maximum, par mise en rotation de la came qui vient alors déformer mécaniquement le profil de la voile. La mise en oeuvre d'une telle came permet ainsi d'optimiser le profil et donc la finesse de la voile, en fonction de l'orientation du vent.It is thus possible for a windsurfer to change the shape of the sail, including moving its maximum hollow, by rotating the cam which then mechanically deform the profile of the sail. The implementation of such a cam thus makes it possible to optimize the profile and therefore the fineness of the sail, according to the orientation of the wind.

L'invention concerne également un engin flottant ou roulant comprenant un gréement comprenant :

  • un boîtier de pied destiné à être monté articulé sur ledit engin;
  • deux mâts comportant chacun une extrémité inférieure solidarisée audit boîtier de pied ;
  • une voile, s'étendant entre lesdits deux mâts et présentant un sommet ;
  • au moins une bôme reliant transversalement lesdits deux mâts le plan théorique de ladite bôme divisant ladite voile en deux parties: une surface de ladite voile partant dudit plan et s'étendant vers ledit boîtier du pied et une surface de ladite voile partant dudit plan et s'étendant vers le sommet, ladite bôme permettant de maintenir et/ou d'orienter ledit gréement, et caractérisé en ce que:
    • ladite voile est semi-rigide et prend au repos au moins deux formes stables,
    • lesdits deux mâts sont symétriques par rapport à un axe longitudinal (X) dudit gréement, s'étendant entre ledit sommet de ladite voile et ledit boîtier de pied, de telle sorte que chaque mât est apte à servir alternativement de bord d'attaque et de bord de fuite,
    • il comprend une deuxième bôme, ladite bôme et ladite deuxième bôme étant disposées dans le plan, de part et d'autre de ladite voile,
    • lesdites deux formes stables de ladite voile présentent chacune au repos une cambrure dont la concavité est dirigée soit vers ladite bôme, soit vers ladite deuxième bôme, chacun des deux creux maximum étant localisé au niveau de la surface de ladite voile partant dudit plan et s'étendant vers ledit boîtier du pied;
    • une desdites bômes comprend une came formant pivot autour de ladite bôme et est adaptée pour venir au contact de ladite voile.
The invention also relates to a floating or rolling apparatus comprising a rig comprising:
  • a foot box for hinged mounting on said machine;
  • two masts each having a lower end secured to said foot housing;
  • a sail extending between said two masts and having a top;
  • at least one boom connecting said two masts transversely to the theoretical plane of said boom dividing said sail into two parts: a surface of said sail starting from said plane and extending towards said foot box and a surface of said sail starting from said plane and extending to the top, said boom for maintaining and / or orienting said rig, and characterized in that:
    • said sail is semi-rigid and resting at least two stable forms,
    • said two masts are symmetrical with respect to a longitudinal axis (X) of said rig, extending between said top of said sail and said foot box, so that each mast is able to serve alternately as leading edge and trailing edge,
    • it comprises a second boom, said boom and said second boom being arranged in the plane, on either side of said sail,
    • said two stable forms of said sail each have at rest a camber whose concavity is directed either towards said boom or towards said second boom, each of the two maximum hollows being located at the surface of said sail starting from said plane and extending to said foot housing;
    • one of said booms comprises a pivot cam about said boom and is adapted to come into contact with said sail.

Bien entendu, l'ensemble des améliorations techniques pouvant s'appliquer au gréement décrit ci-dessus peuvent également s'appliquer mutatis mutandis à un engin flottant ou roulant mettant en oeuvre un tel gréement.Of course, all the technical improvements that can be applied to the rigging described above may also apply mutatis mutandis to a floating or rolling device implementing such a rig.

Brève description des figuresBrief description of the figures

D'autres caractéristiques et avantages apparaîtront à la lecture de la description suivante d'un mode de réalisation particulier de l'invention, donné à titre de simple exemple illustratif et non limitatif, et des dessins annexés, parmi lesquels :La figure 1 illustre une planche à voile équipée d'un gréement selon l'invention.

