EP1169516B1 - Method for renewing railway lines - Google Patents
Method for renewing railway lines Download PDFInfo
- Publication number
- EP1169516B1 EP1169516B1 EP00929352A EP00929352A EP1169516B1 EP 1169516 B1 EP1169516 B1 EP 1169516B1 EP 00929352 A EP00929352 A EP 00929352A EP 00929352 A EP00929352 A EP 00929352A EP 1169516 B1 EP1169516 B1 EP 1169516B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- track
- concrete
- sleepers
- new
- supporting layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/04—Removing the ballast; Machines therefor, whether or not additionally adapted for taking-up ballast
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/005—Making of concrete parts of the track in situ
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/05—Transporting, laying, removing, or renewing both rails and sleepers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B37/00—Making, maintaining, renewing, or taking-up the ballastway or the track, not provided for in a single one of groups E01B27/00 - E01B35/00
Definitions
- the present invention relates to a method for renewing a Track system with a substructure, a bedding, in particular made of gravel, and a track made of rails and sleepers.
- Track systems have to be renewed from time to time because of the ballast bedding is changed by the load.
- the Crushed stones crushed by the load This can cause a deviation occur from the intended track position, without costly conservation measures can lead to a hazard.
- the invention has for its object a method for renewal to specify a track system, through which an advantageously renewing track system by a modern track system with great stability can be replaced.
- the solid roadways produced by the method according to the invention have the advantage of particularly high strength and positional accuracy. Such lanes can therefore be used in particular for high speeds be used.
- the renovation can be carried out in a favorable manner become.
- renewal can be achieved through track-bound work also for track systems that are not accessible from the side. Delivery and removal of the materials can also be advantageous done over track.
- the base layers are installed also track-bound. This step can also be done be carried out advantageously.
- the installation is carried out of the new substructure a dismantling of the existing tracks and a Laying of rails, so that then the installation of the base layers can be done using the training rails.
- Rails can also be installed after the track has been dismantled the solid road with high accuracy.
- a further embodiment of the invention takes place after installation of the new substructure a dismantling of the existing tracks and the installation the base layers using a floor undercarriage, in particular of caterpillars. This eliminates the need to lay Auxiliary rails.
- the set-up takes place and fixing the new track on the asphalt or concrete base course already when building the new track.
- the. altitude the asphalt or concrete base layer at the designated support points the thresholds and the thicknesses of the thresholds in the range of Support points for the rails measured, from the measured values determines the need for height compensation and its size and suitable compensation means attached when laying the track section.
- the height of the Rail measured at the bearing points on the sleepers and during the determination height compensation is also taken into account.
- this measure can also compensate for the height tolerances of the rails and thus the deviations of the altitude of the laid track from the Setpoint can be further reduced.
- the measurement of the Height of the base course and / or the rail height when laying the Track section, especially immediately before placing a Threshold, taking the compensating means before inserting the rail into the Sleepers are attached. This simplifies and improves the determination the bearing point to be measured on the base layer and it section of rail to be measured. By attaching the compensating means before inserting the rail into the sleepers, there will be a loosening the rails from the sleepers to attach the compensating means dispensable.
- the threshold is reduced fixed against shifting. This ensures that the rail remains on the measured section of the base layer and the accuracy achieved by applying the compensating means the altitude remains unchanged.
- the height ratio is preferred when determining the height compensation between the left and right rails of a threshold, the altitude ratio successive thresholds and / or the longitudinal height ratio between two at a given distance, for example five meters of mutually arranged measuring points are taken into account. This can take into account all the usual requirements for positional accuracy be worn.
- the position of the track section in the transverse direction preferably starting from the middle of the sleeper, aligned before fixing. This is advantageously not only the altitude but also the longitudinal direction of the track section and the tolerances are reduced.
- the height and lateral position of the track section can be determined according to an embodiment of the invention by means of applied to the base layer Auxiliary points are made. Likewise, the determination can also be made about Lasers are made from fixed points. Have these methods of determination turned out to be particularly suitable.
- the measured Values, the compensatory measures taken and the final Track position documented. This means that the starting position can be called up at any time was given and with which measures which final result was achieved has been.
- A is preferably used to carry out the method according to the invention
- a trough is completely dispensed with. Instead the track section is supported directly on the lower base layer. After aligning the lateral position of the track section, this is done using fixing elements fixed, which is introduced into the lower base layer and attached to each to be attached to a threshold. In particular, bolts are used for this used.
- the track section is aligned in the case of the invention Procedure by a separate device.
- the support the threshold can, for example, as in the conventional method via spindles that are screwed into appropriate sleeves that are provided in the sleepers by the manufacturer. Because of the absence of the trough and the direct support on the lower one Appropriate spindles and sleeves are required. It can be used to equip all known or new types of sleepers become.
- An advantage of the method according to the invention is that no Trough more is needed. This eliminates the need for producing the trough effort required. It is also particularly advantageous that the Gap between the cast upper base layer and the trough is eliminated, which due to their continuous extension upon ingress of water poses a particular danger.
- the bolts in recesses previously made in the lower base layer can be positioned very precisely with which there is also an exact positioning of the bolts results.
- the necessary displacements of the sleepers relative to the bolts when aligning are relatively small.
- the thresholds in the height slidably attached to the bolt This has the advantage that the sleepers after loosening their support on the lower base layer can follow a shrinkage of the top base material.
- the thresholds after supporting the sleepers on the lower base layer of the Rails released. This prevents shifts, in particular Thermal expansion and contraction of the rails during the Setting of the upper base layer are transferred to the sleepers.
- the bolt in the Attached to the middle of the threshold is halved.
- the invention is under the thresholds one covering several thresholds and in particular with these connected reinforcement provided, which in the upper base layer with is poured.
- the reinforcement is connected to the threshold reinforcement.
- the recesses in the lower base layer introduced as holes. These can advantageously be introduced with particularly high accuracy.
- Another Possibility is the recess as in the longitudinal direction of the road continuously insert slot.
- the alignment takes place the side and / or height of the track section in two or more Steps. This has proven to be particularly advantageous.
- the formwork elements via an upper formwork holder on the rail foot and one lower formwork holder anchored to the reinforcement.
- the bottom one Formwork holder preferably cast in. This can be done with simple A formwork for pouring the upper base layer is attached become.
- the formwork can extend to the lower formwork holder be reused. Basically, it is also possible to get one Formwork trolleys of a conventional type to be used.
- thresholds can be one-piece Sleepers with a vertical slot in the middle of the sleepers or Recordings attached to the side of the sleepers for passage of the bolt can be used for the lateral fixation of the threshold.
- suitable adjusting and fixing means in the slot or the receptacle through which the bolt can be passed and after aligning the track section against side shift relative is fixable to the threshold or vice versa.
- the use of two-part sleepers has the advantage that the length of the joints between the threshold and the cast upper base layer and the weight of the threshold is reduced is.
- the sheet is preferably formed in two parts, with two, one each Half of the passage opening parts. Can over the sheet the threshold in a simple manner on the bolt against lateral displacement be fixed.
- the two-part design has the advantage that the bolt introduced before the threshold is fully aligned laterally can be made by separating the two parts sufficiently far pushed and assembled only after inserting the bolt.
- a lifting device that can preferably be used for the method according to the invention for lifting a track section with rails and on it paved sleepers includes at least one that spans the road Frame on which, in particular, the rails Grippers and lifting devices for lifting the track section are attached.
- the frame is designed to be movable along the road.
- Such a lifting device can be used to set up the track section take place continuously without the need for a large number of lifting devices becomes.
- the lifting device according to the invention is progressing moved forward and for the entire setup process used.
- the frame there are additional means on the frame to align the side and / or height of the track section intended.
- the lifting device can thereby advantageously at the same time be used to align the track section so that a separate device is unnecessary.
- At least three frames are preferably provided, at least of which the first has a floor, in particular crawler, chassis. On in this way, lifting and aligning the Track section can be carried out in several steps. In particular becomes a rough alignment with the first frame, with the second Frame a fine alignment, and with the third or another Frame a fine alignment with final fixation of the sleepers executed.
- each frame on a rail chassis, with all frames via connecting rods are interconnected, which are preferred at the same time Wear supply lines.
- a floor undercarriage is only for the first frame is needed, while the other frames are already on the pre-aligned rails can be moved.
- these frames are based on the running surface of the ground gear, So the lower base layer.
- all frames are open a common ground, especially caterpillar, arranged. This forms a complete device with which the track section can be raised, aligned and fixed.
- the frames Roller tongs for lifting and straightening rollers for aligning the track section that roll on the rails This is a continuous Allows lifting and aligning the track section.
- the frames preferably also have rollable rails Load rollers through which the rails are held down. This has also become the mobile lifting and aligning device turned out to be particularly advantageous.
- the manufacture takes place the trough and / or creating the asphalt or concrete base course and / or building the new track and / or setting up and Fixing the new track using a floor trolley, especially caterpillars. This does not mean laying guide rails required.
- the track is dismantled and / or the track extension track-bound. This in turn has the The advantage that the materials can be easily fed in and out.
- the set-up takes place and fixing the new track to the track. About needed for this Materials can easily be transported again.
