EP2796819A2 - Method and apparatus for the liquefaction of natural gas - Google Patents
Method and apparatus for the liquefaction of natural gas Download PDFInfo
- Publication number
- EP2796819A2 EP2796819A2 EP14165010.1A EP14165010A EP2796819A2 EP 2796819 A2 EP2796819 A2 EP 2796819A2 EP 14165010 A EP14165010 A EP 14165010A EP 2796819 A2 EP2796819 A2 EP 2796819A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- gas
- heat exchange
- bar
- natural gas
- stage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 title claims abstract description 178
- 239000003345 natural gas Substances 0.000 title claims abstract description 88
- 238000000034 method Methods 0.000 title claims abstract description 41
- 239000007789 gas Substances 0.000 claims abstract description 106
- 238000007906 compression Methods 0.000 claims abstract description 26
- 230000006835 compression Effects 0.000 claims abstract description 25
- 238000003860 storage Methods 0.000 claims abstract description 9
- 239000012535 impurity Substances 0.000 claims abstract description 8
- 230000008929 regeneration Effects 0.000 claims abstract description 7
- 238000011069 regeneration method Methods 0.000 claims abstract description 7
- 238000001816 cooling Methods 0.000 claims description 20
- 230000008569 process Effects 0.000 claims description 15
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 claims description 10
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 claims description 8
- 229910002092 carbon dioxide Inorganic materials 0.000 claims description 5
- 239000001569 carbon dioxide Substances 0.000 claims description 5
- 229910052757 nitrogen Inorganic materials 0.000 claims description 4
- 239000003949 liquefied natural gas Substances 0.000 description 27
- ATUOYWHBWRKTHZ-UHFFFAOYSA-N Propane Chemical compound CCC ATUOYWHBWRKTHZ-UHFFFAOYSA-N 0.000 description 14
- 239000000446 fuel Substances 0.000 description 10
- 239000007788 liquid Substances 0.000 description 9
- 238000004519 manufacturing process Methods 0.000 description 7
- 239000001294 propane Substances 0.000 description 7
- 239000003507 refrigerant Substances 0.000 description 5
- 238000002485 combustion reaction Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- OTMSDBZUPAUEDD-UHFFFAOYSA-N Ethane Chemical compound CC OTMSDBZUPAUEDD-UHFFFAOYSA-N 0.000 description 2
- 230000018109 developmental process Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000005057 refrigeration Methods 0.000 description 2
- 241001465754 Metazoa Species 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000001704 evaporation Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25J—LIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
- F25J1/00—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
- F25J1/0002—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the fluid to be liquefied
- F25J1/0022—Hydrocarbons, e.g. natural gas
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25J—LIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
- F25J1/00—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
- F25J1/003—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the kind of cold generation within the liquefaction unit for compensating heat leaks and liquid production
- F25J1/0032—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the kind of cold generation within the liquefaction unit for compensating heat leaks and liquid production using the feed stream itself or separated fractions from it, i.e. "internal refrigeration"
- F25J1/004—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the kind of cold generation within the liquefaction unit for compensating heat leaks and liquid production using the feed stream itself or separated fractions from it, i.e. "internal refrigeration" by flash gas recovery
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25J—LIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
- F25J1/00—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
- F25J1/003—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the kind of cold generation within the liquefaction unit for compensating heat leaks and liquid production
- F25J1/0047—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the kind of cold generation within the liquefaction unit for compensating heat leaks and liquid production using an "external" refrigerant stream in a closed vapor compression cycle
- F25J1/0052—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the kind of cold generation within the liquefaction unit for compensating heat leaks and liquid production using an "external" refrigerant stream in a closed vapor compression cycle by vaporising a liquid refrigerant stream
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25J—LIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
- F25J1/00—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
- F25J1/006—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the refrigerant fluid used
- F25J1/008—Hydrocarbons
- F25J1/0087—Propane; Propylene
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25J—LIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
- F25J1/00—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
- F25J1/02—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
- F25J1/0203—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a single-component refrigerant [SCR] fluid in a closed vapor compression cycle
- F25J1/0208—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a single-component refrigerant [SCR] fluid in a closed vapor compression cycle in combination with an internal quasi-closed refrigeration loop, e.g. with deep flash recycle loop
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25J—LIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
- F25J1/00—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
- F25J1/02—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
- F25J1/0243—Start-up or control of the process; Details of the apparatus used; Details of the refrigerant compression system used
- F25J1/0257—Construction and layout of liquefaction equipments, e.g. valves, machines
- F25J1/0275—Construction and layout of liquefaction equipments, e.g. valves, machines adapted for special use of the liquefaction unit, e.g. portable or transportable devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25J—LIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
- F25J2290/00—Other details not covered by groups F25J2200/00 - F25J2280/00
- F25J2290/70—Processing device is mobile or transportable, e.g. by hand, car, ship, rocket engine etc.
Definitions
- the present invention relates generally to the compression and liquefaction of gases, and more particularly to the partial liquefaction of a gas, such as natural gas, on a small scale by utilizing a combined refrigerant and expansion process.
- Natural gas is a mixture of gases that was formed from fossil remains of plants and animals that are buried deep below the Earth's surface. Natural gas is composed primarily of methane, although it also contains ethane, propane, and traces of other gases. Depending on where it is extracted, it varies between 87%/96% methane with about 1.5% to 5% ethane, and 0.1 % to 1.5% propane.
- Natural gas is a known alternative to combustion fuels such as gasoline and diesel. Much effort has gone into the development of natural gas as an alternative combustion fuel in order to combat various drawbacks of gasoline and diesel including production costs and the subsequent emissions created by the use thereof. As is known in the art, natural gas is a cleaner burning fuel than other combustion fuels.