  • La figure 1 illustre une planche à voile équipée d'un gréement selon un mode de réalisation de l'invention.
  • La figure 2 illustre les mâts, la bôme double et les boîtiers de pied et de tête du gréement de la figure 1.
Other features and advantages will appear on reading the following description of a particular embodiment of the invention, given by way of a simple illustrative and nonlimiting example, and the appended drawings, among which: figure 1 illustrates a windsurfing equipped with a rigging according to the invention.
  • The figure 1 illustrates a windsurfing equipped with a rigging according to one embodiment of the invention.
  • The figure 2 illustrates the masts, the double boom and the foot and head housings of the rigging of the figure 1 .

Description détaillée d'un mode de réalisation de l'inventionDetailed description of an embodiment of the invention

Une planche à voile 1 équipée d'un gréement 2 selon l'invention est représentée sur la figure 1.A sailboard 1 equipped with a rigging 2 according to the invention is represented on the figure 1 .

La planche à voile 1 comporte un flotteur 3 et un gréement 2 monté articulé sur le flotteur 3. Le flotteur 3 comporte une coque rigide de faible épaisseur et un aileron de direction 4, disposé en partie arrière du flotteur 3, permettant de stabiliser la trajectoire de la planche à voile 1. Le flotteur 3 peut également comporter une dérive, disposée en partie centrale, et permettant d'empêcher la planche de dévier de sa trajectoire sous l'action du vent.The windsurfing board 1 comprises a float 3 and a rigging 2 mounted articulated on the float 3. The float 3 comprises a thin rigid hull and a steering fin 4, disposed in the rear portion of the float 3, to stabilize the trajectory 1. The float 3 may also include a fin, disposed in the central portion, and to prevent the board from deviating from its path under the action of the wind.

Le gréement 2 comporte deux mâts (6, 7), une bôme double 8 reliant les deux mâts (6, 7) et une voile 9 tendue entre les deux mâts (6, 7) permettant d'assurer la propulsion de la planche à voile par la force du vent.The rigging 2 comprises two masts (6, 7), a double boom 8 connecting the two masts (6, 7) and a sail 9 stretched between the two masts (6, 7) to ensure the propulsion of the windsurf board by the force of the wind.

La bôme double 8 résulte de l'assemblage de deux bômes simples (8a, 8b) s'étendant de part et d'autre du plan de corde. La bôme double 8 définit un plan P sensiblement perpendiculaire au plan de corde. La voile 9 est alors divisée en deux parties ou portions (9a, 9b), la première portion 9b, localisée au dessus de la bôme double 8, s'étendant entre l'intersection de la voile 9 avec le plan de bôme P et le sommet 18, la deuxième portion 9a, localisée en dessous de la bôme double 8, s'étendant entre l'intersection de la voile 9 avec le plan de bôme P et le boîtier de pied 5.The double boom 8 results from the assembly of two simple booms (8a, 8b) extending on either side of the chord plane. The double boom 8 defines a plane P substantially perpendicular to the chord plane. The sail 9 is then divided into two parts or portions (9a, 9b), the first portion 9b, located above the double boom 8, extending between the intersection of the sail 9 with the boom plane P and the top 18, the second portion 9a, located below the double boom 8, extending between the intersection of the sail 9 with the boom plane P and the foot case 5.

Les deux mâts (6, 7), représentés sur la figure 2, présentent une forme arquée dont la convexité est dirigée vers l'extérieur du gréement 2. Ainsi, les deux mâts (6, 7) se rapprochent l'un de l'autre au niveau de leurs extrémités et s'éloignent au niveau de leur partie médiane. Les extrémités inférieures des mâts (6, 7) sont fixées sur un boîtier de pied 5. Les extrémités supérieures des mâts (6, 7) sont fixées sur un boîtier de tête 11.The two masts (6, 7), represented on the figure 2 , have an arcuate shape whose convexity is directed towards the outside of the rigging 2. Thus, the two masts (6, 7) approach each other at their ends and move away at their level. middle part. The lower ends of the poles (6, 7) are fixed on a foot box 5. The upper ends of the poles (6, 7) are fixed on a head housing 11.

