Nothing Special   »   [go: up one dir, main page]

DE29919790U1 - Tower crane - Google Patents

Tower crane

Info

Publication number
DE29919790U1
DE29919790U1 DE29919790U DE29919790U DE29919790U1 DE 29919790 U1 DE29919790 U1 DE 29919790U1 DE 29919790 U DE29919790 U DE 29919790U DE 29919790 U DE29919790 U DE 29919790U DE 29919790 U1 DE29919790 U1 DE 29919790U1
Authority
DE
Germany
Prior art keywords
boom
piece
section
support
fixed point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE29919790U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liebherr Werk Biberach GmbH
Original Assignee
Liebherr Werk Biberach GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liebherr Werk Biberach GmbH filed Critical Liebherr Werk Biberach GmbH
Priority to DE29919790U priority Critical patent/DE29919790U1/en
Publication of DE29919790U1 publication Critical patent/DE29919790U1/en
Priority to ES00118413T priority patent/ES2250057T3/en
Priority to EP00118413A priority patent/EP1084983B1/en
Priority to DE50011424T priority patent/DE50011424D1/en
Priority to AT00118413T priority patent/ATE307777T1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/34Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes
    • B66C23/342Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes with telescopic elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/68Jibs foldable or otherwise adjustable in configuration

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Jib Cranes (AREA)

Description

04.11.1999 02611-99 G/sk04.11.1999 02611-99 G/sk

Liebherr-Werk Biberach GmbH D-88400 Biberach an der RißLiebherr-Werk Biberach GmbH D-88400 Biberach an der Riss

TurmdrehkranTower crane

Die Erfindung betrifft einen abgespannten Turmdrehkran mit einem an die Turmspitze angelenkten Auslegeranlenkstück, mit dem ein weiteres Auslegerstück gelenkig verbunden ist, mit einem hinteren Abspannelement, das von einem Festpunkt an einer Drehbühne zu einem Festpunkt an einer im Bereich der Turmspitze ^angelenkten Stütze verläuft, und mit zwei weiteren Abspannelementen, die von einem Festpunkt der Stütze oder einem Festpunkt einer weiteren, im Bereich der Turmspitze angelenkten Stütze, die mit der ersten Stütze durch ein Zugelement verbunden ist, zu Festpunkten an dem Auslegeranlenkstück und dem weiteren Auslegerstück verlaufen.The invention relates to a guyed tower crane with a boom pivot piece hinged to the tower top, to which a further boom piece is hingedly connected, with a rear guy element which runs from a fixed point on a rotating platform to a fixed point on a support hinged in the area of the tower top, and with two further guy elements which run from a fixed point of the support or a fixed point of a further support hinged in the area of the tower top, which is connected to the first support by a tension element, to fixed points on the boom pivot piece and the further boom piece.

Turmdrehkräne dieser Art sind in unterschiedlichen Ausführungsformen bekannt.Tower cranes of this type are known in different designs.

Aus EPn 0 132 572 B1 ist beispielsweise ein selbstmontierender Turmdrehkran mit teleskopierbarem Turm bekannt, an dessen äußerem Ende ein Auslegeranlenkstück angelenkt ist, mit dem ggf. über ein Auslegermittelstück ein äußeres Auslegerteil gelenkig verbunden ist. Ein Abspannseil verläuft von einem Festpunkt auf der den Turm tragenden Drehbühne über zwei im Bereich der Turmspitze ange-For example, EP n 0 132 572 B1 discloses a self-assembling tower crane with a telescopic tower, at the outer end of which a boom pivot piece is articulated, to which an outer boom part is articulated, if necessary via a boom center piece. A guy rope runs from a fixed point on the rotating platform supporting the tower over two anchor points attached in the area of the tower top.

-2--2-

lenkte Stützen zu einem Festpunkt an der auslegerseitigen Stütze, an dem zwei weitere Abspannseile befestigt sind, von denen eines zu einem Festpunkt an dem Auslegeranlenkstück und das andere über mindestens eine weitere Stütze zu einem Festpunkt an dem äußeren Auslegerteil geführt ist, derart, daß sich der Kran durch Austeleskopieren des Turms in seine aufgerichtete Betriebsstellung verbringen läßt.directed supports to a fixed point on the boom-side support, to which two further guy ropes are attached, one of which is led to a fixed point on the boom pivot piece and the other via at least one further support to a fixed point on the outer boom part, in such a way that the crane can be brought into its erected operating position by telescoping the tower.

Bei derartigen selbstmontierenden Turmdrehkranen ist in der Transportstellung das Auslegeranlenkstück an den einteleskopierten Turm angeklappt und das äußere Auslegerstück auf das Auslegeranlenkstück zurückgeklappt. Bei einem dreiteiligen Ausleger werden das Auslegeranlenkstück, das Auslegermittelstück und das äußere Auslegerstück zick-zack-förmig zusammengelegt. Dabei kann eine gelenkige Verbindung zwischen den Unter- und Obergurte aufweisenden und aus Gitterträgern bestehenden Auslegerstücken jeweils in der Weise bestehen, daß diese gelenkig an ihren Unter- oder Obergurten verbunden sind. Die frei auseinanderklappenden nicht mit Gelenken versehenen Ober- und Untergurte sind dann an ihren Stirnflächen mit Anschlägen versehen, so daß sich diese im Bereich ihres gestreckten Zustands gegeneinander abstützen können. Besteht aber neben der Abspannung eine derartige Abstützung, ergeben sich bei montiertem Ausleger statisch unbestimmte Systeme, die grundsätzlich zu vermeiden sind.In such self-assembling tower cranes, the boom pivot piece is folded onto the telescoped tower in the transport position and the outer boom piece is folded back onto the boom pivot piece. In a three-part boom, the boom pivot piece, the boom middle piece and the outer boom piece are folded together in a zigzag shape. An articulated connection can be made between the boom pieces, which have lower and upper chords and consist of lattice girders, in such a way that they are articulated to their lower or upper chords. The freely unfolding upper and lower chords, which are not provided with articulated parts, are then provided with stops on their front surfaces so that they can support each other in the area of their extended state. However, if such support is provided in addition to the guying, statically indeterminate systems result when the boom is assembled, which should generally be avoided.

Aufgabe der Erfindung ist es daher, einen einfach montierbaren Turmdrehkran der eingangs angegebenen Art zu schaffen, dessen Ausleger im montierten Zustand ein statisch bestimmtes System darstellt.The object of the invention is therefore to provide an easily assembled tower crane of the type specified at the outset, the boom of which represents a statically determined system when assembled.

Weiterhin soll eine sehr einfache und gleichzeitig sehr sichere Auslegerentfaltung und Zusammenfaltung erreicht werden.Furthermore, a very simple and at the same time very safe boom unfolding and folding should be achieved.

