EP3036361A1 - Apparatus for producing a plurality of synthetic threads - Google Patents
Apparatus for producing a plurality of synthetic threadsInfo
- Publication number
- EP3036361A1 EP3036361A1 EP14750483.1A EP14750483A EP3036361A1 EP 3036361 A1 EP3036361 A1 EP 3036361A1 EP 14750483 A EP14750483 A EP 14750483A EP 3036361 A1 EP3036361 A1 EP 3036361A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- threads
- thread
- godet
- groups
- guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004804 winding Methods 0.000 claims abstract description 61
- 239000002131 composite material Substances 0.000 claims abstract description 31
- 238000009987 spinning Methods 0.000 claims abstract description 30
- 238000002360 preparation method Methods 0.000 claims description 23
- 238000005520 cutting process Methods 0.000 claims description 4
- 238000001816 cooling Methods 0.000 description 21
- 230000000694 effects Effects 0.000 description 9
- 238000004519 manufacturing process Methods 0.000 description 8
- 239000000080 wetting agent Substances 0.000 description 7
- 238000002074 melt spinning Methods 0.000 description 6
- 238000011161 development Methods 0.000 description 5
- 230000018109 developmental process Effects 0.000 description 5
- 238000006243 chemical reaction Methods 0.000 description 4
- 238000009826 distribution Methods 0.000 description 4
- 230000000704 physical effect Effects 0.000 description 4
- 239000000155 melt Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 239000004753 textile Substances 0.000 description 3
- 238000007664 blowing Methods 0.000 description 2
- 238000005538 encapsulation Methods 0.000 description 2
- 238000001125 extrusion Methods 0.000 description 2
- 238000011144 upstream manufacturing Methods 0.000 description 2
- 238000009736 wetting Methods 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 210000002816 gill Anatomy 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000002844 melting Methods 0.000 description 1
- 230000008018 melting Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000002243 precursor Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01D—MECHANICAL METHODS OR APPARATUS IN THE MANUFACTURE OF ARTIFICIAL FILAMENTS, THREADS, FIBRES, BRISTLES OR RIBBONS
- D01D5/00—Formation of filaments, threads, or the like
- D01D5/08—Melt spinning methods
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01D—MECHANICAL METHODS OR APPARATUS IN THE MANUFACTURE OF ARTIFICIAL FILAMENTS, THREADS, FIBRES, BRISTLES OR RIBBONS
- D01D11/00—Other features of manufacture
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01D—MECHANICAL METHODS OR APPARATUS IN THE MANUFACTURE OF ARTIFICIAL FILAMENTS, THREADS, FIBRES, BRISTLES OR RIBBONS
- D01D13/00—Complete machines for producing artificial threads
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01D—MECHANICAL METHODS OR APPARATUS IN THE MANUFACTURE OF ARTIFICIAL FILAMENTS, THREADS, FIBRES, BRISTLES OR RIBBONS
- D01D13/00—Complete machines for producing artificial threads
- D01D13/02—Elements of machines in combination
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01D—MECHANICAL METHODS OR APPARATUS IN THE MANUFACTURE OF ARTIFICIAL FILAMENTS, THREADS, FIBRES, BRISTLES OR RIBBONS
- D01D5/00—Formation of filaments, threads, or the like
- D01D5/12—Stretch-spinning methods
- D01D5/16—Stretch-spinning methods using rollers, or like mechanical devices, e.g. snubbing pins
Definitions
- the invention relates to a device for producing a plurality of synthetic threads optionally as monofilaments or composite threads according to the preamble of claim 1.
- the synthetic filaments needed for the textile industry are made with different devices for melt spinning multifilament threads depending on their use.
- POY yarns Pre Oriented Yarn
- the POY threads represent a precursor to a texturing process, which is then preferably carried out with texturing machines.
- the synthetic threads which are suitable for further processing into a flat structure after a melt spinning process, are referred to as so-called FDY threads (Füll DrawnYarn). Such threads are stretched after the melt spin at least in a stretching device with multiple godets. In that regard, the devices used for this purpose have a plurality of godets, which pull off, suture and relax the threads.
- Another yarn type required in the textile industry is the so-called effect yarns.
- Such effect yarns are formed by combining a plurality of yarns having different physical properties. In this way, certain yarn effects, such as, for example, structural effects, gloss effects or color effects, can be produced directly in the melt spinning process, so that these composite yarns can also be processed directly into textile fabrics.