Le boîtier de pied 5 est monté sur un pied de mât 10 comportant une articulation 13, non représentée de manière détaillée, permettant d'orienter le gréement 2 selon toutes les directions. Le boîtier de pied 5 est avantageusement adapté pour se monter sur un pied de mât 10 standard. Le pied de mât 10 est apte à être fixé de manière amovible sur le flotteur 4. L'articulation 13 peut être réalisée par tout moyen approprié, tel qu'une liaison de type cardan ou une liaison de type diabolo, par exemple.The foot box 5 is mounted on a mast base 10 having a hinge 13, not shown in detail, for orienting the rigging 2 in all directions. The foot casing 5 is advantageously adapted to be mounted on a standard mast base. The mast foot 10 is adapted to be removably attached to the float 4. The hinge 13 can be made by any suitable means, such as a cardan type connection or a diabolo type connection, for example.

Les mâts (6, 7) sont symétriques par rapport à l'axe vertical X s'étendant entre le boîtier de pied 5 et le boîtier de tête 11, c'est-à-dire entre le boîtier de pied 5 et le sommet 18 de la voile 9. Ainsi, chacun des mâts (6, 7) est adapté pour former alternativement un bord d'attaque ou un bord de fuite en fonction de l'amure et le gréement 2 est ainsi apte à être utilisé de manière unilatérale, sans qu'il soit besoin de le retourner.The masts (6, 7) are symmetrical with respect to the vertical axis X extending between the foot box 5 and the head box 11, that is between the foot box 5 and the top 18 of the sail 9. Thus, each of the masts (6, 7) is adapted to alternately form a leading edge or a trailing edge depending on the tack and the rigging 2 is thus able to be used unilaterally, without the need to return it.

Les mâts (6, 7) sont formés d'éléments tubulaires présentant une section profilée de forme ovoïde dont la plus grande dimension est orientée selon la direction transversale afin de faciliter l'écoulement de l'air. Les mâts (6, 7) présentent en outre une flexibilité, notamment au niveau de leur portion supérieure, adapté pour soulager la voile 9 en cas de vent fort.The masts (6, 7) are formed of tubular elements having a shaped section of ovoid shape, the largest dimension is oriented in the transverse direction to facilitate the flow of air. The masts (6, 7) also have flexibility, especially at their upper portion, adapted to relieve the sail 9 in strong winds.

Selon un mode de réalisation, chaque mât (6, 7) est constitué d'un tube supérieur 6a, 7a et d'un tube inférieur 6b, 7b emboitables l'un dans l'autre. Les tubes, supérieur 6a, 7a et inférieur 6b, 7b, de chaque mât (6, 7) sont solidarisés l'un à l'autre par des moyens de fixation. Par ailleurs, chaque extrémité des mâts (6, 7) est emboîtée dans des logements tubulaires de forme complémentaire ménagés dans les boîtiers de pied 5 et de tête 11 et fixée dans ceux-ci par des moyens de fixation.According to one embodiment, each mast (6, 7) consists of an upper tube 6a, 7a and a lower tube 6b, 7b nestable one inside the other. The tubes, upper 6a, 7a and lower 6b, 7b, of each mast (6, 7) are secured to each other by fixing means. Furthermore, each end of the poles (6, 7) is nested in complementary shaped tubular housings formed in the foot boxes 5 and head 11 and fixed therein by fixing means.

La bôme double 8 est équipée, à chacune de ses extrémités d'un demi-manchon 12 venant s'emboîter sur les mâts (6, 7) et assurant la fixation de la bôme double 8 sur les mâts 6, 7. Les demi-manchons 12 sont également équipés de moyens de fixation.The double boom 8 is equipped at each of its ends with a half-sleeve 12 which fits on the masts (6, 7) and ensuring the attachment of the double boom 8 on the masts 6, 7. The half Sleeves 12 are also equipped with fastening means.

Afin de simplifier le montage des éléments du gréement 2, les moyens de fixation précités pourront notamment être de moyens de fixation par encliquetage. Toutefois, tout autre type de fixation pourra également être utilisé. On comprend ainsi, que la structure du gréement peut être facilement montée et démontée et rangée dans un sac de transport de dimensions modestes.In order to simplify the assembly of the elements of the rigging 2, the aforementioned fixing means may in particular be snap fastening means. However, any other type of attachment may also be used. It is thus understood that the structure of the rig can be easily assembled and dismantled and stored in a transport bag of modest dimensions.

