Nothing Special   »   [go: up one dir, main page]

DE202010016190U1 - Disc railings - Google Patents

Disc railings Download PDF

Info

Publication number
DE202010016190U1
DE202010016190U1 DE202010016190U DE202010016190U DE202010016190U1 DE 202010016190 U1 DE202010016190 U1 DE 202010016190U1 DE 202010016190 U DE202010016190 U DE 202010016190U DE 202010016190 U DE202010016190 U DE 202010016190U DE 202010016190 U1 DE202010016190 U1 DE 202010016190U1
Authority
DE
Germany
Prior art keywords
spacer
profile
shaped
wedge
disc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE202010016190U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE202010016190U priority Critical patent/DE202010016190U1/en
Publication of DE202010016190U1 publication Critical patent/DE202010016190U1/en
Priority to PL11009505T priority patent/PL2460949T3/en
Priority to DK11009505.6T priority patent/DK2460949T3/en
Priority to EP11009505.6A priority patent/EP2460949B1/en
Priority to ES11009505T priority patent/ES2570780T3/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1851Filling panels, e.g. concrete, sheet metal panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1851Filling panels, e.g. concrete, sheet metal panels
    • E04F11/1853Glass panels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Securing Of Glass Panes Or The Like (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Scheiben-Geländer (10, 10.3, 10.5, 10.6)
– mit einem formstabilen U-Profil (22, 22.5), zwischen dessen beiden Schenkeln (24, 24.5, 26) der Fußbereich (20) einer Scheibe, wie insbesondere der Glasscheibe (18) eines Geländers eingespannt haltbar ist,
– mit Distanzgliedern (54, 54.3, 70, 70.6, 80, 104) im Mündungsbereich des U-Profils (22, 22.5) jeweils zwischen Scheibe (18) und einem Schenkel (24, 24.5, 26) des U-Profils (22, 22.5),
– dadurch gekennzeichnet, dass
– im oberen, freien Randbereich von zumindest einem der Schenkel (24, 24.5, 26) des U-Profils (22, 22.5) eine Halteeinrichtung (50, 52, 102) für ein an diesem Schenkel (24, 24.5, 26) vorhandenes Distanzglied (54, 54.3, 70, 70.6, 80, 104) so vorhanden ist, dass
– durch die Halteeinrichtung (50, 52, 102) das betreffende Distanzglied (54, 54.3, 70, 70.6, 80, 104) in seinem vorbestimmten Abstand vom Boden (28) des U-Profils (22, 22.5) haltbar ist.
Disc Railings (10, 10.3, 10.5, 10.6)
- With a dimensionally stable U-profile (22, 22.5), between the two legs (24, 24.5, 26) of the foot region (20) of a disc, in particular the glass pane (18) of a railing is preserved,
- With spacers (54, 54.3, 70, 70.6, 80, 104) in the mouth region of the U-profile (22, 22.5) between each disc (18) and a leg (24, 24.5, 26) of the U-profile (22, 22.5),
- characterized in that
- In the upper, free edge region of at least one of the legs (24, 24.5, 26) of the U-profile (22, 22.5) a holding device (50, 52, 102) for a on this leg (24, 24.5, 26) existing spacer member (54, 54.3, 70, 70.6, 80, 104) is present so that
- By the holding means (50, 52, 102) the respective spacer member (54, 54.3, 70, 70.6, 80, 104) in its predetermined distance from the bottom (28) of the U-profile (22, 22.5) is durable.

Figure 00000001
Figure 00000001

Description

TECHNISCHES GEBIETTECHNICAL AREA

Die Erfindung betrifft ein Scheiben-Geländer, mittels der Scheiben in ihrem Fußbereich eingespannt gehalten werden, so dass auf Geländerpfosten verzichtet werden kann.The invention relates to a disc railing, are held by means of the discs clamped in their foot area, so that can be dispensed with railing post.

STAND DER TECHNIKSTATE OF THE ART

Entsprechende Glasscheiben-Geländer sind beispielsweise aus der DE 20 2007 009 239 U1 oder der WO 2009/003452 A1 bekannt. Bei derartigen Geländern ist vorgesehen, die Glasscheibe – die beispielsweise auch aus zwei miteinander verbundenen wie insbesondere miteinander verklebten Einzelscheiben bestehen kann – in ein die Glasscheibe eingespannt haltendes U-Profil einzusetzen. Die Innenwände dieses U-Profils sind ebenflächig ausgebildet. Der Fußbereich der Glasscheibe wird mit einem U-förmigen Profilkörper aus Kunststoff eingefasst, der vor der Montage der Glasscheibe in das U-Profil eingesetzt wird. Anschließend erfolgt mittels keilartiger Einsätze eine exakte und kippsichere Ausrichtung der Glasscheibe. Der U-förmige Profilkörper, der den Fußbereich der Glasscheibe umfasst, reicht dabei beidseitig der Glasscheibe bis in den Mündungsbereich des U-Profils. Vor dem Einsetzen der Glasscheibe in das U-Profil ist dieses U-Profil bereits an einem bauseitig fest angeordneten Befestigungsprofil angeschraubt oder angeschweißt worden. Dazu kann einer der beiden Schenkel des U-Profils eine Umbiegung aufweisen, mittels der das U-Profil an dem Befestigungsprofil eingehängt werden kann.Corresponding glass pane railings are for example from DE 20 2007 009 239 U1 or the WO 2009/003452 A1 known. In such railings is provided, the glass pane - which may for example consist of two interconnected as in particular glued together individual slices - in a glass pane holding clamped holding U-profile. The inner walls of this U-profile are planar. The foot area of the glass pane is edged with a plastic U-shaped profile body, which is inserted into the U-profile before the glass pane is installed. Subsequently, by means of wedge-like inserts, an exact and tilt-proof alignment of the glass pane takes place. The U-shaped profile body, which comprises the foot region of the glass pane, extends on both sides of the glass pane into the mouth region of the U-profile. Before inserting the glass in the U-profile of this U-profile has already been screwed or welded to an on-site fixed mounting profile. For this purpose, one of the two legs of the U-profile having a bend, by means of which the U-profile can be hooked to the mounting profile.

DARSTELLUNG DER ERFINDUNGPRESENTATION OF THE INVENTION

Ausgehend von diesem vorbekannten Stand der Technik liegt der Erfindung die Aufgabe zugrunde, ein verbessertes Scheiben-Geländer anzugeben, das wirtschaftlich günstig hergestellt werden kann und eine möglichst einfache und rasche Montage ermöglicht.Based on this known prior art, the present invention seeks to provide an improved window railing that can be produced economically cheap and allows the simplest possible and quick installation.

Das erfindungsgemäße Scheiben-Geländer ist durch die Merkmale des Hauptanspruchs gegeben. Sinnvolle Weiterbildungen der Erfindung sind Gegenstand von sich an den Hauptanspruch anschließenden weiteren Ansprüchen.The disc railing according to the invention is given by the features of the main claim. Useful developments of the invention are the subject of further claims appending to the main claim.

Erfindungsgemäß ist vorgesehen, im oberen freien Randbereich von zumindest einem der beiden Schenkel des U-Profils eine Halteeinrichtung vorzusehen. An dieser Halteeinrichtung kann ein Distanzglied befestigt werden, so dass das betreffende Distanzglied in seinem vorbestimmten Abstand vom Boden des U-Profils gehalten wird.According to the invention it is provided to provide a holding device in the upper free edge region of at least one of the two legs of the U-profile. At this holding device, a spacer can be attached, so that the relevant spacer is held at its predetermined distance from the bottom of the U-profile.