Erfindungsgemäß wird diese Aufgabe dadurch gelöst, daß zwischen das Auslegeranlenkstück und dem weiteren Auslegerstück ein kurzes Auslegerstück geschaltet ist, das mit seinem Obergurt gelenkig mit dem Auslegeranlenkstück und seinem Untergurt gelenkig mit dem weiteren Auslegerstück verbunden und mit Anschlag-According to the invention, this object is achieved in that a short boom section is connected between the boom pivot piece and the further boom section, which is connected with its upper chord in an articulated manner to the boom pivot piece and its lower chord in an articulated manner to the further boom section and is provided with stop

• ··

• ··

stücken an den Stirnseiten der verbleibenden Ober- und Untergurte versehen ist, die sich im Bereich einer etwa gestreckten Stellung der Auslegerstücke an den Anschlagstellen der Untergurte des Auslegeranlenkstücks und des kurzen Auslegerstücks aneinanderlegen.pieces on the front sides of the remaining upper and lower chords, which lie against one another in the area of an approximately extended position of the boom pieces at the attachment points of the lower chords of the boom pivot piece and the short boom piece.

Bei dem erfindungsgemäßen Turmdrehkran stützen sich im montierten Zustand des Auslegers die Untergurte des Auslegeranlenkstücks und des kurzen Auslegerstücks gegeneinander ab. Hingegen wird die Abspannung so ausgeführt, daß sich die Obergurte des kurzen Auslegerstücks und des weiteren Auslegerstücks nicht gegeneinander abstützen, so daß zwischen diesen ein Spalt verbleibt. Dieser Spalt entlastet das Gelenk zwischen den Obergurten des kurzen Auslegerstücks und des Auslegeranlenkstücks. Die gelenkige Verbindung im Bereich der Untergurte des kurzen Auslegerstücks und des weiteren Auslegerstücks schaffen ein günstiges, statisch bestimmtes System, das zu einer günstigen Beanspruchung und Belastung der einzelnen Kranteile führt. Die Anschlagstelle zwischen den Obergurten des kurzen Auslegerstücks und des weiteren Auslegerstücks kommt nur beim Transport und bei der Auslegermontage zum Einsatz.In the tower crane according to the invention, the lower chords of the boom pivot piece and the short boom piece support each other when the boom is assembled. In contrast, the bracing is designed in such a way that the upper chords of the short boom piece and the other boom piece do not support each other, so that a gap remains between them. This gap relieves the joint between the upper chords of the short boom piece and the boom pivot piece. The articulated connection in the area of the lower chords of the short boom piece and the other boom piece creates a favorable, statically determined system that leads to favorable stress and loading of the individual crane parts. The attachment point between the upper chords of the short boom piece and the other boom piece is only used during transport and when assembling the boom.

Um jedoch zu verhindern, daß sich zwischen den Anschlagstücken der Obergurte des kurzen Auslegerstücks und des weiteren Auslegerstücks während der Montage ein unerwünscht großer Spalt bildet, ist in weiterer Ausgestaltung der Erfindung vorgesehen, daß zwischen den Anschlagstücken der Obergurte des kurzen Auslegerstücks und des weiteren Auslegerstücks ein den Schwenkwinkel begrenzendes Zugelement, z.B. ein mit einem Langloch versehener Riegel, angeordnet ist.However, in order to prevent an undesirably large gap from forming between the stop pieces of the upper chords of the short boom section and the further boom section during assembly, a further embodiment of the invention provides that a tension element limiting the swivel angle, e.g. a latch provided with an elongated hole, is arranged between the stop pieces of the upper chords of the short boom section and the further boom section.

Nach einer bevorzugten Ausführungsform der Erfindung ist vorgesehen, daß das weitere Auslegerstück ein Auslegermittelstück ist, mit dessen Untergurt gelenkig ein äußeres Auslegerstück verbunden ist, daß die Obergurte des Auslegermittelstücks und des äußeren Auslegerstücks mit Anschlagstücken versehen sind, die sich im Bereich ihrer gestreckten Stellung aneinanderlegen, und daß ein Abspannelement von dem Festpunkt der Stütze, statt zu einem Festpunkt an dem Auslegermittelstück, über die Stütze im Bereich zwischen dem Auslegeranlenkstück und Ausle-According to a preferred embodiment of the invention, it is provided that the further boom section is a boom middle section, to the lower chord of which an outer boom section is connected in an articulated manner, that the upper chords of the boom middle section and the outer boom section are provided with stop pieces which lie against one another in the region of their extended position, and that a guying element is connected from the fixed point of the support, instead of to a fixed point on the boom middle section, over the support in the region between the boom articulation piece and the boom.

-A--A-

germittelstück und über eine Stütze im Bereich zwischen dem Auslegermittelstück und dem äußeren Auslegerstück zu einem Festpunkt an dem äußeren Auslegerstück verläuft. Auch nach dieser Ausgestaltung ist vorgesehen, daß im abgespannten Zustand des Auslegers ein Spalt zwischen den Anschlagstücken der Obergurte des Auslegermittelstücks und des äußeren Auslegerstücks verbleibt, so daß sich ein statisch bestimmtes System ergibt.ger middle section and over a support in the area between the boom middle section and the outer boom section to a fixed point on the outer boom section. According to this design, it is also provided that when the boom is braced, a gap remains between the stop pieces of the upper chords of the boom middle section and the outer boom section, so that a statically determined system is created.

Nach einer weiteren bevorzugten Ausführungsform ist vorgesehen, daß im Endbereich des Auslegermittelstücks eine mit einer Fanggabel versehene Stütze angeordnet ist, die sich während der Auslegerentfaltung mit einem Haltestück des Abspannelements verhakt. Diese mit der Fanggabel versehene Stütze ist eine Hilfsstütze während des Entfaltens des Auslegers, die die erforderliche Überleitung des Abspannelements zwischen dem Auslegermittelstück und dem äußeren Auslegerstück bewirkt. Das Haltestück kann eine Gelenkachse zwischen zwei das Abspannelement bildenden Stangen sein. Die mit der Fanggabel versehene Stütze ist zweckmäßigerweise mit einer Halteeinrichtung versehen, die diese in einem derartigen Zustand hält, daß die Fanggabel beim Zusammenfalten des Auslegers wieder in Eingriff mit dem Haltestück kommt.According to a further preferred embodiment, a support provided with a catch fork is arranged in the end region of the boom center piece, which catches itself with a holding piece of the guy element during the boom unfolding. This support provided with the catch fork is an auxiliary support during the unfolding of the boom, which brings about the necessary transfer of the guy element between the boom center piece and the outer boom piece. The holding piece can be a hinge pin between two rods forming the guy element. The support provided with the catch fork is expediently provided with a holding device which holds it in such a state that the catch fork comes into engagement with the holding piece again when the boom is folded up.