- LNG Liquefied Natural Gas
- LNG is natural gas in its liquid form. In order to liquefy natural gas, it must be cooled. As a liquid, natural gas occupies only 1/600th of the volume of natural gas (at atmospheric pressure) in its gaseous form and thereby allows for more economical and practical transportation over great distances. Natural gas is typically transported in liquid state when vast distances, geological or political conditions do not allow for construction of pipelines.
- the cascade cycle consists of a series of heat exchangers with the feed gas; each exchange being at successively lower temperatures until the desired liquefaction is accomplished.
- the levels of refrigeration are obtained with different refrigerants or with the same refrigerant at different evaporating pressures.
- the cascade cycle is considered to be very efficient at producing LNG as operating costs are relatively low.
- An additional problem with large facilities is the cost associated with storing large amounts of fuel in anticipation of future use and/or transportation. Not only is there a cost associated with building large storage facilities, but there is also an efficiency issue related therewith as stored LNG will tend to warm and vaporize over time creating a loss of the LNG fuel product.
- Micro LNG is a natural gas liquefaction plant producing in the range of 50-150 k/tons per year of LNG.
- the biggest difference between traditional large plants, which produce in excess of 1 million tons per year, and Micro LNG is the end user the product is destined for.
- the product is produced for international export, where the plant economy of scale is among the most important factors.
- the distributed production is primarily aimed at local markets, where it is re-gasified and fed as pipeline natural gas or used for local power generation. It includes centrifugal and integrally gear compressors and companders, turbo expander compressors, reciprocating compressors and controllers, which makes this solution very expensive and its adaptability very rigid.
- the present invention is directed to a method and apparatus for the liquefaction of natural gas that overcomes the difficulties and drawbacks of the devices of the prior art.
- the present invention overcomes the deficiencies of the known art and the problems that remain unsolved by providing an easy-to-install and practical method and apparatus for the liquefaction of natural gas with which it is possible to provide a low scale production of LNG at reasonable costs.
- a method for liquefying natural gas comprising:
- a system for cooling a mass of natural gas by expanding the gas through a Joule-Thomson valve. Cooling the mass of natural gas may also include flowing the gas through a heat exchanger.
- a system for cooling a mass of natural gas including the step of collecting the mass of gas already in liquid state and returning the already cooled gas to the circuit so as to use it during the heat exchange steps described above.
- a system for cooling a mass of natural gas to feed the fuel system of a boat, particularly a ferry.
- a method of producing liquid natural gas includes providing a source of unpurified natural gas.
- the present invention is the only Nano LNG station available in the market including a single module combining all the elements needed to produce the transformation of natural gas into LNG.
- the present invention is referred to a method and apparatus for the liquefaction of natural gas that includes an exclusive high pressure LNG liquefaction cycle for small scale production.
- This cycle allows the production at very economical costs of up to 20000 Nm3/day of LNG with a very low operating cost and a significantly lower level investment in comparison with any other known facility available in the market.
- the cycle 100 starts at the inlet 101 of unpurified natural gas.
- This inlet may come from a gas well, an oil well, a natural gas production pipe, or the like. That gas is pretreated at the treatment device 102 to suit it to liquefaction conditions.
- This natural gas contains, at this stage, impurities that need to be removed. Some of these impurities may be carbon dioxide, nitrogen, and other gases. These impurities must be removed to make the gas fit for this cycle.
- the gas Once the gas is purified at 102, it enters into a first high-pressure multi-stage compressor 103. After the stage 103, the gas enters into a heat exchanger 104 after which the mixture of liquid and gaseous natural gas enters a cold box 105 from which the liquefied gas is transferred to a flash liquid/gas separator 106 for its storage 107 and/or transportation 108. Between the cold box and the separator an expansion valve is included to reduce the pressure creating a Joule Thompson effect.
- An independent propane refrigeration cycle 120 including an additional high-pressure multi-stage 109 and a heat exchange stage 110 helps the general cycle 100 to perform the last liquefaction process in the cold box 105.
- the natural gas that still remains in the gaseous state in the cold box 105 is then transferred to a booster compressor 111 and a heat exchanger 112 before it is re-injected into the inlet pipe 122 being mixed with the gas incoming from the treatment plant.
- FIG. 2 shows in more detail the present method 100 for the liquefaction of natural gas.
- the high-pressure multi-stage compressor 103 is shown in this figure as a three-stage process including a first compression stage 201 for compressing the natural gas coming from the inlet pipe 122 at around 10/11 bar to around 30/35 bar.
- a first compression stage 201 for compressing the natural gas coming from the inlet pipe 122 at around 10/11 bar to around 30/35 bar.
- the temperatures rise from around 36 °C to 148 °C; therefore, it is necessary to reduce this temperature drastically for which the gas enters into a first heat exchange stage 202 to cool down the temperature of the gas from 148 °C to 40 °C.
- a second compression stage 203 starts for compressing the natural gas from around 33 bar at the end of the first stage to around 95 bar, and during which the temperatures rise from 40 °C to 149 °C. Therefore, a second heat exchange stage 204 for cooling down the temperature of the gas from 149 °C to 40 °C is performed.
- a third compression process 205 is performed for compressing the natural gas from around 95 bar to around 250 bar, and in which the temperatures rise from 40 °C to 136 °C. Therefore, in a heat exchanger 206, a third heat exchange stage cools down the temperature of the gas from 136 °C to 40 °C.
- the natural gas is at 250 bar and 40 °C. It is then injected into a regeneration cycle 207 that cools down the temperature of the gas from 40 °C to 7 °C keeping the pressure at 250 bar.
- a first main independent heat exchange cycle 208 cools down the temperature of the gas from 7 °C to -47 °C while pressure is kept at 250 bar.