Bei der Verwendung eines U-förmigen Profilkörpers müssen dessen Wände nicht mehr bis in den Mündungsbereich des U-Profils reichen, so dass der U-förmige Profilkörper deutlich flacher ausgebildet werden kann. Auch die Distanzglieder selbst können kürzer als im Stand der Technik ausgebildet werden. Durch die so erzielte Materialeinsparung ist eine wirtschaftlich günstige Fertigung des Scheiben-Geländers möglich.When using a U-shaped profile body whose walls no longer have to reach into the mouth region of the U-profile, so that the U-shaped profile body can be made significantly flatter. The spacers themselves can be made shorter than in the prior art. Due to the material savings achieved in this way, economically viable production of the window railing is possible.

Die Halteeinrichtung kann zumindest in einem der beiden Schenkel des U-Profils als Hinterschneidung ausgebildet sein. In eine solche Hinterschneidung kann eine Hakenausbildung am Distanzglied eingehängt werden, so dass das Distanzglied lagesicher an dem Schenkel des U-Profils positioniert werden kann.The holding device may be formed as an undercut at least in one of the two legs of the U-profile. In such an undercut hook training can be mounted on the spacer, so that the spacer member can be positioned securely on the leg of the U-profile.

Vorzugsweise kann die Halteeinrichtung in zumindest einem der beiden Schenkel des U-Profils als Nut ausgebildet sein. In diesem Fall könnte das Distanzglied eine entsprechende Feder aufweisen, die in die Nut des U-Profils eingesetzt oder eingeschoben werden kann, um das Distanzglied lagesicher an dem Schenkel des U-Profils zu befestigen. Die Nut des U-Profils muss dabei nicht vollständig von der Feder des Distanzglieds ausgefüllt werden, vielmehr kann es ausreichend sein, die Feder etwas kürzer als die Nut auszubilden. Alternativ oder zusätzlich dazu könnte die Feder zumindest bereichsweise etwas breiter als die Nut ausgebildet sein, so dass die Feder zusammengedrückt werden müsste, um in die Nut eingesetzt werden zu können. Um ein solches Zusammendrücken der Feder zu erleichtern, könnte die Feder einen etwa horizontalen Schlitz aufweisen, wodurch sich die Feder innerhalb der Nut leicht aufspreizen würde.Preferably, the holding device may be formed in at least one of the two legs of the U-profile as a groove. In this case, the spacer member could have a corresponding spring, which can be inserted or inserted into the groove of the U-profile, to secure the spacer member secure against the leg of the U-profile. The groove of the U-profile does not have to be completely filled by the spring of the spacer, but it may be sufficient to form the spring slightly shorter than the groove. Alternatively or additionally, the spring could be at least partially formed slightly wider than the groove, so that the spring would have to be compressed in order to be inserted into the groove can. To facilitate such compression of the spring, the spring could have an approximately horizontal slot, whereby the spring would spread easily within the groove.

Vorzugsweise kann zumindest eines der beiden Distanzglieder als Abstandshalter ausgebildet sein und eine etwa konstante Wandstärke aufweisen. Ein solcher Abstandshalter vereinfacht die Montage des Scheiben-Geländers, da eine rasche Positionierung des Abstandshalters an den Halteeinrichtungen möglich ist. Sofern eine spätere Ausrichtung der in dem U-Profil befindlichen Scheibe nicht erforderlich oder nicht gewünscht ist, kann beidseitig der Scheibe ein Abstandshalter als Distanzglied vorgesehen werden. Um die Scheibe in dem U-Profil ausrichten zu können, sollte der Abstandshalter dagegen vorzugsweise lediglich auf einer Seite der Scheibe vorgesehen werden.Preferably, at least one of the two spacer members may be formed as a spacer and have an approximately constant wall thickness. Such a spacer simplifies the installation of the disc railing, as a rapid positioning of the spacer to the holding devices is possible. If a later alignment of the disc located in the U-profile is not required or not desired, a spacer can be provided as a spacer on both sides of the disc. In contrast, in order to align the disc in the U-profile, the spacer should preferably be provided only on one side of the disc.

In einer vorteilhaften Ausführungsform kann zumindest eines der beiden Distanzglieder zweiteilig ausgebildet sein. Der erste Teil des Distanzglieds kann in diesem Fall an der Halteeinrichtung befestigt werden und einen etwa keilförmigen Querschnitt aufweisen, wobei sich die Wandstärke dieses ersten Teils des Distanzglieds nach unten hin – in Richtung des Bodens des U-Profils – verstärkt. Auch der zweite Teil des Distanzglieds kann keilförmig ausgebildet sein. Dieser zweite Teil des Distanzglieds kann zwischen den ersten Teil des Distanzglieds und die Scheibe eingeschoben werden, wobei durch eine unterschiedlich tiefe Positionierung des zweiten Teils des Distanzglieds eine Ausrichtung der Scheibe möglich ist.In an advantageous embodiment, at least one of the two spacer members may be formed in two parts. In this case, the first part of the spacer can be fastened to the holding device and can have an approximately wedge-shaped cross section, with the wall thickness of this first part of the spacer being directed downwards in the direction of the bottom of the U-profile - reinforced. Also, the second part of the spacer may be wedge-shaped. This second part of the spacer can be inserted between the first part of the spacer and the disc, with an orientation of the disc is possible by a different depth positioning of the second part of the spacer.

Der zweite Teil des Distanzglieds könnte auch stabförmig ausgebildet sein. In diesem Fall kann der keilförmige erste Teil des Distanzglieds vorzugsweise mehrere Vorsprünge aufweisen, die mit gegenseitigem Abstand untereinander angeordnet sind, so dass ein unterer Vorsprung jeweils gegenüber einem dazu oberen Vorsprung weiter in den Innenraum des U-Profils in Richtung quer zur Scheibenebene hineinragt.The second part of the spacer could also be designed rod-shaped. In this case, the wedge-shaped first part of the distance member may preferably have a plurality of projections which are mutually spaced so that a lower projection projects in each case opposite an upper projection to the interior of the U-profile in the direction transverse to the disk plane.

Alternativ oder zusätzlich dazu kann der erste Teil des Distanzglieds einen nach oben offenen Schlitz aufweisen. Nach der Befestigung des ersten Teils des Distanzglieds an der Halteeinrichtung des U-Profils kann der keilförmig ausgebildete zweite Teil des Distanzglieds in diesen Schlitz von oben eingeschoben werden. Der zweite Teil des Distanzglieds würde in diesem Fall zwischen den beiden Wandbereichen des ersten Teils des Distanzglieds positioniert werden und diese Wandbereiche auseinander drücken. Durch unterschiedlich tiefes Positionieren des zweiten Teils des Distanzglied kann auch in diesem Fall eine Ausrichtung der Scheibe erfolgen.Alternatively or additionally, the first part of the spacer may have an upwardly open slot. After attachment of the first part of the spacer to the holding device of the U-profile, the wedge-shaped second part of the spacer can be inserted into this slot from above. The second part of the spacer would be positioned in this case between the two wall portions of the first part of the spacer and press these wall portions apart. By positioning the second part of the distance member at different depths, alignment of the pane can also be effected in this case.