Die Stütze kann auch als teleskopierbarer Stab ausgebildet werden, wobei dann die Fanggabel entfallen kann, indem der obere Stützenpunkt dauerhaft mit dem Abspannpunkt gelenkig verbunden wird. Diese Lösung ist sicherer, weil das Eingreifen einer Fanggabel nicht benötigt wird. Das austeleskopierende Stützteil garantiert ein sicheres Auftreffen des entsprechenden Auslegerabspannpunkts auf der Stütze während der Auslegermontage.The support can also be designed as a telescopic rod, in which case the safety fork can be omitted by permanently connecting the upper support point to the guying point. This solution is safer because the intervention of a safety fork is not required. The telescopic support part guarantees that the corresponding boom guying point hits the support safely during boom assembly.

Nach einer weiteren bevorzugten Ausführungsform ist vorgesehen, daß die geometrische Anordnung der Stützen- und Auslegeranlenkpunkte so gewählt ist, daß die Abspannungen in der Betriebs- in der Montage- und in der Transportstellung immer in fast gestreckter Form vorhanden sind, so daß sie auch als Seile ausgeführt werden können, welche sich einerseits wegen der gestreckten Form nirgends bei der Montage verheddern können und welche andererseits das seitliche Ver-According to a further preferred embodiment, the geometric arrangement of the support and boom articulation points is selected in such a way that the guy wires are always in an almost stretched form in the operating, assembly and transport positions, so that they can also be designed as ropes which, on the one hand, cannot get tangled anywhere during assembly due to their stretched form and, on the other hand, prevent lateral movement.

I» ·I» ·

• ··

-5--5-

schwenken der Auslegerteile aneinander auf einfache Weise ermöglichen. Durch diese Ausführungsform wird eine gewichtsmäßig sehr leichte und kostengünstige Abspannung geschaffen.The boom sections can be easily pivoted together. This design creates a very lightweight and cost-effective guying system.

Nach einer weiteren bevorzugten Ausführungsform ist vorgesehen, daß ein meistens mit einer Montagewinde versehenes Montageseil über eine Rolle der Stütze zwischen dem Auslegeranlenkstück und dem Auslegermittelstück zu einem Festpunkt an dem Auslegermittelstück verläuft.According to a further preferred embodiment, it is provided that an assembly cable, usually provided with an assembly winch, runs over a roller of the support between the boom pivot piece and the boom center piece to a fixed point on the boom center piece.

Nach einer weiteren Ausführungsform ist vorgesehen, daß das Montageseil auch bei gestrecktem Ausleger eine tragende Funktion hat und das Auslegermittelstück als dritte Auslegerabspannung in einem Endpunkt während des Kranbetriebs hält, so daß die Obergurtanschlagstelle zwischen Auslegermittel- und Kopfstück im gestreckten Auslegerzustand ohne Kontakt ist. Hierdurch wird ein statisch unbestimmtes System vermieden.According to a further embodiment, the assembly rope has a load-bearing function even when the boom is extended and holds the boom center section as a third boom guy at an end point during crane operation, so that the upper chord attachment point between the boom center section and head section is without contact when the boom is extended. This avoids a statically indeterminate system.

Ein Ausführungsbeispiel der Erfindung wird nachstehend anhand der Zeichnung
näher erläutert. In dieser zeigt
An embodiment of the invention is described below with reference to the drawing
explained in more detail. In this

Fig. 1 eine Seitenansicht eines unten drehenden selbstmontierenFig. 1 is a side view of a bottom rotating self-assembling

den Turmdrehkrans im aufgerichteten Zustand in schematischer Darstellung,the tower crane in the erected state in a schematic representation,

Fig. 2 eine Seitenansicht des Turmdrehkrans nach Fig. 1 in seinemFig. 2 is a side view of the tower crane according to Fig. 1 in its

auf einem Kranfahrzeug zusammengefalteten Transportzustand, folded transport condition on a crane vehicle,

Fig. 3 eine Vorderansicht des zusammengefalteten mobilenFig. 3 a front view of the folded mobile

Turmdrehkrans nach Fig. 2,Tower crane according to Fig. 2,

Fig. 4 bis Fig. 8 den Turmdrehkran nach den Fig. 1 bis 3 in unterschiedlichen Zuständen während seines Aufrichtens,Fig. 4 to Fig. 8 show the tower crane according to Fig. 1 to 3 in different states during its erection,

Fig. 9 den Ausleger kurz vor Erreichen seiner montierten EndstelFig. 9 the boom shortly before reaching its assembled end position

lung,ment,

Fig. 10 den Ausleger nach Fig. 9 in seiner montierten Endstellung undFig. 10 the boom according to Fig. 9 in its assembled end position and

&bull; · &phgr; <&bull; · ϕ <

&bull; &phgr; &phgr;&bull; φ φ

-6--6-

Fig. 11 den Ausleger in der montierten Endstellung, in der das AusleFig. 11 the boom in the assembled end position, in which the boom

germittelstück zusätzlich über das Montageseil gehalten wird.The middle section is additionally held in place by the mounting rope.

Der in Fig. 1 schematisch dargestellte unten drehende Turmdrehkran besteht aus einem auf dem Boden abgestützten Podest 1, das auch, wie aus den Fig. 2 und 3 ersichtlich, durch den Unterwagen eines Mobilkrans ersetzt werden kann, der in seiner Betriebsstellung durch ausfahrbare Stützen abgestützt ist, und aus einem auf dem Podest 1 oder Unterwagen über eine Drehverbindung 2 gelagerten Oberwagen oder Drehbühne 3. Mit der Drehbühne 3 ist ein unteres Turmteil 4 verbunden, aus dem ein oberes Turmteil 5 durch Antriebsmittel, beispielsweise einen Flaschenzug, aus- und einteleskopierbar ist. Der Turm 4, 5 läßt sich zwischen seiner auf der Drehbühne 3 liegenden Transportstellung und seiner aus Fig. 1 ersichtlichen aufgerichteten Stellung verschwenken, wobei diese Verschwenkung üblicherweise durch einen Montageflaschenzug erfolgt und die beidseits gelenkig gelagerten Abstützstreben 6 und 7 den Turm im Montageablauf führen. In der aufgerichteten Stellung wird der Turm 4, 5 mit der Drehbühne 3 durch eine fußseitige Verbolzung 100 verriegelt. Mit einem Festpunkt 8 auf der Drehbühne 3 ist ein Zugelement 9 verbunden, das zu einem Festpunkt 10 einer rückwärtigen Stütze 11 verläuft, die im Bereich der Turmspitze im Gelenk 12 mit dem Auslegeranlenkstück 13 verbunden ist. Im Gelenk 12 ist eine weitere Stütze 14 angelenkt, von deren äußeren Festpunkt 15 ein Zugelement zu dem Festpunkt 10 der Rückenstütze 11 verläuft, das beispielsweise aus zwei durch das Gelenk 16 verbundene Abspannstäbe 17, 18 bestehen kann. Von dem Festpunkt 15 verläuft ein Zugelement 20, das aus einem Seil oder einem teleskopierbaren Stab bestehen kann, zu dem Festpunkt 21 im Endbereich des Auslegeranlenkstücks 13. Von dem Festpunkt 15 verläuft weiterhin eine Abspannung zu dem Festpunkt 23 an dem äußeren Auslegerteil 24, wobei die Abspannung aus faltbar miteinander verbundenen Stäben 25, 26 oder Seilen 27, 28 bestehen kann. Zudem ist der Stab 25 hier als Teleskopstab ausgeführt.The bottom-spinning tower crane shown schematically in Fig. 1 consists of a platform 1 supported on the ground, which, as can be seen from Figs. 2 and 3, can also be replaced by the undercarriage of a mobile crane, which is supported in its operating position by extendable supports, and of an upper carriage or slewing platform 3 mounted on the platform 1 or undercarriage via a slewing connection 2. A lower tower section 4 is connected to the slewing platform 3, from which an upper tower section 5 can be telescoped out and in by drive means, for example a pulley block. The tower 4, 5 can be pivoted between its transport position on the slewing platform 3 and its erected position shown in Fig. 1, this pivoting usually being carried out by an assembly pulley block and the support struts 6 and 7 articulated on both sides guide the tower during the assembly process. In the erected position, the tower 4, 5 is locked to the rotating platform 3 by a bolt 100 on the base. A tension element 9 is connected to a fixed point 8 on the rotating platform 3, which runs to a fixed point 10 of a rear support 11, which is connected to the boom pivot piece 13 in the area of the tower tip in the joint 12. A further support 14 is hinged in the joint 12, from whose outer fixed point 15 a tension element runs to the fixed point 10 of the rear support 11, which can consist, for example, of two guy rods 17, 18 connected by the joint 16. A tension element 20, which can consist of a rope or a telescopic rod, runs from the fixed point 15 to the fixed point 21 in the end region of the boom pivot piece 13. A guy line also runs from the fixed point 15 to the fixed point 23 on the outer boom part 24, whereby the guy line can consist of foldably connected rods 25, 26 or ropes 27, 28. In addition, the rod 25 is designed here as a telescopic rod.