- the effect yarns are subject to the fashion influences, so that their demand and use is subject to very strong fluctuations.
- the known device for producing a plurality of synthetic threads now offers the possibility of optionally producing PO Y threads, FD Y threads or effect yarns.
- the PO Y yarns and FD Y yarns are referred to herein as monofilaments because each of them is formed of a plurality of filaments all having identical physical properties.
- the fancy yarns are referred to herein as composite yarns, since they are formed from at least two different filament bundles in their physical properties.
- several spinneret groups are used in the known device, which are independently connected to a respective melting source. Each of the spinneret groups is associated with one of two yarn collecting devices which cooperate with godet systems arranged therewith.
- the godet systems are associated with two separate on winding machines with two groups of winding stations. In order to produce either monofilaments or composite threads, conversion measures are required in the known device. Thus, in the production of composite yarns one of the winding machines is implemented such that the yarn sheet of Composite threads can be picked up by a godet system and wound into coils. In addition, a conversion of the godet systems is required in order to produce either monofilaments with a POY property or a FD Y property can.
- WO 2005 05 22 26 AI discloses a device in which only monofilaments are produced in large numbers by two spinneret groups.
- the spinneret groups are associated with a yarn collecting device and a godet system for the production of monofilaments with a POY property.
- this device is completely unsuitable for producing either monofilaments or composite threads.
- Another object of the invention is to provide a device for producing a plurality of synthetic threads, in which a high-flexibility production of monofilaments and composite threads is possible according to need.
- a common yarn collecting device is arranged in a yarn path between the spinneret groups and the godets, that the yarn collecting device has a first take-off godet godet for forming a first vertical roll. len yarn guide plane and one of the deduction galette the yarn path downstream effetsgalette or guide roller is assigned to form a further thread running plane.
- the invention has the particular advantage that only a yarn collection device and a godet system is arranged between the spinning device and the take-up device in order to produce either monofilaments or composite yarns with the desired physical properties.
- the device according to the invention can be produced without conversion measures for producing a plurality of monofilaments having a POY property, monofilaments having an FDY property or composite threads having special effects.
- the yarn sheets can be introduced into the godet system immediately after the yarn collection device or can only be transferred into a partial region of the godet system by a downstream guide godet.
- the threads are fed to the godet system via both thread running planes.
- a location is defined by the thread collecting device upstream of the godets, in which all thread groups can be detected together.
- the device according to the invention is preferably designed such that the withdrawal godet and the downstream ordered Systemssgalette or guide roller is arranged relative to the yarn collecting device such that the clamped yarn running planes between them form an angle in the range of 0 ° - 15 °.
- the yarn guide of the threads can be advantageously ensured by the configuration of the yarn collecting device, which has at least one Kammfaden inhabit for guiding the threads and a thread cutting device with a Fadenabsaugung.
- the combed yarn guide allows a guide of a plurality of threads with a predetermined distance between the threads.
- the threads can be guided parallel to each other at a small distance in the range of 4 mm to 10 mm parallel to each other over the gills.
- the godets are preferably arranged according to a development of the invention to a yarn path with simple wrap, with further of the withdrawal godet in the yarn course downstream engineerssgaletten are held for splaying and guiding the threads laterally next to the thread running planes. This ensures that, depending on the inlet height of the threads, which are defined by the withdrawal godet or the guide godet, the treatment of the threads is carried out differently.
- a swirling device is arranged between two guide teeth having a plurality of treatment channels for the optional swirling of monofilaments or composite threads.
- Such swirling devices are preferably held at the end of a godet system in order to produce the thread closure on the monofilaments or the composite threads prior to winding.
- the extrusion of the threads can be carried out in any manner through a plurality of spinneret groups.
- the spinneret groups can in this case be formed by a plurality of multiple spinnerets, each with a plurality of melt inlets, which are held in rows on a spinning beam.
- Such multiple spinnerets have the particular advantage that the threads can be produced side by side in close pitch.
- the winding point groups are distributed on at least two separate on winding machines, which face each other mirror-symmetrically and are independently controllable.
- the composite threads can preferably be wound up with only one of the winding machines.
- both winding machines are used to operate the winding head groups.