- This independent cycle is fed by a propane cycle 120 that includes a compressor 121, a heat exchanger 122, a second compressor 123 and a second heat exchanger 124 that basically liquefies, expands and vaporizes said propane gas.
- a second main heat exchange cycle 209 cools down the temperature of the gas from -47 °C to -77 °C while pressure is kept at 250 bar.
- This second main heat exchange cycle 209 uses the energy of the returning gas through line 210 as will be explained in detail below.
- part of the mass of the natural gas is already in a liquid state.
- the mix of liquid and gaseous natural gas at -77 °C and 250 bar is expanded in an separator device 211 including an internal thermal expansion valve that reduces the gas pressure from 250 bar to 2 bar.
- This significant drop in the gas pressure also produces a significant drop in the gas temperature because of the Joule-Thomson effect.
- the Joule-Thomson expansion describes the temperature change of a gas when it is forced through a valve while kept insulated so that no heat is exchanged with the environment. This procedure is called a throttling process or Joule-Thomson process.
- this evaporator 211 At the exit of this evaporator 211, around half of the mass of natural gas has been liquefied as it is at -151 °C and 2 bar. It is then collected for further processing (storage of transportation) through a pipe 215. The gaseous portion of the gas at -151 °C and 2 bar is injected through the pipe 210 into the second main heat exchange cycle 209. Because of the temperature difference between the gas returning from pipe 210 (-151 °C) and the gas entering the second main heat exchange cycle 209 at -47 °C, this returning gas helps the heat exchange process. At the exit of said second main heat exchange cycle 209, through pipe 212, said returning gas is at -60 °C and 2 bar.
- this returning gas Before this returning gas can be incorporated in the aspiration pipe 122, it must be compressed, as the entrance gas is already at 11 bar and this returning gas is at 2 bar. Thus, this returning gas at 37°C and 1.9 bar enters a compressor 216 that raises the gas pressure from 2 bar to 11 bar and the temperature rises from 37 °C to 224 °C. Therefore, before injecting it into the inlet pipe 122 is injected into a heat exchanger 217 that cools it down from 224 °C to 40 °C. Through a pipe 218, this returning gas is finally reincorporated in the circuit and the process may start again.
- FIG. 3 shows one example of a transportable and compact plant used to perform the liquefaction method of the present invention.
- the module 300 illustrated in FIG. 3 all the necessary elements are included. Therefore once the inlet gas pipe and the LNG outlet liquid gas are connected the plant is fully operational. Instead of having all the typical complex and expensive means used in the LNG plants of the prior art, this solution provides a flexible, affordable solution for low volumes application.
- FIG. 3 In the general perspective view of FIG. 3 some of the parts can be distinguished, including a compressor 301, three heat exchangers 302, a GNL module 303, the GNL outlet 304, refrigerating funs 305, two vent chimneys 306 and a display control 307.
- FIGS. 4-6 show an internal unit of the module of FIG. 3 .
- the unit includes accumulators 321, a GNL outlet 322, and a propane inlet 323.
- the heat exchangers 325 of the unit 320 are protected by an external isolating cover 324.
- the unit also includes a propane outlet 326 and a natural gas outlet 327.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Thermal Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- General Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Separation By Low-Temperature Treatments (AREA)
Abstract
- taking unpurified natural gas from a gas well (101);
- pre-treating the gas for removing impurities;
- performing a first compression stage (201);
- performing a first heat exchange stage (202);
- performing a second compression stage (203);
- performing a second heat exchange stage (204);
- performing a third compression stage (205);
- performing a third heat exchange stage (206);
- performing an additional regeneration heat exchange stage (207);
- performing a first main independent heat exchange cycle (208);
- performing a second main heat exchange cycle (209);
- passing the gas through a Joule-Thomson valve;
- sending the liquefied gas (215) to storage;
- injecting the portion of the gas remaining in the gaseous state (210) into the second main heat exchange stage (209) and subsequently re-injecting the remaining gas in the gaseous state into the inlet pipe (122) being mixed with the gas incoming from the treatment plant.
Description
- The present invention relates generally to the compression and liquefaction of gases, and more particularly to the partial liquefaction of a gas, such as natural gas, on a small scale by utilizing a combined refrigerant and expansion process.
- Natural gas (NG) is a mixture of gases that was formed from fossil remains of plants and animals that are buried deep below the Earth's surface. Natural gas is composed primarily of methane, although it also contains ethane, propane, and traces of other gases. Depending on where it is extracted, it varies between 87%/96% methane with about 1.5% to 5% ethane, and 0.1 % to 1.5% propane.
- Natural gas is a known alternative to combustion fuels such as gasoline and diesel. Much effort has gone into the development of natural gas as an alternative combustion fuel in order to combat various drawbacks of gasoline and diesel including production costs and the subsequent emissions created by the use thereof. As is known in the art, natural gas is a cleaner burning fuel than other combustion fuels.
- Nowadays, natural gas is among the most important sources of energy in the world. Today approximately 25% of the world's energy demand is derived from natural gas. The majority of natural gas is delivered by pipeline in gaseous form. However, in the past two decades Liquefied Natural Gas (LNG) has gained importance in the world's energy market. LNG is expected to play a growing role in the world's energy supply.
- LNG is natural gas in its liquid form. In order to liquefy natural gas, it must be cooled. As a liquid, natural gas occupies only 1/600th of the volume of natural gas (at atmospheric pressure) in its gaseous form and thereby allows for more economical and practical transportation over great distances. Natural gas is typically transported in liquid state when vast distances, geological or political conditions do not allow for construction of pipelines.
- Conventionally, two of the known basic cycles for the liquefaction of natural gases are referred to as the "cascade cycle" and the "expansion cycle".