An der Innenseite von zumindest einem der Schenkel des U-Profils kann ein etwa keilförmiger Vorsprung angeformt sein, der als Halteeinrichtung für ein Distanzglied wirkt. Dieser keilförmige Vorsprung sollte eine sich nach oben hin – weg vom Boden des U-Profils – verjüngende Wandstärke aufweisen. Zwischen den keilförmigen Vorsprung des Schenkels des U-Profils und die Scheibe kann ein keilförmiges Distanzglied eingeschoben werden. Durch unterschiedlich tiefes Positionieren des Distanzglieds kann darüber hinaus eine Ausrichtung der Scheibe erfolgen.On the inside of at least one of the legs of the U-profile, an approximately wedge-shaped projection can be formed, which acts as a holding device for a spacer. This wedge-shaped projection should have a wall thickness tapering upwards away from the bottom of the U-profile. Between the wedge-shaped projection of the leg of the U-profile and the disc, a wedge-shaped spacer can be inserted. By positioning the spacer at different depths, alignment of the disk can also be achieved.

Der obere Mündungsbereich des U-Profils kann seitlich der Scheibe beidseitig jeweils durch eine Abdeckprofil abgedeckt werden. Dieses Abdeckprofil kann das Eindringen von Feuchtigkeit, beispielsweise durch Regen, verhindern und für einen optisch ansprechenden Abschluss des U-Profils sorgen. Das Abdeckprofil kann sich lastmäßig auf einem Distanzglied abstützen. Alternativ oder zusätzlich dazu kann das Abdeckprofil an einem Vorsprung beziehungsweise an einer Halteeinrichtung form- und/oder kraftschlüssig befestigt sein.The upper mouth region of the U-profile can be covered on both sides of the disc by a cover profile. This cover profile can prevent the ingress of moisture, for example by rain, and ensure a visually appealing completion of the U-profile. The cover can be supported on a load capacity spacer. Alternatively or additionally, the cover can be attached to a projection or on a holding device positively and / or non-positively.

In einer besonders bevorzugten Ausführungsform kann das Abdeckprofil einteilig mit dem Distanzglied verbunden sein. Abdeckprofil und Distanzglied können somit in einem einzigen Arbeitsschritt montiert werden; eine spätere Nachbearbeitung des oberen Mündungsbereichs des U-Profils ist damit nicht erforderlich.In a particularly preferred embodiment, the cover profile can be integrally connected to the spacer member. Cover profile and spacer can thus be mounted in a single step; a subsequent reworking of the upper mouth region of the U-profile is not required.

Weitere Vorteile und Merkmale der Erfindung sind den in den Ansprüchen ferner angegebenen Merkmalen sowie den nachstehenden Ausführungsbeispielen zu entnehmen.Further advantages and features of the invention can be found in the claims further specified features and the following embodiments.

KURZE BESCHREIBUNG DER ZEICHNUNGBRIEF DESCRIPTION OF THE DRAWING

Die Erfindung wird im Folgenden anhand der in der Zeichnung dargestellten Ausführungsbeispiele näher beschrieben und erläutert. Es zeigen:The invention will be described and explained in more detail below with reference to the embodiments illustrated in the drawings. Show it:

1 einen Querschnitt durch den Fußbereich einer ersten Ausführungsform des Scheiben-Geländers nach der Erfindung, 1 a cross section through the foot region of a first embodiment of the disc railing according to the invention,

2 eine Darstellung der einzelnen Bauteile des Scheiben-Geländers gemäß 1, 2 a representation of the individual components of the disc railing according to 1 .

3 einen Querschnitt durch den Fußbereich einer zweiten Ausführungsform des Scheiben-Geländers nach der Erfindung, 3 a cross section through the foot region of a second embodiment of the disc railing according to the invention,

4 eine Darstellung der einzelnen Distanzglieder und Abdeckprofile für das Scheiben-Geländer gemäß 3, 4 a representation of the individual spacers and covering profiles for the disc railing according to 3 .

5 einen Querschnitt durch den Fußbereich einer dritten Ausführungsform des Scheiben-Geländers nach der Erfindung und 5 a cross section through the foot region of a third embodiment of the disc railing according to the invention and

6 einen Querschnitt durch den Fußbereich einer vierten Ausführungsform des Scheiben-Geländers nach der Erfindung. 6 a cross section through the foot region of a fourth embodiment of the disc railing according to the invention.

WEGE ZUM AUSFÜHREN DER ERFINDUNGWAYS FOR CARRYING OUT THE INVENTION

Ein Glasscheiben-Geländer 10 ist mit seinem Fußbereich im Querschnitt ausschnittsweise in 1 dargestellt. Die im vorliegenden Beispielsfall aus zwei über eine Klebeschicht 12 fest miteinander verklebten Scheiben 14, 16 bestehende Glasscheibe 18 sitzt mit ihrem Fußbereich 20 eingespannt gehalten in einem U-Profil 22.A glass pane railing 10 is in section with its foot in section 1 shown. The example in this case of two via an adhesive layer 12 firmly glued together discs 14 . 16 existing glass pane 18 sits with her foot area 20 clamped in a U-profile 22 ,

Der rechte und der linke Schenkels 24, 26 des U-Profils 22 sind im vorliegenden Beispielsfall ebenflächig ausgebildet und ragen unter Bildung einer jeweiligen Ausrundung rechtwinklig von einem den Boden 28 des U-Profils bildenden Steg nach oben aus. Im Gegensatz zu dem hier dargestellten Ausführungsbeispiel könnte das U-Profil zumindest in seinem unteren Bereich auch trichterförmig ausgebildet sein. Die Wandstärke der beiden Schenkel würde in diesem Fall ab einem bestimmten Punkt nach unten hin – in Richtung des Bodens des U-Profils – leicht zunehmen.The right and the left thigh 24 . 26 of the U-profile 22 are planar in the present example and protrude to form a respective fillet at right angles from the ground 28 of the U-profile forming web upwards. In contrast to the embodiment shown here, the U-profile could also be funnel-shaped at least in its lower region. The wall thickness of the two legs would in this case from a certain point down towards the bottom of the U-profile - slightly increase.

Die beiden Schenkel 24, 26 des U-Profils 22 können unterschiedlich lang sein. So könnte bei einem an der Stirnseite einer Boden- oder Deckenplatte montierten Glasscheiben-Geländer der innere, rechte Schenkel 24 insbesondere aus optischen Gründen niedriger als der äußere, linke Schenkel 26 ausgebildet sein.The two thighs 24 . 26 of the U-profile 22 can be different lengths. For example, in the case of a glass pane railing mounted on the front side of a floor or ceiling plate, the inner right leg could 24 especially for optical reasons lower than the outer left leg 26 be educated.

In dem U-Profil 22 ist die Glasscheibe 18 mit ihrem Fußbereich 20 eingespannt gehalten. Die Glasscheibe 18 wird dazu in ihrem unteren Randbereich 30 von einem U-förmigen Profilkörper 32 eng anliegend umschlossen. Dieser U-förmige Profilkörper 32 besitzt einen Boden 34 mit zwei nach oben ragenden Wänden 36, 38. Solange noch keine Glasscheibe 18 in das U-Profil 22 und den U-förmigen Profilkörper 32 eingesetzt worden ist, weist der Boden 34 eine satteldachförmige Form auf. Beim Herunterdrücken des satteldachförmigen Bodens 34 durch eine eingesetzte Glasscheibe 18 drücken sich die unteren Wandbereiche 40, 42, die jeweils eine äußere Ausrundung aufweisen, nach außen gegen die beiden Schenkel 24, 26 des U-Profils 22. Auf diese Weise ist eine spielfreie Anlage des Fußbereichs 20 der Glasscheibe 18 im Bodenbereich des U-Profils 22 und damit im unteren Randbereich 30 der Glasscheibe 18 möglich.In the U-profile 22 is the glass pane 18 with her foot area 20 kept clamped. The glass pane 18 will do so in its lower edge area 30 from a U-shaped profile body 32 enclosed tightly. This U-shaped profile body 32 owns a floor 34 with two upstanding walls 36 . 38 , As long as no glass 18 in the U-profile 22 and the U-shaped profile body 32 has been used, the ground points 34 a saddle roof-shaped form. When pushing down the saddle roof-shaped bottom 34 through an inserted glass pane 18 Press the lower wall areas 40 . 42 , each having an outer fillet, outwardly against the two legs 24 . 26 of the U-profile 22 , In this way, a play-free investment of the foot area 20 the glass pane 18 in the bottom area of the U-profile 22 and thus in the lower edge area 30 the glass pane 18 possible.

