EP2923007B1 - Modulare geneigte dächer - Google Patents
Modulare geneigte dächer Download PDFInfo
- Publication number
- EP2923007B1 EP2923007B1 EP13814200.5A EP13814200A EP2923007B1 EP 2923007 B1 EP2923007 B1 EP 2923007B1 EP 13814200 A EP13814200 A EP 13814200A EP 2923007 B1 EP2923007 B1 EP 2923007B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- tiled
- roof
- pitched roof
- sections
- ridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000945 filler Substances 0.000 claims description 60
- 238000000034 method Methods 0.000 claims description 52
- 238000005304 joining Methods 0.000 claims description 32
- 238000003780 insertion Methods 0.000 claims description 6
- 230000037431 insertion Effects 0.000 claims description 6
- 238000004519 manufacturing process Methods 0.000 claims description 4
- 238000000926 separation method Methods 0.000 description 5
- 239000002421 finishing Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 2
- 210000003195 fascia Anatomy 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 125000000484 butyl group Chemical group [H]C([*])([H])C([H])([H])C([H])([H])C([H])([H])[H] 0.000 description 1
- 229920005549 butyl rubber Polymers 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000012528 membrane Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/02—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
- E04B7/026—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs consisting of prefabricated modules, e.g. box-like or cell-like units
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/34315—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
- E04B1/34331—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by three-dimensional elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D1/00—Roof covering by making use of tiles, slates, shingles, or other small roofing elements
- E04D1/34—Fastenings for attaching roof-covering elements to the supporting elements
- E04D1/3402—Fastenings for attaching roof-covering elements to the supporting elements for ridge or roofhip tiles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/02—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D1/00—Roof covering by making use of tiles, slates, shingles, or other small roofing elements
- E04D1/12—Roofing elements shaped as plain tiles or shingles, i.e. with flat outer surface
Definitions
- pitched roof structures are assembled onto the walls of a new building on site.
- the pitched roof structure includes timber roof rafters extending at an angle from timber beams fixed along the tops of the walls which they overhang at the roof eaves, up to the ridge where they support a substantially horizontally extending timber ridge board through a ridge tree fixed to the roof rafters.
- An underlay such as a breather membrane or roofing felt, is laid in overlapping sheets over the roof rafters and tiling battens are fixed to the roof rafters on top of the underlay in spaced apart substantially horizontal relationship.
- the spacing between the roof battens is dependent upon the length of the roof tiles between their head and tail.
- a tiler is employed to lay the tiles by fixing them on the battens in overlapping head to tail and side by side relationship, starting from the eaves and finishing at the ridge board.
- roof tiles on site is time consuming, because it is dependent inter alia upon suitable weather conditions, and the reliability of the tiler turning up for work. Quality control is also difficult to maintain on a building site, sometimes necessitating relaying of at least some of the roof tiles. These factors increase building industry costs, which is particularly relevant to the building industry in times of recession.
- DE 9414313(U1 ) describes a modular roof system in which a plurality of roof modules are individually constructed in an off-site location away from the building site. Each roof module is individually finished with roof coverings, such as roof tiles, and with other finishings, such as fascia board, guttering and so on. The modules are transported to the building site and are arranged side-by-side on the walls of the building to provide a finished roof.
- the invention resides in a method of making a plurality of pre-tiled pitched roof sections for arrangement on the walls of a building.
- the method includes building a pitched roof structure having a plurality of separable sections, tiling the pitched roof structure in courses and separating the tiled pitched roof structure into a plurality of separate pre-tiled roof sections.
- the pitched roof structure is therefore tiled as a single continuous structure before it is separated into the plurality of pre-tiled pitched roof sections.
- pre-tiled pitched roof sections are arranged on a building to form a tiled pitched roof, there is no risk of mis-alignment of the tiles, and hence no need for any adjustment or cutting of the tiles.
- the quality of the roof is maintained despite its modular nature.
- the services of a skilled tiler can be dispensed with altogether, or at least minimised. All of these factors contribute to reduced building costs and more consistent quality of construction.
- the plurality of separable sections may be separable along one or more join lines that are generally parallel to rafters of the pitched roof structure. In this way, the separable sections can be easily separated with little disruption to the underlying roof structure.
- Tiling the pitched roof structure may include arranging junction tiles over the join line, the junction tiles being removable from the pitched roof structure. In this way, tiles that are over the join line may be quickly and easily removed when required.