- An extremely compact arrangement of the device can be achieved by the development of the invention, in which the godets are held on a support frame above the on winding machine such that the threads in the winding point groups of a front end region of the winding machine can be fed.
- the yarn sheet can be advantageous to perform over several pulleys the winding points. It has been found that the treatment of the monofilaments with FDY characteristic is preferably carried out on non-prepared threads. This allows additional heat energy, which is usually required for heating wetted threads, to be saved.
- the development of the invention is particularly preferred in which the yarn collecting device is assigned a first preparation station for preparing the threads and in which a second preparation station for preparing the threads is provided between the guide godets and for which the preparation station is independent of each other are formed controllable.
- a second preparation station for preparing the threads is provided between the guide godets and for which the preparation station is independent of each other are formed controllable.
- FIG. 1 shows schematically a cross-sectional view of a first embodiment of the device according to the invention.
- FIG. 2 schematically shows a longitudinal sectional view of the exemplary embodiment from FIG. 1.
- 3 shows schematically a view of the godet system of the embodiment of Figure 1 in several operating situations.
- FIG. 4 schematically shows a cross-sectional view of a further exemplary embodiment of a spinning device.
- Figure 5 schematically shows several views of another embodiment of a spinning device of the device according to the invention.
- FIG. 1 shows the device in a cross-sectional view and in FIG. 2 in a longitudinal section.
- the device shown in FIGS. 1 and 2 has two groups of spinnerets 2 and 3.
- the spinneret group 2 and the spinneret group 3 each comprise a total of four separate spinnerets in a row-shaped arrangement.
- the two spinneret groups 2 and 3 and their spinnerets are formed by multiple spinnerets 4.1 to 4.4.
- Each of the multiple spinning nozzles 4.1 to 4.4 thus contains in each case a spinneret 2.1 of the spinneret group 2 and a spinneret 3.1 of the spinneret group 3.
- Such multiple spinnerets 4.1 to 4.4 are distinguished by the fact that two spinnerets are integrated in a nozzle package, which are fed via separate melt inlets.
- the multiple spinning nozzles 4.1 to 4.4 with the spinneret groups 2 and 3 are arranged in a spinning beam 1.
- the spinning beam 1 is designed to be heatable, wherein the spinning beam 1 is preferably connected via an inlet and a drain to a heat transfer circuit.
- a driven spinning pump 5 is arranged, which is designed as a multiple pump and is connected via a plurality of distributor lines 7 with the spinnerets 2.1 to 2.4 and 3.1 to 3.4.
- the spinning pump 5 is connected via a melt inlet 6 with a melt source such as an extruder.
- the cooling device 8 is designed in this embodiment as a so-called Querstromanblasung.
- a blow chamber 11 with a blown wall 10 facing the extruded filaments is formed laterally of the spinneret groups 2 and 3 below the spinneret.
- the blow chamber 11 is connected to a source of cooling air and generates via the blowing wall 10 a flowing into a cooling duct 9 cooling air flow.
- the cooling shaft 9 extends below the spinneret groups 2 and 3. Below the cooling shaft 9, each spinneret of the spinneret groups 2 and 3 is assigned a respective thread guide 12, in order to carry out bundling of the extruded filaments per thread.
- the yarn guides 12 is associated with a yarn collection device 16 in the yarn path through which the extruded through the spinneret threads are brought to a treatment distance from each other. In that regard, takes place between the yarn guides 12 below the cooling shaft 9 and the thread collecting device 16, a deflection of the threads instead. This deflection of the threads allows a common treatment of the threads ever as required, as one thread group or as two separate thread groups with relatively narrow thread pitch between the threads.
- the yarn collecting device 16 is formed by a Kammfaden investigating 17, each having separate guide grooves for each thread.
- the combed yarn guide 17 is coupled to a linear drive 18, so that the combed yarn guide 17 can be guided between an operating position and an articulation position.
- the comb thread guide 17 cooperates with a thread cutting device 19 and a thread suction device 20.
- the entire yarn sheet of the two thread groups can be severed together at a yarn breakage by the thread cutting device 19 and lead over the thread suction 20 to a waste container.
- the yarn collecting device 16 is downstream of a godet 21 in the yarn path.
- FIG. 3.1 shows the godet system shown in FIG. 1 enlarged.
- the following description applies to the figures 1 to 3.1.
