Nothing Special   »   [go: up one dir, main page]

DE587582C - Process for the production of concrete piles using jacking pipes with a bottom closure - Google Patents

Process for the production of concrete piles using jacking pipes with a bottom closure

Info

Publication number
DE587582C
DE587582C DEG66956D DEG0066956D DE587582C DE 587582 C DE587582 C DE 587582C DE G66956 D DEG66956 D DE G66956D DE G0066956 D DEG0066956 D DE G0066956D DE 587582 C DE587582 C DE 587582C
Authority
DE
Germany
Prior art keywords
jacking pipes
concrete piles
production
bottom closure
jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEG66956D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Compagnie Internationale des Pieux Armes Frankignoui SA
Original Assignee
Compagnie Internationale des Pieux Armes Frankignoui SA
Publication date
Priority to DEG66956D priority Critical patent/DE587582C/en
Application granted granted Critical
Publication of DE587582C publication Critical patent/DE587582C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

Verfahren zur Herstellung von Betonpfählen unter Verwendung von Vortreibrohren mit unterem Abschluß Es ist bei der Herstellung von Ortpfählen mit Vortreibrohren bekannt, für den .Fall, daß mehrere fernrohrartig ineinandergleitende Vortreibrohre benutzt werden, in das unterste Rohr oder bei Benutzung eines einzigen Vortreibrohrs in dieses Rohr einen als Vortreibspitze dienenden Abschlußkörper einzusetzen, der gleichzeitig mit dem den Abschlußkörper enthaltenden Vortreibrohr den Rammschlägen ausgesetzt wird.Process for the production of concrete piles using jacking pipes with lower end It is in the manufacture of cast-in-place piles with jacking pipes known for the .Fall that several telescope-like sliding into each other propulsion tubes be used, in the lowest pipe or when using a single jacking pipe to use a closing body serving as a propulsion tip in this tube, the at the same time as the propulsion pipe containing the closing body, the ramming strokes is exposed.

Der Erfindung gemäß wird der untere Abschluß durch einen Stopfen aus plastischer Masse gebildet, der gleichzeitig mit dem oberen Rand des Rohres den Rammschlägen ausgesetzt wird, so daß er, unter Mitwirkung des von dem Boden ausgeübten Gegendrucks, einen dichtenden Stopfen bildet, der in dem Maße, wie das Vortreibrohr tiefer gesenkt wird, mit fortschreitet und die Dichtung dauernd aufrechterhält. Nach dem fertigen Eintreiben der Vortreibrohre bzw. des Vortreibrohres kann eine feste Fußstelze durch den plastischen Abschlußkörper hindurch in den Boden getrieben werden.According to the invention, the lower end is made of a plug plastic mass formed, which is simultaneously with the upper edge of the tube Pile driving is exposed, so that he, with the help of the exerted by the ground Counterpressure, forms a sealing plug, which in the same measure as the propulsion pipe is lowered deeper, with advances, and the seal is perpetually maintained. After the driving-in of the jacking pipes or the jacking pipe has been completed, a solid stilts driven through the plastic body through into the ground will.

Die Erfindung ist in den Abb. 1, 2 und 3 der Zeichnung in drei verschiedenen Stufen des Vortreibens veranschaulicht. Es ist angenommen, daß drei Vortreibrohre 1, 2 und 3 fernrohrartig ineinandergeschaltet sind. Diese «erden dadurch in den Boden eingetrieben, daß der Rammbär 9, unter Vermittlung eines aufgelegten Schlagkopfes 7, auf den oberen Rand des untersten Vortreibrohres 3 schlägt, so daß dieses in den Boden eindringt und nacheinander die Vortreibrohre 2 und 3 mitzieht. Der Schlagkopf 7 ist mit einer durch den Bär 9- hindurchgehenden Führungsstange 8 ausgerüstet.The invention is shown in Figs. 1, 2 and 3 of the drawing in three different ways Stages of driving illustrated. It is assumed that three jacking pipes 1, 2 and 3 are interconnected like a telescope. This "earths" in the Soil driven that the ram 9, mediating an applied impact head 7, hits the upper edge of the lowermost propulsion pipe 3, so that this is in penetrates the ground and successively pulls the jacking pipes 2 and 3 along with it. The impact head 7 is equipped with a guide rod 8 passing through the bear 9.

Am unteren Ende des untersten Rohres 3 befindet sich der Abschlußkörper q. aus plastischer Masse. Auf diesen Körper 4 (s. Abb. i) werden die Holzklötze 5 und 6 so aufgesetzt, daß durch den Schlagkopf 7 die Rammschläge gleichzeitig auf den oberen Rand des Rohres 3 und auf den Körper 4. ausgeübt werden. Das Eindringen von Wasser in das Rohr wird durch den als Stopfen wirkenden plastischen Körper wirksam verhindert.At the lower end of the lowermost tube 3 is the closing body q. from plastic mass. The wooden blocks are placed on this body 4 (see Fig. I) 5 and 6 placed in such a way that the ramming blows simultaneously through the impact head 7 the upper edge of the tube 3 and on the body 4. The intrusion of water in the pipe becomes effective through the plastic body acting as a plug prevented.