Die Abspannung 25, 26, 27, 28 zwischen dem Festpunkt 15 an der Stütze 14 und dem Festpunkt 23 an dem äußeren Auslegerstück 24 verläuft über Festpunkte der Zwischenstützen 50 und 51, von denen die Stütze 50 gelenkig auf der GelenkachseThe bracing 25, 26, 27, 28 between the fixed point 15 on the support 14 and the fixed point 23 on the outer boom section 24 runs over fixed points of the intermediate supports 50 and 51, of which the support 50 is hinged on the hinge axis

-7--7-

des Gelenks 54 zwischen dem Auslegeranlenkstück und dem Auslegermittelstück und die Stütze 51 gelenkig mit dem Endbereich des Auslegermittelstücks 33 verbunden ist.the joint 54 between the boom pivot piece and the boom center piece and the support 51 is pivotally connected to the end region of the boom center piece 33.

Die rückwärtige Abspannung 9 kann ebenfalls aus einem Seil oder aber aus gelenkig und/oder teleskopierbar miteinander verbundenen Stäben 30, 31, 32 bestehen.The rear guy 9 can also consist of a rope or of rods 30, 31, 32 connected to one another in an articulated and/or telescopic manner.

Wie aus der Fig. 1 ersichtlich ist, läßt sich das mit dem Auslegermittelstück 33 verbundene Auslegerstück 24 auch über die Montagewinde 34 wippen, deren Seil 35 in der dargestellten Weise über Rollen zu dem Festpunkt 36 an dem Auslegermittelstück 33 verläuft.As can be seen from Fig. 1, the boom section 24 connected to the boom center section 33 can also be luffed via the assembly winch 34, the cable 35 of which runs in the manner shown over rollers to the fixed point 36 on the boom center section 33.

Der aus Fig. 1 ersichtliche Turmdrehkran läßt sich durch Aufrichten des Turms 4, 5 und anschließendem Austeleskopieren des äußeren Turmteils 5 in seine Betriebsstellung verbringen.The tower crane shown in Fig. 1 can be brought into its operating position by erecting the tower 4, 5 and then telescoping out the outer tower part 5.

Aus Fig. 2 ist der in Fig. 1 schematisch dargestellte Turmdrehkran als Mobilkran in seiner Transportstellung dargestellt. Der Unterwagen 1 des Mobilkrans besteht aus dem Fahrgestell, das mit ausfahrbaren Stützen 40 versehen ist. In der aus den Fig. 2 und 3 ersichtlichen Transportstellung ist das Auslegeranlenkstück 35 an den einteleskopierten Turm 4, 5 angeklappt. Das auf das Auslegeranlenkstück 35 zurückgefaltete Auslegermittelstück 33 ist seitlich an das Auslegeranlenkstück 35 angeklappt, um dadurch die Transporthöhe des Mobilkrans in der Transportstellung zu verringern. An das Auslegermittelstück 33 ist um ein im Bereich der Basisgurte liegendes Quergelenk das äußere Auslegerteil 24 angeklappt.Fig. 2 shows the tower crane shown schematically in Fig. 1 as a mobile crane in its transport position. The undercarriage 1 of the mobile crane consists of the chassis, which is provided with extendable supports 40. In the transport position shown in Figs. 2 and 3, the boom pivot piece 35 is folded onto the telescoped tower 4, 5. The boom middle section 33 folded back onto the boom pivot piece 35 is folded laterally onto the boom pivot piece 35 in order to reduce the transport height of the mobile crane in the transport position. The outer boom part 24 is folded onto the boom middle section 33 around a cross joint located in the area of the base belts.

Aus den Fig. 4 bis 7 ist der Turmdrehkran in verschiedenen Zuständen während seines Aufrichtens ersichtlich.Fig. 4 to 7 show the tower crane in different states during its erection.

Fig. 4 zeigt den um einen Winkel von etwa 60 Grad zu der Drehbühne verschwenkten Turm, an den die zick-zack-artig zusammengefalteten Auslegerteile an den Turm angeklappt sind. Das Auslegermittelstück 33 und Auslegerteil 24 ist nochFig. 4 shows the tower pivoted at an angle of about 60 degrees to the rotating platform, to which the zigzag-folded boom parts are folded onto the tower. The boom center section 33 and boom part 24 are still

&igr; » ,. «et&igr; » ,. «et

»&diams;»&diams;

8-8th-

seitlich an das Auslegeranlenkstück 13 zur Verringerung der Transporthöhe angelegt. Die hintere Abspannung 9 ist noch ohne Spannung, wobei teilweise noch die die Abspannung bildenden Gestänge abgewinkelt aufeinander liegen.attached to the side of the boom linkage 13 to reduce the transport height. The rear guying 9 is still without tension, whereby some of the rods forming the guying are still lying at an angle on top of each other.