Die Wände 36, 38 des U-förmigen Profilkörpers 32 können im Vergleich zu den beiden Schenkeln 24, 26 des U-Profils 22 vergleichsweise kurz ausgebildet werden, wie es auch in 1 dargestellt ist. Im Gegensatz zu dem hier dargestellten Ausführungsbeispiel könnten die Wände 36, 38 des U-förmigen Profilkörpers 32 allerdings auch bis fast in den Mündungsbereich des U-Profils 22 hineinragen.The walls 36 . 38 of the U-shaped profile body 32 can compared to the two thighs 24 . 26 of the U-profile 22 be formed relatively short, as it is in 1 is shown. In contrast to the embodiment shown here, the walls could 36 . 38 of the U-shaped profile body 32 but also almost to the mouth of the U-profile 22 protrude.

Der U-förmige Profilkörper 32 besteht aus einem leichten Kunststoffmaterial, das eine ausreichende Druckfestigkeit besitzt. Das Gewicht der Glasscheibe 18 wird durch den auf sie aufgeschobenen U-förmigen Profilkörper 32 nur unwesentlich größer.The U-shaped profile body 32 consists of a lightweight plastic material that has sufficient compressive strength. The weight of the glass 18 is due to the deferred on them U-shaped profile body 32 only slightly larger.

An der Innenseite der beiden Schenkel 24, 26 des U-Profils 22 ist im vorliegenden Beispielsfall jeweils eine Hinterschneidung 50, 52 vorhanden. Die beiden Hinterschneidungen 50, 52 sind im Mündungsbereich des U-Profils 22 angeordnet und befinden sich im vorliegenden Beispielsfall auf gleicher Höhe. Im Gegensatz zu dem hier dargestellten Ausführungsbeispiel könnte eine der beiden Hinterschneidungen 50, 52 auch etwas höher als die andere der beiden Hinterschneidungen 50, 52 angeordnet sein.On the inside of the two thighs 24 . 26 of the U-profile 22 is in this case an undercut 50 . 52 available. The two undercuts 50 . 52 are in the mouth area of the U-profile 22 arranged and are in the present example case at the same height. In contrast to the embodiment shown here could be one of the two undercuts 50 . 52 also slightly higher than the other of the two undercuts 50 . 52 be arranged.

Die Hinterschneidungen 50, 52 dienen als Halteeinrichtung für jeweils ein Distanzglied. An der Hinterschneidung 52 im linken Schenkel 26 des U-Profils 22 ist im vorliegenden Beispielsfall ein als Abstandshalter 54 ausgebildetes Distanzglied befestigt. Der Abstandshalter 54 besitzt eine konstante Wandstärke und weist in seinem oberen Bereich eine Hakenausbildung 56 auf. Mit dieser Hakenausbildung 56 kann der Abstandshalter 54 an der Hinterschneidung 52 eingehakt werden und so lagesicher an dem äußeren Schenkel 26 positioniert werden. Der Abstandshalter 54 reicht dabei nicht bis zur Wand 38 des U-förmigen Profilkörpers 32 hinab, sondern wird in einem vorbestimmten Abstand zum Boden 28 des U-Profils 22 gehalten.The undercuts 50 . 52 serve as a holding device for each spacer. At the undercut 52 in the left thigh 26 of the U-profile 22 is in the present example a as a spacer 54 attached trained spacer. The spacer 54 has a constant wall thickness and has in its upper part a hook training 56 on. With this hook training 56 can the spacer 54 at the undercut 52 be hooked and so secure on the outer leg 26 be positioned. The spacer 54 does not reach to the wall 38 of the U-shaped profile body 32 but is at a predetermined distance to the ground 28 of the U-profile 22 held.

An seinem oberen Randbereich weist der Abstandshalter 54 im vorliegenden Beispielsfall eine Nut 58 auf. In diese Nut 58 kann die Feder 60 eines Abdeckprofils 62 eingesetzt werden. Auf diese Weise kann das Abdeckprofil 62 formschlüssig an dem Abstandshalter 54 befestigt werden und sich auf diesem abstützen. Das Abdeckprofil 62 sorgt für einen optisch ansprechenden Abschluss des oberen Mündungsbereichs des U-Profils 22 und kann das Eindringen von Feuchtigkeit, beispielsweise durch Regen, in das U-Profil 22 verhindern. Im Gegensatz zu dem hier dargestellten Ausführungsbeispiel könnte der Abstandshalter 54 auch einteilig mit dem Abdeckprofil 62 verbunden sein.At its upper edge region, the spacer 54 in the present example, a groove 58 on. In this groove 58 can the spring 60 a cover profile 62 be used. In this way, the cover profile 62 positively on the spacer 54 be fastened and supported on this. The cover profile 62 ensures a visually appealing conclusion of the upper mouth area of the U-profile 22 and can the penetration of moisture, for example by rain, in the U-profile 22 prevent. In contrast to the embodiment shown here, the spacer could 54 also in one piece with the cover profile 62 be connected.

An der inneren Hinterschneidung 50 ist ein zweiteiliges Distanzglied 70 befestigt. Der erste Teil 72 dieses Distanzglieds 70 besitzt eine Hakenausbildung 74, mit der dieser Teil 72 an der Hinterschneidung 50 befestigt werden kann. Die Wandstärke des ersten Teils 72 des Distanzglieds 70 nimmt nach unten hin – weg von der Hakenausbildung 74 – zu, so dass sich ein keilförmiger Querschnitt ergibt. Zwischen den ersten Teil 72 des Distanzglieds 70 und die Glasscheibe 18 kann ein keilförmiger zweiter Teil 76 des Distanzglieds 70 eingeschoben werden. Durch unterschiedlich tiefes Positionieren dieses keilförmigen Teils 76 kann eine Ausrichtung der Glasscheibe 18 erfolgen. Der erste Teil 72 des Distanzglieds 70 weist darüber hinaus eine Nut 78 auf. In diese Nut 78 kann die Feder 60 des Abdeckprofils 62 eingeschoben werden, so dass auch auf dem Distanzglied 70 ein Abdeckprofil 60 positioniert werden kann.At the inner undercut 50 is a two-part spacer 70 attached. The first part 72 this spacer 70 has a hook training 74 with this part 72 at the undercut 50 can be attached. The wall thickness of the first part 72 of the spacer 70 goes down - away from hook training 74 - To, so that there is a wedge-shaped cross-section. Between the first part 72 of the spacer 70 and the glass pane 18 can be a wedge-shaped second part 76 of the spacer 70 be inserted. By positioning this wedge-shaped part at different depths 76 can be an orientation of the glass 18 respectively. The first part 72 of the spacer 70 also has a groove 78 on. In this groove 78 can the spring 60 of the cover profile 62 be pushed in, so also on the spacer 70 a cover profile 60 can be positioned.