- Briefly, the cascade cycle consists of a series of heat exchangers with the feed gas; each exchange being at successively lower temperatures until the desired liquefaction is accomplished. The levels of refrigeration are obtained with different refrigerants or with the same refrigerant at different evaporating pressures. The cascade cycle is considered to be very efficient at producing LNG as operating costs are relatively low.
- However, the efficiency in operation is often seen to be offset by the relatively high investment costs associated with the expensive heat exchange and the compression equipment associated with the refrigerant system. Additionally, a liquefaction plant incorporating such a system may be impractical where physical space is limited, as the physical components used in cascading systems are relatively large.
- During an expansion cycle, gas is conventionally compressed to a selected pressure, cooled, and then allowed to expand through an expansion turbine, thereby producing work as well as reducing the temperature of the feed gas. The low temperature feed gas is then heat exchanged to effect liquefaction of the feed gas. Conventionally, such a cycle has been seen as being impracticable in the liquefaction of natural gas since there is no provision for handling some of the components present in natural gas which freeze at the temperatures encountered in the heat exchangers, for example, water and carbon dioxide.
- Additionally, to make the operation of conventional systems cost effective, such systems are conventionally built on a large scale to handle large volumes of natural gas. As a result, fewer facilities are built making it more difficult to provide the liquefaction plant or facility with the raw gas as well as making distribution of the liquefied product an issue. Another major problem with large scale facilities is the capital and operating expenses associated therewith. For example, a conventional large scale liquefaction plant, i.e., producing on the order of 70,000 gallons of LNG per day, may cost around $15 million, or more, in capital expenses. Also, such a plant may require thousands of horsepower to drive the compressors associated with the refrigerant cycles, making the operation of the plants expensive.
- An additional problem with large facilities is the cost associated with storing large amounts of fuel in anticipation of future use and/or transportation. Not only is there a cost associated with building large storage facilities, but there is also an efficiency issue related therewith as stored LNG will tend to warm and vaporize over time creating a loss of the LNG fuel product.
- Furthermore, safety may become an issue when larger amounts of LNG fuel product are stored. In confronting the foregoing issues, various systems have been devised which attempt to produce LNG or compressed natural gas (CNG) from feed gas on a smaller scale, in an effort to eliminate long term storage issues and to reduce the capital and operating expenses associated with the liquefaction and/or compression of natural gas. However, such systems and techniques have all suffered from one or more drawbacks.
- The above explained reasons entailed the development of small scale plants for producing approximately 1,000 gallons a day of a liquefied or compressed fuel product. Small-scale liquefaction plants are advantageous because their compact size enables the production of LNG close to the location where it will be used. This proximity decreases transportation and LNG product costs for consumers.
- There are some small scale Natural Gas liquefaction plants in the prior art. For example, General Electric Oil & Gas has developed a Micro LNG Integrated Plant called Micro LNG. Micro LNG is a natural gas liquefaction plant producing in the range of 50-150 k/tons per year of LNG. The biggest difference between traditional large plants, which produce in excess of 1 million tons per year, and Micro LNG is the end user the product is destined for. For the large LNG plant, the product is produced for international export, where the plant economy of scale is among the most important factors. In Micro LNG, the distributed production is primarily aimed at local markets, where it is re-gasified and fed as pipeline natural gas or used for local power generation. It includes centrifugal and integrally gear compressors and companders, turbo expander compressors, reciprocating compressors and controllers, which makes this solution very expensive and its adaptability very rigid.
- Based on the above explained challenges and unsuitable solutions, it would be additionally advantageous to provide a plant for the liquefaction of natural gas which is relatively inexpensive to build and operate.
- It would be additionally advantageous to provide such a plant with an easy access of LNG fuel for consumers that is easily transportable and that may be located and operated at existing sources of natural gas, which are within or near populated communities.
- Therefore, the present invention is directed to a method and apparatus for the liquefaction of natural gas that overcomes the difficulties and drawbacks of the devices of the prior art.
- The present invention overcomes the deficiencies of the known art and the problems that remain unsolved by providing an easy-to-install and practical method and apparatus for the liquefaction of natural gas with which it is possible to provide a low scale production of LNG at reasonable costs.
- In a first exemplary embodiment, a method is provided for liquefying natural gas comprising:
- a pre-treating step for removing impurities such as carbon dioxide, nitrogen, etc., from the natural gas flow taken from a source of unpurified natural gas;
- a first compression stage for compressing the natural gas from around 10/11 bar to around 30/35 bar, and in which the temperatures rise from 30/35 °C to 140/150 °C;
- a first heat exchange stage for cooling down the temperature of the gas from 140/150 °C to 40/45 °C;
- a second compression stage for compressing the natural gas from around 30/35 bar to around 90/95 bar, and in which the temperatures rise from 40/45 °C to 140/150 °C;
- a second heat exchange stage for cooling down the temperature of the gas from 140/150 °C to 40/45 °C;
- a third compression stage for compressing the natural gas from around 90/95 bar to around 245/250 bar, and in which the temperatures rise from 40/45 °C to 140/145 °C;
- a third heat exchange stage for cooling down the temperature of the gas from 140/145 °C to 40/45 °C;
- at 250 bar, a new heat exchange stage that is part of a regeneration cycle cools down the temperature of the gas from 40/45 °C to 7/10 °C;
- a first main independent heat exchange cycle cools down the temperature of the gas from 7/10 °C to -40/-45 °C while pressure is kept at 250 bar;
- a second main heat exchange cycle cools down the temperature of the gas from -40/-45 °C to -75/-80 °C while pressure is kept at 250 bar;
- at 250 bar and -75/-80 °C, the gas passes through a Joule-Thomson valve allowing the stream to expand thereby reducing its temperature to -150/-155 °C and reducing its pressure to 2 bar;
- at -150/-155 °C and 2 bar, a portion of the mass of gas is liquefied and sent to storage and the portion of the mass of gas remains in the gaseous state and is injected into the second main heat exchange stage to help in the cooling process described above, increasing its temperature from -150/-155 °C to -60/-65 °C;
- the remaining gas in the gaseous state at -60/-65 °C is injected into the first main heat exchange stage to help in the cooling process described above.