- a first Work step all process steps up to dismantling the track, in a second Step of dismantling the track and, if necessary, installing Base layers and in at least one further step the track extension and the production of the solid track.
- a third Work step in a third Work step the production of a concrete trough and in at least one further work of the track extension, the setting up and fixing of the Track and pouring the sleepers in the trough.
- This Procedure has been adopted for the production of a solid roadway with cast Thresholds using the concrete trough were found to be advantageous.
- ballast bed 4 On the right side of the dividing line I in Figure 1 is an old track system shown, with a formed by two rails 1 and sleepers 2 Track 3, which is laid in a ballast bed 4.
- the ballast bed 4 is on a frost protection layer 5 and this in turn on the surface 6 applied.
- frost protection layer 5 In addition to or instead of the frost protection layer 5 a formation protection layer can also be provided.
- track 3 is with rails 1 and sleepers 2 on a concrete or asphalt base layer 7, which is also multi-layered can be hung up and attached to this.
- the concrete or asphalt base course 7 is on a lower base layer 8, in particular one hydraulically bound base layer or an unbound one Base layer applied, which in turn arranged on a frost protection layer 9 is.
- the frost protection layer 9 lies on the substrate 6 and can in turn be replaced or supplemented by a formation protection layer his.
- the new track system can also be formed with a fixed carriageway be in which the sleepers 2 of the track 3 are poured into a concrete layer are.
- the production of the solid is particularly preferred Roadway without using a concrete trough by using the sleepers 2 directly supported on the lower support layer 8 and on this against lateral Moving be fixed before the sleepers 2 are poured into the concrete become.
- FIG. 2 is to renew a track system with ballast bedding
- the ballast bed 4 as with line 10 indicated, removed
- the frost protection layer 5 according to line 11 and / or optionally a formation protection layer.
- the subsurface 6 according to line 12 is removed as far as it is to build the new track system is necessary to the altitude of the Track 3 to maintain or, if desired, a new altitude to reach.
- a new frost protection and / or formation protection layer 9 has been applied, on this a lower base layer 8, in particular a hydraulic one bound base layer, but possibly also an unbound base layer.
- the lower base layer 8 is then on solid roads with track 3 on it, a concrete or asphalt base course 7 applied, which can also be multi-layered. Then it will be the track 3 placed, directed and fixed.
- For solid roadways with cast-in Thresholds 2 are either on the lower base layer 8 Concrete trough applied, in which the track 1 is then pre-built, aligned and is fixed, or the track 3 is directly on the lower base layer 8 pre-built, aligned and fixed. Then the thresholds 2, if necessary using formwork, poured into concrete.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Paper (AREA)
- Magnetic Resonance Imaging Apparatus (AREA)
- Holo Graphy (AREA)
- Control Of Vehicles With Linear Motors And Vehicles That Are Magnetically Levitated (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
Description
Die vorliegende Erfindung betrifft ein Verfahren zur Erneuerung einer Gleisanlage mit einem Unterbau, einer Bettung, insbesondere aus Schotter, und einem darauf verlegten Gleis aus Schienen und Schwellen.The present invention relates to a method for renewing a Track system with a substructure, a bedding, in particular made of gravel, and a track made of rails and sleepers.
Gleisanlagen müssen von Zeit zu Zeit erneuert werden, da die Schotterbettung durch die Belastung verändert wird. Insbesondere werden die Schottersteine durch die Belastung zerkleinert. Dadurch kann ein Abweichen von der vorgesehenen Gleislage auftreten, was ohne kostspielige Erhaltungsmaßnahmen zu einer Gefährdung führen kann.Track systems have to be renewed from time to time because of the ballast bedding is changed by the load. In particular, the Crushed stones crushed by the load. This can cause a deviation occur from the intended track position, without costly conservation measures can lead to a hazard.
Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren zur Erneuerung einer Gleisanlage anzugeben, durch welches in vorteilhafter Weise eine zu erneuernde Gleisanlage durch eine moderne Gleisanlage mit großer Lagestabilität ersetzt werden kann.The invention has for its object a method for renewal to specify a track system, through which an advantageously renewing track system by a modern track system with great stability can be replaced.
Erfindungsgemäß umfaßt das Verfahren die folgenden Schritte:
- gleisgebundenes Ausbauen der vorhandenen Bettung und Ablegen des Gleises auf dem Unterbau,
- erforderlichenfalls gleisgebundenes Ausbauen des vorhandenen Unterbaues bis auf eine für den Bau der neuen Gleisanlage erforderliche Tiefe und Ablegen des Gleises auf den erhaltenen Grund,
- gegebenenfalls gleisgebundenes Einbauen eines Unterbaues für die neue Gleisanlage,
- Einbauen mindestens einer Tragschicht für eine feste Fahrbahn, insbesondere einer ungebundenen oder einer hydraulisch gebundenen Tragschicht,
- Rückbauen des vorhandenen Gleises,
- Herstellen der festen Fahrbahn, insbesondere mit einem auf eine Beton- oder Asphalttragschicht aufgelegten Gleis oder mit einem Gleis mit in eine Betonschicht eingegossenen Schwellen, mit Vorbauen eines neuen Gleises und Richten und Fixieren des neuen Gleises.
- track-bound expansion of the existing bedding and laying the track on the substructure,
- if necessary, track-bound expansion of the existing substructure to a depth required for the construction of the new track system and laying the track on the preserved ground,
- if necessary, track-based installation of a substructure for the new track system,
- Installing at least one base layer for a solid carriageway, in particular an unbound or a hydraulically bound base layer,
- Dismantling the existing track,
- Manufacture of the solid carriageway, in particular with a track laid on a concrete or asphalt base course or with a track with sleepers cast into a concrete layer, with front end of a new track and straightening and fixing the new track.
Die durch das erfindungsgemäße Verfahren hergestellten festen Fahrbahnen haben den Vorteil besonders hoher Festigkeit und Lagegenauigkeit. Derartige Fahrbahnen können daher insbesondere für hohe Geschwindigkeiten eingesetzt werden. Durch die Kombination der angegebenen Verfahrensschritte kann die Erneuerung in günstiger Weise durchgeführt werden. Insbesondere kann durch das gleisgebundene Arbeiten eine Erneuerung auch bei von der Seite her nicht zugänglichen Gleisanlagen erfolgen. An- und Abtransport der Materialien können ebenfalls vorteilhafterweise über Gleis erfolgen.The solid roadways produced by the method according to the invention have the advantage of particularly high strength and positional accuracy. Such lanes can therefore be used in particular for high speeds be used. By combining the specified process steps the renovation can be carried out in a favorable manner become. In particular, renewal can be achieved through track-bound work also for track systems that are not accessible from the side. Delivery and removal of the materials can also be advantageous done over track.
Nach einer Ausgestaltung der Erfindung erfolgt das Einbauen der Tragschichten ebenfalls gleisgebunden. Auch dieser Arbeitsgang kann dadurch vorteilhaft durchgeführt werden. According to one embodiment of the invention, the base layers are installed also track-bound. This step can also be done be carried out advantageously.
Nach einer weiteren Ausgestaltung der Erfindung erfolgt nach dem Einbauen des neuen Unterbaus ein Rückbau der vorhandenen Gleise und ein Verlegen von Lehrschienen, so daß dann das Einbauen der Tragschichten unter Verwendung der Lehrschienen erfolgen kann. Durch die Verwendung von Lehrschienen kann auch nach dem Gleisrückbau das Einbauen der festen Fahrbahn mit hoher Genauigkeit erfolgen.According to a further embodiment of the invention, the installation is carried out of the new substructure a dismantling of the existing tracks and a Laying of rails, so that then the installation of the base layers can be done using the training rails. By using it Rails can also be installed after the track has been dismantled the solid road with high accuracy.
Nach einer weiteren Ausgestaltung der Erfindung erfolgt nach dem Einbau des neuen Unterbaus ein Rückbau der vorhandenen Gleise und das Einbauen der Tragschichten unter Verwendung eines Bodenfahrwerkes, insbesondere von Raupen. Damit entfällt das Erfordernis des Verlegens von Lehrschienen.According to a further embodiment of the invention takes place after installation of the new substructure a dismantling of the existing tracks and the installation the base layers using a floor undercarriage, in particular of caterpillars. This eliminates the need to lay Auxiliary rails.
Nach einer weiteren Ausgestaltung der Erfindung wird nach dem Rückbau des alten Gleises und dem Fertigstellen der Tragschichten ein Betontrog aufgebracht, anschließend das neue Gleis im Betontrog vorgebaut, eingerichtet und fixiert, und dann der Betontrog mit Beton verfüllt und der Beton verdichtet. Durch diese Verfahrensschritte wird vorteilhafterweise eine feste Fahrbahn mit eingegossenen Schwellen hergestellt.According to a further embodiment of the invention, after dismantling a concrete trough of the old track and the completion of the base course applied, then the new track pre-built in the concrete trough, set up and fixed, and then the concrete trough filled with concrete and the Concrete compacted. These process steps are advantageous a solid roadway with cast sleepers.