In der aus Fig. 5 ersichtlichen Stellung ist der Turm vollständig aufgerichtet und mit der Drehbühne verriegelt. Die hintere Abspannung 9 befindet sich im gestreckten Zustand, so daß durch weiteres Austeleskopieren des inneren Turmstücks 5 aus dem äußeren Turmstück 4 über die Abspannung 9 eine den Ausleger entfaltende Spannung ausgeübt wird. In der aus Fig. 5 ersichtlichen Stellung ist das Auslegermittelstück 33 relativ zu dem Auslegeranlenkstück 13 um eine zu den beiden Auslegerteilen parallele Achse in eine Stellung gedreht worden, in der die Höhen der Profile bzw. die Mittelebenen der Auslegerteile miteinander fluchten. Nach Lösen des oberen Gelenks zwischen dem Auslegeranlenkstück 13 und dem Auslegermittelstück 33, das eine Drehung der beiden Auslegerteile um eine zu diesen parallelen Achse gestattet, wird in der aus Fig. 6 ersichtlichen Weise das Auslegermittelstück 33 relativ zu dem Auslegeranlenkstück 13 abgesenkt. Dieses Absenken geschieht in bekannterWeise über das Montageteil 35 mit Hilfe der Montagewinde 34.In the position shown in Fig. 5, the tower is fully erected and locked to the rotating platform. The rear guy 9 is in the extended state, so that by further telescoping the inner tower section 5 from the outer tower section 4, a tension is exerted on the boom which unfolds the boom via the guy 9. In the position shown in Fig. 5, the boom center section 33 has been rotated relative to the boom articulation piece 13 about an axis parallel to the two boom sections into a position in which the heights of the profiles or the center planes of the boom sections are aligned with one another. After loosening the upper joint between the boom articulation piece 13 and the boom center section 33, which allows the two boom sections to rotate about an axis parallel to these, the boom center section 33 is lowered relative to the boom articulation piece 13 in the manner shown in Fig. 6. This lowering is done in a known manner via the mounting part 35 with the aid of the mounting winch 34.

Das Absenken des Teiles 33 muß, vor einem weiteren Turmausteleskopieren, soweit erfolgen, daß sich die Stützen 12 und 14 am Auslegerteil 33 vorbei entfalten können (siehe Fig. 7).Before further telescoping of the tower, the part 33 must be lowered to such an extent that the supports 12 and 14 can unfold past the boom part 33 (see Fig. 7).

Fig. 7 zeigt die zunehmende Entfaltung der Abspannungen bei weiterem Austeleskopieren des inneren Turmstücks 5.Fig. 7 shows the increasing unfolding of the guy wires as the inner tower section 5 is further telescoped out.

Fig. 8 zeigt den Zustand nach weiterem Austeleskopieren des inneren Turmstücks5 und gleichzeitigem Abspulen des Montageseiles 35 durch die Montagewinde 34; das Auslegerteil 33 muß nämlich immer etwas nach rechts geneigt sein, damit es nicht auf das Auslegerteil 13 fällt.Fig. 8 shows the state after further telescoping of the inner tower section 5 and simultaneous unwinding of the assembly cable 35 by the assembly winch 34; the boom part 33 must always be inclined slightly to the right so that it does not fall onto the boom part 13.

Wie aus Fig. 9 ersichtlich ist, ist zwischen dem Auslegeranlenkstück 13 und dem Auslegermittelstück 33 ein kurzes Auslegerstück 52 mit ähnlichem Profil geschaltet.As can be seen from Fig. 9, a short boom piece 52 with a similar profile is connected between the boom pivot piece 13 and the boom center piece 33.

Dieses kurze Auslegerstück 52 ist mit dem Obergurt oder den Obergurten, je nach dem, ob die Auslegerstücke aus Gitterträgern mit dreieckigem oder viereckigem Profil bestehen, des Auslegeranlenkstücks 13 durch das Gelenk mit der Gelenkachse 54 verbunden.This short boom section 52 is connected to the upper chord or chords, depending on whether the boom sections consist of lattice girders with a triangular or square profile, of the boom articulation section 13 by the joint with the joint axis 54.

Das kurze Auslegerstück 52 ist mit seinen Untergurtträgern mit den Untergurtträgern des Auslegermittelstücks 33 durch ein Gelenk mit der Gelenkachse 55 gelenkig verbunden. Die Untergurtträger des Auslegeranlenkstücks 13 und des kurzen Auslegerstücks 52 sind mit Anschlägen 56 versehen, die sich bei gestrecktem Ausleger aufeinander abstützen. In entsprechender Weise ist auch der Obergurtträger oder die Obergurtträger des kurzen Auslegerstücks 52 und des Auslegermittelstücks 33 mit Anschlägen 57 versehen, die sich während der Auslegerentfaltung und im Transportzustand meistens aufeinander abstützen. Nachdem während der Auslegermontage auch teilweise Zugkräfte an dieser Obergurtstelle auftreten können, sind die Obergurtträger des kurzen Auslegerstücks 52 und des Auslegermittelstücks 33 durch ein Zugglied oder einen Riegel mit einer Langlochführung in der Weise miteinander verbunden, daß sich die Anschläge 57 nur unter Bildung eines verhältnismäßig schmalen Spalts voneinander entfernen können. Bei gestrecktem Ausleger (Arbeitsposition) ist die Langlochverbindung weder auf Zug noch auf Druckkontakt; d.h. die Obergurtstelle 57 ist dann kraftfrei.The short boom section 52 is connected with its lower chord supports to the lower chord supports of the boom center section 33 by a joint with the joint axis 55. The lower chord supports of the boom pivot piece 13 and the short boom section 52 are provided with stops 56, which rest on one another when the boom is extended. In a corresponding manner, the upper chord support or supports of the short boom section 52 and the boom center section 33 are also provided with stops 57, which mostly rest on one another during boom deployment and in the transport state. Since tensile forces can also occur at this upper chord point during boom assembly, the upper chord supports of the short boom section 52 and the boom center section 33 are connected to one another by a tension member or a bar with a slotted hole guide in such a way that the stops 57 can only move away from one another by forming a relatively narrow gap. When the boom is extended (working position), the slotted hole connection is neither in tension nor in compression contact; i.e. the upper chord point 57 is then free of force.

In entsprechenderweise ist auch das äußere Auslegerstück 24 durch eine gelenkige Verbindung der Untergurte mit der Gelenkachse 58 mit dem Auslegermittelstück 33 verbunden. Die Obergurtträger sind an ihren Stirnseiten mit Anschlägen 59 versehen, die sich im Bereich des gestreckten Zustande aneinander anlegen.In a corresponding manner, the outer boom section 24 is also connected to the boom center section 33 by an articulated connection of the lower chords with the articulated axis 58. The upper chord supports are provided with stops 59 on their front sides, which rest against one another in the area of the extended state.