- the method may include removing the junction tiles from the tiled roof structure before separating the tiled roof structure. Removing the junction tiles before separation of the tiled roof structure also reduces the risk of damage to the junction tiles during handling and transportation of the pre-tiled pitched roof sections, as the junction tiles would otherwise be exposed at outer edges of the pitched roof structure.
- the method may include removing the junction tiles from the join line one-at-a-time, moving from a course of tiles at a ridge of the tiled roof structure to a course of tiles at an eave of the tiled roof structure.
- the method may also include removing a ridge tile at the join line before separating the tiled roof structure.
- Tiling the pitched roof structure may include laying ridge filler units at the ridge, and the method may include removing a ridge filler unit at the join line before separating the tiled roof structure.
- the ridge filler unit may be removed by sliding the ridge filler unit out from beneath a ridge tile in a sideways direction that is generally parallel to the ridge. In this way, the ridge filler unit may be easily removed from beneath the ridge tile, without the need to remove additional ridge tiles from the tiled roof structure.
- the ridge filler unit may include a slot that opens onto an edge of the ridge filler unit, the slot being co-operable with a lug of a neighbouring ridge filler unit.
- building the pitched roof structure may include building a plurality of sections and separably joining the sections together. Separably joining the sections together may include arranging a linking member between outer rafters of neighbouring sections, and separably joining the outer rafters to the linking member. The outer rafters may be joined to the linking member by means of a tie bar.
- the method may include laying a roof underlay on each separable section, the roof underlay having an overlap portion that extends beyond an outer rafter of the section. In this way, the overlap portions can be overlapped in the finished roof structure to guard against the ingress of water beneath the underlay sections at the join between the roof sections.
- the method may include fixing the overlap portion of the underlay to one or more battens of the section.
- the invention extends further to a method of erecting a tiled pitched roof on the walls of a building, the method including making a plurality of pre-tiled pitched roof sections according to the method above, transporting the plurality of pre-tiled pitched roof sections to a building site and arranging the plurality of pre-tiled pitched roof sections on the walls of a building.
- the method may include joining the plurality of pre-tiled pitched roof sections together along one or more join lines that are generally parallel to rafters of the pitched roof. In this way, the separable sections can be joined together particularly easily.
- the method may include inserting at least one junction tile into at least one course of tiles over the or each join line and fixing the junction tile to the tiled pitched roof.
- the method may include inserting at least one junction tile into each course of tiles over the or each join line.
- the method may include inserting the or each junction tile into each course of tiles one-course-at-a-time, moving from a course of tiles at an eave of the tiled pitched roof to a course of tiles at a ridge of the tiled pitched roof.
- the method may include adjusting a tile adjacent to the or each junction tile before inserting the respective junction tile into the course of tiles.
- the method may include loosening the tile adjacent to the or each junction tile sufficiently to facilitate insertion of the or each junction tile into the course of tiles.
- the method may include fixing a ridge tile over the or each join line at a ridge of the roof.
- the method may include fitting a ridge filler unit at the or each join line.
- the ridge filler unit may be fitted by sliding the ridge filler unit beneath a ridge tile in a sideways direction generally parallel to the ridge. In this way, the ridge filler unit may be fitted without the need to remove the ridge tile.
- the ridge filler unit may include a slot that opens onto an edge of the ridge filler unit, the slot being co-operable with a lug of a neighbouring ridge filler unit.
- Joining the pre-tiled pitched roof sections together may include arranging a linking member between outer rafters of neighbouring pre-tiled pitched roof sections, and joining the outer rafters to the linking member.
- the pre-tiled pitched roof sections may be joined to the linking member by means of a tie bar.
- Each pre-tiled pitched roof section may include a roof underlay, the roof underlay having an overlap portion that extends beyond an outer rafter of that section, and the method may including overlapping the overlap portions of neighbouring pre-tiled pitched roof sections. Overlapping the overlap portions of the underlay in this way guards against the ingress of water beneath the underlay at the join between the roof sections.
- the method may include adhering the overlap portions together.
- Each overlap portion may initially be removably fixed to a batten of its respective pre-tiled pitched roof section, and the method may include removing each overlap portion from its respective batten before overlapping the overlap portions.
- FIG. 1 a illustrates a pitched roof structure 10 a pitched roof that lies beneath and supports tiles.
- the pitched roof structure 10 is therefore a sub-tile pitched roof structure that will hereafter be referred to for convenience simply as the roof structure 10.