Nach einer weiteren Ausgestaltung der Erfindung wird nach dem Rückbau des alten Gleises und dem Fertigstellen der Tragschichten eine Asphaltoder Betontragschicht darauf aufgebracht und anschließend das neue Gleis vorgebaut, eingerichtet und auf der Beton- oder Asphalttragschicht fixiert. Durch diese Verfahrensschritte wird vorteilhafterweise eine feste Fahrbahn mit aufgelegtem Gleisrost hergestellt. According to a further embodiment of the invention, after dismantling of the old track and the completion of the base course an asphalt or Concrete base layer applied and then the new one Track pre-built, furnished and on the concrete or asphalt base course fixed. These process steps advantageously make it a fixed one Roadway made with the track grating on.
Nach einer weiteren Ausgestaltung der Erfindung erfolgt das Einrichten und Fixieren des neuen Gleises auf der Asphalt- oder Betontragschicht bereits beim Vorbauen des neuen Gleises. Insbesondere werden die. Höhenlage der Asphalt- oder Betontragschicht an den vorgesehenen Auflagerstellen der Schwellen sowie die Dicken der Schwellen im Bereich der Auflagerstellen für die Schienen gemessen, aus den gemessenen Werten das Erfordernis eines Höhenausgleichs und dessen Größe bestimmt und geeignete Ausgleichsmittel beim Verlegen des Gleisabschnitts angebracht. Durch das Vermessen der Höhenlage der Auflagerfläche der Tragschicht und der Schwellendicke im Bereich der Schienenauflage während des Verlegevorgangs kann ein notwendiger Höhenausgleich bereits vor dem Aufsetzen der Schwelle auf die Tragschicht und vor dem Einsetzen der Schiene in die Schwelle festgestellt werden. Dadurch können die notwendigen Ausgleichsmittel bereits beim Verlegen des Gleisabschnitts mit eingesetzt werden. Ein separater nachgeschalteter Arbeitsschritt entfällt dadurch. Das Verlegen wird dadurch insgesamt beschleunigt und vereinfacht.According to a further embodiment of the invention, the set-up takes place and fixing the new track on the asphalt or concrete base course already when building the new track. In particular, the. altitude the asphalt or concrete base layer at the designated support points the thresholds and the thicknesses of the thresholds in the range of Support points for the rails measured, from the measured values determines the need for height compensation and its size and suitable compensation means attached when laying the track section. By measuring the height of the bearing surface of the base course and the threshold thickness in the area of the rail support during the A necessary height adjustment can be carried out before the laying process Place the threshold on the base layer and before inserting the Rail can be found in the threshold. This allows the necessary Compensating agent already used when laying the track section become. This eliminates the need for a separate subsequent step. The installation is accelerated and simplified overall.
Nach einer Ausgestaltung der Erfindung wird zusätzlich die Höhe der Schiene an den Lagerstellen auf den Schwellen gemessen und bei der Bestimmung des Höhenausgleichs mit berücksichtigt. Durch diese Maßnahme können auch die Höhentoleranzen der Schienen ausgeglichen und damit die Abweichungen der Höhenlage des verlegten Gleises von dem Sollwert weiter verringert werden.According to one embodiment of the invention, the height of the Rail measured at the bearing points on the sleepers and during the determination height compensation is also taken into account. By this measure can also compensate for the height tolerances of the rails and thus the deviations of the altitude of the laid track from the Setpoint can be further reduced.
Nach einer weiteren Ausgestaltung der Erfindung erfolgt die Messung der Höhenlage der Tragschicht und/oder der Schienenhöhe beim Verlegen des Gleisabschnitts, insbesondere jeweils unmittelbar vor dem Ablegen einer Schwelle, wobei die Ausgleichsmittel vor dem Einsetzen der Schiene in die Schwellen angebracht werden. Dies vereinfacht und verbessert die Bestimmung der auszumessenden Auflagerstelle auf der Tragschicht und es auszumessenden Schienenabschnitts. Durch das Anbringen der Ausgleichsmittel vor dem Einsetzen der Schiene in die Schwellen wird ein Lösen der Schienen von den Schwellen zum Anbringen der Ausgleichsmittel entbehrlich.According to a further embodiment of the invention, the measurement of the Height of the base course and / or the rail height when laying the Track section, especially immediately before placing a Threshold, taking the compensating means before inserting the rail into the Sleepers are attached. This simplifies and improves the determination the bearing point to be measured on the base layer and it section of rail to be measured. By attaching the compensating means before inserting the rail into the sleepers, there will be a loosening the rails from the sleepers to attach the compensating means dispensable.
Nach einer weiteren Ausgestaltung der Erfindung wird die Schwelle nach dem Absetzen gegen ein Verschieben fixiert. Hierdurch wird sichergestellt, daß die Schiene an dem ausgemessenen Abschnitt der Tragschicht verbleibt und die durch das Anbringen der Ausgleichsmittel erreichte Genauigkeit der Höhenlage erhalten bleibt.According to a further embodiment of the invention, the threshold is reduced fixed against shifting. This ensures that the rail remains on the measured section of the base layer and the accuracy achieved by applying the compensating means the altitude remains unchanged.
Bevorzugt wird bei der Bestimmung des Höhenausgleichs das Höhenverhältnis zwischen linker und rechter Schiene einer Schwelle, das Höhenlagenverhältnis aufeinander folgender Schwellen und/oder das Längshöhenverhältnis zwischen zwei in einem vorgegebenen Abstand, beispielsweise fünf Meter, zueinander angeordneten Meßpunkten berücksichtigt. Damit kann allen üblichen Anforderungen an die Lagegenauigkeit Rechnung getragen werden.The height ratio is preferred when determining the height compensation between the left and right rails of a threshold, the altitude ratio successive thresholds and / or the longitudinal height ratio between two at a given distance, for example five meters of mutually arranged measuring points are taken into account. This can take into account all the usual requirements for positional accuracy be worn.
Nach einer weiteren Ausgestaltung der Erfindung wird die Lage des Gleisabschnitts in Querrichtung, vorzugsweise ausgehend von der Schwellenmitte, vor dem Fixieren ausgerichtet. Damit wird vorteilhafterweise nicht nur die Höhenlage sondern auch die Längsrichtung des Gleisabschnittes festgelegt, und es werden die Toleranzen verringert. According to a further embodiment of the invention, the position of the track section in the transverse direction, preferably starting from the middle of the sleeper, aligned before fixing. This is advantageously not only the altitude but also the longitudinal direction of the track section and the tolerances are reduced.
Die Bestimmung der Höhen- und Seitenlage des Gleisabschnitts kann nach einer Ausgestaltung der Erfindung mittels auf die Tragschicht aufgebrachter Hilfspunkte erfolgen. Ebenso kann die Bestimmung auch über Laser von Festpunkten aus erfolgen. Diese Methoden zur Bestimmung haben sich als besonders geeignet herausgestellt.The height and lateral position of the track section can be determined according to an embodiment of the invention by means of applied to the base layer Auxiliary points are made. Likewise, the determination can also be made about Lasers are made from fixed points. Have these methods of determination turned out to be particularly suitable.
Nach einer weiteren Ausgestaltung der Erfindung werden die gemessenen Werte, die vorgenommenen Ausgleichsmaßnahmen und die endgültige Gleislage dokumentiert. Damit ist jederzeit abrufbar, welche Ausgangslage gegeben war und mit welchen Maßnahmen welcher Endstand erreicht wurde.According to a further embodiment of the invention, the measured Values, the compensatory measures taken and the final Track position documented. This means that the starting position can be called up at any time was given and with which measures which final result was achieved has been.
Zur Durchführung des erfindungsgemäßen Verfahrens wird bevorzugt eine Verlegevorrichtung verwendet, auf welcher alle zur Durchführung des Verfahrens notwendigen Mittel vorhanden sind. Damit kann das Verlegen mit einer einzigen Vorrichtung erfolgen.A is preferably used to carry out the method according to the invention Laying device used, on which all to carry out the Procedural necessary funds are available. So that the laying can done with a single device.
Nach einer weiteren Ausgestaltung der Erfindung umfaßt der Vorbau eines neuen Gleises mit in eine Betonschicht als obere Tragschicht eingegossenen Schwellen, die auf eine untere Tragschicht aufgebracht werden, die Schritte:
- Herstellen eines Gleisabschnittes mit Schienen und daran in einem vorgegebenen Abstand zueinander befestigten Schwellen,
- Anordnen und Halten des Gleisabschnitts mit Abstand oberhalb der unteren Tragschicht,
- Richten der Seiten- und Höhenlage des Gleisabschnitts,
- Abstützen des Gleisabschnitts über mindestens einen Teil der Schwellen auf der unteren Tragschicht,
- Einbringen von Fixierelementen, insbesondere Bolzen, in die untere Tragschicht, insbesondere in der Fahrbahnmitte, im Bereich mindestens eines Teils der Schwellen mit jeweils einem bis zur zugehörigen Schwelle ragenden freien Ende,
- Fixieren der Schwellen an den zugehörigen Fixierelementen gegen Seitenverschiebung, und
- Gießen der oberen Tragschicht, insbesondere unter Verwendung einer zuvor angebrachten Verschalung.