Um ein statisch bestimmtes System zu schaffen, sind die Bauteile so ausgeführt, daß in dem aus Fig. 1 ersichtlichen Betriebszustand zwischen dem Obergurt des Auslegermittelstücks 33 und des kurzen Auslegerstücks 52 einerseits ein Spalt vorhanden ist, also sich die Anschläge 57 nicht aufeinander abstützen und andererseits zwischen dem Obergurt des Auslegerteils 33 und 24 die Obergurtanschläge 59 aufeinander abstützen.In order to create a statically determined system, the components are designed in such a way that in the operating state shown in Fig. 1, there is a gap between the upper chord of the boom center section 33 and the short boom section 52 on the one hand, i.e. the stops 57 do not rest on each other and on the other hand the upper chord stops 59 rest on each other between the upper chord of the boom part 33 and 24.

&bull; ··

-&Igr;&Ogr;&Igr; st bei der Ausführungsfomm nach den Fig. 9 und 10 der Ausleger vollständig in seine Betriebsstellung aufgeklappt, wird das Montageseil 35 in der dargestellten Weise schlaff. -&Igr;&Ogr; &Igr; If in the embodiment according to Figs. 9 and 10 the boom is completely unfolded into its operating position, the assembly cable 35 becomes slack in the manner shown.

Im Bereich des äußeren Endes des Auslegermittelstücks ist eine schwenkbare Hilfsstütze 60 gelagert, die an ihrem äußeren Ende mit einer Fanggabel 61 versehen ist. Diese Hilfsstütze 60 dient bei dem Entfalten und Zusammenklappen der Auslegerstücke der Überleitung des Abspannseils über die gelenkige Verbindung zwischen dem Auslegermittelstück 33 und dem äußeren Auslegerstück 24. Dabei greift die Fanggabel in eine Gelenkachse 62, die die Abspanngestänge 27 und 27" miteinander verbindet. In der montierten Stellung des Krans verharrt die Hilfsstütze 60 in einer Stellung, in der sie beim Zusammenlegen des Krans wieder in Eingriff mit der Gelenkachse 62 kommt. Die Lage und Bauteillängen der Stützen 51, 60 und der Auslegerabspannungen 27, 28 sind erfindungsgemäß so gewählt, daß die Abspannungen 27 und 28 beim Kranbetrieb und in der Montage- und Transportposition soweit gestreckt sind, daß ein Verheddern dieser Abspannungen mit anderen Bauteilen verhindert wird (siehe hierzu z.B. Fig. 7). Dadurch ist auch die Abspannung 27 in einer kostengünstigen und gewichtsparenden Art als Seil ausführbar, weil auch das seitliche Umklappen des Auslegerteils 33 an das Auslegerteil 13 (gemäß Fig. 3) damit auf einfache Weise möglich ist.In the area of the outer end of the boom center section, a pivotable auxiliary support 60 is mounted, which is provided with a catch fork 61 at its outer end. This auxiliary support 60 serves to transfer the guy rope over the articulated connection between the boom center section 33 and the outer boom section 24 when the boom sections are unfolded and folded together. The catch fork engages in a joint axis 62 which connects the guy rods 27 and 27". In the assembled position of the crane, the auxiliary support 60 remains in a position in which it comes into engagement with the joint axis 62 again when the crane is folded together. The position and component lengths of the supports 51, 60 and the boom guy rods 27, 28 are selected according to the invention such that the guy rods 27 and 28 are stretched out during crane operation and in the assembly and transport position to prevent these guy rods from becoming tangled with other components (see e.g. Fig. 7). This also means that the guy rod 27 can be used as a rope in a cost-effective and weight-saving manner. executable because it also makes it easy to fold the boom part 33 sideways onto the boom part 13 (as shown in Fig. 3).

Bei dem Ausführungsbeispiel nach Fig. 11 übernimmt das Montageseil 35 in der Betriebsstellung des Krans, also bei entfaltetem Ausleger, eine tragende Funktion. Um dieser Funktion gerecht zu werden, muß die Montagewinde 34 entsprechend dimensioniert und im Betrieb arretiert sein. Um hierbei ein statisch bestimmtes System zu gewährleisten ist jedoch folgende Abänderung zum System gemäß Fig. 1 bzw. Fig. 10 erforderlich: Zwischen den Anschlägen 59 der Obergurte des Auslegermittelstücks 33 und des äußeren Auslegerteils 24 muß beim gestreckten Ausleger in der Arbeitsposition ein Spalt gebildet sein. Die durch die Anschläge 59 gebildete Obergurtkontaktstelle ist bei der aus Fig. 11 ersichtlichen Anordnung nicht er-In the embodiment according to Fig. 11, the assembly cable 35 takes on a supporting function in the operating position of the crane, i.e. when the boom is unfolded. In order to fulfill this function, the assembly winch 34 must be appropriately dimensioned and locked in operation. In order to ensure a statically determined system, however, the following modification to the system according to Fig. 1 or Fig. 10 is necessary: A gap must be formed between the stops 59 of the upper chords of the boom center section 33 and the outer boom part 24 when the boom is extended in the working position. The upper chord contact point formed by the stops 59 is not present in the arrangement shown in Fig. 11.

forderlich und dient nur als Sicherheitselement für den Fall, daß das Montage- und Halteseil 35 reißen sollte, um dann zu verhindern, daß der Ausleger nicht abstürzt.required and serves only as a safety element in the event that the assembly and holding cable 35 should break, in order to prevent the boom from falling.

Claims (8)