Bei der Montage des Glasscheiben-Geländers 10 wird zunächst der U-förmige Profilkörper 32 in das U-Profil 22 von oben eingesetzt. In den U-förmigen Profilkörper 32 wird die Glasscheibe 18 eingesetzt. Anschließend wird der Abstandshalter 54 an der äußeren Hinterschneidung 52 angebracht. Die Glasscheibe 18 kann jetzt etwas gegen den Abstandshalter 54 gedrückt werden, um den ersten Teil 72 des zweiteiligen Distanzglieds 70 an der inneren Hinterschneidung 50 zu befestigen. Anschließend wird die Glasscheibe 18 durch unterschiedlich tiefes Einschieben des keilförmigen zweiten Teils 76 des Distanzglieds 70 in dem U-Profil 22 ausgerichtet. Im letzten Schritt wird jeweils ein Abdeckprofil 62 im Mündungsbereich des U-Profils 22 angebracht, um für einen optisch ansprechenden Abschluss zu sorgen.When installing the glass pane railing 10 is first the U-shaped profile body 32 in the U-profile 22 used from above. In the U-shaped profile body 32 becomes the glass pane 18 used. Subsequently, the spacer becomes 54 at the outer undercut 52 appropriate. The glass pane 18 can now do something against the spacer 54 be pressed to the first part 72 of the two-part spacer 70 at the inner undercut 50 to fix. Subsequently, will the glass pane 18 by inserting the wedge-shaped second part at different depths 76 of the spacer 70 in the U-profile 22 aligned. In the last step, a cover profile is created 62 in the mouth area of the U-profile 22 attached to provide a visually appealing finish.

Im vorliegenden Beispielsfall ist die auf den keilförmigen Teil 76 zu gerichtete Oberfläche des ersten Teils 72 des Distanzglieds 70 ebenso wie die Keilfläche des keilförmigen Teils 76 des Distanzglieds 70 gezackt ausgebildet. Durch die gezackten Oberflächen verhaken sich der erste Teil 72 und der zweite Teil 76 des Distanzglieds 70 miteinander, so dass ein unbeabsichtigtes Herausrutschen des zweiten Teils 76 verhindert werden kann.In the present example, this is on the wedge-shaped part 76 facing surface of the first part 72 of the spacer 70 as well as the wedge surface of the wedge-shaped part 76 of the spacer 70 formed serrated. The serrated surfaces catch the first part 72 and the second part 76 of the spacer 70 with each other, allowing unintentional slipping out of the second part 76 can be prevented.

Eine zweite Ausführungsform eines Glasscheiben-Geländers 10.3 ist in 3 dargestellt. Im Gegensatz zu dem Glasscheiben-Geländer 10 ist der Abstandshalter 54.3 des Glasscheiben-Geländers 10.3 ohne die Nut 58 ausgebildet. Statt dessen ist die Hakenausbildung 56.3 etwas flacher ausgebildet, so dass die Feder 60.3 des Abdeckprofils 62.3 in eine zwischen der Hinterschneidung 52 und dem Abstandshalter 54.3 vorhandene Nut eingesetzt werden kann. Auch hier könnte der Abstandshalter 54.3 einteilig mit dem Abdeckprofil 62.3 vorhanden sein.A second embodiment of a glass sheet railing 10.3 is in 3 shown. Unlike the glass pane railing 10 is the spacer 54.3 the glass pane railing 10.3 without the groove 58 educated. Instead, the hook training 56.3 something flatter, so that the spring 60.3 of the cover profile 62.3 in between the undercut 52 and the spacer 54.3 existing groove can be used. Again, the spacer could 54.3 in one piece with the cover profile 62.3 to be available.

Auf der dem Abstandshalter 54.3 gegenüber liegenden Seite der Glasscheibe 18 befindet sich in dem in 3 dargestellten Ausführungsbeispiel ein zweiteiliges Distanzglied 80. Der erste Teil 82 dieses Distanzglieds 80 ist etwa V-förmig ausgebildet und weist einen nach oben weisenden etwa senkrechten Schlitz 84 auf. Mittels einer Hakenausbildung 86 kann dieser erste Teil 82 des Distanzglieds 80 an der Hinterschneidung 50 des U-Profils 22 eingehängt werden. Ein keilförmiger zweiter Teil 88 des Distanzglieds 80 kann in den Schlitz 84 des V-förmigen Teils 82 von oben eingesetzt werden, wodurch die beiden Wandbereiche 90, 92 des V-förmigen Teils 82 auseinander gedrückt werden. Durch unterschiedlich tiefes Positionieren des keilförmigen Teils 88 kann eine Ausrichtung der Glasscheibe 18 erfolgen. Ebenso wie bei dem Ausführungsbeispiel gemäß 1 sind auch in diesem Ausführungsbeispiel die Wandbereiche 90, 92 des V-förmigen Teils 82 auf ihrer Innenseite gezackt ausgebildet. Der keilförmig zweite Teil 88 weist entsprechend zwei gezackte Außenwände auf, so dass ein unbeabsichtigtes Herausrutschen des zweiten Teils 88 verhindert werden kann.On the spacer 54.3 opposite side of the glass 18 is located in the 3 illustrated embodiment, a two-part spacer 80 , The first part 82 this spacer 80 is approximately V-shaped and has an upwardly pointing approximately vertical slot 84 on. By means of a hook training 86 can this first part 82 of the spacer 80 at the undercut 50 of the U-profile 22 be hung. A wedge-shaped second part 88 of the spacer 80 can in the slot 84 of the V-shaped part 82 be inserted from above, reducing the two wall areas 90 . 92 of the V-shaped part 82 be pressed apart. By varying the depth of the wedge-shaped part 88 can be an orientation of the glass 18 respectively. As in the embodiment according to 1 are also in this embodiment, the wall areas 90 . 92 of the V-shaped part 82 formed jagged on its inside. The wedge-shaped second part 88 has correspondingly two jagged outer walls, so that an accidental slipping out of the second part 88 can be prevented.

Zwischen dem V-förmigen ersten Teil 82 des Distanzglieds 80 und der Hinterschneidung 50 bleibt eine Nut frei. In diese Nut kann die Feder 60.3 eines Abdeckprofils 62.3 eingesetzt werden, so dass auch auf der Innenseite des U-Profils 22 ein optisch ansprechender Abschluss gegeben ist.Between the V-shaped first part 82 of the spacer 80 and the undercut 50 a groove remains free. In this groove, the spring 60.3 a cover profile 62.3 be used so that even on the inside of the U-profile 22 a visually appealing conclusion is given.

Bei einer dritten Ausführungsform des erfindungsgemäßen Glasscheiben-Geländers 10.5 gemäß 5 wird ein verändertes U-Profil 22.5 verwendet. Der äußere, linke Schenkel 26 des U-Profils 22.5 liegt unverändert gegenüber dem U-Profil 22 gemäß den 1 und 3 vor. An dem inneren, rechten Schenkel 24.5 des U-Profils 22.5 ist am oberen Randbereich unterhalb einer Nut 100 ein keilförmiger Vorsprung 102 an der Innenseite des Schenkels 24.5 angeformt. In die Nut 100 oberhalb des keilförmigen Vorsprungs 102 kann die Feder 60.3 des Abdeckprofils 62.3 eingesetzt werden.In a third embodiment of the glass sheet railing according to the invention 10.5 according to 5 becomes an altered U-profile 22.5 used. The outer left thigh 26 of the U-profile 22.5 is unchanged compared to the U-profile 22 according to the 1 and 3 in front. On the inner right thigh 24.5 of the U-profile 22.5 is at the upper edge area below a groove 100 a wedge-shaped projection 102 on the inside of the thigh 24.5 formed. In the groove 100 above the wedge-shaped projection 102 can the spring 60.3 of the cover profile 62.3 be used.