- Production of a track section with rails and sleepers attached to them at a predetermined distance from one another,
- Arranging and holding the track section at a distance above the lower base layer,
- Straightening the side and height of the track section,
- Supporting the track section over at least part of the sleepers on the lower base layer,
- Introducing fixing elements, in particular bolts, into the lower base layer, in particular in the middle of the carriageway, in the area of at least part of the sleepers, each with a free end projecting up to the associated sleeper,
- Fixing the thresholds on the associated fixing elements against lateral displacement, and
- Pouring the upper base layer, especially using a previously installed formwork.
Bei diesem Verfahren wird vollständig auf einen Trog verzichtet. Stattdessen wird der Gleisabschnitt direkt auf der unteren Tragschicht abgestützt. Nach Ausrichten der Seitenlage des Gleisabschnitts wird diese durch Fixierelemente fixiert, die in die untere Tragschicht eingebracht und an jeweils einer Schwelle befestigt werden. Hierfür werden insbesondere Bolzen verwendet. Das Ausrichten des Gleisabschnitts erfolgt bei dem erfindungsgemäßen Verfahren durch eine separate Vorrichtung. Die Abstützung der Schwellen kann wie bei dem herkömmlichen Verfahren beispielsweise über Spindeln erfolgen, die in entsprechende Hülsen eingedreht werden, die herstellerseitig in den Schwellen vorgesehen werden. Wegen des Wegfalls des Troges und der direkten Abstützung auf der unteren Tragschicht sind entsprechend gefertigte Spindeln und Hülsen erforderlich. Damit können alle bekannten oder neuen Schwellenarten ausgerüstet werden.With this method, a trough is completely dispensed with. Instead the track section is supported directly on the lower base layer. After aligning the lateral position of the track section, this is done using fixing elements fixed, which is introduced into the lower base layer and attached to each to be attached to a threshold. In particular, bolts are used for this used. The track section is aligned in the case of the invention Procedure by a separate device. The support the threshold can, for example, as in the conventional method via spindles that are screwed into appropriate sleeves that are provided in the sleepers by the manufacturer. Because of the absence of the trough and the direct support on the lower one Appropriate spindles and sleeves are required. It can be used to equip all known or new types of sleepers become.
Wie bei bekannten Verfahren mit Trog reicht es außerdem aus, wenn nur ein Teil der Schwellen auf der unteren Tragschicht abgestützt und über einen Bolzen gegen seitliche Verschiebung fixiert wird. Dennoch ist es herstellungstechnisch vorteilhaft, alle Schwellen für die Abstützung und Fixierung vorzubereiten. Dies eröffnet auch die Möglichkeit, bei festgestellter Abweichung der Gleislage von der Sollage zusätzliche Abstützungen und/oder Fixierungen vorzusehen.As with known trough processes, it is also sufficient if only some of the sleepers are supported on the lower base layer and over a bolt is fixed against lateral displacement. Still it is advantageous in terms of manufacturing technology, all thresholds for the support and Prepare fixation. This also opens up the possibility of having found Deviation of the track position from the target position additional supports and / or to provide fixations.
Ein Vorteil des erfindungsgemäßen Verfahrens besteht darin, daß kein Trog mehr erforderlich ist. Damit entfällt der für das Herstellen des Troges erforderliche Aufwand. Besonders vorteilhaft ist außerdem, daß damit die Fuge zwischen der gegossenen oberen Tragschicht und dem Trog wegfällt, die aufgrund ihrer fortlaufenden Erstreckung bei Eindringen von Wasser eine besondere Gefahr darstellt.An advantage of the method according to the invention is that no Trough more is needed. This eliminates the need for producing the trough effort required. It is also particularly advantageous that the Gap between the cast upper base layer and the trough is eliminated, which due to their continuous extension upon ingress of water poses a particular danger.
Nach einer weiteren Ausgestaltung der Erfindung werden die Bolzen in zuvor in die untere Tragschicht eingebrachte Ausnehmungen eingebracht. Die Ausnehmungen können, insbesondere lasergesteuert, sehr genau positioniert werden, womit sich auch eine genaue Positionierung der Bolzen ergibt. Die notwendigen Verschiebungen der Schwellen relativ zu den Bolzen beim Ausrichten sind dadurch verhältnismäßig gering.According to a further embodiment of the invention, the bolts in recesses previously made in the lower base layer. The recesses, particularly laser-controlled, can be positioned very precisely with which there is also an exact positioning of the bolts results. The necessary displacements of the sleepers relative to the bolts when aligning are relatively small.
Nach einer weiteren Ausgestaltung der Erfindung werden die Schwellen in der Höhe verschiebbar an den Bolzen befestigt. Dies hat den Vorteil, daß die Schwellen nach Lösen ihrer Abstützung auf der unteren Tragschicht einem Schwinden des oberen Tragschichtmaterials folgen können. According to a further embodiment of the invention, the thresholds in the height slidably attached to the bolt. This has the advantage that the sleepers after loosening their support on the lower base layer can follow a shrinkage of the top base material.
Nach einer weiteren Ausgestaltung der Erfindung werden die Schwellen nach dem Abstützen der Schwellen auf der unteren Tragschicht von den Schienen gelöst. Dadurch wird vermieden, daß Verschiebungen, insbesondere Wärmedehnungen und -kontraktionen der Schienen während des Abbindens der oberen Tragschicht auf die Schwellen übertragen werden.According to a further embodiment of the invention, the thresholds after supporting the sleepers on the lower base layer of the Rails released. This prevents shifts, in particular Thermal expansion and contraction of the rails during the Setting of the upper base layer are transferred to the sleepers.
Nach einer weiteren Ausgestaltung der Erfindung wird der Bolzen in der Mitte der Schwelle an dieser befestigt. Die bei der Herstellung der Schwellen auftretenden Toleranzen werden dadurch halbiert.According to a further embodiment of the invention, the bolt in the Attached to the middle of the threshold. The one in the manufacture of sleepers Tolerances that occur are halved.
Nach einer weiteren Ausgestaltung der Erfindung wird unter den Schwellen eine mehrere Schwellen überdeckende und insbesondere mit diesen verbundene Armierung vorgesehen, welche in die obere Tragschicht mit eingegossen wird. Die Armierung wird mit der Schwellenarmierung verbunden. Dadurch werden die auf die Schwellen wirkenden Kräfte, insbesondere Schiebekräfte bei Wärmedehnungen und -kontraktionen der Schienen, auf mehrere Schwellen verteilt und können so besser aufgefangen werden.According to a further embodiment of the invention is under the thresholds one covering several thresholds and in particular with these connected reinforcement provided, which in the upper base layer with is poured. The reinforcement is connected to the threshold reinforcement. As a result, the forces acting on the sleepers, in particular Pushing forces during thermal expansion and contraction of the Rails, spread over several sleepers and can thus be better absorbed become.
Nach einer Ausgestaltung der Erfindung werden die Ausnehmungen in die untere Tragschicht als Bohrungen eingebracht. Diese können vorteilhafterweise mit besonders hoher Genauigkeit eingebracht werden. Eine andere Möglichkeit besteht darin, die Ausnehmung als sich in Fahrbahnlängsrichtung fortlaufend erstreckenden Schlitz einzubringen.According to one embodiment of the invention, the recesses in the lower base layer introduced as holes. These can advantageously be introduced with particularly high accuracy. Another Possibility is the recess as in the longitudinal direction of the road continuously insert slot.
Nach einer weiteren Ausgestaltung der Erfindung erfolgt die Ausrichtung der Seiten- und/oder Höhenlage des Gleisabschnittes in zwei oder mehr Schritten. Dies hat sich als besonders vorteilhaft herausgestellt. According to a further embodiment of the invention, the alignment takes place the side and / or height of the track section in two or more Steps. This has proven to be particularly advantageous.
Ebenso hat es sich als vorteilhaft herausgestellt, die Gleislage nach der Fixierung und Abstützung der Schwellen zu kontrollieren und, falls erforderlich, nochmals zu korrigieren. Auch ist es vorteilhaft, die Gleislage nach dem Fixieren der Schwellen zu dokumentieren.It has also proven to be advantageous to move the track after Check the fixation and support of the sleepers and, if necessary, to correct again. It is also advantageous the track position to document after fixing the thresholds.
Nach einer weiteren Ausgestaltung der Erfindung wird zum Gießen der oberen Tragschicht eine Schalung mit Schalungselementen verwendet, die an dem Gleis verankert werden. Insbesondere werden die Schalungselemente über einen oberen Schalungshalter am Schienenfuß und einen unteren Schalungshalter an der Armierung verankert. Dabei wird der untere Schalungshalter bevorzugt mit eingegossen. Damit kann mit einfachen Mitteln eine Verschalung für das Gießen der oberen Tragschicht angebracht werden. Die Schalung kann bis auf den unteren Schalungshalter wiederverwendet werden. Grundsätzlich ist es aber auch möglich, einen Schalungswagen herkömmlicher Art zu verwenden.According to a further embodiment of the invention, the upper base layer used formwork with formwork elements that be anchored to the track. In particular, the formwork elements via an upper formwork holder on the rail foot and one lower formwork holder anchored to the reinforcement. The bottom one Formwork holder preferably cast in. This can be done with simple A formwork for pouring the upper base layer is attached become. The formwork can extend to the lower formwork holder be reused. Basically, it is also possible to get one Formwork trolleys of a conventional type to be used.