La voile 9, représentée sur la figure 1, présente une forme générale ovoïde dont les contours extérieurs suivent la forme des mâts (6, 7). De manière avantageuse, la voile 9 est composée de surfaces transparentes de polyéthylène téréphtalate (Mylar™). La voile 9 présente deux fourreaux (14, 15) disposés le long de ses deux bords latéraux et dans lesquels les mâts (6, 7) peuvent être enfilés afin de monter la voile 9 sur les mâts 6, 7. Les fourreaux 14, 15 sont chacun interrompus sur une portion médiane 16 afin de permettre la fixation de la bôme double 8 aux mâts 6, 7.The sail 9, shown on the figure 1 , has a general ovoid shape whose outer contours follow the shape of the masts (6, 7). Advantageously, the sail 9 is composed of transparent surfaces of polyethylene terephthalate (Mylar ™). The sail 9 has two sleeves (14, 15) arranged along its two side edges and in which the masts (6, 7) can be threaded to mount the sail 9 on the masts 6, 7. The sleeves 14, 15 are each interrupted on a median portion 16 to allow the attachment of the double boom 8 to the masts 6, 7.

La voile 9 est équipée d'éléments de rigidification agencés pour donner à la voile 9 une cambrure. La voile 9 est montée sur les mâts (6, 7) de telle sorte que la concavité de la voile 9 soit orientée en vis-à-vis de la bôme double 8. Les éléments de rigidification sont des lattes transversales 17 insérées dans des goussets portés par la voile 9.The sail 9 is equipped with stiffening elements arranged to give the sail 9 a camber. The sail 9 is mounted on the masts (6, 7) so that the concavity of the sail 9 is oriented vis-à-vis the double boom 8. The stiffening elements are transverse slats 17 inserted into gussets worn by the sail 9.

Notons que, selon un mode de réalisation, la bôme double 8 présente une longueur réglable permettant un éloignement ou un rapprochement des portions médianes des mâts (6, 7) de sorte à permettre un réglage en tension de la voile 9.Note that, according to one embodiment, the double boom 8 has an adjustable length allowing a distance or approximation of the median portions of the masts (6, 7) so as to allow a tension adjustment of the sail 9.

Le creux maximum 9' de la voile 9, c'est-à-dire le centre de poussée de la voile 9, est placé en dessous de l'axe de la bôme double 8 afin de faciliter la navigation et notamment les manoeuvres.The maximum hollow 9 'of the sail 9, that is to say the center of thrust of the sail 9, is placed below the axis of the double boom 8 to facilitate navigation and including maneuvers.

De manière avantageuse, il est possible de faire passer le creux de la voile 9 d'un côté à l'autre du plan de corde suite à la mise en oeuvre sur l'extrados de la voile 9 d'un effort de poussée vélique dépassant un seuil prédéfini.Advantageously, it is possible to pass the hollow of the sail 9 from one side to the other of the rope plane following the implementation on the upper surface of the sail 9 of a thrust force pushing beyond a predefined threshold.

On comprend que le gréement 2 tel que décrit ci-dessus permet de simplifier les manoeuvres de navigation, tout en permettant une remontée au vent. En effet, pour effectuer les manoeuvres de changement d'amure, le véliplanchiste tourne dans le même sens que le gréement 2 et peut conserver en permanence ses deux mains en position sur la bôme 8, sans avoir à lâcher sa main arrière.It will be understood that the rigging 2 as described above makes it possible to simplify the navigation maneuvers while allowing upwelling. Indeed, to perform the change of tack maneuvers, the windsurfer rotates in the same direction as the rigging 2 and can permanently keep both hands in position on the boom 8, without having to let go of his rear hand.

En effet, pour réaliser un virement de bord, le flotteur 3 étant orienté face au vent, le gréement 2 peut être déplacé en le faisant pivoter dans un sens ou dans l'autre, au choix du véliplanchiste. La navigation peut alors être reprise sur l'autre bord.Indeed, to make a tack, the float 3 is facing the wind, the rig 2 can be moved by rotating in one direction or the other, the choice of the windsurfer. The navigation can then be resumed on the other side.

Pour réaliser un empannage, le flotteur 3 étant orienté dans le sens du vent, le gréement 2 peut être déplacé par simple bascule d'un côté ou de l'autre du flotteur 3, afin de changer d'amure en bouclant le virage.To make a jibe, the float 3 being oriented in the direction of the wind, the rigging 2 can be moved by simply rocking one side or the other of the float 3, to change tack by completing the turn.