1. Abgespannter Turmdrehkran mit einem an die Turmspitze angelenkten Auslegeranlenkstück (13), mit dem ein weiteres Auslegerstück (33) gelenkig verbunden ist,
mit einem hinteren Abspannelement (9), das von einem Festpunkt (8) an einer Drehbühne (3) zu einem Festpunkt an einer im Bereich der Turmspitze angelenkten Stütze (11) verläuft, und
mit zwei weiteren Abspannelementen, die von einem Festpunkt der Stütze oder einem Festpunkt (15) einer weiteren, im Bereich der Turmspitze angelenkten Stütze (14), die mit der ersten Stütze (11) durch ein Zugelement verbunden ist, zu Festpunkten (21, 23) an dem Auslegeranlenkstück (13) und einem weiteren Auslegerstück (24) verlaufen, dadurch gekennzeichnet,
daß zwischen das Auslegeranlenkstück (13) und dem weiteren Auslegerstück (33) ein kurzes Auslegerstück (52) geschaltet ist, das mit seinem Obergurt gelenkig mit dem Auslegeranlenkstück (13) und seinem Untergurt gelenkig mit dem weiteren Auslegerstück (33) verbunden und mit Anschlagstücken (56, 57, 59) an den Stirnseiten der verbleibenden Ober- und Untergurte versehen ist, die sich im Bereich einer etwa gestreckten Stellung der Auslegerstücke an den Anlenkstellen (56, 59) aneinanderlegen.
1. Guyed tower crane with a boom pivot piece ( 13 ) hinged to the tower top, to which another boom piece ( 33 ) is hingedly connected,
with a rear guy element ( 9 ) which runs from a fixed point ( 8 ) on a rotating platform ( 3 ) to a fixed point on a support ( 11 ) hinged in the region of the tower top, and
with two further guy elements which run from a fixed point of the support or a fixed point ( 15 ) of a further support ( 14 ) hinged in the area of the tower top, which is connected to the first support ( 11 ) by a tension element, to fixed points ( 21 , 23 ) on the boom linkage piece ( 13 ) and a further boom piece ( 24 ), characterized in that
that a short boom section ( 52 ) is connected between the boom articulation piece ( 13 ) and the further boom section ( 33 ), which is connected with its upper chord in an articulated manner to the boom articulation piece ( 13 ) and its lower chord in an articulated manner to the further boom section ( 33 ) and is provided with stop pieces ( 56 , 57 , 59 ) on the front sides of the remaining upper and lower chords, which lie against one another at the articulation points ( 56 , 59 ) in the region of an approximately extended position of the boom sections.
2. Turmdrehkran nach Anspruch 1, dadurch gekennzeichnet, daß zwischen den Anschlagstücken (57) der Obergurte des kurzen Auslegerstücks (52) und des weiteren Auslegestücks (33) ein den Schwenkwinkel begrenzendes Zugelement, z. B. ein mit einem Langloch versehener Riegel, angeordnet ist, welcher in der Krantransportstellung und während der Auslegermontage auf der rechten und linken Seite zum Anliegen kommen kann und welcher im Kranbetrieb ohne Kontakt ist. 2. Tower crane according to claim 1, characterized in that between the stop pieces ( 57 ) of the upper chords of the short boom section ( 52 ) and the further boom section ( 33 ) a tension element which limits the swivel angle, e.g. a bar provided with an elongated hole, is arranged, which can come to rest on the right and left side in the crane transport position and during boom assembly and which is without contact during crane operation. 3. Turmdrehkran nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß das weitere Auslegerstück ein Auslegermittelstück (33) ist, mit dessen Untergurt gelenkig ein äußeres Auslegerstück (24) verbunden ist,
daß die Obergurte des Auslegermittelstücks (33) und des äußeren Auslegerstücks (24) mit Anschlagstücken (59) versehen sind, die sich im Bereich ihrer gestreckten Stellung aneinanderlegen, und
daß ein Abspannelement von dem Festpunkt (15) der Stütze (14) statt zu einem Festpunkt an dem Auslegermittelstück, über die Stütze (50) im Bereich zwischen dem Auslegeranlenkstück und Auslegermittelstück, und über die Stütze (51) im Bereich zwischen dem Auslegermittelstück und dem äußeren Auslegerstück, zu einem Festpunkt (23) an dem äußeren Auslegerstück (24) verläuft.
3. Tower crane according to claim 1 or 2, characterized in that the further boom section is a boom middle section ( 33 ), to the lower chord of which an outer boom section ( 24 ) is connected in an articulated manner,
that the upper chords of the boom center section ( 33 ) and the outer boom section ( 24 ) are provided with stop pieces ( 59 ) which lie against one another in the region of their extended position, and
that a guy element runs from the fixed point ( 15 ) of the support ( 14 ) instead of to a fixed point on the boom center piece, over the support ( 50 ) in the area between the boom articulation piece and boom center piece, and over the support ( 51 ) in the area between the boom center piece and the outer boom piece, to a fixed point ( 23 ) on the outer boom piece ( 24 ).
4. Turmdrehkran nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß im Endbereich des Auslegermittelstücks eine oder mehrere Stützen in der Weise angeordnet sind, daß die über diese geführte Auslegerabspannung während der Auslegerentfaltung immer mit einem ausreichenden Abstand zum Ausleger gehalten wird, damit der Entfaltungsablauf nicht zum Anhalten kommt. 4. Tower crane according to one of claims 1 to 3, characterized in that one or more supports are arranged in the end region of the boom center section in such a way that the boom guying guided over these is always kept at a sufficient distance from the boom during boom deployment so that the deployment process does not come to a halt. 5. Turmdrehkran nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß im Endbereich des Auslegermittelstücks (33) eine teleskopierbare oder mit einer Fanggabel (61) versehene Montagestütze (60) angeordnet ist, die sich im Ausführungssystem mit Fanggabel während der Auslegerentfaltung mit einem Haltestück (62) des Abspannelements (27) verhakt und die im Ausführungssystem als Teleskopstab immer fest mit dem Auslegerabspannungspunkt (62) verbunden bleibt. 5. Tower crane according to one of claims 1 to 4, characterized in that a telescopic mounting support ( 60 ) provided with a catch fork ( 61 ) is arranged in the end region of the boom center section ( 33 ), which in the design system with catch fork hooks into a holding piece ( 62 ) of the guying element ( 27 ) during boom deployment and which in the design system as a telescopic rod always remains firmly connected to the boom guying point ( 62 ). 6. Turmdrehkran nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß die geometrische Anordnung der Stützen- und Auslegeranlenkpunkte, insbesondere für die Bauteile (50, 51, 61, 52, 33, 24, 27, 28, 62) so gewählt ist, daß die Abspannungen (27, 28) in der Betriebs-, in der Montage- und in der Transportstellung immer in fast gestreckter Form vorhanden sind, so daß diese damit auch als Seile ausgeführt werden können, welche sich einerseits wegen der gestreckten Form nirgends bei der Montage verheddern können und welche andererseits das seitliche Verschwenken des Auslegerteils (33) an das Auslegerteil (13) auf einfache Weise ermöglichen. 6. Tower crane according to one of claims 1 to 5, characterized in that the geometric arrangement of the support and boom articulation points, in particular for the components ( 50 , 51 , 61 , 52 , 33 , 24 , 27 , 28 , 62 ) is selected such that the guy wires ( 27 , 28 ) are always present in an almost stretched form in the operating, assembly and transport positions, so that they can also be designed as cables which, on the one hand, cannot get tangled anywhere during assembly due to their stretched form and which, on the other hand, enable the jib part ( 33 ) to be pivoted sideways to the jib part ( 13 ) in a simple manner. 7. Turmdrehkran nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, daß ein meistens mit einer Montagewinde (34) versehenes Montageseil (35) über eine Rolle der Stütze zwischen dem Auslegeranlenkstück (13) und dem Auslegermittelstück (33) zu einem Festpunkt (21) an dem Auslegermittelstück (33) verläuft. 7. Tower crane according to one of claims 1 to 6, characterized in that an assembly cable ( 35 ), usually provided with an assembly winch ( 34 ), runs over a roller of the support between the boom articulation piece ( 13 ) and the boom center piece ( 33 ) to a fixed point ( 21 ) on the boom center piece ( 33 ). 8. Turmdrehkran nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, daß das Montageseil (35) auch bei gestrecktem Ausleger eine tragende Funktion hat und das Auslegermittelstück (33) als dritte Auslegerabspannung im Endpunkt (36) während des Kranbetriebs hält, so daß dann die Obergurtanschlagstelle (59) im gestreckten Zustand des Auslegers ohne Kontakt ist. 8. Tower crane according to one of claims 1 to 7, characterized in that the assembly cable ( 35 ) has a supporting function even when the boom is extended and holds the boom center piece ( 33 ) as a third boom guy in the end point ( 36 ) during crane operation, so that the upper chord attachment point ( 59 ) is then without contact in the extended state of the boom.
DE29919790U 1999-09-17 1999-11-04 Tower crane Expired - Lifetime DE29919790U1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
DE29919790U DE29919790U1 (en) 1999-09-17 1999-11-04 Tower crane
ES00118413T ES2250057T3 (en) 1999-09-17 2000-08-24 TORRE ROTATING CRANE.
EP00118413A EP1084983B1 (en) 1999-09-17 2000-08-24 Tower crane
DE50011424T DE50011424D1 (en) 1999-09-17 2000-08-24 Tower Crane
AT00118413T ATE307777T1 (en) 1999-09-17 2000-08-24 TOWER CRANE