Im Bereich des keilförmigen Vorsprungs 102 weist der Schenkel 24.5 damit eine sich nach oben hin – weg vom Boden 28 des U-Profils 22.5 – verjüngende Wandstärke auf. Zwischen den Wandbereich des keilförmigen Vorsprungs 102 und die Glasscheibe 18 kann ein keilförmiges Distanzglied 104 eingeschoben werden. Durch unterschiedlich tiefes Positionieren des keilförmigen Distanzglieds 104 kann eine Ausrichtung der Glasscheibe 18 erfolgen. Damit wirkt der keilförmige Vorsprung 102 des U-Profils 22.5 selbst als Halteeinrichtung für das Distanzglied 104. Der Innen-Wandbereich des keilförmigen Vorsprungs 102 ist ebenso wie die auf diesen Wandbereich zu gerichtete Wand des keilförmigen Distanzglieds 104 gezackt ausgebildet, um ein unbeabsichtigtes Herausrutschen des keilförmigen Distanzglieds 104 zu verhindern.In the area of the wedge-shaped projection 102 points the thigh 24.5 with it one upwards away from the ground 28 of the U-profile 22.5 - tapered wall thickness. Between the wall area of the wedge-shaped projection 102 and the glass pane 18 can be a wedge-shaped spacer 104 be inserted. By varying depth positioning of the wedge-shaped spacer 104 can be an orientation of the glass 18 respectively. Thus, the wedge-shaped projection acts 102 of the U-profile 22.5 even as a holding device for the spacer 104 , The interior wall area of the wedge-shaped projection 102 is as well as the directed to this wall area wall of the wedge-shaped spacer 104 serrated to prevent accidental slipping out of the wedge-shaped spacer 104 to prevent.

Ein viertes Ausführungsbeispiel des erfindungsgemäßen Glasscheiben-Geländers 10.6 ist in 6 dargestellt. Dabei entspricht die Ausbildung des linken Schenkels 26 und des an dem linken Schenkel 26 eingehängten Abstandshalter 54 dem Ausführungsbeispiel gemäß 1.A fourth embodiment of the glass sheet railing according to the invention 10.6 is in 6 shown. This corresponds to the formation of the left leg 26 and on the left thigh 26 hinged spacers 54 the embodiment according to 1 ,

An der Hinterschneidung 50 des inneren Schenkels 24 ist ein zweiteiliges Distanzglied 70.6 eingehängt. Der erste Teil 72.6 dieses Distanzglieds 70.6 besitzt eine Hakenausbildung 74, mit der dieser Teil 72.6 an der Hinterschneidung 50 befestigt werden kann. Der erste Teil 72.6 des Distanzglieds 70.6 besitzt mehrere Vorsprünge 110. Die einzelnen Vorsprünge 110 sind jeweils so angeordnet, dass ein unterer Vorsprung gegenüber einem dazu oberen Vorsprung weiter in den Innenraum des U-Profils 22 hineinragt, so dass der erste Teil 72.6 des Distanzglieds 70.6 etwa keilförmig ausgebildet ist. Zwischen benachbarten Vorsprüngen 110 ist die Oberfläche des ersten Teils 72.6 des Distanzglieds 70.6 jeweils konkav ausgebildet, so dass ein stabförmiger zweiter Teil 76.6 des Distanzglieds 70.6, der im vorliegenden Beispielsfall einen kreisrunden Querschnitt mit konstantem Durchmesser aufweist, sicher zwischen zwei Vorsprüngen 110 positioniert werden kann, um die Glasscheibe 18 eingespannt zu halten.At the undercut 50 of the inner thigh 24 is a two-part spacer 70.6 hooked. The first part 72.6 this spacer 70.6 has a hook training 74 with this part 72.6 at the undercut 50 can be attached. The first part 72.6 of the spacer 70.6 has several projections 110 , The individual projections 110 are each arranged so that a lower projection opposite to an upper projection further into the interior of the U-profile 22 protrudes, so the first part 72.6 of the spacer 70.6 is formed about wedge-shaped. Between adjacent protrusions 110 is the surface of the first part 72.6 of the spacer 70.6 each concave, so that a rod-shaped second part 76.6 of the spacer 70.6 , which in the present example case has a circular cross section with constant diameter, safely between two projections 110 can be positioned to the glass pane 18 to be clamped.

Der erste Teil 72.6 des Distanzglieds 70.6 weist darüber hinaus eine Nut 78 auf. In diese Nut 78 kann die Feder 60 des Abdeckprofils 62 eingeschoben werden, so dass auch auf dem Distanzglied 70.6 ein Abdeckprofil 60 positioniert werden kann.The first part 72.6 of the spacer 70.6 also has a groove 78 on. In this groove 78 can the spring 60 of the cover profile 62 be pushed in, so also on the spacer 70.6 a cover profile 60 can be positioned.

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • DE 202007009239 U1 [0002] DE 202007009239 U1 [0002]
  • WO 2009/003452 A1 [0002] WO 2009/003452 A1 [0002]

Claims (9)