- the godet system 21 has, in the direction of yarn travel, a first take-off godet 22 which, with the yarn collecting device 16, tensions a vertical first yarn guide plane 23.1.
- the withdrawal godet 22 is followed by a plurality of guide godets 24.1, 24.2, 24.3 and 24.4 arranged one below the other.
- the guide godets 24.1 to 24.4 form a draw zone in the godet system 21, a guide roller 25 being arranged between the guide godets 24.2 and 24.3.
- the guide godets 24.1 to 24.4 and the guide Role 25 are arranged to form an S-shaped yarn path, so that the yarn sheet on the circumference of the guide godets 24.1 to 24.4 can be guided with a simple loop.
- two further guide godets 24.5 and 24.6 are arranged for further yarn guidance.
- the godet godet 24.5 downstream of the take-off godet 22 is arranged on the godet system 21 in such a way that a second yarn running plane 23.2 is set between the yarn collecting device 16 and the guide godet 24.5.
- the second thread running level 23.2 is shown in dashed lines in Figures 1 and 3.1.
- the take-off godet 22 and the downstream guide godet 24.5 are arranged relative to the yarn collecting device 16 in such a way that an angle extends between the yarn running planes 23.1 and 23.2. In Figure 3.1, the angle is shown with the label ⁇ .
- the thread running planes spanned between the yarn collecting device 16 and the drawing godet 22 and the guide godet 24.5 are suitable for separating the yarn sheet of both spinneret groups 2 and 3 and for removing them separately.
- the order of Abzugsgalette 22 and the constitusgalette 24.5 relative to the yarn collecting device 16 is selected such that extending between the yarn running planes 23.1 and 23.2 angle ⁇ in the range of 0 ° to 15 ° is located.
- all prepared by the godets 22 and 24.5 Means for the treatment of the threads are used independently of the leadership of the threads in the godet 21.
- a preparation station 13.2 is arranged between the guide godets 24.4 and 24.5.
- the preparation station 13.2 has a wetting agent 14.2 and a dosing 15.2 to perform wetting in the preparation station 13.2 optionally on the guided between the godets 24.4 and 24.5 threads wetting.
- the preparation station 13.2 interacts with a second preparation station 13.1.
- the preparation station 13.1 is assigned directly to the yarn guides 12 below the cooling shaft 9 in order to wet the freshly extruded filaments after cooling.
- the preparation station 13.1 also has a wetting agent 14.1 and a dosing 15.1.
- the preparation station 13.1 is also designed controllable, so that optionally the threads are wettable after cooling.
- a turbulence device 26 is arranged upstream of a last guide godet 24.6.
- the swirling device 26 has a plurality of treatment channels 27, in each of which a compressed air for swirling the threads can be fed.
- Such turbulators 26 are well known and will therefore not be further explained at this point.
- the treatment channels 27 of the swirling devices 26 are designed in such a way that either individual threads or a plurality of threads can be guided therein.
- the turbulators 26 can be advantageous to create multiple monofilaments or multiple composite threads.
- the pallets of the godet system 21 are arranged on a carrier plate 29, which is supported on a carrier frame 28.
- the support plate 29 is particularly suitable for holding the guide shells 44 of the godets on a front side and the godet drives 45 on a rear side.
- the usually executed encapsulations of the guide sheaths 44, which are heated and unheated executable, and the encapsulations of the godet drives 45 are not shown here.
- winding machines 30.1 and 30.2 are arranged in mirror symmetry to one another.
- the winding machines 30.1 and 30.2 are framed by the support frame 28, wherein the support plate 29 is arranged with the godet system 21 at a front end face of the winding machines 30.1 and 30.2.
- the winding machines 30.1 and 30.2 are constructed identically and each contain a winding point group 31 and 32.
- the winding head group 31 of the winding machine 30.1 is shown in FIG.
- the winding station group comprises a total of four winding points 31.1 to 31.4.
- the winding stations 31.1 to 31.4 are formed along a winding spindle 33.1.
- the winding stations 31.1 to 31.4 each have a traversing device 35 and a deflection roller 36 in order to wind the yarns supplied via the deflection roller 36.
- the threads are deposited in the winding stations 31.1 to 31.4 by a pressure roller 34 on the surfaces of the coils 38.