- the roof structure 10 includes a plurality of rafters 12 extending from the ridge 16 of the roof structure 10 to its eave 18, and a plurality of battens 14 extending orthogonally with respect to the rafters 12.
- the roof structure 10 includes three separable sections or roof modules 20, illustrated in Figure 1 b.
- the roof structure 10 is formed from three roof modules 20: a left roof module 20a, a central roof module 20b and a right roof module 20c.
- the three roof modules 20 are separably joined together along join lines 21 that lie parallel to the rafters 12 (see Figure 1a ).
- the battens 14 extend across to width of a single roof module 20, and are truncated at outer rafters or joining rafters 12a that are provided at the end of each roof module 20. In this way, there is a gap between the neighbouring battens 14 at the join line 21 between the roof modules 20 that exposes ends 15 of the battens 14.
- FIG. 1c illustrates the boundary between two neighbouring roof modules 20 at the join line 21.
- Each roof module 20 includes at least one outermost joining rafter 12a that borders the join line 21 and faces an opposed joining rafter 12a of the neighbouring roof module 20.
- the left roof module 20a has a single joining rafter 12a at its right-most side
- the right roof module 20c has a single joining rafter 12a at its left-most side
- the centre roof module 20b has two joining rafters 12a, one at each of its left and right sides.
- a linking member in the form of a beam 13 is disposed in face-to-face relation between the joining rafters 12a of the neighbouring modules 20.
- the linking beam 13 is removably fixed to the two joining rafters 12a by a tie bar 24 that extends through the joining rafters 12a and the linking beam 13 sandwiched between them.
- the tie bar 24 can be removed when required to separate the modules 20.
- a roof underlay 26 is disposed between the rafters 12 and the battens 14 of each section.
- the roof underlay 26 extends across the roof module 20, and also extends beyond the joining rafter 12a to provide an overlap portion 28.
- the overlap portion 28 of each roof module 20 is tacked to the ends 15 of the battens 14, so that the overlap section 28 lies clear of the join line, 21 ready for later separation of the roof modules 20.
- Figure 1c also shows how the overlap portions 28 may be released from the battens 14 to lie in overlapping relation over the linking beam 13 between the joining rafters, 12a whereupon a peel-to-stick butyl rubber strip 30 provided on the underside 32 of an upper overlap portion 28 seals against the upper side 34 of a lower overlap portion 28.
- the roof structure 10 described is assembled at an off-site location such as a factory by joining together the three roof modules 20.
- the roof modules 20 are joined by sandwiching the linking beam 13 between the joining rafters 12a and fitting the tie bar 24 to secure the join.
- the overlap portions 28 remain tacked to the ends 15 of the battens 14.
- the roof structure 10 is then fully tiled and finished in the off-site location, as illustrated in Figure 2 .
- tiles 34 are fixed to the battens 14 in courses 35 using fixings such as a steel screw.
- the tiles 34 are fixed to the battens 14 one course 35 at a time, moving from the eave 18 to the ridge 16.
- First the eaves course 35a is laid, then the course 35b above the eaves course 35a is laid, and so on until the uppermost course 35c has been laid at the ridge line.
- junction tile 36 is laid over each join line 21.
- These junction tiles 36 differ from the remaining roof tiles 34 in that they either remain unfixed to the batten 14 below, or are removably fixed to the batten 14. The junction tiles 36 can therefore be easily removed, as will be explained.
- ridge 16 is finished.
- Ridge filler units 40 (not visible in Figure 2 , but visible in Figure 9b ) are laid above the uppermost course 35c of tiles 34, and ridge tiles 38 are laid over the ridge filler units 40 to complete the ridge 16. Additional finishings such as fascia boards, guttering etc. (not shown) may also be fitted at this stage.
- the junction tiles 36 and ridge tile 38 are removed from the join line 21 between the roof modules 20 to allow the separable pre-tiled roof structure 50 to be separated into three pre-tiled roof sections or modules 60, shown in Figure 4 .
- the pre-tiled roof structure 50 is separated by removing the tie bars 24 and linking beams 13 at each join line 21 (see Figure 1b ), which are then stored for later re-use.
- the pre-tiled roof modules 60 are transported to a building site where, as shown in Figures 5 and 6 , they are arranged one-at-a-time on the walls 62 of a building 64. Once in place, the pre-tiled roof modules 60 are re-joined. To re-join the pre-tiled roof modules 60, the linking beam 13 is sandwiched between the joining rafters 12a of adjacent modules 50 and the tie bar 24 is arranged through the linking beam 13 and the two joining rafters 12a to secure the pre-tiled roof modules 60 (see Figure 1c ).