- In accordance with another aspect of the invention, a system is provided for cooling a mass of natural gas by expanding the gas through a Joule-Thomson valve. Cooling the mass of natural gas may also include flowing the gas through a heat exchanger.
- In accordance with another aspect of the invention, a system is provided for cooling a mass of natural gas including the step of collecting the mass of gas already in liquid state and returning the already cooled gas to the circuit so as to use it during the heat exchange steps described above.
- In accordance with another aspect of the invention, a system is provided for cooling a mass of natural gas to feed the fuel system of a boat, particularly a ferry.
- In accordance with another aspect of the invention, a method of producing liquid natural gas is provided. The method includes providing a source of unpurified natural gas.
- In accordance with another aspect of the invention, the present invention is the only Nano LNG station available in the market including a single module combining all the elements needed to produce the transformation of natural gas into LNG.
- The advantages of the present invention may be summarized as:
- Extremely simple to install.
- Fully automatic operation.
- Remote operation via a customized control platform.
- Intrinsically Safe.
- Minimal environmental impact, no noise or vibration.
- Can be installed in height.
- Minimum operating costs.
- Low power consumption.
- Flexible to changes in demand.
- Modular may grow according to the variation of demand.
- Redundant.
- These and other aspects, features, and advantages of the present invention will become more readily apparent from the attached drawings and the detailed description of the preferred embodiments, which follow.
- The preferred embodiments of the invention will hereinafter be described in conjunction with the appended drawings provided to illustrate and not to limit the invention, where like designations denote like elements, and in which:
-
FIG. 1 presents an schematic view of the cycle for refrigerating natural gas in accordance with the present invention; -
FIG. 2 is another schematic view showing in detail the present cycle including one compression cycle and the values of pressure and temperature in the different stages of the cycle. -
FIG. 3 is a general perspective view of one embodiment of a modular and transportable plant for the liquefaction of natural gas in accordance with the present invention. -
FIG. 4 is a right end elevational view of part of the equipment shown inFIG. 3 . -
FIG. 5 is a front elevational view of the unit shown inFIG. 4 , and: -
FIG. 6 is a top plan view. - Like reference numerals refer to like parts throughout the several views of the drawings.
- The following detailed description is merely exemplary in nature and is not intended to limit the described embodiments or the application and uses of the described embodiments. As used herein, the word "exemplary" or "illustrative" means "serving as an example, instance, or illustration." Any implementation described herein as "exemplary" or "illustrative" is not necessarily to be construed as preferred or advantageous over other implementations. All of the implementations described below are exemplary implementations provided to enable persons skilled in the art to make or use the embodiments of the disclosure and are not intended to limit the scope of the disclosure, which is defined by the claims. For purposes of description herein, the terms "upper", "lower", "left", "rear", "right", "front", "vertical", "horizontal", and derivatives thereof shall relate to the invention as oriented in
FIG. 3 . Furthermore, there is no intention to be bound by any expressed or implied theory presented in the preceding technical field, background, brief summary or the following detailed description. It is also to be understood that the specific devices illustrated in the attached drawings, and described in the following specification, are simply exemplary embodiments of the inventive concepts defined in the appended claim. Hence, specific dimensions and other physical characteristics relating to the embodiments disclosed herein are not to be considered as limiting, unless the claims expressly state otherwise. - The present invention is referred to a method and apparatus for the liquefaction of natural gas that includes an exclusive high pressure LNG liquefaction cycle for small scale production. This cycle allows the production at very economical costs of up to 20000 Nm3/day of LNG with a very low operating cost and a significantly lower level investment in comparison with any other known facility available in the market.
- Making first reference to
FIG. 1 , thecycle 100 starts at theinlet 101 of unpurified natural gas. This inlet may come from a gas well, an oil well, a natural gas production pipe, or the like. That gas is pretreated at thetreatment device 102 to suit it to liquefaction conditions. This natural gas contains, at this stage, impurities that need to be removed. Some of these impurities may be carbon dioxide, nitrogen, and other gases. These impurities must be removed to make the gas fit for this cycle. - Once the gas is purified at 102, it enters into a first high-pressure
multi-stage compressor 103. After thestage 103, the gas enters into aheat exchanger 104 after which the mixture of liquid and gaseous natural gas enters acold box 105 from which the liquefied gas is transferred to a flash liquid/gas separator 106 for itsstorage 107 and/ortransportation 108. Between the cold box and the separator an expansion valve is included to reduce the pressure creating a Joule Thompson effect. - An independent
propane refrigeration cycle 120 including an additional high-pressure multi-stage 109 and aheat exchange stage 110 helps thegeneral cycle 100 to perform the last liquefaction process in thecold box 105. - The natural gas that still remains in the gaseous state in the
cold box 105 is then transferred to abooster compressor 111 and aheat exchanger 112 before it is re-injected into theinlet pipe 122 being mixed with the gas incoming from the treatment plant. -
FIG. 2 shows in more detail thepresent method 100 for the liquefaction of natural gas. The high-pressuremulti-stage compressor 103 is shown in this figure as a three-stage process including afirst compression stage 201 for compressing the natural gas coming from theinlet pipe 122 at around 10/11 bar to around 30/35 bar. During this compression stage, the temperatures rise from around 36 °C to 148 °C; therefore, it is necessary to reduce this temperature drastically for which the gas enters into a firstheat exchange stage 202 to cool down the temperature of the gas from 148 °C to 40 °C. - Immediately afterwards, a