Enfin, le véliplanchiste peut à tout moment jouer sur une ouverture ou une fermeture de la voile 9, coordonnée à une action des pieds pour amorcer des transitions.Finally, the windsurfer can at any time play on an opening or closing of the sail 9, coordinated with an action of the feet to initiate transitions.

La facilité d'utilisation d'un tel gréement peut ainsi séduire une nouvelle tranche d'utilisateurs, souvent rebutés par la pratique classique de la planche à voile qui nécessite une bonne maîtrise technique acquise après de nombreuses séances d'un apprentissage laborieux.The ease of use of such a rig can thus attract a new slice of users, often put off by the classic practice of windsurfing which requires a good technical mastery acquired after many sessions of a laborious apprenticeship.

Bien que l'invention ait été décrite en liaison avec plusieurs modes de réalisation particuliers, il est bien évident qu'elle n'y est nullement limitée et qu'elle comprend tous les équivalents techniques des moyens décrits ainsi que leurs combinaisons si celles-ci entrent dans le cadre de l'invention.Although the invention has been described in connection with several particular embodiments, it is obvious that it is not limited thereto and that it comprises all the technical equivalents of the means described and their combinations if they are within the scope of the invention.

En particulier, bien que le gréement selon l'invention ait été décrit ci-dessus en relation avec une planche à voile, il peut également être monté sur un engin roulant comportant une planche équipée de roulettes.In particular, although the rigging according to the invention has been described above in relation to a windsurf board, it can also be mounted on a rolling machine comprising a board equipped with wheels.

Claims (12)