- the overlap portions 28 of the roof underlay 26 are un-tacked from the end 15 of each batten 14, and the overlap portions 28 are arranged one-on-top-of-another to cover the join line 21, secured in place by the peel-to-stick butyl strip 30.
- junction tiles 36 and ridge tiles 38 are replaced at the join line 21 as shown in Figure 7 .
- the erection of the tiled pitched roof is complete, and the building 64 has a finished, tiled pitched roof 70, shown in Figure 8 .
- the invention therefore provides a pre-tiled roof structure 50 that can be separated into pre-tiled roof modules 60 that are small enough to be transported from on off-site location such as a factory to an on-site location such as a building site, for re-assembly on the walls 62 of a building 64.
- the on-site time needed to erect the tiled pitched roof 70 is greatly reduced compared to assembling an entire roof structure on the building 64 from scratch, because on-site tile-laying process is limited to only a small number of junction tiles 36 at the join line 21.
- the underlying roof structure 10 is tiled in its entirety at an off-site location before it is separated into the three pre-tiled roof modules 60, the tiles 34 are already in alignment with one another across the join lines 21 between neighbouring pre-tiled roof modules 60.
- the pre-tiled roof modules 60 are arranged on the walls 62 of the building 64 there is no risk of mis-alignment of the tiles 34 across the join lines 21, and hence no need for any adjustment or cutting of the junction tiles 36. Quality is therefore maintained, weather conditions are less of a limitation and the services of a skilled tiler can be dispensed with altogether, or at least minimised.
- the tiles 34, 36 are double-cambered plain tiles of the sort illustrated in the Applicant's UK registered design number 2089250, although it will be appreciated that any suitable tiles may be used.
- join line 21 is first identified. Tiles that lie on the join line 21 are junction tiles 36 that will be removed.
- the ridge tile 38 that lies on the join line 21 is removed by unscrewing the ridge tile 38 from the ridge timber 39.
- a left ridge filler unit 40a is then removed from beneath the left-hand adjacent ridge tile 38a and, as shown in Figure 9c , a right ridge filler unit 40b is removed from beneath the right-hand adjacent ridge tile 38b, as shown in Figure 9c .
- the ridge filler units 40a, 40b are removed by sliding in a sideways direction that is generally parallel to the ridge 16.
- the ridge filler units 40a, 40b are specially adapted to permit removal by this sliding movement, as will be later described.
- junction tile 36 is then removed from the join line 21, as shown in Figure 9d .
- Each junction tile 36 is removed, working down the join line 21, until all the junction tiles 36 have been removed, as shown in Figure 9e .
- the roof structure 50 can now be separated into the pre-tiled roof modules 60, which are transported to the building site, and re-joined on the walls 62 of a building 64 as has already been described.
- the junction tile 36 of the eaves course 35a of tiles 34 is firstly slid into place over the join line 21 and is fixed to the underlying batten 14 with a steel screw.
- a tile clip 42 is placed on the exposed end of the tile 34 to the right of the join line 21 in the course 35b above the eaves course 35a.
- An adjacent tile 37 that lies to the left of the join line 21 is loosened by loosening the screw 37a or other fixing that attaches the adjacent tile 37 to the underlying rafter 14, as shown in Figure 10c .
- the loosened adjacent tile 37 can be adjusted to permit insertion of a junction tile 36 into that course 35b of tiles 34.
- the junction tile 36 is then fixed to the rafter 14 with a screw and the adjacent tile 37 is re-secured to the batten 14 by tightening the fixing.
- the replacement of the junction tiles 36 then continues in the same manner for each course 35 of tiles 34 in turn moving upwardly from the eave (not visible in Figure 10d ) to the ridge 16, by applying the tile clip 42 to the tile 24 to the right of the join line 21, loosening the adjacent tile 37 to the left of the join line 21, sliding in the junction tile 36 and fixing the junction tile to the batten 14 below, and finally re-securing the adjacent tile 37 to the batten 14.
- the ridge 16 can be finished.
- the left ridge filler unit 40a is firstly slid into place under the ridge tile 38a to the left of the join line 21.
- the right ridge filler unit 40b is slid into place under the ridge tile 38b to the right of the join line 21.