Als Schwellen können nach einer Ausgestaltung der Erfindung einteilige Schwellen mit einem senkrechten Langloch in der Schwellenmitte oder seitlich an den Schwellen angebrachten Aufnahmen zum Hindurchführen des Bolzens für die seitliche Fixierung der Schwelle verwendet werden. In diesem Fall werden geeignete Stell- und Fixiermittel in dem Langloch oder der Aufnahme vorgesehen, durch welche der Bolzen hindurchführbar und nach Ausrichtung des Gleisabschnittes gegen Seitenverschiebung relativ zur Schwelle bzw. umgekehrt fixierbar ist.According to one embodiment of the invention, thresholds can be one-piece Sleepers with a vertical slot in the middle of the sleepers or Recordings attached to the side of the sleepers for passage of the bolt can be used for the lateral fixation of the threshold. In In this case, suitable adjusting and fixing means in the slot or the receptacle through which the bolt can be passed and after aligning the track section against side shift relative is fixable to the threshold or vice versa.
Nach einer weiteren Ausgestaltung der Erfindung werden zweiteilige Schwellen mit zwei über Verbindungseisen verbundenen, jeweils eine Schiene tragenden Teilen verwendet. Die Verwendung zweiteiliger Schwellen hat den Vorteil, daß die Länge der Fugen zwischen der Schwelle und der gegossenen oberen Tragschicht und das Gewicht der Schwelle verringert ist.According to a further embodiment of the invention, two parts Sleepers with two connected by connecting iron, one each Rail-bearing parts used. The use of two-part sleepers has the advantage that the length of the joints between the threshold and the cast upper base layer and the weight of the threshold is reduced is.
Zur seitlichen Festlegung der zweiteiligen Schwellen an den Bolzen wird bevorzugt ein längs der Verbindungseisen verschiebbares und an diesem festlegbares Blech mit einer Durchtrittsöffnung für den Bolzen verwendet. Bevorzugt ist dabei das Blech zweiteilig ausgebildet, mit zwei, jeweils eine Hälfte der Durchtrittsöffnung aufweisenden Teilen. Über das Blech kann die Schwelle in einfacher Weise an dem Bolzen gegen Seitienverschiebung fixiert werden. Die zweiteilige Ausgestaltung hat den Vorteil, daß der Bolzen bereits vor vollständiger seitlicher Ausrichtung der Schwelle eingebracht werden kann, indem die beiden Teile ausreichend weit auseinander geschoben und erst nach Einbringen des Bolzens zusammengefügt werden.For the lateral fixing of the two-part sleepers on the bolt preferably a slidable along the connecting iron and on this fixable sheet with an opening for the bolt used. The sheet is preferably formed in two parts, with two, one each Half of the passage opening parts. Can over the sheet the threshold in a simple manner on the bolt against lateral displacement be fixed. The two-part design has the advantage that the bolt introduced before the threshold is fully aligned laterally can be made by separating the two parts sufficiently far pushed and assembled only after inserting the bolt.
Eine bevorzugt für das erfindungsgemäße Verfahren verwendbare Hebevorrichtung zum Anheben eines Gleisabschnitts mit Schienen und daran befestigten Schwellen umfaßt mindestens einen, die Fahrbahn überspannenden Rahmen, an dem insbesondere an den Schienen angreifende Greifer und Hubmittel zum Anheben des Gleisabschnitts angebracht sind. Hierbei wird der Rahmen längs der Fahrbahn verfahrbar ausgebildet. Durch ein solches Hebegerät kann das Einrichten des Gleisabschnitts kontinuierlich erfolgen, ohne daß eine Vielzahl von Hebevorrichtungen benötigt wird. Die erfindungsgemäße Hebevorrichtung wird mit dem Arbeitsfortschritt vorwärts bewegt und für den gesamten Einrichtvorgang eingesetzt.A lifting device that can preferably be used for the method according to the invention for lifting a track section with rails and on it paved sleepers includes at least one that spans the road Frame on which, in particular, the rails Grippers and lifting devices for lifting the track section are attached. Here, the frame is designed to be movable along the road. Such a lifting device can be used to set up the track section take place continuously without the need for a large number of lifting devices becomes. The lifting device according to the invention is progressing moved forward and for the entire setup process used.
Nach einer Ausgestaltung der Erfindung sind am Rahmen zusätzlich Mittel zum Ausrichten der Seiten- und/oder Höhenlage des Gleisabschnitts vorgesehen. Die Hebevorrichtung kann dadurch vorteilhafterweise zugleich zum Ausrichten des Gleisabschnitts verwendet werden, so daß eine separate Vorrichtung entbehrlich ist.According to an embodiment of the invention, there are additional means on the frame to align the side and / or height of the track section intended. The lifting device can thereby advantageously at the same time be used to align the track section so that a separate device is unnecessary.
Bevorzugt sind mindestens drei Rahmen vorgesehen, von denen mindestens der erste ein Boden-, insbesondere Raupenfahrwerk, aufweist. Auf diese Weise kann mit einer Vorrichtung ein Anheben und Ausrichten des Gleisabschnittes in mehreren Schritten durchgeführt werden. Insbesondere wird mit dem ersten Rahmen eine Grobausrichtung, mit dem zweiten Rahmen eine Feinausrichtung, und mit dem dritten oder einem weiteren Rahmen eine Feinstausrichtung mit endgültiger Fixierung der Schwellen ausgeführt.At least three frames are preferably provided, at least of which the first has a floor, in particular crawler, chassis. On in this way, lifting and aligning the Track section can be carried out in several steps. In particular becomes a rough alignment with the first frame, with the second Frame a fine alignment, and with the third or another Frame a fine alignment with final fixation of the sleepers executed.
Nach einer weiteren Ausgestaltung der Erfindung weisen die weiteren Rahmen jeweils ein Schienenfahrwerk auf, wobei alle Rahmen über Verbindungsstangen miteinander verbunden sind, die bevorzugt zugleich Versorgungsleitungen tragen. Ein Bodenfahrwerk wird dadurch nur für den ersten Rahmen benötigt, während die weiteren Rahmen auf den bereits vorausgerichteten Schienen verfahren werden können. Für den Hebeund Richtvorgang stützen sich diese Rahmen auf der Fahrfläche des Bodenfahrwerks, also der unteren Tragschicht ab.According to a further embodiment of the invention, the others Each frame on a rail chassis, with all frames via connecting rods are interconnected, which are preferred at the same time Wear supply lines. A floor undercarriage is only for the first frame is needed, while the other frames are already on the pre-aligned rails can be moved. For the lifting dog Straightening process, these frames are based on the running surface of the ground gear, So the lower base layer.
Nach einer weiteren Ausgestaltung der Erfindung sind alle Rahmen auf einem gemeinsamen Boden-, insbesondere Raupenfahrwerk, angeordnet. Damit wird eine Komplettvorrichtung gebildet, mit der der Gleisabschnitt angehoben, ausgerichtet und fixiert werden kann.According to a further embodiment of the invention, all frames are open a common ground, especially caterpillar, arranged. This forms a complete device with which the track section can be raised, aligned and fixed.
Nach einer weiteren Ausgestaltung der Erfindung weisen die Rahmen Rollenzangen zum Anheben und Richtrollen zum Ausrichten des Gleisabschnitts auf, die auf den Schienen abrollen. Hiermit wird ein kontinuierliches Anheben und Ausrichten des Gleisabschnitts ermöglicht.According to a further embodiment of the invention, the frames Roller tongs for lifting and straightening rollers for aligning the track section that roll on the rails. This is a continuous Allows lifting and aligning the track section.
Bevorzugt weisen die Rahmen außerdem zusätzlich auf den Schienen abrollbare Auflastrollen auf, durch welche die Schienen niedergehalten werden. Auch dies hat sich für die fahrbare Hebe- und Ausrichtvorrichtung als besonders vorteilhaft herausgestellt.The frames preferably also have rollable rails Load rollers through which the rails are held down. This has also become the mobile lifting and aligning device turned out to be particularly advantageous.
Nach einer weiteren Ausgestaltung der Erfindung werden vor dem Herstellen des Troges oder vor dem Erstellen der Asphalt- oder Betontragschicht oder vor dem Vorbauen des neuen Gleises oder vor dem Einrichten und Fixieren des neuen Gleises Lehrschienen verlegt, und erfolgt das Herstellen des Troges und/oder das Erstellen der Asphalt- oder Betontragschicht und/oder das Vorbauen des neuen Gleises und/oder das Einrichten und Fixieren des neuen Gleises unter Verwendung der Lehrschienen. Durch die Verwendung von Lehrschienen können die beschriebenen Arbeiten wieder mit hoher Genauigkeit durchgeführt werden.According to a further embodiment of the invention, before manufacturing the trough or before creating the asphalt or concrete base course or before building the new track or before setting it up and fixing the new track to the rails, and this is done Making the trough and / or creating the asphalt or concrete base course and / or building the new track and / or setting it up and fixing the new track using the training rails. Through the use of training rails, the described Work can be performed again with high accuracy.