second compression stage 203 starts for compressing the natural gas from around 33 bar at the end of the first stage to around 95 bar, and during which the temperatures rise from 40 °C to 149 °C. Therefore, a secondheat exchange stage 204 for cooling down the temperature of the gas from 149 °C to 40 °C is performed. - At the outlet of the second stage, a
third compression process 205 is performed for compressing the natural gas from around 95 bar to around 250 bar, and in which the temperatures rise from 40 °C to 136 °C. Therefore, in aheat exchanger 206, a third heat exchange stage cools down the temperature of the gas from 136 °C to 40 °C. - At the end of this process the natural gas is at 250 bar and 40 °C. It is then injected into a
regeneration cycle 207 that cools down the temperature of the gas from 40 °C to 7 °C keeping the pressure at 250 bar. - A first main independent
heat exchange cycle 208 cools down the temperature of the gas from 7 °C to -47 °C while pressure is kept at 250 bar. This independent cycle is fed by apropane cycle 120 that includes acompressor 121, aheat exchanger 122, asecond compressor 123 and asecond heat exchanger 124 that basically liquefies, expands and vaporizes said propane gas. - At the exit of this first main independent
heat exchange cycle 208, a second mainheat exchange cycle 209 cools down the temperature of the gas from -47 °C to -77 °C while pressure is kept at 250 bar. This second mainheat exchange cycle 209 uses the energy of the returning gas throughline 210 as will be explained in detail below. At this stage, part of the mass of the natural gas is already in a liquid state. The mix of liquid and gaseous natural gas at -77 °C and 250 bar is expanded in anseparator device 211 including an internal thermal expansion valve that reduces the gas pressure from 250 bar to 2 bar. This significant drop in the gas pressure also produces a significant drop in the gas temperature because of the Joule-Thomson effect. The Joule-Thomson expansion describes the temperature change of a gas when it is forced through a valve while kept insulated so that no heat is exchanged with the environment. This procedure is called a throttling process or Joule-Thomson process. - Thus, at the exit of this
evaporator 211, around half of the mass of natural gas has been liquefied as it is at -151 °C and 2 bar. It is then collected for further processing (storage of transportation) through apipe 215. The gaseous portion of the gas at -151 °C and 2 bar is injected through thepipe 210 into the second mainheat exchange cycle 209. Because of the temperature difference between the gas returning from pipe 210 (-151 °C) and the gas entering the second mainheat exchange cycle 209 at -47 °C, this returning gas helps the heat exchange process. At the exit of said second mainheat exchange cycle 209, throughpipe 212, said returning gas is at -60 °C and 2 bar. It is finally injected into the first mainheat exchange cycle 207 throughpipe 213 to help in the heat exchange process of this cycle. As in the previous case, the temperature difference between the returning gas (-60 °C) and the entering gas (40 °C) makes this returning gas an important helping role in the heat exchange cycle. - Before this returning gas can be incorporated in the
aspiration pipe 122, it must be compressed, as the entrance gas is already at 11 bar and this returning gas is at 2 bar. Thus, this returning gas at 37°C and 1.9 bar enters acompressor 216 that raises the gas pressure from 2 bar to 11 bar and the temperature rises from 37 °C to 224 °C. Therefore, before injecting it into theinlet pipe 122 is injected into aheat exchanger 217 that cools it down from 224 °C to 40 °C. Through apipe 218, this returning gas is finally reincorporated in the circuit and the process may start again. -
FIG. 3 shows one example of a transportable and compact plant used to perform the liquefaction method of the present invention. In themodule 300 illustrated inFIG. 3 all the necessary elements are included. Therefore once the inlet gas pipe and the LNG outlet liquid gas are connected the plant is fully operational. Instead of having all the typical complex and expensive means used in the LNG plants of the prior art, this solution provides a flexible, affordable solution for low volumes application. - In the general perspective view of
FIG. 3 some of the parts can be distinguished, including acompressor 301, threeheat exchangers 302, aGNL module 303, theGNL outlet 304, refrigeratingfuns 305, twovent chimneys 306 and adisplay control 307. -
FIGS. 4-6 show an internal unit of the module ofFIG. 3 . The unit includesaccumulators 321, aGNL outlet 322, and apropane inlet 323. Theheat exchangers 325 of theunit 320 are protected by an external isolatingcover 324. The unit also includes apropane outlet 326 and anatural gas outlet 327. - While the preferred embodiments of the invention have been described above, it will be recognized and understood that various modifications can be made in the invention and the appended claims are intended to cover all such modifications which may fall within the spirit and scope of the invention.
Claims (14)
- A method for the liquefaction of natural gas, comprising:taking unpurified natural gas from a gas well;pre-treating the gas for removing impurities;performing a first compression stage;performing a first heat exchange stage;performing a second compression stage;performing a second heat exchange stage;performing a third compression stage;performing a third heat exchange stage;performing an additional regeneration heat exchange stage;performing a first main independent heat exchange cycle;performing a second main heat exchange cycle;passing the gas through a Joule-Thomson valve;sending the liquefied gas to storage;injecting the portion of the gas in the gaseous state into the second main heat exchange stage; and the remaining gas in the gaseous state is injected into the first main heat exchange stage.
- The method for the liquefaction of natural gas in accordance with claim 1, wherein during the pretreatment stage, carbon dioxide and/or nitrogen is removed from the natural gas.
- The method for the liquefaction of natural gas in accordance with claim 1, wherein during the first compression stage the natural gas is compressed from 10/11 bar to around 30/35 bar.
- The method for the liquefaction of natural gas in accordance with claim 1, wherein during the first heat exchange stage the temperature of the gas is reduced from 140/150 °C to 40/45 °C.
- The method for the liquefaction of natural gas in accordance with claim 1, wherein during the second compression stage the natural gas is compressed from around 30/35 bar to around 90/95 bar.