- the winding stations 31.1 to 31.4 is associated with a second winding spindle 33.2, wherein both winding spindles 33.1 and 33.2 are held on a winding turret 37.
- a continuous winding of the threads in the winding points 31.1 to 31.4 can be realized.
- the winding machine 30.2 is formed identically with a second winding point group 32, wherein here also four winding points 32.1 to 32.4 are provided.
- the number of spinnerets and the number of spools per group are exemplary. In principle, more than four threads can be spun as a thread group, stretched and wound up.
- the exemplary embodiment of the device according to the invention shown in FIGS. 1 and 2 is shown in an operating situation in which a plurality of monofilaments with an FD Y characteristic are produced. For this purpose, the threads spun by the two spinneret groups 2 and 3 are pulled off together as a group of threads through the withdrawal godet 22.
- the bundling is carried out by the yarn guides 12 and the merger by the yarn collecting device 16.
- the preparation station 13.1 is deactivated, so that the threads are removed in a dry state from the spinnerets of the spinneret groups 2 and 3.
- the threads, which are identified by the reference numeral 46, are guided in an S-shaped threadline through the giletsy system 21, wherein at least the guide sgaletten 24.1 to 24.4 have a heated guide shell.
- the guide godets 24.2 and 24.3 are driven at a greater differential speed for stretching the threads.
- the threads are wetted in the second preparation station 13.2 and then guided over the guide godets 24.5 and 24.6 to the winding point groups 31 and 32.
- the threads are treated individually in the swirling device 26, so that in each case a monofilament having FD Y properties can be produced from each of the threads extruded through the spinneret groups 2 and 3.
- FIGS. 3.2 and 3.3 the threadline situation is shown on the godet system 21 in producing a composite thread.
- a first thread group 47.1 in the first thread running plane 23.1 is introduced via the withdrawal godet 22 into the godet system 21.
- Thread group 47.1 is stretched in the following guide godets.
- a second thread group 47.2 in the second thread running plane 23.2 is introduced directly from the yarn collecting device 16 via the guide godet 24.5 in the godet 21.
- the threads of the thread group 47.2 thus receive a PO Y characteristic.
- the second thread group 47.2 is guided together with the already drawn thread group 47.1 such that in each case a thread with a FD Y characteristic and a thread with the POY characteristics are passed together through a treatment channel 27 of the swirling device 26.
- the two monofilaments can be combined so advantageous to a composite thread.
- the threads of the thread groups 47.1 and 47.2 can be added merge a group of multiple composite threads.
- the composite threads are then wound into coils in the winding positions of one of the winding setting groups 31 or 32.
- the device shown in Figures 1 and 2 can be used alternatively for producing a plurality of composite threads.
- the threads of the thread group 47.1 are preferably wetted by the preparation station 13.2 and the threads of the thread group 47.2 preferably by the preparation station 13.1.
- FIGS. 1 and 2 can also be used alternatively without modifications for the production of monofilaments having a POY characteristic.
- the yarn path in the pallet system 21 which adjusts itself is shown in the illustration in FIG. 3.3.
- the threads 46 which are extruded through the spinnerets of the spinneret groups 2 and 3, are guided together in the second thread running plane 23.2 and pulled off by the guide godet 24.5. After the turbulence of the threads in the swirling device 26, they are guided via the last guide godet 24.6 to the winding points of the winding setting groups 31 and 32.
- the last guide godet 24.6 is preferably held laterally to the winding points of the winding actuating groups 31 and 32 in the lower region of the godet system 21 so that the yarns can be distributed substantially out of a horizontal distribution plane onto the winding locations.
- the device according to the invention shown in Figures 1 and 2 is designed to be particularly compact and easy to use.
- the devices for melt spinning, stripping and stretching shown in FIGS. 1 and 2 and for winding up the threads are exemplary.
- the essential feature here is that the device for melt spinning a common yarn collection device and a godet system with a godet assembly, which with the yarn collecting device two thread collection Running levels forms the optional entry into various godet arrangements for the treatment of the threads, are assigned.
- the godets of the gillet system 21 are therefore preferably equipped with individual drives in order to be able to set certain peripheral speeds depending on the application and the process.
- the guide godets can also be replaced by driven guide rollers, so it is also possible to form the second thread running plane between the yarn collecting device and a driven guide roller.