Nach einer weiteren Ausgestaltung der Erfindung erfolgt das Herstellen des Troges und/oder das Erstellen der Asphalt- oder Betontragschicht und/oder das Vorbauen des neuen Gleises und/oder das Einrichten und Fixieren des neuen Gleises unter Verwendung eines Bodenfahrwerkes, insbesondere von Raupen. Ein Verlegen von Lehrschienen ist damit nicht erforderlich.According to a further embodiment of the invention, the manufacture takes place the trough and / or creating the asphalt or concrete base course and / or building the new track and / or setting up and Fixing the new track using a floor trolley, especially caterpillars. This does not mean laying guide rails required.
Nach einer weiteren Ausgestaltung der Erfindung erfolgen der Gleisrückbau und/oder der Gleisvorbau gleisgebunden. Dies hat wiederum den Vorteil, daß die Materialien einfach an- und abgeführt werden können. According to a further embodiment of the invention, the track is dismantled and / or the track extension track-bound. This in turn has the The advantage that the materials can be easily fed in and out.
Nach einer weiteren Ausgestaltung der Erfindung erfolgt das Einrichten und Fixieren des neuen Gleises gleisgebunden. Etwa hierfür benötigte Materialien können wieder einfach antransportiert werden.According to a further embodiment of the invention, the set-up takes place and fixing the new track to the track. About needed for this Materials can easily be transported again.
Nach einer weiteren Ausgestaltung der Erfindung werden in einem ersten Arbeitsgang alle Verfahrensschritte bis zum Gleisrückbau, in einem zweiten Arbeitsgang der Gleisrückbau und gegebenenfalls das Einbauen von Tragschichten und in mindestens einem weiteren Arbeitsgang der Gleisvorbau und die Herstellung der festen Fahrbahn durchgeführt. Ein Vorgehen in derartigen Arbeitsgängen hat sich als besonders vorteilhaft herausgestellt. Die Erneuerung der Gleisanlage kann dadurch günstig und schnell durchgeführt werden.According to a further embodiment of the invention, in a first Work step all process steps up to dismantling the track, in a second Step of dismantling the track and, if necessary, installing Base layers and in at least one further step the track extension and the production of the solid track. An approach in such operations has been found to be particularly advantageous. The renewal of the track system can be cheap and be done quickly.
Nach einer weiteren Ausgestaltung der Erfindung werden in einem dritten Arbeitsgang die Herstellung einer Asphalt- oder Betontragschicht und in mindestens einem weiteren Arbeitsgang der Gleisvorbau, die Einrichtung und die Fixierung des Gleises durchgeführt. Dieses Vorgehen hat sich für die Herstellung einer festen Fahrbahn mit aufgelegtem Gleisrost als vorteilhaft herausgestellt.According to a further embodiment of the invention, in a third Operation the production of an asphalt or concrete base course and in at least one further work of the track extension, the establishment and fixed the track. This approach has been for the production of a firm carriageway with the track grating on is advantageous exposed.
Nach einer weiteren Ausgestaltung der Erfindung werden in einem dritten Arbeitsgang der Gleisvorbau und in einem vierten Arbeitsgang die Einrichtung und Fixierung des Gleises sowie das Eingießen der Schwellen in eine Betonschicht durchgeführt. Dieses Vorgehen hat sich für die Herstellung einer festen Fahrbahn mit eingegossenen Schwellen ohne Verwendung eines Betontroges als vorteilhaft herausgestellt. According to a further embodiment of the invention, in a third Work on the track extension and in a fourth step the installation and fixing the track and pouring the sleepers in carried out a layer of concrete. This procedure has been used for manufacturing a solid roadway with cast sleepers without use a concrete trough was found to be advantageous.
Nach einer weiteren Ausgestaltung der Erfindung werden in einem dritten Arbeitsgang die Herstellung eines Betontroges und in mindestens einem weiteren Arbeitsgang der Gleisvorbau, das Einrichten und Fixieren des Gleises sowie das Eingießen der Schwellen im Trog durchgeführt. Dieses Vorgehen hat sich für die Herstellung einer festen Fahrbahn mit eingegossenen Schwellen unter Verwendung des Betontroges als vorteilhaft herausgestellt.According to a further embodiment of the invention, in a third Work step the production of a concrete trough and in at least one further work of the track extension, the setting up and fixing of the Track and pouring the sleepers in the trough. This Procedure has been adopted for the production of a solid roadway with cast Thresholds using the concrete trough were found to be advantageous.
Ein Ausführungsbeispiel der Erfindung ist in der Zeichnung dargestellt und wird nachfolgend beschrieben. Es zeigen, jeweils in schematischer Darstellung,
- Figur 1
- einen Querschnitt durch eine alte und eine neue Gleisanlage und
- Figur 2
- einen Teil der erfindungsgemäßen Verfahrensschritte zur Erneuerung einer Gleisanlage.
- Figure 1
- a cross section through an old and a new track system and
- Figure 2
- a part of the process steps according to the invention for renewing a track system.
Auf der rechten Seite der Trennlinie I in Figur 1 ist eine alte Gleisanlage dargestellt, mit einem durch zwei Schienen 1 und Schwellen 2 gebildeten Gleis 3, welches in einer Schotterbettung 4 verlegt ist. Die Schotterbettung 4 ist auf eine Frostschutzschicht 5 und diese wiederum auf den Untergrund 6 aufgebracht. Zusätzlich oder anstelle der Frostschutzschicht 5 kann auch eine Planumsschutzschicht vorgesehen sein.On the right side of the dividing line I in Figure 1 is an old track system shown, with a formed by two rails 1 and sleepers 2 Track 3, which is laid in a ballast bed 4. The ballast bed 4 is on a frost protection layer 5 and this in turn on the surface 6 applied. In addition to or instead of the frost protection layer 5 a formation protection layer can also be provided.
Bei der neuen Gleisanlage ist das Gleis 3 mit Schienen 1 und Schwellen 2 auf eine Beton- oder Asphalttragschicht 7, die auch mehrschichtig ausgebildet sein kann, aufgelegt und auf dieser befestigt. Die Beton- oder Asphalttragschicht 7 ist auf einer unteren Tragschicht 8, insbesondere einer hydraulisch gebundenen Tragschicht oder auch einer ungebundenen Tragschicht aufgebracht, die ihrerseits auf einer Frostschutzschicht 9 angeordnet ist. Die Frostschutzschicht 9 liegt auf dem Untergrund 6 auf und kann wiederum durch eine Planumsschutzschicht ersetzt oder ergänzt sein.In the new track system, track 3 is with rails 1 and sleepers 2 on a concrete or asphalt base layer 7, which is also multi-layered can be hung up and attached to this. The concrete or asphalt base course 7 is on a lower base layer 8, in particular one hydraulically bound base layer or an unbound one Base layer applied, which in turn arranged on a frost protection layer 9 is. The frost protection layer 9 lies on the substrate 6 and can in turn be replaced or supplemented by a formation protection layer his.
Anstelle der dargestellten neuen Gleisanlage mit einer festen Fahrbahn, bei welcher das Gleis 3 auf eine Beton- oder Asphaltschicht aufgelegt und fixiert ist, kann die neue Gleisanlage auch mit einer festen Fahrbahn gebildet sein, bei der die Schwellen 2 des Gleises 3 in eine Betonschicht eingegossen sind. Besonders bevorzugt ist dabei die Herstellung der festen Fahrbahn ohne Verwendung eines Betontroges, indem die Schwellen 2 direkt auf der unteren Tragschicht 8 abgestützt und an dieser gegen seitliches Verschieben fixiert werden, bevor die Schwellen 2 in den Beton eingegossen werden.Instead of the new track system shown with a fixed carriageway, in which the track 3 is placed on a concrete or asphalt layer and is fixed, the new track system can also be formed with a fixed carriageway be in which the sleepers 2 of the track 3 are poured into a concrete layer are. The production of the solid is particularly preferred Roadway without using a concrete trough by using the sleepers 2 directly supported on the lower support layer 8 and on this against lateral Moving be fixed before the sleepers 2 are poured into the concrete become.
Gemäß Figur 2 wird zur Erneuerung einer Gleisanlage mit Schotterbettung erfindungsgemäß zunächst die Schotterbettung 4, wie mit Linie 10 angedeutet, abgetragen, sodann gemäß Linie 11 die Frostschutzschicht 5 und/oder gegebenenfalls eine Planumsschutzschicht. Dann wird erforderlichenfalls der Untergrund 6 gemäß Linie 12 so weit abgetragen, wie es zum Aufbau der neuen Gleisanlage erforderlich ist, um die Höhenlage des Gleises 3 beizubehalten oder gewünschtenfalls eine neue Höhenlage zu erreichen.According to Figure 2 is to renew a track system with ballast bedding According to the invention, first the ballast bed 4, as with line 10 indicated, removed, then the frost protection layer 5 according to line 11 and / or optionally a formation protection layer. Then if necessary the subsurface 6 according to line 12 is removed as far as it is to build the new track system is necessary to the altitude of the Track 3 to maintain or, if desired, a new altitude to reach.