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE29916415 1999-09-17
DE29919790U DE29919790U1 (en) 1999-09-17 1999-11-04 Tower crane

Publications (1)

Publication Number Publication Date
DE29919790U1 true DE29919790U1 (en) 2000-04-27

Family

ID=8079081

Family Applications (1)

Application Number Title Priority Date Filing Date
DE29919790U Expired - Lifetime DE29919790U1 (en) 1999-09-17 1999-11-04 Tower crane

Country Status (1)

Country Link
DE (1) DE29919790U1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1084982A1 (en) * 1999-09-17 2001-03-21 Liebherr-Werk Biberach GmbH Tower crane
DE102013006104A1 (en) * 2013-04-09 2014-10-09 Liebherr-Werk Biberach Gmbh Foldable crane jib and crane

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2747048A1 (en) 1976-10-22 1978-04-27 Grues Boilot Pingon Richier S FOLDING BOOM FOR AN EXTENDING CRANE
DE8009033U1 (en) 1980-04-01 1980-09-04 Liebherr-Werk Bischofshofen Gmbh, Bischofshofen (Oesterreich) CRANE WITH TELESCOPE TOWER
DE2831286C2 (en) 1977-07-22 1985-08-29 Ateliers de Construction Mécanique et d'Etudes A.C.M.E. S.A.R.L., Semur-en-Brionnais Device for completely folding or unfolding the boom of a telescopic tower crane, which consists of two articulated elements
DE3433117A1 (en) 1984-09-08 1986-03-20 Peiner Hebe- Und Transportsysteme Gmbh, 5500 Trier Tower crane with three-piece jib
DE4210483C1 (en) 1992-03-31 1993-09-16 Noell Service Und Maschinentechnik Gmbh, 3012 Langenhagen, De Telescopic tower crane - has at least two-part jib with assembly rope which passes over guide rollers on the inner tower and is controlled by adjusting roller

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2747048A1 (en) 1976-10-22 1978-04-27 Grues Boilot Pingon Richier S FOLDING BOOM FOR AN EXTENDING CRANE
DE2831286C2 (en) 1977-07-22 1985-08-29 Ateliers de Construction Mécanique et d'Etudes A.C.M.E. S.A.R.L., Semur-en-Brionnais Device for completely folding or unfolding the boom of a telescopic tower crane, which consists of two articulated elements
DE8009033U1 (en) 1980-04-01 1980-09-04 Liebherr-Werk Bischofshofen Gmbh, Bischofshofen (Oesterreich) CRANE WITH TELESCOPE TOWER
DE3433117A1 (en) 1984-09-08 1986-03-20 Peiner Hebe- Und Transportsysteme Gmbh, 5500 Trier Tower crane with three-piece jib
DE4210483C1 (en) 1992-03-31 1993-09-16 Noell Service Und Maschinentechnik Gmbh, 3012 Langenhagen, De Telescopic tower crane - has at least two-part jib with assembly rope which passes over guide rollers on the inner tower and is controlled by adjusting roller

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1084982A1 (en) * 1999-09-17 2001-03-21 Liebherr-Werk Biberach GmbH Tower crane
DE102013006104A1 (en) * 2013-04-09 2014-10-09 Liebherr-Werk Biberach Gmbh Foldable crane jib and crane
EP2984024B1 (en) * 2013-04-09 2018-05-09 Liebherr-Werk Biberach GmbH Folding crane jib and crane

Similar Documents

Publication Publication Date Title
EP1428788B1 (en) Telescopic jib
DE102017101113B3 (en) Telescopic boom with pole tensioning system for a mobile crane and guying method
EP1369373A2 (en) Telescopic crane boom
DE2552113A1 (en) CRANE, IN PARTICULAR TRUCK-MOUNTED CRANE, AND METHOD OF CONNECTING A LIFTING BOOM TO THE END OF A MULTIPLE TELESCOPIC BOOM
DE2807415A1 (en) JIB CRANE
DE202005005627U1 (en) Crane with anchoring device for moving loads has at least one anchoring support fixed to rocker cylinder
EP0624542A2 (en) Crane with a telescopic tower
EP1426321B1 (en) Mobile crane with two part boom
DE9316113U1 (en) Tower crane
DE1281128B (en) Mobile multi-purpose crane
DE3433117C2 (en) Tower crane with three-part jib
EP2984024B1 (en) Folding crane jib and crane
DE68903372T2 (en) COLLECTABLE CRANE WITH A BOOM CONSISING OF TWO OR THREE JOINTLY CONNECTED ELEMENTS.
DE3340845C1 (en) Lattice boom crane with main boom that can be dismantled
DE20208740U1 (en) Mobile telescopic crane has external bracing cables terminating at their upper end in a fixed sleeve engaging with a cable lock trap at full extension
DE20203443U1 (en) Telescopic jib has bracing supports pivotable around only one single respective pivot point inclined do that supports spread out in V-form during orientation into operating position
DE69810981T2 (en) Technique for erecting the mast for a telescopic crane
DE29919790U1 (en) Tower crane
EP1084983B1 (en) Tower crane
DE202005003207U1 (en) Mobile telescopic crane, for construction work, has stay trestle with stay carrier able to be erected centrally above telescopic boom
DE8009033U1 (en) CRANE WITH TELESCOPE TOWER
DE3337163C2 (en) Suspension of a driver&#39;s cab on a tower crane
DE3401094C2 (en) Crane with telescopic tower
WO2014124798A1 (en) Crane having equipment for dismantling a jib of the crane at height
EP2690053B1 (en) Safety device for a working machine.

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20000531

R021 Search request validly filed

Effective date: 20000510

R163 Identified publications notified

Effective date: 20001117

R150 Utility model maintained after payment of first maintenance fee after three years

Effective date: 20030109

R151 Utility model maintained after payment of second maintenance fee after six years

Effective date: 20051212

R152 Utility model maintained after payment of third maintenance fee after eight years

Effective date: 20071219

R071 Expiry of right