  1. Rigging (2) for floating or rolling craft (1) comprising:
    - a foot housing (5) to be mounted pivotally on said craft (1);
    - two masts (6,7), each comprising a lower end fixedly attached to said foot housing (5);
    - a sail (9) extending between said two masts (6,7) and having a top (18) ;
    - at least one boom (8a) transversally connecting said two masts (6,7), the theoretical plane (P) of said boom (8a) dividing said sail (9) into two parts, a surface (9a) of said sail (9) starting from said plane (P) and extending towards said foot housing (5) and a surface (9b) of said sail (9) starting from said plane (P) and extending towards the top (18), said boom (8a) enabling said rigging (2) to be held and/or oriented, and
    characterized in that said sail (9) is semi-rigid and takes at least two stable shapes at rest,
    and in that said two masts (6, 7) are symmetrical relative to a longitudinal axis (X) of said rigging (2), extending between said top (18) of said sail (9) and said foot housing (5) in such a way that each mast (6, 7) can serve alternately as a leading edge and a trailing edge,
    and it comprises a second boom (8b), said boom (8a) and said second boom (8b) being disposed in the plane (P), on either side of said sail (9),
    said two shapes of said sail (9) each presenting a camber at rest, the concave side of which is directed either towards said boom (8a) or towards the second boom (8b), each of the two maximum drafts (9') being located at the surface (9a) of said sail (9) starting from said plane (P) and extending towards said foot housing (5),
    at least one of said booms (8a, 8b) comprising a cam (19) forming a pivot around said boom (8a, 8b) and being adapted to coming into contact with said sail (9).
  2. Rigging (2) according to claim 1, characterized in that said surface (9a) of said sail (9) extending towards said foot housing is greater than said surface of said sail extending towards said top (18).
  3. Rigging (2) according to any one of the claims 1 to 2, characterized in that the mean value of the at least one draft of said sail (9) ranges from 2.5% to 7.5% of the mean chord value of said sail (9).
  4. Rigging (2) according to any one of the claims 1 to 3, characterized in that the ratio of the longitudinal length of said sail (9) to the maximum chord of said sail (9) is greater than 1.5.
  5. Rigging (2) according to any one of the claims 1 to 4, characterized in that the two masts (6, 7) have, in proximity to said boom (8), an arched shape, the convex side of which is pointed towards the exterior of the rigging (2).
  6. Rigging (2) according to any one of the claims 1 to 5, characterized in the two masts (6, 7) have, in proximity to said top (18) and/or in proximity to said foot housing (5), an arched shape, the convex side of which is oriented towards the interior of said rigging (2).
  7. Rigging (2) according to any one of the claims 1 to 6, characterized in that the masts (6, 7) are profiled, tubular elements having an ovoid section, the largest dimension of which is oriented along the transverse direction.
  8. Rigging (2) according to any one of the claims 1 to 7, characterized in that said sail (9) comprises at least one stiffening element (17).
  9. Rigging (2) according to claim 8, characterized in that said stiffening element (17) is a transverse batten inserted into a batten pocket borne by said sail (9).
  10. Rigging (2) according to any one of the claims 1 to 9, characterized in that said masts (6, 7) and/or said stiffening element (17) and/or said sail (9) are inflatable.
  11. Rigging (2) according to any one of the claims 1 to 10, characterized in that said boom (8) has an adjustable length in order to enable an adjustment in tension of said sail (9).
  12. Floating or rolling craft (1) comprising a rigging (2) comprising:
    - a foot housing (5) to be mounted pivotally on said craft (1) ;
    - two masts (6,7), each comprising a lower end fixedly attached to said foot housing (5) ;
    - a sail (9) extending between said two masts (6,7) and having a top (18) ;
    - at least one boom (8a) transversally connecting said two masts (6,7), the theoretical plane (P) of said boom (8a) dividing said sail (9) into two parts, one surface (9a) of said sail (9) starting from said plane (P) and extending towards said foot housing (5) and one surface (9b) of said sail (9) starting from said plane (P) and extending towards the top (18), said boom (8a) enabling said rigging (2) to be held and/or oriented;
    characterized in that said sail (9) is semi-rigid and takes at least two stable shapes at rest,
    said two masts (6, 7) being symmetrical relative to a longitudinal axis (X) of said rigging (2), extending between said top (18) of said sail (9) and said foot housing (5) in such a way that each mast (6, 7) can serve alternately as a leading edge and a trailing edge,
    and it comprises a second boom (8b), said boom (8a) and said second boom (8b) being disposed in the plane (P), on either side of said sail (9),
    said two shapes of said sail (9) each presenting a camber at rest, the concave side of which is directed either towards said boom (8a) or towards the second boom (8b), each of the two maximum drafts (9') being located at the surface (9a) of said sail (9) starting from said plane (P) and extending towards said foot housing (5),
    at least one of said booms (8a, 8b) comprising a cam (19) forming a pivot around said boom (8a, 8b) and being adapted to coming into contact with said sail (9).
EP15786893.6A 2014-10-21 2015-10-20 Rigging to simplify jibing/tacking manoeuvres Active EP3209551B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR1402358A FR3027281B1 (en) 2014-10-21 2014-10-21 GREATLY SIMPLIFYING AMERICAN CHANGE MANEUVER
PCT/EP2015/074276 WO2016062725A1 (en) 2014-10-21 2015-10-20 Rigging to simplify jibing/tacking manoeuvres

Publications (2)

Publication Number Publication Date
EP3209551A1 EP3209551A1 (en) 2017-08-30
EP3209551B1 true EP3209551B1 (en) 2018-12-12

Family

ID=52016640

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15786893.6A Active EP3209551B1 (en) 2014-10-21 2015-10-20 Rigging to simplify jibing/tacking manoeuvres

Country Status (4)

Country Link
EP (1) EP3209551B1 (en)
CN (1) CN107074330B (en)
FR (1) FR3027281B1 (en)
WO (1) WO2016062725A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3098187A1 (en) * 2019-07-02 2021-01-08 F.One Autonomous traction kite
CN113428333B (en) * 2021-07-14 2022-05-17 哈尔滨工程大学 Telescopic sail for full-sea-condition long-range unmanned sailing boat