Auf die so erhaltene Oberfläche des Untergrundes 6 wird dann erforderlichenfalls eine neue Frostschutz- und/oder Planumsschutzschicht 9 aufgebracht, auf diese eine untere Tragschicht 8, insbesondere eine hydraulisch gebundene Tragschicht, eventuell aber auch eine ungebundene Tragschicht. Auf die untere Tragschicht 8 wird anschließend bei festen Fahrbahnen mit aufgelegtem Gleis 3 eine Beton- oder Asphalttragschicht 7 aufgebracht, die auch mehrschichtig ausgebildet sein kann. Dann wird das Gleis 3 aufgelegt, gerichtet und fixiert. Bei festen Fahrbahnen mit eingegossenen Schwellen 2 wird auf die untere Tragschicht 8 entweder ein Betontrog aufgebracht, in dem dann das Gleis 1 vorgebaut, gerichtet und fixiert wird, oder das Gleis 3 wird direkt auf der unteren Tragschicht 8 vorgebaut, gerichtet und fixiert. Anschließend werden die Schwellen 2, gegebenenfalls unter Verwendung einer Schalung, in Beton eingegossen.If necessary, the surface of the substrate 6 thus obtained is then applied a new frost protection and / or formation protection layer 9 has been applied, on this a lower base layer 8, in particular a hydraulic one bound base layer, but possibly also an unbound base layer. The lower base layer 8 is then on solid roads with track 3 on it, a concrete or asphalt base course 7 applied, which can also be multi-layered. Then it will be the track 3 placed, directed and fixed. For solid roadways with cast-in Thresholds 2 are either on the lower base layer 8 Concrete trough applied, in which the track 1 is then pre-built, aligned and is fixed, or the track 3 is directly on the lower base layer 8 pre-built, aligned and fixed. Then the thresholds 2, if necessary using formwork, poured into concrete.
Bis zur Herstellung der unteren Tragschicht 8 können alle beschriebenen Verfahrensschritte der Erneuerung einer Gleisanlage in einem Arbeitsgang durchgeführt werden. Die Durchführung kann dabei entweder gleisgebunden, mittels Lehrschienen oder mittels Bodenfahrwerken erfolgen. In jedem Fall ist die Erneuerung der Gleisanlage mit den erfindungsgemäßen Schritten vorteilhaft und hat als Ergebnis eine feste Fahrbahn, die hohen Genauigkeitsanforderungen genügt und daher insbesondere für hohe Geschwindigkeiten geeignet ist. Up to the production of the lower base layer 8 all can be described Process steps for renewing a track system in one operation be performed. The implementation can either be track-bound, using training rails or floor trolleys. In in any case is the renewal of the track system with the invention Steps advantageous and as a result has a solid road surface that is high Accuracy requirements are sufficient and therefore especially for high speeds suitable is.
- 11
- Schienerail
- 22
- Schwellethreshold
- 33
- Gleistrack
- 44
- Schotterbettungballast
- 55
- FrostschutzschichtFrost protection layer
- 66
- Untergrundunderground
- 77
- obere Tragschichtupper base layer
- 88th
- untere Tragschichtlower base layer
- 99
- FrostschutzschichtFrost protection layer
- 1010
- Linieline
- 1111
- Linieline
- 1212
- Linieline
- II
- Trennlinieparting line
Claims (10)
- A method of renewing a track system with a substructure (5), a bed (4), in particular made of ballast, and a track (3) laid thereon made of rails (1) and sleepers (2) comprising the following steps:track bound removal of the present bed (4) and laying of the track (3) on the substructure (5);where necessary, track bound removal of the present substructure (5, 6) up to a depth required for the construction of the new track system and laying of the track (3) on the foundation (6) obtained;optionally, track bound installation of a substructure (9) for the new track system;installation of at least one supporting layer (8) for a solid trackway, in particular of a non-bound or of a hydraulically bound supporting layer;dismantling the present track (3);manufacturing the solid trackway, in particular with a track (3) laid on a concrete or asphalt supporting layer (7) or with a track (3) with sleepers (2) cast into a concrete layer, with advance construction of a new track (3) and aligning and fixing the new track.
- A method in accordance with claim 1, characterised in that a dismantling of the present tracks (3) takes place after the installation of the new substructure (9); and in that the installation of the supporting layers (8) takes place using a chassis movable on the ground, in particular using crawlers, or using previously laid guide rails.
- A method in accordance with any one of the preceding claims, characterised in that, after the dismantling of the old track (3) and the completion of the supporting layers (8), a concrete trough is applied to them (8); in that the new track (3) is subsequently advance constructed, adjusted and fixed in the concrete trough; and in that the concrete trough is then filled with concrete and the concrete is compressed; or in that, after the dismantling of the old track (3) and the completion of the supporting layers (8), an asphalt or concrete supporting layer (7) is applied to them; and in that the new track (3) is subsequently advance constructed, adjusted and fixed to the concrete or asphalt supporting layer (7), with the adjusting and fixing of the new track (3) preferably already taking place during the advance construction and with the height position of the asphalt or concrete supporting layer (7) preferably being measured at the provided bearing positions of the sleepers (2) and the thicknesses of the sleepers (2) being measured in the region of the bearing positions for the rails (1), with the requirement of a height compensation and its magnitude being determined from the values measured and suitable compensation means already being applied on the laying of the track section.
- A method in accordance with any one of the preceding claims, characterised in that the advance constructing of a new track (3) with sleepers (2) which are cast into a concrete layer as the upper supporting layer and which are applied to a lower supporting layer includes the following steps:manufacturing a track section with rails (1) and sleepers (2) secured thereto at a pre-determined spacing to one another;arranging and holding the track section with a spacing above the lower supporting layer (8);aligning the side and height positions of the track section;supporting the track section by means of at least some of the sleepers (2) on the lower supporting layer (8);introduction of fixing elements, in particular bolts, into the lower supporting layer (8), in particular at the centre of the trackway, in the region of at least some of the sleepers (2), with a respective free end projecting up to the associated sleeper (2).fixing of the sleepers (2) against lateral displacement to the associated fixing elements; andcasting of the upper supporting layer (7), in particular using previously installed shuttering.
- A method in accordance with any one of the preceding claims, characterised in that guide rails are laid before the manufacturing of the trough or before the manufacturing of the asphalt or concrete supporting layer (7) or before the advance construction of the new track (3) or before the adjustment and fixing of the new track (3); and in that the manufacturing of the trough and/or the preparation of the asphalt or concrete supporting layer (7) and/or the advance construction of the new track (3) and/or the adjustment and Fixing of the new track (3) takes place using the guide rails.
- A method in accordance with any one of the preceding claims, characterised in that the manufacturing of the trough and/or the manufacturing of the asphalt or concrete supporting layer (7) and/or the advance construction of the new track (3) and/or the adjustment and fixing of the new track (3) takes place using a chassis movable on the ground, in particular crawlers.
- A method in accordance with any one of the preceding claims, characterised in that the installation of the supporting layers (8) and or the track dismantling and/or the track advance construction and/or the adjustment and fixing of the new track (3) take place in track-bound manner.
- A method in accordance with any one of the preceding claims, characterised in that, in a first workstep, all method steps up to the track dismantling are carried out; in a second workstep, the track dismantling and, optionally, the installation of the supporting layers (8) take place; and, in at least one further workstep, the track advance construction and the manufacturing of the solid trackway are carried out.
- A method in accordance with claim 8, characterised in that, in a third workstep, the manufacturing of an asphalt or concrete supporting layer (7) is carried out; and, in at least one further workstep, the track advance construction, the adjustment and the fixing of the track (3) are carried out; or that in a third workstep the track advance construction and, in a fourth workstep, the adjustment and the fixing of the track (3) and the casting of the sleepers (2) into a concrete layer are carried out.