- an arrangement of the spinning device as shown for example in FIG. 4, can also be used to melt-melt the threads.
- the spinneret groups 3 and 4 are formed by separate spinnerets 2.1 and 3.1, which are held side by side on a spinning beam 1.
- a cooling shaft 9 is formed, on both sides in each case a blast wall 10.1 and 10.2, each with a blast chamber 11.1 and 11.2.
- the spinnerets 2.1 and 3.1 thread guide 12 and wetting agents 14.1 and 14.2 of the first preparation station 13.1 assigned.
- the wetting agents 14.1 are assigned to the spinnerets of group 2 and the wetting agents 14.2 to the spinnerets of group 3.
- the wetting agents 14.1 and 14.2 are connected to separate dosing means 15.1 and 15.2, so that the first preparation station 13.1 can be used selectively to wet a group of threads or both sets of threads.
- spinning devices are also possible, as shown for example in FIG. 5.1 and FIG. 5.2.
- FIG. 5.1 shows the cross-sectional view
- FIG. 5.2 shows a cross-sectional view of a spinning device, such as would alternatively be used in the device illustrated in FIGS. 1 and 2.
- two spinning beams 1.1 and 1.2 are arranged parallel next to one another, each of the spinning beams 1.1 and 1.2 each holding a plurality of spinning nozzles of a spinning nozzle group 2 and 3.
- the spinneret groups 2 are also shown by four spinnerets 2.1, 2.2, 2.3 and 2.4.
- the arranged below the spinning beam 1.1 and 1.2 cooling device 8 has in this embodiment, each spinneret 2.1 to 2.4 and 3.1 to 3.4 each have a screen cylinder 39, which is arranged in an upper pressure chamber 40.
- the screen cylinders 39 penetrate the pressure chamber 40 as far as an underside, to which a pipe socket 43 connects in each case to the screen cylinders 39.
- the pipe sockets 43 are embedded in a distribution chamber 41, which is coupled on the one hand via a cooling air connection 42 with a cooling air source and on the other hand has a connection to the pressure chamber 40.
- to cool the extruded filaments a radially from outside to inside flowingdeluft- ström generated.
- the cooling device 8 shown in FIGS. 5.1 and 5.2 is selected according to the desired type of yarn, so that the cooling devices shown in the exemplary embodiments are interchangeable.
- the yarn guides 18 and the wetting agent 14.1 of the preparation station 13.1 are combined in order to carry out bundling of the threads. Basically you can However, all variants shown for bundling in the embodiments shown are used alternatively.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Textile Engineering (AREA)
- Spinning Methods And Devices For Manufacturing Artificial Fibers (AREA)
- Yarns And Mechanical Finishing Of Yarns Or Ropes (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102013014508 | 2013-08-22 | ||
PCT/EP2014/067240 WO2015024817A1 (en) | 2013-08-22 | 2014-08-12 | Apparatus for producing a plurality of synthetic threads |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3036361A1 true EP3036361A1 (en) | 2016-06-29 |
EP3036361B1 EP3036361B1 (en) | 2018-06-06 |
Family
ID=51302985
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP14750483.1A Not-in-force EP3036361B1 (en) | 2013-08-22 | 2014-08-12 | Apparatus for producing a plurality of synthetic yarns |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP3036361B1 (en) |
JP (1) | JP6490074B2 (en) |
CN (1) | CN105556009B (en) |
ES (1) | ES2686137T3 (en) |
WO (1) | WO2015024817A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110709543A (en) * | 2017-05-31 | 2020-01-17 | 欧瑞康纺织有限及两合公司 | Method and melt spinning device for producing a crimped multicolour composite thread |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017063913A1 (en) * | 2015-10-16 | 2017-04-20 | Oerlikon Textile Gmbh & Co. Kg | Method and device for producing fine multifilament threads |
DE102017000607A1 (en) | 2016-03-04 | 2017-09-07 | Oerlikon Textile Gmbh & Co. Kg | Apparatus for stripping, drawing and winding a synthetic yarn sheet |
CN108884596B (en) * | 2016-03-24 | 2021-07-06 | 欧瑞康纺织有限及两合公司 | Device for melt spinning, drawing off and winding up a thread web |
CN105821498B (en) * | 2016-05-27 | 2017-12-15 | 浙江显昱纤维织染制衣有限公司 | A kind of stretching structure of spinning-drawing machine |
DE112018001487A5 (en) * | 2017-03-22 | 2019-12-05 | Oerlikon Textile Gmbh & Co. Kg | Method for applying and separating a yarn sheet and a melt spinning device |
CN107354555B (en) * | 2017-09-06 | 2023-02-21 | 浙江凯成智能设备股份有限公司 | Textured yarn machine |