Scheiben-Geländer (10, 10.3, 10.5, 10.6) – mit einem formstabilen U-Profil (22, 22.5), zwischen dessen beiden Schenkeln (24, 24.5, 26) der Fußbereich (20) einer Scheibe, wie insbesondere der Glasscheibe (18) eines Geländers eingespannt haltbar ist, – mit Distanzgliedern (54, 54.3, 70, 70.6, 80, 104) im Mündungsbereich des U-Profils (22, 22.5) jeweils zwischen Scheibe (18) und einem Schenkel (24, 24.5, 26) des U-Profils (22, 22.5), – dadurch gekennzeichnet, dass – im oberen, freien Randbereich von zumindest einem der Schenkel (24, 24.5, 26) des U-Profils (22, 22.5) eine Halteeinrichtung (50, 52, 102) für ein an diesem Schenkel (24, 24.5, 26) vorhandenes Distanzglied (54, 54.3, 70, 70.6, 80, 104) so vorhanden ist, dass – durch die Halteeinrichtung (50, 52, 102) das betreffende Distanzglied (54, 54.3, 70, 70.6, 80, 104) in seinem vorbestimmten Abstand vom Boden (28) des U-Profils (22, 22.5) haltbar ist.Disc railing ( 10 . 10.3 . 10.5 . 10.6 ) - with a dimensionally stable U-profile ( 22 . 22.5 ), between the two thighs ( 24 . 24.5 . 26 ) the footer ( 20 ) a disc, in particular the glass pane ( 18 ) of a railing is preserved, - with spacers ( 54 . 54.3 . 70 . 70.6 . 80 . 104 ) in the mouth region of the U-profile ( 22 . 22.5 ) between each disc ( 18 ) and a thigh ( 24 . 24.5 . 26 ) of the U-profile ( 22 . 22.5 ), - characterized in that - in the upper, free edge region of at least one of the legs ( 24 . 24.5 . 26 ) of the U-profile ( 22 . 22.5 ) a holding device ( 50 . 52 . 102 ) for one on this leg ( 24 . 24.5 . 26 ) existing spacer ( 54 . 54.3 . 70 . 70.6 . 80 . 104 ) is present so that - by the holding device ( 50 . 52 . 102 ) the spacer in question ( 54 . 54.3 . 70 . 70.6 . 80 . 104 ) at its predetermined distance from the ground ( 28 ) of the U-profile ( 22 . 22.5 ) is durable. Scheiben-Geländer nach Anspruch 1, – dadurch gekennzeichnet, dass – in zumindest einem der Schenkel (24, 26) des U-Profils (22, 22.5) eine Hinterschneidung (50, 52) als Halteeinrichtung vorhanden ist, – eine Hakenausbildung (56, 74, 86) am Distanzglied (54, 54.3, 70, 70.6, 80) so vorhanden ist, dass das Distanzglied (54, 54.3, 70, 70.6, 80) lagesicher an dem Schenkel (24, 26) positionierbar ist. Disk railing according to claim 1, - characterized in that - in at least one of the legs ( 24 . 26 ) of the U-profile ( 22 . 22.5 ) an undercut ( 50 . 52 ) is present as a holding device, - a hook training ( 56 . 74 . 86 ) on the spacer ( 54 . 54.3 . 70 . 70.6 . 80 ) is present so that the spacer ( 54 . 54.3 . 70 . 70.6 . 80 ) secure on the leg ( 24 . 26 ) is positionable. Scheiben-Geländer nach Anspruch 1 oder 2, – dadurch gekennzeichnet, dass – in zumindest einem der Schenkel des U-Profils eine Nut als Halteeinrichtung vorhanden ist, – eine Feder am Distanzglied so vorhanden ist, dass das Distanzglied lagesicher an dem Schenkel positionierbar ist.Disk railing according to claim 1 or 2, - characterized in that In at least one of the legs of the U-profile a groove is present as a holding device, - A spring on the spacer member is present so that the spacer member is positionally positionable on the leg. Scheiben-Geländer nach einem der vorstehenden Ansprüche, – dadurch gekennzeichnet, dass – zumindest eines der Distanzglieder (54, 54.3) als Abstandshalter (54, 54.3) mit etwa konstanter Windstärke ausgebildet ist.Disk railing according to one of the preceding claims, - characterized in that - at least one of the spacers ( 54 . 54.3 ) as a spacer ( 54 . 54.3 ) is formed with approximately constant wind strength. Scheiben-Geländer nach einem der vorstehenden Ansprüche, – dadurch gekennzeichnet, dass – zumindest eines der Distanzglieder (70, 70.6) zweiteilig ausgebildet ist, – der an der Halteeinrichtung (50) positionierte erste Teil (72, 72.6) des Distanzglieds (70, 70.6) eine sich nach unten hin vergrößernde Wandstärke aufweist, – der zweite Teil (76, 76.6) des Distanzglieds (70, 70.6) keilförmig oder stabförmig ausgebildet ist und zwischen dem ersten Teil (72, 72.6) des Distanzglieds (70, 70.6) und der Glasscheibe (18) positioniert ist.Disk railing according to one of the preceding claims, - characterized in that - at least one of the spacers ( 70 . 70.6 ) is formed in two parts, - on the holding device ( 50 ) positioned first part ( 72 . 72.6 ) of the spacer ( 70 . 70.6 ) has a downwardly increasing wall thickness, - the second part ( 76 . 76.6 ) of the spacer ( 70 . 70.6 ) is wedge-shaped or rod-shaped and between the first part ( 72 . 72.6 ) of the spacer ( 70 . 70.6 ) and the glass pane ( 18 ) is positioned. Scheiben-Geländer nach einem der vorstehenden Ansprüche, – dadurch gekennzeichnet, dass – zumindest eines der Distanzglieder (80) zweiteilig ausgebildet ist, – der an der Halteeinrichtung (50) positionierte erste Teil (82) des Distanzglieds (80) einen nach oben offenen Schlitz (84) aufweist, – der zweite Teil (88) des Distanzglieds (80) keilförmig ausgebildet ist und zwischen den beiden Wandbereichen (90, 92) des ersten Teils (82) des Distanzglieds (80) positioniert ist.Disk railing according to one of the preceding claims, - characterized in that - at least one of the spacers ( 80 ) is formed in two parts, - on the holding device ( 50 ) positioned first part ( 82 ) of the spacer ( 80 ) an upwardly open slot ( 84 ), - the second part ( 88 ) of the spacer ( 80 ) is wedge-shaped and between the two wall areas ( 90 . 92 ) of the first part ( 82 ) of the spacer ( 80 ) is positioned. Scheiben-Geländer nach einem der vorstehenden Ansprüchen, – dadurch gekennzeichnet, dass – im oberen Randbereich von zumindest an einem der beiden Schenkel (24.5) des U-Profils (22.5) ein keilförmiger Vorsprung (102) mit sich nach oben verjüngender Wandstärke einteilig angeformt ist, – ein keilförmiges Distanzglied (104) zwischen dem keilförmigen Vorsprung (102) dieses Schenkels (24.5) des U-Profils (22.5) und der Glasscheibe (18) positioniert ist.Disk railing according to one of the preceding claims, - characterized in that - in the upper edge region of at least one of the two legs ( 24.5 ) of the U-profile ( 22.5 ) a wedge-shaped projection ( 102 ) is integrally formed with upwardly tapering wall thickness, - a wedge-shaped spacer ( 104 ) between the wedge-shaped projection ( 102 ) of this leg ( 24.5 ) of the U-profile ( 22.5 ) and the glass pane ( 18 ) is positioned. Scheiben-Geländer nach einem der vorstehenden Ansprüche, – dadurch gekennzeichnet, dass – ein den oberen Mündungsbereich des U-Profils (22, 22.5) jeweils seitlich der Scheibe (18) abdeckendes Abdeckprofil (62, 62.3) vorhanden ist, – das Abdeckprofil (62, 62.3) als ein sich lastmäßig auf einem Distanzglied (54, 54.3, 70, 70.6, 80) abstützender Körper und/oder als ein sich an Vorsprüngen des betreffenden Schenkels des U-Profils form- und/oder kraftschlüssig befestigbarer Körper ausgebildet ist.Disk railing according to one of the preceding claims, - characterized in that - a the upper mouth region of the U-profile ( 22 . 22.5 ) each side of the disc ( 18 ) covering cover profile ( 62 . 62.3 ), - the cover profile ( 62 . 62.3 ) as a load on a spacer ( 54 . 54.3 . 70 . 70.6 . 80 ) abstützender body and / or is designed as a protrusions of the respective leg of the U-profile form-fitting and / or non-positively fastened body. Scheiben-Geländer nach Anspruch 8, – dadurch gekennzeichnet, dass – das Abdeckprofil einteilig mit dem Distanzglied verbunden ist.Disc railing according to claim 8, - characterized in that - The cover is integrally connected to the spacer.
DE202010016190U 2010-12-06 2010-12-06 Disc railings Expired - Lifetime DE202010016190U1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
DE202010016190U DE202010016190U1 (en) 2010-12-06 2010-12-06 Disc railings
PL11009505T PL2460949T3 (en) 2010-12-06 2011-12-01 Panelled balustrade
DK11009505.6T DK2460949T3 (en) 2010-12-06 2011-12-01 Panel railing
EP11009505.6A EP2460949B1 (en) 2010-12-06 2011-12-01 Panelled balustrade
ES11009505T ES2570780T3 (en) 2010-12-06 2011-12-01 Glass plate railing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE202010016190U DE202010016190U1 (en) 2010-12-06 2010-12-06 Disc railings

Publications (1)

Publication Number Publication Date
DE202010016190U1 true DE202010016190U1 (en) 2011-04-21

Family

ID=43902404

Family Applications (1)

Application Number Title Priority Date Filing Date
DE202010016190U Expired - Lifetime DE202010016190U1 (en) 2010-12-06 2010-12-06 Disc railings

Country Status (5)