- the ridge filler units 40a, 40b are slid beneath the ridge tiles 38a, 38b in a sideways direction that is generally parallel to the ridge 16.
- ridge-to-ridge seals 44 are then placed against exposed ends of the ridge tiles 38.
- the missing ridge tile 38 is fitted in place over the join line 21 and secured to the ridge timber 39 (see Figure 10g ). The process is repeated for any additional join lines 21 to give the finished pitched roof 70 on the walls 62 of the building 64, shown in Figure 10i .
- the ridge filler units 40a, 40b in the region of the join line 21 are specially adapted so as to permit easy reinsertion of the ridge filler units 40a, 40b beneath the ridge tiles 38, as will now be explained with reference to Figures 11 and 12 .
- Figure 11 illustrates a conventional ridge filler unit 140, which is an elongate strip of plastic material.
- a left side 146 of the ridge filler unit 140 includes an elongate aperture 147.
- a right side 148 of the ridge filler unit includes lugs (not visible) on the undersurface of the ridge filler unit 140. The lugs are co-operable with the aperture 147 of a neighbouring ridge filler unit 140.
- the right side 148 of a first ridge filler unit 140 is lapped over the left side 148 of a neighbouring ridge filler unit 140 with the lugs and the aperture 147 aligned.
- the right side 148 of the first ridge filler unit 140 is then pushed downwardly so that the lugs are locked into the aperture 147 with a push-fit.
- the right side 148 of the ridge filler unit must be pulled upwardly, away from the left side 146 of the neighbouring ridge filler unit 140, so as to pull the lugs out of engagement with the aperture 147.
- Figure 12 illustrates the adapted ridge filler unit 40, which is also visible in Figures 10e and 10f .
- the adapted ridge filler unit 40 differs from the conventional ridge filler unit 40 in that at the left side 46 of the ridge filler unit 40 the aperture is replaced with an elongate slot 47 that opens onto the left edge 46a of the ridge filler unit 40.
- the provision of a slot 47 rather than an aperture allows the left side 46 of the ridge filler unit 40 to be slid under the right side 48 of a neighbouring ridge filler unit 40 such that the lugs can be slid into and out of the slot 47.
- the left side 46 of the ridge filler unit 40 can simply be slid out from beneath the right side 48 of a neighbouring ridge filler unit 40, moving the slot 47 out of engagement with the lugs.
- the left side 46 of the ridge filler unit 40 can simply be slid back beneath the right side 48 of the neighbouring ridge filler unit 40, thereby sliding the slot 47 back into engagement with the lugs.
- the arrangement of the lugs and the slot may be reversed, such that the lugs are arranged on the right side of the ridge filler unit and the slot is arranged on the left side of the ridge filler unit.
- roof structure is made of three separable sections or roof modules, it will be appreciated that the roof structure may be made of any suitable number of sections, which may be of any suitable size or shape.
- the linking beam may be omitted, and the joining rafters may be joined together directly.
- the joining rafters, and linking beam if used, need not be joined together by means of a tie bar, but may be joined together by any suitable joining means.
- a plurality of tie bars or other joining means may be used.
- the overlapping portions of the roof underlay may be tacked to the rafters by any suitable means, and may be
- a single junction tile is removed from each course of tiles over the join line.
- the adjacent tiles to the left side of the join line are loosened to facilitate reinsertion of the junction tiles.
- adjacent tiles to the right side of the join line may be loosened instead of, or in addition to, the adjacent tiles to the left side of the join line.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Working Measures On Existing Buildindgs (AREA)
Claims (15)
- Verfahren zum Herstellen mehrerer vorgedeckter Schrägdachabschnitte (60) zum Anordnen auf den Mauern eines Gebäudes, wobei das Verfahren das Bauen einer Schrägdachstruktur (10) mit mehreren trennbaren Abschnitten (20), das Decken der Schrägdachstruktur (10) in Reihen und das Trennen der gedeckten Schrägdachstruktur (50) in mehrere getrennte vorgedeckte Dachabschnitte (60) enthält.
- Verfahren nach Anspruch 1, wobei die mehreren trennbaren Abschnitte (20) entlang einer oder mehrerer Verbindungslinien (21) trennbar sind, die im Allgemeinen parallel zu einem Gespärre (14) der Schrägdachstruktur sind.