DE102018008716A1 (en) * | 2018-11-07 | 2020-05-07 | Oerlikon Textile Gmbh & Co. Kg | Method and device for winding a multifilament thread |
DE102019004354A1 (en) * | 2019-06-19 | 2020-12-24 | Oerlikon Textile Gmbh & Co. Kg | Melt spinning device |
JP2021102835A (en) * | 2019-12-24 | 2021-07-15 | Tmtマシナリー株式会社 | Combined filament yarn production device |
DE102021001146A1 (en) | 2021-03-04 | 2022-09-08 | Oerlikon Textile Gmbh & Co. Kg | Device for drawing off, stretching and winding up a sheet of threads |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10053073A1 (en) * | 2000-05-16 | 2002-05-08 | Barmag Barmer Maschf | Assembly for the production of melt spun thermoplastic filament, to produce more than six, has a tangling unit between the filament gathering guide and the drawing stage |
CN1368564A (en) * | 2001-02-08 | 2002-09-11 | 淮阴宏丽化学纤维有限公司 | FDY one-step method for preparing three-component blended polyester filament |
DE10116294A1 (en) * | 2001-03-31 | 2002-10-10 | Barmag Barmer Maschf | Melt-spinning thermoplastic filament bundles from nozzles to form composite thread, employs separate cooling for each bundle to differentiate crystallization |
DE602005022362D1 (en) * | 2005-03-19 | 2010-08-26 | Oerlikon Textile Gmbh & Co Kg | DEVICE FOR SPILLING MULTIPLE FIBER YARN FROM THE MELT |
DE102009021118A1 (en) * | 2008-06-11 | 2009-12-17 | Oerlikon Textile Gmbh & Co. Kg | Synthetic threads melt spinning, drawing and winding-up device, has twisting nozzle and/or thread guides movably held at perpendicular unit such that threads are guided into twisting nozzle for stopping twist with deflectors |
CN201381392Y (en) * | 2009-01-20 | 2010-01-13 | 江苏新民纺织科技股份有限公司 | Production equipment for polyester FDY + POY composite yarn |
DE102010015215A1 (en) * | 2010-04-16 | 2011-10-20 | Oerlikon Textile Gmbh & Co. Kg | Apparatus for stripping and winding synthetic threads |
RU2556473C2 (en) * | 2010-07-28 | 2015-07-10 | Ёрликон Текстиле Гмбх Унд Ко. Кг | Device for spinning from melt, drawing and rolling of several complex threads |
JP5685432B2 (en) * | 2010-12-13 | 2015-03-18 | Tmtマシナリー株式会社 | Thread cutting device |
CN102560777A (en) * | 2011-07-25 | 2012-07-11 | 桐乡市中辰化纤有限公司 | Composite different-contraction yarn production method |
DE102011109784A1 (en) * | 2011-08-08 | 2013-02-14 | Oerlikon Textile Gmbh & Co. Kg | Apparatus for melt spinning, stripping, stretching, relaxing and winding a synthetic thread |
CN203080166U (en) * | 2012-12-21 | 2013-07-24 | 杭州红剑聚酯纤维有限公司 | Compound system of full drawn yarn (FDY) wires and polyester pre-oriented yarn (POY) wires |
-
2014
- 2014-08-12 JP JP2016535415A patent/JP6490074B2/en active Active
- 2014-08-12 CN CN201480045578.7A patent/CN105556009B/en active Active
- 2014-08-12 EP EP14750483.1A patent/EP3036361B1/en not_active Not-in-force
- 2014-08-12 ES ES14750483.1T patent/ES2686137T3/en active Active
- 2014-08-12 WO PCT/EP2014/067240 patent/WO2015024817A1/en active Application Filing
Non-Patent Citations (1)
Title |
---|
See references of WO2015024817A1 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110709543A (en) * | 2017-05-31 | 2020-01-17 | 欧瑞康纺织有限及两合公司 | Method and melt spinning device for producing a crimped multicolour composite thread |
CN110709543B (en) * | 2017-05-31 | 2022-10-11 | 欧瑞康纺织有限及两合公司 | Method and melt spinning device for producing a crimped multicolour composite thread |
Also Published As
Publication number | Publication date |
---|---|
EP3036361B1 (en) | 2018-06-06 |
JP2016531216A (en) | 2016-10-06 |
CN105556009B (en) | 2018-01-30 |
JP6490074B2 (en) | 2019-03-27 |
CN105556009A (en) | 2016-05-04 |
WO2015024817A1 (en) | 2015-02-26 |
ES2686137T3 (en) | 2018-10-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3036361B1 (en) | Apparatus for producing a plurality of synthetic yarns | |
EP2283174B1 (en) | Method for melt-spinning, drawing, and winding up a multifilament, and apparatus for carrying out said method | |
EP1979513B1 (en) | Apparatus for melt spinning and winding synthetic threads | |
EP2016212B1 (en) | Spinning, drawing and texturing machine | |
EP2147137B1 (en) | Device for melt-spinning and winding synthetic threads | |
EP2598678B1 (en) | Apparatus for melt-spinning, drawing and winding up a plurality of multifilament threads | |
EP2007935B1 (en) | Method and apparatus for pulling off and drawing a multifilament thread | |
EP2630279B1 (en) | Method for producing a multifilament composite thread and melt spinning device | |
WO2004015173A1 (en) | Device for spinning and winding | |