Country Link
EP (1) EP2460949B1 (en)
DE (1) DE202010016190U1 (en)
DK (1) DK2460949T3 (en)
ES (1) ES2570780T3 (en)
PL (1) PL2460949T3 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202012001104U1 (en) 2012-02-03 2012-03-05 René Bangratz Floor-wall element for securing the position of the glass pane of a railing construction
WO2013113298A1 (en) 2012-02-03 2013-08-08 Bangratz Rene Floor/wall element for securing the position of a glass pane of a handrail structure
DE102012002057A1 (en) 2012-02-03 2013-08-08 René Bangratz Floor-wall-element for securing position of plate, particularly glass panel of rail construction, has target bending area, by which floor-wall-element is bent from starting position into U-shaped mounting position
US20150110552A1 (en) * 2013-10-21 2015-04-23 Qingdao Jinfer International Trading Co., Ltd Concealable Clamping System for Mounting Partitions
DE202015106963U1 (en) * 2015-12-21 2017-03-22 Mogla-Tech Ag Glass railing support structure and wedge profile part for use in such an arrangement
EP3179007A1 (en) * 2015-12-11 2017-06-14 Oy Steelpro Ltd Adjustable glass rail structure
WO2018011309A1 (en) * 2016-07-12 2018-01-18 Bohle Ag Device for fastening a panel-shaped component in a receiving groove of a carrying rail
IT201700024918A1 (en) * 2017-03-07 2018-09-07 Logli Massimo S P A SUPPORT SYSTEM FOR PANEL
DE102018002438A1 (en) * 2018-03-20 2019-09-26 René Bangratz U-profile with installation element
DE102018006913A1 (en) * 2018-08-28 2020-03-05 Pablo Bangratz Support profile with control element

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202017105698U1 (en) 2017-09-20 2017-12-21 Q-Railing Europe Gmbh & Co. Kg System for fixing railing panels

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202007009239U1 (en) 2007-07-02 2007-09-06 Bangratz, René, Dipl.-Ing. Glass pane-rail, has wedge inserted between glass pane and side pieces, where free space between pane and U-section is filled with fluent or sealing compound in form of paste, and base area of pane provided in partial area of outer sides

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2041669A5 (en) * 1969-05-21 1971-01-29 Altulor Sa
BE801568A (en) * 1973-06-28 1973-10-15 Decorophone P V B A IMPROVED PANEL FASTENING
US4690383A (en) * 1986-04-04 1987-09-01 Craneveyor Corp. Panel rail system
FR2725744A1 (en) * 1994-10-13 1996-04-19 Atelier Construction Laplace Safety barrier for curved balcony
US6517056B2 (en) * 2000-03-30 2003-02-11 John D. Shepherd Railing assembly
EP1647663B1 (en) * 2004-10-13 2008-06-11 Alfons Oberhofer Fastener for a panel element
NL1030412C2 (en) * 2005-11-14 2007-05-15 Safety Level B V Balustrade panel mounting system for e.g. balcony, has panel holder beam secured to floor by additional fastener strip on bottom side of beam

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202007009239U1 (en) 2007-07-02 2007-09-06 Bangratz, René, Dipl.-Ing. Glass pane-rail, has wedge inserted between glass pane and side pieces, where free space between pane and U-section is filled with fluent or sealing compound in form of paste, and base area of pane provided in partial area of outer sides
WO2009003452A1 (en) 2007-07-02 2009-01-08 Bangratz Rene Glass panel railing

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013113298A1 (en) 2012-02-03 2013-08-08 Bangratz Rene Floor/wall element for securing the position of a glass pane of a handrail structure
DE102012002057A1 (en) 2012-02-03 2013-08-08 René Bangratz Floor-wall-element for securing position of plate, particularly glass panel of rail construction, has target bending area, by which floor-wall-element is bent from starting position into U-shaped mounting position
DE202012001104U1 (en) 2012-02-03 2012-03-05 René Bangratz Floor-wall element for securing the position of the glass pane of a railing construction
US20150110552A1 (en) * 2013-10-21 2015-04-23 Qingdao Jinfer International Trading Co., Ltd Concealable Clamping System for Mounting Partitions
EP3179007A1 (en) * 2015-12-11 2017-06-14 Oy Steelpro Ltd Adjustable glass rail structure
EP3199738A2 (en) 2015-12-21 2017-08-02 moGla-Tech AG Glass railing holder assembly and wedge profile section for use in such an assembly
DE202015106963U1 (en) * 2015-12-21 2017-03-22 Mogla-Tech Ag Glass railing support structure and wedge profile part for use in such an arrangement
WO2018011309A1 (en) * 2016-07-12 2018-01-18 Bohle Ag Device for fastening a panel-shaped component in a receiving groove of a carrying rail
US10640985B2 (en) 2016-07-12 2020-05-05 Bohle Ag Device for fastening a panel-shaped component in a receiving groove of a carrying rail
IT201700024918A1 (en) * 2017-03-07 2018-09-07 Logli Massimo S P A SUPPORT SYSTEM FOR PANEL
EP3372748A1 (en) * 2017-03-07 2018-09-12 Logli Massimo S.P.A. Panel support apparatus
DE102018002438A1 (en) * 2018-03-20 2019-09-26 René Bangratz U-profile with installation element
DE102018006913A1 (en) * 2018-08-28 2020-03-05 Pablo Bangratz Support profile with control element

Also Published As

Publication number Publication date
DK2460949T3 (en) 2016-06-06
PL2460949T3 (en) 2016-08-31
EP2460949B1 (en) 2016-03-02
ES2570780T3 (en) 2016-05-20
EP2460949A1 (en) 2012-06-06

Similar Documents

Publication Publication Date Title
DE202010016190U1 (en) Disc railings
EP2649256B1 (en) Panelled balustrade
EP2649255B1 (en) Panel railing
EP3260624B1 (en) Panel railing
DE102010053409A1 (en) U-shaped profile for clamped support of sheet of glass sheet railing, is clamped between two legs of foot area of sheet, particularly glass sheet of railing, which is stably fixed on structure
DE202009013904U1 (en) Room-high glazing
DE102010053407A9 (en) Disc railings
DE202016101593U1 (en) Device against the ingress of liquids
CH460296A (en) Edge covering for flat roofs, pitched roofs, terrace floors and the like
WO2012075996A1 (en) U-section for mounting a railing panel in a fixed manner
EP2460947B1 (en) Glazing
DE102010053408A1 (en) Sheet railing, particularly glass sheet railing, comprises dimensionally stable U-shaped profile, which is clamped between two legs of foot area of sheet, particularly glass sheet of railing
AT513622A4 (en) Tool-free mounting device for surface elements
DE102017000924A1 (en) plate holder
DE202006009323U1 (en) Profile frame for balcony safety screen around safety glass panel has slide-fit attachments to C-profile
EP2995737B1 (en) Roof which can be attached to a vertical wall
EP2586928B1 (en) Plate holder particularly for glass panels
EP2809854B1 (en) Floor/wall element for securing the position of a glass pane of a handrail structure
DE202010003684U1 (en) Glasfalzeinlage and door or window sash with such
EP1165902A1 (en) Kit of constructional elements for producing a latticed support structure
DE202012001104U1 (en) Floor-wall element for securing the position of the glass pane of a railing construction
EP3910125A1 (en) Support structure for suspending at least one sound absorber from a ceiling, system for improving the acoustics in a room
DE29520517U1 (en) Threshold
DE102021102882A1 (en) mesh fence
DE102012002057A1 (en) Floor-wall-element for securing position of plate, particularly glass panel of rail construction, has target bending area, by which floor-wall-element is bent from starting position into U-shaped mounting position

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20110526

R163 Identified publications notified
R163 Identified publications notified

Effective date: 20110909

R150 Utility model maintained after payment of first maintenance fee after three years

Effective date: 20140108

R157 Lapse of ip right after 6 years
R082 Change of representative

Representative=s name: GLEIM PETRI PATENT- UND RECHTSANWALTSPARTNERSC, DE