- Verfahren nach Anspruch 2, wobei das Decken das Anordnen von Verbindungsziegeln (36) über der Verbindungslinie (21) enthält, wobei die Verbindungsziegel (36) von der Schrägdachstruktur (10) entfernbar sind, und wobei das Verfahren das Entfernen der Verbindungsziegel (36) von der gedeckten Dachstruktur (50) vor dem Trennen der gedeckten Dachstruktur (50) enthält.
- Verfahren nach Anspruch 3, wobei das Decken das Legen von Dachfirstfülleinheiten (40) am Dachfirst (16) enthält, und wobei das Verfahren das Entfernen eines Dachfirstziegels (38) und einer Dachfirstfülleinheit (40) an der Verbindungslinie (21) vor dem Trennen der gedeckten Dachstruktur enthält.
- Verfahren nach einem der vorhergehenden Ansprüche, wobei das Bauen der Schrägdachstruktur (10) das Bauen mehrerer Abschnitte (20) und das trennbare Verbinden der Abschnitte (20) miteinander enthält.
- Verfahren nach Anspruch 5, wobei das trennbare Verbinden der Abschnitte (20) miteinander das Anordnen eines Kopplungselements (15) zwischen einem äußeren Gespärre (14) von benachbarten Abschnitten (20) und das trennbare Verbinden des äußeren Gespärres (14) mit dem Kopplungselement (15), optional durch einen Verbindungsbolzen (24), enthält.
- Verfahren nach Anspruch 5 oder 6, wobei das Verfahren das Legen einer Unterdachfolie (26) auf jeden trennbaren Abschnitt (20) enthält, wobei die Unterdachfolie (26) einen Überlappungsteil (28) aufweist, der sich über ein äußeres Gespärre (14) des Abschnitts (20) hinaus erstreckt.
- Verfahren zum Aufrichten eines gedeckten Schrägdachs (50) auf den Mauern eines Gebäudes, wobei das Verfahren das Herstellen mehrerer vorgedeckter Schrägdachabschnitte (60) gemäß dem Verfahren nach Anspruch 1 bis 7, das Transportieren der mehreren vorgedeckten Schrägdachabschnitte (60) zu einer Baustelle und das Anordnen der mehreren vorgedeckten Schrägdachabschnitte (60) auf den Mauern (62) eines Gebäudes (64) enthält.
- Verfahren nach Anspruch 8, wobei das Verfahren das Verbinden der mehreren vorgedeckten Schrägdachabschnitte (60) entlang einer oder mehrerer Verbindungslinien (21), die im Allgemeinen parallel zum Gespärre (14) des Schrägdachs sind, enthält.
- Verfahren nach Anspruch 9, das das Einfügen wenigstens eines Verbindungsziegels (36) in wenigstens eine Reihe von Ziegeln (34) über die oder jede Verbindungslinie (21) und das Befestigen des Verbindungsziegels (36) an das gedeckte Schrägdach (60) enthält.
- Verfahren nach Anspruch 10, das das Ausrichten eines Ziegels (34) neben dem oder jedem Verbindungsziegel (36) vor dem Einfügen des entsprechenden Verbindungsziegels (36) in die Reihe von Ziegeln (34) durch das ausreichende Lösen des Ziegels (34) neben dem oder jedem Verbindungsziegel (36) enthält, um das Einfügen des oder jedes Verbindungsziegels (36) in die Reihe von Ziegeln (34) zu ermöglichen.
- Verfahren nach Anspruch 10 oder 11, wobei das Verfahren enthält: Befestigen eines Dachfirstziegels (38) über die oder jede Verbindungslinie (21) an einem Dachfirst (16) des Dachs; und Anbringen einer Dachfirstfülleinheit (40) an der oder jeder Verbindungslinie (21).
- Verfahren nach einem der Ansprüche 9 bis 12, wobei das Verbinden der vorgedeckten Schrägdachabschnitte (50) das Anordnen eines Kopplungselements (15) zwischen einem äußeren Gespärre (14) von benachbarten vorgedeckten Schrägdachabschnitten (50) und das Verbinden des äußeren Gespärres (14) mit dem Kopplungselement (15) enthält, wobei das Verfahren optional das Verbinden der vorgedeckten Schrägdachabschnitte (50) mit dem Kopplungselement (15) durch einen Verbindungsbolzen (24) enthält.