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3391668A (en) * 1967-01-13 1968-07-09 Birchill Joseph Sail
EP0031074A1 (en) * 1979-12-24 1981-07-01 Hans-Joachim Schliebs Wind-surfing device
DE3017362A1 (en) * 1980-05-07 1981-11-12 Hans-Joachim 7600 Offenburg Schliebs Sail frame for surfboard - has sail symmetrical about vertical and with pivot mounted grip bars each side
WO1985000336A1 (en) * 1983-07-06 1985-01-31 CARN, Rozenn, Michèle, Françoise Rigging particularly for sailing board
FR2548622A1 (en) * 1983-07-06 1985-01-11 Carn Rozenn Rigging in particular for sailboard
FR2562501A1 (en) * 1984-04-05 1985-10-11 Bonhommet Herve Rigging for light sail-propelled craft
EP0192688B1 (en) * 1984-08-31 1989-03-01 Peter Dr. Ing. Plica Symmetrical rigging
DE3705291A1 (en) * 1987-02-19 1988-09-01 Fischer Hans Juergen Symmetrical tubular-frame rig for windsurfing
DE3723655A1 (en) * 1987-07-17 1989-02-02 Boge Ag Rig for a surfboard
ATE529325T1 (en) * 2006-09-15 2011-11-15 Pryde Neil Ltd SAIL AND DEVICE FOR ROTATING A SAIL BATTEN TO A MAST AND FORMSING A SAIL Luff

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
WO2016062725A1 (en) 2016-04-28
EP3209551A1 (en) 2017-08-30
CN107074330B (en) 2020-04-03
FR3027281A1 (en) 2016-04-22
FR3027281B1 (en) 2018-03-23
CN107074330A (en) 2017-08-18

Similar Documents

Publication Publication Date Title
EP2398700B1 (en) Device for manoeuvreing a sail
EP0511050B1 (en) Device with at least one aerodynamically shaped element with changeable geometry, incorporating a control system of the boundary layer
WO2016034814A1 (en) Retractable wing
FR2715124A1 (en) Rigging for sailing boats
EP3157808B1 (en) Wing for the propulsion of a vehicle
EP3209551B1 (en) Rigging to simplify jibing/tacking manoeuvres
FR2538772A1 (en) Hydrofoil sailing vessel
EP0151591B1 (en) Rigging particularly for sailing board
FR2462337A1 (en) SAILING EQUIPMENT WITH AUTOMATIC COUNTER-GITE
EP3778376B1 (en) Autonomous traction wing
FR3029497A1 (en) SAILBOAT WITH IMPROVED STABILIZATION APPARATUS
FR2558135A1 (en) RIGGING OF HIGH FINESSE WITH SIMPLIFIED MANEUVER
EP0991567A1 (en) Stabilising device for sailing boat
EP2697113B1 (en) Retractable boat keel
FR2639605A1 (en) Flexible flying wing provided with towing cables intended in particular for towing a boat
WO2018127631A1 (en) Mechanism for actuating and adjusting a foil of a boat with four degrees of freedom
FR2725686A1 (en) Anti-drift system for wind borne boat
EP0225357A1 (en) Sail boat of the biplane type
EP0445217A1 (en) Sail structure with inflatable compartment and manoeuvring device on a boat provided with a mast
FR3132693A1 (en) Pivoting spreader for a rigid sail
FR2489242A1 (en) Adjustable sailing boat rigging - has mast turning on hinged foot with separate rotational axis mounted in hull
FR2561204A1 (en) Profiled aerodynamic link between a jib and a turning mandrel of a sail boat
EP2641824A1 (en) Lift system for a boat and arrangement of such a system
FR2897837A1 (en) Aircraft wing, has sheet placed between central part and leading edge, where leading edge is constituted of stackable and dismountable rectilinear sections presenting angle opened towards bottom between consecutive rectilinear sections
FR2623159A1 (en) Pivoting asymmetric leeway-preventing plane for multi-hulls

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20170313

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20180608

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1075614

Country of ref document: AT

Kind code of ref document: T

Effective date: 20181215

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602015021534

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: FRENCH

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20181212

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190312

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190312

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1075614

Country of ref document: AT

Kind code of ref document: T

Effective date: 20181212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190313

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190412

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190412

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602015021534

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

26N No opposition filed

Effective date: 20190913

REG Reference to a national code

Ref country code: DE

Ref legal event code: R079

Ref document number: 602015021534

Country of ref document: DE

Free format text: PREVIOUS MAIN CLASS: B63B0035790000

Ipc: B63B0032000000

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191031

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191020

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191031

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20191031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191020

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20151020

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230529

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231024

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20231026

Year of fee payment: 9

Ref country code: DE

Payment date: 20231026

Year of fee payment: 9