- The method for the liquefaction of natural gas in accordance with claim 1, wherein during the second heat exchange stage the temperature of the gas is reduced from 140/150 °C to 40/45 °C.
- The method for the liquefaction of natural gas in accordance with claim 1, wherein during the third compression stage the natural gas is compressed from around 90/95 bar to around 245/250 bar.
- The method for the liquefaction of natural gas in accordance with claim 1, wherein during the third heat exchange stage the temperature of the gas is reduced from 140/145 °C to 40/45 °C.
- The method for the liquefaction of natural gas in accordance with claim 1, wherein during the additional regeneration heat exchange stage the temperature of the gas is reduced from 40/45 °C to 7/10°C.
- The method for the liquefaction of natural gas in accordance with claim 1, wherein the first main independent heat exchange cycle is an isobaric cycle to reduce the temperature of the gas from 7/10 °C to -40/-45 °C.
- The method for the liquefaction of natural gas in accordance with claim 1, wherein during the second main heat exchange isobaric cycle the temperature of the gas is reduced from -40/-45 °C to -75/-80 °C.
- The method for the liquefaction of natural gas in accordance with claim 1, wherein the gas is passed through a Joule-Thomson valve reducing its temperature to -150/-155 °C and reducing its pressure to 2 bar.
- A method for the liquefaction of natural gas, comprising:taking unpurified natural gas from a gas well;pre-treating the gas for removing impurities;performing a first compression stage for compressing the natural gas from around 10/11 bar to around 30/35 bar (and in which the temperatures rise from 30/35 °C to 140/150 °C);performing a first heat exchange stage for cooling down the temperature of the gas from 140/150 °C to 40/45 °C;performing a second compression stage for compressing the natural gas from around 30/35 bar to around 90/95 bar (and during which the temperatures rise from 40/45 °C to 140/150 °C);performing a second heat exchange stage for cooling down the temperature of the gas from 140/150 °C to 40/45 °C;performing a third compression stage for compressing the natural gas from around 90/95 bar to around 245/250 bar (and during which the temperatures rise from 40/45 °C to 140/145 °C);performing a third heat exchange stage for cooling down the temperature of the gas from 140/145 °C to 40/45 °C;performing an additional regeneration heat exchange stage to cool down the temperature of the gas from 40/45 °C to 7/10 °C;performing a first main independent heat exchange cycle to cool down the temperature of the gas from 7/10 °C to -40/-45 °C while pressure is kept at 250 bar;performing a second main heat exchange cycle to cool down the temperature of the gas from -40/-45 °C to -75/-80 °C while pressure is kept at 250 bar;passing the gas at 250 bar and -75/-80 °C through a Joule-Thomson valve allowing the stream to expand thereby reducing its temperature to -150/-155 °C and reducing its pressure to 2 bar;sending the portion of the gas already liquefied to storage;injecting the portion of the gas in the gaseous state into the second main heat exchange stage (to help in the cooling process described above, increasing its temperature from -150/-155 °C to -60/-65 °C); and the remaining gas in the gaseous state at -60/-65 °C is injected into the first main heat exchange stage to help in the cooling process described above.
- A method for the liquefaction of natural gas, comprising:a pre-treating step for removing impurities such as carbon dioxide, nitrogen, etc., from the natural gas flow taken from a source of unpurified natural gas;a first compression stage for compressing the natural gas from around 11 bar to around 33 bar, and in which the temperatures rise from 36 °C to 148 °C;a first heat exchange stage for cooling down the temperature of the gas from 148 °C to 40 °C;a second compression stage for compressing the natural gas from around 33 bar to around 95 bar, and in which the temperatures rise from 40 °C to 148 °C;a second heat exchange stage for cooling down the temperature of the gas from 149 °C to 40 °C;a third compression stage for compressing the natural gas from around 95 bar to around 250 bar, and in which the temperatures rise from 40 °C to 136 °C;a third heat exchange stage for cooling down the temperature of the gas from 136 °C to 40 °C;at 250 bar, a new heat exchange stage that is part of a regeneration cycle cools down the temperature of the gas from 40 °C to 7 °C;a first main independent heat exchange cycle cools down the temperature of the gas from 7 °C to -47 °C while pressure is kept at 250 bar;a second main heat exchange cycle cools down the temperature of the gas from -47 °C to -77 °C while pressure is kept at 250 bar;at 250 bar and -77 °C, the gas passes through a Joule-Thomson valve allowing the stream to expand thereby reducing its temperature to -151 °C and reducing its pressure to 2 bar;at -151 °C and 2 bar, a portion of the mass of gas is liquefied and sent to storage and the portion of the mass of gas remains in the gaseous state and is injected into the second main heat exchange stage to help in the cooling process described above, increasing its temperature from -151 °C to -60 °C; and the remaining gas in the gaseous state at -60 °C is injected into the first main heat exchange stage to help in the cooling process described above.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/869,485 US20140318178A1 (en) | 2013-04-24 | 2013-04-24 | Method and apparatus for the liquefaction of natural gas |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2796819A2 true EP2796819A2 (en) | 2014-10-29 |
EP2796819A3 EP2796819A3 (en) | 2015-12-16 |
EP2796819B1 EP2796819B1 (en) | 2018-06-06 |
Family
ID=50543449
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP14165010.1A Active EP2796819B1 (en) | 2013-04-24 | 2014-04-16 | Method and apparatus for the liquefaction of natural gas |
Country Status (5)
Country | Link |
---|---|
US (1) | US20140318178A1 (en) |
EP (1) | EP2796819B1 (en) |
AR (1) | AR096064A1 (en) |
ES (1) | ES2675592T3 (en) |
TR (1) | TR201809037T4 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10605522B2 (en) * | 2016-09-01 | 2020-03-31 | Fluor Technologies Corporation | Methods and configurations for LNG liquefaction |
CN110709659B (en) | 2017-03-14 | 2022-03-08 | 伍德赛德能量科技私人有限公司 | Containerized LNG liquefaction unit and related method of producing LNG |