- Verfahren nach einem der Ansprüche 9 bis 13, wobei jeder vorgedeckte Schrägdachabschnitt (50) eine Unterdachfolie (26) enthält, wobei die Unterdachfolie (26) einen Überlappungsteil (28) aufweist, der sich über ein äußeres Gespärre (14) dieses Abschnitts (50) hinaus erstreckt und ein Überlappen der Überlappungsteile (28) von benachbarten vorgedeckten Schrägdachabschnitten (50) enthält.
- Verfahren nach Anspruch 14, wobei jeder Überlappungsteil (28) anfänglich entfernbar an eine Dachlatte (14) seines entsprechenden vorgedeckten Schrägdachabschnitts (50) befestigt ist und wobei das Verfahren das Entfernen jedes Überlappungsteils (28) von seiner entsprechenden Dachlatte (14) vor dem Überlappen der Überlappungsteile (28) enthält.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL13814200T PL2923007T3 (pl) | 2012-11-26 | 2013-11-26 | Dachy dwuspadowe |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GBGB1221237.9A GB201221237D0 (en) | 2012-11-26 | 2012-11-26 | Pitched roof structure |
GBGB1310959.0A GB201310959D0 (en) | 2013-06-19 | 2013-06-19 | Pitched roof structure |
PCT/GB2013/053127 WO2014080234A1 (en) | 2012-11-26 | 2013-11-26 | Tiled pitched roofs |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2923007A1 EP2923007A1 (de) | 2015-09-30 |
EP2923007B1 true EP2923007B1 (de) | 2018-03-21 |
Family
ID=49883133
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP13814200.5A Active EP2923007B1 (de) | 2012-11-26 | 2013-11-26 | Modulare geneigte dächer |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP2923007B1 (de) |
DK (1) | DK2923007T3 (de) |
ES (1) | ES2674074T3 (de) |
GB (1) | GB2508304C (de) |
PL (1) | PL2923007T3 (de) |
WO (1) | WO2014080234A1 (de) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104805905A (zh) * | 2015-05-06 | 2015-07-29 | 冯菊英 | 一种建筑结构、建筑及暖房 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5092099A (en) * | 1987-09-08 | 1992-03-03 | Valente Daniel J | Modular roof system |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1482182A (fr) * | 1966-04-14 | 1967-05-26 | Applic Ind Des Resines De Synt | Toiture monobloc préfabriquée constituée d'éléments interchangeables assemblés |
US4207714A (en) * | 1978-12-22 | 1980-06-17 | Mehls William L | Building construction |
GB2123050B (en) * | 1982-06-25 | 1986-01-29 | Marley Roof Tile | Roof ridge capping system |
GB2257170B (en) * | 1991-06-28 | 1995-01-11 | Omar Homes Limited | Improvements in or relating to buildings and roofs therefore |
DE29718740U1 (de) * | 1997-10-07 | 1998-01-02 | Erlus Baustoffwerke AG, 84088 Neufahrn | Dachelement zur Herstellung eines Hausdachs |
DE10227564A1 (de) * | 2002-06-20 | 2004-01-08 | Rieter-Werke Gmbh | Dachziegelanordnung und Verfahren zum Eindecken vorgefertigter Dachpaneele |
ES2389417B1 (es) * | 2010-11-30 | 2013-09-13 | Cupa Innovacion Slu | Cubierta para tejados y fachadas. |
-
2013
- 2013-11-26 EP EP13814200.5A patent/EP2923007B1/de active Active
- 2013-11-26 ES ES13814200.5T patent/ES2674074T3/es active Active
- 2013-11-26 WO PCT/GB2013/053127 patent/WO2014080234A1/en active Application Filing
- 2013-11-26 DK DK13814200.5T patent/DK2923007T3/en active
- 2013-11-26 PL PL13814200T patent/PL2923007T3/pl unknown
- 2013-11-26 GB GB1320844.2A patent/GB2508304C/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5092099A (en) * | 1987-09-08 | 1992-03-03 | Valente Daniel J | Modular roof system |
Also Published As
Publication number | Publication date |
---|---|
GB2508304B (en) | 2014-10-22 |
GB2508304A8 (en) | 2015-07-08 |
GB201320844D0 (en) | 2014-01-08 |
PL2923007T3 (pl) | 2018-08-31 |
WO2014080234A1 (en) | 2014-05-30 |
GB2508304B8 (en) | 2015-07-08 |
EP2923007A1 (de) | 2015-09-30 |
ES2674074T3 (es) | 2018-06-27 |
GB2508304C (en) | 2021-06-23 |
GB2508304A (en) | 2014-05-28 |
DK2923007T3 (en) | 2018-06-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8424256B2 (en) | Asphalt roof integrated photovoltaic | |
US8991116B2 (en) | Roof solar panel for conventional sloping roof and shingle integration | |
US8371083B2 (en) | Retrofit roof assembly | |
US8256185B2 (en) | Pre-assembled shingle set and installation system | |
US10829936B2 (en) | Hip and ridge shingle | |
US20140174015A1 (en) | Siding and roofing panels and method for mounting same | |
EP3406818B1 (de) | Dachgaubenanordnung | |
US20150129016A1 (en) | Modular roof solar panel for conventional roof and roofing integration | |
EP2923007B1 (de) | Modulare geneigte dächer | |
EP2872709B1 (de) | Schrägdachstrukturen sowie verfahren zu ihrer montage und konstruktion | |
US20040172901A1 (en) | Insulated weather-resistant interlocking roof system and method | |
GB2480994A (en) | Timber I-beams and panels in attic roof structures | |
EP2146159B1 (de) | Verfahren zur Herstellung einer Solarpaneelanordnung auf einer geneigten Dachbasis | |
DE29718740U1 (de) | Dachelement zur Herstellung eines Hausdachs | |
AU2019204459B2 (en) | A Roof | |
NZ207021A (en) | Ribbed roof tile with top ridge and bottom lip | |