Wenn alle Rohre eingetrieben sind (Abb.2), werden die Klötze 5 und G herausgenommen, worauf die Fußstelze io eingefügt und unter Zwischenschaltung eines Schlagkopfes 12 durch den dünneren Rammbär i i durch den plastischen Körper q. hindurch in den Boden getrieben wird. Der Körper d, verhindert das Eindringen von Wasser in das Vortreibrohr auch während der Zeit, in der die Auswechslung der verschiedenen Teile und das Eintreiben der Fußstelze erfolgt.When all tubes have been driven in (Fig.2), blocks 5 and G removed, whereupon the stilts io inserted and interposed a striking head 12 by the thinner battering ram i i by the plastic body q. is driven through into the ground. The body d prevents penetration of water in the jacking pipe also during the time in which the replacement of the different parts and the driving in of the foot stilt takes place.

Nachdem die Stelze io (Abb. 3) die gewollte Tiefe erreicht hat, wird in der üblichen Weise der Betonpfahl erzeugt, wobei die Stelze io und der jetzt etwas auseinandergetriebene Körper q. als Fuß des Pfahles dienen. Durch Einschütten von Betonmasse und Stampfen des Betons durch den Stampfer 13 bei fortschreitendem Hochziehen der Vortreibrohre 3, 2 und i wird der Pfahl also aufgebaut.After the stilt io (Fig. 3) has reached the desired depth, will produced in the usual way of the concrete pile, the stilt io and the now slightly dispersed bodies q. serve as the foot of the stake. By pouring in of concrete mass and tamping the concrete by the tamper 13 as it progresses By pulling up the jacking pipes 3, 2 and i, the pile is built up.

Claims (2)

PATENTANSPRÜCHE: 1. Verfahren zur Herstellung von Betonpfählen unter Verwendung von Vortreibrohren mit unterem Abschluß, dadurch gekennzeichnet, daß der untere Abschluß durch einen Stopfen (4) aus plastischer Masse gebildet wird, der gleichzeitig mit dem oberen Rand des Rohres :(3) den Rammschlägen ausgesetzt wird. PATENT CLAIMS: 1. Process for the manufacture of concrete piles under Use of jacking pipes with a bottom closure, characterized in that the lower end is formed by a plug (4) made of plastic material, which at the same time as the upper edge of the pipe: (3) exposed to the ramming blows will. 2. Verfahren nach dem Anspruch i, dadurch gekennzeichnet, daß nach dem Eintreiben der Vortreibrohre (3, 2, 1) eine feste Fußstelze (io) durch den plastischen Abschlußkörper hindurchgetrieben wird.2. The method according to claim i, characterized in that after driving the propulsion pipes (3, 2, 1) a fixed foot stilt (io) through the plastic closure body is driven through.
DEG66956D Process for the production of concrete piles using jacking pipes with a bottom closure Expired DE587582C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEG66956D DE587582C (en) Process for the production of concrete piles using jacking pipes with a bottom closure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEG66956D DE587582C (en) Process for the production of concrete piles using jacking pipes with a bottom closure

Publications (1)

Publication Number Publication Date
DE587582C true DE587582C (en) 1933-11-04

Family

ID=7134068

Family Applications (1)

Application Number Title Priority Date Filing Date
DEG66956D Expired DE587582C (en) Process for the production of concrete piles using jacking pipes with a bottom closure

Country Status (1)

Country Link
DE (1) DE587582C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE971834C (en) * 1949-02-15 1959-04-16 Socofonda S A Method and device for the production of in-situ concrete piles

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE971834C (en) * 1949-02-15 1959-04-16 Socofonda S A Method and device for the production of in-situ concrete piles

Similar Documents

Publication Publication Date Title
DE1634470A1 (en) Foundation stake
DE587582C (en) Process for the production of concrete piles using jacking pipes with a bottom closure
DE1129895B (en) Method and device for the production of a foundation pile with concrete casing
DE2260473A1 (en) METHOD AND DEVICE FOR THE PRODUCTION OF DRAENS, PLUG COMPACTIONS OD. DGL
DE2217485A1 (en) METHOD AND APPARATUS FOR MAKING A PILE FROM CONCRETE PAST INTO THE GROUND
DE265150C (en)
DE593620C (en) Device for the production of concrete stakes
DE528006C (en) Process for inserting driven piles made of concrete or reinforced concrete with flange extensions
DE764099C (en) Process and device for the production of reinforced concrete piles
DE594038C (en) Method and device for the production of location posts
AT61209B (en) Method of reinforcing concrete piles.
DE541673C (en) Process for the production of place posts with club feet
DE407615C (en) Process for the production of site stakes in soil containing bog acid
DE428202C (en) Device for making earth holes with concrete filling
DE398627C (en) Method for the production of site stakes from concrete by means of a driving pipe
DE187815C (en)
DE2948879C2 (en) Process for the production of in-situ concrete driven piles
DE232267C (en)
DE270518C (en)
AT133033B (en) Process for the production of cast-in posts made of concrete or the like.
DE414955C (en) Method and device for the manufacture of site stakes from concrete
AT145231B (en) Method of driving pile-driving pipes for the purpose of pouring concrete piles into the ground.
AT123907B (en) Method and device for the production of concrete bored piles.
DE599787C (en) Process for the production of bored piles with a widened pile base
AT140285B (en) Lowering pipe for in-situ concrete piles with end plug.