EP4211100A4 (en) * | 2020-09-14 | 2024-02-28 | ConocoPhillips Company | Method and apparatus for creating a small pressure increase in a natural gas stream |
US20220128298A1 (en) * | 2020-10-26 | 2022-04-28 | JTurbo Engineering & Technology, LLC | Methods and Configurations for LNG Liquefaction |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3292382A (en) * | 1964-02-21 | 1966-12-20 | Continental Oil Co | Low temperature separation of h2s from hydrocarbon gas |
US3323315A (en) * | 1964-07-15 | 1967-06-06 | Conch Int Methane Ltd | Gas liquefaction employing an evaporating and gas expansion refrigerant cycles |
US5327730A (en) * | 1993-05-12 | 1994-07-12 | American Gas & Technology, Inc. | Method and apparatus for liquifying natural gas for fuel for vehicles and fuel tank for use therewith |
KR20080097141A (en) * | 2007-04-30 | 2008-11-04 | 대우조선해양 주식회사 | Floating marine structure having in-tank re-condenser and method for treating boil-off gas on the floating marine structure |
CN102084171B (en) * | 2008-04-11 | 2012-10-10 | 氟石科技公司 | Methods and configuration of boil-off gas handling in LNG regasification terminals |
GB2469077A (en) * | 2009-03-31 | 2010-10-06 | Dps Bristol | Process for the offshore liquefaction of a natural gas feed |
RU2596764C2 (en) * | 2011-08-09 | 2016-09-10 | Эксонмобил Апстрим Рисерч Компани | Natural gas liquefaction method |
-
2013
- 2013-04-24 US US13/869,485 patent/US20140318178A1/en not_active Abandoned
-
2014
- 2014-04-16 ES ES14165010.1T patent/ES2675592T3/en active Active
- 2014-04-16 EP EP14165010.1A patent/EP2796819B1/en active Active
- 2014-04-16 TR TR2018/09037T patent/TR201809037T4/en unknown
- 2014-04-23 AR ARP140101680A patent/AR096064A1/en active IP Right Grant
Non-Patent Citations (1)
Title |
---|
None |
Also Published As
Publication number | Publication date |
---|---|
ES2675592T3 (en) | 2018-07-11 |
TR201809037T4 (en) | 2018-07-23 |
US20140318178A1 (en) | 2014-10-30 |
EP2796819A3 (en) | 2015-12-16 |
EP2796819B1 (en) | 2018-06-06 |
AR096064A1 (en) | 2015-12-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2836628C (en) | Process for liquefaction of natural gas | |
US9506690B2 (en) | Process for the production of a subcooled liquefied natural gas stream from a natural gas feed stream, and associated installation | |
JP5410443B2 (en) | Method and system for adjusting the cooling capacity of a cooling system based on a gas expansion process | |
CN104520660B (en) | System and method for natural gas liquefaction | |
CA2775449C (en) | Methods of natural gas liquefaction and natural gas liquefaction plants utilizing multiple and varying gas streams | |
CA2775499C (en) | Complete liquefaction methods and apparatus | |
AU2012324797A1 (en) | Multi nitrogen expansion process for LNG production | |
JP2019526770A (en) | Process for liquefying natural gas and recovering any liquid from natural gas, comprising two semi-open refrigerant cycles using natural gas and one closed refrigerant cycle using gas refrigerant | |
JP2010514871A (en) | Liquefied natural gas production system and method | |
WO2015069138A2 (en) | Natural gas liquefaction method and unit | |
WO2015110779A2 (en) | Lng production process | |
EP2796819B1 (en) | Method and apparatus for the liquefaction of natural gas | |
WO2011049665A1 (en) | Natural gas liquefaction core modules, plants including same and related methods | |
WO2017079711A1 (en) | Systems and methods for lng refrigeration and liquefaction | |
JP2016522378A (en) | Integrated cascade process for vaporization and recovery of residual LNG in floating tank applications | |
EP3479036A1 (en) | System and method for producing liquefied natural gas | |
US11874055B2 (en) | Refrigerant supply to a cooling facility | |
EP3045849A2 (en) | A plant for liquefying methane gas | |
CN104412055B (en) | Control temperature is with the method for liquid gas and the Preparation equipment using the method | |
AU2016250109A1 (en) | Facility and method for producing liquid helium | |
Jones et al. | A new process for improved liquefaction efficiency | |
EP3371535A1 (en) | Systems and methods for lng refrigeration and liquefaction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20140416 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: F25J 1/02 20060101ALI20151110BHEP Ipc: F25J 1/00 20060101AFI20151110BHEP |
|
R17P | Request for examination filed (corrected) |
Effective date: 20161004 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20171018 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20180323 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 1006564 Country of ref document: AT Kind code of ref document: T Effective date: 20180615 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602014026556 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2675592 Country of ref document: ES Kind code of ref document: T3 Effective date: 20180711 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20180606 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180906 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180907 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1006564 Country of ref document: AT Kind code of ref document: T Effective date: 20180606 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181006 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602014026556 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20190307 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190416 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190430 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190416 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181008 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20140416 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FI Payment date: 20210419 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180606 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220416 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: TR Payment date: 20230426 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20240726 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240726 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240722 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20240725 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20240722 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NO Payment date: 20240723 Year of fee payment: 11 Ref country code: IT Payment date: 20240723 Year of fee payment: 11 Ref country code: SE Payment date: 20240722 Year of fee payment: 11 |