JP6823904B2 (ja) | 折板屋根材を用いた緩勾配屋根の施工方法 | |
GB2400868A (en) | Trapezially ridged roofing sheet supporting insulation | |
EP2305912A1 (de) | Schindelabdeckung für Dächer und Fassaden | |
JP6632032B2 (ja) | 屋根瓦の固定構造及び屋根瓦の固定方法 | |
EP2294341A2 (de) | Traganordnung für eine solaranlage | |
US20210381233A1 (en) | Roof panel, roof structure, and roof structure construction method | |
CA2832861C (en) | Modular roof solar panel for conventional sloping roof and roofing integration | |
EP3438367A1 (de) | Isolierungslamellenstruktur mit gespaltenen lamellen und verfahren zur installation davon | |
NO830395L (no) | Underlagselement til bruk ved tekking av skraatak med takstein. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20150622 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAX | Request for extension of the european patent (deleted) | ||
17Q | First examination report despatched |
Effective date: 20160523 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: TLCUK LIMITED |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: MODUGROUP LIMITED |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20170418 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTC | Intention to grant announced (deleted) | ||
INTG | Intention to grant announced |
Effective date: 20171004 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
GRAL | Information related to payment of fee for publishing/printing deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR3 |
|
GRAR | Information related to intention to grant a patent recorded |
Free format text: ORIGINAL CODE: EPIDOSNIGR71 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
INTC | Intention to grant announced (deleted) | ||
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
INTG | Intention to grant announced |
Effective date: 20180214 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 981259 Country of ref document: AT Kind code of ref document: T Effective date: 20180415 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602013034800 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20180621 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2674074 Country of ref document: ES Kind code of ref document: T3 Effective date: 20180627 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 981259 Country of ref document: AT Kind code of ref document: T Effective date: 20180321 |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20180321 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180621 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180622 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180723 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20181129 Year of fee payment: 6 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602013034800 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PT Payment date: 20181204 Year of fee payment: 6 Ref country code: FI Payment date: 20181130 Year of fee payment: 6 Ref country code: NO Payment date: 20181203 Year of fee payment: 6 |
|
26N | No opposition filed |
Effective date: 20190102 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20181205 Year of fee payment: 6 Ref country code: IT Payment date: 20181129 Year of fee payment: 6 Ref country code: BE Payment date: 20181129 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181126 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181126 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PCAR Free format text: NEW ADDRESS: ROUTE DU COUTSET 18, 1485 NUVILLY (CH) |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 |
|
REG | Reference to a national code |
Ref country code: FI Ref legal event code: MAE |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: EBP Effective date: 20191130 Ref country code: NO Ref legal event code: MMEP |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180321 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20131126 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20191201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191130 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191130 Ref country code: NO Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191130 Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191126 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20191130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191130 Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191126 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191130 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20210601 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191127 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20231129 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20231123 Year of fee payment: 11 Ref country code: IE Payment date: 20231130 Year of fee payment: 11 Ref country code: FR Payment date: 20231127 Year of fee payment: 11 Ref country code: DE Payment date: 20231129 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20231122 Year of fee payment: 11 |