- A method in accordance with claim 8, characterised in that, in a third workstep, the manufacture of the concrete trough and, in at least one further workstep, the track advance construction, the adjustment and fixing of the track (3) and the casting of the sleepers 2) in the trough are carried out.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19916586 | 1999-04-13 | ||
DE19916586A DE19916586A1 (en) | 1999-04-13 | 1999-04-13 | Process for renewing a track system |
PCT/EP2000/003291 WO2000061866A1 (en) | 1999-04-13 | 2000-04-12 | Method for renewing railway lines |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1169516A1 EP1169516A1 (en) | 2002-01-09 |
EP1169516B1 true EP1169516B1 (en) | 2004-11-24 |
Family
ID=7904359
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP00929352A Expired - Lifetime EP1169516B1 (en) | 1999-04-13 | 2000-04-12 | Method for renewing railway lines |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP1169516B1 (en) |
AT (1) | ATE283391T1 (en) |
AU (1) | AU4747300A (en) |
DE (2) | DE19916586A1 (en) |
ES (1) | ES2233371T3 (en) |
WO (1) | WO2000061866A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652179A (en) * | 2015-01-22 | 2015-05-27 | 中铁二院工程集团有限责任公司 | Surface layer-reinforced and waterproof heavy-axle load heavy-haul railway subgrade bed structure |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10227801B3 (en) * | 2002-06-21 | 2004-01-29 | Jörger, Konrad | Procedure for the construction of a track body |
DE10312351A1 (en) * | 2003-03-20 | 2004-10-07 | Leonhard Weiss Gmbh & Co. Kg | Method and device for the production of a particularly solid track for rail vehicles |
DE10319298A1 (en) * | 2003-04-29 | 2004-11-18 | Gsg Knape Gleissanierung Gmbh | Construction method for permanent way for railways, with construction of track bed incorporating antifreeze layer, sub base, concrete sub base, and thin asphalt layer to compensate for unevenness |
AT500876B1 (en) * | 2004-06-03 | 2006-11-15 | Rte Technologie Gmbh | METHOD FOR MANUFACTURING A FIXED RAILWAY RAILWAY |
DE102006035242A1 (en) * | 2006-07-26 | 2008-03-13 | Rail.One Gmbh | Slab track for rail vehicles and method of manufacture |
DK2740842T3 (en) | 2012-12-07 | 2018-01-08 | Sonneville Ag | Method of converting a ballast track to a fixed track |
CN103437252B (en) * | 2013-08-05 | 2016-02-03 | 北京市轨道交通设计研究院有限公司 | A kind of track bed structure and construction method thereof |
CN106679619B (en) * | 2016-12-19 | 2019-09-24 | 长安大学 | Test the device of the sedimentation of road-bridge transition section platform back and top course the tensile strain at the bottom |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SE320996B (en) * | 1965-10-05 | 1970-02-23 | Japan National Railway | |
AT370151B (en) * | 1981-03-04 | 1983-03-10 | Plasser Bahnbaumasch Franz | BALLET CLEANING MACHINE AND HARD FOAM PANEL LAYING |
DE4339833C2 (en) * | 1993-11-23 | 1996-04-18 | Euka Bauelemente Verkaufsgesel | Construction machine for the new construction, expansion or dismantling of paved traffic routes |
DE19706032C2 (en) * | 1996-12-05 | 2003-05-15 | Felix Kunzewitsch | Process for the construction of paved routes and device for this process |
-
1999
- 1999-04-13 DE DE19916586A patent/DE19916586A1/en not_active Withdrawn
-
2000
- 2000-04-12 ES ES00929352T patent/ES2233371T3/en not_active Expired - Lifetime
- 2000-04-12 EP EP00929352A patent/EP1169516B1/en not_active Expired - Lifetime
- 2000-04-12 WO PCT/EP2000/003291 patent/WO2000061866A1/en active IP Right Grant
- 2000-04-12 DE DE50008755T patent/DE50008755D1/en not_active Expired - Lifetime
- 2000-04-12 AU AU47473/00A patent/AU4747300A/en not_active Abandoned
- 2000-04-12 AT AT00929352T patent/ATE283391T1/en active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652179A (en) * | 2015-01-22 | 2015-05-27 | 中铁二院工程集团有限责任公司 | Surface layer-reinforced and waterproof heavy-axle load heavy-haul railway subgrade bed structure |
Also Published As
Publication number | Publication date |
---|---|
DE19916586A1 (en) | 2000-10-19 |
AU4747300A (en) | 2000-11-14 |
ATE283391T1 (en) | 2004-12-15 |
ES2233371T3 (en) | 2005-06-16 |
EP1169516A1 (en) | 2002-01-09 |
WO2000061866A1 (en) | 2000-10-19 |
DE50008755D1 (en) | 2004-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1564331B1 (en) | Lifting device | |
DE69924777T2 (en) | Method for producing a track superstructure | |
EP0894898B1 (en) | Construction method for a railway track and device for adjusting the height of the rails as well as for their temporary support | |
EP1169516B1 (en) | Method for renewing railway lines | |
EP1026320B1 (en) | Method for building a ballastless track | |
EP1882777B1 (en) | Method for making a balastless track for a railway | |
DE29705236U1 (en) | Track facility | |
EP1048783A1 (en) | Railway track and its construction method | |
EP1061176B1 (en) | Process for equalisation of the vertical displacements of structural track elements of a fixed railway track | |
EP2837738B1 (en) | Railway track covering of fixed tracks and method for their production | |
AT500982B1 (en) | METHOD FOR LAYING A TRACK OF A FIXED RAILWAY | |
AT500950A4 (en) | METHOD FOR PRODUCING A TUNNEL TRACK FOR RAIL VEHICLES | |
DE3532766A1 (en) | Method for producing a ballastless track superstructure suitable for rapid and economical retreating working | |
DE10261641A1 (en) | Method of making a slab track and track | |
DE10236535B4 (en) | Process for the production of a slab track with the traverse method on bridges and other art structures | |
DE3820656A1 (en) | Installation and method for position correction of a track structure capable of being sealed in on a longitudinal concrete strip | |
AT500876B1 (en) | METHOD FOR MANUFACTURING A FIXED RAILWAY RAILWAY | |
EP1891271B1 (en) | Lifting and directing tie | |
DE19522478C2 (en) | Process for precise and low-tolerance production of rail support points with high surface accuracy and formwork elements for carrying out the process | |
EP1533420A2 (en) | Method for making a ballastless railway track | |
DE19944783A1 (en) | Slab track system | |
DE4402950A1 (en) | Construction of upper deck road with carriageway | |
DE4428163C1 (en) | Method for construction of permanent way in points area | |
DE10221626A1 (en) | Permanent way track for a magnetically levitating train has steel carrier units for the stator assembly, at the support structure, with exact positioning of the stator sections | |
DE102007048214A1 (en) | Prefabricated supporting concrete slab aligning method for rail track for rail-mounted vehicle, involves adjusting concrete slabs and two beam elements in desired height, side and inclination positions by using lifting leveling elements |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20011012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20041124 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20041124 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20041124 Ref country code: IE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20041124 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REF | Corresponds to: |
Ref document number: 50008755 Country of ref document: DE Date of ref document: 20041230 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: GERMAN |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050224 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050224 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050224 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050412 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050412 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050430 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050430 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050430 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050430 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2233371 Country of ref document: ES Kind code of ref document: T3 |
|
GBV | Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed] |
Effective date: 20041124 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FD4D |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
PLAX | Notice of opposition and request to file observation + time limit sent |
Free format text: ORIGINAL CODE: EPIDOSNOBS2 |
|
PLAB | Opposition data, opponent's data or that of the opponent's representative modified |
Free format text: ORIGINAL CODE: 0009299OPPO |
|
26 | Opposition filed |
Opponent name: DEUTSCHE BAHN AG Effective date: 20050824 |
|
BERE | Be: lapsed |
Owner name: GSG KNAPE GLEISSANIERUNG G.M.B.H. Effective date: 20050430 |
|
ET | Fr: translation filed | ||
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PLAF | Information modified related to communication of a notice of opposition and request to file observations + time limit |
Free format text: ORIGINAL CODE: EPIDOSCOBS2 |
|
PLBB | Reply of patent proprietor to notice(s) of opposition received |
Free format text: ORIGINAL CODE: EPIDOSNOBS3 |
|
PLAB | Opposition data, opponent's data or that of the opponent's representative modified |
Free format text: ORIGINAL CODE: 0009299OPPO |
|
R26 | Opposition filed (corrected) |
Opponent name: DEUTSCHE BAHN AG Effective date: 20050824 |
|
PLCK | Communication despatched that opposition was rejected |
Free format text: ORIGINAL CODE: EPIDOSNREJ1 |
|
BERE | Be: lapsed |
Owner name: *GSG KNAPE GLEISSANIERUNG G.M.B.H. Effective date: 20050430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050424 |
|
APBP | Date of receipt of notice of appeal recorded |
Free format text: ORIGINAL CODE: EPIDOSNNOA2O |
|
APAH | Appeal reference modified |
Free format text: ORIGINAL CODE: EPIDOSCREFNO |
|
PLAB | Opposition data, opponent's data or that of the opponent's representative modified |
Free format text: ORIGINAL CODE: 0009299OPPO |
|
R26 | Opposition filed (corrected) |
Opponent name: DEUTSCHE BAHN AG Effective date: 20050824 |
|
APBQ | Date of receipt of statement of grounds of appeal recorded |
Free format text: ORIGINAL CODE: EPIDOSNNOA3O |
|
APBU | Appeal procedure closed |
Free format text: ORIGINAL CODE: EPIDOSNNOA9O |
|
PLBN | Opposition rejected |
Free format text: ORIGINAL CODE: 0009273 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: OPPOSITION REJECTED |
|
27O | Opposition rejected |
Effective date: 20081111 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20110426 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20110421 Year of fee payment: 12 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120412 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 50008755 Country of ref document: DE Representative=s name: MANITZ, FINSTERWALD & PARTNER GBR, DE |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20120411 Year of fee payment: 13 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 50008755 Country of ref document: DE Owner name: KNAPE GRUPPE HOLDING GMBH, DE Free format text: FORMER OWNER: GSG KNAPE GLEISSANIERUNG GMBH, 85737 ISMANING, DE Effective date: 20130320 Ref country code: DE Ref legal event code: R082 Ref document number: 50008755 Country of ref document: DE Representative=s name: MANITZ, FINSTERWALD & PARTNER GBR, DE Effective date: 20130320 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20130610 Year of fee payment: 14 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20131030 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120413 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20140627 Year of fee payment: 15 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 283391 Country of ref document: AT Kind code of ref document: T Effective date: 20140412 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20141231 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140412 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140430 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 50008755 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20151103 |