DE102009038496A1 (en) | Device for melt-spinning and winding multiple synthetic threads, comprises groups of spinning nozzles arranged at the lower sides of adjacent spinning beams and connected with melt source/melt sources, roller systems, and winding devices | |
EP2591153B1 (en) | Method and device for producing a composite yarn | |
EP2742173A1 (en) | Device for melt-spinning, drawing off, stretching, relaxing, and winding a synthetic thread | |
EP3433400B1 (en) | Device for melt-spinning, drawing, and winding a thread group | |
DE102009021131A1 (en) | Device for melt-spinning and rolling of threads utilized for e.g. textile applications, has collective thread guides at which threads are guided parallel to each other with distance and with partial looping of greater than specific degree | |
EP2567008B1 (en) | Process and apparatus for melt-spinning, drawing and winding multiple synthetic threads | |
EP2737115B1 (en) | Melt spinning device | |
DE102009021118A1 (en) | Synthetic threads melt spinning, drawing and winding-up device, has twisting nozzle and/or thread guides movably held at perpendicular unit such that threads are guided into twisting nozzle for stopping twist with deflectors | |
DE10053073A1 (en) | Assembly for the production of melt spun thermoplastic filament, to produce more than six, has a tangling unit between the filament gathering guide and the drawing stage | |
EP1687465A1 (en) | Device for melt spinning a plurality of threads | |
DE10355294A1 (en) | spinning plant | |
WO2010069777A1 (en) | Device for texturing and winding a plurality of threads | |
WO2017063913A1 (en) | Method and device for producing fine multifilament threads | |
EP1838908B1 (en) | Method and device for melt-spinning and texturing a plurality of multifilament threads | |
DE102015016800A1 (en) | A method of melt spinning, stripping, stretching, relaxing and winding a synthetic thread for technical applications and associated apparatus | |
DE102008039378A1 (en) | Method for melt-spinning, drawing, and winding multifilament to form fully drawn yarn, involves drawing filament bundle at specific drawing speed, preparing filament bundle using preparation fluid and winding thread into package |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20160314 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20180123 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 1006179 Country of ref document: AT Kind code of ref document: T Effective date: 20180615 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502014008484 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20180606 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2686137 Country of ref document: ES Kind code of ref document: T3 Effective date: 20181016 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180906 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180906 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180907 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: TR Payment date: 20180904 Year of fee payment: 5 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181006 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502014008484 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180831 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180812 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180831 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20180831 |
|
26N | No opposition filed |
Effective date: 20190307 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20180906 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180812 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180831 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180906 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180606 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20140812 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 1006179 Country of ref document: AT Kind code of ref document: T Effective date: 20190812 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20200819 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190812 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20200826 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20201023 Year of fee payment: 7 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502014008484 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190812 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210812 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220301 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20221005 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210813 |